Contents
1. INTRODUCTION TO THE SECTOR OF WORK ........................................................................................ 2
2. BACKGROUND INFORMATION ............................................................................................................ 2
3. PURPOSES AND OBJECTIVES OF THE PROPOSED WORK .................................................................... 4
Purpose: .......................................................................................................................................... 4
Objectives: ...................................................................................................................................... 4
4. SCOPE OF WORK: ................................................................................................................................ 4
5. UNICEF RESPONSIBILITIES ................................................................................................................... 7
6. EXPECTED DELIVERABLES AND TIMELINE ........................................................................................... 7
7. KEY SKILLS, TECHNICAL BACKGROUND, AND EXPERIENCE REQUIRED ............................................. 11
8. DURATION ......................................................................................................................................... 11
9. QUALITY ASSURANCE ........................................................................................................................ 11
10. EVALUATION OF PROPOSAL ............................................................................................................ 11
a. Technical Proposal .................................................................................................................... 11
b. Price Proposal ........................................................................................................................... 14
PRICE PROPOSAL TEMPLATE: ........................................................................................................ 14
*Payment Provisions ............................................................................................................................. 16
TRAVEL: ................................................................................................................................................. 17
10. GUIDING PRINCIPLES FOR THE CORE PRINCIPLES FOR THE PROJECT ............................................. 17
2. BACKGROUND INFORMATION
In 2012, UNICEF and partners embarked on an innovative project to provide a more effective and
secure information management system (IMS) to UNICEF country offices and implementing partners
in order to better identify most vulnerable children in emergencies and to improve case
management services, including referral for protection support and other services. The Information
1
UNICEF uses the term child protection to refer to preventing and responding to violence, exploitation and abuse against children including commercial sexual exploitation,
trafficking, child labour and harmful traditional practices, such as female genital mutilation/cutting and child marriage. UNICEFs child protection programmes also target children who
are uniquely vulnerable to these abuses, such as when living without parental care, in conflict with the law and in armed conflict
2 Taken from: http://www.unicef.org/protection/57929_62178.html
3
See UNICEFs Core Commitments for Children in Humanitarian Action: http://www.unicefinemergencies.com
4 The IASC Guidelines on Gender-based Violence Interventions in Humanitarian Settings (2005) describe GBV as an umbrella term for any harmful act that is perpetrated against a
persons will, and that is based on socially ascribed (gender) differences between males and females (p. 7). See: http://www.gbvaor.net
5 In times of crisis, families get separated and dispersed. Children get lost. Organizations devote lots of time and effort to bringing these families back together, through a process called
Family Tracing and Reunification, or FTR. See: http://www.rapidftr.com/faq/1-rapidftr-faq/1-what-is-family-tracing-and-reunification
6 See www.unicef.org/protection for more information in relation to UNICEFs role, responsibility and MRM mandate and specifically MRM information management.
7 This initiative emerged following a study released in May 2010 assessing existing efforts to manage MRM information; its recommendation was to centrally develop a
standardized, comprehensive and robust MRM information management system, including database, which was endorsed by inter-agency partners.
Management and Innovation to Protect Children in Emergencies project is currently in Phase Two,
which includes deploying and bringing to scale a next generation software application that will
help partners securely and safely collect, store, manage, and share data for protection-related
incident monitoring and case management. The platform is called Primero (Protection-related
Information Management)8.
Primero is adaptable to accommodate a broad range of protection programming, including:
unaccompanied and separated children (UASC), psychosocial support (PSS), recruitment and use of
children by armed forces and groups, other grave violations of childrens rights in situations of
armed conflict (MRM), and incidents of gender-based violence (GBV) as well as the documentation
of responses and services provided for such cases. The Primero platform currently supports three (3)
modules: the Child Protection Information Management System Plus9 (CPIMS+) for case
management, the Gender based Violence Information Management System Plus10 (GBVIMS+), and
the Monitoring and Reporting Mechanism Information Management System Plus (MRMIMS+). The
platform is also complimented by an Android mobile client called RapidReg (Rapid Registration),
which has both case management and FTR functionality.
Primero was developed to meet the need for a secure, globally coordinated platform that would
provide user-friendly support to field level CP and GBV practitioners, and useable data and insights
on critical CP and GBV concerns in humanitarian and development contexts at country, regional and
global levels. The Primero application is designed to meet the information management (IM)
standards outlined in the inter agency Minimum Standards for Child Protection in Humanitarian
Action11 (CPMS). The project is also governed by the UNICEF-endorsed Principles for Digital
Development12.
UNICEF has invested in the Primero platform to address the proliferation of custom software
applications in the sector. By investing in a single, centrally supported, open source platform, and by
offering this software freely as a global public good, UNICEF aims to bring cost savings, extensibility,
and increased data security to CP programmes, while ensuring confidentiality, accountability, and
increased child friendliness to beneficiaries.
The project is bringing together key global actors around a common technology and approach to
child protection information management. Primero is an inter-agency initiative led by UNICEF and
managed in partnership with the Office of the United Nations High Commissioner for Refugees
(UNHCR), United Nations Population Fund (UNFPA), International Rescue Committee (IRC), Save the
Children, United Nations Department for Peacekeeping Operations (DPKO), and the United Nations
Office of the Special Representative of the Secretary-General for Children and Armed Conflict
(OSRSG-CAAC). The Child Protection Section and UNICEF Headquarters is leading the Primero
initiative, in collaboration with the UNICEF Innovation Unit, UNICEF Information Technology and
Support Services (ITSS) and Regional and Country Office colleagues.
Primero modules are now live in +5 countries. The application is helping social workers, protection
officers and programme managers more efficiently deliver, track, and report on services in very
complex operational environments. These deployments have added to the global demand for the
application. There are more than twenty (20) pending requests for deployments, from countries
implementing both humanitarian responses and development programming. Furthermore, current
8 www.primero.org
9 www.cpims.org
10 www.gbvims.com
11 www.cpwg.net/minimum-standards
12 www.digitalprinciples.org/
users provide a constant source of feedback for issue tracking, enhancements and extensions of the
application. UNICEF is striving to address these requirements in order to ensure a positive user
experience and maximize uptake. Hence, there is a need for additional support so that the Primero
business case can be fully realized, UNICEF and donors return on investment is ensured, and the
project can achieve scale.
UNICEF is a global organization with country offices in and National Committees in more than 190
countries. These entities are supported with guidance, tools and technical support from UNICEF
Regional Offices and Headquarters. UNICEF does not currently have adequate in-house capacity to
develop, deploy and support this non-enterprise, open source software. This request for proposals is
for Long Term Agreements (LTA) with service providers that can be used by UNICEF teams globally to
support the implementation and scaling up of Primero.
Please see Annex 1: Primero Documentation & Resources for a detailed description of these
component systems.
Create a sustainable, scalable, and cost effective global Primero support model.
Objectives:
1) Primero modules will be deployed in at least 20 countries by end of 2018 by providing
technical support to UNICEF teams, country offices and partners in deploying and
implementing Primero and its modules and mobile clients.
2) Primero software with be extended and enhanced, including the development Primero
version 2 (v2) in 2017.
3) Primero end users, teams, implementing partners, and UNICEF Country Offices will be
provided with timely, effective remote technical support in 2017-2018.
4) Primero will be promoted and shared as a global public good and its community of users and
developers will expand in 2017-2018.
4. SCOPE OF WORK:
In order to achieve the objectives, UNICEF is looking for companies to provide three (3) distinct
Categories of Services:
1. Implementation support:
This involves the provision of direct, hands-on, field-level technical assistance to UNICEF
Country Offices and implementing partners to deploy Primero modules/clients (CPIMS+,
GBVIMS+, MRMIMS+, RapidReg). Primero needs to be quickly and easily deployed in
2. Software Development:
UNICEF and partners will continue to develop the Primero open source software,
following the v2 Development Roadmap. Primero feature development is user-driven
and iterative. Priority is given to features that have been requested or identified as
critical to multiple users/programmes, and where requirements and value-added are
clear. Services in this category include:
i.
Client relations and project management (sprint management, daily stand ups,
client reports, release management)
j.
13 http://agilemethodology.org/
ff. Design and conduct training workshops for core business teams, when
requested
Note: If your organization is not able to provide any of the above services, you may still be
considered for this contract. Carefully review Section 6: EXPECTED DELIVERABLES AND TIMELINE for
details.
5. UNICEF RESPONSIBILITIES
UNICEF will be available for consultation, technical and project discussions, daily meetings,
and general project coordination support.
The Primero Project Lead/Product Owner, based at UNICEF headquarters in New York City,
will manage software development, contracting, and support coordination and engagement
with field level teams.
organizations face in emergency, low connectivity and low-resource situations, and to get a direct
sense of how the use of technology can help change lives.
Do not include costs of travel in the technical or financial proposal.
Deliverable
Time line
3-4 weeks
2-3 weeks
14 www.gnu.org/licenses/agpl-3.0.en.html
1-2 weeks
3-4 weeks
1.5 Configure and comprehensively test the CPIMS+ module of Primero for a
network of eight (8) organizations involved in case management, with five
distinct roles and a total of 50 active users. Provide details of the process.
2-4 weeks
1 week
1 week
1.8 Design and implement a one-week training for system end users and
administrators. Include capacity building materials, documentation, and
videos. All materials should be reusable and contribute to the global Primero
community.
2 weeks (1 week
prep, 1 week
implementation)
3-6 weeks
NA
2.2 Analyse, plan and implement a redesign of the Primero admin modules
to make configuration processes more user friendly and scalable, providing
specifics on the process.
8-12 weeks
2.3 Analyse, plan and implement a UX/UI redesign of the Primero web app,
providing specifics on the process.
4-6 weeks
4-6 weeks
2.5 Design, develop and test configurable reporting and dashboard features
6-8 weeks
to allow Primero users and administrators to select and define granular
reports based on their needs. Select an option that can be implemented with
modest investment in the timeline provided.
2.6 Design, develop and test a new module for Primero to Country Xs
programme to track children in foster care. This module should include a list
of potential foster families, and
8-12 weeks
2.7 Provide a brief dev ops plan with setup and documentation for failover,
redundant hosting, disaster recovery, etc, to productionalize Primero for
scale.
NA
2.8 Provide a short narrative on how you would lead a workshop with
relevant stakeholders to elaborate a Primero development roadmap and
vision, including upgrading application architecture, and technical oversight.
NA
2.9 Design, develop and test a new mobile feature for the Primero Android
client that would allow a system administrator to remotely wipe data from a
stolen device. Include details of process, including testing.
4-6 weeks
2 weeks
3.2 Provide a plan to ensure that critical feedback gathered from the team in 1 week
Country X is relayed to the global development team. Explain how you would
prioritize this information.
3.3 Provide a sample SLA. DO NOT INCLUDE ANY PRICING DETAILS
NA
3.4 Provide a brief explanation of how you would foster and sustain a
community of users in Country X, noting that the country has few smart
phone users.
NA
NA
3.6 Provide an example of a hot fix/live production response your team has
provided and how you ensured that the impact on business was minimized.
NA
3.7 Explain how you would identify that a cloud instance of Primero has
been compromised in Country X. How would you respond? Limit your
answer to one page.
NA
1 week
3.9 Provide examples of training programmes and materials your team has
created and implemented for end users and/or system administrators. You
may provide hard copies or links.
NA
NA
NA
10
8. DURATION
The resulting LTAs will be globally available to UNICEF teams for a period of two (2) years. Upon
review, it is possible that UNICEF may seek to extend these agreement a third year (through 2019).
9. QUALITY ASSURANCE
After each project, a vendor performance evaluation will be produced by the relevant office in
UNICEF and will be in contact with the vendor. It will consist of a brief review of the various
technical requirements, a review of the elements identified in this RFPS, and a a section on lessons
learnt.
After such review, UNICEF may decide to put the company either up or down in the list of vendors
for the next project(s) or remove the vendor from the list in case of severe issues (non-delivery,
important delays, non-respect of quoted pricing, etc.)
A more thorough review will take place at the end of the first year of the contract, through a review
of all quality control reports. A satisfaction survey will also be conducted with users
a. Technical Proposal
Bidders may choose to submit technical proposals for one, multiple, or all categories of work. Each
technical proposal must be clearly marked (i.e Technical Proposal Category 1). These technical
11
proposal should address all aspects, requirements, and criteria outlined for the relevant Category of
Work in the Request for Proposals. These requirements represent indicative deliverables expected
by UNICEF, however, bidders are free to suggest/propose any solution or approach that they think
would be technically effective. If an alternative approach to work is being proposed, please explain
why this option is preferable. UNICEF welcomes new ideas and innovative approaches. Bidders may
be asked to provide additional information.
No price information should be contained in any of the technical proposals.
Ensure that the level of effort to be committed by the different team members in each phase/task is
visible within the technical proposal. That same information with additional cost data should feature
in the financial proposal.
The proposal should very clearly articulate how you propose to address key questions included in
the PURPOSE AND OVERVIEW OF THE PROPOSED WORK section of RFPS.
The technical proposal should be no more than 20 pages for each Category of Work excluding
annexes and should be organized according to order of deliverables in section 6. EXPECTED
DELIVERABLES AND TIMELINE. See the supporting documents folder for a sample submission.
Keep in mind that the following specific items must be present, in addition to whatever other
approaches and methods are proposed as per the requirements detailed above:
1. Information which will enable us to determine whether your institution (or your team) have
relevant specialized knowledge in the areas that are critical to this work.
2. Information on any additional experience that may be critical to the success of the proposed
work, including but not limited to: a) Affiliation to communities of practice; b) Prior
experience with the tools and technologies outlined; c) Any other information that you
deem relevant to this work that would give your institution an advantage over others
competing for the same contract.
The Technical Proposals from all 3 Categories will be evaluated against the following:
REF
CATEGORY
POINTS
TE1
25
The summary CVs (maximum one page) and current titles (and links to public,
open-source code repositories of developers, if available) of all proposed team
members, and an acknowledgment that any changes to the team prior to or
during the contract term will be subject to written approval by UNICEF after
review of CVs, current titles and links to public, open-source code repositories,
if available.
12
TE2
For deliverables where no timeline has been provided (marked with NA), you
may insert them in your timeline, or submit them as separate segments
Project Management
TE3
TE4
TE5
Provide a short narrative (1-2 pages) that explains how members of your team
will coordinate with each other and the UNICEF project coordinator to deliver
the services listed in the EXPECTED DELIVERABLES AND TIMELINE section.
Include a skeletal calendar for a typical two week period.
25
Review the Primero code and documentation provided and devise a technical
plan for delivery of services that reflects a thorough understanding of the
context (you may cite details of the countries previously listed), the
requirements, the EXPECTED DELIVERABLES, and technologies involved. Make
sure this plan touches on:
o
How you work with other teams involved in the project, including dev
teams
Testing philosophy
Security
Completeness of submission: All submissions must address all points for the
respective Category of Work indicated in EXPECTED DELIVERABLES AND
TIMELINE.
Communications pieces
10
10
10
13
Total Technical
80
b. Price Proposal
The price proposal should be separate from the technical proposal. A separate price proposal should
be submitted for each category of work (i.e Price Proposal Category 1). The price should be broken
down for each component of the proposed work, based on an estimate of time taken, which needs
to be stated.
The total amount of points allocated for the price component is 20. The maximum number of points
will be allotted to the lowest price proposal that is opened and compared among those invited
firms/institutions which obtain the threshold points in the evaluation of the technical component.
All other price proposals will receive points in inverse proportion to the lowest price; e.g.:
Price (in
US$)
1. Implementation Support
(Category 1)
1.1 Organize and conduct an
implementation planning mission
to Country X to support the rollout of the CPIMS+ module of
Primero. Provide details of the
process.
14
15
The quotation will not be subject to revision unless officially invited to re-submit by UNICEF.
The Cost Proposal must include detailed item-wise quotations, based on the project narrative and
other relevant documents. Please note that travel costs and subsistence rates (lodging, food, local
transport, and incidentals) should not be included as these will be reimbursed based on the
prevailing United Nations rates.
*Payment Provisions
UNICEF's policy is to pay for the performance of contractual services rendered or to effect payment
upon the achievement of specific milestones described in the contract. UNICEF's policy is not to
grant advance payments except in unusual situations where the potential contractor, whether a
private firm, NGO or a government or other entity, specifies in the bid that there are special
circumstances warranting an advance payment. UNICEF will normally require a bank guarantee or
other suitable security arrangement.
Any request for an advance payment is to be justified and documented, and must be submitted with
the financial bid. The justification shall explain the need for the advance payment, itemize the
amount requested and provide a time schedule for utilization of said amount. Information about
your financial status must be submitted, such as audited financial statements at 31 December of the
previous year and include this documentation with your financial bid. Further information may be
requested by UNICEF at the time of finalizing contract negotiations with the awarded bidder.
UNICEF shall conduct regular assessments of the vendors performance. Results of the assessment
will be shared with the vendor for discussion and possible corrective measures.
16
At the end of the implementation phase, UNICEF shall assess the vendors ability to:
A similar evaluation will be repeated after each year of service. End-of-year evaluations will also
include a user-satisfaction survey. Poor performance may result in the partial or total termination of
the contract, at the discretion of UNICEF.
TRAVEL:
For all required travel, the vendor will be responsible in arranging their own travel and will be
reimbursed accordingly upon presentation of receipts and based on the following UN standards of
travel and accommodation found in the following sites:
Travel:
Section 4, paragraph 4.2, numerals (d) and (e)
Accommodations (Daily Subsistence Allowance, DSA): http://icsc.un.org/ (all countries and
destinations can be found by navigating on the map)
Terminal Expenses: Include all expenditures for transportation between the airport or other point of
arrival or departure and the hotel or other place of dwelling, including transfer of accompanied
baggage and other incidental charges. For New York, the amounts to be reimbursed for each such
trip are $63 in respect of the staff member authorized to travel at United Nations expense. For all
other duty stations, the amounts to be reimbursed for each trip are $38. When official United
Nations or government vehicle is made available for the trip, the amounts to be reimbursed shall be
set at $11.
Usability: Applications must be modern, intuitive, and easy to use. It should be built with
accessibility (WCAG / Section508) in mind. Layouts and features should remain simple, consistent
throughout, and to the point.
Scalability: Application must be designed in such a way that it is possible to horizontally scale in the
case of a hosted (vs. standalone) deployment.
Extensibility: As much as possible, the system should be built to adapt to varying needs, diverse
audiences, changing requirements based on users profile. This will be particularly important for the
customizations of the product, as one should aim at developing reusable and adaptable features
rather than one-time development for a specific project. Capacity for internationalization and multilanguage support are essential to the success of the solution.
Connectivity: UNICEF works all over the world, including the most isolated locations and in regions
affected by disasters and conflicts. It is critical to develop solutions to ensure access to essential
resources to as many users as possible, online or offline, through Web server or local, standalone
deployments in occasionally connected environments.
Self-sustainability: It is expected that few human resources will be available to support the
administration of the applications and support users. Therefore, it is critical to aim at designing
systems and processes that are as self-sustainable as possible. This implies for example the creation
of automation, communication templates, workflows, reliable technology, FAQ, inline help and selftraining solutions.
18
19
Reunification (FTR) called RapidFTR15. This application was an early component in the development
of Primero, and has now been reinvented as RapidReg, the mobile client for the CPIMS+.
RapidReg allows Primero users to register new cases and edit existing cases. It also feeds data into
the FTR module of the CPIMS+/Primero web app. See the repo for more information.
3) Inter agency Child Protection Information Management System (IA CPIMS)
The Inter Agency Child Protection Information Management System (IA CPIMS) is a .NET application
used by multiple agencies as a case management tool to gather and analyse data about specific
vulnerable children in emergency situations and track the delivery of specific services that they
need. The IA CPIMS is currently being used by partners including governments in more than 15
countries. Primeros case management module is the CPIMS+. This module is a next generation of
the IA CPIMS. Many of the current implementations of the IA CPIMS are scheduled to transition to
the use of Primero/CPIMS+ in 2017-2018, and it is therefore important that bidders be familiar with
this application.
For more information see: www.cpims.org
Also, please see IACPIMS Evaluation 2010: http://www.savethechildren.org.uk/resources/onlinelibrary/evaluation-inter-agency-child-protection-management-system
15
http://www.rapidftr.com/
20
Definition
Tiered Support
Level 1 (L1)
Support
This is the initial support level responsible for basic customer issues and technical
support to end-users. Personnel at this level have a basic to general understanding of
the platform or service and may not always have the competency required for solving
complex issues, but should be able to handle 70%-80% of the user problems before
finding it necessary to escalate the issue to a higher level. Personnel from the
applicable UNICEF Country Office (CO) or partner organization will provide Level 1
support. The country level System Administrator will have the role of overseeing Level
1 support, and making sure that consolidated reports are made available to the
development team.
The first job of a Level 1 Specialist is to gather the customers information and to
determine the customers issue by analyzing the symptoms and figuring out the
underlying problem. Where possible the Level 1 Specialist shall resolve the issue
directly with the end-user.
If they cannot determine the solution, then the issue is escalated to Level 2 support
by logging a ticket in the issue tracking/ticketing system. Level 1 support providers
must ensure adequate information is passed on to Level 2 and Level 3 support in case
of escalation.
21
This is the next support level that requires a person with deep knowledge of how the
system is used, the business domain and has the required access rights to the
production instance (such as superuser) to resolve operational issues.
Level 2 (L2)
Support
This level of support does not perform code modifications to resolve the problem. If
resolution requires code modification, the support request is passed on to Level 3
support.
Level 2 support would assess the time already spent with the client so that the work is
prioritized and time management is sufficiently utilized. Level 2 support providers
must ensure adequate information is passed on to Level 3 support in case of
escalation.
This is the highest level of support, which consists of making infrastructure, code,
and/or database changes to resolve a support request. Level 3 Support may also
require access to log files or notification alerts from the hosting monitoring tools.
Level 3 (L3)
Support
Fixes made by Level 3 support shall be tested and then released into production.
Release schedules are driven by the severity of the issues. Issues related to system
performance and stability may also be addressed within Level 3 support.
The Level 3 support may also be required to actively trouble shoot with third party
partners such as hosting providers. These partners and the respective contact, SLAs
and escalation plans shall be established with the UNICEF Product Owner.
Level 3 support has the same responsibility as L2 support in reviewing the issue ticket
and assessing the time already spent with the stakeholders so that the work is
prioritized and time management is sufficiently utilized.
Backlog:
Maintenance
Enhancements
Issue Prioritization:
Critical
A complete interruption causing the system or data (or a critical piece of functionality)
to be completely inaccessible. No workaround is available.
High
Medium
22
Low
Issue distracts users from their work in the system, but does not impact functionality
or data. A workaround may or may not be available.
The engagement model or ways of working for support and maintenance contemplates all Level 1
support provided by UNICEF or country level partners. End users shall contact a respective point of
contact with issues. The point of contact shall attempt to resolve the issue or submit the issue using
the issue tracking/ticketing system provided under the terms of the contract.
Critical or High issues shall automatically be assigned to the respective PS&M team. Level 1 point of
contact and UNICEF Product Manager shall call PS&M team according to the escalation plan below.
The triage process and prioritization assignment to each issue shall be managed by the UNICEF
Product Manager and reviewed with the PS&M team. The table below lists the four priority levels
and the corresponding response time expected. The following response levels will be maintained
during the specified hours of support.
Priority Level
Response Time
Critical
On call
High
3 hours
Medium
1 business day
Low
2 business days
Response time means that PS&M Team will acknowledge receipt of the ticket and begin researching
a solution to the issue within the allotted time. Once a solution has been discovered, PS&M Team
shall account for the time taken to research/troubleshoot the problem, the probable cause and the
estimated time required to solve the issue. Level 2 and Level 3 researching and troubleshooting of
issues may include contacting third party partners.
The PS&M Team will work with the UNICEF Product Manager to prioritize the backlog of items,
based on the priority and support level. When requested, they would then determine a suitable
timetable for the issue to be resolved, tested and implemented within the production environment.
All issues including critical and high issues will be submitted via the online ticketing system. Critical
and high issues will also be followed by a call to the designated PS&M Team telephone number to
ensure prompt attention. Other channels that may be used to alert PS&M Team of the Critical or
High issues in the ticketing system include instant message, email or Skype.
PS&M Teams will be responsible for providing a primary telephone contact number. This number
shall be a local number in the supporting PS&M Team office. The number shall be assigned to the
PS&M Team member on call. An escalation plan (see sample below) must be provided in the event
the PS&M Team contact is unavailable or an issue has not received a response in the agreed
response time.
Contact
Escalation
23
PS&M Teams will use commercially reasonable efforts to resolve all items in the backlog in priority
order, in consultation with UNICEF; provided however, the efforts will be undertaken on a time and
materials basis. The work will be done employing an Agile development methodology, which means
weekly meetings to assess progress, constant prioritization, frequent validation and feedback.
The Team
PS&M Team will employ a cross-functional poly-skilled team. The team will have a breadth of
knowledge across various applications and a depth of knowledge in the specific applications. The
team will consist of the following skills, Business Analyst (Strategy & Requirements Analysis), Quality
Analysis and Application Development.
Governance
The engagement would be governed by a steering committee to be defined in alignment with the
Primero Governance Committee.
Time spent by the PS&M team working on Delivery and Reporting activities shall be deducted from
the allocated number of support and maintenance days.
During the steering committee meetings the UNICEF Product Owner, PS&M team Delivery Lead and
PS&M team Client Principal shall review the number of allocated hours not used by support (if any)
and agree to a number of hours the PS&M team shall apply an equivalent number of hours
volunteered towards developing the open source community.
24