Você está na página 1de 15

CLIENT

CONTRACT NO.: 4600002029

CONTRACTOR.

EPC for Revamp of Oil Pier Jetty at Port of Salalah


(Raysut)
JOB HAZARD ANALYISIS
Doc. No: 2029-PJ-JHA-007

Rev no: 03

Date: 18/10/2016
Location: Inside Port of
Salalah, from Oil jetty to
Booster pump Facility.

Job description: JHA for Construction of New 8 Oil Pipeline.


Member present: HSE Department, Project department, Operation Department.

S.
No.
1.

Activity job
stages

Entering the
work area.

Hazards
(What can go wrong)

Controls
(How to prevent it)

Action
party

Working without Valid


Permit.
Personnel Injuries due to
slips, trips & falls.
Over speeding of
vehicles.
People hit by moving
Vehicles.
Poor housekeeping.
Heat stress.
Manual Handling.
Adverse weather
condition.

Valid permit to be obtained from POS and


Orpic before starting any job.
All people should undergo POS & ORPIC
Induction.
A Tool Box Talk to be conducted before
starting any job on daily basis.
A Competent supervisor should be available at
site at all times.
First Aider should be present at site at all
times.
First aid facility available at site at all times.
Adequate drinking water available at site
altimes.
Ensure adequacy of resources required and
plan the work area properly to avoid
accumulation of materials, spills, wastages,
etc., that harm personnel at site.
Establish clearly maintained walkways and for
movement of vehicles / equipment, wherever
possible.
Plan & control vehicle / equipment movement
with the presence of an authorized banksman.
Proper storage of materials.
Maintain good housekeeping in worksites.

AWS

Page 1 of 15

Contingency
(If control fails &
result in accident)
If in case of any
incident initiate
Emergency
Response Plan.
Seek Medical
assistance
POS Emergency
contact:2322000
(Ext.666),
99247666
AWS Emergency
Contact No.:
91409583,
91395892,
91395890

Remarks

CLIENT
CONTRACT NO.: 4600002029

CONTRACTOR.

EPC for Revamp of Oil Pier Jetty at Port of Salalah


(Raysut)
JOB HAZARD ANALYISIS
Doc. No: 2029-PJ-JHA-007

Rev no: 03

Date: 18/10/2016
Location: Inside Port of
Salalah, from Oil jetty to
Booster pump Facility.

Job description: JHA for Construction of New 8 Oil Pipeline.


Member present: HSE Department, Project department, Operation Department.

2.

Opening of
existing concrete
trench.

Working Without valid


permit
Heat Stress.
Personnel Injury.
Manual Handling.
Lifting Equipment Failure.
Lifting Gear Failure.
Damage to nearby
structures.
Damage to U/G Utilities.
Unstable or Non secured
load
Falling of Load.
Overturning of
Equipment.
People hit by equipment.

Establish a site clean-up schedule for collection


& disposal of wastes, spills, accumulations, etc.
Warning signs to be inatlled.
Use of PPEs Safety Shoes, coverall, goggles,
helmet, etc.)
In any adverse weather condition work will be
temporarily suspended and will be resumed
after condition is clear.
Valid permit to be obtained from POS/Orpic
before starting any job.
All people should undergo POS&ORPIC
Induction.
A Tool Box Talk to be conducted before
starting any job on daily basis.
A Competent Rigging Supervisor and Rigging
crew should be available at site at all times.
First Aider should be present at site at all time.
First aid facility available at site at all times.
Adequate drinking water should be available
at site at all times.
Adequate rotation and intervals for the job to
avoid heat stress.
Area to be barricaded and signboards to be
placed to avoid any people entering the work
area.
Flickering lights to be installed on the
barricades to warn night users.
Page 2 of 15

AWS

If in case of any
incident initiate
Emergency
Response Plan.
Seek Medical
assistance
POS Emergency
contact:2322000
(Ext.666),
99247666
AWS Emergency
Contact No.:
91409583,
91395892,
91395890

CLIENT
CONTRACT NO.: 4600002029

EPC for Revamp of Oil Pier Jetty at Port of Salalah


(Raysut)

CONTRACTOR.

JOB HAZARD ANALYISIS


Doc. No: 2029-PJ-JHA-007

Rev no: 03

Job description: JHA for Construction of New 8 Oil Pipeline.


Member present: HSE Department, Project department, Operation Department.

Load swings in the air.


People hit by the truck or
equipment.
Slip, Trip & Fall.
Heat stress
Adverse weather
condition
Noise

The area to be checked for U/G utilities before


placing the crane.
Suspend all lifting activities if wind speed
exceeds 25 mph.
Proper lifting plan to be prepared before doing
any major lifting activities and to be approved
by ORPIC / MMC.
All Lifting Equipments and Gear's should
possess a valid third party certificate.
All Lifting Equipment's and Gears should be
inspected before carrying out the job.
Crane should be placed on levelled surface.
All people should wear reflective jacket at all
times.
Tag line rope to be tied before lifting the load
Adequate PPE to be used for the job.
Suitable access and egress shall be provided
with suitable means.
A trained banksmen will be provided along
with the vehicle.
The work area to be kept clean and free of
obstruction.
After finishing the work, housekeeping to be
carried out.
Page 3 of 15

Date: 18/10/2016
Location: Inside Port of
Salalah, from Oil jetty to
Booster pump Facility.

CLIENT
CONTRACT NO.: 4600002029

CONTRACTOR.

EPC for Revamp of Oil Pier Jetty at Port of Salalah


(Raysut)
JOB HAZARD ANALYISIS
Doc. No: 2029-PJ-JHA-007

Rev no: 03

Date: 18/10/2016
Location: Inside Port of
Salalah, from Oil jetty to
Booster pump Facility.

Job description: JHA for Construction of New 8 Oil Pipeline.


Member present: HSE Department, Project department, Operation Department.

3.

Loading and
Unloading of
pipes to be
fabricated

Working Without valid


permit
Heat Stress.
Personnel Injury.
Manual handling
Lifting Equipment Failure.
Lifting Gear Failure.
Damage to nearby
structures.
Damage to U/G Utilities.
Unstable or Non secured
load
Falling of Load.
Overturning of
Equipment.
People hit by equipment.
Load swings in the air.
People hit by the truck or
equipment.
Slip, Trip & Fall.

In any adverse weather condition work will be


temporarily suspended and will be resumed
after condition is clear.
Valid permit to be obtained from POS/Orpic
before starting any job.
All people should undergo POS & ORPIC
Induction.
A Tool Box Talk to be conducted before
starting any job on daily basis.
A Competent Rigging Supervisor and Rigging
crew should be available at site at all times.
First Aider should be present all time at site.
First aid facility available altimes.
Drinking water available at site at all times.
Adequate job rotation and intervals to avoid
heat stress.
Area to be barricaded and signboards to be
placed to avoid any people entering the work
area.
Flickering lights to be installed on the
barricades to warn night users.
The area to be checked for U/G utilities before
placing the crane.
Adequate PPE to be used for the job.
Suspend all lifting activities if wind speed
exceeds 25 mph.
Page 4 of 15

AWS

If in case of any
incident initiate
Emergency
Response Plan.
Seek Medical
assistance
POS Emergency
contact:2322000
(Ext.666),
99247666
AWS Emergency
Contact No.:
91409583,
91395892,
91395890

CLIENT
CONTRACT NO.: 4600002029

CONTRACTOR.

EPC for Revamp of Oil Pier Jetty at Port of Salalah


(Raysut)
JOB HAZARD ANALYISIS
Doc. No: 2029-PJ-JHA-007

Rev no: 03

Date: 18/10/2016
Location: Inside Port of
Salalah, from Oil jetty to
Booster pump Facility.

Job description: JHA for Construction of New 8 Oil Pipeline.


Member present: HSE Department, Project department, Operation Department.

Heat stress
Adverse weather
condition

4.

Grit blasting of
the 8 pipeline.

Working without Valid


Permit
Personnel Injuries due to

No people should work underneath the


suspended load while shifting.
Proper lifting plan to be prepared before doing
any major lifting activities and to be approved
by Orpic.
All Lifting Equipments and Gear's should
possess a valid third party certificate.
All Lifting Equipment's and Gears should be
inspected before carrying out the job.
Crane should be placed on levelled surface.
All people should wear reflective jacket at all
times.
Tag line rope to be tied before lifting the load
Proper stacking and lashing of the pipes
stacked will be ensured.
A trained banksmen will be provided along
with the vehicle.
The work area to be kept clean and free of
obstruction.
After finishing the work, housekeeping to be
carried out.
In any adverse weather condition, work will be
stopped and resumed after conditions are apt
for the job.
Valid permit to be obtained from POS and
ORPIC before starting any job.
All people should undergo POS & ORPIC
Page 5 of 15

AWS

If in case of any
incident initiate
Emergency

CLIENT
CONTRACT NO.: 4600002029

CONTRACTOR.

EPC for Revamp of Oil Pier Jetty at Port of Salalah


(Raysut)
JOB HAZARD ANALYISIS
Doc. No: 2029-PJ-JHA-007

Rev no: 03

Job description: JHA for Construction of New 8 Oil Pipeline.


Member present: HSE Department, Project department, Operation Department.

slips, trips & falls


Communications
Heat Stress
Manual Handling
Personnel Injury.
Dehydration.
Musculoskeletal Injury.
Damage to property
Fall of object tools.
Accidental fall of person.
Exposure of dust, noise
and injury to the workers
Wrong Posture / unsafe
handling, Wrong Posture
/ unsafe handling of tools
Slip, Trip & Fall
Noise
Untrained workers.
Incorrect material /
equipment.
Fire explosion
Scattered material

Induction.
A Tool Box Talk to be conducted before
starting any job on daily
A Competent supervisor should be available at
site at all times.
First aider should be made available at site at
all times.
First aid provision should be made available at
site at all times.
Adequate drinking water to be made available
at the site.
Ensure condition of tools prior to use.
Use of right tool for the job.
Area to be barricaded and signage's to be
placed to avoid any people entering the work
area.
Flickering lights to be installed on the
barricades to warn night users.
Restrict access only to authorized personnel in
the work area.
Ensure availability of DCP / CO2 Fire
Extinguishers.
Trained and Competent people in blasting
should be engaged for the job.
Wash hands and face after handling, and
before eating, drinking.
Adequate Access and egress to be provided.
Page 6 of 15

Date: 18/10/2016
Location: Inside Port of
Salalah, from Oil jetty to
Booster pump Facility.

Response Plan.
Seek Medical
assistance
POS Emergency
contact:2322000
(Ext.666),
99247666
AWS Emergency
Contact No.:
91409583,
91395892,
91395890

CLIENT
CONTRACT NO.: 4600002029

CONTRACTOR.

EPC for Revamp of Oil Pier Jetty at Port of Salalah


(Raysut)
JOB HAZARD ANALYISIS
Doc. No: 2029-PJ-JHA-007

Rev no: 03

Date: 18/10/2016
Location: Inside Port of
Salalah, from Oil jetty to
Booster pump Facility.

Job description: JHA for Construction of New 8 Oil Pipeline.


Member present: HSE Department, Project department, Operation Department.

5.

Painting of 8
pipeline.

Working without Valid


Permit
Scaffolding
Personnel Injuries due to
slips, trips & falls
Communications

A reasonable time should be allocated for the


inspection and should include regular breaks
for the operators.
Ensure the personnel involved in blasting uses
correct suitable PPE.
Enclose the grit blast area with tarpaulin and
post Warning notice.
Ensure the blast gun is fitted with Dead man's
switch and it's functional.
Adequate lights to be provided during night
works.
Do not leave the grit blast equipment
Unattended with air supply on.
Establish emergency communication with grit
blasting supervisor and the grit blaster.
Never allow spray painting in location if grit
blasting going on to avoid fire and explosion
Arrange the recovery and safe disposal of
spent grits as per ORPIC procedure. 3
Ensure proper winding up of equipment and
tools and tidiness of the work area.
Valid permit to be obtained from POS and
Orpic before starting any job.
All people should undergo POS & ORPIC
Induction.
A Tool Box Talk to be conducted before
starting any job on daily
Page 7 of 15

AWS

If in case of any
incident initiate
Emergency
Response Plan.
Seek Medical

CLIENT
CONTRACT NO.: 4600002029

CONTRACTOR.

EPC for Revamp of Oil Pier Jetty at Port of Salalah


(Raysut)
JOB HAZARD ANALYISIS
Doc. No: 2029-PJ-JHA-007

Rev no: 03

Job description: JHA for Construction of New 8 Oil Pipeline.


Member present: HSE Department, Project department, Operation Department.

Heat Stress
Manual Handling
Personnel Injury.
Dehydration.
Musculoskeletal Injury
Damage to property
Un Authorized person
doing Spray painting
Fall of object tools.
Exposure of dust, noise
and injury to the workers
Exposure to harmful
Vapor
Wrong Posture / unsafe
handling, Wrong Posture
/ unsafe handling of tools
Slip, Trip & Fall
Noise
Untrained workers
Incorrect material/
equipment.
Lack of communication
Fire explosion
Scattered material
Contaminated clothing
Un attended spray

A Competent supervisor should be available at


site at all times
First aider should be made available at site at
all times.
First aid provision should be made available at
site at all times.
Adequate drinking water available at the site
to avoid heat stress.
Use of right tool for the job.
Enclose the area to be painted with tarpaulin
and post warning notice.
Ensure the equipment/tool to be used for
spray painting (Spray paint gun, hose, pump
etc. are free from defect.
Obtain MSDS for the paint as well as thinner
and should be kept at site.
Wear the adequate PPE such as long sleeve
coverall, apron, face shield and suitable
respiratory protection etc.
Ensure proper ventilation of the area.
Ensure there is no naked flame or spark
generating equipment in the area where spray
painting is to be done.
Never smoke in the area where spray painting
is going on.
Do not eat or smoke wearing a paint socked
Page 8 of 15

Date: 18/10/2016
Location: Inside Port of
Salalah, from Oil jetty to
Booster pump Facility.

assistance
POS Emergency
contact:2322000
(Ext.666),
99247666
AWS Emergency
Contact No.:
91409583,
91395892,
91395890

CLIENT
CONTRACT NO.: 4600002029

CONTRACTOR.

EPC for Revamp of Oil Pier Jetty at Port of Salalah


(Raysut)
JOB HAZARD ANALYISIS
Doc. No: 2029-PJ-JHA-007

Rev no: 03

Date: 18/10/2016
Location: Inside Port of
Salalah, from Oil jetty to
Booster pump Facility.

Job description: JHA for Construction of New 8 Oil Pipeline.


Member present: HSE Department, Project department, Operation Department.

painting tools
Unsafe storage of paint
and thinner
Scattered material

6.

Fabrication of
the pipe line.

Working Without valid

permit
Presence of flammable
/toxic vapor or liquid
Fire and explosion
Exposure to hazardous
fumes
Burns
Falling Sparks& hot bids
Oxy-acetylene cylinder
Improper handling of
hand tools or power tools

coverall or gloves.
Wash hands properly before taking any food
Do not leave the spray paint gun and hose
with the equipment unattended.
Isolate the equipment from all source of
energy when not in use.
Ensure proper winding up and housekeeping
at worksite.
The accessories (spray gun, hose and pump)
not being used must be disconnected and
stored separately.
Paint and thinners should be stored safe
designated location away from source of
ignition.
Valid permit to be obtained from POS/Orpic
before starting any job.
All people should undergo POS & ORPIC
Induction.
A Tool Box Talk to be conducted before
starting any job on daily basis.
A Competent supervisor should be available at
site at all times.
First Aider should be made available present at
site at all times.
First aid facility should be made available
present at site at all times.
Drinking water available at site at all times.
Page 9 of 15

AWS

If in case of any
incident initiate
Emergency
Response Plan.
Seek Medical
assistance
POS Emergency
contact:2322000
(Ext.666),
99247666
AWS Emergency

CLIENT
CONTRACT NO.: 4600002029

CONTRACTOR.

EPC for Revamp of Oil Pier Jetty at Port of Salalah


(Raysut)
JOB HAZARD ANALYISIS
Doc. No: 2029-PJ-JHA-007

Rev no: 03

Job description: JHA for Construction of New 8 Oil Pipeline.


Member present: HSE Department, Project department, Operation Department.

Awkward Position.
Noise.
Vibration.
Electrocution
Scattered material.
Heat stress
Hot weather
Personnel Injury
Slip, Trip and Fall
Rotating equipment
sparks.
Damaged grinding disc
Flying object/eye injuries

Tripping.
Damaged or leaking
cylinders or hoses

Damage cable
Hot tabs end pieces of
welding rods.
Sparking
Damage cable
UV rays

Slip, Trip & Fall.


Heat stress

Adequate job rotation and intervals to avoid


heat stress.
Make sure guards are fitted to all moving
parts.
Ensure the proper use of guards.
Inspect the grinding discs prior to starting
work (ring test).
Make sure that disc is compatible with the
grinding machine.
Check the RPM of disc & machine.
Correct installation of Grinding Wheel.
Spark containment to be done while doing
welding and cutting activities.
Only experienced personnel should use the
equipment.
Wear a face shield while grinding and cutting
activities.
Proper isolation of system to be in place and
to be checked before starting the job.
All cylinders to be secured in upright position.
Cylinders must always keep in upright position
and secured all times.
OXY Acetylene should be segregated and
stored separately.
Smoldering debris that cannot be removed
should be wetted down.
Page 10 of 15

Date: 18/10/2016
Location: Inside Port of
Salalah, from Oil jetty to
Booster pump Facility.

Contact No.:
91409583,
91395892,
91395890

CLIENT
CONTRACT NO.: 4600002029

EPC for Revamp of Oil Pier Jetty at Port of Salalah


(Raysut)

CONTRACTOR.

JOB HAZARD ANALYISIS


Doc. No: 2029-PJ-JHA-007

Rev no: 03

Job description: JHA for Construction of New 8 Oil Pipeline.


Member present: HSE Department, Project department, Operation Department.

Adverse weather
condition

Keep oxy-acetylene cylinders safely at least 5


mtrs away from the work location
All the cylinders valves must be closed before
leaving the site
Flash back arrestor to be provided in the hose.
Cylinders, Hoses and cables to be inspected

before starting the job.


Trained Fire Watcher to be allocated.
Gas Monitor to be provided to the working
crew.
Fire Blanket to be used to cover the area.
Before starting Hot work make sure the area is
clear of all types of combustible materials
Make sure fire extinguishers are available on
site.
The accessories (torch, hoses, cylinders) not
being used bust be disconnected and stored
separately.
Wear proper PPE for welding i.e., leather
jackets, Gloves, welding goggles/welding
mask.
Proper earthing to be provided.
Only Certified and competent welder should
be employed.
Ensure that rod holder is in good condition
Ensure that forward and return cables are in
Page 11 of 15

Date: 18/10/2016
Location: Inside Port of
Salalah, from Oil jetty to
Booster pump Facility.

CLIENT
CONTRACT NO.: 4600002029

CONTRACTOR.

EPC for Revamp of Oil Pier Jetty at Port of Salalah


(Raysut)
JOB HAZARD ANALYISIS
Doc. No: 2029-PJ-JHA-007

Rev no: 03

Date: 18/10/2016
Location: Inside Port of
Salalah, from Oil jetty to
Booster pump Facility.

Job description: JHA for Construction of New 8 Oil Pipeline.


Member present: HSE Department, Project department, Operation Department.

7.

Hydro testing of
8 pipeline.

Working Without valid

permit
Hot weather
Personnel Injury
Slip, Trip and Fall
Manual Handling
Adverse weather
condition
Un authorized personnel
Defective tools and
equipments.
Exceeding Maximum
Allowable pressure
Injury to workers
Damage to equipment/
system

good working condition.


Use proper cable connector for extension.
If cables are crossing the road then ensure
proper protection.
The welder & the welder helpers must wear
welding goggles
Appropriate PPE should be used for the work.
In any case of adverse weather condition work
will be stopped and renewed after conditions
are suitable for work
Valid permit to be obtained from POS / Orpic
before starting any job.
All people should undergo POS & ORPIC
Induction.
A Tool Box Talk to be conducted before
starting any job on daily basis.
A Competent supervisor should be available at
site at all times.
First Aider should be present at site at all
times.
First aid facility be made available at site at all
times.
Drinking water should be made available at
site all times.
Adequate job rotation and intervals to avoid
heat stress
Barricade the area where hydro test to be
Page 12 of 15

AWS

If in case of any
incident initiate
Emergency
Response Plan.
Seek Medical
assistance
POS Emergency
contact:2322000
(Ext.666),
99247666
AWS Emergency
Contact No.:
91409583,
91395892,
91395890

CLIENT
CONTRACT NO.: 4600002029

EPC for Revamp of Oil Pier Jetty at Port of Salalah


(Raysut)

CONTRACTOR.

JOB HAZARD ANALYISIS


Doc. No: 2029-PJ-JHA-007

Rev no: 03

Job description: JHA for Construction of New 8 Oil Pipeline.


Member present: HSE Department, Project department, Operation Department.

Unattended pressurized
tools and equipment.
Changing the duration of
hydro test.
Unsafe depressurization
of Hydro test fluid.
Scattered Material

carried out and warning signs to be placed.


Adequate lights to be provided during night
works.
During hydro test sufficient stand by personnel
to be employed to warn the nearby.
Ensure the equipment/ tools to be used for
hydro testing (Such as hose, pump, coupling,
pressure gauge, gasket spade etc.) are free
from defect and suitable for the pressure
rating of the system.
Only people required for the job to be allowed
to work in the area.
All calibration certificates to be kept at site
during the operation. 3
Ensure the pressure relieving device is set at
maximum allowable pressure for weakest
portion of the segment to be hydro tested
Keep away from the pressurized segment of
the system being hydro tested.
Monitor the pressure gauge from a safe
distance away from the potential source of
high pressure jetting (Such as flange joint,
spade and coupling etc.)
Ensure the workers are having proper PPE.
Never increase the hydro test pressure more
than for the maximum allowable pressure for
weakest portion in the segment or pressure
Page 13 of 15

Date: 18/10/2016
Location: Inside Port of
Salalah, from Oil jetty to
Booster pump Facility.

CLIENT
CONTRACT NO.: 4600002029

EPC for Revamp of Oil Pier Jetty at Port of Salalah


(Raysut)

CONTRACTOR.

JOB HAZARD ANALYISIS


Doc. No: 2029-PJ-JHA-007

Rev no: 03

Date: 18/10/2016

Job description: JHA for Construction of New 8 Oil Pipeline.


Member present: HSE Department, Project department, Operation Department.

Location: Inside Port of


Salalah, from Oil jetty to
Booster pump Facility.

rating of the hose and coupling.


Do not leave the pressurized hose or pump
unattended when the hydro test is going on.
Isolate the equipment from all source of
energy when not in use.
Do not change (exceed/decrease) the duration
of hydro test without permission from
inspection engineer.
Ensure the safe depressurization of hydro test
Fluid.
Ensure proper wind up and housekeeping at
worksite.
The accessories (hose, pump) not being used
must be disconnected and stored separately.
In any case of Adverse weather condition work
will be temporarily suspended and renewed
after condition are favorable.
Note: During execution if any disturbance or emergency occurs to the process the job will be suspended immediately and shall be resumed after
the issue has been resolved

PPE to be used during execution of the Job:


Hard hat, Safety Googles, Protective Clothing, Hand Gloves, Ear Plug / Muff, Respiratory mask, Safety Boots., Apron, Face shield, etc.

Page 14 of 15

CLIENT
CONTRACT NO.: 4600002029

EPC for Revamp of Oil Pier Jetty at Port of Salalah


(Raysut)

CONTRACTOR.

JOB HAZARD ANALYISIS


Doc. No: 2029-PJ-JHA-007

Rev no: 03

Job description: JHA for Construction of New 8 Oil Pipeline.


Member present: HSE Department, Project department, Operation Department.

Date: 18/10/2016
Location: Inside Port of
Salalah, from Oil jetty to
Booster pump Facility.

Other Misc. Equipments to be used during execution of the Job:


Hand Tools, Low Bed Truck, .Diesel Generator, Oxy-acetylene gas cutter, Welding set, cutting machine, Grinding machine .hydro testing unit etc.

Page 15 of 15