17) _________ is the process of using one base file for two or more parallel activities
like customization
Merging
Check-in
Branching
Check-out
17) _____________ ensures that the changes made by one user are available to all
the other users of a file:
Check-in
Check-out
Branching
Merging
17) SCM benefits an organization in the areas;
Control, Management, control, quality ?
Document control
Tools usage
None of the above
18) Sharing Files is a good alternative as compared to
Merging
Branching
A&B
None of the above
19) Your project is in the User Acceptance Testing phase and the customer comes back
with a new requirement. What is correct sequence of activities in handling this change
request:
Log the CR in the CCR, The CR is taken up by the CCB for impact analysis, PM
approves the change, Change is implemented
PM approves the Change, Change is implemented,CR is recorded in the CCR,CCB
approves the recorded CR.
CCB approves the Change, PM does Impact analysis, Change is implemented, CR
is recorded in the CCR
Change is recorded in the CCR, Impact analysis is done by the CCB, Change is approved
by the CCB, Change is implemented
20) Any proposals for improvement in SCM process defined in veloci-Q can be raised
using
TedWeb Request
PIP
Audits
None of the above
16) An aggregation of CI(s) that has been formally reviewed and agreed upon and taken
into control at single point in time can be defined by. and using and SCM
tool it is identified by . (Fill in the blank from respective comma separated
words)
Project, Pinning
Baseline, Label
Branch, Trigger
Keyword, Pinning
17) SCM is the art of identifying, organizing and controlling modifications to the
software being built by programming team. It maximizes productivity by minimizing
mistakes. It is SCMs definition by:
SEI
IEEE
Roger Pressmen
Wayne Babich
18) Component libraries are defined on the basis of ________
Content
Access Control
Both
none of the above
19) A feature has been incorrectly implemented by a programmer. Which feature of SCM
tool can be used to track the programmer and the version from which it is implemented ?
Rollback
Merging
Branching
History
20) Which of the following needs to be taken into consideration for SCM tool selection
OS Support
Development Environment
Hardware Requirements
All of the above
21) According to all definitions of SCM, the basic activities are:
Identifying and organizing Configuration Items
Managing and controlling the version of Configuration Items
Audit and reporting the status of repositories contents
All of the above
22) _____________ ensures that the changes made by one user are available to all the
other users of a file:
Check-in
Check-out
Branching
Merging
23) Standardized, measurable process for change management are inherent of
SCM processes ?
SCM tools
SCM plan
None of the above
24) ______ can help to reverse back to the previous baseline at any point of SDLC
Merging
Labelling
Baselining
None of the above
25) Multiple people working on one work item is
Multi-Development
Multi-release
Concurrent development
None of the above
21) Change Control Register and Software Configuration Audit Reports are kept
within Veloci-Q section:
Policies
Procedures
Templates
Checklist
22) _________ model focuses on improving support for creating configurations,
managing their history, and using them as working contexts.
Check-in, Check-out
Composition ?
Long Transaction
Change set
20) Defining rights of individuals for accessing the project repository is defined at which
of the following stage of SCM:
SCM Planning
SCM Control
SCM status accounting
SCM Audit
21) SCM related procedures in Veloci-Q are
Configuration Management
Control of documents
A&B
None of the above
22) CMMi level 2 is described as
Initial
Repeatable
Optimized
Evolving
23) _____________ ensures that the changes made by one user are available to all the
other users of a file:
Check-in
Check-out
Branching
Merging
24) If a SCM break downs, which of the following is of the most help:
Individual developers knowledge and understanding of the system developed so far
The last complete backup of SCM repository
Team coordination & proper project management in crisis
Running release in production
8) If you have two sets of changes to a single file and you need to reflect both the
changes, the task to be performed is
Merging
Rollback
Branching
Labeling
8) Which of the following is NOT a CI type
Design Document
Executable Code
Installation Manual
Contract document ?
9) In the composition model, the two step process of composition and selection can be
graphically visualized as ____________ graph
AND-NOR
AND-XOR
AND-OR
XOR-AND
10) An aggregation of CI(s) that has been formally reviewed and agreed upon and taken
into control at single point in time can be defined by. and using and SCM
tool it is identified by . (Fill in the blank from respective comma separated
words)
Project, Pinning
Baseline, Label
Branch, Trigger
Keyword, Pinning
11) SCM is the art of identifying, organizing and controlling modifications to the
software being built by programming team. It maximizes productivity by minimizing
mistakes. It is SCMs definition by:
SEI
IEEE
Roger Pressmen
Wayne Babich
12) Status Accounting provides
Status of change request and defect reports
Version status of various configuration items (CIs)
Status of configuration items in various project baselines
All of the above
13) In a project to identify the baseline artifacts which of the following techniques can be
adopted?
Keywords
Merging
Trigger
Labeling
14) Software Configuration management is a CMMi Level _____ process area
2
3
4
5
15) Which of the following should be considered as Configuration Items for any project:
Project plan, Requirement specification, Class diagrams
Design specification, Design tools, Activity diagrams
Source Code, Test plan, test Script, Test tools, Test results ?
All of the above
16) Management issues that need be considered for SCM tool evaluation are
License Cost
After sales support
Availability of upgrades
All of the above
17) _________ helps us to know how merging works
Merging manual
Merging online help
Merging Semantics
None of the above
18) Multiple people working on one work item is
Multi-Development
Multi-release
Concurrent development
None of the above
19) Identification of configuration item is an essential part of SCM. Which is the
immediate benefit of identifying the CI?
Managing release of multiple versions
Producing Product Deltas
Analyzing historic information
Reporting project status
20) Which of the following needs to be taken into consideration for SCM tool selection
OS Support
Development Environment
Hardware Requirements
All of the above
Author
Reader
Review Leader
Recorder
3) A ______ is a document which describes the objective, scope , approach and focus of
a software testing effort
Test Strategy
Test Script
Test Case
Test Plan
4) In a software development environment ____________ is confirmation that the output
of a particular phase of development meets all of the input requirements for that phase.
Reviews and Testing
Software Validation
Software Testing
Software Verification
5) Tools commonly used for causal analysis are
Pareto Analysis
Root cause analysis
Both (1) and (2)
None of the above
6) The different types of flow/coverage based testing are:
Statement coverage
Full Path coverage
Decision coverage
All of the above
7) An informal meeting for evaluation or information purpose is a
Walkthrough
Inspection
Testing
None of the above
8) Table review process is followed mostly for reviewing documents. What is the other
name of Table Review Process?
PEST Analysis
Brainstorming
Fagan's Review Process
SWOT Analysis
9) ___________ stage ensures that review comments have been incorporated during
rework
Review
Rework
Causal Analysis
Follow up
10) ________ helps analyze the required efforts for validating the acceptability of a
software product.
Test Case
Test Plan
Test Script
All of the above
11) If the cost of fixing a defect in the requirements phase is 1, what is the relative cost
of fixing a defect in the Testing Phase
15-40
10
10 to 15
>100
12) ________ complexity-based testing measures program length and vocabulary,
volume, difficulty, and effort.
McCabe
Halstead
Combination
None of the above
13) Mike Fagan of IBM published a paper in 1976, describing a method called
__________ which formalised the software review process.
Peer review
Online review
Pair review
Table review
14) ______ provides a measure of the conditions which could ensure that a branch is
executed.
Condition coverage
Condition operand coverage
Decision coverage
Both (a) and (b)
15) What is the correct definition of a Test Script?
It is a document that defines the input, action and expected output to determine if a
certain feature of an application is working correctly
It is a document that describes the sequence of steps to execute a test case.
It is a logical group of test cases which when taken together test a particular function or
unit of the system
Acceptance Testing
Integration testing
23) The basic building block of any activity in any phase of the SDLC which forms the
core of Wipro's Reviews and Testing Process is called the :
Peer Review
Verification and Validation Techniques
ETVX Model
All of the above
24) _______ is done to validate the entire product.
System testing
Acceptance testing
Regression testing
Integration testing
25) JTest, Jprobe, Purify are some of the __________ used in projects.
Verification tools
Testing tools
Validation tools
All of the above
vel q
1) Which of this is not the intended use of Metrics?
To monitor the project performance
To take appropriate decisions based on measured values
To monitor individual performance
To revise plans
2) Objectives of customer focus is to:
Elicit parameters that are critical to quality from customers
Collect data and metrics
Track performance
All of the above
3) All Configuration Audit issues are recorded in -------------- and tracked to closure:
Software Configuration Audit Report (SCAR)
Software Configuration Order Form (SCOF)
Baseline Record
PMR
4) The set of actions to be taken when the perceived risk becomes a reality is
documented as part of
Contingency plan
Mitigation Plan
Defect Prevention Report
Risk Tracker
5) Risk quantification is done based on
Risk probability and impact of risk
Risk mitigation
Risk schedule
None of the above
6) Practitioners working on projects can suggest process improvements through a
Process Improvement Proposal
Change Request
Email/Phone
All of the above
7) _________ serves as an important verification activity to ensure the completeness of
testing in order to ensure product quality.
Unit Testing
Integration Testing
Test Audit
System testing
8) Group that focus on the tools used by projects and the impact of using tools is
Tools group
SQA
SEPG
All of the above
9) Corrective and Preventive Action Plan should be drawn for:
Customer complaints received
Customer feedback ratings
Customer Satisfaction surveys
All of the above
10) Look ahead meetings and root cause analysis are examples of
Defect prevention activities
Error capture activities
Appraisal activities
None of the above
11) The effectiveness of the Quality Management System is continuously improved
through
Audit results, corrective and preventive actions, CSATs, Management Review
Sales reports, Balance sheets, Company audit reports
19) Each phase /activity of a life cycle model is represented in veloci-Q by the
____________ Criteria
WBS
DMADV
ETVX
SDLC
20) Process artifacts that help to perform project activities in a standard manner are
Policies
Procedures
Checklists and Templates
All of the above
21) The threshold value of Risk Score beyond which the Mitigation and contingency
plans need to be documented is
18
100
27
45
22) is a repository of data and learning from closed projects.
Project Data Bank
Veloci-Q
Six Sigma
None of the above
23) Six sigma methodology that is used for reduction of cycle time is
Cross Functional Process Map
DMAIC
DSSS
Six steps
24) is an initiative that involves measuring and analyzing business processes.
Six Sigma
Root Cause Analysis
Pugh Matrix
None of the above
25) Six Sigma measures defects based on:
the teams decision
Wipros Senior managements perception
Customers perception
number of defects in the project
vel q
1) Configuration audits are verification mechanisms used to ensure that deliverables are:
Defect free
On schedule
Consistent with requirements
None of the above
2) In Wipro which model representation of CMMI was adopted
Rank model
Linear model
Staged model
Process area model
3) Each phase /activity of a life cycle model is represented in veloci-Q by the
____________ Criteria
WBS
DMADV
ETVX
SDLC
4) PDCA stands for
Plan, Define, Change, Add
Plan, Do, Change, Aid
Plan, Do, Check, Act
Plan, Define, Check, Add
5) In Veloci-Q, intentions and directions for quality initiative are documented in
Policies section
Procedure section
Guidelines section
All of the above
6) What is the monthly mechanism to record and track metrics of the project?
PDMR
Work Plans
PMR
ASR
7) For a project that involves resolving incidents, job cycle monitoring and software
upgrades, the process model to be chosen is
V-Process model
Iterative Process model
Production Support process model
None of the above