KING ABDULLAH SPORTS CITY

CONTRACT NO. 6600027544 (IK)


TYPE:

AS-BUILT DRAWING
TITLE:

MAIN STADIUM PAVA SYSTEM UPS POWER CABLE LAYOUT ECC ROOM (ASBUILT SUBMITTED AFTER IN-CORPORATING REDLINE COMMENTS)

X MS - Main Stadium

Part:

SH - Sports Hall

MO - Mosque

X ME - Mechanical & Electrical Works

ST - Structural Works

AR - Architectural Works

CS - Civil Works

PM - Project Management

Trade :

DOCUMENT'S STATUS

EX - External Works

COMMENTS

ACCEPTED (ACC)

ACCEPTED WITH COMMENTS (AWC)

TO RESUBMIT (TRS)

REJECTED (REJ)

NAME:

POSITION:

DATE:

SIGNATURE:

ISSUER
Rev.

Date

16-Aug-16

Description

MAIN STADIUM PAVA SYSTEM UPS POWER CABLE LAYOUT ECC ROOM (AS-BUILT
SUBMITTED AFTER IN-CORPORATING REDLINE COMMENTS)

Initiated

Verified

VEN

VEN

Sample?

NAME: MR.LINGAIAH VENKAT

POSITION: PRB LEAD

DATE: 16/8/2016

M S

M E

E A

S A M

D W G

Number of
Pages: 1

SIGNATURE:

DOCUMENT CODE
K A S C

Approved

REV.

4 0

7 8 2 8 1 5

A0

Notes
1.

This drawing shell be read in conjunction with


KASC-MS-ME-IT-SAM-DWG-40-852368.

UPS AC INPUT
3

CU/XLPE/PVC

CU/XLPE/PVC

AC-Input
TO MBP
5

Cable Direction Schedule:


FR: TRANSFORMER SEC. OUTPUT TB L1,L2,L3
TO: AC INPUT MANUAL BYPASS TERMINAL E1,E2,E3

UPS Output

FR: TRANSFORMER SECONDARY CKT.BRK. L1,L2,L3


TO: AC INPUT UPS RECTIFIER TERMINAL E1,E2,E3

FR: UPS AC INPUT UPS TERMINAL E9,E10,E11


TO: MBP CRITICAL LOAD DIST. TERM E9,E10,E11
FR: UPS AC INPUT TERMINAL E6,E7,E8
TO: MANUAL BYPASS TERMINAL E6,E7,E9

CU/XLPE/PVC

FR: PDU MAIN INPUT CKT.BREAKER


TO: MBP CRITICAL LOAD DIST. TERMINAL L1,L2,L3
FR: AC INPUT MANUAL BYPASS TERMINAL E1,E2,E3
TO: TRANSFORMER SEC. OUTPUT TB L1,L2,L3
FR: AC INPUT UPS RECTIFIER TERMINAL E1,E2,E3
TO: TRANSFORMER SECONDARY CKT.BRK. L1,L2,L3

10

CU/XLPE/PVC
To Distribution Panel (Critical Load)

FR: MBP CRITICAL LOAD DIST. TERM E9,E10,E11


TO: UPS AC INPUT UPS TERMINAL E9,E10,E11

16/08/16

MAM

AM

PMT/KASCOD

AS-BUILT
3

11/07/16

MOHI

TG

JG

SD

JD

MR

SD

JD

MR

By

Chkd

Appd

REDLINE
2

01/06/15
Second Issue

FR: MANUAL BYPASS TERMINAL E6,E7,E9


TO: UPS AC INPUT TERMINAL E6,E7,E8

11

06/08/14
First Issue

Rev

Date

Key Plan

24 25

FR: MBP CRITICAL LOAD DIST. TERMINAL L1,L2,L3


TO: PDU MAIN INPUT CKT.BREAKER
1

48

96

49

Equipment's Schedule:

12

ITEM

UPS MODEL

Description

Labeling

Qty

UNIT
73 72

EATON PW9155-15

Capacity: Rated at 15KVA /13.5KW


Input Voltage: 220VAC 60Hz 2-Phase 2W+N

PAVA-4.1-UPS
STA-91-4.1-001

SET

Client

Output Voltage: 220VAC 60Hz, 2 Phase 2W+N

13

Contractor

Manual Bypass

BPE-20, 300volts, 125 kmp, 1Phase

PAVA-4.1-MBP
STA-91-4.1-001

SET

Transfermer

90KVA Input Isolation

PAVA-4.1-X'FORMER
STA-91-4.1-001

SET

14

Primary Voltage: 400V 3W

CU/XLPE/PVC

Al Muhaidib Six Construct.


P.O.Box:9493
Dammam 31463
Kingdom of Saudi Arabia

Lead Consultant

Job No

ABOVE CEILING

218250
13 Fitzroy Street, London W1T 4BQ
Tel +44 (0)20 7636 1531 Fax +44 (0)20 7580 3924
www.arup.com

Secondary Voltage: 220V 4W

Trade Subcontractor

Trade Designer

Phase - Three
Battery
15

Battery
Battery
Battery
Battery
16

EBM64 (Extended Battery Module) +1 Internal Battery


IBC (Integrated Battery Cabinet)
Battery Type: Sealed Lead Acid
Battery Protection Time at 90kVA/72kW:130 minutes

PAVA-4.1-BAT.1
STA-91-4.1-001
PAVA-4.1-BAT.2/3
STA-91-4.1-001
PAVA-4.1-BAT.4/5
STA-91-4.1-001
PAVA-4.1-BAT.6/7
STA-91-4.1-001
PAVA-4.1-BAT.8/9
STA-91-4.1-001

1
1
1
1
1

Project

Drawing Title

SET

Main Stadium
PAVA SYSTEM
UPS POWER CABLE LAYOUT
ECC ROOM
Drawing Status

AS-BUILT
Contract No

6600027562 (OOK)
Drawn by:
Project

Do not scale

SD

Scale at A0:

Part Trade Sub

NTS.

Origin

Type

Date: 16/08/16
Level

Number

Rev.