Defects
Qty
PPM
Tight
48
678
ZE Cylinder Head
33
466
Taping
23
325
piSTON Hit
22
311
Forigen Material
16
226
Crank shaft
10
141
Score Rod
9
127
LB
4
57
CC Problem
2
28
Tube Leak
1
14
CS Under size
1
14
Total
169
2388
160
2388
4697
Qty
1124
131
1092
98
98
259
2802
PPM
239302
27890
232489
20864
20864
55142
596551
70756
Defects
Tight
ZE Cylinder Head
Taping
piSTON Hit
Qty
48
33
23
22
PPM
678
466
325
311
Forigen Material
Crank shaft
Score Rod
LB
CC Problem
Tube Leak
CS Under size
Total
16
10
9
4
2
1
1
169
226
141
127
57
28
14
14
2388
60
50
40
30
20
10
0
48
33
23
22
16
10
48
33
23
20
14
10
7
4
2
1
1
163
Reduction
I
21
23
11
9
8
5
5
2
1
1
1
87
85
1194
Reduction
II
14
7
7
5
2
3
2
2
1
0
0
43
42
597
44%
70%
48%
41%
50%
50%
56%
50%
50%
100%
100%
29%
21%
30%
23%
13%
30%
22%
50%
50%
Reduction
III
9
3
4
4
3
2
0
0
0
0
0
25.0
25
358.2
1194
Reduction
1025
110
1100
98
98
225
2656
500
50
450
50
45
100
1195
254418
cumulative
% Qty
48
28%
81
48%
104
62%
126
75%
Reduction
44%
38%
41%
51%
46%
39%
678
1145
1470
1781
300
30
350
25
30
75
810
172451
Cumilative
PPM
28%
48%
62%
75%
Reduction
27%
23%
32%
26%
31%
29%
150
20
200
15
13
30
428
91122
142
152
161
165
167
168
169
84%
90%
95%
98%
99%
99%
100%
2007
2148
2275
2332
2360
2374
2388
84%
90%
95%
98%
99%
99%
100%
120%
100%
80%
60%
10
40%
Qty
20%
cumulative % Qty
0%
19%
9%
17%
20%
21%
20%
Reduction
IV
4
0
1
2
1
0
0
0
0
0
0
8
8
96
Reduction
13%
15%
18%
15%
13%
12%
75
10
100
8
10
20
223
47477
100
21290.1852
7%
8%
9%
8%
10%
8%
Tight
ZE Cylinder Head
48
33
678
466
Taping
23
325
Pisont Hit
Forigen Material
22
16
311
226
SNO
1
2
3
S.no
1
Defect
Tight
Defect
Crank case dents,rust
RootCause
OBB Perpendicularity out of spec
Crank Case OBB Squareness
OBB Alignment out of spec
Position of OBB Top Bush.
Con Rod Oil hole bur
Crank Shaft Short End damage
Piston Damages on OD while Washing,handling
Shifting of Crank case cylinder head Holes
Wrong selection of Gasket.
Double Suction Valve With Less gasket .
Shifting of OBB Holes
Root cause
Crank case Rust
Crank case Dents
Action Initated
100% freeness check at Kit testing & manual checking prior to packing
100% Squareness Checking Before Imeco Washing
Start of the shift and every 3 hrs Operator is inspecting OBB Alignment and
Maintaining record.
Special Tools initiated for removing burs in oil hole.
Before Washing
100% Checking
Will work with SQD to eliminate this defect as this is a supplier defect
100% checking being done before assembly with help of guage
Action Initated
Non Usage crank case need to apply Honilo oil and keep aside
Holding of Crank Case in soaking Area
2388
672255
100
Resp
Phani
Target Date
Immediate
Gangadhar/v
ivek
Immediate
phani
Maintaining
Record
Moosa
Maintaining
Vivek/Ganga
dhar
SQD/Phani
Phani
Resp
Target date
gangadhar/Vivek
phani
169
2802
Total
Qty
total
(ppm)
product.
reject
Total: 2005
21179
291,564
6175
1594
259
617
2991
Total: 2006
20906
227,542
4757
641
136
1331
Total: 2007
25340
260,060
6590
622
267
1070
Total: 2008
17946
199,096
3573
1304
418
73
738
Total: 2009
19702
125,621
2475
714
69
186
601
Total: 2010
15004
118,946
1683
93
55
31
291
Total: 2011
6975
75,264
525
223
26
159
Total: 2012
6101
120,633
736
228
44
403
Total: 2013
2964
129,541
384
26
26
151
Total: 2014
1020
115,705
118
15
11
18
Total: 2015
823
123,993
102
17
15
January
5659
7775
44
February
10606
March
1757
10243
18
April
1948
7700
15
May
3346
9565
32
16
June
6545
6545
22
July
2296
8710
20
August
1873
9612
18
September
#DIV/0!
October
#DIV/0!
November
#DIV/0!
December
#DIV/0!
Total
2388
70756
9
10
14
169
16
48
23
total %
9%
28%
0%
14%
defect 2 = Tight
defect 11 = Rusty
defect 13 = No Stamp
169
131
132
124
97
475
53
2033
3293
1066
178
15
631
213
552
57
94
54
14
35
11
27
73
11
18
57
14
12
61
10
33
6%
1%
0%
2%
0%
20%
0%
0%
11
33
10
Comments / Remarks
14
15
16
17
11
74
240
15
159
67
977
27
19
47
13
18
19
20
10
30
1
1
3
1
0%
0%
4%
0%
0%
5%
0%
1%
22
23
24
25
26
27
1
0
0
0
1
10
32
24
43
4
2
1
1
16
0%
0%
0%
0%
9%
0%
1%