PROJECT
[OKIPL1]
Project No.
Document No.
P-OkiPL1
P-OkiPL1-100-01-FRM-XXX
Revision
00
Page
1 of 7
Issue Date
Contents
Page
1. OBJECTIVE
2
2. DEFINITIONS
APPENDIX
A.
Project No.
Document No.
P-OkiPL1
P-OkiPL1-100-01-FRM-XXX
Revision
Bringing Plant and Apparatus Under
The Safety Rules
Page
Issue Date
00
2 of 7
February 10, 2016
1. Objective
The objective of issuing a Safety Rules Clearance Certificate (SRCC) is to
advise all parties that the subject Plant or Apparatus is about to be made Live,
or pressurized with working fluid, or brought into service for the first time and by
virtue of this, any further work on this Plant or Apparatus constitutes a hazard.
2. Definitions
Definitions printed in bold type are defined in the Safety Rules.
3. Conditions For Issue of An SRCC
Before an SRCC (Appendix A) is issued, the Plant or Apparatus to be brought
under the Safety Rules must be:
(i)
(ii)
(iii)
(iv)
(v)
4. General
4.1 In general terms, the SRCC will be issued in advance of first energize
or pressurization with working fluid.
4.2 SRCCs shall wherever possible, be issued on a System basis and shall
take into account the need to complete the commissioning activities
within the terminal points.
SRCCs will only be issued for systems, which are substantially omplete.
To control this transfer from the construction phase to the
commissioning phase a System Punch List will be raised when Plant /
Apparatus construction is completed. The System Punch List will be
raised by the responsible Erection Group Nominee and presented to the
Commissioning Group Nominee.
4.3
4.4
Project No.
Document No.
Revision
Page
Issue Date
P-OkiPL1
P-OkiPL1-100-01-FRM-XXX
00
3 of 7
February 10, 2016
4.5
4.6
The Isolation of the Plant / Apparatus and the SRCC, shall be checked
and signed by the Manager nominated by the Site Manager who will
issue the SRCC to all nominated parties approximately two days before
the Plant / Apparatus is to be energized or pressurised. The Nominated
Parties will acknowledge receipt of the SRCC by signing the relevant
section of the SRCC.
4.7 Once a SRCC has come into force, work on the Plant / Apparatus is to be
carried out under the appropriate Safety Document or Verbal Instruction
in accordance with the Safety Rules.
4.8 The persons acknowledging receipt of the SRCC will be responsible for
ensuring that their staff are informed that the SRCC is being issued and
that all subsequent work will be conducted under the terms of the Safety
Rules.
5
Records
SRCCs will be identified thus:System / SRCC No i.e.
/SRCC
and a register shall be retained by the Site Managers Nominee together with
the original of each SRCC.
6
Keys
Keys forming SRCC terminal point isolations shall be retained by the Site
Managers Nominee and secured in a dedicated uncommissioned Plant /
Apparatus key safe.
Appendix 1
(Sheet 1/4)
UNIT
Serial No.
I hereby give notice that the Plant / Apparatus scheduled below is ready to be made live / charged with
working fluid / put into service and all subsequent work is to be conducted under the terms of the TANJUNG
BIN POWER PLANT SAFETY RULES.
Effective From
Time: ______________
Date : _____________
Plant / Apparatus being made live / charged / put into service:ID Ref.
___________________________________________________________________
Description
___________________________________________________________________
Location
___________________________________________________________________
Type of System
___________________________________________________________________
Name __________________________
Date ________________
Signed _____________________
Name __________________________
Date ________________
Appendix 1
(Sheet 2/4)
UNIT
Serial No.
Description
SRCC No.
Subsequently
Released By
** SRCC No.
Initials
Date _____________________
Time __________________________
Appendix 1
(Sheet )
UNIT
SRCC NO.:
ID
Serial No.
Description
SRCC No.
Name
Initials
(*Note)
* Note: - 1 authorise the terminal points of previous SRCCs listed above and locked by myself or by my nominated
deputy, to be released.
PERMIT OFFICE
I confirm this SRCC has completed its process as required by local management instruction XX/XX/XX and the Plant
/ Apparatus identified on page 1 may be made live / charged with the working fluid / put into service from
Date : _________________
Time : ___________________
Date _____________________
Time __________________________
Appendix 1
(Sheet 4/4)
SRCC NO.:
UNIT
Serial No.
Acknowledgment
I acknowledge receipt of this SRCC and will fulfill my responsibility to ensure all relevant personnel, sub
contractors and all their relevant personnel under my control are informed that this SRCC is being issued
and that all subsequent work on the detailed Plant / Apparatus must be conducted under the Terms of
SZC POWER PLANT SAFETY RULES.
Organisation
Name
Signature
Date
Time
FL COMMISSIONING
PB COMMISSIONING
___________________________ ____________
CLO2 COMMISSIONING
___________________________ ____________
ETP COMMISSIONING
NAOH COMMISSIONING
OXY.SO2.PAC COMMISSIONING
___________________________ ____________
___________________________ ____________
___________________________ ____________
PD COMMISSIONING
___________________________ ____________
WHP COMMISSIONING
___________________________ ____________
WTP COMMISSIONING
___________________________ ____________
LK COMMISSIONING
___________________________ ____________
RB COMMISSIONING
___________________________ ____________
RC COMMISSIONING
___________________________ ____________
TG COMMISSIONING
___________________________ ____________
VE COMMISSIONING
___________________________ ____________
HSSE COMMISSIONING
___________________________ ____________