Welcome to this presentation.


It is part of a suite of Engineering training modules.
It shows the activities and deliverables of the Process
discipline.
Comments are most welcome (herve.baron@gmail.com),
which I will incorporate for the benefit of all.

Herv

2015 Herv Baron

Please download this file so that you can see my trainers


notes in the top left corner latest Acrobat Pro feature.

HERVE
BARON

Engineering disciplines: activities and deliverables

PROCESS

PLANT LAYOUT

EQUIPMENT

SAFETY & ENVIRONMENT

CIVIL

PIPING

PIPELINE

INSTRUMENTATION

ELECTRICAL

2015 Herv Baron

Engineering disciplines: activities and deliverables

HERVE
BARON

PROCESS
Design basis and criteria
Process Flow Scheme, PFD, HMB
Process description
Process Operating and Control Philosophy
Equipment sizing
P&IDs
Piping specification and sizing
Instrument process specification
Process and Emergency shutdown
Flare study
Operating manual

2015 Herv Baron

Engineering disciplines: activities and deliverables

HERVE
BARON

PROCESS
Design basis and criteria
Process Flow Scheme, PFD, HMB
Process description
Process Operating and Control Philosophy
Equipment sizing
P&IDs
Piping specification and sizing
Instrument process specification
Process and Emergency shutdown
Flare study
Operating manual

2015 Herv Baron

HERVE
BARON

Process Design Basis

What constitutes the Design Basis of a Process/Utility Unit?

2015 Herv Baron

HERVE
BARON

Process Design Basis

What constitutes the Design Basis of a Process/Utility Unit?

Sizing cases: max capacity /turndown

Other operating cases

Feedstock composition and condition

Product specifications

Battery limit conditions

2015 Herv Baron

HERVE
BARON

Process design basis


Compressor Station

2015 Herv Baron

Engineering disciplines: activities and deliverables

HERVE
BARON

PROCESS
Design basis and criteria
Process simulations, Process Flow Diagram, HMB
Process description
Process Operating and Control Philosophy
Equipment sizing
P&IDs
Piping specification and sizing
Instrument process specification
Process and Emergency shutdown
Flare study
Operating manual

2015 Herv Baron

HERVE
BARON

Choice of Process Scheme

2015 Herv Baron

What are the bases of process scheme definition?

HERVE
BARON

Overall Plant Process Design

What is the name of


this drawing?

2015 Herv Baron

HERVE
BARON

Results from the high level functional requirements of the plant


Depicts the various Processes carried out within the facility and their sequence
Shows the inputs (feed) and outputs (products)
The item of the BFD is the Process Unit

2015 Herv Baron

The Block Flow Diagram (BFD)

HERVE
BARON

Unit Process Design

2015 Herv Baron

HERVE
BARON

The Process Flow Diagram (PFD)

2015 Herv Baron

Unit Process Scheme Optimization

HERVE
BARON
TEG

HP Compression & TEG


Gas Injection

1200 psig
3000 psig

500 psig

200 psig

50 psig

LP Compression

IP Compression
From Wells
165 - 205 F

HP Separator
500 psig

5500 psig

5 psig

Cooler

Emul. Treater
50 psig 150 F

What are the elements taken into account in the


definition/optimization of the process scheme?

Oil Production

2015 Herv Baron

Degasser
5 psig

HERVE
BARON

Process simulations

2015 Herv Baron

Process simulations

HERVE
BARON

Input
- Feed composition and
conditions

Simulator settings
- Flow scheme
- Thermodynamic model
- Equipment performance

Output
- Stream flows and
composition
- Equipment duty

2015 Herv Baron

Process simulations

HERVE
BARON

Input
- Feed composition and
conditions

Simulator settings
- Flow scheme
- Thermodynamic model
- Equipment performance

Output
- Stream flows and
composition
- Equipment duty

2015 Herv Baron

Process simulations

HERVE
BARON

Input
- Feed composition and
conditions

Simulator settings
- Flow scheme
- Thermodynamic model
- Equipment performance

Output
- Stream flows and
composition
- Equipment duty

2015 Herv Baron

Process simulations

HERVE
BARON

Input
- Feed composition and
conditions

Simulator settings
- Flow scheme
- Thermodynamic model
- Equipment performance

Output
- Stream flows and
composition
- Equipment duty

2015 Herv Baron

Process simulations

HERVE
BARON

Input
- Feed composition and
conditions

Simulator settings
- Flow scheme
- Thermodynamic model
- Equipment performance

Output
- Stream flows and
composition
- Equipment duty

2015 Herv Baron

Process simulations

HERVE
BARON

Input
- Feed composition and
conditions

Simulator settings
- Flow scheme
- Thermodynamic model
- Equipment performance

Output
- Stream flows and
composition
- Equipment duty

2015 Herv Baron

HERVE
BARON

The Process Flow Diagram (PFD)

2015 Herv Baron

HERVE
BARON

The Process Flow Diagram (PFD)

Results from process simulations

Depicts the various Equipment within a Process (or Utility) Unit and their sequence

Shows the process controls

The individual drawing item of the PFD is the Equipment Item

2015 Herv Baron

HERVE
BARON

The Process Flow Diagram (PFD)

Scheme including the following information, as a minimum:

Main equipment (all the itemized ones),

Process lines between equipment,

All control loops and main instruments,

Heat & Mass Balance (HMB)

Design conditions of main equipment.


It shall be drawn-up according to ISA 6.12 regulation as far as symbology is
concerning

2015 Herv Baron

For each stream, indication of:


Temperature
Pressure
Composition
Specific gravity
Operating density
Heat content
Flow rate (relevant to each phase)

HERVE
BARON

Heat & Material Balance

2015 Herv Baron

Engineering disciplines: activities and deliverables

HERVE
BARON

PROCESS
Design basis and criteria
Process Flow Scheme, PFD, HMB
Process description
Process Operating and Control Philosophy
Equipment sizing
P&IDs
Piping specification and sizing
Instrument process specification
Process and Emergency shutdown
Flare study
Operating manual

2015 Herv Baron

HERVE
BARON

Process Description

2015 Herv Baron

Engineering disciplines: activities and deliverables

HERVE
BARON

PROCESS
Design basis and criteria
Process Flow Scheme, PFD, HMB
Process description
Process Operating and Control Philosophy
Equipment sizing
P&IDs
Piping specification and sizing
Instrument process specification
Process and Emergency shutdown
Flare study
Operating manual

2015 Herv Baron

HERVE
BARON

Engineering disciplines: activities and deliverables

2015 Herv Baron

Engineering disciplines: activities and deliverables

HERVE
BARON

PROCESS
Design basis and criteria
Process Flow Scheme, PFD, HMB
Process description
Process Operating and Control Philosophy
Equipment sizing
P&IDs
Piping specification and sizing
Instrument process specification
Process and Emergency shutdown
Flare study
Operating manual

2015 Herv Baron

HERVE
BARON

Equipment sizing

2015 Herv Baron

HERVE
BARON

Cass study: Equipment Sizing

2015 Herv Baron

32

HERVE
BARON

2015 Herv Baron

33

HERVE
BARON

Case study: Equipment Sizing


Production separator
Sets the gas
cross section

Vessel size

Sets the liquid volume

2015 Herv Baron

HERVE
BARON

Process data sheet


Drums

2015 Herv Baron

HERVE
BARON

Process data sheet

2015 Herv Baron

Contents of the Process Data Sheet:


Design conditions
Overdesign
Fluid properties
Equipment duty
Skeleton drawing & dimensions
Material (generic type) and
corrosion allowance
Specification of internals:
demister, distributor, baffle etc.
Nozzles list
Allowable pressure drop, fouling
factor, Cp, Cv, enthalpy curve (for
HX, heaters)
Available NPSH (for pumps)

HERVE
BARON

Process Data sheet


Column

2015 Herv Baron

Columns and Drums

HERVE
BARON
Column internals must be specified.

2015 Herv Baron

These pictures are excerpts from Sulzer douments

HERVE
BARON

Process Data sheet


Column

2015 Herv Baron

HERVE
BARON

Process Data sheet


Rotating equipment

2015 Herv Baron

HERVE
BARON

Process Data sheet


Rotating equipment

2015 Herv Baron

HERVE
BARON

Process Data sheet


Heat Exchangers / Shell & Tubes

2015 Herv Baron

HERVE
BARON

Heat Exchanger thermal sizing


TEMA Data Sheet
A Thermal data sheet is
received from Process for
shell & tubes heat
exchangers following
thermal sizing

2015 Herv Baron

HERVE
BARON

Process Data sheet


Heat Exchangers / Other types

2015 Herv Baron

HERVE
BARON

Process Data sheet


Air Cooled HX

2015 Herv Baron

HERVE
BARON

Process Data Sheet


Fired heaters

2015 Herv Baron

HERVE
BARON

Process Data Sheet


Fired heaters

2015 Herv Baron

What is particularly important while specifying a heater ?

HERVE
BARON

Process Data Sheet


Storage tank

2015 Herv Baron

HERVE
BARON

Process Sizing

Process Equipment Sizing is done on the basis of:

Sizing cases

Over design

Design criteria

2015 Herv Baron

HERVE
BARON

Process Sizing

Process Equipment Sizing is done on the basis of:

Sizing cases all operating cases

Over design

Design criteria

2015 Herv Baron

HERVE
BARON

Process Sizing

Process Equipment Sizing is done on the basis of:

Sizing cases all operating cases

Over design 10% as a rule

Design criteria

2015 Herv Baron

Process Sizing

HERVE
BARON

Process Equipment Sizing is done on the basis of:

Sizing cases all operating case

Over design 10% as a rule

Sizing criteria

On which basis are the following


equipment sized?

2015 Herv Baron

Process Sizing

HERVE
BARON

Process Sizing is done on the basis of:

Sizing cases all operating case

Over design 10% as a rule

Sizing criteria
Separator
KO drum
Distillation/Absorption column
Reactor
Storage tank

2015 Herv Baron

Process Sizing

HERVE
BARON

Process Equipment Sizing is done on the basis of:

Sizing cases all operating case

Over design 10% as a rule

Sizing criteria

2015 Herv Baron

Separator Size of droplet => velocity, residence time + Surge


KO Drum Hold up time
Distillation/Absorption column Diameter based on flow. Number
of trays/height of packing based on purity required
Reactor Contact time (also called space velocity)
Tank Storage capacity

HERVE
BARON

Process specification
Package

2015 Herv Baron

What document is issued by Process for packages?

HERVE
BARON

Process specification
Package

2015 Herv Baron

HERVE
BARON

Process specification
Package
What type of guarantees
are requested?

2015 Herv Baron

HERVE
BARON

Process Equipment list

2015 Herv Baron

HERVE
BARON

Process Equipment list

2015 Herv Baron

Engineering disciplines: activities and deliverables

HERVE
BARON

PROCESS
Design basis and criteria
Process Flow Scheme, PFD, HMB
Process description
Process Operating and Control Philosophy
Equipment sizing
P&IDs
Piping specification and sizing
Instrument process specification
Process and Emergency shutdown
Flare study
Operating manual

2015 Herv Baron

HERVE
BARON

2015 Herv Baron

Compare the
information shown on
the PFD and the P&ID

Piping & Instrumentation Diagram (P&ID)

HERVE
BARON

2015 Herv Baron

Compare
Comparethe
the
information
informationshown
shownon
on
the
thePFD
PFDand
andthe
theP&ID
P&ID

Piping & Instrumentation Diagram (P&ID)

HERVE
BARON

Piping & Instrumentation Diagram (P&ID)

What are the


purposes of P&IDs?

2015 Herv Baron

Compare the
information shown on
the PFD and the P&ID

HERVE
BARON

Piping & Instrumentation Diagram (P&ID)

What are the


purposes of P&IDs?

During operation:
Reference drawing for operator, work permit, plant modifications etc.

2015 Herv Baron

At design stage:
Defines the design basis for Piping & Instrumentation disciplines
Compare
Serves to
theshow and agree the operating and maintenance features between
Engineer and Owner or between Engineer and Vendor
information shown on
Serves to show the interface with equipment/package vendors
the PFD and the P&ID
Perform HAZOP review

HERVE
BARON

Piping & Instrumentation Diagram (P&ID)

What are the


purposes of P&IDs?

P&ID

During operation:
Reference drawing for operator, work permit, plant modifications etc.

2015 Herv Baron

At design stage:
review
Defines the design basis for Piping & Instrumentation disciplines
Compare
Serves to
theshow and agree the operating and maintenance features between
Engineer and Owner or between Engineer and Vendor
information shown on
Serves to show the interface with equipment/package vendors
the PFD and the P&ID
Perform HAZOP review

HERVE
BARON

Piping & Instrumentation Diagram (P&ID)

What are the


purposes of P&IDs?
Which are the usual
points reviewed
during a P&ID
review?

P&ID

During operation:
Reference drawing for operator, work permit, plant modifications etc.

2015 Herv Baron

At design stage:
review
Defines the design basis for Piping & Instrumentation disciplines
Compare
Serves to
theshow and agree the operating and maintenance features between
Engineer and Owner or between Engineer and Vendor
information shown on
Serves to show the interface with equipment/package vendors
the PFD and the P&ID
Perform HAZOP review

HERVE
BARON

Piping & Instrumentation Diagram (P&ID)


P&ID review

Ease of operation and maintenance:

Isolation /bypass of equipment

Isolation/bypass of valves

Vents/drains

2015 Herv Baron

HERVE
BARON

Piping & Instrumentation Diagram (P&ID)


P&ID review

Ease of operation and maintenance:

Isolation /bypass of equipment

Isolation/bypass of valves

Vents/drains

2015 Herv Baron

What do you call each type of


isolation?

HERVE
BARON

Piping & Instrumentation Diagram (P&ID)


P&ID review

Ease of operation and maintenance:

Isolation /bypass of equipment

Isolation/bypass of valves

Vents/drains

2015 Herv Baron

Where do you use double block


and bleed?

HERVE
BARON

Isolation philosophy

2015 Herv Baron

HERVE
BARON

Isolation philosophy

2015 Herv Baron

HERVE
BARON

Isolation philosophy

2015 Herv Baron

HERVE
BARON

Piping & Instrumentation Diagram (P&ID)


P&ID review

Ease of operation and maintenance:

Isolation /bypass of equipment

Isolation/bypass of valves

Vents/drains

2015 Herv Baron

Piping & Instrumentation Diagrams (P&IDs)

HERVE
BARON

Important features

2015 Herv Baron

Normal operation
Redundancy for critical instruments / safety switches
Shutdown
Check valves
Start-up
Pressurization
warm-up / purge lines
Maintenance
Equipment isolation & bypass: valves, spectacle/blind
Nitrogen injection, vent
Drains
Control and ON/OFF valves isolation
Instrument isolation

HERVE
BARON

Piping & Instrumentation Diagrams (P&IDs)

It includes:
1.
2.

3.

All itemized equipment,


Item number and service description of each equipment with relevant
design condition
All lines (process , utilities, start-up, maintenance), with indication of
Diameter
Rating
Material
Service
Line number
Piping class
Piping class break / change
External finishing (such as insulation, personal protection, tracing)

2015 Herv Baron

HERVE
BARON
4.
5.

6.

Piping & Instrumentation Diagrams (P&IDs)

Battery limits between Parties, e.g. contractor and vendor


All valves for operation, start-up, maintenance with indication of
valve type, including isolation valves, check valves etc.
All instruments with detailed control loops:

All instruments shall be tagged as per united numbering system,


Local instruments or instruments on local panel,
Sequences and interlocks (with brief description e.g.: comp. start / stop,
permissive to start, etc.),

Control valves, ON/OFF valves,

8.

Safety valves (with set point and inlet/outlet size),

9.

Electrical controls, such as pump local or remote start/stop,


emergency shutdown

2015 Herv Baron

7.

HERVE
BARON
9.

Particular data or notes


installation, such as:

10.

relevant to

equipment/instruments

Max or mini length of piping (requirement regarding suction / discharge


piping straight length, etc.),
Slope of piping
Elevation of equipment
Pertinent interior arrangement of equipment
Safe location requirement
Control and monitoring signals for rotating equipment and electrical
motors,

Item number and service description of each equipment with relevant


design condition
Connecting flags for pipe lines running from one drawing to another

2015 Herv Baron

11.

Piping & Instrumentation Diagrams (P&IDs)

Instruments and controls must be drawn-up according to ISA 6.12


requirements.

Piping & Instrumentation Diagrams (P&IDs)

HERVE
BARON

Various types of P&IDs

Legend and Symbols


Identification & Numbering
Details and Typicals
Process or Utility P&ID
Distribution P&ID
Interconnection P&ID
Pumps auxiliary P&ID
Package P&ID

2015 Herv Baron

Piping & Instrumentation Diagrams (P&IDs)

HERVE
BARON

Various types of P&IDs

Legend and Symbols


Identification & Numbering
Details and Typicals
Process or Utility P&ID
Distribution P&ID
Interconnection P&ID
Pumps auxiliary P&ID
Package P&ID

2015 Herv Baron

HERVE
BARON

P&IDs legend & symbols

2015 Herv Baron

Piping & Instrumentation Diagrams (P&IDs)

HERVE
BARON

Various types of P&IDs

Legend and Symbols


Identification & Numbering
Details and Typicals
Process or Utility P&ID
Distribution P&ID
Interconnection P&ID
Pumps auxiliary P&ID
Package P&ID

2015 Herv Baron

HERVE
BARON

Identification and numbering system

2015 Herv Baron

HERVE
BARON

Identification and numbering system

2015 Herv Baron

Piping & Instrumentation Diagrams (P&IDs)

HERVE
BARON

Various types of P&IDs

Legend and Symbols


Identification & Numbering
Details and Typicals
Process or Utility P&ID
Distribution P&ID
Interconnection P&ID
Pumps auxiliary P&ID
Package P&ID

2015 Herv Baron

Piping & Instrumentation Diagrams (P&IDs)

HERVE
BARON

Various types of P&IDs

Legend and Symbols


Identification & Numbering
Details and Typicals
Process or Utility P&ID
Distribution P&ID
Interconnection P&ID
Pumps auxiliary P&ID
Package P&ID

P&ID
representation

Details

2015 Herv Baron

Piping & Instrumentation Diagrams (P&IDs)

HERVE
BARON

Various types of P&IDs

Legend and Symbols


Identification & Numbering
Details and Typicals
Process or Utility P&ID
Distribution P&ID
Interconnection P&ID
Pumps auxiliary P&ID
Package P&ID

2015 Herv Baron

Piping & Instrumentation Diagrams (P&IDs)

HERVE
BARON

Various types of P&IDs

Legend and Symbols


Identification & Numbering
Details and Typicals
Process or Utility P&ID
Distribution P&ID
Interconnection P&ID
Pumps auxiliary P&ID
Package P&ID

What are the different typicals that should be


defined?
2015 Herv Baron

HERVE
BARON

Piping & Instrumentation Diagram (P&ID) - Typicals

2015 Herv Baron

How would you call each of these two types


of arrangement?
For what service(s) would each be used?

Piping & Instrumentation Diagrams (P&IDs)

HERVE
BARON

Various types of P&IDs

Legend and Symbols


Identification & Numbering
Details and Typicals
Process or Utility P&ID
Distribution P&ID
Interconnection P&ID
Pumps auxiliary P&ID
Package P&ID

2015 Herv Baron

HERVE
BARON

P&ID work sequence

P&IDs are typically issued 3 times, as design progresses

2015 Herv Baron

P&ID work sequence

HERVE
BARON

P&IDs are typically issued 3 times, as design progresses

IFD

IFC

2015 Herv Baron

IFR

P&ID work sequence

HERVE
BARON

P&IDs are typically issued 3 times, as design progresses

IFD

IFC

2015 Herv Baron

IFR

P&ID work sequence

HERVE
BARON

P&IDs are typically issued 3 times, as design progresses

P&ID
Review

IFD

IFC

2015 Herv Baron

IFR

P&ID work sequence

HERVE
BARON

P&IDs are typically issued 3 times, as design progresses

P&ID
Review

IFD

IFC

2015 Herv Baron

IFR

HAZOP

HERVE
BARON

Quiz
Which revision of P&IDs has the following purpose/contents?

Purpose
Collect Client comments
Perform PID review
Perform HAZOP
Perform Piping MTO for 1st Piping purchase
Freeze Control system I/O list
Issue Piping ISOs
Contents
Comments from all disciplines

IFR

IFD

IFC

IFR

IFD

IFC

Comments from Piping, I&C disciplines


Finalized interfaces with eqt/package
Exercised Contract Option(s)
2015 Herv Baron

Size, number of PSVs and CVs


Diameter of process lines
Diameter of utility lines
HAZOP comments incorporated
Client comments incorporated

HERVE
BARON

Quiz
Which revision of P&IDs has the following purpose/contents?

Purpose
Collect Client comments
Perform PID review
Perform HAZOP
Perform Piping MTO for 1st Piping purchase
Freeze Control system I/O list
Issue Piping ISOs
Contents
Comments from all disciplines

IFR
X
X

IFD

X
X

IFR

Comments from Piping, I&C disciplines

IFD

X
X
X
X
X
X
X

2015 Herv Baron

Size, number of PSVs and CVs


Diameter of process lines
Diameter of utility lines
HAZOP comments incorporated
Client comments incorporated

X
X
IFC
X

Finalized interfaces with eqt/package


Exercised Contract Option(s)

IFC

P&ID work sequence

HERVE
BARON

P&IDs are typically issued 3 times, as design progresses

P&ID
Review

IFD

IFC

2015 Herv Baron

IFR

HAZOP

P&ID work sequence


The different revisions

HERVE
BARON

The prime purpose of the first issue (IFR: Issued for Review) is to
obtain COMPANYs comments/APPROVAL this APPROVAL is
necessary before progressing the design further to avoid re-work
The IFD revision, which incorporates COMPANY comments, aims
at transferring information from Process to other disciplines:

to Piping, to perform routing studies


to Piping materials, to perform 1st MTO for purchase
To Instrumentation, to perform Instrument list
To Civil for routing of Undeground Piping

2015 Herv Baron

IFC incorporates HAZOP impacts and information from Vendors. It


is a pre-requisite to:
Start production of Piping isometrics

P&ID work sequence

HERVE
BARON

P&ID
Review

HAZOP

Piping Isometric
drawings
Piping material
top-ups

IFR

IFD

IFC
Piping 2nd MTO & 1st material purchases
Instrumenation & Control design
Undeground piping (civil)

2015 Herv Baron

Piping routing

P&ID work sequence

HERVE
BARON

Sometimes an IFH revision, mark-ups of the P&ID review,


is used to anticipate the HAZOP

P&ID
Review

IFD

IFC

2015 Herv Baron

IFR

HAZOP

P&ID work sequence

HERVE
BARON

An IFD2 revision is issued in case major change from Vendors/HAZOP to


up-date piping material purchases, instrumentation design etc.

P&ID
Review

HAZOP

Piping Isos
Piping material
top-up

Start

IFR

IFD IFD2

IFC

Piping routing
Piping 1st material purchases
Instrumenation & Control design
Undeground piping (civil)

2015 Herv Baron

Up-date

Engineering disciplines: activities and deliverables

HERVE
BARON

PROCESS
Design basis and criteria
Process Flow Scheme, PFD, HMB
Process description
Process Operating and Control Philosophy
Equipment sizing
P&IDs
Piping specification and sizing
Instrument process specification
Process and Emergency shutdown
Flare study
Operating manual

2015 Herv Baron

HERVE
BARON

Fluids list

2015 Herv Baron

Line list
HERVE
BARON

2015 Herv Baron

HERVE
BARON

Line sizing

2015 Herv Baron

Engineering disciplines: activities and deliverables

HERVE
BARON

PROCESS
Design basis and criteria
Process Flow Scheme, PFD, HMB
Process description
Process Operating and Control Philosophy
Equipment sizing
P&IDs
Piping specification and sizing
Instrument process specification
Process and Emergency shutdown
Flare study
Operating manual

2015 Herv Baron

HERVE
BARON

Instrument process data sheet

2015 Herv Baron

HERVE
BARON

2015 Herv Baron

What is the most


important process data
for control valves?

Instrument process data sheet

HERVE
BARON

Instrument process data sheet

2015 Herv Baron

Operating range, typ.


Maximum flow rate: 110 % of max. operating flow rate
Minimum flow rate: 30 % of minimum operating flow
rate,
in order to guarantee correct functioning at the extremes
of the operating range.

Engineering disciplines: activities and deliverables

HERVE
BARON

PROCESS
Design basis and criteria
Process Flow Scheme, PFD, HMB
Process description
Process Operating and Control Philosophy
Equipment sizing
P&IDs
Piping specification and sizing
Instrument process specification
Process and Emergency shutdown
Flare study
Operating manual

2015 Herv Baron

HERVE
BARON

Process Shut Down

Look at the extracts of these 2 P&IDs.


How is the protection against loss of
liquid level achieved in each case?
2015 Herv Baron

HERVE
BARON

ESD logic diagram

2015 Herv Baron

HERVE
BARON

Safeguarding narrative & Cause and Effects charts

2015 Herv Baron

HERVE
BARON

Process and Safety Diagrams (PSD)

2015 Herv Baron

Engineering disciplines: activities and deliverables

HERVE
BARON

PROCESS
Design basis and criteria
Process Flow Scheme, PFD, HMB
Process description
Process Operating and Control Philosophy
Equipment sizing
P&IDs
Piping specification and sizing
Instrument process specification
Process and Emergency shutdown
Flare study
Operating manual

2015 Herv Baron

HERVE
BARON

Relief load summary

2015 Herv Baron

HERVE
BARON

Flare study

2015 Herv Baron

HERVE
BARON

Flare study

2015 Herv Baron

Engineering disciplines: activities and deliverables

HERVE
BARON

PROCESS
Design basis and criteria
Process Flow Scheme, PFD, HMB
Process description
Process Operating and Control Philosophy
Equipment sizing
P&IDs
Piping specification and sizing
Instrument process specification
Process and Emergency shutdown
Flare study
Operating manual

2015 Herv Baron

HERVE
BARON

Operating manual

2015 Herv Baron

HERVE
BARON

Operating manual
What are the most important contents of the
operating manual?

2015 Herv Baron

HERVE
BARON

1 INTRODUCTION
1.1 General presentation
1.2 Glossary
1.3 Basic data
2 DESCRIPTION OF FACILITIES
2.1 General
2.2 Process
2.3 Utilities
2.4 Auxiliaries

4 OPERATION
4.1 Start-up
4.2 Normal operation
4.4 Shutdown
4.5 Depressurization
5 SAFETY
5.1 Operating philosophy
5.2 Escape, evacuation and
rescue
5.3 Emergency power system
5.4 Safety equipment list
5.5 Fire protection
2015 Herv Baron

3 AUTOMATIC CONTROL SYSTEM


3.1 System overview
3.2 Operator control interfaces
3.3 Telecommunications
3.4 Process alarms and trips
3.6 Emergency shutdown system
3.7 Fire & gas system

Operating Manual
Table of Contents (typ.)

Operating Manual
Annexes (typ.)

HERVE
BARON

EQUIPMENT LIST

SINGLE LINE DIAGRAM

PFDs

P&IDs

F&G
SYSTEM
DRAWING

VESSELS
SHEETS

INSTRUMENT DATA SHEETS (PSVs,


Level instruments)

ARCHITECTURE

MECHANICAL

DATA

ESD LOGIC DIAGRAM

EQUIPMENT START/STOP
SHUTDOWN SEQUENCES

GENERAL PLOT PLAN

ESD SIMPLIFIED DIAGRAM

DCS ARCHITECTURE DRAWING

CONTROL LOOPS AND ALARM LIST

ELECTRICAL CONTROL SYSTEM


ARCHITECTURE DRAWING

SECURITY SWITCHES LIST

&

2015 Herv Baron

Operating Manual
Annexes (typ.)

HERVE
BARON

EQUIPMENT LIST

SINGLE LINE DIAGRAM

PFDs

P&IDs

F&G
SYSTEM
DRAWING

VESSELS
SHEETS

INSTRUMENT DATA SHEETS (PSVs,


Level instruments)

ARCHITECTURE

MECHANICAL

DATA

ESD LOGIC DIAGRAM

EQUIPMENT START/STOP
SHUTDOWN SEQUENCES

GENERAL PLOT PLAN

ESD SIMPLIFIED DIAGRAM

DCS ARCHITECTURE DRAWING

CONTROL LOOPS AND ALARM LIST

ELECTRICAL CONTROL SYSTEM


ARCHITECTURE DRAWING

SECURITY SWITCHES LIST

&

2015 Herv Baron

HERVE
BARON

Operating Manual
Control loops and Alarms list

2015 Herv Baron

Engineering disciplines: activities and deliverables

HERVE
BARON

PROCESS
Design basis and criteria
Process Flow Scheme, PFD, HMB
Process description
Process Operating and Control Philosophy
Equipment sizing
P&IDs
Piping specification and sizing
Instrument process specification
Process and Emergency shutdown
Flare study
Operating manual

2015 Herv Baron

HERVE
BARON

Process design criteria

What are the different Process design criteria?

2015 Herv Baron

HERVE
BARON

Process design criteria

What are the different Process design criteria?

Design margins
Design Pressure and Temperature criteria
Equipment sizing criteria
Line sizing criteria
Control valve sizing criteria

2015 Herv Baron

HERVE
BARON

Process design criteria

Design margins
Design Pressure and Temperature criteria
Equipment sizing criteria
Line sizing criteria
Control valve sizing criteria

2015 Herv Baron

Process design criteria

HERVE
BARON

Design margins: what is the usual Equipment (rotating, heat exchangers, columns) overdesign (%)?
Design Pressure and Temperature criteria
Equipment sizing criteria
Line sizing criteria
Control valve sizing criteria

+?%
2015 Herv Baron

Process design criteria

HERVE
BARON

Design margins: what is the usual Equipment (rotating, heat exchangers, columns) overdesign (%)?
Design Pressure and Temperature criteria
Equipment sizing criteria
Line sizing criteria
Control valve sizing criteria

+10%
2015 Herv Baron

HERVE
BARON

Process design criteria

Design margins
Design Pressure and Temperature criteria
Equipment sizing criteria
Line sizing criteria
Control valve sizing criteria

2015 Herv Baron

Process design criteria

HERVE
BARON

Design margins
Design Pressure and Temperature criteria
Equipment sizing criteria
Line sizing criteria
Control valve sizing criteria
The design temperature should be the highest or lowest temperature to which the
equipment is subjected, plus a margin.
The following cases must be considered:
(a) A maximum temperature which can occur when bypassing a heat exchanger or
cooler for cleaning.
(b) A high metal temperature on uninsulated equipment due to solar radiation.

(d) The maximum metal temperature that can occur during steam out or decoking
operation.

2015 Herv Baron

(c) The lowest temperature that may be caused by auto-refrigeration.

HERVE
BARON

Process design criteria

Design margins
Design Pressure and Temperature criteria
Equipment sizing criteria
Line sizing criteria
Control valve sizing criteria

2015 Herv Baron

HERVE
BARON

Process design criteria

Design margins
Design Pressure and Temperature criteria
Equipment sizing criteria
Line sizing criteria
Control valve sizing criteria

2015 Herv Baron

HERVE
BARON

Licensed vs Open Art Process

When one uses a process under license, what are the deliverables
issued by the process LICENSOR?

2015 Herv Baron

Typical PROCESS Licensor / Engineering split

HERVE
BARON

Process Licensor

Engineer

PFD, H&MB

Equipment data sheet

Equipment process data sheet: Equipment Mechanical data sheet


- Operating conditions,
- Duty
- Diameters of vessels
- Size of Nozzles
- Pump head
+ specific info for internals etc.

P&IDs

Generic

customized (piping class, line and


valves size, HAZOP comments,
vendor info)

Line sizing

Line sizing criteria

Sizing (takes into account eqt loc,


elevation etc.)

Plot Plan

recommendations

Material selection

Basic requirement

MSD

2015 Herv Baron

Item

Typical PROCESS Licensor / Engineering split

HERVE
BARON

Process Licensor

Engineer

PFD, H&MB

Equipment data sheet

Equipment process data sheet: Equipment Mechanical data sheet


- Operating conditions,
- Duty
- Diameters of vessels
- Size of Nozzles
- Pump head
+ specific info for internals etc.

P&IDs

Generic

customized (piping class, line and


valves size, HAZOP comments,
vendor info)

Line sizing

Line sizing criteria

Sizing (takes into account eqt loc,


elevation etc.)

Plot Plan

recommendations

Material selection

Basic requirement

MSD

2015 Herv Baron

Item

HERVE
BARON

The Oil & Gas Engineering Guide


2nd edition

Do you want to know more... Much more?

2015 Herv Baron

HERVE
BARON

The Oil & Gas Engineering Guide - 2nd edition


Table of Contents

2015 Herv Baron

HERVE
BARON

The Oil & Gas Engineering Guide - 2nd edition


Table of Contents

This suite of training modules


covered
the
discipline
chapters of the book...

2015 Herv Baron

HERVE
BARON

The Oil & Gas Engineering Guide - 2nd edition


Table of Contents

The Guide contains much more:


The overall picture, interfaces,
methods & tools, etc.
2015 Herv Baron

HERVE
BARON

The Oil & Gas Engineering Guide


2nd edition
Order direct from the publisher:
http://www.editionstechnip.com/en/catalogu
e-detail/1111/oil-gas-engineering-guidethe.html

2015 Herv Baron

Você também pode gostar