silo budget form

S.L./N.
Description of Items
Earth Boring for 400mm Dia and 7 M Long Cast in situ pile including layout, watering,
1
clearing earth etc. all complete.
Fabrication and fixing of reinforcement (60000 Psi or 414 MPa) as per design for RCC
2
works including straightening and cleaning rust.
Reinforced cement concrete works with 20mm down graded stone shingles keeping the
3
ratio of concrete 1(Cement) :2(Sand) :4 (Shingles).
Earth work in excavation of foundation in all kinds of soils up to specified depth from E.G.L.

Quantity

Unit
m
ton
m3

including leveling, dressing and ramming the bed to the required grades bailing out water,
4

removing the debris, slush mud (if any), removing all soils from site, layout of foundation

m3

providing center line of columns and permanent bench mark column for grades etc.
5
6

complete in all respect as per design drawing and direction of Architect/Engineer-in-Charge.


piles head cut
Original soil refilling, ramming layer by layer,thickness of every layer is 150-250mm.

pcs
m3

(1: 2: 4) Cement Concrete work in Base. Using brick Chips in specified thickness as per
7

drawing providing concrete mixed with cement sand (F.M. 1.2) and down graded 1st
class brick chips, Mechanical mixing and wooden float finished proper curing all work

complete in all respect as per design drawing and direction of Architect/Engineer-in-Charge.


Reinforced Cement Concrete(1:1.5:3) Works having minimum crushing strength of 3000 psi
or mentioned in design. At 28 days with cement, best quality coarse sand [(33% quantity of
best local sand having F.M. 1.2 and 67% quantity of Sylhet sand or Coarse sand of
8 equivalent F.M.2.5)], down graded stone chips and screening centering, shuttering,
supplying polythene sheet for making shuttering leak proof, placing of rod in position, mixing
the aggregates, casting in forms, vibrating till it's dense & curing for 28 days, if possible
excluding the cost of reinforcement and its fabrication.
9 250mm Brick Work (Solid Considered) with 1:6 cement mortar including labour charge
10 Plaster to brick work surface and RCC surface according to design and information of Engineer in
charge
Total

m3

m3

m3
m2

Rate In Tk.

Amount in Tk.