Você está na página 1de 162

Solution

Manual lo Engineering

Hydrology,

Third Edition by Dr. K. Subramanya

Chapter I
I.I

1.2

.:II= I day
Qx lx24x60x60=(2.5/100)x200x
Q = (5 x 10'')186400 = 57.37 m'ts

10'

Period= ll.t = I year


Input volume= 140 x 10<> x120/J00 = 168 f\1m3
Runoff= Output volume = (2 x 3) + ( 3 x 6) + ( 5 x 3) = 39 rnl/s. month

= 39 x (365112) x 24 x 60 x 60 = 102.492 Mm'

(i) Runoff coefficient = 102.492/168.0 = 0.61


Abstraction= 168.0 - 102.492 = 65.508 ~lml
(ii) Due. to afforestation:
Runoff= 0.5 x 168 .0 = &4.0 ~ln1J
Abstraction = 168.0 -&4.0 = 84.0 f\11113
Increase in abstraction= 84.0 -65.058 = 18.492 ~frn)
1.3

Period= 6l = I month = 30 days


Input volume = PA+ l/JJ
Outpu1 volume = Qil.t +(G + E + T)A
P1\+ /t)J ( Q~I + (G + E + T)1\ J = change in storage =JS
PA= 13.5x1375x10~
= 2.5438 r-itm.;
JOO
10"
Total input volume = 17.5438 1'ilnr~

1
1375x10'
(0 + E +T) A =(2.5 +9.5 + +0) x -x
,
= 1.60 Mm'
100
10
1375xl0~
.;
.4S=SiSr=-0.15x
=-0.1031Mm
10,
Qt.r =[PA+ f.:11)-.:IS - (G + E + T)A = 17.5438+0.103 I l.60 = 16.047 Mm'

Ccnstnnt rate cf withdrawal = Q


1.4

l.:11-Qt.r = e.s = s,

16.047 )( 10"
30x24 x60x60

= 6.191 n1J/s

-s,

1!;1 = 14.2 x 3 x 60 x 60 = 153,360 rn'


Qt.<= 10.6x 3 x 60x60= 114,480 m'
Sr S1= 38.880 m'
S, = 15.5 ha. m = 155.000 nr1
s, = 155.000 + 38.800 = 193,880 m3 = 19.JJS ha.m
ftcopyrlghted Ma1er1a1'" "ACd~ional resource mate1ial supplied wi1h the boOk El'lgineemo
Hydl'OIO'l!Y. Thin:I EcMiOl'l w1ltten by Or. K. Subramanya & published by McG,av1-Hill Edvc-.a1t0n
(India) Pvt lid. This resource material is lot lns1ruc1or's use onty:

Solution

r.s

Manual lo Engineering

(i)

Hydrology,

Third Edition by Dr. K. Subramanya

P = l:A;P, I Lt,= annual average precipitation

(10.7 x 1030) + (3.0x 830) + (8.2 <900) + (17.0 x 1300)


= 110_~ 111n1
(10.7 +3.0+ 8.2+17.0)
(ii)
Annual averageevaporation E = L,.\E, /I.4,
= (10.7 x 530) +(3.0x 438) +(8.2 x 430) +(17.0x 600) =
532.4 mm
(10.7 + 3.0 +8.2 + 17.0)
(iii) Runoff coefflclems of sub-areas
Arca
Runoff coefficient
A
r. = (1030 - 530)/1030 = 0.485
B
,., = (830 . 438~30 = 0.4 72
c
r, = (900 430)/900 = 0.522
D
r,, = ( 1300 - 600)11300 = 0.538
For the entire catchment r= (J 105- 532)11105 = 0.518
=

l .6

FromTable I. I (Tex1book):
Atmospheric moisture

(i)

(ii)

(iii)

= 12,900 /(458,000 + 119,000) = 0.022 years


= 8.2 days
Global groundwater t, = I0,530.000n20 = 4787 years
Global ocean water 11 = I ,338.000.000/47,000 = 28468 years
1,

ftcopyrlghted Ma1er1a1'" "ACd~ional resource mate1ial supplied wi1h the boOk El'lgineemo
Hyd101C>lly, Thin:I EcMiOl'l w1ltten by Or. K. Subramanya & published by McGrav1-Hill Edvc-.a1t0n
(India) Pvt lid. This resource material is lot lns1ruc1or's use onty."

Solution

Manual lo Engineering

Hydrology,

Third Edition by Dr. K. Subramanya

Chapter-2
2.1

For thegiven data

'1.,., = 22.545. 'P = 130.43

From Eq, (2,3)

N = ( ~ )' =

and C., = 17.286

7;2~6
)' = t 1.95

"1)'

12,

Minimum number of additional stations= 12 - 7 = 5


2.2

P,
.=-N,[P,
--+
..\
J\f 1V. N?

From Eq, (2.SJ

P.,]

+-

J\1"

9.2 6,8
=-137[13.2
--+-+-+-4

2.3

125

102

76

10.2] : 12 ,86 C111


113

A double mass curve plot of IPA vs !PA is prepared (Fig. r -2.3). The calculations
are shown in Table p-2.3. II is seen from Fig. P -2.3 that there is n change in regime
in the year 1955. The correction ratio is the ratio of 1hc L\\'O slopes = J\il.,JC\t. =
0.9496/1.1796 = 0.805. The adjusted values of station A are shown in Col. 6 of
Table p-2.3.

c urve

I) eubte 1\l:1ss

T able o-2.3
I

Year
1967
1966
1965
1964
1963

1962
1961
1960

1959
1958
1957
1956
1955

1954
1953

1952
1951
1950

1949

p.,

IPAv
161
146
130
13
135
163
135
115

143
155
164
156
193
128
117
152

p,
163
130
137
130
140
142

1013
1128
1271
1426
1590
1746
1939

1~8

2184
2336

155

2491

161
147

2652

2799

95
132
145
158
141
196
160
1
196
168
194
162

Finalised
values of

Adjus1ed
values of
PA(al Post
PA
1955 reuime)

rP.

161
307
37
580
715
878

2067

163
293
430
560
700
842
990

1085
1217
1362
1520

l 661
1857
2017
2161
2357
2525

2719
2881

129
118
158
135
156
130

161
16
130
13
135
163
135
115
13
155
164
158
193
129
116

I 58
135
156
130

ftcopyrlghted Ma1er1a1'" "ACd~ional resource mate1ial supplied wi1h the boOk El'lgineemo
Hyd101C>lly, Thin:I EdifiOl'l w1ltten by Or. K. Subramanya & published by McGrav1-Hill Edvc-.a1t0n
(India) Pvt lid. This resource material is lot lns1ruc1or's use onty:

Solution Manual lo Engineering Hydrology, Third Edition by Dr. K. Subramanya

146
132
"3

1948
1947

1946

2945

178

3077

144
177

3220

Ag. p-2.3

143
116
142

3059
3200
3380

143
116
142

Probl11m 2.3

-coo
Bt-': ill th

3500

11r 1955

3000

..
~
~

,
,

= 1.17961(.

416.9

w :0.9997

2'00

'500

000
y

= 0,94.Mll 11.$0$
#:0.9998

sec

"'

500

SOO

000

2300

Cumulative P,,.,_.0

Cot.e (for values before 1955) =(Values of Col. 4) x 0.805


Col.7 = Finalized values or P,. for a11 years corresponding IQ the current (post 1955)
regime. The values have. been rounded off to the nearest cm.
The mean annual precipitation of Station A= 3165/22 = 143.9 cm

2.4

1'able r -24.
Cumulative
Time
(minl

0
30
60

Incremental
donth (cml

flainlall

Rainfall
intensity

(cm)

(cmlhl

0.00
1.75

1.75

3.50

2.25

4.00

4.50

ftcopyrlghted Ma1er1a1'" "ACd~ional resource material supplied wi1h the boOk El'lgineemo
Hydr'OIO'l!Y. Thin:I EcMiOl'l w1ltten by Or. K. Subramanya & published by McGrav1-Hill Edvc-.a1t0n
(India) Pv1.ltd. This resource material is lot lns1ruc1or's use onty:

Solution

Manual lo Engineering

Hydrology,

Third Edition by Dr. K. Subramanya

Chapter I
I.I

1.2

.:II= I day
Qx lx24x60x60=(2.5/100)x200x
Q = (5 x 10'')186400 = 57.37 m'ts

10'

Period= ll.t = I year


Input volume= 140 x 10<> x120/J00 = 168 f\1m3
Runoff= Output volume = (2 x 3) + ( 3 x 6) + ( 5 x 3) = 39 rnl/s. month

= 39 x (365112) x 24 x 60 x 60 = 102.492 Mm'

(i) Runoff coefficient = 102.492/168.0 = 0.61


Abstraction= 168.0 - 102.492 = 65.508 ~lml
(ii) Due. to afforestation:
Runoff= 0.5 x 168 .0 = &4.0 ~ln1J
Abstraction = 168.0 -&4.0 = 84.0 f\11113
Increase in abstraction= 84.0 -65.058 = 18.492 ~frn)
1.3

Period= 6l = I month = 30 days


Input volume = PA+ l/JJ
Outpu1 volume = Qil.t +(G + E + T)A
P1\+ /t)J ( Q~I + (G + E + T)1\ J = change in storage =JS
PA= 13.5x1375x10~
= 2.5438 r-itm.;
JOO
10"
Total input volume = 17.5438 1'ilnr~

1
1375x10'
(0 + E +T) A =(2.5 +9.5 + +0) x -x
,
= 1.60 Mm'
100
10
1375xl0~
.;
.4S=SiSr=-0.15x
=-0.1031Mm
10,
Qt.r =[PA+ f.:11)-.:IS - (G + E + T)A = 17.5438+0.103 I l.60 = 16.047 Mm'

Ccnstnnt rate cf withdrawal = Q


1.4

l.:11-Qt.r = e.s = s,

16.047 )( 10"
30x24 x60x60

= 6.191 n1J/s

-s,

1!;1 = 14.2 x 3 x 60 x 60 = 153,360 rn'


Qt.<= 10.6x 3 x 60x60= 114,480 m'
Sr S1= 38.880 m'
S, = 15.5 ha. m = 155.000 nr1
s, = 155.000 + 38.800 = 193,880 m3 = 19.JJS ha.m
ftcopyrlghted Ma1er1a1'" "ACd~ional resource mate1ial supplied wi1h the boOk El'lgineemo
Hydl'OIO'l!Y. Thin:I EcMiOl'l w1ltten by Or. K. Subramanya & published by McG,av1-Hill Edvc-.a1t0n
(India) Pvt lid. This resource material is lot lns1ruc1or's use onty:

Solution

r.s

Manual lo Engineering

(i)

Hydrology,

Third Edition by Dr. K. Subramanya

P = l:A;P, I Lt,= annual average precipitation

(10.7 x 1030) + (3.0x 830) + (8.2 <900) + (17.0 x 1300)


= 110_~ 111n1
(10.7 +3.0+ 8.2+17.0)
(ii)
Annual averageevaporation E = L,.\E, /I.4,
= (10.7 x 530) +(3.0x 438) +(8.2 x 430) +(17.0x 600) =
532.4 mm
(10.7 + 3.0 +8.2 + 17.0)
(iii) Runoff coefflclems of sub-areas
Arca
Runoff coefficient
A
r. = (1030 - 530)/1030 = 0.485
B
,., = (830 . 438~30 = 0.4 72
c
r, = (900 430)/900 = 0.522
D
r,, = ( 1300 - 600)11300 = 0.538
For the entire catchment r= (J 105- 532)11105 = 0.518
=

l .6

FromTable I. I (Tex1book):
Atmospheric moisture

(i)

(ii)

(iii)

= 12,900 /(458,000 + 119,000) = 0.022 years


= 8.2 days
Global groundwater t, = I0,530.000n20 = 4787 years
Global ocean water 11 = I ,338.000.000/47,000 = 28468 years
1,

ftcopyrlghted Ma1er1a1'" "ACd~ional resource mate1ial supplied wi1h the boOk El'lgineemo
Hyd101C>lly, Thin:I EcMiOl'l w1ltten by Or. K. Subramanya & published by McGrav1-Hill Edvc-.a1t0n
(India) Pvt lid. This resource material is lot lns1ruc1or's use onty."

Solution

Manual lo Engineering

Hydrology,

Third Edition by Dr. K. Subramanya

Chapter-2
2.1

For thegiven data

'1.,., = 22.545. 'P = 130.43

From Eq, (2,3)

N = ( ~ )' =

and C., = 17.286

7;2~6
)' = t 1.95

"1)'

12,

Minimum number of additional stations= 12 - 7 = 5


2.2

P,
.=-N,[P,
--+
..\
J\f 1V. N?

From Eq, (2.SJ

P.,]

+-

J\1"

9.2 6,8
=-137[13.2
--+-+-+-4

2.3

125

102

76

10.2] : 12 ,86 C111


113

A double mass curve plot of IPA vs !PA is prepared (Fig. r -2.3). The calculations
are shown in Table p-2.3. II is seen from Fig. P -2.3 that there is n change in regime
in the year 1955. The correction ratio is the ratio of 1hc L\\'O slopes = J\il.,JC\t. =
0.9496/1.1796 = 0.805. The adjusted values of station A are shown in Col. 6 of
Table p-2.3.

c urve

I) eubte 1\l:1ss

T able o-2.3
I

Year
1967
1966
1965
1964
1963

1962
1961
1960

1959
1958
1957
1956
1955

1954
1953

1952
1951
1950

1949

p.,

IPAv
161
146
130
13
135
163
135
115

143
155
164
156
193
128
117
152

p,
163
130
137
130
140
142

1013
1128
1271
1426
1590
1746
1939

1~8

2184
2336

155

2491

161
147

2652

2799

95
132
145
158
141
196
160
1
196
168
194
162

Finalised
values of

Adjus1ed
values of
PA(al Post
PA
1955 reuime)

rP.

161
307
37
580
715
878

2067

163
293
430
560
700
842
990

1085
1217
1362
1520

l 661
1857
2017
2161
2357
2525

2719
2881

129
118
158
135
156
130

161
16
130
13
135
163
135
115
13
155
164
158
193
129
116

I 58
135
156
130

ftcopyrlghted Ma1er1a1'" "ACd~ional resource mate1ial supplied wi1h the boOk El'lgineemo
Hyd101C>lly, Thin:I EdifiOl'l w1ltten by Or. K. Subramanya & published by McGrav1-Hill Edvc-.a1t0n
(India) Pvt lid. This resource material is lot lns1ruc1or's use onty:

Solution Manual lo Engineering Hydrology, Third Edition by Dr. K. Subramanya

146
132
"3

1948
1947

1946

2945

178

3077

144
177

3220

Ag. p-2.3

143
116
142

3059
3200
3380

143
116
142

Probl11m 2.3

-coo
Bt-': ill th

3500

11r 1955

3000

..
~
~

,
,

= 1.17961(.

416.9

w :0.9997

2'00

'500

000
y

= 0,94.Mll 11.$0$
#:0.9998

sec

"'

500

SOO

000

2300

Cumulative P,,.,_.0

Cot.e (for values before 1955) =(Values of Col. 4) x 0.805


Col.7 = Finalized values or P,. for a11 years corresponding IQ the current (post 1955)
regime. The values have. been rounded off to the nearest cm.
The mean annual precipitation of Station A= 3165/22 = 143.9 cm

2.4

1'able r -24.
Cumulative
Time
(minl

0
30
60

Incremental
donth (cml

flainlall

Rainfall
intensity

(cm)

(cmlhl

0.00
1.75

1.75

3.50

2.25

4.00

4.50

ftcopyrlghted Ma1er1a1'" "ACd~ional resource material supplied wi1h the boOk El'lgineemo
Hydr'OIO'l!Y. Thin:I EcMiOl'l w1ltten by Or. K. Subramanya & published by McGrav1-Hill Edvc-.a1t0n
(India) Pv1.ltd. This resource material is lot lns1ruc1or's use onty:

Solution

Manual lo Engineering

90
120
150
180
210

Hydrology, Third Edition by Dr. K. Subramanya

6.00
4.50
2.50

10.00
14.50
17.00

i.so

16.SO

0.75

19.25

Hyetograph of Storm

Fig. p-2.4(a)
14.0
~
~ 12.0
g _ 10.0

.
.
- z;
8.o .
=l'O -" 6.0 .
c
;;;
4.0 .

12.00
9.00
5.00
3.00
1.50

12.00
9.00

.: e

a:

3.SO

S.00

4.SO

3.00

I 1.SO

2.0

o.o
30

60

120

90

150

180

210

Time (min)

Fig. p2.4(b) Mass curve of rainfall


~

-a

:s. " e
" u
~~
~

ae

25.0

20.0
15.0

./

10.0

5.0

o.o
0

50

100

150

200

2SO

limo (min)

'l"olal depth of rainfall = 19.25 cm


Duration of Storm = 210 111in

Average intensity = 19.25 x 60/210 = 5.5 cm/h

ftcopyrlghted Ma1er1a1'" "ACd~ional resource mate1ial supplied wi1h the boOk El'lgineemo
Hyd101C>lly, Thin:I EcMiOl"l w1ltten by Or. K. Subramanya & published by McGrav1-Hill Edvc-.a1t0n
(India) Pvt lid. This resource material is lot lns1ruc1or's use onty:

Solution

Manual lo Engineering

Hydrology, Third Edition by Dr. K. Subramanya

"d' IO = ~"""-0.1
--x-4
1000 998 x9.S l

2.5

d'=

4000x0.I

=0.0013

Jtxl0x998x9.81

2.6

= 0.03606 m = 36.06 mm

Average rainfall= 546.7 rnm

= 15% of Normal rainfall = 0.15 x 546.7


Years 1%4. 1971. 1972. 1976and 1980 were drought years.
Incipient drought condition

= 410.0

mrn.

Annual Ralnlall at Stauon A


1000
900
900

000 760.75

100

=" eoo
- ..
Ir

...

oo
c

!i

300

200
100
0

......,,_ -

040024

I- 380_
~ - - ~ - - ~
1--480_

~ ~

... ...

700

...

GOO

- sso S25 - - - - - -- - - ,
_
_,,,_
- - ~ -- - - - - - - ,_ - ~ - - - - - - - - - ~ --102 - - - - - - ,_ - - I- - - -

...

~ ~ ~ ~ ~

~~~~~~~~~~~~~~~~~~~
"Q,,. "Q~

"if

,..

~> '\II ~ ~o ~... ~ ~ --;. --4- ~~ ?

~ -~ ~

Yci,:,r

Rainrau at Station /.\

2.7

P = ...!_[(92
600

x (12+ 15)) + (128x (12 +9)) +(120x (9 + 6))


2
2
2
3))
+ (175 x (G+
+ (85 x (J + 1\1

= (l/600)11242 + 1344 + 900 + 787.S + 1701


ftcopyrlghted Ma1er1a1'" "ACd~ional resource mate1ial supplied wi1h the boOk El'lgineemo
Hyd101C>lly, Thin:I EdifiOl'l w1ltten by Or. K. Subramanya & published by McGrav1-Hill Edvc-.a1t0n
(India) Pvt lid. This resource material is lot lns1ruc1or's use onty."

Solution

Manual lo Engineering

Hydrology,

Third Edition by Dr. K. Subramanya

= 7.41 cm
2.8

The catchment is drawn to scale.(Fig:. P ~2.8) and using the given deu, lschyetals

of value 130, 110. 90 and 70cm11redn1wn and inter-isohyetal area determined.


p = ((9.5x 150) + (36x 140) + (25x 120) + (21x100) + (9 x SO)J =
rm
135

J9.5+36+25+21+91

Fig. r 2.8 Catchment wlth lsohyetals


2.9 (a)

[Compuration in Table-2.9(a)J

Schematic Thiessen polygons and isohyc1;1ls arc shown in Pig. P - 2.9(n) and (b)
respectively.

ftcopyrlghted Ma1er1a1'" ...ACd~ional resource mate1ial supplied wi1h the boOk El'lgineemo
Hyd101C>lly, Thin:I EcMiOl'l w1ltten by Or. K. Subramanya & published by McGrav1-Hill Edvc-.a1t0n
(India) Pvt lid. This resource material is lot lns1ruc1or's use onty:

Solution

Manual lo Engineering

... .

.
..

'

..

. . .

..

..;

Im. .

'

Third Edition by Dr. K. Subramanya

.
..

-. .

'I

Hydrology,

..
..
.- .

r :jj;!j

..

ij.!:l:n

. . .
.. . . . .
.. ..
...
r
.

:Yll
lli:m. ..
-

-.
'
..

111

.
...

Flg. Pl.9(a)

fig. I' - 2.9(a) Thiessen Polygons

'fbl
n e P2?()
a

Thiessen
area (1\1}

P,

PA1

10.S

34
16
67
128
105
50
48

9.2

54
313
131

8.2
6.3
10.9
10.2
13.2

4Q

14.0
11. 7

83

11.2

Sume 582

rPA

P., =-'-'
A =61$7/582=

422

1396
1071
660
672

538
930
:!:=6187
10.6cm

2.9 (b)

ftcopyrlghted Ma1er1a1'" "ACd~ional resource mate1ial supplied wi1h the boOk El'lgineemo
Hyd101C>lly, Thin:I EcMiOl'l w1ltten by Or. K. Subramanya & published by McGrav1-Hill Edvc-.a1t0n
(India) Pvt lid. This resource material is lot lns1ruc1or's use onty:

Solution

Manual lo Engineering

Hydrology, Third Edition by Dr. K. Subramanya

Fig. P 2.9(b) Isehyetats


Table p-2.9(b)

Inter
lsohyetal

Average.
precipitation

area (A,)
8

14.0
13.5
12.5
11.5
10.S
9.5
8.5
7.5
6.0

57
85

290
308

90
60

22
22

112
770

1063
3335
3234
855
510
165
132
l:= 10176

Sum=942
(c)

P;A,

(P,)

P",= 101761942 = 10.8-0 cm


Ari1hnwtic1uan=(I0.2+ 11.2+ 13.2+ 14.0+ 10.9+ ll.7+6.3)n
= 11.07 (Ill

2.10
Station
A

c
D

p
102
120
126
108

o:(x'+l')

1ro

PW

0.200

20.<10

2
I

10

0.125
0.100

15.00
12.60

3.25

0.308

33.23

3
1.5

ftcopyrlghted Ma1er1a1'" "ACd~ional resource mate1ial supplied wi1h the boOk El'lgineemo
Hyd101C>lly, Thin:I EcMiOl'l w1ltten by Or. K. Subramanya & published by McGrav1-Hill Edvc-.a1t0n
(India) Pvt lid. This resource material is lot lns1ruc1or's use onty:

Solution

Manual lo Engineering

131

Hydrology,

4.5

Third Edition by Dr. K. Subramanya

1.5

22.50

0.044

5.82

Surn =

0.7n

87.05

P, =:!:PW/ zw = 87.05/0.777 = 112.03


2.11

St::irting from the storm central area the area between t\VO successive isohyc1s is
muhiplicd by the average value of 111c bounding isohyers 10 get incremental

vcluruc of rainfall. The calculations arc sho\vn in Table p-2.11. The average
depth is calculated by dividing the accumulated volume by the area enclosed by
the outer isohyc1:1I. 1"hc average depth is plotted against the area in fig. P -2.11.
T a bl e D211

1\

rea - 1\ vera2e dent hd ata


Total

Isohyetal
{111111)

Arca
enclosed
(km')

Ntt

lncremental
area

A verage
rainran
(111m)

incre
mental

Total
Average
volume of depth of

volume

rain

ralnrau

(1000

(1000111.J)

(n1n1)

11674.5
28115.5
41473.0
51000.5
SS 175.5
63538.0
67490.5
70028.0
72323.0
72760.5

21.5
20.9
20.4
20.0
19.7
19.4
19.1
18.9
18.6
18.6

Ill~

543
543
1345
802
2030
685
2545
515
410
2955
3280
32.5
255
3535
3710
175
170
3880
3915
35
*=This value ii> assumed.
21
20
19
1$
17
16
15
14
13
12

21.5"
20.5
19.5
18.5
17.5
16.5
15.5
14.5
13.5
12.5

(i)
By inte.~lation in Fig:. P -2.11
area or 2400 km" is 20.1 111m.

11674.5
16441.0
13357.5
9527.5
7175.0
5362.5
3952.5
2537.5
2295.0
437.5

the average depth or precipitation for an

ftcopyrlghted Ma1er1a1 .. "ACd~ional resource mate1ial supplied wi1h the boOk El'lgineemo
Hyd101C>lly, Thin:I EdiliOl"l w1ltten by Or. K. Subramanya & published by McGrav1-Hill Edvc-.a1t0n
(India) Pvt lid. This resource material is lot lns1ruc1or's use onty."

Solution

Manual lo Engineering

Hydrology,

Third Edition by Dr. K. Subramanya

Depth Area curve


22.0

21..S

<,

E 21.0

<,

"e
c

20.5

: 20.0

;;.

.!:41

19.5

"'

-. <,
"\

19.0
18.$

18.0
0

1000

2000

3000

4000

5000

Aroa (km7)

Fig. 1> -2.11


(ii)

Area -Average Depth Relationship

By assuming the storm centre to have an area of 25 krn", the depth at lhe

storm centre is 22.0 mm.

ftcopyrlghted Ma1er1a1'" "ACd~ional resource mate1ial supplied wi1h the boOk El'lgineemo
HV(il'OIO'l!Y. Thin:I EcMiOl"l w1ltten by Or. K. Subramanya & published by McGrav1-Hill Edvc-.a1t0n
(India) Pvt lid. This resource material is lot lns1ruc1or's use onty."

Solution

2.12

Manual lo Engineering

Hydrology,

Third Edition by Dr. K. Subramanya

Table p-2.12(n) shows the calculations

for constructing the- hyercgraph of the

SIC)nn.

Table u-2.12{a)
Accumulated
Tln'e
(mtm

Inc re.111e11tal

lnte11sity

or

rainfall (n1111) amount


rainfall (n1111)

0
10

30

0
19
41
48

40

68

50

91
124
152
100
166

20

60
70

80
90

(n1n1/h)

19

I 14
132
42
120
138
198
168
48

22
7

20
23
33

28
8
6

36

The hyetcgraph is shewn in F'ig.p-2.12(a)

...

Hye1091pfl ol s101m or P1001om 2.12

"'
'"

"'
_114

"'

.,

.,
0

,,.

"'
-

30

.. . .
Tlme(mins)

"'

. .

Fig. P -2.12 (a) Hyetograph :>f the Storm


2.12(b)\'arious durations dt = 10. 20. 30. 40. 50. 60. 70. SO and 90 minutes are chosen.
Foe each durations the depth of rainfall in the s1011n at this interval is calculated.
(Table p-2.12(bi)).For each duration the maximum value is noted (shown by Bold
iype) and assembled 10 calculate the corresponding maximum intensity, ( Table ir
ftcopytlghted Maletlal'" "ACd~ional resource mate1ial supplied wi1h the boOk El'lgineemo
Hyd101C>lly, Thin:I EcMiOl'l w1ltten by Or. K. Subramanya & published by McGrav1-Hill Edvc-.a1t0n
(India) Pvt lid. This resource material is lot lns1ruc1or's use onty:

Solution

Manual lo Engineering

Hydrology, Third Edition by Dr. K. Subramanya

2.12(1.>-ii)J. The plot or Maximum intensity in mm/h

V$

Duration in minutes is

shown in fig. P 2. J2(b).


Tbl
a e P212(bl)

Cla cuI'auen orM axrmum Dt!Pl h

Time
since
(min)

Rainfall death lmml for various durations

S1ar1

6!=10

61:20 61:30 61:40 6!:50 61:60 6!:70 61:80 6!:90

min

min

10
20
30
40
50

41
~

60

7
20
23
33

70
60

28
6

9()

Table o-2.12 lb-ii


Duration (min)
(mmf
Max. tntensily
{mmlhl

min

min

min

min

min

min

19
22

ti;1ax. Depth

min

48
49
50
76
84
69
42

27
43
56
61
35
14

68
91
105
111
112
98

72

83
104
92
75

124
133
119
118

152
1<1
125

160
147

166

Maximum Iutcusltv - Duration Data


10

20

30

40

50

60

70

90

90

33

61

94

104

112

133

152

160

166

156.0

13.i.4

133.0

130.3

120.0

110.7

198.0

163.0 168.0

ftcopyrlghted Ma1er1a1'" ...ACd~ional resource material supplied wi1h the boOk El'lgineemo
Hyd101C>lly, Thin:I EcMiOl'l w1ltten by Or. K. Subramanya & published by McGrav1-Hill Edvc-.a1t0n
{India) Pv1. l1d. This resource material is lot lns1ruc1or's use onty."

Solution

Manual lo Engineering

Hydrology,

M.ax. lnten,ity

e,

Third Edition by Dr. K. Subramanya

Our01tion

...

"

gE 00
.~

.. . .
c

""
" ''

,.

''~~~~~~~~~~~~~~~~~~~~~~

"

50

70

EO

DuratJon (min)

too

"

Fig. P 2.12(b) Max. Intensity - Durati()n curve of the Storm


2.13

various durations d.t = 10. 20. 30. 40. 50. 60. 70. SO and 90 minutes are chosen,
For each durations the depth of rainfall in the storm al this interval is calculated.
(Fig. P 2.1 J(i)).For each duration the maximum value is noted (shown by Bold
type) and assembled in Table p2. I 3(ii) lo provide data for maximum depth duration curve, The maximum depth -dul'ation curve is shown in Fig. P 2. I 3.
Table p-2.13(i)
Time

$inc;e
St:in
fn'linl

10
20
30
40
50
60
70

tu.10
1ni1i

8
7
10
5
16
9
5

esee

tr,1,30

tr.1~41)

61.sc

6111Ml

4t1170

llt-80

tr.1~91)

''"

tnil'I

niin

min

min

1nin

"'"

tnin

15
17
15
21
25
14

25
22
31
30
30

I
30
38
40
35

46
47
45

55
52

60

I
I

ftcopyrlghted Ma1er1a1'" "ACd~ional resource material supplied wi1h the boOk Engineemo
Hyd101C>l)y, Thin:I EcMiOl"l w1ltten by Or. K. Subramanya & published by McGrav1-Hill Edvc-.a1t0n
(India) Pvt lid. This resource material is lot lns1ruc1or's use onty:

Solution

Manual lo Engineering

80
90

Duration (min)
Max. Depth

tmm)

10

ro

18
12

9
7

Tble D-2.13 Iii)

Hydrology, Third Edition by Dr. K. Subramanya

3
21

49

39
37

56
52

42

6'
59

67

Maximum Demh - Duration Data


10

2()

30

50

60

70

80

90

16

2S

31

40

47

SS

60

64

67

40

ro

10

100

OuroUon (nt.inf)

Fig. P -2.13 Maximum Depth- Duration Curve

2.14

Calculations ae shown in Table p-2.14(a). Rainfall intensity is calculated for for


de storm at 10 ruin. intervals and de hyetograph is shown in Fig. P -2.14.

Table p2.14.(a)

ftcopyrlghled Ma1er1a1'" "ACd~ional resource mate1ial supplied wi1h the boOk El'lgineemo
Hyd101C>lly, Thin:I EcMiOl'l w1ltten by Or. K. Subramanya & published by McGrav1-Hill Edvc-.a1t0n
(India) Pvt lid. This resource materialis lot lns1ruc1or's use onty."

Solution

Manual lo Engineering

Hydrology, Third Edition by Dr. K. Subramanya

R;iinf;ill
intensity

R11inh1ll Dcipttl (mm} in any possible limo intllt'val of


Cumutat

'""

Timo
(min)

Rainfall
(mm)

0
10
20
30
40
50
60
70
60
90

0
2.1
6.3
1-t.5
27
27.9
33
35.1
36.2
37

rrur!

N11l ll

10

20

30

min

min

min

2.1
4.2
6.2
12.5
0.9
5.1
2.1
1.1

0.6

6.3
12.4
20.7
13.4

6
7.2
3.2
1.9

14.5
24.9
21.6
18.5
8.1
8.3

(mmlh)al

.. ..
min

omin

min

27
25.8
26.7
20.6
9.2
9.1

27.9
30.9
28.8
21.7
10

70

80

min

min

min

10 min,
limo
inte.rVlll

12.6
252
49.2
75.0
5.4
30.6
12.6
6.6

33
33
29.9
22.5

3S.1
34.1
30.7

36.2
34.9

.6

37

l'aUd lin'>.

f1g.p-2.14

Hyetcgraph oruie sto-m al 10 mln.Hme Interval

Maximum depth corresponding to various durations is picked up fr(,>111 theTable p2.14(:1} and collated in Table p-2. I 4(b). Corresponding to each duration the
maximum intensity is calculated. The variations of the (\ laximum irnenshy with
Duration and of Maximum depth with Durmicn are shown in Fig. P -2.14(b).
1

>.taxi mum
Intensity

75.0

62.1

49.8

40.5

37, 1

33.0

30.1

27.2

24.7

rmm/hl
Duration
(Minl

10

20

30

40

50

60

70

80

90

12.5

20.7

24.9

27

30.9

33

35.1

36.2

37

>.ta:xlmum
Oeplh

Imml

ftcopytlghted Maletlal'" "ACd~ional resource mate1ial supplied wi1h the boOk El'lgineemo
Hyd101C>lly, Thin:I EcMiOl"l w1ltten by Or. K. Subramanya & published by McGrav1-Hill Edvc-.a1t0n
(India) Pvt lid. This resource material is lot lns1ruc1or's use onty:

Solution

Manual lo Engineering

80
~

II
~=

~ c,

y = 23.&10Ln(x) + 13-0.12
R' :0.9932

"' <,

70

Hydrology, Third Edition by Dr. K. Subramanya

60

<,

50

............_

~ ~ 40

E E

E, ~
E 30

E ;;

-: .." 20
::s;

y = 4.SS20x'""

10

R~ a 0.9734

0
0

40

20

60

80

100

Duration (min)

Fig. P -2.14 (b)

VariatiQn ofi\rlaximum Depth wifh Duration and of!\laximun1

Intensity '''ith Duration.


2. I 5 The data are arranged in descending order and the recurrence intervals of various
events are calculated in Table p-2.15.

Table e-z.
? l5
m
1

2
3
4
5
6
7

8
9
10
11

12
13

Rainfall
(cm)

T (N 1)/m

122.60
113.00
I 06.60
I 02.20
99.80
94.50
94.50
92.70
91.00
90.70
87.50
87.00
86.30

26.00
13.00
8.67
6.50
5.20

(Vea1s)

3.71
3.25
2.69
2.60
2.36
2.17
2.00

RaXlfall
(cm)

T(Nl)/m

14
15
16
17
18
19
20
21
22
23
24
25

85.10
84.00
82.$0
81.00

1.66
1.73
1.63
1.53
1.44
1.37
1.30
1.24
1.18
1.13
1.08
1.04

n.30
76.00
74.40
71.30
69.40
68.60
66.60
65.00

(Vea1s}

Fig. P -2. IS shows the plot of Tin logarithmic scare and Pon arithmetic scale'. B)'
extrapolation of the curve T5'1 = 132.50 cm and T1 ... = 143.0 c111.

ftcopytlghted Maletlal'" "ACd~ional resource mate1ial supplied wi1h the boOk El'lgineemo
Hyd101C>lly, Thin:I EcMiOl'l w1ltten by Or. K. Subtamanya & published by McGrav1-Hill Edvc-.a11on
(India) Pvt lid. This resource material is lot lns1ruc1or's use onty:

Solution Manual lo Engineering Hydrology, Third Edition by Dr. K. Subramanya

160
140
120
.. 100
80
60

e
:.

r""

-=

40

20

10

100

T (Years)

Fig. P 2.151-~requencyof Rainfall magnitude

2.16

The data are arranged in descending order and the recurrence Intervals of venous
are calculated in Table p2.16. The cxccedancc probability J> = lfT ( in
percentlis also cnlculmed for each event.
events

Table o-2.J 6
Rainfall

(cm)

1
2
3
4

5
6
7
8
9
10

(c)

120
115
109
106
102
I 01
95
95
92
92

Exceedance
T:(N-t 1 )Im p1obability in
(Years)
cercent. P
!rnJ(N+ 1)}x100
21.00
10.50
7.00
5.25
4.20

3.50

4.76
9.52
14.29
19.05
23.81
28.57

2.63

38.10

2.10

47.62

11
12
13

"

15
16
17
18
19
20

Rainfall

(em)

90
90
69
88
64
84
80
76
70

66

T
s(Nl)/m
(Years)

Exceedance

probabil~y in
percent. P

(ml(N I ))xi 00

1.75
1.62
1.50

57.14
61.90
66.67

1.31
1.24
1.17

76.19
80.95
85.71
90.48
9524

1.11

1.05

Fig. r 2.16 is a plot of Rainfall P in the arithmetic scale and the recurrence interval
T in logarithmic scale. From this plot (a) :11 T = 15 years. P1s= 118.0 cm and (b) :11
J:> = 100 cm. T = 3.5 years.
By observation of the probabilhy pin the table. it seen that
Alp= 66.67%

Rainf:11l = 88 cm

ftcopytlghled Maletlal'" "ACd~ional resource mate1ial supplied wi1h the boOk El'lgineemo
Hyd101C>lly, Thin:I EcMiOl"l w1ltten by Or. K. Subramanya & published by McGrav1-Hill Edvc-.a11on
(India) Pvt lid. This resource material is lot lns1ruc1or's use onty."

Solution

Manual lo Engineering

Hydrology, Third Edition by Dr. K. Subramanya

Alp= 76.19% Rainfidl = S4 cm. Hence b)' linear interpolation. 15%


dependable rainfatl, Le., the rainfall corresponding to p=75% is 84.5 cm.

-
'ii
c

a:

130
120
110
100
90
80
70
60
50
40
1

10

100

T (Years)
Fi2. P 2.16
2. 17

Frequency or Rainfall.

The calculations are shown in Table p-2.17


Table 2.17 Calculatlou or3\'('ar ~10VillfJ f\.fean
3-year
Yea1
1950
1951
1952
1953
1954
1955
1956
1957
1958
1959
1960
1961
1962

Annual
Rainlal
tcm\

Moving
Mean
tcm\

113.0
94.3
76.0
87.5
92.7
71.3
77.3
85.1
122.8

94.4
85.9
85.4
83.8
80.4
77.9
95.1
92.4

69.4

91 .1

81.0
94.5
86.3

81 .6
87,3

Annual
Rainfall

Year
1963
1964
1965
1966
1967
1968
1969
1970
1971
1972
1973
197.i

<cm>
68.6
82.5
90.7
99.8
74.4
68.6
65.0
91.0
106.8
102.2
87.0
84.0

3-year
Moving
._lean

'""'

79.1
80.6
91.0
88.3
80.9
69.3
74.9
87.6
100.0
98.7
91.1

60.3

Fig. P -2.17 is n plot of the above 3-yea.r and 5-year moving me-ans. There appears to be no
specific recognizable trend. 5-)'e.tir moving mean srnoorhens the data much more than the
3-ye:ir reeving mean

ftcopytlghted Maletlal'" "ACd~ional resource mate1ial supplied wi1h the boOk El'lgineemo
Hyd101C>lly, Thin:I EcMiOl'l w1ltten by Or. K. Subramanya & published by McGrav1-Hill Edvc-.a1t0n
(India) Pvt lid. This resource material is lot lns1ruc1or's use onty.

Solution

Manual lo Engineering

Hydrology,

Third Edition by Dr. K. Subramanya

120.0

3Y' ~loving fl.lean

Syf r~1oving Mean

~: -e 100.0

~~

~ tii

" E

: a:

..

80.0

:t

:
,\

60.0
1950

1955

1960

1965

1970

1975

Year

2.18

Fi~. P 2.17

3-ye-nr & 5-ycnr ~1ovin~ Means

(a)

o= 1/50 = 0.02
"''" = IO! (0.02)(0.98)' = 0.167
9!. I!

IO.r=2
.
IO! 00 '098'
00 "
= -(
8! .2! . 2) ( . ) = . 1>3
po= 1-(1-0.02)'0:0.183

(b)

n=

(C)

2.19

p=0.01
(a)
(b)

P-">= (I -0.01)
,, = 0.01

"' = 0.605

2.20

Number of events = 4 + 2 + 5 = I I in total


venrs or record = 36 + 25 +4$ = 109
The even! is equaled to or exceeded I I times in 109 years of record.
Hence r=(I09+
1)111 =IOyears.

2.21

(ii) .r~ 120cm


(b) x~ 140cm

'r=71/11 =6.4S5ycar:;.p= lff=0.155


p= 3n1=0.04225
p,, = 2!_(0.04225)'= 0.0Cll79
-

()! .2!

ftcopyrlghted Ma1er1a1'" "ACd~ional resource mate1ial supplied wi1h the boOk El'lgineemo
Hyd101C>lly, Thin:I EcMiOl'l w1ltten by Or. K. Subramanya & published by McGrav1-Hill Edvc-.a1t0n
(India) Pvt lid. This resource material is lot lns1ruc1or's use onty:

Solution

Manual lo Engineering

(c) ,,. < 60 cm,

Hydrology,

Third Edition by Dr. K. Subramanya

p = 6/71 = 0.0845

ftcopyrlghted Ma1er1a1'" "ACd~ional resource mate1ial supplied wi1h the boOk El'lgineemo
Hyd101C>lly, Thin:I EcMiOl'l w1ltten by Or. K. Subramanya & published by McGrav1-Hill Edvc-.a1t0n
(India) Pvt lid. This resource material is lot lns1ruc1or's use onty:

Solution

Manual lo Engineering

Hydrology, Third Edition by Dr. K. Subramanya

Chapter- 3
3. I

At 30 the latent heat of vaporization


l = 25-0 I - 2.37 T = 2501-(2.37 x 30) = 2430 kJ/kg
p <density of water at 30'> (from Tablesje 996 kg/nr1
EL= cvapcrarion rate = R fllt: l

996 x

cZ:

x 1000) = 1.2395 x 10' mis

= 1.2395 x 10' x 1000 x 8644 mmld:t}' = 10.7 m111/day

3.2

By water balance for the l)ln


Pan evaporation = 195 + 45 - IS- 190 = 35 mm
Lake evaporation = 0.7 x 35 = 24.5 mm

3.3

Area =SO k111~ = 50 x 106 m:


Before reservoir: Nonna! runoff= (120/100) x0.4x50x10'> = 24 ri.1m3
After reservoir: Input in 10 the reservoir = 1.20 x 50 = 60 \\ln13
Loss from the reservoir= 07 x 2.4 x 50 = 84 l><lnr'
Net annual supply=. 24 [\'hn3(decrease)
Net overall change per year= 24 - (-24) = 48 r.11nJll>s..o> water

3.4

Mcycrs fonuula:

E," =K .. (e.. -e ,, )(l+u)


16
Take K,,.=.O.S and obtain e,. front Table 3.3 (of Te-xi book).

e..= e... R1t where R,. is relative humidity. Also


Thus Er,= 0.5(1- R~)e,,(1 +

11.,

":(%>'"

= I .2396 u:

~'6> Md the calculations are shown in Table p-3.4.

1'a bl e P- 34
.
Uonlh
Jail

Feb
Mar
A

i\lav
Jun
Jul
Auo

Sen
Oct

No.of
day$

31
28
31
30
31
30
31
31
30
31
30

(mm
ot Hg)

R,

t0.87
13.43
t8.28
26.74
33.67
38.75
32.82
29.00
26.34
22.11
16.37

0.85
0.82
0.71
O.J18
0.41
0.52
0.78
0.86
0.82
0.75
0.77

E,

"
(k'mlh)

(mm/day)

4.96
.o
5.0
6.20
5.o I 6.20
5.0 I 6.20
7.8 I 9.67
10.0
12.40
8.0
9.92
5.5
6.82
5.0
6.20
4.0
4.96
4.46
3.6

1.07
1.68
3.68
9.65
15.94
16.51
5.85
2.90
3.54
3.62
2.41

"'

(km/h)

Monlhly
Evaporatk>n
(mm)

33.t
47.0
114.0
289.4
494.0
495.2
181.3
89.7
106.2
112.2
72.2

Nov
.
ftcopyrlghted Material
ACd~1ona1 resource matenal sopplteCI with the boOk Engineemo
Hyd101C>lly, Thin:I EcMion w1ltten by Or. K. Sobramanya & published by McGrav1-Hill Edvc-.a1t0n
(India) Pvt lid. This resource material is lot lns1ruc1or's use onty:

..

Solution

Manual lo Engineering

Dec

31

11.76

Hydrology, Third Edition by Dr. K. Subramanya

0.73

4.0

4.961

2.08 I
64.51
~-T~o~~~-=~~~20~9~8~.7~

Mean monthly evaporation= 2098.7/12 = 174.9 m1n/nt(1nth

3.S(a) By Penman's formula:


From Table 3.3 (of Text Book) A = 2.18. e. = 38.75 mm of llg
Frorn Table 3.4 (of Text Book)//.,= 16.36 nun of \\ater/day
From Table 3.5 (ofText Book) N = 13. 94 hrs. n/N = 0.646
From given data: e; = 38.75 x 0.52 = 20.15 mm of Hg
A= 0.29 cos zgO = 0.256: b = 0.52; 0 = 2.0 I x 104 m1nfday ;
T~=273T33.5=306K;
r:0.05 and oT,,'1= 17.7385.
Using Eq.( 3.5)
H" = 16.36(1 -0.05)(0.256 + 0.52 x ().646)
- 17.73SS(0.56-0.092j20. IS) (0.10 + 0.9 x0.646)
= 7.39 mm (If water per day
From Eq. (3. 15)

e, = 0.35(1 + l~~i4)(3S.75-

20.15) = 16.275

From Eq. (3. 13) '=0.49


"T
k
.
(2.18x7.39)+(16.275x0.49)
.
Pc. = 1a 'C evaporation=
= 902
. rnm1uay
2.18+0.49
Evaporation in June= 9.02 x 30 = 270.6 nun= 27.1 cm
3.5(b) By Thomthwaite equation IEq. 3. I 71:
From Tobie 3.8 (ofTc.i Book) Lo= I. 168 ;
Heat Index i
i1 = 4.004

;, = 5.708
i1= S.593
i~= 12.848

Hc-~11 Index i
;J= 15.837

Heat Index i
iy= 13.722

it.= 17.811

i10= 10.614

;,: 15.529

;,,:7.487
i12 = 4.600

is= 14.316

By D111n

r =33.s"C

I, :}:i; = 131.069
"= 1.51986 - 1.3245 + 2.34876 + 0.49239 = 3.036
- ( 3.17) e, = 1.6. x I.I 6ox( 10x33-5 ) '"'' = 3 2.ze
,. cm
Sy Eq.
131.069
3.6

lnf'low
: 10 )( 60 X 60 x 24 X 30: 2-5.921v(n1..\
Out flow
= 15 x 60 x 60 x 24 x 30 = 38.88 ~Im..\
Rainfall volume = ( 10/100) x 20 x ( 1000)2 = 2.00 f'.1ro3
Seepage
= ( 1.S/100) x 20 x ( 1000)' = 0.36 Mn.'
Change in volume =(25.92 + 2.00-38.SS -0.36) =. 11.321'.ihn}

ftcopyrlghted Ma1er1a1'" "ACd~ional resource mate1ial supplied wi1h the boOk El'lgineemo
HV(il'OIO'l!Y. Thin:I EcMiOl"l w1ltten by Or. K. Subramanya & published by McG,av14iill Edvc-.a1t0n
(India) Pvt lid. This resource material is lot lns1ruc1or's use onty:

Solution

Manual lo Engineering

Actual changc

e .

Hydrology, Third Edition by Dr. K. Subramanya

16.00 P.1111.l

Hence evaporatione 16.00-ll.32=4.68,..11n3=

468

20xl0

~ xl06)()00

= 23.4 cm

3.7

r, F

p,
8.68
8.94
8.76
8.26

P,T/100
0.5
2.1483
I
4.3985
4.2574
I
I
Sent
3.9731
8.3l 1.9778
0.5 Oct
Total 16.7541
Take K = 1.10. By Blaney - Criddle formula (Eq. 3.16)
E'o=2.;4x r.io 16.7541 = 46.81 cm
Unit

Month
June
Julv
Au2

49.5
49.2
48.6
48.1
47.6

..

3.S

Thomthwaitc formula (Eq.3.17):

Month
Jon
Feb

L.

ET (cm)
9.75 22.5 0.99 8.02
11.09 24.5 0.91
9.63
March 12.85 27.0 1.03
14.80
Anl'il
13.56 28.0 1.035 16.88
1vtav
12.85 27.0 1.09 15.66
June
11.44 25.0 I07
12.07
Julv
10.41 23.5 1.10 10.21
Aue
10.75 24.0 1.075 10.67
10.75 24.0 1.02 10.12
Seot
11.09 24.5 1.015 10.75
Oc
Nov
10.0S 23.0 0.96 8.33
Dec
9.75 225 0.98 7.94
I

l,='E.i; = 134.37
o = 1.6376 1.39206 + 2.4079 + 0.49239 = 3.1458 (1'11is ~'(1/ue is 11se(I in Eq. .1.17
1() cnlc11lr11t: Er i11 Col. 5CJ/1he obove Tllble)
"t.tT= 134.88 cm = 1\nnual PET
ftcopytlghted Maletlal'" "ACd~ional resource mate1ial supplied wi1h the boOk El'lgineemo
Hyd101C>lly, Thin:I EcMiOl'l w1ltten by Or. K. Subtamanya & published by McGrav1-Hill Edvc-.a1t0n
(India) Pvt lid. This resource material is lot lns1ruc1or's use onty."

Solution

Manual lo Engineering

Hydrology,

Third Edition by Dr. K. Subramanya

Mean monthly PBT = 134.88/12 = JJ.25 cm


3.9

Herc J;, = 6.0

mm and rvl..\$\V= 120 mm


(1-p) MASW = (l-0.2)xl20 = 96.0 and E, = 0.65 x6.0 = 3.9 mm/d:iy
Day):
AASVl = 120111111 > (1-v) rvl..\$\V
Hence potential condition exists and E.. = ~ = 3.9 mm/day
This rate will continue till a depletion of ( 120-96) = 24 mm takes place in
the soil. This will lake 2413.9 = 6.15 days. Thus on Day2 the. actual evapotranspiration I!,= Eo; = 3.9 mm and Day 7 also will have
E.. =Er= 3.911111a/dny.
Day S: At the beginning of Day 8. A1\S\V: (120-3.9)(7) = 92.7 mm
Since AASW <(I - p) MASW.
E, = [:!~]x39

= 3n

mm

Day 9: At the beginning of Doy 9. AASW= (92.7 - 3.77) = 88.93 mm


Since r\AS\\' <(I -11) ~IASW.
E,= [ SS.93]
-x3.9=3.6tmn1
96.0
3. 10

B)' observauon of the data f. = 1.0 cm/h. Compuiarions needed for the plot of 111 (!J1

fcJ\IS uruc (h) arc shown in


Time
(h}
0.25
0.50
0.75
1.00
1.25
1.50
1,75
2.00

the following table:

lnlittraliOn
capacity
f,(cmib)
5.60
3.20
2.10
1.50
1.20
1.10
1.00
1.00

lp>/0

4.60
2.20
1.10
0.50
0.20
0.10
0.00

f.n (11>1,)

1.5261
0.7885
0.0953
-0.6931

1.6-094
2.3026

o.oo

Values of LJ1(fi,-JC) nre ploued against time on an nrithmetic SJ!lph paper


3.10).

(Fig..f>-

ftcopyrlghled Ma1er1a1 .. "ACd~ional resource mate1ial supplied wi1h the boOk El'lgineemo
Hyd101C>lly, Thin:I EdifiOl'l w1ltten by Or. K. Subramanya & published by McGrav1-Hill Edvc-.a1t0n
(India) Pvt lid. This resource material is lot lns1ruc1or's use onty:

Solution

Manual lo Engineering

Hydrology,

Third Edition

by Dr. K. Subramanya

Horton's Equation Prob.3.10


2.00
y = 3.11( 2.3466_

1.50

<,

l.00

R' 0.8903

0.50

'

o.oo

c -0.50

<,

' <, -,

l.00
1.50
2.00

'lo.

4.50

o.so

0.00

1.00

nm
Fig. I 3.10

1.50

2.00

t (h)

Derivation of Horton's equation

'The best fit straight line through the plotted points could be expressed as
/11(/~ - f,.) = 3. I I+ 2.3486
Thus K11 3.1 n" anc U1(jj, = 2.3486 giving UP- J:.) = 10.4499;
Since f., = 1.0 cm/h. /., = 11.45 cmlh

f.>

Hence /,. = 1.0 +- 10.45 e"11

3.11
Table 3.11
Time{min)

F,.(cm)

Incremental
infiltration
(cm)

fp{cmlh)

(1,.4,J
(Cmlh)

ln(fpf~)

r in
hOUI'$

0
5
2.15
2.15
25.8
22.59 3.117507
0.083
10
3.77
1.62
19.4'4
16.23 2.786861
0.167
15
1.45
17 .'4
14.19 2.652537
5.22
0.250
1.36
13.11 2.573375
20
6.58
16.32
0.333
7.84
4.35 I .~70176
30
1.26
7.56
0.500
40
1.11
3.-45 1.23837'1
0.667
8.95
6.66
10.18
1.23
0.48 0.73397
1.000
60
3.69
11.26
1.08
3.24
1.333
80
0.03
ftcopyrlghted Ma1er1a1'" "ACd~ional resource mate1ial supplied wi1h the boOk El'lgineemo
HV(il'OIO'l!Y. Thin:I EcMiOl'l w1ltten by Or. K. Subramanya & published by McGrav1-Hill Edvc-.a1t0n
(India) Pvt lid. This resource material is lot lns1ruc1or's use onty:

Solution

Manual lo Engineering

100

Hydrology,

12.33

1.01

Third Edition by Dr. K. Subramanya

3.21

ol

1.ss1

/11(J~{r)vs 1i111e 1 in hours is ploued as shown in Fig. P 3.11. The equation or the
best lit line is obtained as 111({"{..)=-4.1235 t + 3.6393. Thus K., = 4.1235 h'1 and
'"(f<>-fc)= 3.6393 giving (fo-!cl= 38.065 cm/h,
Since f..= 3.2 Jcnvb. /11 41.275 cn1n1.
Horton's Equation Prob.3.11

--...."
u

a.

- ~

3.5
3
2.5
2
1.5

" ;; 4.1235x 3.6393


R2 = 0.9676
<,

<,

0.5
0
-0.5

'

0.00

0.20

o.so

0.40

0.80

1.20

1.00

Time t (h)
1iig. l' J.110el'elopn)en1 or Horton's Equation
3. I I

Incremental infiltration depth values and corresponding infiltration intensities/,. at

various data observation rimes arc calculated as shown in the following'fable p-S. I 2.
Also, various parameters needed for plotting din'crent Infiltration models arc also
cajcutated as shown in Table 4. The units used <.ire}~ in cm/h, I~ in cm and 1 in hours.

Table p-3.12 Computationsfor Problem J.12


2

Time

(min)
0
5

I in

F,
hou1s (cm)
0.000
0.083

1.00

Incremental
infiltration

1.
(cll\lll}

(em)
1

12

Ln Fp

o.ooo

7
Ln
1(11)

2.46$

8
f/Fp

1.000

,..

3.-'6"4

ftcopyrlghled Ma1er1a1'" "ACd~ional resource mate1ial supplied wi1h the boOk El'lgineemo
HV(il'OIO'l!Y. Thin:I EdiliOl'l w1ltten by Or. K. Subramanya & published by McGrav1-Hill Edvc-.a1t0n
(India) Pvt lid. This resource material is lot lns1ruc1or's use onty:

Solution

Manual lo Engineering

10
15
20
30
40
60
120
150

0.167
0.250
0.333
0.500
0.667
1.000
2.000
2.500

1.80
2.50
3.10
4.20
5.10
6.60
11.00
12.90

Kosli:tkov"!>. i::.gu:ttion:

Hydrology,

0.8
0.7
0.6
1.1
0.9
1.5

...
1.9

Third Edition by Dr. K. Subramanya

9.6
8.4
7.2
6.6
5.4
4.5
4.4
3.8

0.566
0.916
1.t31
1.435
1.629
1.667
2.396
2.557

1.792
1.366
1.099
-0.693
0.405

o.ooo

0.693
0.916

F,. (t )=at"

0.556

o.eoo
0.323
0.238
0.195
0.152
0.091
0.078

2.449
2.000
1.732
1.414

1.225
1.000
0.707
0.632

f.q.(3.25)

laking logarithms of both sides of the equation (3.25)


!11(!",.) = !11 (J + b !11(1).
The dma set is plotted as ln(t~,.) vs /11(1) on an arithmetic groph paper (Fig.P3.12l .Innd the best fi1 straight line through the plotted is obtained as
hr(P,) =i.9117 + 0.7.193 /11(1).
111e coefficients of Kosrinkov eqnnrion are b = O. 7393 and
Lit a= 1.907 and hence a= 6.733. Best filling Kcsuakcv equation for the data is
p =6.7331(1.t.t)>

'

Kosliakov's Equalion Prob.3.12


3.00.
2.50
2.00

...c 1.50
... 1.00
0.50

y ;; 0. 7393x + 1.907
R' = 0.996

j-----;;;'-'-------

0.00

3.0

2.0

1.0

0.0

1.0

2.0

ln t(h)
Fig. 3.121 Kostlakov Equation

Green - Ampt Equation:

f ,. =111+-

"

(3.27)

'
ftcopytlghled Maletial'" "ACd~ional resource mate1ial supplied wi1h the boOk El'lgineemo
Hyd101C>lly, Thin:I EdiliOtl w1ltten by Or. K. Subramanya & published by McGrav1-Hill Edvc-.a1t0n
(India) Pvt lid. This resource material is lot lns1ruc1or's use onty:

Solution Manual lo Engineering Hydrology, Third Edition by Dr. K. Subramanya

values of fp (col. 3) arc plotted ngainsr I/ Fp (col. 8) on <in arithmetic graph paper

(Fig.P-3.11-2).

The best fit straight line through the plcued points is obtained as

I, = 9.0239(1..)+3.8375.

,.

The coefficients of the Green - Ampt equations are,,,= 3.$357 nnd

11

= 9.0239

Oreef\-Ampl EqiMtion. Prob, 3.12

"

"
10

:c

- '
~

= 9.0239x

+ 3.8375

R1: 0.9339

'

o.oo

0.20

O.GO

c.ec

1.00

. ..

1/ Fp

Fig. p-3.12-2 Green -Am1t Equation

Philip's Equation: The expressionfr{1)=

Yis,-X +

(Eq.3.24) is used. Values of

J,.

,.o.1(col.9) on an arithmetic graph paper (Fig.P-3.12-3). 'lbc best


111 suaight line through the plotted points is obtained as
I, = 2.9135 ,-ll) + 2.0461

(col. 3) arc plotted against

lbc coefficients of Philip's equation arcs= 2 x 2.9735 = 5.9470 and K= 2.0461

ftcopytlghled Maletlal'" "'ACd~ional resource mate1ial supplied wi1h the boOk El'lgineemo
Hyd101C>lly, Thin:I EdiliOl'l w1ltten by Or. K. Subtamanya & published by McGrav1-Hill Edvc-.a1t0n
(India) Pvt lid. This resource material is lot tns1ruc1or's use onty:

Solution

Manual lo Engineering

Hydrology, Third Edition by Dr. K. Subramanya

Philip's Equ:iUon Prob. 3.12

,.
12
10

_,,.-

~.

8
4

y : 2.9735 2.0461
A, .o.~7

2
0
0.0

Fig. 3.1~3

0.5

1.0

1.5

2.5

3.0

3.5

4.0

Philip'"' Equation

3.13
Computations needed for the plot of /11 (1!1{cJ vs ti rue (h) are shown in the
following table: Jn this test . the reading corresponding to time t = 110 min is obviously an
error of observation and as such is taken as eoual to 1.50 crn.
lncre-mental
Time(mln)

Time !in

nours

depth
Fi;(mm)

F.{cm)

durin9
interval

I,
(Cmlllf

({of()

ln(f9fd

(cm)
0
5
10
15
25
40
60
75
90
110
130

0
0.0633
0.1667
0.2500
0.4167
0.6667
1.0000
1.2500
1.5000
1.8333
2.1667

21.0
36.0
47.6
56.9
63.8
69.8
7-1.8
79.3
87.0
92.0

2.10
3.60
4.76
5.69
6.38
6.98
7.48
7.93
8.70
9.20

2.1
1.50
1. 16
0.93
0.69
0.60
0.50
0.-45

o.n

0.50

25.200
18.000
13.920
5.560
2.760
1.800
2.000
1.800
~.31Q
1.500

23.700
16.500
12.420
4.080
1.260
0.300
0.500
0.300
~
0.000

3.1655
2.8034
2.5193
1.4061
0.2311
1.2040
-0.6931
1.2040

Values of l11ifpfc)are ploued against time (h) on an arithmetic graph paper (Fig.P- 3. J 3).
Note that the data of 1 = I JO min is not included in the plot.
ftcopytlghted Maletial'" ...ACd~ional resource material supplied wi1h the boOk El'lgineemo
HV(ir'OIO'l!Y. Thin:I EcMiOl"l w1ltten by Or. K. Subtamanya & published by McGrav1-Hill Edvc-.a1t0n
(India) Pvt lid. This resource material is lot lns1ruc1or's use onty."

Solution

Manual lo Engineering

Horton's

Hydrology, Third Edition by Dr. K. Subramanya

equation Prob. 3.13

4.0

::Jl
~

y = 3.2747X + 3.0612

2.0

R1

o.o .

= 0.9012

c:

....

2.0 .
-4.0
0.0

0.5

1.0

1.5

2.0

2.5

I (h)

Fi;:. p3.13 Fill.inf: of l!orlon's Equation - Problem 3.13.


The best fit Slraigh1 line through the plot.ted p~ints could be. expressed as
In(!,,- le)= -3.2747 t + 3.0612 with R = 0.9012.
Thus K, = 3.06 11 and /Jo({, - J,.) = 3.2747
giving(!,,-

ts= 26.435

Sincef,. = 1.50 cn\/h. /., = 27.935 cnl.11


3.14

Incremental Infiltration depth values and corresponding infllnntion intensitjesJ;. at


various data observation times are calculated as shown in the following Table p.
3.14. Also, various parameters needed for plotting different infiltration models arc
also calculated as shown in Table P3.14. The units used are J~ in cnl/h, F,. in cm

and 1 in hours.

Table pJ.14 Computations for Problem J.14


1

10

Incremental

<leplh
Time
lmin\

0
10
20
30
50

Time
tin

hours
0
0.167
0.333
0.500
0.833

du ting
F,

F,

rmml

icm'

9.8
18.0
25.0
38.0

0.98
1.80

2.50
3.80

'

interval
<cml

(cmlh'

0.98
0.82
0.70
1.30

5.880
4.920
4.200
3.900

tn F
0.020
0.588
0.916
1.335

Ln t
1.792
1.099
0.693
0.182

t!F

('-'

1.020
0.556
0.400
0.263

2.449
1.732
1.414
1.095

ftcopyrlghted Ma1er1a1" "ACd~ional resource mate1ial supplied wi1h the boOk El'lgineemo
Hy<1101C>l)y, Thin:I EcMiOl"l w1ltten by Or. K. Subramanya & published by McGrav1-Hill Edvc-.a1t0n
(India) Pvt lid. This resource material is lot lns1ruc1or's use onty.'

Solution

Manual lo Engineering

Hydrology,

1.333
55.0
5.50
76.0
2.000
7.60
94.0
9.40
2.667
110.0
11.00
3.333
4.667
137.0 13,70
163.0
16.30
S.000
Kos1iakovs Equation: F"'(1)= o 111

Third Edition by Dr. K. Subramanya

1.70
2.10
1.80
1.60
2.70
2.SO

90
120
160
200
290
360

3.400
3.150
2.700
2.400
2.025
1.950

1,705
2.028
2.241
2.399
2.617
2.79i

0.299
0.693
0.981
1.204
1.540
1,792

0.182
0.132
0.106
0.091
0.073
0.061

o.sss
0.707
0.612
0.548
0.463
0.409

Eq.(3.25)

Taking logarithms of both sides of me equation (3.25)


ln(P,.) = /11 a + b ln(t).
'The data set is ploued as IJ1(Fr> vs 111(1) 01 an arithmetic graph paper (Fig.P-3.14- I .)and the
best Iii Stl'aight line through the ploued is obtained as
!t1(P,.) =J.4457+ 0.78411!1(1).
The coefflcienrs of Kostiakov equation are b = 0.784 I and
U1 a= 1.4457 and hence (1 = 4.24). Best fitting Kostiakovequation fol' the data is
F,. = 4.2451'13J'

Kcsttakcv Equation Prob. 3.14


3.00
2.50
2.00

u,

1.$0

_,e

1.00
y0.7841X .. 1.4457
Rl 0.9N3

0.50
0.00

0.50 '-----~------------'
2.00 1.50 1,00 O.SO 0,00 0.50 1,00 1.50 2.00

Ln1

Fig. P -3.141 Kostiakov Euanon

Philip's

Equation: The expression

I, (t) = fis ,-M

+K

(Eq.3.24) is used. Values of fr

(Col. 6) are ploued against ,--0s(col. lO) on an arithmetic graph paper (Fig.P-3.14-2).
best lit straight line through the plotted points is obtajned as
JI'= 1.9111''~ + 1.485

TIe

'The coefficients of Philip's equation ates= 2 x 1.91 l = 3.822 and K= 1.485


ftcopyrlghted Ma1er1a1'" "ACd~ional resource mate1ial supplied wi1h the boOk El'lgineemo
HV(il'OIO'l!Y. Thin:I EdifiOl'l w1ltten by Or. K. Subramanya & published by McGrav1-Hill Edvc-.a11on
(India) Pvt lid. This resource material is lot lns1ruc1or's use onty:

Solution

Manual lo Engineering

Hydrology,

Third Edition by Dr. K. Subramanya

Philip's Equalion PfOb. 3.13


7.0

,,...,

6.0

--"
:c
E

s.o

- .,,...,

4.0
3.0

_,,...,

A7

2.0
y = 1.911)1+1.485
R> : 0 ..9593

1.0
0.0
0.00

o.so

1.50

1.00

2.00

2~50

3.00

Fi,::. P-3.142 Philip's Equation

(3.27)
"
(col. 6) are pJoued agains; 'I/ P" (col. 9) on an arithmetic graph paper (Fig.P.

Green- Ampl Bouation:

[. = nt+-

'

Values of J,.
3.14-3). The best fil sttaighl line through the ploued

points is obtained

as

!, = 3.97851. /'. ) + 2.30;.

'

TI.e coefficients of 1he Green - Ampt equations are 111 = 2.305 and

"=

3.9785

ftcopyrlghted Ma1er1a1'" "ACd~ional resource mate1ial supplied wi1h the boOk El'lgineemo
Hyd101C>lly, Thin:I EcMiOl'l w1ltten by Or. K. Subramanya & published by McGrav1-Hill Edvc-.a1t0n
(India) Pvt lid. This resource material is lot lns1ruc1or's use onty:

Solution

Manual lo Engineering

Hydrology, Third Edition by Dr. K. Subramanya

Gre.en Ampl Equallon-Prob.3.14


7.0

s.o

--"
.c

s.o

E ~o
3.0

:..-
..,,.

_,.....-

_...-

2.0

= 3.9785 .. 2.305
R1 0.8797

1.0
0.0
0.00

0.20

0.40

0.60

0.80

1.00

1.20

1/F
ig. l,3.143 Green -Anlpt Equatieu
3. 15 Ccmpmmtons needed for the plots of/--,.. J~ and /11 (JjJ{t) vs time (hours) arc shown
in the following table:
Time

F,
(hours) (mm}
1

0
0.033
0.167
0.500
1.000
1.500
2.167
4,000
6.000
.

F,
(cm)

Incremental
inliruation

depth (cm)

'

(cmlh)

(fpI~}

Ln(fplc)

tp(mmlh)

7
0.7
3.174
240.00
0.8 24.000
23.900
9.750
2.267
20
2
1.3
9.650
97.50
1.35
4.050
1.374
40,50
33.5
3.35
3.950
37.8 3.78
0.43
0.760
0.274
0.860
8.60
0.17
0.240
1,427
3.40
39.5
3.95
0.340
41
4.1
0.15
0.125
0225
2.079
2.25
4.3
0.109
4.700
3
0.2
0.009
1.09
4.5
0.2
0.100
1.00
5
.
.
The vanauon ofjp (mnllh) with 1(/J)1s shown m Fig. P 3.15 I. The cquanon of
lhc best fit line is obtained as/p = O. 7598 (111j$

ftcopyrlghted Ma1er1a1'" "ACld~ional resource material supplied wi1h the boOk El'lgineemo
HV(il'OIO'l!Y. Thin:I EdifiOl'l w1ltten by Or. K. Subramanya & published by McGrav1-Hill Edvc-.a1t0n
(India) Pvt lid. This resource material is lot lns1ruc1or's use onty:

Solution

Manual lo Engineering

Hydrology,

Third Edition by Dr. K. Subramanya

Variation of Infiltration capacity Prob. 3.15

100.00

= 0.75981(11''
Ai= 0..9497

0.01
0.01

0.10

1.00

10.00

Time (h)

g. P-3.ISl

Fi
Variation of lnfiltrati(1n Capatily

TI1e variation of Fp (mm) wid1 l (h) is shown in Fig. P -3.14-2. The equauon of the
best lit line is obtained as Fp = 7.4827 ln t + 34.781
Vatlallon ot cumctenve lnllllrallon with TlmeProb.3.15

eE so
~ 50

y 7.... 27Lnt~) 3.7"1


Ala0.0503

~ 40

..
..

~ 30
~ 20

3 10
E

0
0.01

0.10

1.00

10.00

Time (h)

Fig. P - 3.15-2 Yariation of Cumulative lnriltr:1ti(1n with Time


ftcopyrlghted Ma1er1a1'" "ACd~ional resource mate1ial supplied wi1h the boOk El'lgineemo
Hyd101C>lly, Thin:I EcMiOl"l w1ltten by Or. K. Subramanya & published by McGrav1-Hill Edvc-.a1t0n
(India) Pvt lid. This resource material is lot lns1ruc1or's use onty."

Solution

Manual lo Engineering

Hydrology,

Third Edition by Dr. K. Subramanya

B)' observation of the dataf.. =0.10 cm/h. Values of /11(/JJ-/c) arc plotted against
time (h) on an arithmetic graph paper (Fis.f> 3.153). The best fit straiSht line.
through the plotted points could be expressed tis
fn(f,,- /,) = -1.9()95 I+ 2.3169
Thus K,,; 1.91h., and U1(f,,- / ..) = 2.317 giving (h,- J..) = 10.144 cm/h
Since le O. IOCm/h, f0 - 10.244 cmlh

Hortons oqwtlon Problem 3.15

..
::

g
5

'

1.0
0.0
1.0
:!.O

I
y = -1.9095x. 2.31
A, 0.9423

-ae
4.0
5.0
G.O
0.0

.O

2.0

----

a.s

2.6

Tim t (h)

<O

Fig. I' - 3.153 Horton's Equation


3.16

= J' t, di and Ji.=


'
(i) lo 4 hours cumulative infiltration
F,,

Fr= aJ(0.5+1.2e0$')<11

'

= ((O.S x 4) -

0.5 + 1.2 e.o.''

= [ 0.5r-~e0j'
~~

]''

0-(2.4)( e''''' -(-e")J = 2.0- 2.4(0.13533-1) =4.075 cm


Average infihrauon capacity rate =/,..,= 4.075/4 = 1.02 cnt/l'
3.17

Fp = 3.0 r"'
Differentiating wjth respect to time 1. J~ = (3.0 x 0. 7) i-0}
Att=2.0h. /p=2.I x(2.or"= l.7cm/h
A11 = 3.0 h, Io= 2.1 x (J.or11>= 1.stcntlh

ftcopyrlghled Ma1er1a1'" "ACd~ional resource mate1ial supplied wi1h the boOk El'lgineemo
Hyd101C>lly, Thin:I EdifiOl'l w1ltten by Or. K. Subramanya & published by McGrav1--Hill Edvc-.a1t0n
(India) Pvt lid. This resource material is lot lns1ruc1or's use onty:

Solution

Manual lo Engineering

Hydrology,

Third Edition by Dr. K. Subramanya

3.18
340000 = 0.068 m = 6.S cm.
jCJOxlO ..
Pulses of uniform time duration tl.1 = 2 h are considered. The pulses are numbered
sequentially and intensity of rainfall in each pulse is calculated as shown below.
Runoff=

T blI.' D 3 18 Cal tuIauens


'
ror Problem 3 18
Pulse number
I
z 3 4
Time from start of rain 2
4
6
8

10

12

7
14

8
16

(h)

Cumulative

rainfall 0.80 2.W 4.10

7.30 10.80

I I.SO 12.40

12.W

1.00

0.60

0.20

0.50

0.30

0.10

fem\

Incremental rain (cm) 0.80 1.80 I.SO 3.20 3.50


Intensity of rain (/,) in 0.40 0.90 0.75 r.so 1.75
cn\/b.
Herc duration of rainfall D = 16 h.

ss = 2 h and

N = 8.

Trinl I:

Assume- Af = 5. tl.1 = 2 h and hence t., = 1\I. 61 = 10 hours.


Select these 5 pulses in decreasing order of/;. Pulse I. 7 and S are omiued.
Runoff R, =6.8 cm =

' -p).:.
I(i,

1=

'
LI,

.6 1 -11(5x2)

' x 2) + ( 1.75 x 2) + (0.50 x 2) I 10 <JI


6.S = (0.90 x 2)' + (0.75 x Z) + (1.60
=11.0-IOq>
op= 4.2110 = 0.42 cm/h
By inspection or fO\V 5 of Table (p-3.18). A1., = number or pulses having f 2:: qi. that
is 11 ~ 0.42 cm/h is 5.
Thus Jlf,. = 5= /.1. Hence assumed /lf is OK.
The e-index of the storm is 0.42 cn\/h and the durauoa of rainfall excess=
1,. =

10 bours.

ftcopyrlghted Ma1er1a1'" "ACd~ional resource mate1ial supplied wi1h the boOk El'lgineemo
Hyd101C>lly, Thin:I EdifiOl'l w1ltten by Or. K. Subramanya & published by McGrav1-Hill Edvc-.a1t0n
(India) Pvt lid. This resource material is lot lns1ruc1or's use onty:

Solution

Manual lo Engineering

Hydrology, Third Edition by Dr. K. Subramanya

Fig. P3.18 HytographandERH of tho Stm (Prob!om 3.18)

2.00

. ..

t.eo

~
,._

1.40

"s

'>.oo'

0.80

;,;;
e

.s

~
"'

o.eo
o..w

1.75

r. ..

0.00
0,75

O.<O

- ra,

-0.:10--

_1:index
= 0.42
Cfl'llh

:O:'i!tl_____

I n

0.20
0.00

"

"

Time (hoi.-s)

,,

Fig. P-3.18 ERH


3.19
Pulses of uniform time duration 6.1 = O.S Ii art' considered. The pulses are numbered
sequenlially and intensity of rainfall in eachpulse is calculated as shown below.
Table n.J.19 calculations tor Problem 3.19
Pulse number
I
2
4
5
7
10
3
6
8
9
Ti1ne front start of 0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00 4.50 5.00
rain Ch)
Curnularive
0.25 o.so I. 10 1.60 1.60 .1.50 5.70 6.5() 7.30 7.70
rninfall (cm)
Incremental rain 0.25 0.25 0.60 0.50 1.00 0.90 1.20 1.10 0.50 0.20
(cm)

Intensity of rain 0.50


(/;\in cmlh.

o.so

1.20

1.00 2.00

1.80 2.40 2.20

1.00 0.40

Herc duration of rainfall V = 5 h, 61 = 0.5 hand N = 10.


1r;a1 I:
Assume A1 = 7. tl1 = 0.5 hand hence 1.. = r..t . .61 = 3.5 hours.
Select these 7 pulses in decreasing order of I;. Pulse 1.2 and 10 tin: crniued.

Runoff R,=3.Scm =

~)1, -11)<.11

'

= fJ, <.\

'

-1' (7 x0.5)

ftcopytlghted Maletlal" "ACd~ional resource mate1ial supplied wi1h the boOk El'lgineemo
Hyd101C>lly, Thin:I EcMiOtl w1ltten by Or. K. Subramanya & published by McGrav1-Hill Edvc-.a1t0n
(India) Pvt lid. This resource material is lot lns1ruc1or's use onty:

Solution

Manual lo Engineering

Hydrology, Third Edition by Dr. K. Subramanya

3.5 = (1.2 x 0.S) + ( 1.00 x 0.S) + (2.00 x 0.S) + ( 1.80 x 0.S) + (2.4 x 0.S) +
(2.20 x 0.5) + (1.0 x 0.S) l- 3.5 ~
= 5.8- 3.5 'I'
'+> = 2.3/3.S = 0.0.657 crnrb
By inspectionof row 5 of Table. (p-3.19). A1, e numbcr of pulses having/,~ ip. thiu is
/,~ 0.0.657 cm/his 7. Thus Af.:= 7= AI. Hence assumed .~1 is OK.
The o-index of the storm is 0.657 cn\/11 and the duration of rainfall excess= t, = 3.5
hours.
Fig. P3.19 Storm Hyetograpt. ond AH Problem 3.19

es

"ii

:?.O

~
~
~
e~

<

...

o.s
0.0

,,

'=--"'=-""----'--1---'---'----'--1---'=--'
,,
0.5

ac

30

s.o

fig. P - 3.19 ERfl


3.20
Pulses of uniform lime duration lit = 2:0 min are considered. The pulses are numbered
sequentially and intensity of rainfall in each pulse is calculated us shown below.

Table p-3.20

C:alculalions for Problem J.20

Pulse No.
I
4
2
3
Time from start of rain (h)
0.333 0.667 1.00 1.333
Rainfall Intensitv (nln1/h)
18
13
6
6
lncremeutal rainfall depth in the
2.00 2.00 6.00 4.33
interval (1nm)

0.67

0.67 4.00

A veraze Loss =Q)x/it

1.0
0

1.0
0

1.0
1.00

Runoff (Olin) in 6.t

Total runoff

= 13.33

1.0
1.00

1.0
1.0
5.00 3.33

7
6
l.667 2.00 2.333
12
2
2
1.0
3.00

mm

ftcopytighted Maletial'" ...ACd~ional resource mate1ial supplied wi1h the boOk El'lgineemo
Hyd101C>lly, Thin:I EcMiOl"l w1ltten by Or. K. Subramanya & published by McGrav1-Hill Edvc-.a1t0n
(India) Pvt lid. This resource material is lot lns1ruc1or's use onty:

Solution

Manual lo Engineering

Hydrology,

Third Edition by Dr. K. Subramanya

Calculation of w-Index:
Deduct initial loss 111 = 0.8 mm front the rainfall hyetograph. The firs! pulse will
have a rainfall of ( 2.00 - 0.80 = I .2 nun) and lhe resulting intensity is 1.2/0.333 =
4.00 rum/h. The resulting byerograpb is !IS follows:
Pulse No.

2
0.667

3
I.OD

4
1.333

5
6
7
1.667 2.00 2.333

1.2

2.00

6.00

4.33

0.67

0.67 4.00

IS

13

Time from start of rain (h l


0.333
Incremental rainfall depth in
the interval (nun)

Rainfall intensity of pulses


for \\'.index computauon

12

(n11n/h)

Trial I:
Assume A'1 = S. :l.1 = 0.333

h and hence I-: = l\1. at = I .667 hours.


Select these S pulses in decreasing order of/;. Pulse 5 and 6 are omined.

'
:2:(1,

Runoff R, =13.33 mm=

-~)<11

'
=LI,

((4 x 0.333) + (6 ' x 0.333) + (18


1.6<\7 ~
= 17.53 - 1.6<\7 ~

13.33

tp

<11 -~ (Sx0.333)

x' 0.333)

+ (13

x 0.333)

+ (12

x 0.333))-

= 4.211.67 = 2.52

By inspection of

tO\Y 4

1nn1'h
of Table (p3.20), A1, = number of pulses having 11 ~(I). that

is

Ir~ 2 . .52 rnnl/h is 5.


Thus J\1,. = S= A1. Hence assumed /\1 is OK.

The w-toocx of the storm is 2.52 1ru1\/h and the duration of rainfall excess
1.67 hours.
3.21

O>-={)60
.
cm/h

Increment

Cum.

tncrc-

from
start

;i,l time
(=M)

Rainfall

mental
rninf:ill

(11fi1 ua uo I)

(cm)

= ( <J)X 01)

80
100

= O>O
- crn ocr 2 0 min time steo

1"imc

0
20
40
60

=I-:

20
20
20
20
20

(cm)

0
0.50
1.20
2.60
3.30
3.50

Loss

0.70
0.20

0
0.20
0.20
0.20
0.20
0.20

sum

I.OD

0.50
0.70

1-4-0

Runoff
(cm)

0
0.30
0.50
1.2
0.5
0
2.50

ftcopyrlghted Ma1er1a1'" "ACd~ional resource mate1ial supplied wi1h the boOk El'lgineemo
Hyd101C>lly, Thin:I EdifiOl'l w11uen by Or. K. Subramanya & published by McGrav1-Hill Edvc-.a1t0n
(India) Pvt lid. This resource material is lor lns1ruc1or's use onty:

Solution

Manual lo Engineering

Hydrology, Third Edition by Dr. K. Subramanya

Runoff in each time Step is equal to the Incremental rainfal! in 1ho1 step minus
infiltration loss calculated as equal to ( cpx At). Nole 1h111 the initial loss hos already
been accounted for in lhe calculation of c-Index and as such does not appear in lhe
calculations. The total surfnee runoff from the catchment is
2.50 cm.

3.22
Depth
of

intensity

of
<p

%of

IOOcx

catchment (cm/h)

0.2

0.3

0.5

1.0
1.0
1.0
0.8
0.8
0.8
0.5

0.5
0.5

Rainfnll
Intensity
(cm/h)

0.8
2.3
1.5
0.7
2.1

1.0
1.0
2.5

I o.s

Runoff
in CJCh

sub-

Runoff

depth

cffecitive
Rainfall
rainfall
Ou ml ion excess

arc;i

over IOCJI
catchment

(cnvh)

(cm)

(cm)

o.o
1.3
0.5
0.0
1.4
0.3
0.5
2.0
0.3

(cm)

(h)

1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0

o.o
1.3
0.5
0.0
1.4
0.3
0.5
2.0
0.3

1.8

0.36

1.6

0.48

2.8
Total =

1.40
2.24 cm

ftcopyrlghled Ma1er1a1'" "ACd~ional resource mate1ial supplied wi1h the boOk Engineemo
Hyd101C>lly, Thin:I Edition w1ltten by Or. K. Subramanya & published by McGrav1-Hill Edvc-.a1t0n
(India) Pvt lid. This resource materialis lot lns1ruc1or's use onty:

Solution

Manual lo Engineering

Hydrology,

Third Edition by Dr. K. Subramanya

Chapter-4

4.1

For the ficst and lasl sections

=1.6875

Dlstance

Ill

from lhe

1eh
water
edge

Vo.>o

Average
widlh
Im)

Im\

V0.6d Ave1age

depth

velocity

Im)

tmls)

0.0

o.o I
o.so

1.097
2.813
1.530
0.750

1.5

t.6675

1.30

0.6

0.4

3.0
4.5
6.0

1.5000
1.5000
1.5000

2.50
1.70
1.00

0.9
0.7
0.6

0.6

0.4

0.75
0.60
0.50

7.5

1.6875

0.40

0.4

031

0.35

0.00

o.o

e.o I

9.0

e.s I

Segmental
discha1ae

0.00
I Sum=

II
I
I

0.236

commetu

Fst
seemem

test

secmera

6.426

Total discharge= 6.426 inJ/s


4.2 (a) v = ky"
I"
k ''
kd"
V=-J
vdv=-l
y" dy =-d
d
(1n +I)
11

v04 =velocity ~1 0.6 dcplh.that is a1 y = 0.4 d


v kd"
I
I
I

-=
x
x-=
l'o.tt
(ur+I)
k(0.4) ..
(0.4)"'(,,1+1)

a ..

Fot
4.2 (b) v.,

111=

1/6:0.16667.

;;

,,_.,, = 1.001

= k(0.8)" ti"

v,.., = k(O.IS)"d"
i
I
I
~---=
x-( '\: ~ "t) [ (0.8)" +2(0.18)"] (I+ m)

Substituting "'

= 0.1667.

RHS of above equation is equal to J.00036.

ftcopyrlghted Ma1er1a1'" "ACd~ional resource mate1ial supplied wi1h the boOk El'lgineemo
Hyd101C>lly, Thin:I EcMiOl'l w1ltten by Or. K. Subramanya & published by McGrav1-Hill Edvc-.a1t0n
(India) Pvt lid. This resource material is lot lns1ruc1or's use onty:

Solution

4.3

Manual lo Engineering

Hydrology,

'0)'
(2.0 + .:::_
2

For the first section 1\.' =

For the last section \11 =

..

water

Average:

edQe

\Vidlh

2x2

Ois-1an~
from the

oeom
rrm

rrm

1mi

Third Edition by Dr. K. Subramanya

=2.25 m

)'

LO+ LO

2xI

Revoh.1
tlora in
Tmin.

=1.125 m

oeeerva- Average
tion time
T ts\

velocity

trnts'

Segmen1a1
dlscha1rie

0.00

2.25

0.50

80

180

0.174

0.196

I. I 0

6
9

2.00
2.50
3.00

1.95
2.25

83
131
139

120
120
120

0.253
0.381
0.403

0.557
1.859
2.718

12

3.00

1.85

12\

120

0.355

1.968

15

1.75
1.65
1.50
1.25

114

18
20
22

3.00
2.50
2.00
1.50

109
92
85

120
120
120
120

0.336
0.323
0.277
0.259

1.764
1.331
0.832
0.485

23

1.125

0.75

70

\ 50

0.219

0.185

24

Commen1

0.000

0.000
Sum;

Firs!

secmeru

Last

aecrnent
0

11.895

ftcopyrlghted Ma1er1a1'" "ACd~ional resource mate1ial supplied wi1h the boOk Engineemo
Hyd101C>lly, Thi.Cl EcMiOl'l w1ltten by Or. K. Subramanya & published by McGrav1-Hill Edvc-.a1t0n
(India) Pvt lid. This resource material is lot lns1ruc1or's use onty:

Solution Manual lo Engineering

4.4

Hydrology, Third Edition by Dr. K. Subramanya

For the firs1 and Inst sections

Seelion

Average
Widlh
(m)

0
1
2
3

84.375

75
75
75
75
75
75
75

5
6
7
8
9

84.375

10

Oepth
(m)

0
1.8
2.5
3.5
3.8
4.0
3.8
3.0

2.5
2.0
0

_ (1s+~)'
"' =

= 84.375 Ill

2x7S-

Average

v.

Oeg~ees

0
1.75
1.84
2.00
2.28

2.30
2.20
2.00
1.84
1.70

55
57
60
64

65
63
60
57
54

vebc~y
(mis)

1.36
1.47
1.65
1,95
1.98
1.86
1.65
1.47
1.31
Sum=

Segmental
Discharge
(m'ts)

206.8
274.9
431.9
554.8
594.1
530.7
370.2
274.9

220.5
3458.9

Segmental discharge is calculated by Eq. (4.11) IL'i i!t.Q = \V x r, xVp


where Yi= depth at the 1'1hsection and
\')i = average vetccity in the i section = 0.9S x Va sin 9.
Discharge in the river= 3458.9 rn3/s
4.5

Area of time>- concentration curve =


(0 +3.0 + 10.5 + 18.0 + 18.0 + 12.0 + 9.0 + 6.0 + 4.5 + 1.5 +OJ x60 x60 x 10
units = 287000 x 109 units.
287000 x 10' x[9.8Ix1000] x Q = 300
Q = 103 inJ/s

4.6

Q = Q,(C, -C,)

c,-c.

Q = 4x 103 nrl/s: C1

= 0.50: Ci= 4x106

- 4x JO J x(0.50-4x JO') -SOO


Q,
4xl0

4.7

and assume Co= 0

,,

m1S

Q = Q,(C, -C,)

c,-c.

ftcopytlghted Ma1er1a1'" "ACd~ional resource mate1ial sopplieCI wi1h the boOk El'lgineemo
HV(i1'0IO'l!Y. Thin:I EcMiOl"l w1ltten by Or. K. Sobramanya & published by McG,av1-Hill Edvc-.a1t0n
(India) Pvt lid. This resource material is lot lns1ruc1or's use onty:

Solution

Manual lo Engineering

Hydrology,

Third Edition by Dr. K. Subramanya

Q, = 25x 10~ m'is: C1=0.200: C, = 45x10: Co= 10x104


Q

= 25 x 10- x (0.20 - 45 x 104) = 142.8 m'is


(4x10 .. - 10 )( 10")

4.8

"eq. (4 . 15).tor rmxmg


. . 1cngt11 .is _L_=_0_.1_3_B_c_,_(0_.7_C_+_c_c,fii)"'g"-)

gd

B = 45 m. C

= 20 10 30. d = 2.0

n~. Since L varies directly with C. for safe mixing


length adopt 1he larges; value or c. Hence using c = 30.

L= 0.13x(45)'

x30x(0.7x30+
9.Slx2.0

10975

Adopt L = 11 km

49

Pronenv Section A

Section B

73.293 rn26.S 18 ru
2.733 m

93.375111"

A
p

R
K

30.228 in
3.089 m

=-1-(73.293)(2.733)'" = 7163.5
0.02
AverageK= JK..,K11 =8422.4

=-1-(93.375)(3.089)'" = 9902.5

0.02

Fnll P = 104.771 - 104.500 = 0.271 m. L= 10000 rn.


To start with assume .<:1=(FIL)= (0.271/10000) 10 get JS;= 0.005206
Q= K

Js; = 43.85 m'is

Since 1he now is expaoding . eddy loss It,= 0.31!t.-

128

ti.I

A & B \\ith suffixes I &

2g

2 for sections ;\ & B respectively. The head loss


llj= (It,

v,:

vr

-lt:)+(:,---2
)-It,
-8
8

The discharae that sans


. f res this cuauon ts
. ~oun db v trial an d error.
v?~/Z,
11,"12g
Trial
llJ
~8
(Trial}
1
0.271
0.271xl0~
43.85
0.01824 0.01124
0.2754

s,

2
0.2754 0.2754xl0~
0.2760 0.276x103
Q = 44.2!) m,/s.

4.10
I Property I Section I

,,,

s:
44.20
44.25

0.01854
0.01860

0.01142
0.01)44

0.276
0.276

I Section 2

ftcopyrlghted Ma1er1a1'" "ACd~ional resource mate1ial supplied wi1h the boOk El'lgineemo
HV(il'OIO'l!Y. Thin:I EcMiOl"l w1ltten by Or. K. Subramanya & published by McG,av1-tiill Edvc-.a1t0n
(India) Pvt lid. This resource material is lot lns1ruc1or's use onty."

Solution

Manual lo Engineering

Hydrology,

Third Edition by Dr. K. Subramanya

102.70 - 100.20: 2.5 m


(12+2 x2.50) x2.SO =42.50 m"
(12 + 2,/5 x2.50 =23. 18 m
1.8335 m

"

A
/>

101.30- 98.00 2.70 Ill


(12+2 x2.70) x2.70 =46.98 m"
(12+2,/5 x2.70=24.074m
J.9514m

=1-(42.50)(1.8335)"' = 2122.2
=-'0.03
-< 46.98)(1.9514)"'
0.03

Av.:rage.K= JK,K! =2278

= 2445.4

andlr,.=O

Q=Kf=K.j$,

(I)

v!

y!

2g

2g

Also/~= (h, -h,)+(-'---L)


.

(2)

The discharge Q is found from Eqs (I) and (2) by trial and error.
As a firs1 trial assume h1= FaJI = 102.70 - 101.30 = 1.4 111

.SJ=

1.40/8000= l.75xl0~

Trial

'~

andQ=2278.JT,

s,

(Trial)

1.400
1.4056
1.4046
3
Q=J0.18m ...
Is
I
2

l.75x10~
I.757x 10..l.756xl0~

s:
30.14
30.20
30.18

\1,12g

Vi"/2g

I~

0.0256
0.0257
0.0257

0.02!0
0.0211
0.02!0

1.4056
1.4046
1.4046

4.11

(I) The stage -discharge equauon is Q = C, (G - a)-9


log Q = p log(G- <1) +log Cr
Y=PX+b
where Y = IQg Q and X =log (G - a)
Values of X, Ynnd XY are calculated for all the data as shown in Table p-4.11.

Taking dte logarithms

or

'fable p4.11 Calculations

S1a9e(G)

Ga

Olschaoe
(0)

(meters\

lml

(m'fs.\

35.91
36.90
37.92

0.41
1.40
2.42
8.90
9.90

89
230
360
3800
45&0

44.40

45.40

Log(Ga)

LogQ.

-x

XY

x'

v'

-0.387
0.146
0.384
0.949
0.996

1.949
2.362
2.556
3.580
3.659

0.755
0.345
0.981
3.399
3.643

0.150
0.021
0.147
0.901
0.991

3.800
5.578
6.535
12.815
13.388

ftcopyrlghted Ma1er1a1'" "ACd~ional resource mate1ial supplied wi1h the boOk El'lgineemo
HV(il'OIO'l!Y. Thin:I EcMiOl"l w1ltten by Or. K. Subramanya & published by McG,av1-Hill Edvc-.a1t0n
(India) Pvt lid. This resource material is lot lns1ruc1or's use onty:

Solution

Manual lo Engineering

46.43
39.07
41.00
43.53
48.02
49.05
49.SS
49.68

10.93
3.57
5.50
8.03
12.52
13.55
14.0S
14.18

Hydrology, Third Edition by Dr. K. Subramanya

5305
69
798
2800
5900
6800
6900
6950
SUM

1.039

3.725

3.869

1.079

13.873

0.553

2.671
2.902
3,447
3.n1

0.305

3.833
3.839
3.8"2

1.476
2.149
3. 119
4.139
4.338
4.406
4.425

42.135

35.533

7.135
8.422
11,883
14.219
14.688
14.737
14.761
141.833

0.740

0.905
1.098
1.132
1.148
1.152

9.853

From the above table


=9.853
LY =42.135
l: X'= 10.092
lY' = 141.833
(~X)1= 97.082
(l:Y)' = 1775.39
Sy using Eq. (4.2Sa)
p = N(l:XY)-(l:X) (l:Y)
N(l:X ')-(l:X)'

zx

0.548
0.819
1.205
1.281
1.317
1.326
10.092

l:XY=35.533
N = 13

= (13x35.533)-(9.853)(42.135) = 1.371
(13x 10.092) -(9.853)'
By Eq. (4.28b)
b = l:Y -P(l:X)
N
= (42.135)-1.371
13

x (9.853)

= 2.20206

Hence
C, =159.44
The required glluge - discharge rctauonship is therefore
Q = 159.44 (0- a)''''
(2)

By Eq. (4.29)(of1'cJtt) cocfflcicm or corretauon

N(l:XY)-(l:XXl:Y)

=-.=~~=(=13=x=3~5_.5~33~)_-~(9_.8~5_3~X_2~.1~3_S>~~~,/l(13 x 10.092) -(97.082)11(13 x 141.833) - (1775.39)1


= 0.968
As the value of ,. is nearer to unity the correlation is very good.
(J.a) When G = 42.5. as a= 35.0. (G - a)= 7.50

0 = 159.44 (7.5)1J11 = 2525 n13/s


ftcopytlghted Maletial'" "ACd~ional resource mate1ial supplied wi1h the boOk El'lgineemo
Hyd101C>lly, Thin:I EcMiOl'l w1ltten by Or. K. Subramanya & published by McGrav1-HillEdvc-.a1t0n
(India) Pvt lid. This resource material is lot lns1ruc1or's use onty:

Solution

Manual lo Engineering

Hydrology,

Third Edition by Dr. K. Subramanya

(3-b) When G = 48.5, as" =35.0,(G-o) = 13.0


G = 159.44 (13.0)'-"' = 5368 m3/s

.Q.. = (!..)"

4.12

Q..

F.,

JOO = (O.SO)": Hence m = 0.60

580

1.50

\\1hen the

auxiliary gauge- reads 120.10 rn. Frill= 0.90 m.

Q=580x (O'~)"' =426.9m'ts


I.>

4.13

F;g. P-4.IJ

'1 lllrlllllC'S MU!od


- lf.60

4. 14

The regression equation is X =a Y + C


(Eq. 4.35)
where X =log (G - a) and Y =Jog Q. The value of ex is given by Eq.(4.35 a) as
N(!Xl')-(tY)(l:X)
a=
N(tY')-(tY)'
Values of X . Y and XY arc calculated in Table p-4.14.

a-205m
-

N-1.i

Discharge
Stagc(G)

1mete-ts~
21.95
22.4$
22.80

(Ga)

(0)

Im\

tmJiS'

t.45
1.95
2.30

100
220
295

Log (Ga)
=X

LogO =
y

XY

x'

Y'

0.1 St
0.290
0.362

2.000
2.342
2.470

0.323
0.679
0.893

0.026
0.084
0.131

4.000
S.4$7
6.100

ftcopyrlghted Ma1er1a1'" "ACd~ional resource material sopplieCI wi1h the boOk El'lgineemo
Hyd101C>lly, Thin:I EcMiOl'l w1ltten by Or. K. Sobramanya & published by McGrav1-Hill Edvc-.a1t0n
(India) Pvt lid. This resource material is lot lns1ruc1or's use onty:

Solution

Manual lo Engineering

23.00
23.40
23.75
23.65
24.05
24.55
24.65
2$.40
25.15
25.55
25.90

2.50
2.90
3.25
3.15
3.55
4.05
4.35
4.90
4.65
5.05
5.40

400
90
500
640
780
1010
1220
1300
1420
1550
1760
SUM:

Hydrology, Third Edition by Dr. K. Subramanya

0.398
0.462
0.512
0,498
0.550
0.607
0.638
0.690
0.667
0.703
0.732
7.273

2.602
2.690
2.699
2.806
2.892
3.004
3.096
3.114
3.152
3.190
3.246
39,295

1.035
1.244
1.382
1,398
1.591
1.825
1.971
2.149
2.104
2.244
2.377
21.216

0.158
0..214
0.262
0.248
0.303
0.369
0.408
0.476
0.445
0.495
0.536
4.156

6.77t
7.237
7.284
7,875
8.364
9.026
9.526
9.697
9.937
10.178
10.533
112.015

rx

= 1.2n
i:,y = 39.295
l:XY=21.216
lY' :112.015
N=l4
Subsunning rnese values in Eq.( 4.35)
"= (14 x 21.216) -(39.295)((7.:73) =0.4648
(14x 112.015)-(39.295)"
The coefflcieat C is given by Eq. (4.35~ b) as
C= (rX)-a(I-Y)
N
= (7.273)-0.4648x(39.295)

14
c, = <111tilog C = 0.1641 leading
(G-20.50) :0.1641
(b)

4.15

10

= 0.785

the gage-discharge equation as

Q'"""

When Q = 2600 1n'J/s and given that''= 20.50 m


(G -20.50) = 0.02246 (3500)''" = 6.342 111
G = 26.842 in

Q.

/1 + v..Is., dlrdi

Q.= 1

112

_Jli=
=3.lllx.10.sn\/'s
di 100x60x60
= ( 113600). Q.. = 160 m'ts, = 2.0 mis

s.

v..

Q,. = 160x ,,/1 +


I

2. x(l/3 600)

x3.ll

Ix

10>

= 164.4 111-'/s

ftcopytlghted Maletial'" "ACd~ional resource mate1ial supplied wi1h the boOk El'lgineemo
Hyd101C>lly, Thin:I EcMiOl'l w1ltten by Or. K. Subramanya & published by McGrav1-HillEdvc-.a1t0n
(India) Pvt lid. This resource material is lot lns1ruc1or's use onty:

Solution

Manual lo Engineering

Hydrology, Third Edition by Dr. K. Subramanya

Chapter- 5
5.1
2

I
Acea (km')

Nlean

3
Product [I ]x[2 I

isohyer

value (cm)

300
450
700
600

137.5
132.5
127.5
122.5
117.5

6875
39750
57375
85750
70500

400

1122.s

45000

200

107.5

50

21500
ToUll =2700
Sum =326750
.
Mean annual R::unfall
= 326750/2700= 121. 02.cn1
(b) Annual runoff in cm = (65 x 365 x24 x60 x60)1 (2700 x 10") = 75. 92 cm
Runoff ccefflciem = 75.921121.02 = 0. 627 = 62.7%
5.2
Ta bl e D- 5?
- Comnutanons
,,1onlh

2
3

5
6
7

8
9
10
11

12
SUM

or

..

,,,

cm

Re-1>9t1e

G:iug~d
mondlly
flow
(ll1rn>i

UI
u1ifzation
llJ!m')

1.090
2.270
1.950
2.600
3.250
0.280
2.900
2.980
3.800
0.840
0.280
0.400
22.840

0.80
0.70
0.70
0.70
0.70
0.30
0.70
0.70
0.70
0.30
0.30
0.30
6.700

lloN
1!\lm~

0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
2.400

From the above Table- p-5.2.


P = 86.60
IR = 38. 771
1: 1>2= 822.24
N = 12
By using Eq. (5.3a)

R
Virgin
lloN

ill.Im,.
1.490
2.770
2.450
3.300
3.75o
0.380
3.400
3.480
4.300
0.940
0.380
0.500
27.140

sVlrg.n

"''"

IAontllly
rn.inf.a!I

fern)

2. 13
3.96
3.50
4.71
5.36
0.54
<1.86
4.97
6.14
1.34

o.~
0.71
38.771

RP

'

(cm)

11.069
5.20
34.031
8.60
7.10
24.850
9.20
43.371
11.00
58.929
1.20
0.651
I 0.50 51.000
II.SO
57.171
14.00 86.000
3.70
4.969
1.60
0.869
2. 143
3.00
86.600 375.053

27.0~
73.96
50.41
64.64
121.00
1.44
110.25
132.25
196.00
13.69
2.56
9.00
822.24

PR= 375.053

ftcopyrlghted Ma1er1a1'" ''ACd~ional resource mate1ial supplied wi1h the boOk Et1gineemo
HV(il'OIO'l!Y. Thin:I EcMiOl"l w1ltten by Or. K. Subramanya & published by McG,av1--Hill Edvc-.a1t0n
(India) Pvt lid. This resource material is lot lns1ruc1or's use onty:

Solution

Manual lo Engineering

Ii

Hydrology,

Third Edition by Dr. K. Subramanya

N(Y:PR) - (EP)(Y:R)

= -~~,--'--~,--'-

N(rP') - (Y:P)'

= (12 x 375.053) -(86.60)(38.771)

= 0.4848

(12 x 822.24)-(38.771)'
By Eq. (5.3-b)

!.R - o('t.P)
IJ=--~~
N

= (38,771)-(0,4828x86.6)

= _0_2535

12
Hence the required annual rainfall - runoff relationship of the catchment is given by
R = 0.48"28 I' - 0.2535 with both P and R being in cm and R ~ O.
when P = 15.50 cm, H = 7.23 cm= 5.061 f\tn1.l.
5.3
p.
Year

RalnfaU
(cm}

1964
1965
1968
1967
1968
1969
1970
1971
1972
1973
1974
1975

90,50
111.00
38.70
129.50

145.SO
99.80
147.60
50.90
120.20
90.30
65.20
75.90
1165.10

SUM

A.
P2

A2

PA

8190.3
12321.0
1497.7
16770.3
21170.3
9960.0
21785.8
2590.8
14448.0
8154. 1
4251.0
5760.8
126900.0

906.0
2520.0
28.1
3782.3
5595.0
1592.0
4186. 1
42.3
2125.2
1310.4
605.2
400.0
23092.6

2724.1
5572.2
205.1
7964.3
10883.4
3982.0
9549.7
330.9
5541.2
3268.9
1603.9
1518.0
53143.6

Runoff
(cm)
30.10
50.20
5.30
61.50
74.$0
39.90
64.70
6.50
46.10
36.20
24.60
20.00
459.90

Prom the. above Table 5.1,


rP = 1165.1
rR =459.9
tr'= 126900
lR' = 23092.6
By using Eq. (5.3-a)

Y:PR=53143.6
N = 12

N(Y:PR) - (!P) (ER)


= N('tP') - (EP)'

ftcopytlghted Maletlal'" ...ACd~ional resource mate1ial supplied wi1h the boOk El'lgineemo
HV(il'OIO'l!Y. Thin:I EcMiOl"l w1ltten by Or. K. Subtamanya & published by McGrav1-Hill Edvc-.a1t0n
(India) Pvt lid. This resource material is lot lns1ruc1or's use onty."

Solution

Manual lo Engineering

Hydrology,

= (12x53143.6)-(l165.IX459.9)

Third Edition by Dr. K. Subramanya

= 0.6163

(12 x 126900) - (1165.1)'

By Eq. (5.3-b)
b = l:R - a(~P)
N
= (459.9)-(0.6163xl
165.1) = _21.51
12
Hence the required annual rainfall - runoff relationship of the catchment is given
by
R = 0.6163 /' - 21.513 with beth P and R being in cm and R ~ O.
By Eq. (S.4) coefficient of correlmice
N(l:PR)-(l:P)(l:R)

(12 x 53143.6) -(1165.1)(459.9)


=-.=========~~"'"-;-~~~...,...~~.,..,..,,..

,/1(12 x 126900)-(1165. I )1 ]1(12 x 231)')2.6) -( 459.9)'1


= 0.978. Further,~= 0.9572

As the value of r is nearer to unity the correlation is very good.


When P = 100.0 cm. R

= 40.12

cm

5.4
Catculatlon or Yleld of River Netravau at Bantwal

Year
endino

1971
1972
197$
1974
1975
1976
1977
1978
1979
1980
1981

Observed
Annual

Wiltld

Evapor

Flow

rawa1s

anon

IMCM\

llACMI

It.ICM~

IS925
14813
11726
11818
12617
1S704
8334
12864
16195
10392
16565

91
93
9S
97
99
101
103
105
107
109
111

'

'

'

Annual
Yield

IMCM)
16020
14910
11825
11919
12720
15809
8441
12973
16306
10SOS
16700

SOrte<i
Yleld
values

16700
16306
16020
15809
14910
14766
12973
12720
11919
11825
11676

Excee<lance
Rank
lml

1
2
3

'

5
6
1
8
9
10
11

ProbabUlty
l'l;m.'18

onss
0.111
0.167
0.222
0.278
0.333
0.369
0.444
o.500
0.556
0.611

ftcopyrlghted Ma1er1a1'" "ACd~ional resource mate1ial supplied wi1h the boOk El'lgineemo
Hyd101C>lly, Thin:I EdifiOl'l w1ltten by Or. K. Subramanya & published by McGrav1-Hill Edvc-.a1t0n
(India) Pvt lid. This resource material is lot lns1ruc1or's use onty:

Solution

Manual lo Engineering

1982
1983
1964
1985
198$
1987

14649
10662
11 SSS
10821
9456
9732

Hydrology, Third Edition by Dr. K. Subramanya

113
115
117
119
121
123

1-'766
10781
11076
10944
9S91
9859

4
4

10944
10781

12
13

0.667
0.722

IOSOS

14

o.rre

9959
9S91
6441

IS

0.833
0.689
0.944

16
17

A"r;,ge

12691

75% dependable yield= (by interpolation between p= 0.722 and p = 0.778)


is 10143 MCM
Average annual yield a1Ban1\val=12691 ~ICf\I
Average annual Yield for the whole basin = J269 I X 3222/3184 =12842 ~IC!\l
B> Kbostas formula R... = p"" -0.48 T,... ( in cm)

5.5

~IOnlh

Jlm

0.7

2
0.9

3
I. I

5
10.7

6
7.1

24
0

27
0

32

33

31
0

26

Mon th

Pm

I I.I

8
13.7

9
16.4

10
15.3

II

12

6.1

1.3

24
2.18

23
5.36

21
5.22

20
0

21
0

4.5

(crn)

T,,, "C

Rn

fc.111)

(cm)

r, "C 24

Rn

tern)

t.R.., = 12.76 crn

!.P.., = $8.9 crn

Runoff coefficient = 12.76188.9

= 0.1435
5.6
Table p~S.6 Calculation of f\1onlhly runotl hy Sln1nge'~ method
July

Month

Aug.

St:pt.

Oct.

Monthly Rainfall (mm)

210

160

69

215

Cumulative monthly rainfall (mm)

210

490

559

774

(Runolf {rainfall} as %(From


Stranoas Table 5.3-a\

2.2

10.7

12.9

20.1

4.62

52.43

72.11

155.6

Cumulative

Runofl (mm)

ftcopyrlghted Ma1er1a1'" ...ACd~ional resource material supplied wi1h the boOk El'lgine:emo
Hyd101C>lly, Thin:I EdiliOl'l w1ltten by Or. K. Subramanya & published by McGrav1-Hill Edvc-.a1t0n
(India) Pvt lid. This resource material is lot lns1ruc1or's use onty:

Solution Manual lo Engineering Hydrology, Third Edition by Dr. K. Subramanya

t.tonthlv Runoff (mm\


Monthlv Yield (m'l

4.62

47.61

19.66

63.49

41580

430290

177120

751410

To1a1 seasoeat viek:l l>dm')

1.44

Row 4 is obtained by using Strange's Tables 5.3-a. 1''ote lhat cumulative monthly
rainfall is used to gel lhc cumulative runoff-ratio percentage at any month. Row 7 is
obtained as

Monthly yield (mJ.) =l(ltcn1 in row 5)11000) x (Catchment area in ha) x JO"
Total seasonal yield =sum of items in row 6= 1,440,000 mJ. = .1.44 ~l_mJ
5.7 (a)
Since antecedent 5 - ~1ys rainf:1U is 25 mm and the season is donnanl
season, from 'fable S.3 Arv1C is of Type-It. Thus CN = CN11 = 68
S=(25400J68) 254= I 19.5
for orm-black couon soils
=(P-0.3S)'
. ~030

for

P+0.1S

P> . o

_ [s0-(0.3x 119.5)]' _ [so-35.85]' _


-.m1u
11 91
80+(0.7xll9.5)
80+83.65
Total runoff volume over 1he catchment V,;: 500x IO~x I 1.91/( 1000)= 59550
-

(b)

nt)

lf antecedent 5 - days rainfall is 35 mm, since the season is dorrnam season. from
Table 5.3, AMC is of Type-Ill.

From Eq. 5.20

,, CJ\ IJJ -

c,v,,
0.427 + 0.00573CN,,

68
= 83.27
0.427 +0.00573x68
$=(25400/83.27). 254= 51.03
Q= (P-0.3S)'
for P>0.3S
P+0.7S
__(S0-(0.3x51.03)]' __(S0-15.31]'
= 36.I 6 mm
80+(0.7x51.03)
80+35.72
Total runoff volume over lhc catchment V,= 500x 104x36.16/(IOOO)
Hence CN1r, =

= 180800 IUJ

5.8
Using Table 5.4 weigtued CN11 is calculated as below:
ftcopyrlghled Ma1er1a1'" "ACd~ional resource mate1ial supplied wi1h the boOk El'lgineemo
HV(il'OIO'l!Y. Thin:I EdiliOl"l w1ltten by Or. K. Subramanya & published by McG,av1--Hill Edvc-.a1t0n
(India) Pvt lid. This resource material is lot lns1ruc1or's use onty:

Solution

Manual lo Engineering

Hydrology, Third Edition by Dr. K. Subramanya

Land Use

Soil Grout C
Soil Grcur D
% CN
Product % CN
Product
45 95
4?75
30 95
2850

Cultivated Land (Paddv)


Scrub Forest
6
waste land
9

64
85

384
765
1999

Total

4
6

67
268
528
88
Tot.al 5071

wet
c1,g.hICdCN u-- (5071+1999) _707

100

By E<J.(5.20) CNm= O
O = 84.96
.427+( 0700
. 573x7
.7)
7
707
B E<J.(5.19) CN =
CN,,
=
l
' 2.28L-0.01281CN"
2.281-0.0128Lx70,7

= 51.41

5.9
Given CNu= 73. Using Eq.(5.20) CN1u=

s = (25400/1l6.36)-254

730
= 86.36
0.427 + (0.00573x 73.0)

= 4(1, 12

The. retevant runoff equation for Black soil and At-.1C-lll is


Q= (P-0.IS)' = [P-(O.lx40.12))'
= [P-4.012)'
P+0.9S
P+(0.9x40.12)
P+36.ll
Dav f>tmnti
I
65
2

'IQU1I

Otmm\

36.79
49.73
rot.11 = 86.52 nun

80

runoff volume over the carchrneru V..= 400_:t10Jx86.52/( 1000) = 346080 m3

5.10
Using Table 5.4 weighted CN11 is calculated as below:
Land Use

Soil GrouD D

Total

Soil Grouo C

CN

Product

CN

Product

55

27.5

76

2090

27.5

79

2172.S

45

22.5

85

1912.5

22.5

88

1980

Cultiv.-i1ed

-Good
Bunding}

waste
land

ftcopytlghted Maletlal'" "ACd~ional resource mate1ial supplied wi1h the boOk El'lgineemo
Hyd101C>lly, Thin:I EcMiOl'l w1ltten by Or. K. Subramanya & published by McGrav1-Hill Edvc-.a1t0n
(India) Pvt lid. This resource material is lot lns1ruc1or's use onty:

Solution

Manual lo Engineering

Hydrology, Third Edition by Dr. K. Subramanya

I Total I 4002.5
wc1ghtcdCN u _<1s2.;.4002.s>_s15JOO
-

I Total I 4152.5

. :>

81.55

By E<J.(>.20) CNm= O.427+(. O OO51 l Xol.55)

= 91.1

Using standard SCS-CN equations

s = (25400/91.19).

254

= 24.54

Q= (P-0.2S)'

for P> 0.2S

P+0.8S

(150- (0.2 x 24.54)]' = 124. t mm


150+ (0.8 x 24.54)
Total runoff volume over 'he catchment V r= 500x 104x 124.1/( 1000) = 620500 mJ

5. t I:
Given CNu1 = CN = 77.
S = (25400n7)-254 = 75.87

(P-0.2S)'
P+O.SS

Q=

for P>0.2S

_ (P-(0.2x75.87))'
P+(O.Sx75.87J

_(P-IS.17]',
P+flJ.1

[lay

P (min)

Q (min)

30

2.42

50

13

10.96
0

~1517

10rr;o ..

mn1

Total Q = I 3.38 mm
Total runoff \'Olu111e over 'he catch1nen1Vr=680x 104x I 3.38/(1000) = 909841nl
5.12
Using Table 5.6-a weighted CNn is csjculatcd as below:

Land Use
Row

croos

Soil Groue B
(ha)

CN

Product

400

86

34400

ftcopyrlghted Ma1er1a1'" "ACd~ional resource mate1ial supplied wi1h the boOk El'lgineemo
Hyd101C>lly, Thin:I EcMiOl'l w1ltten by Or. K. Subramanya & published by McGrav1-Hill Edvc-.a1t0n
(India) Pvt lid. This resource material is lot lns1ruc1or's use onty."

Solution

Manual lo Engineering

Hydrology, Third Edition by Dr. K. Subramanya

I Pasture
TOLttl

\Ve1gJned CNu

1100 161

16100
40500

=- -40500 81
5100

By llq.(5.24) CNm= 0.427 + (O~~~~?Jx&l.O)

= 90.9

Using standard SCSCN equations

s = (25400/90.9). 254 = 25.43


Q.-

(P-0.2S)'

for P> 0.2S

P+Q.&S

(P-(0.2x25.43))'
P + (O.Sx 25.43)

(P-5.09)'
P + 20.34

011

P mm

90

100

5.13
(a) Calculation of weighted CN
Since Al\<tC e Category LI. using Table 5.6(:i) weighted CN11 is calculated ns
below:

Landuse

Total
%

Resi~

dcntial
Paved

Soil Group B
(35%)
Prod.
% CN

S-Oil Group C (4W>)

CN

8()

28

85

2380 32

90

20

98

686

98

erg htedCN u = (3006+3664+2330)


100

\V.

I P11id.
2880

I 784

Soil Group 0
(25%)
%
CN rn...t

20

92

1840

98

490

= 90,..v

Using Standard SCS-CN equations


ftcopyrlghted Material'" "ACd~ional resource mate1ial supplied wi1h the boOk El'lgineemo
Hyd101C>lly, Thin:I EcMiOl'l w1ltten by Or. K. Subramanya & published by McGrav1-Hill Edvc-.a1t0n
(India) Pvt lid. This resource material is lot lns1ruc1or's use onty:

Solution

Manual lo Engineering

Hydrology,

Third Edition by Dr. K. Subramanya

s = (25400190.6)254=26.35
Q= (P-0.2S)' forP>0.2S
P+0.8S

_ (150-(0.2x 26.35))' _
- 122 4 Olm
150+ (O.Sx 26.35)
(b) Before urbanizauon: 1\1\,IC e Category II

Land use Total


Pasture

Soil Group C

Soil Group B

(35%)

100

% CN Pfod.
35 79 2765

. h dCN u = (2765+3440+2225)
\veie,ute
100
Using Standard SCSC~' equations
s = (25400/84.3)-254=47.3

Soil Group D

(40%)
CN l'rod. %
86 3440 25

%
40

(25%)
CN Prod.
89 2225

= 84,..l

Q= (P-0.2S)' for P>0.2S


P+0.8S

(150- (0.2 x 47.3))' = 10-~.!)Olm


1150+(0.8x47.3)
fi
. . = (122.4-105.S )xJ 00
Percentage increase m runon'[d ue 10 urbamzanon
105.15
= 16%
=

5.14
N.a 1095

a.

Number of

Oischactte

a: 350
250 .349

150 249
100. 1~9
4099
20. 39

15. 24.9
10 14.9

Pp
lm/lN.1}100

occvuences currunanve
6
30
60
121
137
169
232
183

6
36
96
217
354
523
755
938

lowest
value in

the ranee
350
250
150
100
40
47.7
20
15
68.9
85.8
10
0.5
3.3
8.8
19.8
32.3

I
I

ftcopyrlghted Ma1er1a1'" "ACd~ional resource material supplied wi1h the boOk El'lgineemo
HV(ir'OIO'l!Y. Thin:I EcMiOl'l w1ltten by Or. K. Subramanya & published by McG,av1-Hill Edvc-.a11on
(India) Pvt lid. This resource material is lot lns1ruc1or's use onty:

Solution Manual lo Engineering Hydrology, Third Edition by Dr. K. Subramanya

10751
1095

98.1
99.9

100

1 ~~~~~~~~~~~~~~~~~~~~~

10

100

Pp
Fig,. PS.15 Problem 5.14

.S. J.S
The- calculations an: shown in Table' p-S. l.S. Nole that the flrst entry in Col.
7 corresponding I() June ls negative and the entry corresponding 10 the month of May is
also negative. As such. one more series of data covering 12 months from June 10 May
is added sequentially. thus giving two water years of data.

ftcopyrlghted

Ma1er1a1'"

"ACd~ional resource

mate1ial supplied wi1h the boOk El'lgineemo

Hyd101C>lly, Thin:I EcMiOl'l w1ltten by Or. K. Subramanya & published by McGrav1-Hill Edvc-.a1t0n
(India) Pvt lid. This resource material is lot lns1ruc1or's use onty:

Solution Manual lo Engineering

Hydrology, Third Edition by Dr. K. Subramanya

SISCll'!I cu aucn o rs~ toraue


T3 bl en- .

r..tean
Month

Inflow
<ale
(m'ls)

rnllO\v
Volume
(eumec
.day)

Demand

rate
(m3/S)

Demand
volume
(cumec.
day}

Oepa1

wre
!oot3
col.5}

Cum.
excess
demand
volume
(cumec.
day)

2700
90
2100
2100
1860
90
2790 I
930
3000
6200
90
2190 I 3410
2700
Seot
9000
90
6300
2790
3410
CCI
6200
90
Nov
4500
90
2700
1800
3100
2790
310
Dec
90
Jan
2480
2790
90
310
310
Feb
1680
-840
90
2520
1150
Mar
1240
90
2190 I l 550
2100
iii
2700
1600
4500
900
90
Mav
775
2790
2015
6515
90
Jun
600
90
2700
2100
861 s
Julv
1860
2790
.9545
90
-930
lwn
3410
6200
90
2190 I
Sen11
9000
90
2100 I 6300
2790
3410
Oct
6200
90
Nov
4500
2700
1800
90
Oecr
3100
2790
310
90
Jan
2480
90
2790
310
310
Feb
1660
2520
-840
1150
90
Mer
1240
2790
90
I 550
-2700
fil
900
90
2700
1800
4500
Mav
775
90
2790
2015
6515
. .
.
Minimum storage capacny required= 954!) cumec.day
S.16 r...o cycles of data are used to give distinctive Peaks and valleys.
Table 5.1 6
Jun
Julv
;Wn

20
60
200
300
200
150
100
80
60
40
30
25
20
60
200
300
200
150
100
80
60
40
30
25

SI.
No.

~~onlh

Cum.
excess
Inflow
volume
(cumec
day)

600

3410
9710
13120
14920
15230

3410

6300
3410
1800

310

--

Mean inflow
ra;e(m3/s)

lnllow
Volume
(cumec. day)

1 Jun
2 Julv

20
60

3 Auo

I
resource
200

600
1860
6200

Cumulalive
monthly inflow
v<>lume
rcumec.dav\

600
2460
8660

ftcopytlghted Matetlal" ...ACd~ional


mate1ial supplied wi1h the boOk El'lgineemo
Hyd101C>lly, Thin:I EcMiOtl w1ltten by Or. K. Subramanya & published by McGrav1-Hill Edvc-.a1t0n
(India) Pvt lid. This resource material is lot lns1ruc1or's use onty:

Solution

Manual lo Engineering

4 Sen1em~1
5 oei
6 Nov
7

December

8 Jan
9 Feb
10 >.1ar
11

Aoril

12
13
14
15
16
17
18
19
20
21
22
23
24

>.1av
Jun
Julv
Aun
SeDtember

OCI
Nov

necember
Jan
Feb

>.1a1
Aoril

.1av

Hydrology, Third Edition by Dr. K. Subramanya

300
200
150
I 00
80
60
40
30
25
20
60
200
300
200 I

150
I 00
80
60
40
30
25

9000
6200
4500

17660

23850
28360

3100
2480
1680
1240

31460

900

37760

n5

38535

1860
6200
9000
6200
4500

39135
40995
47195
56195
62395
66895

soo

3100
2-480

1680
1240

900
n5

33940
35620
36850

69995
72475
74155
75395
76295
77070

ftcopyrlghted Ma1er1a1'" "ACd~ional resource mate1ial supplied wi1h the boOk El'lgineemo
Hyd101C>lly, Thin:I EcMiOl"l w1ltten by Or. K. Subramanya & published by McGrav1-Hill Edvc-.a1t0n
(India) Pvt lid. This resource material is lot lns1ruc1or's use onty:

Solution

Manual lo Engineering

4~

'

40

ITTTT

'

lj' . i
...

I
'

' '.

Hydrology, Third Edition by Dr. K. Subramanya

,.

"
"

'

'

.
I

..

'

15

.'. I.

'

..

11111

..

'

'

."

'

..
..

' '

..

"' "

' '

'

'

11

'

'

'

10

1~11

.
'~l f . '

25

JI

'

C. ;

llmtf

..

30

20

..

'

' '

.iw,

111 ! I
35

iJlU

'

'

'l1

'

11rn1

'
'

Fii:. P - 5.16 ~lass curve of Flow


Calculations ate shewn in Table p-5.16 and 1he mass curve in Fig. P-5.16. From the mass

curve it is seen lhat


(a)
(b)

Minimum storage required for uniform demandof70 111)/s is 5700 cumec. Day
f...10061 imum uniform rate of whbdrawable from a storage of 7500 cumec. Day is
82 1n,,./s

ftcopyrlghted Ma1er1a1'" "ACd~ional resource mate1ial supplied wi1h the boOk El'lgineemo
Hyd101C>lly, Thin:I EcMiOl'l w1ltten by Or. K. Subramanya & published by McGrav1-Hill Edvc-.a1t0n
(India) Pvt lid. This resource material is lot lns1ruc1or's use onty:

Solution Manual lo Engineering

5.17

Hydrology, Third Edition by Dr. K. Subramanya

Table o-5.17

r.tonth

Jan

lnfiOw
volume

Oemand
Volume

IMCMI

IMCMI

50
40
30
25
20
30
200
225
150
90
70
60

Cumulative

Cumulative

El<cess

El<cess

(l.nfk>\V

Demand

inflow

Oemandl

IMCMl

20
Feb
.35
Mar
50
An
60
Mav
110
Jun
90
Jul
175
Auo
200
110
Seo
Oc1
45
Nov
20
Oec
,0
Minimum storage required = 365 P.'1111

..

70
75
80
65
130
120
25
25
40
45
50
60

catculatlons ares

5. I 8

town m
'T ab e

IMC Ml
-20
.55

105
165
275
365
175
375
485

530
550
550

P5 .1 8.

NOi
lnll:>W

\'Olume
IAonth WCM'

Jan
Feb

r.tar
Aot

r.~.av
Jun
Jul
Aun
Seo

oer

Nov
Dec

Jan

....

Feb

A
Mav
Jun
Jul

50
40
30
25
20
30
200
225
150
90
70
60
50
40
30
25
20
30
200

Ev"'

tnllow

r:sticH'I

R:sinl:iH

IMCf.ll

MC1,f1
0,18
0
0
0
0
3.42
7,74
1.02
3.96
1.06
0.36
0.18
0.18
0
0
0
0
3.42
7.74

1.8
2.
3.9
5.1
6.6
6.6
4.2
3.3
3.9
3.6
2.1
1.5
1.8
2.4
3.9
5.1
6.6
6.6
4.2

Volume
11.ACr,11

48.36
37.6
26.1
19.9
'3.4
26.82
203.54
228.72
150.06
67.48
68.26
56.68
48.38
37.6
26.l
19.9
l 3.4
26.82
203.54

Demand
Volume
,,,,c,,11

70
75
80
65
130
120
25
25
40
45
50
60
70
75
80
85
130
120
25

Cumul.

Cumul

{Net

EKCC$~

EKCC~~

hlflO'N

O~mand
llACr.11

11.AC1t11

Oema .....
21,62
37.4
-53.9

65. l
116.6
93.18
178.54
203.72
110.06
42.48
18.26
1.32
21.62
-37.4
53.9
65. 1
116.6
93.18
178.54

in!IO'N

20
-57.4
111.3
176.4
293
386.18
176.54
362.26
492.32
534,8
553.06
1.32
-22.94
-60.3'1
114.24
179.34
295.94
389.12
176.54

ftcopytlghted Maletial'" ...ACd~ional resource material supplied wi1h the boOk El'lgineemo
Hydr'OIO'l!Y. Thin:I EcMiOl'l w1ltten by Or. K. Subramanya & published by McGrav1-Hill Edvc-.a1t0n
(India) Pvt lid. This resource material is lot lns1ruc1or's use onty:

Solution Manual lo Engineering

Aua
Seo
Oct
Nov
Dec

Hydrology, Third Edition by Dr. K. Subramanya

225
15()
90

3.3
7.02
228.72
150.06
3.9
3.96
87.48
3.6
1.09
2.1
70
0.36
68.26
0.18
60
1.5
58.68
..
New rmounum
s;orage recuement = 389.12

25
40
45
50
60
MCM

200.72
110.06
42.48
18.26
1.32

362.26
492.32

534.8
553.06

Evaporation volume= (E (cm)llOO) x 30 x 10" = 0.3 E l\o1m:t


Rainfall contribution= (P{cm)llOO} x( I ~ 0.4) x 30 x 106 = 0.18 P Mm:t
Net inflow volume = Virgin flow - Evaporation + Precipitation
Since the demand for the month of December is in sequence with January to June demand
in the sense thnt the excess demand in these months is negative, two cycles of data are run.
5.19 The given data is for two years and 11.s such the sequent peak algorithm catculmions
are performed for 2 x 2 = 4 years. Calculations are shown in Table p- 5.19.
1'able - s.. I 9
No.
Days

h'llOw

In me

Demand
volume
lha.m\

Mon1h

month

volume
iha.m\

Jan
Feb

31
28
31
30
3t
30
31
31
30
31
30
31
31
28
31
30
31
30
31
31
30

Ma
r

Mav

Jun
Jul
Ava

Seo
Oct
Nov
Dec

Jan
Feb
Ma.

'

Mav

Jun
Jul
Ava

Seo
1

Oct
Nov
Dec

Jan

31
30
31
31

57.40

65.50
28.60
32.80
36.90
24.60
10.20
2.10
2.10
2.10
4.10
6.20
10.2

30.8
43.1

53.t
38.9
28.9
16.4
12.3
12.3

2
4.1
6.2
2.1
57.40

18.75
16.93
18.75
18.14

18.75
18.14
16.75
18.75
18.14

t8.75

NCI
tnllOlo\'

i
I
I

18.14 ~

t8.75

vcteme

....e.ml

fha.m\

5
38.65

6
38.65

48.57

87.22

9.85

97.07

14.66
18.15
6.46

111.72
129.88
136.33
127.78
111.13

16.65
16.04
16.65
14.04
10.55

6.55

16.75
16.93
16.75
18.14 I
18.75 I
16.14

13,67
24.35
34.96
20.15
10.76

2.35

t6.75
18.75
18.14

3
18.75
18.14
18.75
18.75

lnllow

volume

6.55

Cum.
Net

6.45
-5.84

Remarks
7

Peex-t

95.09
78..(i-1
64.40

53.65
45.30
59.16

TrounhI

83.52
118.47

t 38.62
149.38
147.03
140.58
134.74

14.65
-9.94
16.65

120.09
110.14

39.65

132.15

93.50

Peex-z

Trounh2

ftcopyrlghted Ma1er1a1 .. "ACd~ional resource mate1ial supplied wi1h the boOk El'lgineemo
Hyd10IO'l)y, Thin:I EcMiOl'l w1ltten by Or. K. Subramanya & published by McGrav1-Hill Edvc-.a1t0n
(India) Pvt lid. This resource material is lot tns1ruc1or's use onty."

Solution

Manual lo Engineering

28
31
30
31
30
31
31
30
31
30
31
31
28
31
30
31
30
31
31
30
31
30
31

Feb
Ma'

'

Mav
Jun
Jul

fWn
Son
Oct
Nov
Dec
Jan
Feb
Ma'

'

Mav
Jun
Jul

twn
Seo
Ocl
Nov
Oac

Hydrology,

65.50
28.60
32.80
36.90
24.60
10.20
2.10
2.10
2.10
4.10
0.20
10.2
30.8
43.1
53.1
38.9
28.9
16.4
12.3
12.3
4.1
8.2
2.1

16.93
18.75
18.14
18.75 I
18.14 i
18.75
18.75 I
18.14
18.75
18.14
18.75 I
10.15 I
16.93
18.75
18.14
18.75 I
18.14 c
18.75 I
18.75 !
18.14
18.75
18.14
18.75 I

Values of Peaks and Troueh


NO

Peak
136.331
149.379
229.827
242.875

2
3

Trounh
45.2992
93.496
177 .012

Third Edition by Dr. K. Subramanya

48.57
9.85
14.66
18.15
6.46
8.55
16.65
16.04
16.65
14.04
10.55
8.55
13.87
24.35
34.96
20.15
10.76
2.35
6.45
5,84
14.65

9.9-t
16.65

180.71
190.56
205.22
223.37
229.83
221.28
204.63
188.59
171.94
157.89
147.34
138.80
152.66
177.01
211.97
232.12
242.88
240.53
234.08
228.23
213.58
203.64
186.99

Peak3

Trounh3

Peak4

(Peal<.
Ttounh~
91.032
55.8832
52.8152

. .

Required Minimum storage = Max. of (Peak- Trough) values

= 91.032

5.20

ha.m

Calculations are shown in Table p~S.20. Cols. I to 7 in Table p-5.1 Sare retained as
ii is. Col. S is the cumulauve values of col.7. The series in ccl.? starts with a

negauvevalue and 1he first trough is located. There is no peak before this Trough I. 'The occurrences of troughs and the peaks are indicated in Table p5.20 and the
salient data can be summed u as below:
Peak.

SI.No
l

165.26
329.2

Trcccn

(Peak
Tro ....h~

-387.8
-223.86

389.12

3
There is only one ::;cl of valid peak and trough set and the minimum storage needed
10 meet the demand is obtained as 389.12 ~'IC~t.
ftcopyrlghled Ma1er1a1" "ACd~ional resource mate1ial supplied wi1h the boOk El'lgineemo
Hyd101C>lly, Thin:I EdifiOl'l w1ltten by Or. K. Subtamanya & published by McGrav1-Hill Edvc-.a1t0n
(India) Pvt lid. This resource material is lot lns1ruc1or's use onty."

Solution

Manual lo Engineering

Hydrology, Third Edition by Dr. K. Subramanya

Table p-5.20

Inflow
volume
lf..1Cf..ll

IA<>tlth
Jan
Feb
~ar

so
40
30
25

Ao(
t.ta11
Jun
Jul
Au

20

30
200
225
150
90
70
60

Seo
Oct

Nov
De<:

so

Jan
Feb
~tar

40
30
25

Ao'

>.tav
Jun
Jul
Aun

Seo
0C1

Nov
De<:

20

I
I

30
200
225
150
90
70
60

Ev~r
.:i!ion

tf'Cl\11

1.8
2.4
3.9
5.1
6.6
6.6
4.2
3.3
3.9
3.6
2.1
1.5
1.8
2.4
3.9
5.1

6.6
6.6
4.2
3.3
3.9
3.6
2.1
1.5

5
N$1 tnflQ.N

R:sin(:i!I
(MCIA)

0.18
0
0
0
0
3.42
7.74
7.02
3.96
1.08
0.36
0.18
0.18
0
0
0
0
3.42
7.74
7.02
3.96
1.06
0.36
0.18

Volume
OACIA)

48.38
37.6
26.1
19.9
13.4
26.82
203.54
228.72
150.06
87.48
68.26
58.68
48.38
37.6
26.1
19.9
13.4
26.82
203.54
228.72
150.06
67.48
66.26
58.68

'"''"'"
WCMI
Volume

70
75
60
85
130
120
25
25
40
45
50
60
70
75
60
85
130
120
25
25
40
45
50
60

iNel lnllow

Cumulative

Detn8Nfl

OI Col.7
21.62
59.02
l 12.92
l 78.02
294.62
387.80
209.26
5.54
104.52
147.00
165.26
163.94
142.32
104.92
51.02
14.08
130.68
223.86
-45.32
158.40
268.46
310.94
329.20
327.88

21.62
.37 .4
53.9
65.1
116.6
93.18
178.54
203.72
110.06
42.48
18.26
1.32
21.62
.37 .4
53.9
65.1
116.6
93.18
178.54
203.72
110.06
42.46
18.26
1.32

9
Remark a

Trounl'l-t

Peak2

Trounh2

Peak4

ftcopyrlghted Ma1er1a1'" "ACd~ional resource mate1ial supplied wi1h the boOk El'lgineemo
Hyd101C>lly, Thin:I EcMiOl"l w1ltten by Or. K. Subramanya & published by McGrav1-Hill Edvc-.a1t0n
(India) Pvt lid. This resource material is lot lns1ruc1or's use onty:

Solution

5.21

Manual lo Engineering

Hydrology, Third Edition by Dr. K. Subramanya

Average now = 56.4140 = 1.41 t\tC~l/dny


Averaee now in d davs e .S64 Mc M

o,,
4

8
12
16
20
24
28
32
36
<0
44
48
52
56
60
64
68
72
76
80

lnflov1
volume
(MCM)

OU1flow
volume
(MCM)

9.6
5.4
2.3
3.5
2.3
2.2
1,4
6.4
12.4
10.9
9.6
5.
2.3
3.5
2.3
2.2
1,4
6.4
12.4
10.9

5.6.t
5.64
5.64
5.64
5.64
5.64
5.64
5.64
5.64
5.64
5.64
5.64
5.6~
5.64
5.64
5.64
5.64
5.64
5.64
5.64

(Inflow
Oul11ow)
MCM

Cum

fi"Row

ou11lo't1)
MCM

3.96 I 3.96
0.24 I 3.72
3.34 I 0.38
2.14
1.76
3.34
5.10
.3,44
8.54
4.24
12.78
0.76 12.02
6.76
-5.26
5.26
0.00
3.96
3.96
0.24
3.72
3.34 I 0.38
2.14 ' 1.76
-3.34 I 5.10
3.44
8.54
4.24 12.78
0.76 12.02
6.76
-5.26
5.26
0.00

Remalks

o-t

I 1

p-2

12

l: = 56.4
?oifinimu1n storage required= 3.96-( 12.78) = 16.74 l\ICT\f
Spillage = 0
5.22

Consider a water surface area of75 k1ui = 75 (\<fm2


Before reservoir: Normal runoff volume = 0.35 x (160/100) x 75 = 42 ~tn1J

After reservoir:
Conmbunon of R~infall = (160/75) x 75 = 120

~1013

Loss due 10 evaporation= O. 70 x 250 x 100 x 75 = 105 (\ lnr}


Net annual supply 10 the reservoir= 120 - 105 = 15 r-.1ml
Nc1 annual decrease = 42 - 15 = 27 (\ln1'
1

ftcopytlghted Maletial'" "ACd~ional resource mate1ial supplied wi1h the boOk El'lgi"eemo
Hyd101C>l)y, Thin:I EcMiOl"l w1ltten by Or. K. Subtamanya & published by McGra ...1-Hill Edvc-.a1t0n
(India) Pvt lid. This resource material is lot lns1ruc1or's use onty.'

Solution

Manual lo Engineering

Hydrology,

Third Edition by Dr. K. Subramanya

Chapter 6
6. I

The: data are plotted on a semi-log plot wlth discharge on the log scale. (See Fig. P6.1). The data points from day 5 onwards ptor on straight line. The best fining
exponential curve for this straight line portion is( obtained through use of f\IS
Excel) is

0.1!--~~-!-~~-+~~~!--~~-'-~~-+~~__,~~~-'-~~-l
~o
1.0
10
6.0
7.0
a.o

Time in DtrY

Pig. P -11.1
Q, = 2.5299 e ..u.1-:cr.o with R: =0.9148.
The base flow recession constant Km= e..o.t:oo = 0.8864.
The base curve recession is extended till I = 0, and the surface water
depletion is obtained by subtracting the base Flow from the observed recesslon limb
of the hydrcgrapb. The. computations are shown in Table p-6.1.
Time
tdavs\

0
0.5
1.0
1.5
2.0
2.5
3.0
3.5
4.0

Observed

OiSchar.-... fm3/$l
70

011 .aas~ llowl


2.53
2.38

36

2.24

19
9.0
5.5
3.5
2.5
1.9

2.11
1.99
1.87
1.76
1.66
1.56

155

O 1surlace 1uno111
152.47
67.62
35.76
16.89
7.01
3.63
1.7A
0.84
0.34

ftcopytlghted Maletial'" "ACd~ional resource mate1ial supplied wi1h the boOk El'lgineemo
Hyd101C>lly, Thin:I EcMiOl"l w1ltten by Or. K. Subramanya & published by McG,av1-Hill Edvc-.a1t0n
(India) Pvt lid. This resource material is lot lns1ruc1or's use onty."

Solution

Tbc

Manual lo Engineering

s.o

1.4

6.0
7.0

1.2
1.1

Hydrology,

Third Edition by Dr. K. Subramanya

best fitting equation to the surface runoff (Col.4) is obtained as

Q, = 153.28 e_,.,.__..,, with R~ = 0.9991.


'fbe surface flow recession coefficient K,, = e.w.~ = 0.222.
(b) On the seventh day. the OC.)\\' is bnse flow recession with a= 0.1206 (day' units).
Hence storage available at the end of 7111 d:t)' =S1 =Qin= 1.1/().1206 = 9.12 curnec.days.

6.2

Q, =Q.K:
QI =QK'=80
"
t
Q =Q K" =40
. " '
fiL:(K! )=SO =2.0

Q2

K?"

40

K;"' =2.0 and K,=0.966


Q,= 801(0.966)" =

113.137

On JulylO, 1 = 40 days and 0) = 113.137


6.3

x (0.966)"' = 28.28 m'ls

Cominuity equation: I Q = dS/rli


For base flow recession, / = 0 and hence dS/1/i = (1(1)
- dS{1) = Q(1) d1 = Q,A' dt
Integrating -.''',/S(t)= f.'Q(1)1l1 = I~'Q.,K' 1/1

S -S(1)=[Q(i)-Q.)
"
In K
S -S(1 )= IQ(l,)-Q.I
1
"
In K
S -S(1 )= IQ(1,)-Q.I
''
:
lnK
For any l\VO times 11and11;
when

1! =O'J.

S..,=Oaud

S(I )-S(I )=IQ(l,)-Q(i.))


1

In K

Q .. =0

ftcopytlghted Maletlal'" "ACd~ional resource mate1ial supplied wi1h the boOk El'lgineemo
Hyd101C>lly, Thin:I EcMiOl'l w1ltten by Or. K. Subramanya & published by McGrav1-Hill Edvc-.a1t0n
(India) Pvt lid. This resource material is lot lns1ruc1or's use onty:

Solution Manual lo Engineering Hydrology, Third Edition by Dr. K. Subramanya

:. S(I,)

= -Q(I,) = CQ(1,)

Thus S(t1)
model.

6.4

lnK
= storage left in the basin at any time t1 follows the linear reservoir

The rainfall excess in the wbcle basin is calculated 3$ below:


Rainlal excess j mm>
Sub

area
(km2)

qi-Index
(m""")

15
25
35

1$1

hour

Run off
from
2nd 3rd 4lh
hour hour hour sub

area

rmrm
10
15
21
16

3S

27
19
26

0
0

12
5
0
2

0
0
0
0

Runoff
voluine
norn sub

area lt.im3\
0.640

56
33
19
28

0.825
0.665

Total=

2A70Um'

0.140

Average effective rainfall is obtained by giving weightages proportional to (sub-

area /rotal area):


I" hour: (l/80)x [(15x6) + (25 x I)}= 1.44 mm
2"' hour: (1/80) x [ (15x 38) + (25 x 27) + (35x19)+ (5 x 26)] = 25.50 nun
3" hour: (1/80) x ( (15x 12)+ (25 x 5) + O+ (5 x 2)] =3.90 mm
4" hour: (l/SO)x [OJ =O
Distribution of Avcraec ER
Time (h)

Ave1~e Ell.
rainfal <mm)

1
1.44

25.50

3.94

Total

Runoff

average
EA (mm)

volume

30.875

IMm:i)

2.470

6.5
Time (h)

0
6
12
18
24

30
36
42

ObServed
Fb\v {m3/s)

0
100
250
200
I 50
100
70

so

Ordifla1es ot
e-n UH (m1/s}

0
23.1
57.9
46.3
34.7
23.1
16.2
11.6

4a
35
8.1
ftcopytlghted Maletlal'" "ACd~ional resource mate1ial supplied with the boOk El'lgineemo
Hyd101C>lly, Thin:I EcMiOfl w1ltten by Or. K. Subramanya & published by McGrav1-Hill Edvc-.a1t0n
(India) Pvt lid. This resource material is lot lns1ruc1or's use onty:

Solution

Manual lo Engineering

Hydrology, Third Edition by Dr. K. Subramanya

54
60
66
72
Sum ..
vo1u1neof
ruooff IMr..tl
OCpth Of

ruoofl fem)

6.6

25
15
5
0
1000

5.8
3.5
1.2

231.5

21.60

5.00

4.32

1.00

o.o

volme of runoff = [lOOO x 6 x 60 x 60Vt0'> = 21.601'<1nr'


Depth of runoff = (21.60 x 106 )/500 xJ06 = 0.0432 m = 4.32 cm
Ordinate of e-h UH= Col.2 / 4.32
votume of DR= (J/2) x 30 x 66 x 3600 = 3.564 x 106 nl'~
lfli=DRindepthunits(c1n).lhen
189x 106x{h/100)=3.564x
10'>
h = 1.886 cm.
The 6h UH will have a base of 66 hours and a peak q,, = (33/1.886) = 15.91 m3/s

occurring a1 10 h from the start.


6.7
Time
(h)

0
6

12
16
24
30
36
42
48
54
60
66
72

ordinate of
Flood
H~1ograph
(m3/s)

40
65
215
360
400
350
270
205
145
100
70
50
42

Base

flow
(m3/s)

40
40
40
40
40
40
41
41
41

42
42
42
42
Sum=

Oirec<
Runof-1
Hyelr0g1aph
(m3/s)

0
25
175
320
360
310
229
164
104
58
28
8
0
1781

ShUH
ordinate

(m'Js)

0.0

s.o
35.0
6'1.0
72.0

62.0
45.6
32.6
20.8
11.6

5.6
LS

0.0
356.2

Direct runoff volume= 1781 x 6 x 60 x 60 = 38.469 x 106 t-.11n'


Depth of DR= (38.469 x 10") 1(770 x IO'J = 0.05 m = 5.0 cm
ftcopytlghted Maletlal'" "ACd~ional resource mate1ial supplied wi1h the boOk El'lgineemo
HV(il'OIO'l!Y. Thi.Cl EdifiOl'l w1ltten by Or. K. Subtamanya & published by McGrav1-Hill Edvc-.a1t0n
(India) Pv1.l1d. This resource material is lot lns1ruc1or's use onty:

Solution

Manual lo Engineering

Hydrology, Third Edition by Dr. K. Subramanya

Ordinmes of 6-h UH= Col.4 15.0

6.8
Time
(h)

Ord.ol Flood
Hydrograph
rm3/sl

Base Flow
(m~/s)

20
63
151

2
3

..

90
63

5
6
7

29
20
20

8
9

1-<1ay DiSL ?'aph

ordina;e (m /s)

(m1/s)

20
22
25
28
28
26
23
21
20
20

133

Dlrec1 Avnolf

0.00

41

10.25
31.50

126
1 OS

62
37

21
8
0
0

'
'
I
'
400 I

Sum=

26.25
15.50
9.25
5.25

2.00
0.00
0.00
100

votomc of DR= 400 x 60 x 60 x 24 = 34.56 x 106 m"'Js


Arca of catchment = 600 x 106m2
Depth of OR= 34.561600 = 0.0576 111 = 5.76 cm= Depth of rainfall excess

6.9

Raiufall excess e a.S crn. Duration = 8.0 h


Ordinates

ors - h lJH = crdinmes of DRH/ 4.5

Table n..6.9
Time

Orel. of Flood

8h UH ()td.

(h)

Hyel'tograph (m3ts)

(m,ls)

~~~~~~~~~~~

0
5

0
40

o.o

13
21
28
32

210
400
600
820

46.7
88.9
133.3
182.2

35

1150

255.6

41
45

1440
1510
1420

320.0
335.6
315.6

1190

204.4
144.4

55
61
115

650
520
290

138

91

98

6. 10

8.9

115.6
64.4

o.o

Duration= 6 hours
tnflltrmion = 0:25 x 6 = I .SO ctn
Rainfall excess = 8.0- 1.50 = 6.50 cm

ftcopytlghted Maletial'" "ACd~ional resource material svpplied wi1h the boOk Engineemo
Hyd101C>lly, Thin:t Edition w1ltten by Or. K. Subtamanya & pvblished by McG,av1-Hill Edvc-.a1t0n
(India) Pvt lid. This resource material is lot lns1ruc1or's use onty:

Solution

Manual lo Engineering

Hydrology, Third Edition by Dr. K. Subramanya

Peak of flood hydrograph

Deduct base flow


Peak of DRH
Pcokof6-hUH=
6.11

Rainfall

=
=

= 4.0 cm.

455 mJ/s
70 m3/s

=
=

455/6.50

;.\re.a= 100 kru2

Ti111e
(h)

Total runoff

Base flow

Direct runoff

(m:./s)

(111J/s)

300
300

300
300
300
300
300
300

(m'ts)
0

1200

3
4

450
300
300

0
900
ISO
0

Su11 =

0
1050

voteme of direct runoff= 1050 x 60 x60 = 3.78 ~Im~


Depth of runoff= 3.781100 = 0.0378 rn = 3. 78 cm
q> - index= 4.00 - 3.78 = 0.22 collh
For 6 cm rainfall in one hour. rainfall excess= 6.0 - 0.22 = 5.78 cm
Surfaoe ronoff peak =(5.78 x 900'JI 3.78 = 1376 mJ/s
votume of Direct surface runoff= 5.78 cm = (5.78/100) x JOO= 5.78 ~lnJ
6.12
Time interval fh)

010 6 6 to 12

Rainfall in the irucrvalfcrn)


Losses ( = m x 6)

3.0

5.0

121018
4.0

1.2
1.8

1.2
3.8

2.8

Effc:cli\'e rainfall (cm)

1.2

Oi1ec1 R1.11lott d\le 10


Time
(h)
0
3

6h UH ()Id.
(m"ls)

EA:1 .8

ER= 3 ..8

ER =2 . .8

Base tto\v
(mils}

Flood
H~rograph
(m'ls)

0
0
30
30
150
270
30
300
250
450
6
0
30
80
450
810
570
1410
9
30
1080
12
600
950
0
30
2060
18
800
1440
2280
700
30
4450
24
700
1260
1680
6010
3040
30
22<40
6010
30
600
1080
2660
30
36
450
810
2280
1960
30
5080
42
576
1710
1680
320
30
3996
48
1216
1260
200
360
30
2666
54
100
180
760
896
30
1866
ftcopytlghted Maletlal .. "ACd~ional resource mate1ial supplied wi1h the boOk Ellgineemo
Hyd10IO'l)y, Thin:I EcMiOll w1ltten by Or. K. Svbtamanya & published by McGrav1-Hill Edvc-.a1t0n
(India) Pvt lid. This resource material is lot lns1ruc1or'suse onty:

Solution

Manual lo Engineering

60
66
72
76

50
0

Hydrology, Third Edition by Dr. K. Subramanya

90
0

360
190
0

560
280
140
0

1060

30
30
30
30

500
170
30

IN01..: lh:11 lbc Ofinat~S an: n()I al rc:gu1<1r intervals. lni1ially lhey arc <il 3h<>ur inlcr\als.
Care is nccll.:d in ou1i11g ORI-I ()rllinalcS at vadccs lags Oil prOfk!r lin1c in1cr,3ls)

6. 13
Time
/hi

0
6
12
18
24
30
36
42
48
54
60
66
72

Direct Runoff due 10


6h UH
ord. (m)/s) ER .. 1 ..0 ER= 1.0

0
20
60
150
120
90
66
50
32
20
10
0

0
20
60
150
120
90
66
50
32
20
10
0

Base 11ov1

0
20
60

150
120
90
66
50
32
20
10
0

Flood Hy(ftograph

{m3/s)

(m)/s)

10
10
10
10
10
10
10
10
10
10
10
10
10

10
30
90
220
260
220
166
126
92
62
40
20
10

6. 14
Time
(h)

0
6
12

16
24

30
36
42
4,9

54
60
66
72
(Note:

6h UH
<;-h UH. IOQged
on:t (m)/s} by 6 hours (m>ls)

0
20
60
150
120
90
66
50
32
20
10
0

0
20
60
150
120
90
66
50
32
20
10
0

Ord. 01 l 2h UH.

(Co12
Col. 31
0
20
60
210
270
210
156
116
82
52
30
10
0

(m3/s)

0
10
40
105
135
105
76
58

41

26
15
5

I
I
I

Col.S = (Col.4)12)

6. 15
Time
(h)

~-hUH

Svcurve

o<d.

additions

(m'Js)

(m'Js)

s~-eurvt
S2-C1.1rve 1aggedby 4
ord.(m;,IS)
hour$
{m$/sl

(COi. 4

col.5)

Ord.of
~-AUH
(m1/s)

ftcopyrlghted Ma1er1a1'" "ACd~ional resource material supplied wi1h the boOk El'lgineemo
HV(ir'OIO'l!Y. Thin:I EcMiOl'l w1ltten by Or. K. Subramanya & published by McGrav1-Hill Edvc-.a1t0n
(India) Pvt lid. This resource material is lot lns1ruc1or's use onty:

Solution Manual lo Engineering Hydrology, Third Edition by Dr. K. Subramanya

0
2
4

6
8
10
12
14
IS
18

20
22
24

0
25
100
160
190
170
110
70
30
20
6
0
0

0
25
125
285
475
65
755
825
855
875
661
681

0
25
125
285
475
645
755
825
855
875
881
681
881

0
25
125
285
475
645
755
825
855
675
681

'

0
25
125
260
350
360
280
180
100
50
26

o.o
12,5
62.5
130.0
175.0
180.0
140,0
90.0
50.0
25.0
13.0
3.0

o.o

l Note: Col.7 = !Col.6/l412)11

6.16

\to)u1ue.ofDR=

..!..i<64x3600=3.456xlO(i

1n3

If A = area of catchment in km1 then (Ax I Of') x 1/100 = 3.456 x IOf.

'' = 345.6 kn1!


For the unit hydrogrnph I)= 6 hours
Equilibrium discharge of S - curve = Q, =( 2.778 x.345.6}16 = 160 111J/s
6.17

For the one hour UH. Volume of I)~ =(5+ $+ 5 + 3+ I) x Ix 3600= 792001113
If A = area Of catchment in km:. then (Ax 106) x 1/100 = 79200

.4 = 7.'}2 km'

Time
(hi

0
1
2

5
6
7

lhUH

o<d.
(m1/s)

0
5
8
5
3
1
0

Secrve

S1Curve
ad011ions
Otd.(m3/S)
(m'ls)

0
0
5
13
18
21
22
22

0
5
13
18
21
22
22
22

s.-curve
laggeO by

(COi. 4
ool.5)

2 hoots
{m3/s)

I
0
5
13
18
21
22

'
1

0
5
13
13
8
4
1
0

Ord.ol
2h UH
(m'ls)

o.o
2.5
6.5
6.5
4.0
2.0

e.s

o.o

6. 18

ftcopyrlghted Ma1er1a1'" "ACd~ional resource mate1ial supplied wi1h the boOk El'lgineemo
Hyd101C>lly, Thin:I EcMiOl'l w1ltten by Or. K. Subramanya & published by McGrav1-Hill Edvc-.a1t0n
(India) Pvt lid. This resource material is lot lns1ruc1or's use onty:

Solution

Manual lo Engineering

Time
(hi

(m1/s)

0
6
12
18
24
30
36
42
48
54
60
66

0
10
37
76
111
138
150
153
146
130
114
99
84

72

78
84
90
96
102
108
114
120
126
132
138
144

[Col.7

l 2h
UH ord.

71

58
46
35
2S
17
12
8
6
3
2

Hydrology,

Third Edition by Dr. K. Subramanya

S12curve
lagged
by
512-Curve
additions
orc:J,(
m
3/s)
6
hours
(m1/S)
(m3/s)

s-curve

0
10
37
86
148
222
298
37S

...

505
558
604
642
675
700
721
735
748
7S2
758
760
704
763

0
10
37
86
148
222
298
37S
444

0
10
37
86
148
222
298

sos

444

S58
604
642
67S
700
721
735
746
752
7S8
760
764
763
766
763

558
604
642
67S
700
721
73S
746
7S2
758
760
764
763
766

375

sos

(cot 4

Ord,ol 6h

COl.5)

UH (m3ts)

0
10
27
49
62
74
76
77
69
61
S3
46
38
33
2S
21
14

0
20
54
98
124
148
1S2
154
138
122
106
92
76
66

so
42
26
22
12
10
6
3
1

11

6
6
2

1
3

= (Col.6)1(6112)]

Faired values of 6-h UH are shown in bold.

6. 19
Time
(h>

3hUH
o<d.
(m3/s)

s-curve

additions Srcurve
ord.(m3/s)
(m3/S)

$3-curve
lagged

by9
hours

(COi. ~.

col.SJ

Ord.of
9h UH
(m'ts)

tm3tsl

0
3
6
9
12
15
18
21
24
27

0
12
75
132
180
210
183
158
135
114

0
0
12
87
219
399
609
792
948

12

87
219
399
609
792
948
1083

12
87
219
399
609
792

0
12
87
219
387
522
573
549
474
405

0
4
29
73
129
174
191
183
158
135

1083
1197
ftcopyrlghted Ma1er1a1'" "ACd~ional resource mate1ial supplied wi1h the boOk El'lgineemo
Hyd101C>lly, Thin:I EcMiOl'l w1ltten by Or. K. Subramanya & published by McGrav1-Hill Edvc-.a1t0n
(India) Pvt lid. This resource material is lot lns1ruc1or's use onty:

Solution

Manual lo Engineering

30
33
36
39
42
45
48
51
54
57
60
63
66

96
87
66
54
42
33
24
18
12
6
0

Hydrology, Third Edition by Dr. K. Subramanya

1197
1293
1380
14.t6
1500
1542
1575
1599
1617
1629
1635

1293
1380
1446

948
1083
1197
1293
1380
1446
1500
I 542
1575
1599
1617
1629
1635

1500
1542
1575
1599
1617

1629
1635
1635

1835
1635

345
297
249
207
162
129
99
75
54
36
18
6
0

115
99
83
89
54
43
33
25
18
12
6
2
0

6.20
Time interval (h)

010 6 610 12 12 10 18
Rainfall in the irncrval (cm} 4.0
1.0
5.0
Losses tee x 6)
1.0
1.0
1.0
Effective rainfall (cm}
3.0
4.0
0

Time
(h)

1
0
6
12
18
24
30
36
42
48
5'
60

6h UH

Oi1oc1 Runoff cfuo to

Old.

ER :3

(m3/s)

cm

3
0
60
180
450
360
270
198
150
96
60
30

0
20
60

150
120
90
66

so

32
20

10

ER :oO

0
0
0
0
0
0
0
0
0
0
0

ER :4

em
s
0
0
0
80
240

600
480
380
264
200
128

Base

Flood

!low
(m3/s)

Hyd~raph
(m IS)

6
20
20
20
20
20
20
20
20
20
20
20

7
20

80
200
550
620
890
698
530
380
280
178

ftcopyrlghted Material'" ...ACd~ional resource mate1ial supplied wi1h the boOk El'lgineemo
Hyd101C>lly, Thin:I EcMiOl"l w1ltten by Or. K. Subramanya & published by McGrav1-Hill Edvc-.a1t0n
(India) Pvt lid. This resource material is lot lns1ruc1or's use onty:

Solution Manual lo Engineering Hydrology, Third Edition by Dr. K. Subramanya

H!
6.21

0
0

20
20
20

vorumc orun = !x72'X3600)(100=


2

(Ax 10<) xl/100 = 12.96xl06,


Time
(h)

Direct Runoff due to

Or(f.

ER 2

0
6
12
18
24

cm

0
25
50
75
100

30
36
42
46
54
60
66

87.5

72

0
50
100
150
200
175
150
125
100
75
50
25
0
0

75
62.5
50
37.5
25
12.5

78

1u3

hence- A= 1296 kin?

6h UH
(m3fs>

12.96)()0

100
60
20

ER. 4

cm
0
100
200
300
400
350
300
250
200
150
100
50
0

Base
llOV1

(m31$)

25
25
25
25
25
25
25
25
25
25
25
25
25
25

Flood
H~1ograph
(m3/s)

25
75
225
375
525
600
525
450
375
300
225
150
75
25

24 h
72h
6h UH
Fig. P 6.21

6.22

Vofume of'Uf-l

-)(69x3600xQ
2

Hence Q_p = 80. 5 mJ/s

m3=(l000x IO~)xl/)00
'

ftcopyrlghted Ma1er1a1'" "ACd~ional resource material supplied wi1h the boOk El'lgineemo
HV(il'OIO'l!Y. Thin:I EcMiOl'l w1ltten by Or. K. Subramanya & published by McGrav1-HillEdvc-.a1t0n
(India) Pvt lid. This resource materialis lot lns1ruc1or's use onty:

Solution

Manual lo Engineering

Hydrology, Third Edition by Dr. K. Subramanya

6.23
Tlme interval (h)
Rainfall in the intervallcm)

Oto 4 4 to S S to 12
3.5
2.2
1.8

Losses(-" x 4}

1.0
2.5

Etfecrive rainfall (c1n)

Time

Oist1ibulion

0
010 4
4108
810 12
12tOl6
16 to 20
2010 24
24 10 28
28to 32
32 to 36

0
5
20
40
20
10
5
0
0
0

1.0
0.8

Oi1ecl Aunolf c:tue 10


ER
ER 1.2
ER 0.6
2.5
cm
cm
cm
0.000
0.000
0.125
0.000
0.000
0.500
0.060
0.000
1.000
0.240
0.040
0.500
0.480
0.160
0.240
0.250
0.320
0.120
0.160
0.l25
0.000
0.060
0.080
o.ooo 0.000
0.040

Average

{nJ

1.0
1.2

(%)

o.ooo

o.ooo

Ol(ect
Runoff
Hyd1ograph

o.ooo

Sum-

(cm)

0.000
0.125
0.560
1.280
1.140
0.810
0.405
0.140
0.040

o.ooo

4.500

Runoff rare corresponding to I cm rainfall excess in 4 hours


= 50"Xl0(,

I
100

X'-X

I
=34.72
4x3600

Ill

/s

The ORH corresponding IQ runoff rates of Col.6 in Tnbte p6.23 are !1$ (QllO'''S:
Time Ch)
IQ
DR crd. /mJsl 10

2
4.3

6
19.4

10
44.4

14
39.6

18
28.1

22

26

14.1

4.9 1.4 0

30

34

INotc that the DR mies an: entered ;:i1 mid values of tbc time iutervals.l

6.24

Areaof6-hUll=

1-x48x3600xQ,

=86400P

86400 Q, = 259.2 x 10' x( 11100)


Qr= 30 01.l/s.

Uni! interval= 6 hours: Arca of UH= ( 1/2) x 48 x 30 = 120 units

I Unit Tinle I
ftcopytlghted Maletlal'" "ACO~ional resource mate1ial supplied wi1h the boOk El'lgineemo
Hyd1'0IO'l!Y. Thin:I EcMiOl"l w1ltten by Or. K. Subramanya & published by McGrav1-Hill EOvc-.a11on
(India) Pvt lid. This resource materialis lot lns1ruc1or's use onty:

Solution

Manual lo Engineering

Hydrology,

Third Edition by Dr. K. Subramanya

(112) x I 5VI 20
I 15 + 30112]1120
(30 + 25)121/120
25 + 20)/21/120
1(20 + 15)1211120
1115 + 10)/21/120
I( 10 + 5)12Jll 20

I st

2nd
3rd
4Lh
5Lh
61h
7Lh
81h

6.25%
18.75%

22.92%
18.75%
14.58%
10.42
6.25%
2.08%
100%

(5 + Ol/211120

Total =

6.ho1llo'lr1ibuuon
' uram h ercentaees
Time (units of6
I
2
hours)

Distribution graph
eercentaaes

6.25 18.75

22.92

18.75

14.58

10.42 6.25 2.0S

30
20
Q

10

30
20

12

24

30

42

48

Houis

6 hUH
Fig. p. 6.24

6.25

ftcopyrlghled Ma1er1a1'" "ACd~ional resource mate1ial supplied wi1h the boOk El'lgineemo
Hyd101C>lly, Thin:I EcMiOl'l w1ltten by Or. K. Subramanya & published by McGrav1-Hill Edvc-.a1t0n
(India) Pvt lid. This resource material is lot lns1ruc1or's use onty:

Solution

Manual lo Engineering

Hydrology, Third Edition by Dr. K. Subramanya

3.6 cm

2.acm
o.1cm

o.1cm

ER

9.0h
1-hUH

Fig. P6.25(J

Oirecl Runoff
Time
(h)

lh UH
Ord,
(m3/s)

o.oo

1.20
2.40
3.60
3.00
2.40
1.80
1.20
0.60

2
3
4

5
6
7

8
9
10

due to

ER
3.3cm
0
3.96
7.92
11.88
9.9
7.92
5.94
3.96

1.98

o.oo

0
0

ER

z.a cm

OR
HydrOg1:lph

{m31S)

o.oo
0
2.76
5.52
8.28
6.9
5.52
-<!. 1 <!!
2.76
1.38
0

3.96
10.68
17.40
18.18
14.82
11.46
8.10
4.74

t.38
0.00

Total=
90.72
Tl)tal volume of DRH = 90.72 (m3/s).h = 326592 m3

After Urbanisation:

"""

2.&m

e.e cm

0.4em
1.5 h
6.0 h

ER

'

1tlUH

Fig. P 6,25(b)

ftcopyrighted Ma1er1a1'" "ACd~ional resource m31e1ial supplied wi1h the boOk El'lgineemo
Hyd101C>lly, Thin:I EcMiOl"l w1ltten by Or. K. Subramanya & published by McGrav1-Hill Edvc-.a1t0n
(India) Pvt lid. This resource material is lot lns1ruc1or's use onty:

Solution

Manual lo Engineering

Hydrology,

Third Edition by Dr. K. Subramanya

Dlrect Runoff

Time
(h)

1hUH
Ord,

{m3/s)

0
1
1.5
2

3
4
5
6
7

0.00
4.00
6.00
5.33
4.00
2.67
1.33

0.00
0.00

OR

due to
ER
3.6cm

o.oo
14.40
21.60
19.19
14.40
9.61
4.79
0.00
0.00

Hyd1ograph
(m3/s)

ER
2.6cm

o.oo

o.oo

14.40

10.40
15.60
13.86
10 ..:iO
6.94
3.46
0.00
Tota.I:

32.00
34.79
28.26
20.01

11.73
3."16
0.00
144.65

Total volume of DRH = 144.65 (m.l/s).h = 520725.6 1n3


Hence. increase in the llocxl volume= 520725.6 - 326592 = 194133.6
Percentage increase = ( 194133.6 / 326592) x JOO= 59.44%
lnc-reaseinthcpeak=34.79-IS.18=
16.61 m'Js=91.4 %

6.26

Consider 3 hour intervals.


k1=2cn1
01 =R1 U1
120 = 2 U1
R2=4c-n1

Q1= 120m3/s

U1=601n3/s

Q2=480=2 lJ2-+4XU1
=2U2+4x60:

Similarly.
2xU3+4:xt20
2 x U-1+ 4:x 90
2xUs+4x50

2xU,+4x30
2xU,+4x20
2xUii+4><
10
2xU.,+4><5

=660:
= 460:
=260:

= 160:
= 100:
:50:
:20:

Time (h)
0 3 6
3h UH ord. (m'/s) 0 60 120

6.27

m3

U2= 120m3/s

u, = 90 m3/s
u.. = 50 1n-,./s

Us= 30 m3/s
U<>= 20 1n-,./s

u, = 10 m-,./s
Ua = 5 1n3/s

U->= O 1n3/s
12 15 IS 21 24 27
90 50 30 20 10 5 0

For catchment [\'I:

ftcopytlghted Maletlal'" "ACd~ional resource mate1ial supplied wi1h the boOk El'lgineemo
Hyd101C>l)y, Thin:I EcMiOl'l w1ltten by Or. K. Subramanya & published by McGrav1-Hill Edvc-.a1t0n
(India) Pvt lid. This resource material is lot lns1ruc1or's use onty:

Solution Manual lo Engineering

...c.+t
2

Hydrology, Third Edition by Dr. K. Subramanya

=37 h

I' p =34 h = (21/22)

Hence

Ir+ IH. /4

,,. = l,(1~ L,..)0'


2.78 x.Cr x.2718
Q,=
=200:

111= 34.05

34.05=c,<143 x 16)11.l

c, = 2.014

C,= 0.90

34
For catchment 1-.::

(;, = 2.074: (,~ = 0.90


1, = 2.074 ( 106 x S2)" = 27.S h
1, = 27.S 15.5 = 5.0 h
Using rs e 6.0 h. 1', = (27.5 x 21122) + (6/4) = 27.75 h

Q = l.7S><0.9xl400=126.2:
IV =

say 126 m'ts

2.7

I'

5.87

=79h

"'

(12611400)"
w,, = 79/1.75 = 45 h
Time base: r, = (72 + (3 x 27.75)) = 155 h
or = 5(27.75 + 3)
= 154 h.
Use rt>= 156 hours as a convenient time base.
6.28

1,. = C,(l

l,,,)'= 1.5 x (35 x IO)..,= S.7 h

I,= 8.115.5 = l.55h


Uset,=3.0h.

t'o =(21/22)xS,7+(3.0/4)=9.0h
2.78x0.70,400
S ,,
Q
<
86 . 1n1S
I'
9.0
587
IV =
= 30.7 h
" (86.S/ 400)
IV15=30.711.75=

17.Sh

Time base: '/'0 = (72 + (3 x 9)) = 99 h


Or = 5(9 + 1.5)
= 52.5 h.
U$C f;. = 52 hours as a convenient rime base.

6.29

Q,. = 126 m~/s


T = l',, T lit/2 = 27.75 T 3 = 30.75 h
Muniply the coordinates of SC Dimensionless l{H given in Table 6.10 (Text) by
the respectivescales.

G!: I

Qf00

(ho~rs)

(m~s)

lfT.

010.

(ho:rs)

(m~s)

ftcopyrlghted Ma1er1a1'" "ACd~ional resource mate1ial supplied wi1h the boOk El'lgineemo
Hyd101C>lly, Thin:I EcMiOl'l w1ltten by Or. K. Subramanya & published by McGrav1-Hill Edvc-.a1t0n
(India) Pvt lid. This resource material is lot lns1ruc1or's use onty:

Solution Manual lo Engineering

Hydrology, Third Edition by Dr. K. Subramanya

o.oo

o.ooo

o.oo

o.oo

0.10
0.20
0.30
0.40

0.015
0.075
0.160
0.280
0.430
0.600
0.770
0.890
0.970
1.000
0.980
0.920
0.840
0.750

3.08
6.15
9.23
12.30
15.38
18.45
21.53
24.60
27.68
30.75
33.83
36.90
39.$8
43.05

1.89
9.45
20.16
35.28
54.18
75.60
97.02
112.14
122.22
126.00
123.48
115.92
10-5.84
94.50

o.so
0.60
0.70
0.80
0.90
l.00
l .10
1.20
1.30
1,40

1.50
1.60
1.80
2.00
2.20
2.40
2.60
2.80
3.00
3.50
4.00
4.50
5.00
5.50

0.660
0.560
0.420
0.320
0.240
0.180
0.130
0.098
0.074
0.036
0.018
0.009
0.004

o.ooo

46.13
49.20
55.35

83.16
70.56
52.92
40.32
30.24
22.68
16.38
12.35
9.32

SI.SO
67.65
73.80
79.95
86.10
92.25
107.63
123.00
136.38
153.75
169.13

4.54

2.27
1.13
0.50

o.oo

6.30
Fig.6.30(a) shows he ERH and DRH.
(i)
Ordinates of 4-h UH nrc obtained by

rcsultin 4 .h UH. rs as bcl ow IF12. o- 6 30(b)I

0
Ordinate of DRlI ('eru/h)
0
Ordinate of 4~h UH (crn/h) 0
Time (h)

dividing the DR.H ordinates by 6.0. The

6
I

12
2

3 4 5 6
IS 24 18 12
3 4 3 2

6
I

8
0
0

DRH of Probf1m1 p ,,3.0

6om

~ 30

eu

';' 20
! 10

"'

~
~
i3 0

10

Time (h)

Fig.p- 6.JO(a) Gtven DRH or 6 cm ER


ftcopyrlghted Ma1er1a1'" "ACd~ional resource mate1ial supplied wi1h the boOk El'lgineemo
Hyd101C>lly, Thin:I EcMiOl'l w1ltten by Or. K. Subramanya & published by McGrav1-Hill Edvc-.a1t0n
(India) Pvt lid. This resource material is lot lns1ruc1or's use onty."

Solution Manual lo Engineering Hydrology, Third Edition by Dr. K. Subramanya

!;'

as

.....

!!' e

".'!!" u
0
'

05
0
0

Time (h}

Fig. P6.3-0(b)
Derivation of me Scurve is shown in Table p-6.30(b).

Table

O 630( a)

Dertvauon
'
o rs

curve

Ordinate
Time in
hOurs

ordina:e

0
6
12
18
24
18
12

2
3

'

5
6

OI OAH

ct 4h
UH
0

S-.curve
a<jjltion

0
1
2
3

0
0
0
0

2
3

'
3
2

1
2
3

s. Curve

S~CUfVG

ordinate

'
4
4
4

' 6.30

problem p

10

Time (h)

Fig. P6.30(c)

s,. curve

ftcopyrlghted Ma1er1a1'" "ACd~ional resource material supplied wi1h the boOk Engineemo
HV(ir'OIO'l!Y. Thin:I Edition w1ltten by Or. K. Subramanya & published by McG,av1-Hill Edvc-.a1t0n
(India) Pvt lid. This resource material is lot lns1ruc1or's use onty:

Solution

(ii)

Manual lo Engineering

Hydrology, Third Edition by Dr. K. Subramanya

Ccmputmion of 3 h UH using Sa-curve:


Table o-j)-~b) Comnutation of 3- h UH
Time ii\

fours

s~-curve
l~ged by

s-ccrve

<>tdinale 3
0
0

nours

'

'
''

2
3

OAHof
due ER
OI (314)

Ord. OI
3hUH
0
0.00
1
1.33
2
2.67
3
4.00
4.00
3
2
2.67
1
1.33
0
0.00

cm

s
6
7

a-n UH OI Problem p-6.30

Time (h)

Fig. p6.30 (c)

3h UH

6.31
111c cajculmions relating to

Sccurvc and d-h UH arc shown in Table p-6.31 (:1)

Table p 6.3J(a)

Tiine
(h)

2-h
UH

s-cu-ve

addition

Sr-Curve
ordinate

(cnllb)

(lllJll)

{in mm)

Si-curve

DRH

ordinates
2c1n
lagged by mm)
'1 hours (in

of 4-h UH
(in ordinate
(11111'1/h)

nun)
ftcopyrlghted

Ma1er1a1'"

"ACd~ional resource

mate1ial supplied wi1h the boOk El'lgineemo

Hyd101C>lly, Thin:I EdifiOl'l w1ltten by Or. K. Subramanya & published by McGrav1-Hill Edvc-.a11on
(India) Pvt lid. This resource material is lot lns1ruc1or's use onty:

Solution

Manual lo Engineering

Hydrology,

Third Edition by Dr. K. Subramanya

0
0
0
0.5
0.5

0.5
0.5
0.5
0.5
0.5

0.5
0.S
0.5

0.5

0.5

0.5

6
7

0.5

0.5

0.5

0.5
0.5

0.5
0.5

0.5
0.5

0.5

0.5
0.5
0
0

2
3
4

0.5

0.25
0.25
0.25
0.25

0.5

0.25

2-h UH

Tirnc Ih) ~

S, CUr'llO

Tlmc Ih) ~
4h UH

F;g. p-6.31 (a)

5
Time Ih) ~
S, Curve and 4 - h Ul:I or Problem 6.31
4

6.32
Time Ol)

O+t:
I

2
3

4
5

DRH due to 3 ORH due to 0 cm


cm ER (in nrl/s) ER (in nl3/s)
300
300
300
300
0

ORH due to 5
cm

Ordinate

or

ER (in 1n3/s) final

0
0

0
0

500

500

500

DRH
(in nr'Js)
300
300
300
800
500
500

ftcopyrlghted Ma1er1a1'" "ACd~ional resource mate1ial supplied wi1h the boOk El'lgineemo
Hyd101C>lly, Thin:I EcMiOl"l w1ltten by Or. K. Subramanya & published by McGrav1-Hill Edvc-.a1t0n
(India) Pvt lid. This resource material is lot lns1ruc1or's use onty:

Solution Manual lo Engineering Hydrology, Third Edition by Dr. K. Subramanya

5+ e

EAH
3cm

Scm
800

">c

OAH

>
>-

IP"

500

~
300

500

3-00

"
0

'

~fhnt(h) ~

Jiig. 1>6.32 .1RH and Resulting ORH of Problem 6.32

6.33
(;) A=750ha=7.5km'
11= 15 min= 0.25 h
1<'. = 90 111in = 1.5 h
lag Lime Ip= 0.6 t<'. = 0.6 x 1.5 = 0.9 h
I

T,. = ( ~ +1,)
1\

= 0.125 +0.90 = 1.025 h

Q,. = 2.08-T= 2.08 x

,.

1.5
}
= 20.48 m /s
07
1 . -)

Ti.=2.61T,=2.67 x 1.025 =2.74 h (say 2.75 h)


(ii) The DRH due 10 40 mrn in IS min. on the watershed would be a triangle of

Base width

= 2.75

h
Peak =4x 20.48= 81.92 nr'zs cccurring aL T,.= 1.025 h frorn c.he start of the

storm.
6.34

ftcopyrlghled Ma1er1a1'" "ACd~ional resource mate1ial supplied wi1h the boOk El'lgineemo
Hyd101C>lly, Thin:I EcMiOl'l w1ltten by Or. K. Subramanya & published by McGrav1-Hill Edvc-.a1t0n
(India) Pvt lid. This resource material is lot lns1ruc1or's use onty:

Solution Manual lo Engineering Hydrology, Third Edition by Dr. K. Subramanya

Ord. of

U(t)

IUH

lagged
by 2
hour

Time
(hi

"\"

(m /s)
0
2
4

6
9
10
12
14

16
19
20
22
24
26
28
30
32
34
36
36

6.35

o.oo
5.00
10,00
15.00
20.00
18.57
17.14
15.?1
14.29
12.86
11.43
10.00
8.57
1.14

5.71
4.29
2.86
'.-13
0.00

o.oo

tceia-

o.o
s.o

10.0
15.0
20.0
18.6
1?' 1
15.7
14.3
12.9
11.4
10.0
8.6
7.1
5.7
4.3
2.9
1.4

0.0

Ot(i. QI

COl.3)

2h UH
(m'IS)

0.00
5.00
15.00
25.00
35.00
38.57
35.71
32.86
30.00
27.14
24.29
21.-13
18.57
15.71
12.86
10.00
7.14
~.29
1.43

0.00
2.50
7.50
12.50
17.50
19.29
17.86
16.43
15.00
13.57
12.14
I 0.71
9.29
7.86

6.43
5.00
3.57
2.1~
0.?1

I o.oo I o.oo

Since the ordinates arc given at uneven time interval, by interpolation the ordinates
of IUH nre assembled at regular interval of one- hour. Calculations arc shown in

Table p-6.35.

ftcopyrlghted Ma1er1a1'" "ACd~ional resource material supplied with the boOk El'lgineemo
Hydr'OIO'l!Y. Thin:I EcMiOl'l w1ltten by Or. K. Subramanya & published by McGtav1-Hill Edvc-.a1t0n
(India) Pvt lid. This resource material is lot lns1ruc1or's use onty:

Solution

Manual lo Engineering

'able
I

.ji .JS
u(t)

Time
(h)

0
1
2
3
4

5
6
7
8
9
10
11

12
13
14
15
16
17
18
19
20
21
22
23

Hydrology, Third Edition by Dr. K. Subramanya

(V,
m I<

o.o
11.0
37.0
60.0
71.0
75.0
72.0
66.0
60.0
52.5
45.0
39.0
33.0
27.0
21.0
16.5
12.0
9.0
6.0
3.0
0.0

lagged
by 1
hour
0.0
11.0
37.0
60.0
71.0
75.0
72.0
66.0
60.0
52.5
45.0
39.0
33.0
27.0
21.0
16.5
12.0
9.0
6.0
3.0
0.0

Ofd. Of

UH

o.oo
5.50
24.00
48.SO
65.50
73.00
73.50
69.00
63.00
56.25
48.75
42.00
36.00
30.00
24.00
18.75
14.25
10.50
7.50
4.50
1.50
0.00

lh UH
lagged
by 1
hOUI
0
5.50
24.00
48.50
65.50
73.00
73.50
69.00
63.00
56.25
48.75
42.00
36.00
30.00
24.00
18.75
14.25
10.50
7.50
4.50

I.SO
0.00

Sum

Ord.
of 3h

lh UH
lagged
by 2
hou1s

Sum of
Cols.4,
5&6

o.oo

o.o

0.00
5.50
24.00
48.50
65.50
73.00
73.50
69.00
63.00
56.25
46.75
42.00
36.00
30.00
24.00
18.75
14.25
10.50
7.50
4.50
1.50
0.00

5.50
29.50
78.00
138.00
187.00
212.00
215.50
205.50
188.25
168.00
147.00
126.75
108.00
90.00
72.75
57.00
43.SO
32.25
22.50
13.50
6.00
1.50
0.00

1.8
9.8
26.0
46.0
62.3
70.7
71.8
68.5
62.8
56.0
49.0
42.3
36.0
30.0
2-1.3
19.0
14.5
10.8
7.5
4.5
2.0
0.5
0.0

UH
(m3{s)

716.00

votumeof l-h UH = 716 (m'/s. hour) e 716 x 3600 1n3


If A= Area of catchment in km". Ax 106 x ( 1/100) = 716 x 3600
A= 257.76 km'

ftcopyrlghted Ma1er1a1'" "ACd~ional resource mate1ial supplied wi1h the boOk El'lgineemo
Hyd1'0IO'l!Y. Thin:I EcMiOl'l w1ltten by Or. K. Subramanya & published by McGrav1-Hill Edvc-.a1t0n
(India) Pvt lid. This resource material is lot lns1ruc1or's use onty."

Solution

Manual lo Engineering

Hydrology, Third Edition by Dr. K. Subramanya

CHAPTER7
7.1

i=

30
(45/60)

401nmlh

Catchment area A

120 ha = 1.20 km~

By Eq. 7.2. Q,,= ( 1/3.6) x 0.3 x 40 x 1.20


7.2

= 4.0 m'ts

The Kirpicb formula (Eq. 7.4) gives


1,.

= 0.01947 l071 S"J~ = 0.01947 ( 1250)11.n x (0.001).i>.)IJS = 67.45 min

From given data maximum lntenshy of


duration 67.45 min is. by interpolation .
.,_

IOJ.25

(67.45/60)

- 90 07
-.mn1

rainfnll of SO year return period and of

/h

By Eq. 7.2. Q,,= ( 113.6) x 0.2 x 2.0 x 90.07 = 10.0 m'ls


7.3

Refer to Fig. P-7.3.


l'1bour:

The coruribuuons of the runoff would be as fo1IO\\'S:

l.7cm/hrainon

..\

2n.j hour: 1.7 cin/11 rain on Band 1-\


3"' hour: I. 7 cmlh rain on C and B: and 1.25 cnsb rain on A
4ih hour: 1.7 c-m/h ruin on D and C : and 1.25 cm/h rain on B and A
51h hour: 1.7 cnVh rain on D: and 1.25 cn\/h rain on C. Band

1-\

The discharge :11 the end of vnlious nintervnls arc calculated by the Ra1iQn:1I

Iorrnuta.
Q,= ( 1/3.6) x 0.5 xix,\

ftcopytlghted Maletlal'" "ACd~ional resource mate1ial supplied wi1h the boOk El'lgineemo
Hyd101C>lly, Thin:I EcMiOl'l w1ltten by Or. K. Subtamal'lya & published by McG,av1-Hill Edvc-.a1t0n
(India) Pvt lid. This resource material is lot lns1ruc1or's use onty:

Solution

Manual lo Engineering

Hydrology, Third Edition by Dr. K. Subramanya

200 ha

250ha

3h

! c
l

350ha

170 ha

Ih

cuuet

Fig. P-7.3

At me
endol
1h
2h
3h

'"

Sh

o.
4.014
4,014
2.951
2.951
2.951

o.

o.

0-

I
8.26'1
8.264
6.076
6.076

I
5.903
5.903
4.3~

4.722
4.722

Total O
rmJls'
4.014
12.276
17 .116
19.652
18.08.9

The peak rate of runoff is 19.652 nf1/s and occurs at the end of 411' hour.
7.4

From Table 7.l(a)(Text),


A 52% 20%

18%

10%

0.85 0.075 0.70 0.65

weighted C = C = (0.85 x 052) + (0.075 x 0.2) + (0.70 x 0.18) + (0.65 x O. IO) =

0.648
ftcopyrlghted Ma1er1a1'" "ACd~ional resource mate1ial supplied wi1h the boOk El'lgineemo
Hyd101C>lly, Thin:I EcMiOl'l w1ltten by Or. K. Subramanya & published by McGrav1-Hill Edvc-.a1t0n
(India) Pvt lid. This resource materialis lot lns1ruc1or's use onty:

Solution

Manual lo Engineering

r1e"'

Hydrology, Third Edition by Dr. K. Subramanya

85
,
---=
I 02 mm/h : A= 3 km'
(50/60)

Q,= ( 1/3.6) x 3 x 102 x 0.648


7.5

= 55.0S

m'ls

The peak flow from tbe nreas:


QA:(J/3.6))(6XCi

: l.667Ci n1J/s

Q= (113.6) x 7.5 x Ci= 2.083C; m'ls

Qc=(l/3.6)x 10 x Ci= 2.778 Ci m'ts


QlJ= ( J/3.6) x 12 X C; = 3.333 Ci IUJ/S
The contributions or the various sub-areas at different times are shown below:
Ave(age
Time
(h)

ln1ensily

Aunoft

of

factor,

Rainfall

a,

a,

a.

Tota1Q
Do

(Ord. of

OAH)

tmmtn\

0
25
50
50
23.5

2
3

0.5
0.7

0.0
0.85

0.00
20.84
58.35
66.66
33.30

0.00
0.00
26.04
72.91
83.32
41.61

6
7
8

Total peak

now=

0.00
0.00
0.00
34.73
97.23
111.12
55.49

0.00
0.00
0.00

o.oo
4 1.66
116.66
133.32
66.58

0.00
20.SA
84.38
17~.31
255.51
269.38
188B1
66.58
0

DRH peak + Base flow

= 269.38 + 42.50 = 311.88 m-'I.


This peak occurs at the end of the 5111 hour fro the SHI.rt of the. storm.
7.6

1o

= 20 minutes; Area A = 20 ha= 0.2 k1112; T = 25 years

Dun1ti(111 0

Iirnc of concentration = 20 ruin = 0.333 h

i.., = 0693x(2S)o.l!r) = 15 cm/h = 1501nmlh


(0.333 +0.50)61111

Qr= ( 113.6) x 0.25 x 0.2 x I SO= 2.08 m'is

ftcopyrlghted Ma1er1a1'" "ACd~ional resource mate1ial supplied wi1h the boOk El'lgineemo
Hyd101C>lly, Thin:I EcMiOl'l w1ltten by Or. K. Subramanya & published by McGrav1-Hill Edvc-.a1t0n
(India) Pvt lid. This resource material is lot lns1ruc1or's use onty."

Solution

Manual lo Engineering

Hydrology, Third Edition by Dr. K. Subramanya

L;C,A,
7.7

Equivalent runoff coefficient C; = -''~A

((0.25x 30) +(0.16 x 10) + (0.40x 60)) = 0.331


100
Area A= IOOha = 1.0 km'
By Eq.(7 .4-a) time of concentration 1( = 0.01947 (K, }'"
Since. L = 3500 rn and i.lH
K,=~(3

5:)'

= 6.'l m

=25633

1,. = 0.01947 (25683)'" = 48.4 min= 0.806 h


.
3.97 (25)"'"
r= ,
} ,,, = 6.752/0.968 = 6.978cm/h = 69. 78 mmlh
10.so6+0.1s"
Peak Flow
Q,. = (113.6)(C,; A)
= 0.331x69.78x.l =64210,1s
3.6
7.8(a) Referring 10 Fig.P 7.8 (a)
~tionABCD
1(

(min)

30 25

ISO m

'

lsocnrones

"

450

,/

10

15

20

25 min

ftcopyrlghted Ma1er1a1 "ACd~ional resource mate1ial supplied wi1h the boOk El'lgineemo
Hyd101C>lly, Thin:I EcMiOl'l w1ltten by Or. K. Subramanya & published by McGrav1-Hill Edvc-.a1t0n
(India) Pvt lid. This resource material is lot lns1ruc1or'suse onty."

Solution

Manual lo Engineering

Hydrology, Third Edition by Dr. K. Subramanya

fiig. P-7.S(a) lsochroncs


of rmvel 1c8 = ' = 25 ruin. Dividing BC and .Ad in to five parts
the 5 min interval isocbrones arc shown in Fig. P- 7 .3 [n].
(b) For 5 - min rain. area ccntnburing to now 111 5 min:
A,= (In) x ( 15()/5) x 450 = 675() m'
Q,r- 0.8x[71(100 x 3600)) x 6750 = 0.105 m'ts
Sirnilnrty Orl = 2 x Q"1=0.210 n1l/s
Or is reached in 5 min..; Ori is reached in 10 min: Q..z remains constant up
10 20 ruin. Then onwards ii decreasesto reach zero at 1 = IOtal I.:+ duration of rain=
30 min.
The idealized bydrograph is shown in Fig:.P- 7 .S(b-1 ).
The 1i111e

t
~

'k,,

..

2~

0.210
0.105

10

20

30

Time (min)

Fig. P- 7.8(bl) l>lll:f for 5-nlin. R:ainfaU


For 30 111in rain:
1,.

= 30 min.: Q,.= 0.8x(71(100 x 3600)) x (150 x 450) = I.OS m'/s

The entire area contributes to the peak runoff of I .05 m)/s. The peak occurs at 30
min. As 0 = 40 min. the peak will remain constant Lill 1 = 40 ruin and then onwards
decreases for another 1.. = 30 min to reach zero al 1 = 70 min.
The idealized
hydrcgrapb is shown in Fig. P-7.8(b-2).

ftcopytlghted Maletlal'" "ACd~ional resource mate1ial supplied wi1h the boOk El'lgineemo
Hyd101C>lly, Thin:I EdifiOl'l w1ltten by Or. K. Subramanya & published by McGrav1-Hill Edvc-.a1t0n
(India) Pvt lid. This resource material is lot lns1ruc1or's use onty:

Solution

Manual lo Engineering

Hydrology,

Third Edition by Dr. K. Subramanya

eE

~
~
u

"!

'"

Fig. 7.8 (b-2)


7.9

10

30

20

40

60

50

70

minutes

ORR for 40 min. Rninfnll-min

For D= 10 minutes. Maximum area having

I.:= IOmin
marked (ADCD and (>\'D:C'D')in Fig. P- 7.9J is
A=(l/2)x J50x300=22500m'
Q,= 0.92 x (6/( 100 x 3600)) x 22500 = 0.345 m'ls

(=Area

150m
I

75 m
15
20

25

10

75 m
10
15

I
20

2L

15

20

'II~

<(

"'
0

.
15

20

Fig. p. 7.9
7. JO

(a)

(b)

c
10

10

'

Catchment c~ Isochrones of Problem 7.9

"=0.025
For au occurrence of at least once in 20 years
P1

= I -(I -11)" = I - (0.975)"' = 0.397

ftcopyrlghted Ma1er1a1'" "ACd~ional resource mate1ial supplied wi1h the boOk El'lgineemo
HV(il'OIO'l!Y. Thin:I EcMiOl'l w1ltten by Or. K. Subramanya & published by McGrav1-Hill Edvc-.a1t0n
(India) Pvt lid. This resource material is lot lns1ruc1or's use onty."

Solution

7.11

Manual lo Engineering

Hydrology, Third Edition by Dr. K. Subramanya

(c)

q = I - p = 0.975

(a)

P1= I -(l-11)'=

(bl

Fol' an occurrence of at least once in 20 years

1-(1-0.

1)'=0.41

P1 = I -(I -p)"' = I -(0.05)'' = 0.642

Probability tltat the event \viii not occur in next 20 years= I - p1

I - 0.642 = 0.358

7.12

(c)

p = 1150 = 0.02

(d)

p=0.02.r=

(e)

p = 0.02.111 = I -(I - 0.02)"' = 0.636

y-V

K = --
N

7.13

'

...>. n =IO, By Eq.


' 2.12 p, =-(0.02)
10!
1
' 1
(0.98)
= 0 . 0008 334
7!x3!

where y = - In. ln(Tl(T- l)f

Y..

)'r

s.

35

1000

6.907255 0.5402

1.1285

5.6421

45

1000

6.907255 0.5463

1.1519

5.5221

55

1000

6.907255 0.5504

1.1681

5.4420

60

1000

6.907255 0.5521

1.1747

5.4100

65

1000

6.907255 0.5535

1.1803

5.3832

(a)

N = 13 years.

X = 2703.5 nfl/s,

oe.r= 898.6 m"ts

From Table 7 .3 {Text) for N= 13 years )',,


yr= - In. ln(T/(T-1)):

K=1

= 0.5070 ands .. = 0.9971

v -V
...

.'.

andx1=.T+Ka,

Values of xrnrc calculated for various T values as below:


'r years
)'<
50 3.901939

K
3.404813

xr
5763

ftcopyrlghted Ma1er1a1'" "ACd~ional resource mate1ial supplied wi1h the boOk El'lgineemo
Hyd101C>lly, Thin:I EcMiOl"l w1ltten by Or. K. Subramanya & published by McGrav1-HillEdvc-.a1t0n
(India) Pvt lid. This resource material is lot lns1ruc1or's use onty:

Solution

Manual lo Engineering

Hydrology, Third Edition by Dr. K. Subramanya

100

4.600149

4.105054

6392

1000

6.907255

6.4l887

8471

(b) Log Pearson Type J: Tbe values of z-variate z. tog ;I,' are calculated for
various flood magnitude as in Table 7.13(b)
Table 7.13 (b)
Year

Flood s

1963
1964
1965
1966
1967
1968
1969
1970
1971
1972
1973
1974
1975

z e jca x

3210
4000
1250
3300
24$0
1780
1860
4130
3110
2320
24$0
3405
1820

3.5065
3.6021
3.0969
3.5185
3.3945
3.2504
3.2695
3.6160
3.4928
3.3655
3.3945
3.5321
3.2601

Froru this. Table ;:- = 3.40763

ts. c, = 0.15552 rn.\/s and


C.. = Cocff't. of skew= 0.0375. Values of Kt for C.. = -0.0375 arc read from Table
7.6 rrexn. Values ofzrandxrarc calculated by using Bqs. 7.25 and 7.26 and arc
Ill'

given below.

so

100
2.299

IOOO
3.038

3.7240

0.3575
3.7652

0.4725
3.8800

5296

5823

7588

T'years

2.034
0.3163

(c) Log - Normal Distribution

l = 3.40763 1n'ts.
T'years
K,

c,

so
2.0;4

= 0.15552 1n'ts and c.. = 0


100
2.326

1000

3.090

ftcopytlghted Maletlal'" "ACd~ional resource mate1ial supplied wi1h the boOk El'lgineemo
Hyd101C>lly, Thin:I EcMiOl'l w1ltten by Or. K. Subtamanya & published by McGrav1-Hill Edvc-.a1t0n
(India) Pvt lid. This resource material is lot lns1ruc1or's use onty:

Solution

7.14

Manual lo Engineering

N=20years ..

Hydrology, Third Edition by Dr. K. Subramanya

0.3194

0.3617

0.4806

3.7271

3.7674

3.8882

5334

5880

7730

i= 121 rn3/s.

From Table 7.3 I'Text) for N= 20 years


From cq, 7.20
K = 3.8167 =

)'. = 0.5236 ands,= 1.0628

350= 121 +60K

y, -0.5236
1.0628

)'r

= 4.57995 = In . ln[T/(T- I )J:

giving T = 98 years

Hence a return period of the design flood is 100 y~1r.s.


7.15

X= J.65crna.nd er,, ,=0.45c1n


.rr-= X-t K er,,.1
3.0 = 1.65+ K (0.45)
K = 3.0= y, -0.577
1.2825
Hence yr= 4.4245
T
Also. Yr= 4.4245 =[In . In--)
T-1

T
= 1.0120522
T-1
T= 84.0 years. say 85 years
.. -

7.16

X=4200m}/sa.nd a.,_1= 1705 m}/s

Ker ,,_1
9500 = 4200 + K (1705)

.YT=

-t

K = 3.1085

= y,

-O.Sl7
1.2825
Hence Yr= 4.56366
Also. Yr= 4.56366 =[In.

In T- I]

ftcopyrlghted Ma1er1a1'" "ACd~ional resource mate1ial supplied wi1h the boOk El'lgineemo
Hyd101C>lly, Thin:I EcMiOl'l w1ltten by Or. K. Subramanya & published by McGrav1-Hill Edvc-.a1t0n
(India) Pvt lid. This resource material is lot lns1ruc1or's use onty."

Solution

Manual lo Engineering

:. T:i'=

Hydrology,

Third Edition by Dr. K. Subramanya

1.001048

T = 96.4 years, say 100 years


7, 17

l.A:ig Pearson 'fype 3 distribution:

z = 2..510

m"ls..
Oi = 0.162 m"ls and C, = Ccefft. of skew = 0.70. Values of
for(,~= 0.70 11.n: read from Table 7.6 {Text]. values of er and ,,r arc cnlculnred
by using Eqs. 7.25 and 7.26 and 91'1! given below.
K:

T years

50

100

200

1000

K:.

2.407

2.$24

3.223

4.105

K:. Ox

0.3899

0.4575

0.5221

0.6506

zr

2.8999

2.9675

3.032

3.175

794

928

ion

1496

50

100

200

1000

K:.

2.054

2.326

2.576

3.090

K~Ox

0.3327

0.3768

0.4173

0.5006

~r

2.8427

2.8868

2.9173

3.0106

696

771

846

:tr (111"/s)

Log - Norrnal Dlscrlbution


r yc-J1rs

.tr (111"/s)

1025

7.18

r years Q
50

10000

200

15000 4.17009

4.00000

2.261
2.949

~=+Ku
.,r
..
~~
4.17609 =

+ 2.949 ,,,

4.00000=: +2.261
0.17609 =0.688 o,

v,

a, = 0.25595

z = 4.000 - (2.261 x 0.25595) = 3.4213

and

ftcopyrlghted Ma1er1a1'" "'ACd~ional resource mate1ial supplied wi1h the boOk El'lgineemo
Hyd101C>lly, Thin:I EcMiOl'l w1ltten by Or. K. Subramanya & published by McGrav1-Hill Edvc-.a1t0n
(India) Pvt lid. This resource material is lot lns1ruc1or's use onty."

Solution

Manual lo Engineering

Hydrology,

Third Edition by Dr. K. Subramanya

When T = 1000 years. K~ = 3.670


zr= 3.4213 + ( 3.670 x 0.25595) = 4.36064
Q =:inti log zr = 22943 m3/s , ~Y 229somJ/s
7. 19

Log normal dtstributien:

C5 = 0, K: = 2.054 (for T = 50 years from Table

7.6ofTexi)
= 3.2736 + ( 2.054 x 0.3037) = 3.8974
Qs.-,= enntcg ZJIJ= 78961n3/s
l..og Pe-arson Type 3 distribution:
C, = 0.07. K,= 2.091 (for T = 50 years- from Table 7.6 of Text)
= 3.2736 + ( 2.091 x 0.3037) = 3.90864
Q.si>= anti log zsi>-= 8103 n1J/s

z,.
z,.
7.20

River- Ganga:

N = 92 years.

.i

= 6437 1n3/s.

0 . 1-= 295 I

From Table 7.3 (TeXI) for N= 92 years

Y.

= 0.5589 ands,= 1.2020

100

1000

Yr

4.6000

6.9073

Kr

3.362

5.2815

xr

16359

22023

4.2195

6.2088

1298

1910

I
b =..,1+1.JK+l.lK

.f,.

ba .,
= ..{ii

ru3/s

x11~ = x., /(c).f,.


f(c)

= 1.96
.r, 18903

25767

13815

18279

-'2

ftcopyrlghted Ma1er1a1'" "ACd~ional resource mate1ial supplied wi1h the boOk El'lgineemo
Hyd101C>lly, Thin:I EcMiOl"l w1ltten by Or. K. Subramanya & published by McGrav1-Hill Edvc-.a1t0n
(India) Pvt lid. This resource material is lot lns1ruc1or's use onty:

Solution

Manual lo Engineering

Hydrology,

Third Edition by Dr. K. Subramanya

lli\ er Yarnuna:
N = 54 years. X = 5627 m3/s,
1

From Table 7 .3 (Text) for N= 54 years ~.. = 0.5501 ands,,= 1.1667


T

100

IOOO

y,

4.6000

6.9073

Kr

3.4735

5.4488

17298

23935

4.3344

6.3829

1982

2919

XJ

21182

29656

"

13413

18214

.l'11:

= .t'r J (c)s..

)tc) = J.96

7.21

x + Kru,
435 = X + K1oo<T,._,
395 = X+ KJo<f.. 1

.t"T=

(Kl(~-KSf!)<T. ,=40 .... (1)


andK= )'r -Y,,

s,
Y100

=(In.

In

100
I= 4.6001 and
99

s =(In.

50
In- ( = 3.9019
49

ftcopyrlghted Ma1er1a1'" ...ACd~ional resource mate1ial supplied wi1h the boOk El'lgineemo
Hyd101C>lly, Thin:I EcMiOl'l w1ltten by Or. K. Subramanya & published by McGrav1-Hill Edvc-.a1t0n
(India) Pvt lid. This resource material is lot lns1ruc1or's use onty:

Solution

Manual lo Engineering

(>100-Yso)

= 0.6982

Hydrology,

Third Edition by Dr. K. Subramanya

06982

and from (Eq. I)

s,

u,.,= 40

1 tence a-,._, = 57.29

when T = I 000 year.


"

1'J@-

"

n100=

01000- 435 =

7.22

6 9073- j'

K 1000 =

s,

..

6.9073-4.6001 = 2.3072

.'.

'

2.3072
"-
s

= 2.3072 x 57.29 = 132

N = 30 years
.t-r= X + Kro- ~-
1200= .i+ K1()(J'7., I
1060 = .i + K$d<T,..,
(K100-Kw)o ... r= 140 .... (1)

andK7:7 }'

- v
s.

r100

= [In.

100

ln - J
99

= 4.600 I

= 4.6001-0.532

K
I(~

l.l 124

K = 3.9019-0.5362
,,

1.1124

= 3.6533
= 3.0257

(K100-Kso)o ... , = ( 3.6533-

(b)

3.0257) o ... , = 140

cr,,_1
1200

= 140/0.6276 = 223 1n-'/s


= .i + (3.6533 x 223) giving

= 6.2136-0.5362
1.1124

,,,

Xm

7.23

50
and y., =[In. hi-)= 3.9019
49

= 385 + ( 5.1034

= 3851n3/s

=S.I034
X 223)

= 1523 m'fs

Calculation of Design Stenn

ftcopyrlghted

Ma1er1a1'"

"ACd~ional resource

mate1ial supplied wi1h the boOk El'lgineemo

Hyd101C>lly, Thin:I EcMiOl"l w1ltten by Or. K. Subramanya & published by McGrav1-Hill Edvc-.a1t0n
(India) Pvt lid. This resource material is lot lns1ruc1or's use onty."

Solution

Manual lo Engineering

Time
(h)

0
12
24
36
4$

Curnul.
rainfall

12-h
increment

[cm]

(cn1)

0.0
10.2
30.5
34.0
38.0

0
10.2
20.3
3.5
2.0

Hydrology,

Ord,

l;irst
arrange-

tif
12--h

flJCl11

UH

98

72

75
50
30
15
7
0

R<1inrnJ1
lnfihr<11ion excess or
Deslgn
(crn in 12
o~';'Sign
sequence
IM>ur$.)
storm
ltn1)

0
32
96
130
126

60
84
96
106
120
132

Third Edition by Dr. K. Subramanya

0
3.5
10.2
20.3
2.0

2.0
20.3
10.2
3.5

0
1.8
1.8
1.8
1.6

0
1.7
8.4
18.5
0.2

Note: Col. 6 rs reversed sequence cl Col. J


lnflhraticn loss= 0.15 cn\/h = 1.8 cm per 12 hour interval

CIa cu I nuon ofFlodHd


I'!' 1'02.1'30 h
0
Excess rainfall or Design
storm (cm)

ord. of
12-h
Tin1c:

UH

(h)

(1n3/s)

0
12
24
36
48
60
72
84
96
108
120
132
1<4
156
168

0
32
96
130
126
98
75
50
30
15
7
0

Base
now
1.7
8.
0
$4.4
0
163.2 266.6
221 806.4
214.2
1092
1&6.6 1058
121.S 823.2
65
630
51
420
25.5
252
11.9
126
0
58.8
0

18.5

0
592
1n6
2405
2331
1613
1388
925
555
277.5
129.5
0

0.2

0
6.
19.2
26
25.2
19.6
15
10

6
3
1.4

(n1l/s)
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50

ord. of
Flood
Hydroyaph
Cm"Js)
50
104
462
1669
3139
3699
3358
2603
1928
1268
753
392
183
51
50

ftcopyrlghted Ma1er1a1'" "ACd~ional resource mate1ial supplied wi1h the boOk El'lgineemo
Hyd101C>lly, Thin:I EcMiOl"l w1ltten by Or. K. Subramanya & published by McG,av1-Hill Edvc-.a1t0n
(India) Pvt lid. This resource material is lot lns1ruc1or's use onty:

Solution Manual lo Engineering

7.24

Dosren
. SIonn:

Carcurauon
I I I o f

Cumul

12h

1ainlal

inc.re
men I

(cm)

(cm)

Time

(h)
0
6
12
16
24

Hydrology, Third Edition by Dr. K. Subramanya

0.0
5.0
12.0
15.0
l 7.6

First
arrange

01d. of
6h UH

0
5.0
7.0
3.0
2.6

ment

0
12.5
25
37.5

30

40

36
42
46

30

Oesign
sequence

ontcm
in 12

hours)

3.0
1.0
5.0

50

lnfillrali

0
2.6
5.0
7.0
3.0

as

0
0.6
0.6
0.6

o.s

Rainfall
excess of
Design

sto1m
(cm)

0
2.0
4.4
6.4
2.4

20
10
0

S4

Calculation of

Flood Hydrogrnph:
Excess Rainfall of Design
Stonn{cm)

ord. or
ord or

Buse

Flood

Time

6-hUH

1-i yc.Jrogr..tph

(h)

(n1l/s)

now
(ml/S)

0
6
12
18
24
30
36
42
48
54
60
66
72

7.25

(a)

2.0

12.S
25.0
37.5
50.0

40.0
30.0
20.0
10.0
0

0
25
50
75
100
80
60
40
20
0
0
0

4.4
0
55
110
165
220
176
132
88
44
0
0
0

6.4
0
80
I 60
240
320
256
I 92
128
64
0
0

1.4

0
30
60
90
120
96
72
48
24
0

20
20
20
20
20
20
20
20
20
20
20
20
20

(m>fs)

20
45
125
285
475
620
666
566
416

264
132
44
20

-R,=1-(1-T) I

ftcopyrlghted Ma1er1a1'" "ACd~ional resource mate1ial supplied wi1h the boOk El'lgineemo
Hyd101C>lly, Thin:I EcMiOtl w1ltten by Or. K. Subramanya & published by McGrav1-Hill Edvc-.a1t0n
(India) Pvt lid. This resource material is lot lns1ruc1or's use onty:

Solution

Manual lo Engineering

0.05=1-(I--)

Hydrology, Third Edition by Dr. K. Subramanya

. 0.95=(1-_I_)"
T

1' = 390 years


I " =0.12
R.=1-(1--)

(b)

390

R, =

12%

7.26

R =(1--1 )"

7.27

R,=1-(1-7)"

7.28

'

50

= 0.603

(a)

O.IOl-(1-7)':

(bl

0.10=1-(I--)":

T=!Oyea.s

T=190YearS

if =1-0-.!..r
'

When T=

11.

R1=1-(1-!)"

(I -.t ) =l-11x+

n(n-1)

Jl

n(n-1)(11-2

,I{ -

2!
When .r = //11
I).
I n r1(11-I)
( I -= --+
JI

":

2!.Jll

3!

11(11-1)(11-2
].1rJ

_J

;r+

+-1\

l-l+_l_ __ l__ _I_+ (Jn-2) _ _l_A


2! 2!n 3!
3!.n~
4!

For large values of 11


I,

I
I
I
=e 1
2! 3! 4!
= 1-e =I -(2.71828)'' = I 0.3678 = 0.6322

(1--)

=1-1+---+-A

11

7f,
7.29

X = 1200 ml/sand <T.,~, = 650 1n:i/s


Reliability R. = 0.95

1-;

= (0.95)""'

= (I - ;)"'
= 0.9989746

ftcopyrlghted Ma1er1a1'" "ACd~ional resource mate1ial supplied wi1h the boOk El'lgineemo
Hyd101C>lly, Thin:I EcMiOl'l w1ltten by Or. K. Subramanya & published by McGrav1-Hill Edvc-.a1t0n
(India) Pvt lid. This resource material is lot lns1ruc1or's use onty."

Solution

Manual lo Engineering

Hydrology,

Third Edition by Dr. K. Subramanya

T = 975.29 =say 975 years


.l:T=

x + K 0-... 1

K = Yr -053622
1.1123$
Also,

975
~r = -Hn . In
J
.
(975-1)

= 6.881925

= 5.7046

.rr=
7.30

1200 + (5.7046)x650

= 8520

m}/s and 0'.,.1

= 4908 m'ts

= 3900 1n}/s.

N-= 21 years. 11 = 40 years

Reliability R~ = 0.35 = (I - ~)>


T= 247 years
For using Gumbels method: From Tables 7.3 and 7.4, for N-= 21 years

Y.

= o.5252 ands.= 1.0696

sr =-[In

247
.111246 I= 5.50736

K= 5.5()736-0.5252

=4.657966

1.0696
.tr= 8520 + (4.657966)x 3900 = 26686 1n~/s, sav 26700 11fl/s
XT = C11r = 26700 nrvs: Caf = 1.3 x 26700 = 34710 111 /s
Safety n1argin = 34710 - 26700 = 8010 nr1/s

'

'

ftcopyrlghted Ma1er1a1'" "ACd~ional resource mate1ial supplied wi1h the boOk El'lgineemo
Hyd101C>lly, Thin:I EcMiOl'l w1ltten by Or. K. Subramanya & published by McGrav1-Hill Edvc-.a1t0n
(India) Pvt lid. This resource material is lot lns1ruc1or's use onty."

Solution

Manual lo Engineering

Hydrology,

Third Edition by Dr. K. Subramanya

Chapter 8
8.1

Goodrich Method is used IOr routing. By Bq. 8.7


+l,)+(2S,

(I,

-Q,)=<2S, +Q,)

tit
J.\ time interval of at= 3 hours= 0.0108 Ms is chosen. Following table is prepared
tl.1

10 construct

various curves.

Elev. (mj

299.S
300.2
300.7
301.2
301.7
302.2
302.7

S (Mm')

Q (rn)/s) ( 2S +Q)

4.8

0
0
IS
40
75
115
160

5.5
6.0
6.6
7.2
7.9
8.8

'"

888.9
1018.5
1126.1
1262.2
1408.3
1578.0
1789.6

Fig. p, 8. l(tl} shows the plot of Elevation us ( 2S +Q) ~and Elevation

\'SQ

curves. For an

!J.1

initial reservoir elevation or 300.00 the inflow hydrograph is routed through the reservoir
as in Table p-8. I.
Goodrich method: 61 = 3 hours= 0.0108 Ms

,.,

I 1111'/s)

0
3
6
9
12
15
18
21
24
27

10
20
52
60
53
43
32
22
16
10

nnH:

t:le!v11til.u1

Cl1 + 1,)
30

72
112
113

96
75

54
36
26

C2S/i1U (1
995.0
1023.0
1075.0
1131.8
1168.2
1180.5
1174.9
1158.2
1137.6

(2S/.itl+ 0
995.0
1025.0
1095.0
1187.0
1244.8
1264.2
1255.5
1228.9
1196.2
1163.6

(111)

300.00
300.30
300.45
300.95
301.17
301.24
301.21
301.11
300.99
300.87

~lr'ls)
0.00
1.00
10.00
27.60
38.29
41.88
40.26
35.35
29.30
23.27

ftcopytlghted Maletlal'" "ACd~ional resource mate1ial supplied wi1h the boOk El'lgineemo
HV(i1'0IO'l!Y. Thin:I EcMiOl'l w1ltten by Or. K. Subramanya & published by McGrav1-Hill Edvc-.a1t0n
(India) Pvt lid. This resource material is lot lns1ruc1or's use onty:

Solution

Manual lo Engineering

ecc

'"
"''
,.,

...

Hydrology,

. ..

""

1:?00

Oi~h.vge

,,.

<

.g

301

,,.

... 3'!0.!I

'"

"''
'"

(:tSJ.'l~+O
1300
1400

1500

1600

1700

1800

1900

ElllWl!IOA\'l;

g 3'11.!I

Third Edition by Dr. K. Subramanya

_,,..

,.,,..-

Ele'lllion~

l12SfAl).0

/
0

20

...

"

..

... ,,.

ou1now(Oln111i~a)

....

... . .

ig. 1'-8.l(a) Basic plots for routing by Goodrich Method


Tbe inflow and omflow hydrographs are sbown in Fig. P-3. l(b). The variation of etevariun
with rime is shown in Fig. P-8. I (c}.

ftcopyrlghted Ma1er1a1'" "ACd~ional resource mate1ial supplied wi1h the boOk El'lgineemo
Hyd101C>lly, Thin:I EcMiOl'l w1ltten by Or. K. Subramanya & published by McGrav1-Hill Edvc-.a1t0n
(India) Pvt lid. This resource material is lot lns1ruc1or's use onty:

Solution

Manual lo Engineering

Hydrology,

Third Edition by Dr. K. Subramanya

60

...-

..

50

40

"'~
~ 30
u

.~
Q

20

10

O ... ..,
0

..

10

1$

20

Time (Hours)

Fig. PS.l(b) Inflow and Outflovl' Hydrographs

ftcopyrlghted Ma1er1a1'" "ACd~ional resource mate1ial supplied wi1h the boOk El'lgineemo
Hyd101C>lly, Thin:I EcMiOl'l w1ltten by Or. K. Subramanya & published by McGrav1-Hill Edvc-.a1t0n
(India) Pvt lid. This resource material is lot lns1ruc1or's use onty:

30

Solution

Manual lo Engineering

Hydrology, Third Edition by Dr. K. Subramanya

.,,,,.-

-......_

--........

/
I

I
I

--

'

"

"

"

Tim (Hot,11

Fig. 1> 8. l(c) Reservoir \\'S Elevation


0

8.2

I
I

\'S Outtlow

Goodrich Method is used for routing. A time interval of L\t = 3 hours = 0.0108 f\.1s
is chosen for routing.

Titt.C

(b'>

0
3
6
9

12
15
18
21
24
27

I (ln'\/s) (11+1:)

10
20
52
60
53
43
32
22
16
10

30
72
112
113
96
75
5
36
26

(2Sl&t) Q

(lS/~I)+ Q

E"'''nlion

Q (Jn>/s)

1231.1
1188.3
1183.8
1204.1
1215.3
1212.2
1199.6
1173.8
1147.4

1358.824
1267.1
1260.3
1295.6
1317.1
1311.3
1287.2
1253.6
1211.a
1173.4

301.50
301.19
301.17
301.29
301.36
301.3 ..
301.26
301.20
301.04

60..84
39.41
36.25
45.86

300.90

25.08

50.92
.. 9.53
43..81
39.91
32.17

ftcopyrlghted Ma1er1a1'" "ACd~ional resource mate1ial supplied with the boOk El'lgineemo
Hyd101C>lly, Thin:I EcMiOl'l w1ltten by Or. K. Subramanya & published by McGrav1-Hill Edvc-.a1t0n
(India) Pvt lid. This resource material is lot lns1ruc1or's use onty."

Solution

Manual lo Engineering

Hydrology,

Third Edition by Dr. K. Subramanya

"'

....
..-

lnflO\\'

.s~

.......

'II

. . .y

!!'

~ 30

...

15
20

"
0

'

rme "
(.'Houts)

"

Fig. J8.2(a) lnflo"' & Ourncw Hydrographs


301.6
.... 301.S
!. 301.4
301.3

-'\
'\.

~ 301.i
~ 301.1

" "'

~ 301.0
300.9
300.8

"

"

Tlmo (hours)

Fig. 1.s.2 (b) Variation of Reservoir \\1.S. Elevation with 'rime


8.3

is used for routing. A time interval of .1.t = 6 hours = 0.0216 t\.1s


is chosen for routing.
Q = JSH''~ m-'/s
Goodrich ~fchod

ftcopyrlghted Ma1er1a1'" "ACd~ional resource mate1ial supplied wi1h the boOk El'lgineemo
Hyd101C>lly, Thin:I EcMiOl'l w1ltten by Or. K. Subramanya & published by McGrav1-Hill Edvc-.a1t0n
(India) Pvt lid. This resource material is lot lns1ruc1or's use onty."

Solution

Manual lo Engineering

Elev. (m}

;5.00
58.00
60.00
61.00
62.00
63.00

S (Mm')

Hydrology, Third Edition by Dr. K. Subramanya

Q (nl'l/s} (2S +Q)


Ill

0.25
0.65
J.00
1.25
1.50
1.$1)

42.4

23.1
60.2
92.6
130.7
181.3

78.0

244.7

0
0
0
15.0

1'a ble I -83..


TittM-

(b)

0
6
12
18
2<

30
36
42

I (roJ/s)

5
20

O
60
50
32
15
10

(I,+ ll)

25
60
100
110
82
47
25

(?.l\fAt}

60.2
85.2
l 01.1
95.3
94.9
97.1
101.2

(2.SIAt)+ Q

60.2
85.2
1-tS.2
201.1
20S.3
176.9
144.1
126.2

Elt,:11lon

(nl)

(rn'ts)

58.00
59.54
61.29
62.32
62.38
61.92
61.27
60.98

o.oo
0.00
22.03
52.94
55.19
39.89
21,48
14.45

ftcopyrlghted Ma1er1a1 .. "'ACd~ional resource mate1ial supplied wi1h the boOk El'lgineemo
Hyd101C>lly, Thin:I EcMiOl'l w1ltten by Or. K. Subramanya & published by McGrav1-Hill Edvc-.a1t0n
(India) Pvt lid. This resource materialis lot lns1ruc1or'suse onty."

Solution

Manual lo Engineering

..

Hydrology, Third Edition by Dr. K. Subramanya

...

50

...

(2Sf,U).-Q

..

250

300

;;;:::

.,

62

60

/
.. I
..
57

e
59 ~

~!I!

~Elevtuioo vs Disdiarg!!

57

--Elev:ition vs (2Sf1\l)O

SS

Fig. p8.3(a)

'

SS

30

40
Oil1eh~r9e 0 (mtls)

5~

..

70

Basic plots for routing by Goodrich Method

ftcopyrlghted Ma1er1a1'" "ACd~ional resource material supplied wi1h the boOk El'lgineemo
HV(ir'OIO'l!Y. Thin:I EcMiOl'l w1ltten by Or. K. Subramanya & published by McGrav1-Hill Edvc-.a1t0n
(India) Pvt lid. This resource material is lot lns1ruc1or's use onty:

Solution

Manual lo Engineering

Hydrology,

Third Edition by Dr. K. Subramanya

,.

/~-~- '\. ..

,.

.. ti .. OlllHOw

-+-Inflow

~',

"

JO
Tlm.(Hours)

"

Fig. P~ 8.3(b) LnOo,, & Oulflo'v Elydrographs


6l.O
&2.5
02.0
..... 61.5
$1,0

,. /

.....,

-~ 00.5
t; 6().0

>

!! $9,5
w
59.0
58.5
5".0
$7,5

/
/

10

20

30

40

so

Time (hours)

Fig. PS.3(c)

vartatleu or \V .S. Elevation in the Rcscevotr-, Problem 8.3

Peak outnow = 55.20 11,-'/s


Attenuation = 4.80 111J/s
Etevauon of reservoir \\1.S. al peak outflow= 62.38 111
ftcopyrlghted Ma1er1a1'" "ACd~ional resource mate1ial supplied wi1h the boOk El'lgineemo
Hyd101C>lly, Thin:I EcMiOl'l w1ltten by Or. K. Subramanya & published by McGrav1-Hill Edvc-.a1t0n
(India) Pvt lid. This resource material is lot lns1ruc1or's use onty:

Solution Manual lo Engineering

Hydrology, Third Edition by Dr. K. Subramanya

8.4

101.00 tO 100.50

Change of \V.S. elevation:

111

= 100,000 m;;
Average discharge= ( 1$ + 25)/2 = 21.5 m;./s
I = 10.0 1n'ls constant.
Lil= LIS /(Average Q- Average J) = I 000001(21.5- 10.0)
= $696 $C'C()l1dS= 2 h 25 min

L\$

8.S

= 2 hours = 7200 s.
2SI41 (72000 +36000 y )n200
L\t

Q = io.
(2Sl4t) + Q=

Tim(l
(b)

0
2
4
6
8
10
12
14
16
18
20
22
24
26

I
(1n'ts)

0
10
2Q

30
27
24
21

18
15
12
9

6
3
0

10+ !Sy

(11 + I:)

10
30
50
57
51
45
39
33
27
21
15
9
3

= 10 + 5 y;

(2..-1\/AU Q

10.00

6.67
1 . 11
3.70
4.43
2.19
0.94
0.65
2. 12

3.63
5.12
6.63
8.12

(?S/At)+

10
20.00
36.67
51.11
53.30
46.57
42.81
38.06
33.65
29.12
24.63
20.12
15.63
11.12

)' (lu)

0
0.67
1.78
2.74
2.89
2.44
2.19
1.67
1.58
1.27
0.98
0.67
0.38
0.07

..

200
200.67
201.78
202.74
202.89
202.44
202.19
201.87
201.58
201.27
200.98
200.67
200.38
200.07

0
6.67
17.78
27.41
28.86
24.3$
21.87
18.71
15.76
12.75
9.75
6.75
3.75
0.75

Ek,nti

(ln'ls)

ftcopytlghted Ma1et1a1'" "ACd~iona1 resource mate1ial s1.1pplied with the boOk El'lgineemo
Hydl'OIO'l!Y. Thin:I EdifiOl'l w1lt1en by Or. K. $1.1bramanya & p1.1blished by McGr'3.w-Hlll Ecvc-.a1t0n
{India) Pv1. L1d. This resource material Is lot lns1ruc1o(s use onty:

Solution

..

...!.
;

Manual lo Engineering

"
"

Third Edition by Dr. K. Subramanya

...

as

~~

:io

'

'

c
c

Hydrology,

rs

"
i5

'

s
0

..

Fig.

p8.5(a)

203.5
203.0
g 202.5
-~2020 .
- 201.5
w
(/) 201.0 .
3' 200.5 I/'
200.0
199.5

'

'

"
Time (Hours)

Variation

of

''

Innow

and

Ourncw

30

with

Time

....
/
~

II

--

-.....

"

10

15

20

25

30

Time (hours)

Fig. P-8.S(b) Variilti1n of Reservoir \'7.S. Elevation with Ti111e

Sh

For storasc
~

routino
l:'

S. -S =(I, + '~)

I
2

/jJ -

(Q, +Q~)
2

ftcopytlghted Maletlal'" "ACd~ional resource mate1ial supplied with the boOk El'lgineemo
Hydl'OIO'l!Y. Thin:I EdifiOl'l w1lt1en by Or. K. Subramanya & published by McGr'3.w-Hlll Ecvc-.a1t0n
{India) Pv1.L1d. This resource material Is lot lns1ruc1o(s use onty:

Solution Manual lo Engineering Hydrology, Third Edition by Dr. K. Subramanya

.
(l,+i.)
SinceS = KQand
=I,

= t, tit - CQ, ;Q,l

S1- S, = K Qi-KQ,
KQi+ Q!iJt/2

= i,LJ1-Q,t11!2+KQ1

Q2(K + 41/2) =

i, tit+

/jf

Q2=

Q,(K -41/2)

(K-l")

- Q1 =C1i,+C2Q,

11+

(K+6t)

(K+6t)

\\'here c. =

61

tl1
(K + 6t)

= _2~ru
__
(2K +61)

2
_ ( K - !JJ 12) _(~2~K_-_ll1-'-)
C... -""'."":

(K + ll1)
(2K + 61)

2
In the present problem C, =

Q,:0.4

C.

= (2x4-2)

(2x4+2)

I,

(h)

(111J/~)

0
2

'6

0
20
60
100

BO

10
12

60
40
30
20
10
0

"

-0.6

t, +0.6Q,

'ttme

16
18
20
22
2
26
28

2x?
= 0.4
(2x4+2)

t,

(l1+l1\f2 0.4
0
10
4
<O
16
32
60
90
36
70
28
50
20
35
25
10
15
6
5
2
0
0
0
0
0
0
0
0

"

I,

0.6Q,
0.00
2.40
11.04
25.82
37.09
39.06
35.43
29.66
23.80
17.88
11.93
7.16
4.29
2.58

~f'/s)
0.00
4.00
18.40
43.04
61.82
65.09
59.06
49.43
39.66
29.80
19.88
11.93
7 .16
4.29
2.58

ftcopytlghted Ma1et1a1'" "ACd~iona1 resource mate1ial s1.1pplied with the boOk El'lgineemo
Hydl'OIO'l!Y. Thin:I EdifiOl'l w1lt1en by Or. K. Subramanya & published by McGr'3_w-Hlll Ecvc-.a1t0n
{India) Pv1.L1d. This resource material Is lot lns1ruc1o(s use onty:

Solution

Manual lo Engineering

Hydrology, Third Edition by Dr. K. Subramanya

1''ig. p-8.6 Inflow and Outncw Hydrographs


8.7

4)t

= 6 hours

As a first trial x = 0.2 is selected and values of [x I + (lX) Q) are calculated and
ploued againsl values of S in Fig. P-8.7. As a looped curve is obtained other lrials have (O
be made, Aflel' trial and error a value of x = 0.3 is taken as final value as it gives a nearly
Slraight line. 'The best fining Slraigt1l line is Y: 0.0992 X + 17.194 \Vilh R? = 0.9947. Tile
inverse slope= K = 10.08. say JO hours.

Tin1e

'h\

f1n.'!/s)

'n1;/s\

n-

0
6
12
18
24
3()

20
80
210
240
215
170

20
20

0
60
160
90
15
-40

50
150
200
210

0)

'1

t.\S IC.I.~
A,1:1:tgt 6
I

3()
110
125

0
180
840
1590

ii. n\

52.5
12.5

l1n)/s.h\
0
180
660
750
315
75

=
!l\S x = 0.2
20
32
82
168
1905 203
183() 202

x =0.3
20
38
98
177
204.5
196

ftcopytlghted Maletlal'" "ACd~ional resource mate1ial supplied with the boOk El'lgineemo
Hydl'OIO'l!Y. Thin:I EcMiOl'l w1lt1en by Or. K. Subramanya & published by McGr'3_w-Hlll Ecvc-.a1t0n
{India) Pv1.L1d. This resource material Is lot lns1ruc1o(s use onty:

Solution

Manual lo Engineering

130
90
60
40
28
16

36
42
48
54

60
66

185
155
120

85
55
23

Hydrology,

55
65
60
5
27
.7

Third Edition by Dr. K. Subramanya

47.5

60
62.5
52.5
-36
17

.265
-360

1545

.375

810
495
279
177

-315
216
102

1185

174
142
108
76
49.6
21.6

166.5
135.5
102
71.5

46.9
2<).9

250

x=.3

2<)0

~ISO

~
~

~ 100
.?!.
50
0
0

500

1000

1500

2000

2500

Storage S (m11s.h)

Fig. 1'-8.7

8.S

Determination of Kand x ror the channel reach

K = 22 h and x = 0.25 Take i.\t = 12 hours.

C = (-22><0.25)+(0.5xl2)

=0.0222

22-(22x0.25)+(0.Sxl2)
C, = (22x0.25)+(0.5xl2)
=O.Sl II
22-(22x0.25)+(0.S xl2)
C1= 1.o-co.0222 +0.5111) =0.4667
Routing equation is Q'l = C"o/2 + C'1 t, +

Cz Q1

ftcopytlghted Maletial'" "ACd~ional resource mate1ial supplied with the boOk El'lgineemo
Hydl'OIO'l!Y. Thin:I EdifiOl'l w1lt1en by Or. K. Subramanya & published by McGr'3_w-Hlll Ecvc-.a1t0n
{India) Pv1.L1d. This resource material Is lot lns1ruc1o(s use onty:

Solution Manual lo Engineering

seo

Hydrology, Third Edition by Dr. K. Subramanya

Lag :21 h

250

_,..
-

~E
e rso

.... 1
a

'

i5 100
a

,.
0
0

Fi~. p. 8.8

40

Tim (hour$)

''

Inflow and Outflo,v hydrographs

rao

...

..

or the reach

From Fig, pS.S. Peak Jag= 21 hand auenuaucn = 35 n1J/s

8.9

K=l.6days=38.4ha11dx=0.2S

c, =

Take at e e hours.

(-38.4x0.2S)+(O.Sx6)
=-0.253
38.4-(3S.4x0.2S) +(0.5x6)
C, = (38.4x0.28)+(0.5x6)
=0.449
384 -(38.4x0.28) +(0.5 x6)
C1= 1.0- ( .0.253 + 0.449) = 0.804
Routing equation is Q2 =Cst:+ C1 I,+ Ci Qi

ftcopytlghted Ma1et1a1'" "ACd~iona1 resource mate1ial s1.1pplied with the boOk El'lgineemo
Hydl'OIO'l!Y. Thin:I EdifiOl'l w1lt1en by Or. K. $1.1bramanya & p1,1blished by McGr'3_w-Hlll Ecvc-.a11on
{India) Pv1.L1d. This resource material Is lot lns1ruc1o(s use onty:

Solution

Manual lo Engineering

Hydrology, Third Edition by Dr. K. Subramanya

Table p-8.9:

S. 10

Time
(h)

(m'/s)

0
6
12
18
2
30

35.o
55.0
92.0
130.0
160.0
140.0

0.25J 1,

0.449 '

0.804 Q,

Q (m'ts)

13.92
23.28
32.89
40.-48
3.S.42

15.72
24.70
41.31
58.37
71.84

28.14
24.07
20.49
2325
33.07

35
29.94
25.49
28.91
41.14
69.49

K =8.0 hand x = 0.2.~ Take at= 4 bcurs.


C, = (-8.0x0.25)+(0.5x4)
=O

8.0-(8.0x0.25)+(0.5 x4)
C, = (8.0x0.2S)+(0.5x4)
=O.S
8.0-(8.0x0.25) +(0.Sx4)
C,= 1.0-(0+0_5)=0.5
Routing, equation is Q.: = Co/2 + C111 + C2 Q1=0.5 f 1 + 0.5 Q1

Tin1c

(h)

(1n'ts)

8.0
16.0
30.0
30.0
25.0
20.0
15.0
10.0

6
12
16
20
24
26

8.11

0.5 1,
4.00
8.00
15.00
15.00
12.50
10.00
7.50

0.5 Q,
I .OO
4.00
8.00
10.50
12.75
12.63
11.31

Q
(111J/s}

8.00
8.00
12.00
21.00
25.50
25.25
22.63
18.81

K = 10.0 hand x = 0. 'fake at= 3 bcurs.


C, =

(O.SxJ)
10.0+(0.5x3)

=0.1304

C, =

(0.5x3)
=0.1304
IO.O+(O.Sx3)
Ci= t.0-(0.1304+01304)=0.7392
Routing equation is Qi= Col2 + C1 /1 + C2 Q1 = 0.1304 (11+ Ii)+ 0. 7392 Q,
ftcopytlghted Maletlal'" "'ACd~ional resource mate1ial supplied with the boOk El'lgineemo
Hydl'OIO'l!Y. Thin:I EdifiOl'l w1lt1en by Or. K. Subramanya & published by McGr'3_w-Hlll Ecvc-.a1t0n

{India) Pv1.L1d. This resource material Is lot lns1ruc1o(s use onty:

Solution

Manual lo Engineering

Hydrology, Third Edition by Dr. K. Subramanya

1'able n..~8.I I
Time

8.12

(h)

I
(m3/s)

0
3
6
9
12
15
18
21
24
27
30

10.0
40.0
70.0
62.5
55.0
47.5
40.0
32.S
25.0
17.5
10.0

(I,+!,)

50.0
t 10.0
132.5
117 ,5
102.5
87.5
72.5
57.5
42.5
27.S

0.1304 x
0.7392 Qi
(Col. 3)
0.00
6.52
14.34
17.28
15.32
13.37
11.41
9.45
7.50
5.5~
3.59

Q
(m'ls)
10
I 13.91
24.63
I 35. .a
41.55

7.39
10.28
18.20
26.23
30.71
32.58
32.52
31.03
28.48
25.15

144.06
43.99
I 41.97
38.53
I 34.02
128.73

K =9.5 hand r.. = 70 h. Take 6t.:.= I hours.


C =

'

(0.5xl) =0.05
9.5+(0.5<1)

C, = 9.S-0.5

=0.90

. 9.5+0.5=
Routing equation is Q~ = 2 c, /1 +Ci Q1 = 0. 10 11 + 0.90 Q1 <ordinate of IUH
Al 1=0,Qo=O

=2.78A/l.0=2.78A,

/0

m'ls

Catculancn of IUH and I -h UH arc shown in Table pS.12.

Table p-8.12
Tin)(:
(hi

0
1
2
3

,\#(krnJ)

I (n1.l/s)

01 1,

(t.9 o,

Ord.

11r

IUll
(1n1ts)

o.oo

o.oo

o.oo

o.oo

o.oo

Ord.
ICol.6
C<1L7)

o.oo o.oo

or

IJI I.
(Cut& 12)
n1'1s

o.eo

1.39
2.78
0.00
2.78
0.00 2.78
10.56 2.50
13.07
15.85
7.92
2.78
5.56
11.76
17.3:2
13.07 30.39
15.19
12.51
15.59 28.10
17.32 -45.-42
22.71
31.14
5
8.90
25.29 34.18
28.10 62.28
2.78
'30.77 33.55
34.18 07.73
33.86
6
7
0.56
30.19 30.75
33.55 $4..29
32.15
27.67 27.67
30.75 58.-42
29.21
8
24.90 24.90
27.67 52.58
26.29
9
ftcopytlghted Ma1et1a1'" "ACd~iona1 resource mate1ial s1.1pplied with the boOk El'lgineemo
Hydl'OIO'l!Y. Thild EcMiOl'l w1lt1en by Or. K. $1.1bramal'lya & p1.1blished by MCGr'3_w-Hlll ECvc-.a1t0n
{India) Pv1.L1d. This resource material Is lot lns1ruc1o(s use onty:

'

10.00
38.00
20.00
45.00
32.00
10.00
2.00

27.80
105.64
55.60
125.10
88.96
27.60
5.56

Col.6
""ilh
I 11
lag

Solution

Manual lo Engineering

Hydrology, Third Edition by Dr. K. Subramanya

10

22.41
20.17
18.16
16.34
14.71
13.24

11

12
13
14

15

S.13

K= 10.0h~ndx=O,

2'2.41

20.17
18.16
16.34
14.71
13.241

24.90
22.41
20.17
16.16
16.34
14.71

47.32
42.59
38.33
34.50

3t.05
27.94

23.U
21.29
19.16
17.25
15.52
13.97

61=3hours,andx=0.5

C = -K+ll.i = -I0+3 :0.5385


(I
K+tl1
10.0+3
c, =1.0
C1= Co= 0.538:>
Q, = 0.538:> (I,- Q,) +I,
I
(nfl/s)
10.00
40.00
70.00
62.50
55.00
47.50
40.00
32.50
25.00
17.50
10.00

Time
0
1
2
3
4

5
6
7

8
9
10

Peak Las=
8.14

0.5386 X(lzQ,)

Q 1n3/s

16.t6
23.61
-0.60
7.76
3.9
6.0
-4.86
-5.416
5.14
5.31

1 o.o
26.16
63.61
69.40
54.74
51.10
41.52
35.14
27.04
19.86
12.19

3 hours.

Auenuation

= 0.60 1nJ/s

,,,

tlS = 1-Q
For a linear reservoir S

= K Q. As such

,,,

KdQ =1-Q
dQ +aQ=a/
(II

\\'he.n J=l(l+p1

ftcopytlghted Maletial'" "ACd~ional resource mate1ial supplied with the boOk El'lgineemo
Hydl'OIO'l!Y. Thin:I EcMiOl"l w1lt1en by Or. K. Subramanya & published by McGr'3_w-Hlll Ecvc-.a1t0n
{India) Pv1. L1d. This resource material Is lot lns1ruc1o(s use onty:

Solution Manual lo Engineering

Q=[10+p1-p

Hydrology, Third Edition by Dr. K. Subramanya

+c,1

When l =O. Q = o. Hence C = p

Q=Pt+(P-1,)e_P

- I6

8.15
I (t/K)" I e ofK
r(11)K
Herc K = 6.0 and n = 4,0
rr ..) = 1'(4) = 3!=6.0
11(1)=

u(t) in cru/h e -1-(1/6)"-1 :" = 0.02778 (r /6)' e '''


6x6
Values of u(c) in cnllh for various values of 1 in hours is shown ot 3 hours interval
in Table pS.15. f\1u11iplying 11(1) in cmlh by ( 27Sx area of the catchment) = 2.78 x 500 =
1390 the value of 14(1) in 1113/s is obtained.

8. 16

in U(I) in Time
IU3/s
(h)

TinlC
(h)

11(1>
cm/h

0
3
6
9
12
15
18
21
24
27
30

0
0.002106
0.01022
0.02092
0.030077
0.03563
0.037343
0.035967
0.032564
0.026122
0.023-398

11(1)

1
r(11)K

0.00

33
36

2.9G
14.21
29.08
41.81
49.53
51.91
49.99
4S.20
39.09
32.52

39
42
45
46
51
54
57
60
63

11(1)

crnzh

in 11(1) in
m~/s

0.018889
0.014874
0.01147
0.008689
0.006482
o.004n1
0.003471
0.002~99
0.001783
0.001261
0.000886

26.26
20.67
1S.94
12.08
9.01
6.63
4.83
3.47
2.48
1.75
1.23

(1 / K)"-1 e'K

du
AlpeakOO\v-=
dt

r(11)K"

(t"

I
nc1"(11-l))=O

e ' IK (--)+e'
K

ftcopytlghted Ma1et1a1'" "ACd~iona1 resource mate1ial s1.1pplied with the boOk El'lgineemo
Hydl'OIO'l!Y. Thin:I EcMiOl"l w1lt1en by Or. K. $1.1bramanya & p1.1blished by MCGr'3_w-Hlll ECvc-.a1t0n
{India) Pv1.L1d. This resource material Is lot lns1ruc1o(s use onty:

Solution

Manual lo Engineering

---

r(11)K"

Hydrology, Third Edition by Dr. K. Subramanya

l I _, e_,,,( -- I ) +e -IK t -(
u- l)J = 0
K

Al peak J/K =(rt I) or Ip= K(nI)

(I(' I K)""' -o

111=
( )

f'{rt)K

"

(u-1)""1 t'-1..-u

r(u)K

S.17

B)' Nash model

==

11(r)

_ 1

{n-1)""1

t'1 .....

r(11)K

(s /

K)~- t-11"

r(11)K

Hert' K = 1.69 hand 11 = 3.3. Area of Catchment= 250 km"?


f(11) = r(J.3) = 2.3x l .3x r(l .3)

(from Tobie 8.6(Tcxi))

ro .3> = o.897471
r(3.3J = 2.6834
11(1> in cn1/h =

(s/l.69):J t!_,,.~

2.6834 x 1.69
= 0.220Sx(1 /I .69)'!J e11-"'

11(1) in ml/s = (11(1) in cmlh]

x 2.78 x 2.SO = 69S x tr(I) in <.-111/h

values of u(t) art calculated for various t values. Values of u(t) in m~/s are lagged
by I-hour and ordinates of l-h UI I are shown col. 5 of Table p-8.17.

Ta bl e n, 8.17 - C.I cu Ianon


' or I - II Ull b v N nsh M d cI
Time
(h)

u(l)
(cm/h)

u(l)
(m'ts)

0.000
0.036
0.099
0.140
0.150
0.139
0.) 17
0.092
0.069
0.050
0.035

0.000
25.367
69.130
97.207
104.250
96.381
81.120
63.992
46.143
34.930
24.630

2
3
4

5
6
7

6
9
10

U.H.

u(J)

l-bour

lagged by

(nfl/s)

I-hour

LCol.3 + Col.41/2

0.000
25.367
69.130
97.207
104.250
96.381
61,120
63.992
46.143
3'1.930

0.00
12.68
47.25
83.17
100.73
100.32
86.75
72.56
56.07
41.54
29.78

ftcopytlghted Ma1et1a1 .. "ACd~iona1 resource mate1ial s1.1pplied with the boOk El'lgineemo
Hydl'OIO'l!Y. Thin:I EcMiOl"l w1lt1en by Or. K. $1.1bramanya & p1.1blished by McGr'3_w-Hlll Edvc-.a1t0n
{India) Pv1.L1d. This resource material Is lot lns1ruc1o(s use onty:

Solution

Manual lo Engineering

0.024
0.017
0.011
0.007
0.005
0.003
0.002
0.001
0.001
0.000

11

12
13

,.
15
16
17
18
19
20

S.IS

Hydrology, Third Edition by Dr. K. Subramanya

16.970
11.472
7.631
5.008
3.24$
2.065
1.326
0.837
0.525
0.327

24.630
16.970
11.472
7.631
5.006
3.248
2.085
1.326
0.837
0.525

20.80
14.22
9.55
6.32
4.13
2.67
1.71
1.08
0.68
0.43

~ln= II.Oh
MQ1=2S.O
Mu=l70h
MQ1=730
11K=t-.1Q1-1'<111:25.0-11.0:14
~IQ! - f\11! = 11 (n+ I) K + 2 uK r-.tu
= (11Ki' + (nKJ K + 2 ~1K) Mu
Hence 730- 170 = (14)'+ (14) K + (2 xl4 x 11)

K = 4.0 '1.1\d II= 3.5


r(n) = r(J.5) = 2.5x I .3x

ru.5)

1'(1.5) = 0.886227
r(J.5) = 3.3233
11(1)

r(11)K

(1/K)""' e"'"'
1

(1/ K)?.~ e""' = 0.075226(1/4),,'e-'''


3.32J3x4
in m>ts = 2.78 x 100 x 11(1) in cm/h = 20.91(t/4)~.s :"

u(1> in cnVh =
11(1)

Tiow:

u(1)

(h)

rn~/s

0
2

o.ooo

6
8
10
12
14
16
18
20

8.19

2.2'12
7.692
12.857
16.008
16.962
16.228
14,471
12.255
9.978
7.876

in

Ti1ne
(h)

u(1)

22
24
2
28
30
32
34
36
36
40
2

.002
4.571
3.386
2.472
1.7$2
1.270
0.696
0.627
0.435
0.300
0.206

in

1n3/s

Calculation of 1\111 and Af1i

ftcopytlghted Ma1et1a1'" "ACd~iona1 resource mate1ial s1.1pplied with the boOk El'lgineemo
Hydl'OIO'l!Y. Thin:I EdifiOl'l w1lt1en by Or. K. $1.1bramanya & p1.1blished by McGr'3_w-Hlll Ecvc-.a1t0n
{India) Pv1.L1d. This resource material Is lo' lns1ruc1o(s use onty:

Solution Manual lo Engineering

Hydrology, Third Edition by Dr. K. Subramanya

Tbl
a C~'.819()a
Time{h)

'

0
6
12
18
24

Rain tall
Excess
(cm)

0
4,3
2.8
3.9
2.7

jntervet

t.u (h}

..I

Flrs1

mere. Moment

6
6
6
6

SUM

area

Olm

mcmem

0
25.8
16.8
23.4
16.2
82.2

0
3
9
15
21

0
77.4
151.2
351
340.2
919.s

Second
Momeni
(Pait aJ

Second
>.ioment

0
232.2
1360.8
5265
7144.2
14002.2

(Pan b)
0
77.4
50.4
70.2
48.6
2.tS.6

In Tobie p-8.19 (o)


Col 6 =first moment of the incremental area about the origin = (Col. 4 x xCol.SJ

Col. 7 =Col 4 x (Col. 5)'


Col.$= second moment of the incremental area about its own centroid=
Mu
Mu

= ( 1112) x (Col. 3)' x (Col. 2)


=(Som of Col. 6)/(Som of Col 4) = 919.8182.2 = 11.19
= ((Sum of Col. 7)+ (Sum of Col.S)Y(Sum of Col 4) = ( 14248.8 + 246.8)11\2.2
= 173.34

Calculation of l\1Q1 and l\.'IQ1

Time

O<d. ol
ORH

lncre.

Momeni

rm31s1

;n
bl
tm3/$1

fnervaJ

lhl

At

area

arm

0
6
12
18
24
30
36
42
48

0
20
140
368
380
280
160
75
30
10
0
0

10
80
254
374
330
220
117.5
52.5
20
5
0

6
6
6
6
6
6
6
6
8
8
8

0
60
480
I 524
2244
1980
1320
705
315
'20
30
0
8778

0
3
9
15
21
27

54
80
88
SUM

3
Average
OR rate

First
moment

63

0
180
4.320
22860
47124
53460
43560
27495
14175
6120
1710
0

3'13

221004

33
39
45
51
57

In Table p-8.19 (b)


= F'irSI moment of the incremental area of
(Col. 5 x Col.6]
Col. 8 e Col. 5 x (Col. 6)'
Col 7

Seoond
Moment

Seooncl
Momeni
(Part

{Part

''

0
540
38880
342900
989604
1443420
1437480
1072$05
637875
312120
97470
0
6372594

bl
0
180
1440
4572
6732
5940
3960
2115
945
360
90
0
26334

DRH about the origin=

ftcopytlgh1ed Ma1et1a1'" "ACd~iona1 resource mate1ial s1.1pplied with the boOk El'lgineemo
Hydl'OIO'l!Y. Thilcl EcMiOl"l w1lt1en by Or. K. Subramanya & published by MCGr'3_w-Hlll ECvc-.a1t0n
{India) Pv1. L1d. This resource material Is lot lns1ruc1o(s use onty:

Solution Manual lo Engineering

Hydrology, Third Edition by Dr. K. Subramanya

Col. 9 e Seccnd moment of the incremental area cf DRH about it$ own centroid=
= ( 1112) x (Col. 4)' x (Col. 3)
Moo= (Sum of Col. 7)/(Sum of Col. 5) = 22100418778 = 25.18
Mu= ((Sum of Col. SJ+ (Sum ofCol.9)Jl(Sum of Col. S)

= (6372594+

26334)18778 = 728.97

Determination or 11 and K
11K=MQi-Mn
=25.18-11.19=13.99
1'ilQ2 - f\lu = 11 (tr+ J) K~ + 2 uK ri.111
= (11K)!+ (nKJ K + 2 (nK) f\.tu
Hence 728.97 - 173.34 = ( 13.99)' + (13.99) K + (2x1399
K = 46.82113.99 = 3.35 and 11 = 13.9913.35 = 4.18

11.19)

ftcopytlghted Ma1et1a1'" "ACd~iona1 resource mate1ial s1.1pplied with the boOk El'lgineemo
Hydl'OIO'l!Y. Thin:I EdifiOl'l w1lt1en by Or. K. $1.1bramanya & p1.1blished by McGr'3_w-Hlll Ecvc-.a1t0n
{India) Pv1.L1d. This resource material Is lot lns1ruc1o(s use onty:

Solution Manual lo Engineering

Hydrology, Third Edition by Dr. K. Subramanya

CHAPTER9
9.1

\\'eigh1

of water drained by gravity = 105 - 97 = 8 N

votume of water drained= 819790 = 0.817 x 10} 1n3/s = O.S l 7 liters


Specific yield= (0.817/5) x 100 = 16.34%
votumeof pores= (105 - 93)19790 = l.22574x 10'3 nr>= 1.225'74 liters
votume of solids= 5.0 - 1.2257 = 3.7743 liters; Wt of solids= 93 N
Density of solids= 93/ (3.7743 x JO'')= 24642 Nim'

Relative density of solids= 2464219790 = 2.517


9.2

i=(45.0-39.5)12000=2.75x
10"'
(a)
Q = 2000 x 25 x 30 x 2.75 x 10 J = 4125 m'tday
(b)
h=45-(2.75x
IO''x300)=44.175m

9.3

Va= 421(6 x 60 x 60) = 1.9444 x 10' mis


\I= II. Va= 0.2 x I .9444 x JO.}= 3.889 x 10 ... n1/s;
i = 0.85 x 0.42 = 0.020238 ;
K= VI i =0.0192 mis= J.92cm/s

9.4

s = 1(11P+a)
t= 9. 81 x lo':~=

llEw

= 1/(2.2

xJO'J cm1/N = 4.5455 x 101 m1/N

a= l/E~

= 1/7800 cm?/N = 1.2821 x 104 m2/N


S = 9. Six 101 x(0.32 x 4.5455 x 1000 + 1.2821 x 104) x 30 = 3.816 x 10'3
-In. Jli(" + n. ~)

a.=

=-I

9.5

0.32x4.5455xl0'"
(1.2821l<I0~11)
+(0.32x4.5455x10~11)

Refer10 Fig.P9.5.

I =-00112

=-1.12

l', = \t sin8 = V sin 30<> = 0.5\'

v.=Vcos8 =Vcos30=0.866V
i =(157.00-156.50)

=-1-

800
1600
\~.=Ki= K/1600
K/1600 = 0.866 v
01' v = K/1847.5
Similarly i..:.. =Ki= 0.5 V=0.5 x (K/1847.5) = Kf3695
;, = 1/3695 = (-aH,)12000
<IH, = 2000/3685 = 0.541 = H., H,
H., = Elevation of water table at C = 157000 -0.541 = 1545.459 m

ftcopytlghted Ma1et1a1'" "ACd~iona1 resource mate1ial s1.1pplied with the boOk El'lgineemo
Hydl'OIO'l!Y. Thin:I EcMiOl"l w1lt1en by Or. K. Subramanya & published by MCGr'3_w-Hlll ECvc-.a1t0n
{India) Pv1. L1d. This resource material Is lot lns1ruc1o(s use onty:

Solution

Manual lo Engineering

Hydrology, Third Edition by Dr. K. Subramanya

NORTH

GJEL 158.00

FLOW

Al"'~~~-~.>...:B::_~~+EAST
GL: El.160.00
\VT: El. 157.00

f;g. P-9.5
9.6

GL: El. 159.00


WT: El. 156.00
Problem 9.5

Refer to Fig.P9.6. T = K~ B = '.K18,


Ke x 12 = (3.5 x 45) + (3.5 x20) + (5 x 30)
Ke= 377.5112 = 31.46 m/d:ty

12.0 m

J,5m

K.= 45

mis

35m

1<;,.._20

mid

I<> 30

m/dl

lm

Fig. p9.6 Problem 9.6

ftcopytlghted Ma1et1a1'" 'ACd~iona1 resource mate1ial s1.1pplied with the boOk El'lgineemo
Hydl'OIO'l!Y. Thild EdifiOl'l w1lt1en by Or. K. Subramanya & published by McGr'3_w-Hlll Ecvc-.a1t0n
{India) Pv1.L1d. This resource material Is lot lns1ruc1o(s use onty:
0

Solution

9. 7

Manual lo Engineering

Hydrology, Third Edition by Dr. K. Subramanya

Refer to Fig.f>-9.7. The flow is normal to the stratification. Hence,


K = !L, = (IOO+L+50)
'!(L,IK,)
(100+_!:_+50)
JO 0.1 50
K = 150+L
' IOL+ll
Q = O.S m31s = Vx ("'4) x ( 1.2)1
V = 0. 707 m/day = K,. i = K, x (20/( 120+l)(

1oom

K,
10 m/day

som

Sihy Sand

K3

0.1 m/day

I(,

SOm!dav

Fig. P9.7

Substituting for K,.,

1~)
20
( J50+
x(
) = 0.707
JOL+ll
JSO+L

l= 20-7.7$= J.7301
9.8

7.07
Referring to Pig. P-9.8. 111) = 30 + 15
11,= 10+ 15:25rn

= 45 m

Gross velocity V = K (h.. -h,) = 20x ( 45- 25) =0.267 rnzday


L
1500
Actual velocity of seepage= V., = Vin= 0.267/0.3 = 0.889 m/day
Time 10 travel t = (1500/0.889) = 1687 days= 4.6 years

ftcopytlghted Maletlal'" "'ACd~ional resource mate1ial supplied with the boOk El'lgineemo
Hydl'OIC>l!Y. Thild EcMiOl"l w1lt1en by Or. K. Subramanya & published by McGr'3_w-Hlll Edvc-.a11on
{India) Pv1. L1d. This resource material Is lot lns1ruc1o(s use onty:

Solution

Manual lo Engineering

--

.,

..

Hydrology, Third Edition by Dr. K. Subramanya

30 m

IMP

10 m

IN'
h,

15 m

Flow

K=20m/d

150() m

Fig. P9.8 Problem 9.8


9.9

Refer to Fig. P 9.9.


q e discharge per unit length of gallery
50

150

(J'-Ji')1

K ~

2l

x.2

xl(3.2) -(0.S) J = 3.2 m Is per meter len~lh

"'

h,

L
fig. P-9.9 Ptoblotn 9..9

9. 10

,J:h

2R

rt,,.; = -K

In the present case the impervious surface is ti units below the bouom or the drain.
tli(h+cl)
dx:

=-- 2R
K

R ' +C,.\'+C:
(It+<!) ' =--.r
K

when

x = 0, h =II()

c1 = (ho-+t/)1

ftcopytlghted Maletlal'" "ACd~ional resource mate1ial supplied with the boOk El'lgineemo
Hydl'OIO'l!Y. Thild EcMiOl"l w1lt1en by Or. K. Subramanya & published by McGr'3_w-Hlll Ecvc-.a1t0n
{India) Pv1. L1d. This resource material Is lot lns1ruc1o(s use onty:

Solution

Manual lo Engineering

\\'hen.-:= L; 11 = h(J
when .,. = in, Ji = h,,,

Hydrology, Third Edition by Dr. K. Subramanya

C1 = NUK

R l'

l'

(It +(/)2 = (11,, +ti):+-(---)

K 2

4K

t: = 111".: -h; + 2d(h.


9.J I

-h,)]

.ho= 5.0

Refer to Fig.P-9.11.

=- R

(I)

lt1 = 3.0 m, l = 400 m, K = 3 mldlt)'

01,

L.

K(l1t-111:)

+2

21~

3 (5' -3')

400

6
10011

100=--x
+fl 2x4()0
2
R = 6 x 10" n1J/day/n1J
R

=----i200h

I I I I

'

I\. .. 5J)m

,.

3.0m

L 4COm
Protilcm 9. 1 I

Fl9. P-9.1 I

(2)

RL'

lt~-1t--

R11

'K

Ji=----(
...
K

~
11,

=-6xl0

x(IOO)
3

Solving for 11,.,,

-r

]a+11

~
II

25_9_

(6xl0~)x(400)'
3
]xlOO+S'
400

h,,, = 5.196 m

, Rl:

l1r,-h;-(3)

q,=K[

2l

K_]

ftcopytlghted Ma1et1a1'" 'ACd~iona1 resource mate1ial s1.1pplied with the boOk El'lgineemo
Hydl'OIO'l!Y. Thild EdifiOl'l w1lt1en by Or. K. $1.1bramanya & p1.1blished by McGr'3.w-Hlll Ecvc-.a1t0n
{India) Pv1.L1d. This resource material Is lot lns1ruc1o(s use onty:
0

Solution Manual lo Engineering

25_9_

Hydrology, Third Edition by Dr. K. Subramanya

(6xlO~)x(400)'

q0:3x(~~~~~~~~'~~-J

2x400

= 0.06 mJ/day/n1'''idIii
(Negative sin indicates now in (,\')direction J
q1 = R L + q0 = ({) x I 04 x 400) -0.06 = 0.18 m.l/day/m width
9.12

"=12.0m,

111=9.0m.

l=400m.

K= 1.5mld:iy

R = 20 crwyenr = (20 x 0.01)1365 = 5.49 x 10" m'ldoylm'


K (/~; -h;)
t:
a=-+R
2L
2
4000 =
1.5
x <12' -9'> = 2000-(2737.2x0.007S75)
2
0.000548 2x4000
= 1978.4 m

Rl K (I' I 'J 5.48xl0~ x4()()1) l.5x(l2'-9')


q,, =-2+ 2L 'ii - 1' =
2
+ 2x4000

= 1.0842 rn3/dny/rn width


(Negative sin indicates flow in ( ~.r}direction)
q11 = RL + q.., = (5.48 x
9.13

to" x 4000/2) -

1.0842 = l.108 n1'/day/n1 width

Q = 2;,KB(fl, -fl,)
ln(1~/1j)
Here K = 45 mlday = 45/(24 x 60 x 60) = 5.208 x 10" mis
rr = R = 350 m: ,., r,. = 0.15 m: (h~ - lt1) = s., 4.0 m
_ 2;;x5.20SxlO-'x25x4 _004,2 ,1,_25321.1,_,,,
.
- . _ m .s - 1 ersrmtnute
QIn (35010.15)

9.14

Here K = 35 mlday = 35/(24 x 60 x 60) = 4.051 x 10" mis


rs= R =300 m; r1 = r,, =0.10 m: (h1-h1) =s.,= 3.0 m

Q = 2Jrx4.0S I xl0-4 xJO x 3 =0.0286 nt3/s = 1716 Lpm


In (30010. IO)
(a)

g,, = In (30010.10)

= 1.095

Q In (300/0.20)
% change in discharge = 9.5% Increase
ftcopytlghted Maletial'" "ACd~ional resource mate1ial supplied with the boOk El'lgineemo
Hydl'OIO'l!Y. Thild EdifiOl'l w1lt1en by Or. K. Subramanya & published by MCGr'3_w-Hlll ECvc-.a1t0n
{India) Pv1.L1d. This resource material Is lot lns1ruc1o(s use onty:

Solution

Manual lo Engineering

Hydrology, Third Edition by Dr. K. Subramanya

Q, =~ =2.0
Q 3

(b)

% change in discharge= 100% increase

Q,=175 =0.50
Q 35.0

(c)

% change in discharge
9.15

= 50%

decrease

=2;rl<8(h, -h,)
ln(r:/'i)

( 2000 )= 2~Kx35x(3.0-0.3)
1000 x60

In (120112)
K= 1.293:>( 1o'nt1s= 11.17111/day

9.16

V = ...!l_ =gross velocity


2;rr8

Seepage velocity =Vs= V/n = _Q_

2nr8n

<Ir 2,TrB'
tlt=--=-(b

v,

I,.
I
J: - 2:rr811
ti=Q
k

I=-

,18n(R'

_,

Q
9.17

')

'

K = 20/(60 x 60x 24) = 0.0002314 mis


hi= 30.0- 4.2

= 25.S m

tn = 30.0 - 5.0 = 25.0 m


_.<x0.0002314x(2S.S'-2S.0')_00426?27
- .
In (30115)

Q_

,1 __
.
m S - 2!'!!'! 61 lS

.
II!_,,?
If h,.. e Deptb of water table at the pumping well, then . :
11;-hl

lo(r./r)
1
"

In (1~/tj)

.-

(25.0)' - I,'. _ In (15.0/0.225) _


6 09
(25.S)' -(25.0)
ln(30.0/15.0) -.)
Solving hw =

19.46

Drawdewn at the pumping well =s.. , = (30.0 - 19.46) = J0.54 m

ftcopytlgh1ed Ma1et1a1 .. "ACd~iona1 resource mate1ial s1.1pplied with the boOk El'lgineemo
Hydl'OIO'l!Y. Thin:I EdifiOl'l w1lt1en by Or. K. $1.1bramanya & p1.1blished by McGr'3_w-Hlll Ecvc-.a1t0n
{India) Pv1.L1d. This resource material Is lot lns1ruc1o(s use onty:

Solution

9.18

Manual lo Engineering

Hydrology, Third Edition by Dr. K. Subramanya

Q=2100Lpm=0.035m'ls
ht= 25.0 - 4.0 = 21.0 m, rr = 90 rn,
h, = 25.0- 5.0 = 20.0 m, r1=30111
0.035 = 17x K x(21.0' - 20.0')
In (90130)
K = 2.9852 x 101 mfs = 25.8 nt!day
T= KB= 25.8 ><25 = 645 nr'tdny/rn width
If h... = deplh of water table at the pumping well, !hen

"'~! _,'~.!
Ii; -hj

ln(1j/r.,)

ln(r:lij)

(20.?)' -11,; ' = In (30.0/0.15) = 4.8227


(21.0)" -(20.0)" In (90.0/30.0)
Solving h., = 14.22 111
Drawdown a11he pumping well =s ... = (25.0- 14.22) = J0.78 in
9.19

K=0.01 cm/s=0.001

mis
Q= IOLps=0.01 m'ls
hz = "" r1=25 rn.
h1 = h... =10.0 m, r1=0.15 m
O.OI =xO.OOlx(ll~ -10.0')
ln (25/0.15)
Solving Ir,..= 10.784 111
(a)

h: -Ji:
In (1Blt;,)
lf hs =depth of water Table al Point 13. then ~ : = ~~~
Ir~ -h~.
In (1:,/1j)

-(10.0)'
_ ln(40.0/0.15) = J.09IS7
(10.784)' -(10.0)'
ln(25.0/0.15)

Solving hn= J0.853 111


(ii,)'

(b)

dJO e mcdinn size = 2.S nun= 0.0025 m


v = 10.(,
Reynolds number = R~ = (V d;cf v) =( 0.0025 x \1)/10''' =

At Point A: r = 25 111. and V = _Q_ =


2ttrh

O.OI
2)(,,.x.25x:10.784

2500 \1

= 5.903 x I0'61n/s

(R,),,= 2500 x 5.903 x 10~ = 0.0148

ftcopytlghted Maletlal'" "ACd~ional resource mate1ial supplied with the boOk El'lgineemo
Hydl'OIO'l!Y. Thild EcMiOl"l w1lt1en by Or. K. Subramal"lya & published by MCGr'3_w-Hlll ECvc-.a1t0n
{India) Pv1. L1d. This resource material Is lot lns1rue1o(s use onty:

Solution Manual lo Engineering

Hydrology, Third Edition by Dr. K. Subramanya

At Point 8: r 40 m. aod V

= _g_
=
O.OI
= 3.667 x 10'> rn/s
2/frll 2'X,f"X40'X(0,853

(H,),,= 2500 x 3.667 x 10~ = 0.00917

At Pumping "ell:

= 0.15 m. and \1 = _Q_ =

O.OI

'2x;;rx0.J5xl0.0
= t.061x10-lmfs
'2,1"11

(R,),= 2500 x 1.061 x 10' = 2.653

9.20

Q = 600 Lpm = 0.01

ru-'/s

45 Ill. rr= 500 m.


ft1 :: 45.3: 42 Ill. r,= 0.225
fl1:

..

(a)

IU

?!

0.01 =ml: x(45 -4- )


In (500/0.225)
Solving K = 9.3984 x 10~ = 8. 12 mzdny

Q = = K(9.3984x 10-')x( 45' -39') =0.0193 on'ts = 1159 L m


In (500/0.225)
(a)

Q. = Q" = In (500/0.225) = 0.95


Q,,

0.01
In (500/0.15)
QJu=0.95x0.0I =9.5x 1oln1l/s=570Lpn1
9.21

9.22

0.005 = xK x(l 2.5' -12')


ln (30/15)
K=9.0x IO~mls=7.78m/day
K = 0.01 emfs= 0.0001 mis
/t1: 30 Ill. l'J: 20() m.
lt1=30 12= IS1n.r1=0.2251n
:

(a)

Q = '7xO.OOO1 x(30 - I$ ) = 0.02665 m'ls = 2.W.1 m'lda


In (200/0.225)

9.23

ftcopytlghted Ma1et1a1'" "ACd~iona1 resource mate1ial s1.1pplied with the boOk El'lgineemo
Hydl'OIO'l!Y. Thin:I EdifiOl'l w1lt1en by Or. K. $1.1bramanya & p1.1blished by McGr'3_w-Hlll Ecvc-.a1t0n
{India) Pv1.L1d. This resource material Is lot lns1ruc1o(s use onty:

Solution Manual lo Engineering

S .1nce R = CQ.
?

Q = "K(/1;-1~)
In (CQlr .)
CQ.

.Qi_= (50 - 47 ) x
Q1

In( CQ,)
0.15

Hydrology, Third Edition by Dr. K. Subramanya

In(-)
Q. I 5
= 0.01/0.03= 113
(501 -38.31)

Putting Q1 = 0.0 I n1J/sand Q1 = 0.03 m)/s.

x ln(0.2C) = 0.333
h1(0.0667C)
On solving In c = 8.6988 nnd C = 5995
97 x3

8S.3x 11.7

for n drawdown of 6.0 m at the well,

Q, (501 -441) ln(5995x0.0l/0.15)


Mi= (50' - 471) x-1n""(-59-9-5x-Q-,-,0-.-,
5..-)
IOOQo= (94x6)x
5.9906 = 11.611
97x3
In 3996.7Q1, In 3996.7Q,,
Solving by trial and error method. Q6 = 0.0252 m)/s = 1512 Lpm
9.24

Since R = CQ.

Q = nK(li~-h{)

ln(CQ,lr,)

0.025= xK(451-401) = xK(451-431)


In (Cx0.025/10) In (Cx0.025/30)
I
(451-401) n 1o.025C)
30
0025Cx
,
'=I
In( . - ) (45- -43)
10
(85x5)x lnC-7.09 _ 1
8Sx2 lnC-5.9915
On solving In C = 7 .8662 and C = 2608
(3)

(451 -h)
ln(2608x0.025/10)
1
(451 -431) x ln(260Sx0.025/0.225) =

ftcopytlghted Ma1et1a1'" "ACd~iona1 resource mate1ial s1.1pplied with the boOk El'lgineemo
Hydl'OIO'l!Y. Thin:I EdifiOl'l w1lt1en by Or. K. $1.1bramanya & p1.1blished by McGr'3_w-Hlll Ecvc-.a1t0n
{India) Pv1.L1d. This resource material Is lot lns1ruc1o(s use onty:

Solution Manual lo Engineering

Hydrology, Third Edition by Dr. K. Subramanya

(-4-5-'
--~I!~)
x 1.8749 = I
45' -43' 5.6691
Solving: h11 = 27.20 and drnwdown !11 the pumping well = 45.0-27.20 = 17.80 m.
O.OZ5 =

(b)

,7K(45' -40')

In (2608 x0.025110)
K = 3.5106 x 10-5 nu's= 3.033 m/day
T =KB= 3.033 x 45 = 136.5 m1/day

Q = 2000 Lpm = 0.033 m'ls

(c)

0.033 = ,7x3.5106 xio- x(45' -11;)


In (2608 x0.033/0.225)
It.,= )5.67 and drawdownat the pumping well
R=2608Q

(d)

when Q1 = 1500 Jpm = 0.025 1u'ts.


When Qi= 2000 lpm

9.25

= 0.033 m'ls,

45.0- 15.67 = 29.33 m.

R 1 = 65.2 111

R1 = 86.1 m

A= ft x(4.S)' = 15.904m1
4

K,=30.012.0= 15m'ls
(i)
(ii)

K~ = 15,0 =0.943h'I
A
15.904

4xs.o ' =19.63 m,'

Di =5.0 m
Q= [ ~

1\1= ft

Hi=2.5nt

xA,]xH,

Q = 0.943 x 19.43 x 2.5 = ~.3 m'fh


9.26

Ko =~In
A
H1=

r,

Hi
H:

117.0- 115.70 = 1.30 rn


114.60=2.401n

H1= 117.0-

A1=are.1ofv.cll=:

x3.0l =7.0686 m2

ftcopytlghted Ma1et1a1'" "ACd~iona1 resource mate1ial s1.1pplied with the boOk El'lgineemo
Hydl'OIO'l!Y. Thild EdifiOl'l w1lt1en by Or. K. $1.1bramanya & p1.1blished by McGr'3_w-Hlll Ecvc-.a1t0n
{India) Pv1. L1d. This resource material Is lot lns1ruc1o(s use onty:

Solution Manual lo Engineering

Hydrology, Third Edition by Dr. K. Subramanya

240 030661 1
I I n-:,
I
2.0 1.30
K= 0.3066 x 7.068 = 2.167 m1/h
K,
-=1\

9.27

A=

.O.x(4.0)' = 12.566 m'


4

Ko=_!_ In

f/1

A
Tr Hi
He.f't'T,.:80min= l.333h.
Ku
A

= -1-111
1.333

25

0.70

J./1=2.51n

andHz=2.5-

l.S=0.70m

= 0.9547 b.1

K = 0.462 x 0.9547 = 12.0 m'lh


Q = K~H= 12.0 x 3.0 = 36.0 m'n1

9.28

The drawdown is plcued against time on a semi-fog paper. Fig. P-9.28


Frorn Ibis Figure: \\'hens= 0.

1=10=

3.0 ruin = I SO s.

~ron1 ,,i;q. 9 .58 (.1.ext ) : ~1. = 2.2SxTt,


~
r:
From Bq, 9.57 (Text): (6.9 - 2.4) = O.OJ ln(IO)
41(/.

T= 1.22 x 10" m~/s

s = 2.25x

= 105 1111/day

1.22 x ~o' x ISO = 1_976 x 10 ...


(50)'

ftcopytlghted Ma1et1a1'" "ACd~iona1 resource mate1ial s1.1pplied with the boOk El'lgineemo
Hydl'OIO'l!Y. Thin:I EcMiOl"l w1lt1en by Or. K. $1.1bramanya & p1.1blished by McGr'3.w-Hlll Ecvc-.a1t0n
{India) Pv1. L1d. This resource material Is lot lns1ruc1o(s use onty:

Solution Manual lo Engineering

Hydrology, Third Edition by Dr. K. Subramanya

Drawdown Time Plol

Fig. P 9.28

Time inc:ie SM11t(mln)

.O

0.0

o.
.O

10.0

'

'

100.0

'

'

r.s

' I

'

2.0
...... 2.!I

!.

'I

3.0
3.5

'

I
I

~ 4,0
4.5
0

I '
I I

' ' '


' ' I
' ' '
'' 'I ''
' ' ;

5.0

s.s
e.o
6.5
7.0

''

<,
I

"-

I I

<,

I ' '

.....

' I I :

'

'

'
'

......

'I ''

' '

' I I '

Hg. J'-9.28 Drawdcwn - Time plot - problem 9.29

9.29

r=

IOOm, 11=4 h=~I x3600= 144,000s..

.f1=

I.Sin

11= 16 h = 57600!. si= 2.0m .. fo=O m

s1-s1=4

I,

If

t1

.,.In(...:..)

and S:-st> =

4,.rln(:l.)

10

s, -s, 0.50 ln(l614)

--=--=
S: -$11

2.00

ln(~)=5.545

'

T=

ln(l6/r11)

l6/1=2.56and1p=0.0625h=22Ss

Sr' = (0.0003)x(IOO)' =5.925xl0''


2.2St0
2.2Sx225
.

Q
16
s; -.f1 =-0.5= -In(-)

4~T 4
Q = 4 x0.5 = 4.532

ln4

ftcopytlghted Ma1et1a1'" "ACd~iona1 resource mate1ial s1.1pplied with the boOk El'lgineemo
Hydl'OIO'l!Y, Thin:I EdifiOl'l w1lt1en by Or. K. $1.1bramanya & p1.1blished by McGr'3.w-Hlll Ecvc-.a1t0n
{India) Pv1.L1d. This resource material Is lot lns1ruc1o(s use onty:

Solution Manual lo Engineering Hydrology, Third Edition by Dr. K. Subramanya

Q = 4.532 x 5.925 x 10' = 0.0268 m3/s = 26.8 lps = 16JJ lpm

9.30

Q = 2000 lpm = 0.0333 m'is

s = 0.005

r = 480 m2/d:ty = 0.005555 111'/s

r=3.0m

(i)

t1=1h=3600s

..

,, s -- (3.0)' x 0.005 -- 5 625


,-- 4'ft,
4x0.005555x3600
ll'(u1) = 0.5772 - ln(S.625 XlO,)
.JL = 0.03333 = 0.4774
4/f/. 4 x /{ )( 0.05555

10

= 6.9059

Drawdown s1 =

"'("1) = 0.4774 x 6.9059 = 3.2969 m


4~1
=say 3.3 m

r=3.0m

(ii)

t1=8h=2S800s

_ ,'S _-

(3.0)' x0.005
_7
,.J
01,... )X 10.,
4Tt, 4x0.005555x28800
\V(u1) = 0.5772 - h1(7.03125 xlO") = 8.98536
.JL =
0.03333
= 0.4774
4n- T 4 x.n- x 0.005555
ll1-

Drawdcwn ss= _Q_\\'(11:) = 0.4774 x S.93536 = 4.2896


4;rT

: say 4,3 Ill


9.31

Q = 60 m3/11=0.01667 m'is
S = 0.0004
T = 15 m2/li = 0.0041667 m2/s
r= IOOm

,'s

"=
1

4Tt1

\V(u1) =

t1=Sh=28800s

(IOO)'x0.0004

=S.333xlO''

4x0.004)67 x28800

.JL=

0.5772 - ln(S.333 JO')= 4.2103


0.016667
=0.3184

4,f" T

4 x ,f" x 0.0041667

Drawdown = s = _Q_\\1(u~) = 0.31 $4 x 4.2103 = 1.234 rn


4;fT

9.32

Q =100 m'ih = 0.02778 m'is

ftcopytlghted Ma1et1a1'" "ACd~iona1 resource mate1ial s1.1pplied with the boOk El'lgineemo
Hydl'OIO'l!Y. Thild EdifiOl'l w1lt1en by Or. K. $1.1bramanya & p1.1blished by McGr'3_w-Hlll Ecvc-.a1t0n
{India) Pv1.L1d. This resource material Is lot lns1ruc1o(s use onty:

Solution

Manual lo Engineering

s, = 0.65

Hydrology,

Third Edition by Dr. K. Subramanya

1, = 1.0 h = 3600s
1,=2.0h=7200s

m,

st = O.SO rn,

s = _g_\\1(11~)
4;ff

S1l:i1

-0.S772-ln11
= \V(1t1)/\\1(111) =----~

-0.5772-lnu:
-0.5772-lnu1
S1 Is~ =
-0.5772-ln(11!/2)

Since 11=211

-0.5772-lnu1
= --~~~---'---0.5772+0.69315-Jnu1

( 0.65J0.80) = 0.8125

-0.5712-ln111
-0.11595-1011.

On solving

In u1 = 3.58085 and 111 = 0.02764


\V(u1)= 0.5712 - In 111 = 0.5772 + 3.58085=3.0113
T = __Q_"'(u1)
4;r s,

Slnces, = Q IV(u1).
4RT
=
T

,.?s

111

0.02764
x3.0113=
4 x R" x 0.65

'
0.01024 m/s

= 36.87 1n'n1

= 0.2764 = --

4T 11

S = 0.02764 x4x0.~102x3600=4_06x10_,
(100)

9.33

Herc since 11=300111in,

= 11 + r= 300 + 1

The Lime ratio 1/1' is calculated (as shewn in the table below) and tt semi-log plot of
s' vs 1/1' is plotted, (Fig. p-9.33}.

t'
t
111

I
301 303
301 101
1.35 I.IS

5
305
61.0

I.II

10
20
40
310 320 340
31.0 16.0 8.5
1.05 0.98 0.88

90
390
4.33
0.80

150
450
3.00
0.70

200

500
2.50
0.68

ftcopyrlghted Ma1er1a1'" "'ACd~ional resource mate1ial supplied with the boOk El'lgineemo
Hydl'OIO'l!Y. Thin:I EcMiOl"l w1lt1en by Or. K. Subiamanya & published by McGr'3_w-Hlll Ecvc-.a1t0n
{India) Pv1.L1d. This resource material Is lot lns1ruc1o(s use onty:

Solution

Manual lo Engineering

Hydrology, Third Edition by Dr. K. Subramanya

0.132 Ln(Vf) 0.1881


A1 0.9928

e o.a

-:

c 0.7

0
-e 0.6

0.5

;; 0.4

-:

,Y

/
/

:!! 0.3
~
a: 0.2

0.1

0
10

100

1000

Time ratio (tit')

Fig. P-9.33 Plot c,r residual drawdown against ume rali) (t/t 1)

A best li11ing straight line 1hroug,h the ploued points is given by the equation
s'=0.1132 ln(tit')+O.ISSI
By Eq.(9.60)

slope of the bes! fit line= 0.1132 =

,JL_
4;rT

40x24
i
!
T=
=674.9 m idoy = 28.1 m /h
O.l 132x4..-

ftcopytlghled Maletlal'" ...ACd~ional resource mate1ial supplied with the boOk El'lgineemo
Hydl'OIO'l!Y. Thin:I EcMiOl'l w1lt1en by Or. K. Subramanya & published by McGr'3.w-Hlll Ecvc-.a1t0n
{India) Pv1.L1d. This resource material Is lot lns1ruc1o(s use onty:

Solution

Manual lo Engineering

Hydrology, Third Edition by Dr. K. Subramanya

CHAPTER

10

10. I

Q = 0.00323
. :II = 0 .041 7 Mrn '
1,;m .,)'Car
(1500)'
= 4.17 ha-in/JOO sq.knvyear
'
Joglekar's formula : Q = 0.005&7
= O.J032fl.11n ' :tk1t1/year
(1500) 0,'
= 10.32 hom/100 sq.km/year

10.2

In I 1113ofscdimcnt:
volume of $0lid$ = (I -1>) m; where t' = pcroslty.
volume of water = p rn;
weight of solids= 850 =(I p) x2.65 xlOOO
Hence p = 0.679
\\'eight of I m3 of sediment de-posit= (I - 0.679) x 2.65x1000 + 0.679 x 1000
= $50 + 679 = 1529 kg.

10.3

The unit weight (dry) of reservoir sediment deposit is given by Eq. 10.11

Kbosla's formula:

lo\',= P,.. (IV +B log'T )+ p~ (\V, +8. logT )+


J

100

I 00

as

114
I 00 (IV.I + 8l 1001)
e,

Herc Ps- = 25. J>i = 35 and J><t = 40


Referring to Table 10.7. values of coefficients 81.Bi and BJ and \1'1 \1'1 and
found and introduced in to Eq. 10.11 to obtain

"'J are

20

(1490 )+ 35 (1265+161ogT)+ 40 (961+96.llogT)


100
100
100
II', = 1199.65 + 44.04 logT
IV,=

when T = 1 year, l\'11=I199.65kgln1J


when T = 25 years, \Vns = 1261.2 kg/nfs

10.4

By use of Eq. 10.11andTable10.7


. IV, = ~(1490 ) + 2!_(1185+43.31ogl0)+1:_(737

JOO
100
= 1539 kgtm'

Accuracy of prediction =

10.5

ByEq.10.12

JOO

1650-1539

1650

= 0.0694.Say 7%

+ 171.4log10)

under prediction

IV.,:IV1+0.434xB ... [{~!ln35}-1]

1100 = IV,+ K x 2.66


ftcopytlghted Ma1er1a1'" "ACd~ional resource mate1ial s1.1pplied with the boOk El'lgineemo
Or. K. Subramanya & published by MCGr'3_w-Hlll ECvc-.a1t0n
{India) Pv1. L1d. This resource material Is lot lns1ruc1o(s use onty:
Hydl'OIO'l!Y. Thin:I EcMiOl"l w1lt1en by

Solution

Manual lo Engineering

Hydrology, Third Edition by Dr. K. Subramanya

1200 = IV1 + K x 2.9919


On Solving K = 60.26 and IV1 = Average unit weight at the end of first year=
Similarly

939.7 s:iy 940 kglm'


Al the end of 100 years, lV100= 940+ 60.26 x [{1:1n100}-1]=
10.6

1160 kg/11f'

Averageunit weight is given by Eq. 10.12 as

w., +0.434e.[{<r~

r}-1)
1)1n
FotT: IO years. \V10: IV11+ 0.4343x(I0/9)[ [ln 10) IJ B.
= IV11 + 0.6286 8,.
FotT=20)eats, \l'ZtJ= = V.171+0.91248 ...
IV,.-lV,o=0.28388 .. =600-500=
100
B.. = 100/0.2838 = 352.36
\Vso = "'1'1 + I.2905 8,..
11'.w w,,, = ( 1.2905 -0.9214) B.. = 0.3691 B.
IV.w= 600 + (0.3691 x 352.36) = 730 kglm'
IV.,,=

l0.7

Annual sediment inflow = O. J5 rvtnl'l


Initial capacity = 50 f\!1111 and final capacity = 0.7 x 50 = 35 t\.1m1
Calculations arc shown in Table P. 10.7. Three steps of 6C .. s.o r.tm3 are
In 1ablc P. 10.7:
TllbleP

107.
2

s
Average

Capacity

!in Mm3)

50
45
40
35

chosen.

~c
5.0
5.0
5.0

Trap
Efficiency
Cll

0.714
0.643
0.571
0.500

1 oo.oo

98.80
98.09
97.68

Trap
Efficiency

99.4
98.4
97.7

6
Volumeol
Sediment
Depos~ed

cer vear
0.1~91
0.1477
0.1465
Total

7
Time to
fill
!in Years)

sc

33.53
33.86
34.12
101.52

Col.4 is the I-rap efficiency corresponding 10 (11 value of Col. 3 calculated by using
Eq. (10.10). Note that forC/I >0.7. the trap efficiency= 1.0.
Col. 5 is the a.,er:1ge trap efficiency in a step
Col. 6 is the volume of sediment deposited in the- reservoir per year during the
event represented by the step. CoL6= 0.15 x(Col. 51100)
Col. 7 is the time in years required to fill the capacity represented by the- Step.

Col.7 = Col. 2/Col.5.


ftcopytlghted Ma1et1a1'" "ACd~iona1 resource mate1ial s1.1pplied with the boOk El'lgineemo
Hydl'OIO'l!Y. Thild EdifiOl'l w1lt1en by Or. K. Subramanya & published by MCGr'3.w-Hlll ECvc-.a1t0n
{India) Pv1.L1d. This resource material Is lot lns1ruc1o(s use onty:

Solution Manual lo Engineering Hydrology, Third Edition by

Dr. K. Subramanya

'lbc sum of the tune periods represented by Col. 7 is che rime required 10 fill the
capacity by 15 r-.11113 Thus the toUtl rime required to reduce the reservoir capacity
by 35SfJ is r"s = I 01.52 years = s;1y I 02 years,
10.8

50~;, reduction in volume = 90000/2 = 45000 ha-111 .

.e.c 4500015 9000 ham

Volume of
Sedlmeru

Capacity

fin ham)

Trap
Efficiency

6C
lhaml

90000
81000
72000
63000
54000
45000

Cll
0.225
0.203
0.180
0.158
0.135
0.113

9000
9000
9000
9000
9000

..

A11era9e

Deposlled

Time to

Trap
Efficiency

P"

Iii 6C

year(ha

(in

"''

Ytars)

92.435
91.796
91.081
90.272
89.337
88.231

n,

92.115
91.439
90.677
89.804
88.78'1

552.7
548.6
544.1
538.8
532.7

Say

16.3
16.4
16.S
16.7
16.9
82.8
83
yers

Col.4 is the trap efficiency corresponding to C/I value of Col. 3 calculated by using

~,=6.064 Lol(Cll) + 101.48


Col. 5 is the average trap efficiency ill a step
Col. 6 is the volume or sediment deposited in the reservoir per year during the
event represenied by the step. Col.6 = 600 x(Col. 5/100)
Cot 7 is the time in years required to fill the capacity represented by lhe step.
Col.7 =Col. 2/Col.5.
The sum of the time periods represented by Col. 7 is 1he umc required to fill the
capacity by 45000 ha-m. Thus the total time required to reduce the reservoir
capacity by 50% is T = 82.8 years= say 83 years.

'

10.9

water Yield =2660 x 0.40 = 1064 Mm)/year


Total sediment inflow per year= 360 x 2660 = 0.9576 r>.1T/year
Assurning n dry unit weight of I.I '1'/m3,
volume of scdimem inflow per ye:lr = 0.870~11i11J/year.
'faking tmp efficiency as 1.0,
Trial I:

Approximate time for 40'% loss of capacity=

0.40x360
= 16_:i years.
0.870

lilly 170 years.

Trial 2: Using Table p-10.9.


Initial unit weight ~v,

= (1490 x 0.20) + ( 1185 x 0.35) +{ 737 x 0.45) = 951


= 1.0444 Tonnc:-.s/m3

kg/rn3

II,.= (p _ B, + P. B, + p.,,B,) = 10 + (0.35 x 43.3) + (0.45x171.4)1 = 91.285


ftcopytlghted Maletlal'" "ACd~ional resource mate1ial supplied with the boOk El'lgineemo
Hydl'OIO'l!Y. Thild EcMiOl'l w1lt1en by Or. K. Subramanya & published by MCGr'3_w-Hlll ECvc-.a1t0n

{India) Pv1.L1d. This resource material Is lot lns1ruc1o(s use onty:

Solution

Manual lo Engineering

Hydrology,

Third Edition by Dr. K. Subramanya

II'~= 1044.4+ 0.4343 x(92.285) [{:~~In

170}-1] = 1211.3 kglm'

= 1.211

Tonncsl~'tm.\
The calcutauon for esumaring me tirne to fill (0.4 x360 = 144 tvtm"J of capacity by
sediment is performed in tabular forrn (Table P. I0.9(a}&(b)).
Problem 10.9

Table p. 10.9 (a\

Average
Trap
Tai>
EHiciency Elfictency

Capacity

(in t.1m3)
360
320
290
265
240
216

l1C
40
30
25
25
24

C/I

0.338
0.301
0.273
0.2.t9
0.226
0.203

94.9t
94.19
93.60
93.05
92.45
91.81

vcwme ol

Time to

Sectemen1
Deposi1ect

per veer

94.55
93.90
93.32
92.75
92.1$

0.747
0.742
0.738
0.733
0.728
Tot1I

liU

ec

(In

Years)
53.51
40.42
33.89
34.10
32.95
194.86

Col.4 is the trap efficiency corresponding to Cfl value of Col. 3 calculated by using:
Eq. ( 10.10). Thus Ct)I. 4 = 6.064xln (Col.3) +JO 1.48
C-01. S is the average trap efficiency in a step
Col. 6 is the volume of sediment deposited in the reservoir per year during the
event represented by the step. Col.6 = 0.9576 x(Col. 5/100)11.211
C-01. 7 is the time in years required to fill the capacity represented by 1he step.

Col.7 = COi. 2/Col.5.

The surn of the time periods represented by Col. 7 is the tin>e required to fill the
capacity by 144 ~hn}. Thus the tout time required to reduce the reservoir capacity
by40% is T40= l94.9 years e say 195 years.
Since the value ofT.w differs from the assumed value of 175 years further trials to
refine the value of \V,,., are necessary.
tu Triill: Take T-'0 = 195 years
II'~=1044.4+ 0.4343 x(92.285) [ {::;In

195}-1]

= 1216.5 kJlim'

= 1.2165 ronnes/ri.im3

ftcopytlghted Maletlal'" "ACd~ional resource material s1.1pplied with the boOk El'lgineemo
Hydl'OIO'l!Y. Thild EcMiOl"l w1lt1en by Or. K. $1.1bramanya & p1,1blished by MCGr'3_w-Hlll ECvc-.a1t0n
{India) Pv1.L1d. This resource material Is lot lns1ruc1o(s use onty:

Solution Manual lo Engineering

Table P 10.9 lbl

Pl'Ot>lem 1 0.9 F.nal lrial


Averaoe
Ttap
T<\l~
Etteiency Efficiency
Cll
94.91
0.338
0.301
94.19
94.55

Cap3city

(in J.1m3)

bC

360
320
290
265
240
216

Hydrology, Third Edition by Dr. K. Subramanya

40
30
25
25
24

Volume 01
Sediment

Time to

Deposiled
cer veer

(in
Yearsl

'

'

0.273

93.60

93.90

0.739

0.249

93.05
92..45
91.81

93.32
92.75
92.13

0.735
0.730

0.226
0.203

fm AC

0.744

53.74
"10.59
34.03

34.24
33.09

0.725
0.000

195.70

This indicates T"l'J = 196 years and which 1s practically same as assumed value of
195 years. No further trials are required and T.w = 196 yc-J1rs can be taken :t$ the

desired l't'SUIL
10.10 The Flow duration curve is shown plcued on a semi-log paper in

~i

Fig.P 10.10-(a)

""

c
0

0
~

;;
Q

...

"!--~~~~~~~~~~~~~~~~~~~__,
to

&ti

to

100

Exco!Mlanco Probabilily (,.)

Fig. 1'-10.10

(a)

Flow Duration Curve

'lhe sediment r:tling curve is plotted on log-log paper as sbown in Fig. P.10. 10-b

ftcopytlghted Maletlal'" "ACd~ional resource material s1.1pplied with the boOk El'lgineemo
Hydl'Oll:>l!Y, Thin:I EcMiOl'l w1lt1en by Or. K. Subiamanya & published by McGr'3_w-Hlll Ecvc-.a1t0n

{India) Pv1.L1d. This resource material Is lo' lns1ruc1o(s use onty:

Solution

Manual lo Engineering

Hydrology,

Third Edition by Dr. K. Subramanya

1.ooe.o1

,..,..,,.
1i!0 -,.,
..J

1.00E..o5

a:-e ~c ,..,i;.o.
c c
$

;r I-0
$

~-

1.00E..-03

en

1.00E..-02
1.ooE.01

10

100

1000

1000l

Water Discharge (m3fs)

Fig. P~lO. IO(b) Suspended sediment Rating curve


Considering 13 secuous of the 00\V duration curve, by suitable lnterpolatten of Pigs. P~

10.10 (o) and p- 10.10 (b), tbe following Table p-10.10 ls prepared.
Thi
a c ... 1010
.
1

Exceedence
Frequency
ranae !%)
0.51.S
1.55.0
5.010.0
10.015.0
1520
20-30
3040
40-50
50-65
6580
8090
9095
9599.9

Interval
f%l

>.1idpoitu
f%l

1
3.5
5
5
5
10
10
10
15
15
10
5
4

1
3.25
7.5
12.5
17.5
25

35
45
57.5
72.5

es
92.5
97.45

>.iean
Dally
Sediment
Discharge Discharge
(Cumec}
(Tonnes/davl
2550
1275
945
700
600
450
325
200
137.5
77.5
40
27.8
20

350000
14$673
105744
54439
39996
22497.5
15934
8323
4$41
I $70.$
241
72
2

6
Ex.pee1ed
-SeC11mel'll
Load per

fTonnes)

Volume of
Wa1erflow
(cumec.dau\

"''X"''llOO

f41Xf21fl00

day

3500.0
5133.6
5287.2
2722.0
1999.8
2249.8
1593.4
832.3
696.2
235.6
24.1
3.6
1.0

25.5
44.6
47.3
35.0
30.0
45.0
32.5
20.0
20.6
11.6
4.0
1.4
0.8

ftcopytlghted Ma1et1a1'" "ACd~iona1 resource mate1ial s1.1pplied with the boOk El'lgineemo
Hydl'OIO'l!Y. Thild EdifiOl'I w1lt1en by Or. K. Subtamanya & published by MCGr'3.w-Hlll ECvc-.a1t0n
{India) Pv1.L1d. This resource material Is lor lns1ruc1o(s use onty:

Solution

Manual lo Engineering

Hydrology,

Third Edition by Dr. K. Subramanya

Total

24278

Adel 1 0-o/o tor beO load


Total Sediment Load

318.32

2426
26708

lnTable. P-10.10:

The h)tal expected mean daily suspended sediment load is 24278Tl)nnes. obtained as the
sum or C-01.6 values.
Over one year. suspended sediment load yield is = 365 x 24278 = 886J470Tonnes= say
8.86 rvtilliou Tonnes
Thus suspended sediment Load yield= 8.86~1illion Tonne-sfyear.
Bed load (at 10% of suspended load yield)= 0.10 x 8.86 = 0.886 Million Tonnes
Total sediment yield = 9.75 C\fillion Tonnes/year
(ii) \\tater Vie.Id: Mean daily yield= 318.32 cumec.day
Annual yield= 365 x 318.32 = 116186.8 cumec.days
= 116186.8 x (60 x60x24)/IO= 1003.9 Million on'.
Considering annual values

;\ verage concentrationof Suspended Load


886x:IO<>
=

10"= 874.9

(1003.9xl0')+(8.86xl0')
pp
= say 875 parts per million (ppm) by weight.

10.11

reservoir capacity = 180 t\.im3


Final reservoir capacity = 0.65 x ISO= 117 ~tm"
An1Q11n1 of sediment deposit = 63 l\ l'ronnes
Initial

Fir.\11rit1loj'tAvertige unit u eigJ11:


1

Assume n unit weight of 1.0 Tim".


votume of total sediment deposit = 63 t\1m3
Assuming a Cll ratio > 0.70 throughout. trap efficiency '11 = 100%
Approximate ti rue. required to fill 35% or initial capacity= 63/3.0 = 21 years.

= 21 years to calculate \V#


Second Trial: Using Table J0.3(TexL).
Initial unit weight 1\'1 = (1490 x 0.20) + (1040 x 0.30) +{ 480 x 0.50)
Assume T

= 0.850 To1lneslnr'
8,,= (P,.. B, + 11, 8, .. P.-.81) = 10 + (0.3 x 91.3 I)+

= 850 kg/111)

(0.5 x 256.3)1 = 155.54 kglm'

By Eq. 10.12

IV..,= 850+ 0.4343 x( 155.54) [{~~In 21 }- I]= 995 kglm' = 0.995 Tonnes/Mm'
The calculation for estimating the time to fill I 17 ~lm3 of capacity by sediment is
performed in tabular form (Table P 10.11 ).
ftcopytlgh1ed Ma1et1a1'" 'ACd~iona1 resource mate1ial s1.1pplied with the boOk El'lgineemo
Hydl'OIO'l!Y. Thin:I EcMiOl'l w1lt1en by Or. K. $1.1bramanya & p1.1blished by MCGr'3.w-Hlll EOvc-.a11on
{India) Pv1.L1d. This resource material Is lot lns1ruc1o(s use onty:
0

Solution

Manual lo Engineering

Hydrology, Third Edition by Dr. K. Subramanya

Table P-10 . II
Average

of

Time
IO fill

volume

Capacity

Trap

Trap

Sedemem

t.C

(in

Efficiency

Efficiency

I\,

Deposited
oer vcar

Years)

96.28
95.52
94.77
94.23

2.902937
2.879962
2.857395
2.840988

C\lm3)
ISO

C/I

6C

160
140
125

20
20

117

IS

0.45
0.40
0.35
0.31
0.29

I\,
96.6

95.9
95.1
94.4
94.0

(in

6.9
6.9
S.2

2.8
21.9
22

Sav

rears

In Table P 10.11:
Col. I gives lhe capacily of lhe reservoir. The decrease in the capacily due to
sedimentation is considered in 5 sleps.(Steps need not be equal)
Col. 2 is me decrease in capacity between two successive steps.
Col.3 is chc Capacity - Inflow ratio m tbe beginning of lhe step. Col.3 =Col. I 1400
Col.4 is the trap efficiency corresponding to C/I value of Col. 3 calculated by using
Eq. (I 0.10). Thus Col. 4 = 6.064xlo(Col.3) + 101.48
Col. 5 is me average trap efficiency in a step
Col. 6 is the volume of sediment deposited in the reservoir per yc~1r during lhe
event represented by the step. Col.6 = 3.00 x(Col. 51100)!0.995
Col. 7 is the lime in )'enrs required IQ fill the capacity represented by the step.
Col.7 =Col. 2/Col.5.
The sum of the rime periods represented by Col. 7 is the time required to fill the
capacity by 63 f\11113. Thus the toU1I time required to reduce the reservoir capacity

by 35% is T }S = '21. 9 years = Sil)' 22 years.


Since the value of T3s differs frorn the assumed value of 21 years by a very small
value TJs = 22 years can be adopted.

ftcopytlghted Maletial'" "ACd~ional resource mate1ial supplied with lhe boOk El'lgineemo
Hydl'OIO'l!Y. Thin:I EdifiOl'l w1lt1en by Or. K. Subramanya & published by McGr'3_w-Hlll Edvc-.a11on
{India) Pv1. L1d. This resource material Is lot lns1ruc1o(s use onty:

Solution

Manual lo Engineering

Hydrology, Third Edition by Dr. K. Subramanya

10.12 From the given elevation daia calculate the correspcndlng height above the bed

level of 560.52 mas shown Table P 10.12.


Table P-10.12
Elov:ition
Area thal
0
19.42
56225
563.27
47.75
563.88
62.32
79.72
56'1.18
564.49
96.72
565.10
137,59
555.55
191.41
366.64
566.93
568.45
513.95
569.97
679.06

<ml

560.52

Height
Capacity in 1bovo bed
tha.ml
lml
0
0.00
11.8
1.83
41.8
2.75
75.3
3.36
96.5
3.66
123.8
3.97
194.6
4.56
268.7
5.03
647.2
6:41
1313.3
7.93
2217.1
9.45

Plot in 3 log - log paper the height above bed as ordinate and the capacity as
abscissa. fig.P-10.12. Draw :1 best fining. straigfu through the ploued points and
measure the slope of ihe line using linear scale. 111e slope is the value of 111 and is
found to be 3.2.

ftcopytlghted Ma1et1a1'" "ACd~iona1 resource mate1ial s1.1pplied with the boOk El'lgineemo
Hydl'OIO'l!Y. Thild EdifiOl'l w1lt1en by Or. K. $1.1bramanya & p1.1blished by McGr'3_w-Hlll Ecvc-.a1t0n
{India) Pv1.L1d. This resource material Is lot lns1ruc1o(s use onty:

Solution

Manual lo Engineering

Hydrology,

Third Edition by Dr. K. Subramanya

100

-.,
E

.,>

..,

.<>

..0

.<>

.c

a;
"'
J:

10

.I I

"11
~ --

1.11
I ..
..
.
.
.
........
- ~
. ..

I_

..

'

I I

"

10

100

1000

10000

Capacity (ha-m]

Fig. P-10.12 Determination of factor sr

10.13 Table P-10.13 shows the ccmputaticns.


H = 512.06 - 35(}.52 = 161.54 m
In Tobk p-10.13,
Col.2 = Elevation in meters
Col.3 e Originnl water surface area a1 given elevation in ha
Col.4 e Original reservoir capachy in ha-m.

Col.5 = Incremental height (m)


Col.6 = Height above original bed elevation (rn):: Cumulative values of Col.5 =Ji
Col.7 e Relative depth p = 11111 = Col.6 /161.54
Col.S e FunctionA,.. calculated by Eq.10.13 as A,. = 2.4&7,,0~1(1 - )"'.
A trial and error Procedure is adopted. The level up 10 which the reservoir is fully
covered by sediment at the end of 25 years is taken as 365.76 01. as per the hint
given. This would be the new datum for the bed of the reservoir at the e1KI of 25
years. 1-\t this level:
,\,..= 0.6217. Original reservoir are.a= 1\,,:: 364.0 ha.
Coefficient K (for the first trial)= K1 = 364/0.6217 = 585.4
Col.9 = Represents K Ar = 585.4x Col.7 for all elevations higher than 539.40 m.
This
column represents the area covered by sedimeutaucn at a particular level
and hence called Sediment area.
ftcopytlghted Maletial'" "ACd~ional resource mate1ial supplied with the boOk El'lgineemo
Hydl'OIO'l)y, Thin:I EdifiOl'l w1lt1en by Or. K. Subramanya & published by MCGr'3_w-Hlll ECvc-.a1t0n
{India) Pv1. L1d. This resource material Is lot lns1ruc1o(s use onty:

Solution Manual lo Engineering

Hydrology, Third Edition by Dr. K. Subramanya

Col.I 0= Incremental sediment volume between two successive elevations


calculated as (average area x incremental depth).
Col. I I= Accumulated sediment volume starting from 2460 ha-m al E-1.365.76 m.
end of 25 years.
'Ille last value in Col. 10 is obtained as 92041.2 ha-rn whereas the given
sediment data indicates a deposition of 9'2250 ha-rn in 25 years. This
indicates the calculations are very near the togical final values and since
the difference is very slig.ht it requires only minor correction. This is done
by tweaking the coefficient K. Thus for second trial Ki=
Ka x92250 = 586.4. Values of this second trial (with K,=.5$6.8) are
92()41
shown in Cols. 11. 12 and 13.
Second Trial:
Col.12 = Revised sediment area with K1=5S6.S
Col.13:. Revised incremental sediment volume with K1=5S6.S
Col.14 = Revised accumulated sediment volume with K1=586.8.
Note that this trial improves the result considerably and the accumulated
sediment volume at El. 365.76 111 is 92234 ha-m. The difference between
this and the given value of 92250 ha-m is less than 0.1% and thus this
distribution could be taken as final values.
C.ol.15 = Final Reservoir area distribution at the end of25 years
Col.16 = Final Reservoir volume distribution at the end of25 years.
Col. 17 =Avan able reservoir elevations after 25 years
Note that the new bed level of the reservoir nt the cod of 25 years is

365.76 m.

ftcopytlghted Ma1et1a1'" "ACd~iona1 resource mate1ial s1.1pplied with the boOk El'lgineemo
Hydl'OIO'l!Y. Thin:I EdifiOl'l w1lt1en by Or. K. $1.1bramanya & p1.1blished by MCGr'3_w-Hlll ECvc-.a1t0n
{India) Pv1.L1d. This resource material Is lot lns1ruc1o(s use onty:

SOiution Manuat to Eno1neer1ng Kydrology, Third EchUon .,Y Dr. K. S11~am,nya

....,.,
2

.. -

.\WU:

"'' !))

~..
'

.Ql.1:

-Ml ....

,_
I

-E

Oe 1!'
Oe..

"

12

..

13

"

,,s

!l!I

JJtl

~
!!:

~ %~
~ za

l\!-1

~
~

'"" ''"
'"'
"

.,.,

. ...

"11!

"

17

'~

>

~~

""
l.\.!-1

<O!

ll.w

!(!!~?

'"

IOl).I

""'"
1.0

,, .. 7

,~,

1IO>lll

om

''.S

~l'IW)

Sd I)

1111$.11

,..,,

~ U>

:.,,,-.o

:rM.l

,,"'''
...,'

om

Jt.!H

Jlll-M

tlu'i)

?Ill 11

IJl !I>

tMU!t

-"
'""''"

0!.M
IOloll

'""'"

11~.'I

UI

U!

7!1~.7

l<r>t.l.t

I!!"!

oM
ii.~UI

r.111.0

l'ltl!-

HI!,

i.:, ..

Ul&l:I

.. ,M'

011'~

JllJ

:.v.:c>

II)!!!

......_,,,

....
~=,..., _.

1?:r<1-1

f!lll.!

11:.T.7

IUlO

,,, :1

....

~~

Mt')

..__,

~"..,>........,


.....

. ,,_,, .......
""'"

11>1:1

JJ!JO
, .. Jl

~ f:
,.J!!.,

'6111 I

,.,

1.w,1

- E.

MO

)llllU

ea

Cft

,...

l:'Cll

~M

J)o,11

O.t1!

~M

IJJJf

O!"'

0.}11

l!I

llMO

n.:11

Ul-1

'"'
...,: ""' ....,
,19)

..

"

&

'
t t a

I
l 6 .-i
t

:;;
-~
!i
l
=
J
:;;

=
is
i~ !- ! ....
i"

" i

.- . -. 1!
r j~
.,, i l .il
: e I~
e e if! .. "

"'" '""" ....,


"
...... ,,,_ "" '""
"

"'' ,,_ ~:~


"

10

... ...- ~ ..

-~
.-- -- ... . . - ~ ~

.
....~ ~-~
-- ~...~. -~ -~ ~ - - ~ - -
- ~-- .. _, - ~ .... ~ -. ..
w

' ''"

;;

8
> J1!~

z
;;

ID

"
s

~)11J

IJ
1'!1_,,

..,..., "':'It ~,,.,


_,, '""'
.,,..... .,_
""'
~,

sos..a
!!J.1.0

!1.tl

,.-:9!
'1!~

I(," 511tt.w

"'Copyriglltod M~erlar "Ad:tlbn11ltet.0uree ma!et.t.11 s~)ell wtll ee bo:ii. 19n<!etroq M,Volcqy. Tllhll Edi!lonw!lnen by
& pll?ll!iflod flyMcGfilw.H!I Ed~~n(ltt:lll) P1>1. lid. llllli re~
ll'llllOflllllli lo1 hlli!NCl11f5 use cnly."

Or. IC. S11br11m:i!!p

Solution

Manual lo Engineering

Hydrology, Third Edition by Dr. K. Subramanya

10.14 Original capechy at El. 124.97 m = 42710 ba-rn.


Sediment accumulation in 10 years= 10 000 ha-rn.
H = 124.97 - 97.53 = 27.44 m
1:1r.t1trial: Assume sedimentation up to cl. 105. 76 rn. this gives
lr.=(105.7697.53)=8.21 m
A..=41 l.16ha. Vo= 1171
Vs=A,(fl-/i.,)+
Vo=411.16x(27.44-8.21)+
1171 =9077.I ha-rn
Given sediment volume = 10.000 ha-m. Hence assumption is short by
1(10.000-9077)/10.000J x 100 = 9.2%. Hence a new trial is needed.
Second trial: .Assume sedirrentaticn up to ~I. 106.68 m. this gives
" = ( 106.68 -97.53) = 9.15 rn
By linear interpolation A .. = 464.2 ha. V,. = 1509
v.. = 1\,.(lf -11,,) + l'o = 464.2 x(2?.44 - 9.15) + 1509 = 9999 ha-in
This value is practically same as the given sediment volume = 10.000 ha-m and
hence 1)0 further trial is needed,
The distributioo of 1J1e sediment over the depth of lhe reservoir is shown in Table
p. 10.14.

Table 1>10.14 Distribution or Sedhuent by Area Increment Method


Now

Bod Elevation:
2

106 68

Of'igi.nal
Elevation 01191na1 eapaclly
(ml
"roa (ha) (ham)

7.51
100.58
105.76
106.68
109.73
112.77

43.7
168 4
411.2
464.2
720.7
1659

0
98
411
1177
1509
3'.\21
72.58

118.88
121.92
124.97

3083
4346
6206

uiJ,63

'"

.,

,,.,

abovonow
bed a1 El.
106.68.

SlldimGnt atoa aftllt'

Sedlme-nt volume
;11100! (h;a) (ham)

3.0.
6.0

464.2
464.2
464.2

1"-1'

n '

'''-'

21300
32550
42710

12.

464.2
464.2
464.2

1-,
).
I 8.2

9
4 I
117
150
292.
433
"7:l
717
858.
99"

10 ye&1s

th)

0
256.S
1194.8
1'77' 1)
2618.8
3881.8
5741.8

Volumo aftot
10)'Hr'S
(ha.m)

39
292
7""'
1412
2396
3271

ftcopytlghted Maletlal'" "ACd~ional resource mate1ial supplied with the boOk El'lgineemo
Hydl'Oll:>l!Y. Thin:I EcMiOl'l w1lt1en by Or. K. Subramanya & published by MCGr'3.w-Hlll ECvc-.a1t0n
{India) Pv1. L1d. This resource material Is lot lns1ruc1o(s use onty:

Você também pode gostar