Escolar Documentos
Profissional Documentos
Cultura Documentos
AS-BUILT DRAWING
TITLE:
MAIN STADIUM PAVA SYSTEM UPS POWER CABLE LAYOUT ECC ROOM (ASBUILT SUBMITTED AFTER IN-CORPORATING REDLINE COMMENTS)
X MS - Main Stadium
Part:
SH - Sports Hall
MO - Mosque
ST - Structural Works
AR - Architectural Works
CS - Civil Works
PM - Project Management
Trade :
DOCUMENT'S STATUS
EX - External Works
COMMENTS
ACCEPTED (ACC)
TO RESUBMIT (TRS)
REJECTED (REJ)
NAME:
POSITION:
DATE:
SIGNATURE:
ISSUER
Rev.
Date
16-Aug-16
Description
MAIN STADIUM PAVA SYSTEM UPS POWER CABLE LAYOUT ECC ROOM (AS-BUILT
SUBMITTED AFTER IN-CORPORATING REDLINE COMMENTS)
Initiated
Verified
VEN
VEN
Sample?
DATE: 16/8/2016
M S
M E
E A
S A M
D W G
Number of
Pages: 1
SIGNATURE:
DOCUMENT CODE
K A S C
Approved
REV.
4 0
7 8 2 8 1 5
A0
Notes
1.
UPS AC INPUT
3
CU/XLPE/PVC
CU/XLPE/PVC
AC-Input
TO MBP
5
UPS Output
CU/XLPE/PVC
10
CU/XLPE/PVC
To Distribution Panel (Critical Load)
16/08/16
MAM
AM
PMT/KASCOD
AS-BUILT
3
11/07/16
MOHI
TG
JG
SD
JD
MR
SD
JD
MR
By
Chkd
Appd
REDLINE
2
01/06/15
Second Issue
11
06/08/14
First Issue
Rev
Date
Key Plan
24 25
48
96
49
Equipment's Schedule:
12
ITEM
UPS MODEL
Description
Labeling
Qty
UNIT
73 72
EATON PW9155-15
PAVA-4.1-UPS
STA-91-4.1-001
SET
Client
13
Contractor
Manual Bypass
PAVA-4.1-MBP
STA-91-4.1-001
SET
Transfermer
PAVA-4.1-X'FORMER
STA-91-4.1-001
SET
14
CU/XLPE/PVC
Lead Consultant
Job No
ABOVE CEILING
218250
13 Fitzroy Street, London W1T 4BQ
Tel +44 (0)20 7636 1531 Fax +44 (0)20 7580 3924
www.arup.com
Trade Subcontractor
Trade Designer
Phase - Three
Battery
15
Battery
Battery
Battery
Battery
16
PAVA-4.1-BAT.1
STA-91-4.1-001
PAVA-4.1-BAT.2/3
STA-91-4.1-001
PAVA-4.1-BAT.4/5
STA-91-4.1-001
PAVA-4.1-BAT.6/7
STA-91-4.1-001
PAVA-4.1-BAT.8/9
STA-91-4.1-001
1
1
1
1
1
Project
Drawing Title
SET
Main Stadium
PAVA SYSTEM
UPS POWER CABLE LAYOUT
ECC ROOM
Drawing Status
AS-BUILT
Contract No
6600027562 (OOK)
Drawn by:
Project
Do not scale
SD
Scale at A0:
NTS.
Origin
Type
Date: 16/08/16
Level
Number
Rev.