Escolar Documentos
Profissional Documentos
Cultura Documentos
Type : A340
Rev. Date : Jul 01, 2016
Manual : AMM
Selected applicability : ALL
24-26 - GALLEY SUPPLY CONTROL
** ON A/C ALL
Page 1 of 16
Customer : MHK
Type : A340
Rev. Date : Jul 01, 2016
Manual : AMM
Selected applicability : ALL
24-26 - GALLEY SUPPLY CONTROL
1XA
PANEL 235VU
F_MM_242600_0_AAM0_01_00
Page 2 of 16
Customer : MHK
Type : A340
Rev. Date : Jul 01, 2016
Manual : AMM
Selected applicability : ALL
24-26 - GALLEY SUPPLY CONTROL
FIN
FUNCTIONAL DESIGNATION
PANEL
ZO
NE
ACCESS
DOOR
ATA REF
1XA
P/BSW - ELEC/GALLEY
235VU 210
24-26-00
3. System Description
The galley general supply is controlled from the cockpit overhead panel by means of the ELEC/GALLEY
pushbutton switch (in normal operation the pushbutton switch is pushed in).
This pushbutton switch is used:
to shed all the galley loads and,
to reset the galley loads automatically shed after an overload detection by the Electrical Contactor
Management Unit (ECMU).
A. Galley Automatic Shedding Logic
The galley automatic shedding logic is performed by the ELMU and the ECMU. (see Ref. 24-29-00 and
24-54-00)
4. Operation/Control and Indicating
A. Galley Automatic Shedding
(Ref. Fig. Galley Control - Block Diagram SHEET 1)
Page 3 of 16
Customer : MHK
Type : A340
Rev. Date : Jul 01, 2016
Manual : AMM
Selected applicability : ALL
24-26 - GALLEY SUPPLY CONTROL
116MC
RCCB 12
OVERLOAD
117MC
RCCB 11
M
E
M
O
R
I
Z
A
T
I
O
N
1XU3
GCU 1
SAME AS
GCU 1
1XU4
GCU 2
15MC
RCCB 9
CONTROL
LOGIC
5MC
103PP
28VDC
6XA1
1MC
11MC
RCCB 1
103PP
28VDC
12MC
RCCB 3
SAME AS
GCU 1
111MC
RCCB 2
EXT POWER A
112MC
RCCB 7
APU
40XG
GAPCU
SAME AS
GCU 1
CTLD BY
COMMERCIAL
P/B SW
1XM1 ECMU 1
1XA P/B SW
RESET
EXT POWER B
SAME AS
GCU 1
FAULT
OFF
RESET
SAME AS
GCU 1
1XL ELMU
2XA1
M
E
M
O
R
I
Z
A
T
I
O
N
1XU1
GCU 3
SAME AS
GCU 1
1XM2 ECMU 2
3XA
23MC
RCCB 4
CONTROL
LOGIC
2MC
24MC
RCCB 5
206PP
28VDC
224MC
RCCB 6
223MC
RCCB 8
1XU2
GCU 4
24XN
RLY
601PP
28VDC
115MC
RCCB 10
2XA2
4MC
6XA2
206PP
28VDC
1XL
ELMU
F_MM_242600_0_AJF0_01_00
Page 4 of 16
Customer : MHK
Type : A340
Rev. Date : Jul 01, 2016
Manual : AMM
Selected applicability : ALL
24-26 - GALLEY SUPPLY CONTROL
In normal operation, the ELMU performs the shedding function, the ECMU is in standby mode, but if the
ELMU is not operative (failure or OFF mode), the ECMU galley shedding function is activated.
This function consists in controlling the galley RCCBs (Remote Control Circuit Breakers) which serve to
shed the galleys according to the electrical sources available and the generator overloads if any.
(1)
ELMU principle
The Electrical Load Management System (ELMS) sheds or restores electrical loads to different systems
in accordance with a level of priority given to each load managed. To do this, it uses a computer, the
Electrical Load Management Unit (ELMU), which monitors the power output from each of the AC power
sources (IDGs, APU generator, ground power units). When there is an overload, the ELMU sheds
electrical loads in a sequence of priority, and when the available capacity of the generator is sufficient
again, it restores the loads, again in a sequence of priority.
Thus, the ELMU ensures optimum utilization of the power available on the power sources.
(2)
(3)
Each logic function is programmed into a specific logic circuit. Each galley RCCB and the
relays (2XA1, 2XA2, 6XA1, 6XA2) control the logic.
B. Loss of one or more IDG(s)
(Ref. Fig. EXT PWR A (B) Overload Configuration - EWD/SD)
Page 5 of 16
ACTION ON
CLEAR P/B SW
(ON ECAM
CONTROL PANEL)
- RELEASED - OUT
GALLEY P/B SW
MANUAL CREW
ACTION
OVERLOAD ON
THE EXT PWR A(B)
SYST
CONFIG
OFF
FAULT
GALLEY
WHITE "OFF"
OFF
FAULT
GALLEY
AMBER "FAULT"
OFF
FAULT
GALLEY
SYS IMD ON
OVHD PANEL
MASTER
CAUT
SINGLE
CHIME
WARNING
NORMAL CONFIG
STS
GALLEY........OFF
EWD
STATUS
GALLEY
INOP SYS:
ELEC AC PAGE
IS DISPLAYED
(SHEET 2)
SD
Customer : MHK
Type : A340
Rev. Date : Jul 01, 2016
Manual : AMM
Selected applicability : ALL
F_MM_242600_0_APNA_01_00
Figure 24-26-00-15550-00-B / SHEET 1/2 - EXT PWR A (B) Overload Configuration - EWD/SD
** ON A/C ALL
Page 6 of 16
Customer : MHK
Type : A340
Rev. Date : Jul 01, 2016
Manual : AMM
Selected applicability : ALL
24-26 - GALLEY SUPPLY CONTROL
2WK2
SD
F_MM_242600_0_APNA_02_00
Figure 24-26-00-15550-00-B / SHEET 2/2 - EXT PWR A (B) Overload Configuration - EWD/SD
** ON A/C ALL
Print Date: October 31, 2016
AIRBUS S.A.S. ALL RIGHTS RESERVED. CONFIDENTIAL AND PROPRIETARY DOCUMENT.
Page 7 of 16
Customer : MHK
Type : A340
Rev. Date : Jul 01, 2016
Manual : AMM
Selected applicability : ALL
24-26 - GALLEY SUPPLY CONTROL
Page 8 of 16
Customer : MHK
Type : A340
Rev. Date : Jul 01, 2016
Manual : AMM
Selected applicability : ALL
24-26 - GALLEY SUPPLY CONTROL
2WK2
SD
F_MM_242600_0_ARN0_01_00
Figure 24-26-00-15300-00-C / SHEET 1/1 - Loss of One IDG - System Display (SD)
** ON A/C ALL
Print Date: October 31, 2016
AIRBUS S.A.S. ALL RIGHTS RESERVED. CONFIDENTIAL AND PROPRIETARY DOCUMENT.
Page 9 of 16
Customer : MHK
Type : A340
Rev. Date : Jul 01, 2016
Manual : AMM
Selected applicability : ALL
24-26 - GALLEY SUPPLY CONTROL
If the Electronic Load Management Unit (ELMU) is operational, it will shed the loads only if there is an
overload on the power supply source.
If the ELMU sheds galley's load, the messages GALLEY PARTIALLY SHED or GALLEY SHED are
displayed on the ELEC AC page of the system display (SD).
C. Galleys Shedding with the COMMERCIAL pushbutton switch
(Ref. Fig. Commercial P/BSW in OFF Position - System Display (SD) SHEET 1)
Page 10 of 16
Customer : MHK
Type : A340
Rev. Date : Jul 01, 2016
Manual : AMM
Selected applicability : ALL
24-26 - GALLEY SUPPLY CONTROL
2WK2
SD
F_MM_242600_0_AZMA_01_00
Figure 24-26-00-15500-00-A / SHEET 1/1 - Commercial P/BSW in OFF Position - System Display (SD)
** ON A/C ALL
Print Date: October 31, 2016
AIRBUS S.A.S. ALL RIGHTS RESERVED. CONFIDENTIAL AND PROPRIETARY DOCUMENT.
Page 11 of 16
Customer : MHK
Type : A340
Rev. Date : Jul 01, 2016
Manual : AMM
Selected applicability : ALL
24-26 - GALLEY SUPPLY CONTROL
When the crew release the COMMERCIAL pushbutton switch, all the galleys are shed.
The COMMERCIAL OFF indication is shown on the SD, on the ELEC AC page.
The commercial indications are shown on the SD, on the STATUS page.
Figure 24-26-00-12200-00-A / SHEET 1/1 - Galley Supply Control - Component Location
Figure 24-26-00-14700-00-M / SHEET 1/1 - Galley Control - Block Diagram
Figure 24-26-00-15300-00-C / SHEET 1/1 - Loss of One IDG - System Display (SD)
Figure 24-26-00-15500-00-A / SHEET 1/1 - Commercial P/BSW in OFF Position - System Display (SD)
Figure 24-26-00-15550-00-B / SHEET 1/2 - EXT PWR A (B) Overload Configuration - EWD/SD
Figure 24-26-00-15550-00-B / SHEET 2/2 - EXT PWR A (B) Overload Configuration - EWD/SD
Access
YES
Test
NO
1.
Mhr
00.2
E/T
00.2
Nb Men
1
B.
Specific Tools
NO
QTY DESIGNATION
AR ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE
AR SAFETY CLIP - CIRCUIT BREAKER
ZONE DESCRIPTION
AVIONICS COMPARTMENT
C. Referenced Information
REFERENCE
(Ref. 24-41-00-861-801-A).
(Ref. 24-41-00-861-801-A-01).
(Ref. 24-41-00-861-801-A-03).
(Ref. 24-41-00-861-801-A-04).
DESIGNATION
Energize the Aircraft Electrical Circuits from the External Power A
Energize the Aircraft Electrical Circuits from the APU (APU Started
with APU BAT)
Energize the Aircraft Electrical Circuits from the External Power A and
B
Energize the Aircraft Electrical Circuits from the APU (APU started with
External power A)
Page 12 of 16
Customer : MHK
Type : A340
Rev. Date : Jul 01, 2016
Manual : AMM
Selected applicability : ALL
24-26 - GALLEY SUPPLY CONTROL
REFERENCE
(Ref. 24-41-00-861-801-A-05).
(Ref. 24-41-00-862-801-A).
(Ref. 24-41-00-862-801-A-01).
(Ref. 24-41-00-862-801-A-03).
(Ref. 24-41-00-862-801-A-04).
3.
DESIGNATION
Energize the Aircraft Electrical Circuits from the External Power B
De-energize the Aircraft Electrical Circuits from the External Power A
De-energize the Aircraft Electrical Circuits from the APU
De-energize the Aircraft Electrical Circuits from the External Power A
and B
De-energize the Aircraft Electrical Circuits from the External Power B
Job Set-up
Subtask 24-26-00-010-050-A
A.
Subtask 24-26-00-860-050-A
B.
Subtask 24-26-00-865-050-A
C.
4.
DESIGNATION
GALLEY SYS 1
GALLEY SHED
GALLEY SYS 2
FIN
1MC
3XA
2MC
LOCATION
T14
N44
S36
Procedure
Subtask 24-26-00-040-050-A
A.
5.
Close-up
Subtask 24-26-00-862-050-A
A.
Subtask 24-26-00-410-050-A
B.
Close Access
(1) Close the access door 811.
Page 13 of 16
Customer : MHK
Type : A340
Rev. Date : Jul 01, 2016
Manual : AMM
Selected applicability : ALL
24-26 - GALLEY SUPPLY CONTROL
B.
QTY DESIGNATION
AR ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE
ZONE DESCRIPTION
AVIONICS COMPARTMENT
C. Referenced Information
REFERENCE
(Ref. 24-41-00-861-801-A).
(Ref. 24-41-00-861-801-A-01).
(Ref. 24-41-00-861-801-A-03).
(Ref. 24-41-00-861-801-A-04).
(Ref. 24-41-00-861-801-A-05).
(Ref. 24-41-00-862-801-A).
(Ref. 24-41-00-862-801-A-01).
(Ref. 24-41-00-862-801-A-03).
(Ref. 24-41-00-862-801-A-04).
3.
DESIGNATION
Energize the Aircraft Electrical Circuits from the External Power A
Energize the Aircraft Electrical Circuits from the APU (APU Started
with APU BAT)
Energize the Aircraft Electrical Circuits from the External Power A and
B
Energize the Aircraft Electrical Circuits from the APU (APU started with
External power A)
Energize the Aircraft Electrical Circuits from the External Power B
De-energize the Aircraft Electrical Circuits from the External Power A
De-energize the Aircraft Electrical Circuits from the APU
De-energize the Aircraft Electrical Circuits from the External Power A
and B
De-energize the Aircraft Electrical Circuits from the External Power B
Job Set-up
Subtask 24-26-00-861-050-A
A.
Subtask 24-26-00-010-051-A
B.
Subtask 24-26-00-865-051-A
Print Date: October 31, 2016
AIRBUS S.A.S. ALL RIGHTS RESERVED. CONFIDENTIAL AND PROPRIETARY DOCUMENT.
Page 14 of 16
Customer : MHK
Type : A340
Rev. Date : Jul 01, 2016
Manual : AMM
Selected applicability : ALL
24-26 - GALLEY SUPPLY CONTROL
C.
Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
PANEL
721VU
722VU
722VU
4.
DESIGNATION
GALLEY SYS 1
GALLEY SHED
GALLEY SYS 2
FIN
1MC
3XA
2MC
LOCATION
T14
N44
S36
Procedure
Subtask 24-26-00-860-051-A
A.
Subtask 24-26-00-440-050-A
B.
5.
Close-up
Subtask 24-26-00-410-051-A
A.
Close Access
(1) Close the access door 811.
(2) Remove the access platform(s).
TASK 24-26-00-040-802-A
Operational Test of Commercial Load Shedding
Task Summary
MMEL or CDL Ref
MMEL 24-26-01B
Access
NO
1.
Specific Tools
NO
Mhr
00.3
E/T
00.3
Nb Men
1
Referenced Information
REFERENCE
(Ref. 24-51-00-710-801-A).
3.
Test
NO
DESIGNATION
Operational Test of Commercial Load Shedding
Job Set-up
Subtask 24-26-00-869-050-A
A.
4.
Not applicable.
Procedure
Page 15 of 16
Customer : MHK
Type : A340
Rev. Date : Jul 01, 2016
Manual : AMM
Selected applicability : ALL
24-26 - GALLEY SUPPLY CONTROL
Subtask 24-26-00-710-050-A
A.
Do the operational test of commercial load shedding (Ref. AMM TASK 24-51-00-710-801) .
End of document
Page 16 of 16