Escolar Documentos
Profissional Documentos
Cultura Documentos
c)
d)
No change has been seen and the concerns remains the same
Small positives have been observed (like lower transactional
costs, better understanding of projects by bank officials, etc.)
but much is still solicited
Things have greatly improved like the EE loan applications are
entertained and unattractive financial terms due to high risk
perception have eased
Others (please write a line explaining your part if this option is
selected)
2. How responsive the government & international agencies were found out
during the project:
a)
b)
c)
d)
c)
d)
b)
d)
b)
c)
d)
6. Will you recommend the cluster level workshops in near future as the right
platform to hold discussions or meetings:
a)
b)
c)
d)
7. Moving ahead from our initial question about the central financial
institutions, do you foresee any change at the local bank level while
interacting with them:
a)
b)
c)
Yes, the local bankers are now much more responsive &
understanding of our challenges & limitations while reviewing
our proposal for implementation of an energy efficient
technology
The local bankers have become receptive to our needs and
limitations to a certain extent, however, still a lot needs to be
done before we can term it a considerable change
The local bankers now do understand the scenario of local
b)
c)
d)
No, there has been no support from any agency in getting the
soft costs covered which we incur while endeavouring to
implement a EE project
No, there has been no support because we were not able to
fulfil the requirements that were required for being eligible
Yes, there have been partial assistance in which they did
covered some of the expense that we incurred but the
umbrella of assistance needs to be enhanced
Yes, the agencies were really cooperative and covered
whatever viable soft costs we incurred during the whole
process of implementation
9. Did you got any support from your local association which was also part of
the programme:
a)
b)
c)
d)
10.Have you gone through the DPR submitted for your unit and implemented
any of the proposed energy efficiency measures:
a)
b)
c)
d)
f)
11.What are the possible reasons you perceive that some of the feasible
technologies have failed to take off and get replicated across the sector:
a)
b)
c)
d)
e)
12.Do you think the implementation was enacted as per the plan:
a)
b)
c)
d)
e)
c)
d)
b)
c)
d)
e)
No, were not aware that any such agency exists who can be
approached for financing of EE project
No, since we cannot fulfil the minimum criteria required for a
loan so we have never got in touch with them
Yes, have submitted a proposal to them but was turned down
because of certain technical and financial shortcomings
Yes, have secured a loan but encountered several other
challenges during the process which should have been more
user friendly
Yes, the process was hassle free and have gone ahead with the
implementation of project/technology
16.Do you find the training material compiled in by the experts in line with
your requirements:
a)
b)
c)
d)
17.Kindly populate your total savings which have been accrued after
implementing of energy efficiency measures:
a)
b)