PROFORMA B

PRADHAN MANTRI GRAM SADAK YOJANA (PMGSY)


Package Summary (STAGE II)

NAME OF ROAD:- Mendhar to JaranWali Gali

PACKAGE No. JK11-146

S.
No.

State:- J&K

Name of Road

Name of
Block

Mendhar

Type
Propose
of
Cost of
d
Propo
pavement
Length
sal

District : POONCH
Cost of CD
No. of CD
works/prot
works
ection

Total
Estimated
cost

Av. Cost / km
(Rs. in lacs)

From

To

N/U

Km

(Rs. in lacs)

Nos.

(Rs. in
lacs)

(Rs. in lacs)

Mendhar

Jaranwali
Gali

21.000

1809.64

122

1421.14

3230.78

i) Road Safty and Traffic sign Boards

8.40

ii) Preparation of DPR

4.20

iii) Five Years maintenance

166.80

259.47
Total

3502.85

Total Estimated Cost of Package 3502.85


=
Rs. Lacs
N New connectivity
U- Up gradation
Prepared by:
Signature

Signature

Name: Munish Verma


Designation:

Checked by:

Signature
Name
Designation

Scrutinized by: Signature


Name
Desigation:

Draftsman

Name :

Signature
Changez Khan

Name :

Designation:J.E

Er. Muneer Hussain Khan


Exeutive Engineer
PMGSY Division
Mendhar

Superintendi Engineer
PMGSY Circle
Jammu

Sarfraz Ahmed Choudhary

Designation: Asstt. Executive Engineer


PMGSY Sub Division
Mendhar

Technical ScrutSignature
done by:
Name
Designation

Co-ordinator
STA:
Jammu

Signature
Name

BHARAT NIRMAN

Formate F- 1

SUMMARY SHEET

NAME OF ROAD :

Mendhar to JaranWali Gali

BLOCK :- Mendhar

LENGTH OF ROAD:- 21.00 Kms.

Name of Block Total No of Habitation


>1000

Unconnected Habitations
500-1000
250-500

Package No. :- JK11-146

<250

Mendhar
District :- Poonch

Type of work

No. of
Roads

Total Length
No of New
of Road
CD Works
(KM)

upgradation

one

21.000

CD Work

Pavement from
Formate F-5

CD Structure fron Total (5+6)


Total
Formate F-6
(Rs. In Lacs) Villages

1809.64

1421.14

3230.78

i) Road Safty and Traffic sign Boards


ii) Preparation of DPR, Check Survey & CBR Testing, PMGSY Logo

8.40
4.20
259.47

iii) Five Years maintenance

Total

Assistant Executive Engineer


PMGSY Sub-Division
Mendhar

No. of Vilage
Connected

Estimate Cost

3502.85

Executive Engineer
PMGSY Division
Mendhar

SC/ST
Villages
9

. :- JK11-146

BHARAT NIRMAN
ROAD PROPOSED IN PMGSY FOR RURAL CONNECTIVITY (PAVEMENT LAYERS)
NAME OF ROAD :- Mendhar to JaranWali Gali
BLOCK

:-

DISTRICT

Formate F-5

Mendhar

Package No. :- JK11-146


LENGTH OF ROAD :- 21.00 Kms.

:- POONCH

Name of places
villages connected by
road

Facilit
New
Road Enstin
y
Const.
acces lengt
g
upgrad
sed
suefac
h
ation
use
Km. e type
N/U
ABCD

From

To

Mendhar

Jaranwali
Gali

Surface
Detail

S.No

DETAIL OF THICKNESS AND COST OF PAVEMENT LAYERS

21

Earth Work

Earth work Sud


grade prepared

10

Earth Work in
Excavation
Qty in cum

Earth Work /
Subgrade
Prepration

GSB /
WBM -I

11

GSB

29232.00 cum
H.S 44572.87 29232.00 cum
@ 106.00
@ Rs 106.00
@ Rs 633.00
= 47.25
= 30.99
= 185.04
Rs
Berm Filling
S.R 21713.72
@ 183.00
= 39.74
Rs

WBM-II

WBM-III

Prime coat

MSS
/ Carriage item

OMC with seal


coat

12

13

14

16

17

18

WBM-II

Primer Coat

Tack Coat

Bitumin Macadam

Carriage Stone
Aggregate
(6mm-63mm)

20mm thick
Premix

112612.50 cum

5630.60 cum

8043.75 cum
@ Rs 1032.00
= 83.01

112612.50 cum
@ Rs 43.00
= 48.42

@ Rs 16.00
= 18.02

WBM-II

2590.00 cum

@ Rs 6820.00
= 384.01
Tack Coat

cum

@ Rs 57.00
= 1.48

Total pravement
upto col. To FW
statvs

Tack Coat

112612.50 cum

@ Rs
=

@ Rs 16.00
= 18.02

77757.81 cum
@ Rs 962.40
= 485.51
Carriage of
Bitumen
761.48 MT
@ Rs 1227.50
= 9.35

112612.50 cum
@ Rs 140.00
= 157.66
Seal Coat
112612.50 cum
@ Rs 52.00
= 58.56

Rigid Pavement
8662.50 cum

H.R 18954.41
@ 302.00
= 57.24
Rs

Total

Asstt. Executive Engineer


PMGSY Sub.Division
Mendhar

144.23

@ Rs 2140.00
= 185.38

32.46

185.04

268.39

48.42

18.02

402.02

494.86

Executive Engineer
PMGSY Division
Mendhar

19

216.22

1809.65

BHARAT NIRMAN
ROAD PROPOSED IN PMGSY FOR RURAL CONNECTIVITY (PAVEMENT LAYERS)
NAME OF ROAD :- Mendhar to JaranWali Gali
BLOCK

:-Mendhar

PACKAGE No. :- JK11-146


LENGTH OF ROAD :- 21.00 Kms.

:-POONCH

New
Const. Road
Name of
upgrad length
the Road
ation
Km.
N/U

Detail

S.No

DISTRICT

Hume Pipe
Culverts

Mendhar
to
Jaranwali
Gali

21

RCC Culvert

Retaining wall
length in Mtr.

Breast wall
length in Mtr.

Drain length in
Mtr.

Parapets No.

Edge wall
length

10.0 Mtr
Span Bridge

Crated wires

in Mtr.
Dia.
No.
in Mtr.
7
8

No.
1

Formate F-6

HPC
43.00 NO
@ Rs. 2.22
95.46

Span
9

2.00 Mts RCC


48.00 No
@ Rs. 8.85
424.80

No.
10

11

3.0mtr ht.

Breast wall

12

13

Pucca Drain

14

Parapets

15

Edge wall

16

10.0 Mtr Span


Bridge

1500.00 Rmt.
2100.00 Rmt.
2000.00 Rmt.
2000.00 Rmt
2350.00 Rmt
3.00
NO
@ Rs. 10591.00 @ Rs. 5757.00 @ Rs. 1366.00 @ Rs. 1865.00
@ Rs. 2650.00 @ Rs. 38.14
158.87

120.90

= 27.32

= 37.30

= 62.28

= 114.42

Total
eart
h
Total Cost work
of
and
proposed sub
structure grad
s
e
prep
arati
on
17

Create Wire
300.00 No.
@ Rs. 18246.00
= 54.74

3.00 Mts RCC


28.00 No

1421.16

@ Rs. 11.61
325.08

Total

95.46

Asstt. Executive Engineer


PMGSY Sub.Division
Mendhar

749.88

158.87

120.90

27.32

37.30

62.28

114.42

54.74

Executive Engineer
PMGSY Division
Mendhar

18

Total
cost
of
road
upto
FW
status
(15+1
6)
19

Proforma C
Pradhan Mantri Gram Sadak yojana (PMGSY)
Check list for P.I.U. & S.T.A
(For Individual Road Works)
To be filled by PIU
Location :- State :1

Jammu & Kashmir

PACKAGE No. :- JK11-146

Name of Road :-

Length (Km) :-

From :Total

21.00 kms

Estimated Cost Rs. 3243.38 Lacs

DISTT:POONCH

Mendhar to JaranWali Gali


In Built
up area :
kms
Lakhs

Maintenance cost Rs 259.47 Lacs

Item

Total cost of Project Rs 3502.85 Lacs

Rigid
Pavement

Type of Proposal :-

In Open area :

Average Cost;
Total Coat
in Lakhs

Km

Lakhs

Cost per Km
in

185.38

Lakhs
8.83

Flexible
Pavement

1624.26

77.35

CD + others

1433.74

68.27

3243.38

154.45

Total
6

BLOCK:- Mendhar

New connectivity

If the Proposed road is a New connectivity

Is the road a part of core network

If Yes, Through/Link Route Number

Name of the unconnected Target Habitation (to be cross checked with CN-6)

Yes

- List of Habitations connected enroute


- Population sub served by the proposed road.
Does the proposed road lead up to the Habitation for which it is supposed to provide
connectivity (In other words are you sure the road is not being made partially?)
-

Does the proposed road connect the unconnected Habitation to

a)

Another Habitation having all-weather road. (Connected Status).

b)

Directly to an All weather road.

(b)

If (b), indicate the nature of road to which the proposed road leads.

RR

If the proposal is for up gradation

Is the road a part of the core network

Is it associated Through Route or not

PCI value

Age of the road

- Is it certified that there are no other Unconnected Habitations in the district.

No

7. a) Whether the Proposed Road has the desired carriageway width, roadway width and road land width
(RLW).
Indicate the actual widths adopted for the Upgradation/Widening road
b) . a)
b)
c)

Yes
In the Built Up
Area (m)

In the Open
Area (m)

Carriageway

5.50

5.50

Roadway

7.50

7.50

Road Land Width

15.00

15.00

Road section details


Section of the Existing

a.

Section of the Existing road showing different component layers.

Cross Section of the Proposed road

b.

Cross Section of the Proposed road showing different component layers.


( Should be as per Actual Provision of DPR )

Base year traffic volume

Month and Year of Traffic Volume Count=


Motorised Traffic

Days

Trucks

Cars, Jeep
Motorised
vans,Three
two wheeler
wheelers

day 1

50

80

Cycle

70

10

10

OL

30

25

OL

8
8

60

85

75

32

27

55

90

65

10

35

23

Average

55

85

70

10

32

25

Growth rate adopted (%) =

6%

Design Life (in years) =

10

Number of Harvesting Season =

No. of days in each harvesting season (t) =

75

Value of (n) assumed =

10

"A/2"= 153

Base year Traffic AADT (T) =

Cummalative EASL =

Animal Drawn

Num.Tyre
d

SWC

day 3

"A" = 305

Cycle
Rickshaw

OL

213.83288

285003

Traffic Category= T-5

Sub grade CBR

Design CBR (%)

A.

Buses

day 2

Chainage

10

Tractor trailer

LCV

ADT in the year of Traffic count

Non Motorised Traffic

Km 6th,8th,10th,13th & 20th.

Km 1st,2nd,3rd,4th,5th,7th,9th,11th,12th,14th,15th,16th,17th,18th,19th &20th

5-6%

Cost Details

7-9%
Cost
Unit

Cost /Km

Quantity

(Rs. in

(Rs. in Lakhs)

Lakhs)

General Costs
Cost of Perparation of DPR , Check Survey & CBR Testing

Km.

21.00

4.20

0.20

Pavement Components
Cost
Description of the layer

B.

Unit

Cost /Km

Quantity

(Rs. in
Lakhs)
6.87

(Rs. in Lakhs)
144.23

Earth work in Excavation / Cutting

Cum

85241.00

Earth work in Filling (Embankment )

Cum

Nil

Nil

Sub grade (if provided seperately)

Cum

Nil

Nil,

Const. of Sub Grdae

Cum

29232.00

30.98

1.48

Berm Filling

Cum

2590.00

1.48

0.07

( G. S. B )

Cum

29232.00

185.03

8.81

WBM-II

Cum

8043.75

83.01

3.95

WBM-III

Cum

Rigid Pavement

0.00

Cum

8662.5

185.38

8.83

Prime Coat

Sqm

112612.50

48.42

2.31

Tack Coat

Sqm

112612.50

18.02

0.86

Bituminous Macadam

Cum

5630.60

384.00

18.29

Tack Coat

Sqm

112612.50

18.02

0.86

20mm Thick Premix

Sqm

112612.50

157.65

7.51

Sqm

112612.50

58.56

2.79

51994.00

485.51

23.12

761.48

9.35

0.45

1809.64

86.17

Bituminous Layers

MPM
Surface Dressing
PMC with Seal Coat
Carriage item (B - C)
(6mm-63mm)
Bitumen

Cement Concrete Road Pavement Quality Concrete (M30)


Total Cost of Pavement Components
E

CD Works
No. of Existing CD works
If yes, cost of improvement
Location - Chainge ( Similar of CD's may be grouped together )

TOTAL No.

Unit

43.0

Cost
(Rs. in Lakhs)

1.0 Mt. H.P.C

No.

2.00Mt. Span RCC Culvert

No.

48.00

424.80

3.00Mt. Span RCC Culvert

No.

28.00

325.08

3.00

114.42

122.00

959.76

10.00Mt. Span RCC Culvert

No.

Total Cost of Proposed CD Works

Protection Works

Unit

95.46

Cost /Km

Cost
(Rs. in Lakhs)

(Rs. in
Lakhs)

Protection Works
F.

B/Wall

Length :2100

Rmt.

120.89

5.76

R/Wall

Length :1500

Rmt.

158.86

7.56

Pucca Drain

Length :2000

Rmt.

27.32

1.30

Parapit

Length :2000

Rmt.

37.30

1.78

Edge Wall

Length :2350

Rmt.

62.27

2.97

No.

54.74

2.61

461.38

21.97

CRATED WIRES

300

Total cost ( Rs.)


Road Logo, Other RoadTrafficSigns Boards, Road safty Boards, and Setting out
pillars

Total cost of Project ( Rs.)


I.

Any other Provisions (Please Specify)

8.40
3243.38

Five Year Routine Maintenance = Rs.259.47 Lacs

11.

12.

13.

14

Year

Cost in Lakhs

% of Const. Cost

Cost /Km (Rs.)

25.95

0.80%

1.24

II

38.92

1.20%

1.85

II

51.89

1.60%

2.47

IV

61.62

1.90%

2.93

81.08

2.50%

3.86

Total Maintenance Cost

259.47

8.00%

12.36

Whether the road has Geometrics as per Rural Roads Manual (RRM) /Circular of NRRDA.

Latest

Whether CD Works / Protection works are provided as per RRM / Circular of NRRDA /
Respective Codes.

Latest

Whether the Cost estimates are as per standard data analysis and S.S.R

Sources and the lead distance of Materials are under


Source

Lead Distance
(Km)

Material

Source

Lead Distance (Km)

Local

30

Cement

Jammu

215

Murrum (Subgrade)

Chhatyari

95

Emulsion

Jammu

215

Aggregate

Chhatyari

95

Bitumen

Jammu

215

Sand

Akhnoor

195

Steel

Jammu

215

Material
Stone

Certified that information provided is true

Prepared By

Assistant Executive Engineer


P.M.G.S.Y Sub Division
Mendhar

Checked by

Executive Engineer
PMGSY Division
Mendhar

Scrutinized by

Superintending Engineer
PMGSY Circle
Jammu

Countersigned by
Technical Authority

State

To be filled by S.T.A

Name of the STA


15 Is the proposed road entered on the OMMS

Yes / No

If the proposal is for new connectivity


Have you satisfied yourself that the proposed road is a part of the Core Network

Yes / No

Is the unconnected habitation(s) part of list of unconnected habitation as per CN-6

Yes / No

Does the proposal ensure full connectivity of the targer habitation

Yes / No

16

Are you satisfied with the following


Engineering Survey

Yes / No

17 Soil / Material Investigation

Yes / No

Traffic Surveys / Estimation

Yes / No

Hydraulic Studies

Yes / No

18 In case, traffic is projected beyond 45CVPD, are you satisfied with the reason given

Yes / No

19 In case, sub grade CBR is less than 3, has soil stabilization etc. been proposed

Yes / No

20

Is the design of the following elements as per Roads Manual :


Alignment & Geometric

Yes / No

Pavement Design

Yes / No

CD Works and protection Measures

Yes / No

Side Drains

Yes / No

Integration for cross and longitudinal drainage

Yes / No

21 Does the estimation confirm to standard rate analysis and SSR

Yes / No

22 Does the proposal have provision for


PMGSY Logo Sign Boards

Yes / No

Km / Hm stones

Yes / No

Guard Stones (where necessary)

Yes / No

Traffic Sign Board ( as necessary)

Yes / No

23 Specific remarks, if any by STA


Certified that the Design and Estimation for the proposed road work are based on the data and SSR provided by Engineers.
The proposal may be cleared.

Technical Scrutiny

Coordinator

Done by

S.T.A.

Signature

Signature

Name

Name

Designation

Designation

ABSTRACT OF COST
NAME OF ROAD :- Mendhar to JaranWali Gali
BLOCK

:-Mendhar

DISTRICT

:- Poonch

S.NO
1

Items

PACKAGE No. :- JK11-146


LENGTH OF ROAD :- 21.00Kms.
Quantity

Unit

Rate

Amount
(Rs. inLacs)

Earth Work in Excavation

Hard Soil

44572.87 cum

106.00

47.25

Soft Rock

21713.72 cum

183.00

39.74

Hard Rock

18954.41 cum

302.00

57.24

Construction of Sub-Grade

29232.00 Cum

106.00

30.99

Berm Filling

2590.00 cum

57.00

1.48

G.S.B

29232.00 cum

633.00

185.04

WBM Grade -II

8043.75 cum

1032.00

83.01

Rigid Pavement

8662.50 Sqm.

2140.00

185.38

Primer Coat

112612.50 Sqm.

43.00

48.42

Tack Coat

112612.50 Sqm.

16.00

18.02

10

Bituminous Macadam

5630.60 cum

6820.00

384.01

11

Tack Coat

112612.50 Sqm.

16.00

18.02

12

20mm thick Premix

112612.50 Sqm.

140.00

157.66

13

Seal Coat

112612.50 Sqm.

52.00

58.56

14

Carriage item (1 - 7)

a) (6mm-63mm)
(D/d cost of Stone 50%

b) Bitumen

15

0.00
cum.

962.40

485.51

761.44 M.T

1227.50

9.35

Breast Wall

2100.00 Rmt.

5757.00

120.90

16

Retaining Wall

1500.00 Rmt.

10591.00

158.87

17

Crate

300.00 No.

18246.00

54.74

18

Pucca Drain

1366

27.32

51994.00

2000.00 Rmt.

S.NO

Items

Quantity

Unit

Rate

Amount
(Rs. inLacs)

19

H.P.C

43.00 No.

2.22

95.46

20

2.0M Span R.CC. Culvert

48.00 No.

8.85

424.80

21

3.0M Span R.CC. Culvert

28.00 No.

11.61

325.08

22

10.0M Span R.CC. Culvert

3.00 No.

38.14

114.42

23

Edge Wall

2350.00 Rmt.

2650.00

62.28

24

Parapit

2000.00 No.

1865.00

37.30

25

Road Safety and Traffic Sign


Board

26
27

5 Year Maintenance Cost


Preparation of DPR , Check
Survey & CBR Testing,PMGSY
Logo

Total

Asstt. Executive Engineer


PMGSY Sub.Division
Mendhar

8.40
259.47
4.20

3502.88

Executive Engineer
PMGSY Division
Mendhar

BHARAT NIRMAN
CARRIAGE OF MATERIAL BY MECHNICAL TRANSPORT CHART
NAME OF ROAD :- Mendhar to JaranWali Gali
BLOCK

:- MENDHAR
:-POONCH

LENGTH OF ROAD :- 21.00 Kms.

Distance
(in Km)

S.
N
o

Items

1 Sand

Loading

Un
loading

B.T

Gravel

Kacha

Total
(in R.s)

A=
(d+e)

Density

DISTRICT

PACKAGE No. :- JK11-146

Total Haulage
Grand Total
as per
(in R.s)
Distance

Haulage

B=
For BT @
For Gravel @
For Kacha @
R.s 4.49/mt Km Rs. 5.40/mt Km R.s 10.86/mt Km

(f
[g+h+i+] )

g = a x 4.49

h =b x 5.40

i = c x 10.86

(A+B)

195.00

0.00

2.50

24

33.00

1.60

875.55

27.15

1444.32

1477.32

95.00

0.00

2.50

45

54.00

2.00

426.55

27.15

907.40

961.40

30.00

0.00

2.50

45

54.00

1.85

134.7

27.15

299.42

353.42

4 Cement

215.00

0.00

2.50

103

103

206.00

1.00

965.35

27.15

992.50

1198.50

5 Steel

215.00

0.00

2.50

110

110

220.00

1.00

965.35

27.15

992.50

1212.50

7 Bituman

215.00

0.00

2.50

122

113.00

235.00

1.00

965.35

27.15

992.50

1227.50

95.00

0.00

2.50

45

10.00

55.00

2.00

426.55

27.15

907.40

962.40

245.00

0.00

2.50

74.00

329.00

403.00

1.13

1100.05

27.15

1268.10

1671.10

Stone
2 Aggrega

te
3 Stone

8 GSB

NP3
9 1000mm

dia. H/P

Asstt. Executive Engineer


PMGSY Sub.Division

Executive Engineer
PMGSY Division

Mendhar

Mendhar

BHARAT NIRMAN
NAME OF ROAD :- Mendhar to JaranWali Gali
:- Mendhar

PACKAGE No. :- JK11-146

DISTRICT

:-POONCH

LENGTH OF ROAD :- 21.00 Kms.

1 (a)

S.No

BLOCK

Description

Total

Earth work in Soil in Hill Road : Bulk excavation in hilly area in all kinds of soil by mechanical means
including cutting & trimming of side slopes upto a depth of 300 MM and above & disposing of excavated
earth with lift upto 1.5 M and lead upto 50.0 M complete as per technical specifications clause 1603.1
( 1.50m Length for Rigid Pavement)

1500.00

5.8

0.1

870.00

11500.00

5.8

0.3

20010.00

8000.00

5.8

0.15

6960.00

Add 5% for curves & Passing


Place
Total

1(b)

Construction of embankment with approved material deposited at site from roadway cutting and
excavation from drain and foundation of other structures graded and compacted to meet requirement of
table 300.1 and 300.2 as per technical specification clause 301.5

Rate /
Unit

29232.00

CuM

106.00

30.99

2590.00

CuM

57.00

1.48

29232.00 CuM

633.00

185.04

1392.00
29232.00

5000.00

1.40

0.13

910.00

16000.00

1.40

0.08

1680.00

Total
Const. of GSB by providing well graded material, spreading in uniform layers with tractor grade by
mixing in place method with rotavotor at OMC and compacting with smooth wheel roller at achieve the
desired denesity completed as per technical specification clause 402 grade II material

Amount
(Rs.
inLacs)

Quantity Unit

2590.00

1500.00

5.8

0.1

870.00

11500.00

5.8

0.3

20010.00

8000.00

5.8

0.15

6960.00

Add 5% for curves & Passing


Place
Total

1392.00
29232.00

Water bound macadam with crushable


WBM grade- II

Providing laying spreading


and compacting stone Aggregate Of specific sizes to water bound macadam specification incl.
spreading in uniform thickness hand packing rolling with three wheel 80-100Kn static roller in stages to
proper grade and camber applying and brooming crushable screening to fill up the interstices of coarse
Aggregate Watering and compacting to the required density grading 3 as per technical specification
clause 405 of MOST.

Providind and laying rectangular cement concrete block pavement of size 3.0mx2.75m Top layer
thikness 250mm of R.C.C M25 and Bottom layer of thickness 150mm of M10
5

83.01

19500.00

5.50

0.075

1500.00

5.50

8250.00

Add 5% for Passing Place&


curves

412.50

Total

8043.75

8662.50

8043.75

CuM

1032.00

185.38

8662.50

CuM

2140.00

Primer Coat
6

(1) Low Porosity Providing and applying primer coat with bitumen
emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying
primer at the rate of 0.70-1.0 Kg/Sqm using mechanical means as per technical specification clause 502
of MOST.

19500.00

5.50

Add 5% for Passing Place&


curves
Total

###
48.42

5362.50
112612.50 112612.50 CuM

43.00

S.No

Description

Total

19500.00

5.50

###

Quantity Unit

Rate /
Unit

Amount
(Rs.
inLacs)

Tack Coat

Providing and applying tack coat with bitumen emulsion (RS-1) using
emulsion distributor at the rate of 0.25 to 0.30Kg per Sqm on the prepared granular surface treated with
primer and cleaned with hydraulic broom as per technical specification clause 503 of MOST.

Add 5% for Passing Place&


curves
Total

Bituminous Macadam
Providing and laying bituminous macadam with hot mix plant using crushed aggregates of grading as
per table 500.4 premixed with bituminous binder transported to site upto a lead of 1000m laid over a
previously prepared surface with paver finisher to the required grade level and alignment and roller to
avhieve the desired compaction as per technical specification clause 504
Tack Coat

Providing and applying tack coat with bitumen emulsion (RS-1) using
emulsion distributor at the rate of 0.25 to 0.30Kg per Sqm on the prepared granular surface treated with
primer and cleaned with hydraulic broom as per technical specification clause 503 of MOST.

19500.00

112612.50 112612.50 CuM


0.05

5362.50
268.13

5.50

Add 5% for Passing Place&


curves
Total

10

11

20mm thick open graded premix carpet providing laying and rolling of open graded premix carpet of
20mm thickness composed of 13.2mm to 5.6mm Aggregate Wither using penetration grade bitumen or
emulsion to required line grade and level to serve as wearing course on a previously prepared base
including mixing in a suitable plant, laying and rolling with a three wheel 80-100KN static roller capacity
finished to required level and grades to be followed by seal coat type B as per technical specification
clause 508 of MOST.Using Bitumin (S-90)
By hot mix plant and pavers.
Seal Coat
Providing and laying of seal coat sealing the voids in a bituminous
surface laid to the specified levels, grade and cross fall using type B as per Technical specification
clause 510 of MOST.
By mechanical means (type-B).

5362.50

Add 5% for Passing Place&


curves
Total
19500.00

5.50

19500.00

5.50

18.02

5630.63

Total
19500.00
5.50
Add 5% for Passing Place&
curves
Total

384.01
5630.63

cum

6820.00

###
5362.50
112612.50

Add 5% for Passing Place&


curves

16.00

18.02
112612.50 CuM

16.00

###
157.66

5362.50
112612.50 112612.50 CuM

140.00

###
58.56

5362.50
112612.50 112612.50 CuM

52.00

Total

Assistant Executive Engineer


PMGSY Sub-Division
Balakote

1170.57

Executive Engineer
PMGSY Division
Mendhar

BHARAT NIRMAN
CARRIAGE OF MATERIAL BY MECHNICAL TRANSPORT CHART
NAME OF ROAD :- Mendhar to JaranWali Gali
BLOCK

:- Mendhar

PACKAGE No. :- JK11-146

DISTRICT

:- Poonch

LENGTH OF ROAD :- 21.00 Kms.

S.No

Item

Stone Aggregate

GSB

b
c

Particular

WBM II

Quantity vide Item No. 3

Screening

8043.75

WBM III

Quantity vide Item No. 4

Screening

1850.00

x21%

1689.19

Quantity

Unit

28755.70

CuM

8043.75

CuM

1689.19

CuM

1850.00

CuM

x (21+8)%

Rate /
Unit

Amount (Rs.
In Lacs)

962.40

500.39

CuM

Bitumen Macadam (50MM THICK) Quantity vide Item No. 7


Crusher stone aggregate

5630.60

1.41

20mm thick open graded premix

Quantity vide Item No. 10

Crusher stone aggregate

112612.50

Seal Coat

Quantity vide Item No. 7

CRUSHER DUST

112612.50

cum

x 0.027 Cu m/ Sqm =

x 0.006 Cu m/ Sqm =

7939.15

3040.54

675.68

Total Quantity

7939.15
3040.54

CuM

675.68

CuM

51994.00

CuM

Total
B
a

500.39

Bitumen
Bitumen

Quantity vide Item No. 5 ,68,9 & 10


112612.50

b
bitumin for Macadam

5630.00

@3.14 Kg/sqm.=353603 Kgs.


Quantity vide Item No.7
72.44kg/cum 40781 Kg.

353.6

761.47

MT

1227.50

407.87

Total
Less cost of Available stone

9.35

6615

225.00

9.35
14.88
494.86 Lacs

Asstt. Executive Engineer


PMGSY Sub.Division

Executive Engineer
PMGSY Division

Mendhar

Mendhar

BHARAT NIRMAN
Cost Estimate for the Construction of Cement Concrete Drain (Pucca Drain) 10.00 mtr length.
NAME OF ROAD :- Mendhar to JaranWali Gali
BLOCK

:- MENDHAR

PACKAGE No. :- JK11-146

DISTRICT

:- POONCH

LENGTH OF ROAD :-21.00Kms.


Rate
Amount
Quantity
(in
Rs.)

S.No
1
2
3

Description of Item
Earth work excavation in structures ( 70 % hard soil, 20 % soft rock
& 10 % Hard Rock
PCC M-10 grade using 40-10 MM aggregates
PCC M-15 grade 20mm & 10mm aggregate in foundation

Unit
CuM
CuM
CuM

1.23
0.825
1.68

243.6
3534
3683

299.628
2915.55
6187.44

Total
5

(in Rs.)

9402.62

Carriages
Sand

CuM

Stone Aggregate

CuM
MT

Cement

Say Rs.

Asstt. Executive Engineer


PMGSY Sub.Div.
Mendhar

1.12
2.06
0.52

1477.32
961.4
1198.5

1654.5984
1980.484
623.22

Total

4258.30

Grand Total

13660.92

1366 .00 Per R mtr.

Executive Engineer
PMGSY Division
Mendhar

COST ESTIMATE FOR TRAFFIC SIGNS AND ROAD SAFFETY MEASURES


NAME OF ROAD :- SURAN-MENDHAR ROAD
BLOCK :MENDHAR
PACKAGE No. :- JK11-146
DISTRICT :POONCH
LENGTH :- 21.00 Km.
S.No

Item of works

No.

(m)

(m)

(m)

Quantity

Unit

Rate(Rs.)

Amount
Rs. In Lac.

Reinforced cement concrete M -15 grade


kilometer stone of standard design as per IRC: 8
fixing in position including painting and printing
rtc as per drawing and technical specification
1/10.1 clause 1703.
0
i)21th Kilometer Stone

no.

2907

0.03

ii) Ordinary Kilometer Stone (Precost)

21

21

no.

1712

0.36

iii) 200m Stone (Precost)

105

105

no.

417

0.44

840

840

no.

369

3.10

272.37

no.

79

0.22

1462

3.45

Reinforced cement concrete M -15 grade


boundary pillars of standard design as per IRC:
25 fixing in position including finishing and
2/10.1 lettering but including painting as per drawing
1
and technical specification clause 1704.

Painting two coats including primercoat after


filling the surface with synthetic enamel paint in
3/10.5 all shades on new plastered surfaces as per 272.4
drawing and technical specification clause 1701
(for boundary pillers).

Providing and fixing of retro-reflectorised


cautionery, mandatory and informatory sign as
per IRC: 67 made of encapsulated lens type
reflective sheeting vide clause 1701.2.3 fixed
over aluminum sheeting 1.5mm thick supported
on mild steel angle iron post 75x75x6mm firmly
to the ground by means of property designed
foundation with M-15 grade cement concrete
4/10.2
450mm x 450mm x 600mm below grond level as
A (1). per drawing and Technical specification clause
801.

(ii) 60cm equilateral triangle


Speed limit

42

42

no.

Right / Lift hand curve

189

189

no.

no.

236

each

School
Men at work
Falling rocks

Total

Providing and erecting direction and place


identification retro-reflectorised sign as per IRC:
67 made of encapsulated lens type reflective
sheeting vide clause 1701.2.3 fixed over
aluminum sheeting 2 mm thick with area not
exceeding 0.9Sqm supported on mild steel
angle iron post 75x75x6mm firmly to the ground
5/10.3 by means of property designed foundation with
A (1) M-15 grade cement concrete 450mm x 450mm x
600mm below grond level as per drawing and
Technical specification clause 1701.

30

30

Sqm

Total

Asstt. Executive Engineer


PMGSY Sub- Division
Mendhar

2709

0.81

8.40

Executive Engineer
PMGSY Division
Mendhar

BHARAT NIRMAN
Cost Estimate for the Construction of Retaining Wall (3Mtr Height) 10.00 mtr length.
NAME OF ROAD :- Mendhar to JaranWali Gali
BLOCK
DISTRICT

:- MENDHAR
:- POONCH

S.No
1
2
3
4
5
6

Description of Item
Earth work excavation in structures ( 70 % hard
soil, 20 % soft rock & 10 % Hard Rock
PCC M-10 grade using 40-10 MM aggregates
PCC M-20 coaping using(20mm-10mm) agg.
R.R Masonary in 1:5 mix
(less
50% stone Available)
R.R Masonary dry(less 50% stone Available)
Back Filling stones behind Abutment, wing wall,
R/ Wall (less 50% stone Available)

Unit
CuM
CuM
CuM
CuM
CuM
CuM

PACKAGE No. :- JK11-146


LENGTH OF ROAD :- 21.00Kms.
Rate
Amount
Quantity
(in Rs.)
(in Rs.)
14.67
1.45
0.3

243.6
3534
4236

3573.61
5124.30
1270.80

18.27
13.34

2785
1330

50881.95
17742.20

11.25

448

5040

Total
7

Carriages
Sand
Stone Aggregate
Cement
Stone (less 50% stone Available)

CuM
CuM
MT
CuM

7.18
1.57
2.14
21.48

1477.32
961.4
1198.5
353.42

Total
Grand Total
Say Rs.

Asstt. Executive Engineer


PMGSY Sub.Div.
Mendhar

83632.86
10607.16
1509.40
2564.79
7591.46

22272.81
105905.67

10591 .00 Per R mtr.

Executive Engineer
PMGSY Division
Mendhar

BHARAT NIRMAN
Cost Estimate for The Construction of Crated Wall for 6.00mtr length
NAME OF ROAD :- Mendhar to JaranWali Gali

BLOCK
DISTRICT
S.No.
1

:-MENDHAR
:- POONCH
Description of Item

Earth work excavation in


structures (70% hard soil , 20%
soft rock & 10% hard rock)
Filling of stones into GI wire
crates.
Carriages
Stone

Unit

CuM

5.76

243.6

1403.136

CuM

8.64

1596

13789.44

Total

15192.576

CuM

Say
Rs.

Asstt. Executive Engineer


PMGSY Sub- division
Mendhar

PACKAGE No. :- JK11-146


Length of Road :- 21.00 KMS
Amount
Quantit
y
(in Rs.)

8.64

353.42
Total
Grand Total

3053.55
3053.55
18246.12

### .00 Per Crate

Executive Engineer
PMGSY Division
Mendhar

BHARAT NIRMAN
Cost Estimate for the Construction of Breast wall for 10.00 mtr length.
NAME OF ROAD :- Mendhar to JaranWali Gali
BLOCK
DISTRICT

:- MENDHAR
:- POONCH

S.No
1
2
3
4
4

Description of Item
Earth work excavation in structures ( 70 % hard
soil, 20 % soft rock & 10 % Hard Rock
PCC M-10 grade using 40-10 MM aggregates
PCC M-20 coaping using(20mm-10mm) agg.
R.R Masonary in 1:6 mix
R.R Masonary dry

PACKAGE No. :- JK11-146


LENGTH OF ROAD Amount
:- 21.00Kms.
Unit
CuM
CuM
CuM
CuM
CuM

Quantity
13.26
1.69
0.525
7.74
5.13

(in
243.6
3534
4236
2910
1455

Total
5

Carriages
Sand
Stone Aggregate

CuM
CuM

Cement

MT

Stone

4.45
3.14
1.68
12.87

Asstt. Executive Engineer


PMGSY Sub.Div.
Mendhar

3230.14
5972.46
2223.90
22523.40
7464.15

41414.05

1477.32
961.4
1198.5
353.42

Total
Grand Total
Say Rs.

Rs.)

6574.07
3018.80
2013.48
4548.52

16154.87
57568.91

5757 .00 Per R mtr.

Executive Engineer
PMGSY Division
Mendhar

BHARAT NIRMAN
Cost Estimate for The Construction of Edge Wall 10 mtr. Length
NAME OF ROAD :- Mendhar to JaranWali Gali
BLOCK
DISTRICT
S.No.

:-MENDHAR
:-POONCH
Description of Item

PACKAGE No. :- JK11-146


LENGTH OF ROAD :-21.0Kms.
Unit

Quantit
y

(in

Earth work excavation in structures ( 70


% Hard Soil, 20 % Soft rock & 10 % hard
Rock )

CuM

2.12

243.60

516.43

PCC M-10 grade using (40-10)mm agg.

CuM

1.70

3534.00

6007.80

PCC M-15 grade coping 50mm agg.

CuM

0.30

3683.00

1104.90

Back filing of granular material behind


abutment, wing wall, R/wall

CuM

2.45

527.00

1291.15

R.R. masonary dry

CuM

7.25

1455.00

Total
6

Carriages
Sand
Stone Aggregate
Cement
Stone

CuM
CuM
MT
CuM

0.900
1.800
0.450
9.700

1477.32
961.4
1198.5
353.42

Total

Say Rs.

Asstt. Executive Engineer


PMGSY Sub.Division
Mendhar

10548.75

19469.03
1329.59
1730.52
539.33
3428.17

7027.61

Grand Total
26496.64
2650 .00 Per R mtr.

Executive Engineer
PMGSY Division
Mendhar

BHARAT NIRMAN

Cost Estimate for The Construction of Parapets


NAME OF ROAD :Mendhar to JaranWali Gali
BLOCK
:MENDHAR
BALAKOTE
DISTRICT
:POONCH
POONCH
Width
S.No.

Description of Item
(M)

PACKAGE No. :- JK11-146


LENGTH OF ROAD :- 21.00 Kms
Rate

Height /
Thickne
ss (M)

Unit

Amount
(in Rs.)

Qty.
(in Rs.)

PCC M-15 grade


using (40-10)mm agg.

1.50

(0.30+0.45)/2

0.60

CuM

0.34

3683.00
Total

1252.22
1252.22

Carriages
Sand

CuM

0.153

1477.32

226.03

Stone Aggregate

CuM

0.30

961.4

288.42

MT

0.082

1198.5

98.28
612.73
1864.95

Cement

Total
Grand Total
Say Rs.

Asstt. Executive Engineer


PMGSY Sub.Div.
Mendhar

1865 .00 Per each

Executive Engineer
PMGSY Division
Mendhar

BHARAT NIRMAN PMGSY


COST ESTIMATE FOR THE CONSTRUCTION OF 1000mm DIA. H.P. CULVERT.
Name of the Scheme: - Mendhar to JaranWali Gali
Block
MENDHAR
PACKAGE No
:-JK11-146
District:
Poonch
Length: 21 KMS
Sr. No.
1
1
2
3
5
6
7

Description of items
2
Earth excavation in structures
hard soil 70% soft
rock20% H.R 10%
M10 grade using 40mm
40-10mm
aggregate
PCC M15
to 20mm
and 10mm
aggregate
Back filling with stone behind abutment.
Earth filling in trenches
Add cost of Hume pipe NP-3

Unit

Quantity

Rate

Amount

6
Cum
Cum
Cum
Cum
Cum
RM

7
56.93
7.13
17.36
3.5
2.76
10

8
243.6
3534
3683
527
340
5950

9
13868.15
25197.42
63936.88
1844.50
938.40
59500.00

TOTAL
8
1
2
3

165285.35

Carriage.
Material
Sand
Aggregate
Stone

Cum
Cum
Cum

Total
Grand Total

1477.32
961.4
1198.5

15068.664
18362.74
10978.26

56521.988
221807.34

Say 2.22 Lacs

Asstt. Executive Engineer


PMGSY Sub.Div.
Mendhar

10.2
19.1
9.16

Executive Engineer
PMGSY Division
Mendhar

Cost Estimate for the construction of RCC Culvert of 2.00M Span


NAME OF ROAD :- Mendhar to JaranWali Gali
BLOCK :- MENDHAR
DISTRICT :- POONCH
S.No.

Description of Item

Unit

PACKAGE No. :- JK11-146


LENGTH OF ROAD :- 21.00 Kms.
Quantit Rate in
Amount in Rs.
y
Rs.

Earth work excavation in structures ( 70% hard


soil, 20% soft rock & 10% Hard Rock

CuM

140.7

243.60

34274.52

PCC M-10 grade using 40-10 MM aggregates

CuM

12.34

3534.00

43609.56

PCC M-15 grade using (40-10)mm agg.& 10mm


aggregates

CuM

123.1

3683.00

453377.3

RCC M-25 grade using 20mm-10mm aggregates


(Slab)

CuM

5.46

4910.00

26808.6

H.Y.S.D. Steel (TMT)

MT

0.55

72531

39892.05

Back filling with granular material behind


abutments, wing wall, R/wall

CuM

14.06

527.00

7409.62

Carriages

TOTAL

Sand

cum

68.14

Stone Aggregate

cum

128.40
38.75
25.30
0.55

MT

Cement

cum
MT

Stone
Steel

Total
Grand Total

605371.65
1477.32

100664.58

961.4
1198.5
353.42
1212.50

123443.76
46441.88
8941.53
666.88
280158.62
885530.27

Say Rs 8.85 Lacs

Asstt. Executive Engineer


PMGSY Sub.Division
Mendhar

Executive Engineer
PMGSY Division
Mendhar

Cost Estimate for the construction of RCC Culvert of 3.00M Span


NAME OF ROAD :- Mendhar to JaranWali Gali
BLOCK :- MENDHAR
DISTRICT :- POONCH
S.No.
1
2
3
4
5
6
7

Description of Item
Earth work excavation in structures ( 70% hard
soil, 20% soft rock & 10% Hard Rock
PCC M-10 grade using 40-10 MM aggregates
PCC M-15 grade using (40-10)mm agg.& 10mm
aggregates
RCC M-25 grade using 20mm-10mm aggregates
(Slab)
H.Y.S.D. Steel (TMT)
Back filling with granular material behind
abutments, wing wall, R/wall
Carriages
Sand

Unit
CuM

160.77

243.60

39163.572

CuM

20.2

3534.00

71386.8

CuM

155.45

3683.00

572522.35

CuM

4910.00

44190

MT

0.9

72531

65277.9

CuM

22.5

527.00

11857.5

TOTAL
cum
cum

Stone Aggregate

MT

Cement

cum
MT

Stone
Steel

Total
Grand Total

Say Rs 11.61 Lacs

Asstt. Executive Engineer


PMGSY Sub.Division
Mendhar

PACKAGE No. :- JK11-146


LENGTH OF ROAD :- 21.00 Kms.
Quantit Rate in
Amount in Rs.
y
Rs.

83.50
167.00
46.60
44.75
0.90

804398.122
1477.32
961.4
1198.5
353.42
1212.50

123356.22
160553.80
55850.10
15815.55
1091.25
356666.92
1161065.04
1161065.04

Executive Engineer
PMGSY Division
Mendhar

Earth work chart for construction of Road from Mendhar to Jaranwali Gali
Distt. Poonch
Block Mendhar
KM

1st

L=21.00 Km

Earth work in cutting

RD

Earth Work in Filling

Area (m2) Length (MTotal Area Mean Area Qty. M3 Area (m2) Total Area Mean Area
0
0.36
25
0
0
0
0
25
0.36
25
0.72
0.36
9
0
0
0
50
0.36
25
0.72
0.36
9
1.17
1.17
0.585
75
0.36
25
0.72
0.36
9
0
1.17
0.585
100
0.36
25
0.72
0.36
9
0
0
0
125
0.36
25
0.72
0.36
9
1
1
0.5
150
0.36
25
0.72
0.36
9
1.44
2.44
1.22
175
0.36
25
0.72
0.36
9
0
1.44
0.72
200
0.36
25
0.72
0.36
9
0
0
0
225
0.36
25
0.72
0.36
9
0
0
0
250
0.36
25
0.72
0.36
9
1
1
0.5
275
0.36
25
0.72
0.36
9
1.6
2.6
1.3
300
0.36
25
0.72
0.36
9
3.3
4.9
2.45
325
0.36
25
0.72
0.36
9
4.35
7.65
3.825
350
0.36
25
0.72
0.36
9
5.7
10.05
5.025
375
0.36
25
0.72
0.36
9
0
5.7
2.85
400
0.36
25
0.72
0.36
9
4.6
4.6
2.3
425
0.36
25
0.72
0.36
9
3.1
7.7
3.85
450
0.36
25
0.72
0.36
9
1.2
4.3
2.15
475
0.36
25
0.72
0.36
9
1.89
3.09
1.545
500
0.36
25
0.72
0.36
9
4.25
6.14
3.07
525
0.36
25
0.72
0.36
9
3.4
7.65
3.825
550
0.36
25
0.72
0.36
9
0
3.4
1.7
575
0.36
25
0.72
0.36
9
0
0
0
600
0.36
25
0.72
0.36
9
0
0
0
625
0.36
25
0.72
0.36
9
0
0
0
650
0.36
25
0.72
0.36
9
0
0
0
675
0.36
25
0.72
0.36
9
0
0
0
700
0.36
25
0.72
0.36
9
0
0
0
725
0.36
25
0.72
0.36
9
0
0
0
750
0.36
25
0.72
0.36
9
0
0
0
775
0.36
25
0.72
0.36
9
0
0
0
800
0.36
25
0.72
0.36
9
0.5
0.5
0.25
825
0.36
25
0.72
0.36
9
0
0.5
0.25
850
5.16
25
5.52
2.76
69
0
0
0
875
5.26
25
10.42
5.21 130.25
0
0
0
900
2.53
25
7.79
3.895 97.375
0
0
0
925
9.86
25
12.39
6.195 154.88
0
0
0
950
2.55
25
12.41
6.205 155.13
0
0
0
975
0.36
25
2.91
1.455 36.375
0.9
0.9
0.45
1000
0.36
25
0.72
0.36
9
1.5
2.4
1.2
Total
949
Total

A..E.E

Executive Engineer

Qty. M3
0
14.625
29.25
0
25
61
36
0
0
25
65
122.5
191.25
251.25
142.5
115
192.5
107.5
77.25
153.5
191.25
85
0
0
0
0
0
0
0
0
0
12.5
12.5
0
0
0
0
0
22.5
60
1992.875

PMGSY Sub-Division
Mendhar

PMGSY Division
Mendhar

Earth work chart for construction of Road from Mendhar to Jaranwali Gali
Distt. Poonch
Block Mendhar
KM

2nd

RD

L=21.00 Km

Earth work in cutting

Earth Work in Filling

Area (m2) Length (MTotal Area Mean Area Qty. M3 Area (m2) Total Area Mean Area
0
0.36
25
0
0
0
0
25
0.36
25
0.72
0.36
9
0
0
0
50
0.36
25
0.72
0.36
9
0
0
0
75
0.36
25
0.72
0.36
9
0
0
0
100
0.36
25
0.72
0.36
9
0
0
0
125
0.36
25
0.72
0.36
9
0
0
0
150
1.86
25
2.22
1.11 27.75
0
0
0
175
1.16
25
3.02
1.51 37.75
0
0
0
200
1.86
25
3.02
1.51 37.75
0
0
0
225
1.86
25
3.72
1.86
46.5
0
0
0
250
0.36
25
2.22
1.11 27.75
0
0
0
275
0.36
25
0.72
0.36
9
0
0
0
300
0.36
25
0.72
0.36
9
0
0
0
325
0.66
25
1.02
0.51 12.75
0
0
0
350
0.36
25
1.02
0.51 12.75
0
0
0
375
0.36
25
0.72
0.36
9
0
0
0
400
0.36
25
0.72
0.36
9
0
0
0
425
0.36
25
0.72
0.36
9
0
0
0
450
0.36
25
0.72
0.36
9
0
0
0
475
0.36
25
0.72
0.36
9
0
0
0
500
1.11
25
1.47
0.735 18.375
0
0
0
525
0.36
25
1.47
0.735 18.375
0
0
0
550
2.86
25
3.22
1.61 40.25
0
0
0
575
4.36
25
7.22
3.61 90.25
0
0
0
600
5.56
25
9.92
4.96
124
0
0
0
625
5.91
25
11.47
5.735 143.38
0
0
0
650
0.36
25
6.27
3.135 78.375
0
0
0
675
5.63
25
5.99
2.995 74.875
1.27
1.27
0.635
700
0.36
25
5.99
2.995 74.875
0
1.27
0.635
725
1
25
1.36
0.68
17
0
0
0
750
0.36
25
1.36
0.68
17
0.85
0.85
0.425
775
0.36
25
0.72
0.36
9
2.3
3.15
1.575
800
0.36
25
0.72
0.36
9
0.51
2.81
1.405
825
2.53
25
2.89
1.445 36.125
0.52
1.03
0.515
850
1.63
25
4.16
2.08
52
0
0.52
0.26
875
3.43
25
5.06
2.53 63.25
0
0
0
900
2.68
25
6.11
3.055 76.375
0
0
0
925
9.86
25
12.54
6.27 156.75
0
0
0
950
2.55
25
12.41
6.205 155.13
0
0
0
975
0.36
25
2.91
1.455 36.375
0
0
0
1000
0.36
25
0.72
0.36
9
0
0
0
Total
1610.8
0
Total

Qty. M3
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
31.75
31.75
0
21.25
78.75
70.25
25.75
13
0
0
0
0
0
0
272.5

A..E.E
PMGSY Sub-Division
Mendhar

Executive Engineer
PMGSY Division
Mendhar

Earth work chart for construction of Road from Mendhar to Jaranwali Gali
Distt. Poonch
Block Mendhar
KM

3rd

RD

L=21.00 Km

Earth work in cutting

Earth Work in Filling

Area (m2) Length (MTotal Area Mean Area Qty. M3 Area (m2) Total Area Mean Area
0
0.36
25
0
0
0
0
25
0.36
25
0.72
0.36
9
0
0
0
50
0.36
25
0.72
0.36
9
0
0
0
75
0.36
25
0.72
0.36
9
0
0
0
100
6.81
25
7.17
3.585 89.625
0
0
0
125
7.56
25
14.37
7.185 179.63
0
0
0
150
5.36
25
12.92
6.46 161.5
0
0
0
175
4.06
25
9.42
4.71 117.75
0
0
0
200
2.81
25
6.87
3.435 85.875
0
0
0
225
0.36
25
3.17
1.585 39.625
0
0
0
250
2.46
25
2.82
1.41 35.25
0
0
0
275
5.48
25
7.94
3.97 99.25
0
0
0
300
6.66
25
12.14
6.07 151.75
0
0
0
325
7.41
25
14.07
7.035 175.88
0
0
0
350
0.36
25
7.77
3.885 97.125
0
0
0
375
0.36
25
0.72
0.36
9
0
0
0
400
0.96
25
1.32
0.66
16.5
0
0
0
425
1.41
25
2.37
1.185 29.625
0
0
0
450
0.36
25
1.77
0.885 22.125
0
0
0
475
2.66
25
3.02
1.51 37.75
0
0
0
500
3.81
25
6.47
3.235 80.875
0
0
0
525
4.11
25
7.92
3.96
99
0
0
0
550
4.16
25
8.27
4.135 103.38
0
0
0
575
2.61
25
6.77
3.385 84.625
0
0
0
600
2.83
25
5.44
2.72
68
0
0
0
625
0.36
25
3.19
1.595 39.875
0
0
0
650
3.96
25
4.32
2.16
54
0
0
0
675
3.43
25
7.39
3.695 92.375
0
0
0
700
0.36
25
3.79
1.895 47.375
0
0
0
725
0.36
25
0.72
0.36
9
0
0
0
750
0.36
25
0.72
0.36
9
0
0
0
775
2.11
25
2.47
1.235 30.875
0
0
0
800
0.36
25
2.47
1.235 30.875
0
0
0
825
3.11
25
3.47
1.735 43.375
0
0
0
850
3.16
25
6.27
3.135 78.375
0
0
0
875
2.51
25
5.67
2.835 70.875
0
0
0
900
1.53
25
4.04
2.02
50.5
0
0
0
925
2.51
25
4.04
2.02
50.5
0
0
0
950
3.51
25
6.02
3.01 75.25
0
0
0
975
5.86
25
9.37
4.685 117.125
0
0
0
1000
2.66
25
8.52
4.26 106.5
0
0
0

Qty. M3
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total

A..E.E
PMGSY Sub-Division
Mendhar

2717

Total

Executive Engineer
PMGSY Division
Mendhar

Earth work chart for construction of Road from Mendhar to Jaranwali Gali
Distt. Poonch
Block Mendhar
KM

4th

RD

L=21.00 Km

Earth work in cutting

Earth Work in Filling

Area (m2) Length (MTotal Area Mean Area Qty. M3 Area (m2) Total Area Mean Area
0
2.66
25
0
0
0
0
25
5.98
25
8.64
4.32
108
0
0
0
50
0.36
25
6.34
3.17 79.25
0
0
0
75
0.36
25
0.72
0.36
9
0
0
0
100
4.76
25
5.12
2.56
64
0
0
0
125
1.76
25
6.52
3.26
81.5
0
0
0
150
0.78
25
2.54
1.27 31.75
0
0
0
175
0.36
25
1.14
0.57 14.25
0
0
0
200
0.36
25
0.72
0.36
9
0
0
0
225
0.36
25
0.72
0.36
9
0
0
0
250
0.36
25
0.72
0.36
9
0
0
0
275
0.36
25
0.72
0.36
9
0
0
0
300
0.36
25
0.72
0.36
9
0
0
0
325
3.51
25
3.87
1.935 48.375
0
0
0
350
2.08
25
5.59
2.795 69.875
0
0
0
375
1.96
25
4.04
2.02
50.5
0
0
0
400
2.66
25
4.62
2.31 57.75
0
0
0
425
1.11
25
3.77
1.885 47.125
0
0
0
450
1.96
25
3.07
1.535 38.375
0
0
0
475
6.76
25
8.72
4.36
109
0
0
0
500
7.6
25
14.36
7.18 179.5
0
0
0
525
9.36
25
16.96
8.48
212
0
0
0
550
14.76
25
24.12
12.06 301.5
0
0
0
575
12.36
25
27.12
13.56
339
0
0
0
600
10.36
25
22.72
11.36
284
0
0
0
625
1.43
25
11.79
5.895 147.38
0
0
0
650
2.85
25
4.28
2.14
53.5
0
0
0
675
7.41
25
10.26
5.13 128.25
0
0
0
700
4.36
25
11.77
5.885 147.13
0
0
0
725
0.36
25
4.72
2.36
59
0
0
0
750
5.26
25
5.62
2.81 70.25
0
0
0
775
11.21
25
16.47
8.235 205.88
0
0
0
800
0.36
25
11.57
5.785 144.63
0
0
0
825
0.36
25
0.72
0.36
9
0
0
0
850
0.36
25
0.72
0.36
9
0
0
0
875
5.4
25
5.76
2.88
72
0
0
0
900
6.56
25
11.96
5.98 149.5
0
0
0
925
3.36
25
9.92
4.96
124
0
0
0
950
4.56
25
7.92
3.96
99
0
0
0

Qty. M3
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

975
1000

9.56
3.06

25
25

14.12
12.62
Total

A..E.E
PMGSY Sub-Division
Mendhar

7.06 176.5
6.31 157.75
3922.5

0
0
0

0
0

0
0

0
0
0

Total

Executive Engineer
PMGSY Division
Mendhar

Earth work chart for construction of Road from Mendhar to Jaranwali Gali
Distt. Poonch
Block Mendhar
KM

5th

RD

L=21.00 Km

Earth work in cutting

Earth Work in Filling

Area (m2) Length (MTotal Area Mean Area Qty. M3 Area (m2) Total Area Mean Area
0
3.06
25
0
0
0
0
25
5.42
25
8.48
4.24
106
0
0
0
50
3.26
25
8.68
4.34 108.5
0
0
0
75
0.36
25
3.62
1.81 45.25
0
0
0
100
1.58
25
1.94
0.97 24.25
0
0
0
125
2.11
25
3.69
1.845 46.125
0
0
0
150
4.71
25
6.82
3.41 85.25
0
0
0
175
4.61
25
9.32
4.66
116.5
0
0
0
200
8.61
25
13.22
6.61 165.25
0
0
0
225
5.61
25
14.22
7.11 177.75
0
0
0
250
3.81
25
9.42
4.71 117.75
0
0
0
275
4.23
25
8.04
4.02 100.5
0
0
0
300
6.11
25
10.34
5.17 129.25
0
0
0
325
10.86
25
16.97
8.485 212.13
0
0
0
350
9.11
25
19.97
9.985 249.63
0
0
0
375
3.48
25
12.59
6.295 157.38
0
0
0
400
6.96
25
10.44
5.22 130.5
0
0
0
425
4.86
25
11.82
5.91 147.75
0
0
0
450
6.36
25
11.22
5.61 140.25
0
0
0
475
5.76
25
12.12
6.06 151.5
0
0
0
500
1.56
25
7.32
3.66
91.5
0
0
0
525
0.36
25
1.92
0.96
24
0
0
0
550
2.56
25
2.92
1.46
36.5
0
0
0
575
0.36
25
2.92
1.46
36.5
0
0
0
600
0.36
25
0.72
0.36
9
0
0
0
625
1.98
25
2.34
1.17 29.25
0
0
0
650
0.36
25
2.34
1.17 29.25
0
0
0
675
0.36
25
0.72
0.36
9
0
0
0
700
2.81
25
3.17
1.585 39.625
0
0
0
725
2.76
25
5.57
2.785 69.625
0
0
0
750
2.81
25
5.57
2.785 69.625
0
0
0
775
0.36
25
3.17
1.585 39.625
0
0
0
800
0.36
25
0.72
0.36
9
0
0
0
825
0.56
25
0.92
0.46
11.5
0
0
0
850
3.06
25
3.62
1.81 45.25
0
0
0
875
4.26
25
7.32
3.66
91.5
0
0
0
900
6.96
25
11.22
5.61 140.25
0
0
0

Qty. M3
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

925
950
975
1000

7.16
3.98
0.36
0.36

25
25
25
25

14.12
11.14
4.34
0.72
Total

A..E.E
PMGSY Sub-Division
Mendhar

7.06 176.5
5.57 139.25
2.17 54.25
0.36
9
3571.5

0
0
0
0
0

0
0
0
0

0
0
0
0

0
0
0
0
0

Total

Executive Engineer
PMGSY Division
Mendhar

Earth work chart for construction of Road from Mendhar to Jaranwali Gali
Distt. Poonch
Block Mendhar
KM

6th

RD

L=21.00 Km

Earth work in cutting

Earth Work in Filling

Area (m2) Length (MTotal Area Mean Area Qty. M3 Area (m2) Total Area Mean Area
0
0.36
25
0
0
0
0
25
6.16
25
6.52
3.26
81.5
0
0
0
50
0.36
25
6.52
3.26
81.5
0
0
0
75
0.36
25
0.72
0.36
9
0
0
0
100
0.36
25
0.72
0.36
9
0
0
0
125
2.74
25
3.1
1.55 38.75
0
0
0
150
2.04
25
4.78
2.39 59.75
0
0
0
175
2.56
25
4.6
2.3
57.5
0
0
0
200
3.26
25
5.82
2.91 72.75
0
0
0
225
1.01
25
4.27
2.135 53.375
0
0
0
250
0.36
25
1.37
0.685 17.125
0
0
0
275
0.46
25
0.82
0.41 10.25
0
0
0
300
1.86
25
2.32
1.16
29
0
0
0
325
1.86
25
3.72
1.86
46.5
0
0
0
350
7.48
25
9.34
4.67 116.75
0
0
0
375
9.21
25
16.69
8.345 208.63
0
0
0
400
0.36
25
9.57
4.785 119.625
0
0
0
425
0.36
25
0.72
0.36
9
0
0
0
450
1.86
25
2.22
1.11 27.75
0
0
0
475
0.36
25
2.22
1.11 27.75
0
0
0
500
0.36
25
0.72
0.36
9
0
0
0
525
0.36
25
0.72
0.36
9
0
0
0
550
0.36
25
0.72
0.36
9
0
0
0
575
0.85
25
1.21
0.605 15.125
0
0
0
600
0.36
25
1.21
0.605 15.125
0
0
0
625
0.36
25
0.72
0.36
9
0
0
0
650
0.36
25
0.72
0.36
9
0
0
0
675
0.36
25
0.72
0.36
9
0
0
0
700
0.36
25
0.72
0.36
9
0
0
0
725
6.26
25
6.62
3.31 82.75
0
0
0
750
0.36
25
6.62
3.31 82.75
0
0
0
775
0.36
25
0.72
0.36
9
0
0
0
800
3.81
25
4.17
2.085 52.125
0
0
0
825
0.36
25
4.17
2.085 52.125
0
0
0
850
0.36
25
0.72
0.36
9
0
0
0

Qty. M3
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

875
900
925
950
975
1000

6.39
4.26
0.36
0.56
7.56
4.26

25
25
25
25
25
25

6.75
10.65
4.62
0.92
8.12
11.82

3.375 84.375
5.325 133.13
2.31 57.75
0.46
11.5
4.06 101.5
5.91 147.75
Total
1992.5

A..E.E
PMGSY Sub-Division
Mendhar

0
0
0
0
0
0
0

0
0
0
0
0
0

0
0
0
0
0
0

0
0
0
0
0
0
0

Total

Executive Engineer
PMGSY Division
Mendhar

Earth work chart for construction of Road from Mendhar to Jaranwali Gali
Distt. Poonch
Block Mendhar
KM

7th

RD

L=21.00 Km

Earth work in cutting

Earth Work in Filling

Area (m2) Length (MTotal Area Mean Area Qty. M3 Area (m2) Total Area Mean Area
0
4.26
25
0
0
0
0
25
0.36
25
4.62
2.31 57.75
0
0
0
50
4.1
25
4.46
2.23 55.75
0
0
0
75
0.36
25
4.46
2.23 55.75
0
0
0
100
1.89
25
2.25
1.125 28.125
0
0
0
125
1.96
25
3.85
1.925 48.125
0
0
0
150
0.36
25
2.32
1.16
29
0
0
0
175
0.36
25
0.72
0.36
9
0
0
0
200
0.36
25
0.72
0.36
9
0
0
0
225
0.36
25
0.72
0.36
9
0
0
0
250
0.36
25
0.72
0.36
9
0
0
0
275
0.36
25
0.72
0.36
9
0
0
0
300
0.36
25
0.72
0.36
9
0
0
0
325
0.36
25
0.72
0.36
9
0
0
0
350
0.36
25
0.72
0.36
9
0
0
0
375
0.36
25
0.72
0.36
9
0
0
0
400
0.36
25
0.72
0.36
9
0
0
0
425
0.36
25
0.72
0.36
9
0
0
0
450
0.36
25
0.72
0.36
9
0
0
0
475
0.36
25
0.72
0.36
9
0
0
0
500
0.36
25
0.72
0.36
9
0
0
0
525
0.36
25
0.72
0.36
9
0
0
0
550
0.36
25
0.72
0.36
9
0
0
0
575
1.29
25
1.65
0.825 20.625
0
0
0
600
0.36
25
1.65
0.825 20.625
0
0
0
625
0.36
25
0.72
0.36
9
0
0
0
650
0.36
25
0.72
0.36
9
0
0
0
675
0.36
25
0.72
0.36
9
0
0
0
700
0.36
25
0.72
0.36
9
0
0
0
725
0.36
25
0.72
0.36
9
0
0
0
750
9.36
25
9.72
4.86 121.5
0
0
0
775
2.53
25
11.89
5.945 148.63
0
0
0
800
6.66
25
9.19
4.595 114.875
0
0
0

Qty. M3
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

825
850
875
900
925
950
975
1000

0.36
8.76
11.1
6.21
0.36
0.36
0.36
0.36

25
25
25
25
25
25
25
25

7.02
9.12
19.86
17.31
6.57
0.72
0.72
0.72

3.51 87.75
4.56
114
9.93 248.25
8.655 216.38
3.285 82.125
0.36
9
0.36
9
0.36
9
Total
1665.3

A..E.E
PMGSY Sub-Division
Mendhar

0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
Total

0
0
0
0
0
0
0
0
0

Executive Engineer
PMGSY Division
Mendhar

Earth work chart for construction of Road from Mendhar to Jaranwali Gali
Distt. Poonch
Block Mendhar
KM
15th

L=21.00 Km

RD Length (M

Earth work in cutting

Earth Work in Filling

Area (m2)

Total Area

Mean Area

Qty. M3 Area (m2)

Mean Area

Qty. M3

Total Area
0

25

25

0.36

0.36

0.18

4.5

50

25

0.36

0.72

0.36

75

25

0.36

0.72

0.36

100

25

0.36

0.72

0.36

125

25

0.36

0.72

0.36

150

25

0.36

0.72

0.36

175

25

0.36

0.72

0.36

200

25

0.36

0.18

4.5

225

25

2.26

2.26

1.13

28.25

250

25

3.16

5.42

2.71

67.75

275

25

2.46

5.62

2.81

70.25

300

25

2.36

4.82

2.41

60.25

325

25

5.56

7.92

3.96

99

350

25

7.56

13.12

6.56

164

375

25

0.36

7.92

3.96

99

400

25

2.16

2.52

1.26

31.5

425

25

1.81

3.97

1.985

49.625

450

25

3.26

5.07

2.535

63.375

475

25

0.36

3.62

1.81

45.25

500

25

4.76

5.12

525

25

4.86

9.62

550

25

7.26

12.12

575

25

8.73

15.99

7.995

199.875

600

25

6.41

15.14

625

25

4.16

10.57

5.285

132.125

650

25

2.06

6.22

3.11

77.75

675

25

3.36

5.42

2.71

67.75

700

25

3.96

7.32

3.66

91.5

725

25

5.02

8.98

4.49

112.25

750

25

3.51

8.53

4.265

106.625

775

25

4.46

7.97

3.985

99.625

800

25

8.96

13.42

6.71

167.75

825

25

2.26

11.22

5.61

140.25

850

25

4.16

6.42

3.21

80.25

875

25

2.01

6.17

3.085

77.125

900

25

2.2

4.21

2.105

52.625

925

25

4.82

7.02

3.51

87.75

950

25

11.26

16.08

8.04

201

975

25

9.06

20.32

10.16

254

1000

25

0.36

9.42

4.71

117.75

Total

2907.25

A..E.E
PMGSY Sub-Division
Mendhar

Total

Executive Engineer
PMGSY Division
Mendhar

Earth work chart for construction of Road from Mendhar to Jaranwali Gali
Distt. Poonch
Block Mendhar
KM

L=21.00 Km

RD Length (M)

16th

Earth work in cutting


Area ( M2)

Total Area

Earth Work in Filling


Mean Area

Qty. M3 Area ( M2)

Total Area

Mean Area

Qty. M3

0.36

25

25

0.36

0.72

0.36

50

25

1.16

1.52

0.76

19

75

25

1.31

2.47

1.235

30.875

100

25

5.66

6.97

3.485

87.125

125

25

0.36

6.02

3.01

75.25

150

25

0.71

1.07

0.535

13.375

175

25

3.36

4.07

2.035

50.875

200

25

2.06

5.42

2.71

67.75

225

25

1.71

3.77

1.885

47.125

250

25

3.36

5.07

2.535

63.375

275

25

1.86

5.22

2.61

65.25

300

25

1.86

0.93

23.25

325

25

2.26

2.26

1.13

28.25

350

25

3.26

5.52

2.76

69

375

25

3.36

6.62

3.31

82.75

400

25

5.76

9.12

4.56

114

425

25

0.36

6.12

3.06

76.5

450

25

1.86

2.22

1.11

27.75

475

25

3.26

5.12

2.56

64

500

25

3.36

6.62

3.31

82.75

525

25

5.21

8.57

4.285

107.125

550

25

0.86

6.07

3.035

75.875

575

25

5.76

6.62

3.31

82.75

600

25

2.16

7.92

3.96

99

625

25

3.26

5.42

2.71

67.75

650

25

0.36

3.62

1.81

45.25

675

25

0.36

0.18

4.5

700

25

0.36

0.36

0.18

4.5

725

25

0.36

0.72

0.36

750

25

1.26

1.62

0.81

20.25

775

25

1.26

0.63

15.75

800

25

0.36

0.36

0.18

4.5

825

25

0.36

0.72

0.36

850

25

1.06

1.42

0.71

17.75

875

25

2.76

3.82

1.91

47.75

900

25

3.26

6.02

3.01

75.25

925

25

3.26

1.63

40.75

950

25

1.86

1.86

0.93

23.25

975

25

1.86

3.72

1.86

46.5

1000

25

0.36

2.22

1.11

27.75

Total

1921.5

Total

A..E.E
PMGSY Sub-Division
Mendhar

Executive Engineer
PMGSY Division
Mendhar

Earth work chart for construction of Road from Mendhar to Jaranwali Gali
Distt. Poonch
Block Mendhar
KM

L=21.00 Km
Length

RD (M)

Earth work in cutting


Area (m2)

17th

Earth Work in Filling

Total Area Mean Area

Qty. M3 Area (m2)

Total Area

Mean Area

Qty. M3

0.36

25

25

0.86

1.22

0.61

15.25

50

25

0.36

1.22

0.61

15.25

75

25

6.36

6.72

3.36

84

100

25

1.36

7.72

3.86

96.5

125

25

2.61

3.97

1.985

49.625

150

25

0.72

3.33

1.665

41.625

175

25

0.36

1.08

0.54

13.5

200

25

0.36

0.72

0.36

225

25

3.36

3.72

1.86

46.5

250

25

24.46

27.82

13.91

347.75

275

25

0.72

25.18

12.59

314.75

300

25

0.36

1.08

0.54

13.5

325

25

8.18

8.54

4.27

106.75

350

25

5.05

13.23

6.615

165.375

375

25

4.98

10.03

5.015

125.375

400

25

0.79

5.77

2.885

72.125

425

25

4.96

5.75

2.875

71.875

450

25

0.36

5.32

2.66

66.5

475

25

2.15

2.51

1.255

31.375

500

25

9.82

11.97

5.985

149.625

525

25

0.36

10.18

5.09

127.25

550

25

4.61

4.97

2.485

62.125

575

25

0.69

5.3

2.65

66.25

600

25

4.71

5.4

2.7

67.5

625

25

4.74

9.45

4.725

118.125

650

25

0.86

5.6

2.8

70

675

25

0.36

1.22

0.61

15.25

700

25

0.36

0.72

0.36

725

25

0.36

0.72

0.36

750

25

0.36

0.72

0.36

775

25

11.21

11.57

5.785

144.625

800

25

0.36

11.57

5.785

144.625

825

25

0.36

0.72

0.36

850

25

0.66

1.02

0.51

12.75

875

25

1.86

2.52

1.26

31.5

900

25

12.14

14

175

925

25

12.41

24.55

12.275

306.875

950

25

3.89

16.3

8.15

203.75

975

25

7.95

11.84

5.92

148

1000

25

4.46

12.41

6.205

155.125

Total

3721

A..E.E
PMGSY Sub-Division
Mendhar

Total

Executive Engineer
PMGSY Division
Mendhar

Earth work chart for construction of Road from Mendhar to Jaranwali Gali
Distt. Poonch
Block Mendhar
KM

RD

L=21.00 Km
Length
(M)

Earth work in cutting


Area (m2)

18th

Total Area

Earth Work in Filling

Mean Area

Qty. M3

25

25

4.46

6.22

3.11

77.75

50

25

1.76

3.82

1.91

47.75

75

25

2.06

2.42

1.21

30.25

100

25

0.36

0.72

0.36

125

25

0.36

5.37

2.685

67.125

150

25

5.01

5.37

2.685

67.125

175

25

0.36

5.22

2.61

65.25

200

25

4.86

11.75

5.875

146.875

225

25

6.89

7.88

3.94

98.5

250

25

0.99

8.32

4.16

104

275

25

7.33

11.54

5.77

144.25

300

25

4.21

8.42

4.21

105.25

325

25

4.21

4.21

2.105

52.625

350

25

375

25

1.61

0.805

20.125

400

25

1.61

2.52

1.26

31.5

425

25

0.91

1.27

0.635

15.875

450

25

0.36

0.72

0.36

475

25

0.36

1.6

0.8

20

500

25

1.24

3.23

1.615

40.375

525

25

1.99

2.35

1.175

29.375

550

25

0.36

4.5

2.25

56.25

575

25

4.14

4.14

2.07

51.75

600

25

11.46

5.73

143.25

Area (m2)

Total Area

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Mean Area

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Qty. M3

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

625

25

11.46

28.51

14.255

356.375

650

25

17.05

23.64

11.82

295.5

675

25

6.59

7.7

3.85

96.25

700

25

1.11

1.47

0.735

18.375

725

25

0.36

0.72

0.36

750

25

0.36

3.37

1.685

42.125

775

25

3.01

23.86

11.93

298.25

800

25

20.85

39.81

19.905

497.625

825

25

18.96

53.52

26.76

669

850

25

34.56

82.95

41.475 1036.875

875

25

48.39

53.25

26.625

665.625

900

25

4.86

39.83

19.915

497.875

925

25

34.97

51.04

25.52

638

950

25

16.07

24.38

12.19

304.75

975

25

8.31

14

175

1000

25

5.69

5.69

2.845

71.125

Total

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

7105

A..E.E
PMGSY Sub-Division
Mendhar

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total

Executive Engineer
PMGSY Division
Mendhar

Earth work chart for construction of Road from Mendhar to Jaranwali Gali
Distt. Poonch
Block Mendhar
KM

RD

L=21.00 Km
Length (M

Earth work in cutting


Area (m2)

19th

Total Area

Earth Work in Filling

Mean Area

Qty. M3

5.69

25

25

12.86

23.12

11.56

289

50

25

10.26

14.12

7.06

176.5

75

25

3.86

9.77

4.885

122.125

100

25

5.91

12.2

6.1

152.5

125

25

6.29

12.2

6.1

152.5

150

25

5.91

22.02

11.01

275.25

175

25

16.11

21.53

10.765

269.125

200

25

5.42

6.03

3.015

75.375

225

25

0.61

9.07

4.535

113.375

250

25

8.46

12.27

6.135

153.375

275

25

3.81

14.38

7.19

179.75

300

25

10.57

10.93

5.465

136.625

325

25

0.36

3.24

1.62

40.5

350

25

2.88

2.88

1.44

36

375

25

400

25

3.96

1.98

49.5

425

25

3.96

10.77

5.385

134.625

450

25

6.81

8.82

4.41

110.25

475

25

2.01

2.37

1.185

29.625

500

25

0.36

0.72

0.36

525

25

0.36

0.36

0.18

4.5

550

25

0.36

0.18

4.5

575

25

0.36

15.3

7.65

191.25

Area (m2)

Total Area

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Mean Area

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Qty. M3

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

600

25

14.94

24.75

12.375

309.375

625

25

9.81

22.97

11.485

287.125

650

25

13.16

21.83

10.915

272.875

675

25

8.67

17.88

8.94

223.5

700

25

9.21

17.64

8.82

220.5

725

25

8.43

36.08

18.04

451

750

25

27.65

41.79

20.895

522.375

775

25

14.14

14.5

7.25

181.25

800

25

0.36

0.72

0.36

825

25

0.36

4.95

2.475

61.875

850

25

4.59

4.95

2.475

61.875

875

25

0.36

5.64

2.82

70.5

900

25

5.28

13.32

6.66

166.5

925

25

8.04

29.17

14.585

364.625

950

25

21.13

43.78

21.89

547.25

975

25

22.65

22.65

11.325

283.125

1000

25

Total

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

6738.00

A..E.E
PMGSY Sub-Division
Mendhar

Executive Engineer
PMGSY Division
Mendhar

Earth work chart for construction of Road from Mendhar to Jaranwali Gali
Distt. Poonch
Block Mendhar
KM

RD

L=21.00 Km
Length (M

Earth work in cutting

Area (m2)

Total Area

Earth Work in Filling

Mean Area

Qty. M3

Area (m2)

Total Area

Mean Area

Qty. M3

20th
0

25

25

2.89

2.89

1.445

36.125

50

25

4.16

7.05

3.525

88.125

75

25

1.96

6.12

3.06

76.5

100

25

3.96

5.92

2.96

74

125

25

1.99

5.95

2.975

74.375

150

25

0.36

2.35

1.175

29.375

175

25

0.36

0.72

0.36

200

25

13.46

13.82

6.91

172.75

225

25

16.97

30.43

15.215

380.375

250

25

8.12

25.09

12.545

313.625

275

25

14.16

22.28

11.14

278.5

300

25

4.41

18.57

9.285

232.125

325

25

9.51

13.92

6.96

174

350

25

5.04

14.55

7.275

181.875

375

25

0.36

5.4

2.7

67.5

400

25

5.16

5.52

2.76

69

425

25

2.89

8.05

4.025

100.625

450

25

4.94

7.83

3.915

97.875

475

25

0.36

5.3

2.65

66.25

500

25

0.36

0.72

0.36

525

25

0.36

0.72

0.36

550

25

5.01

5.37

2.685

67.125

575

25

6.51

11.52

5.76

144

600

25

5.91

12.42

6.21

155.25

625

25

7.87

13.78

6.89

172.25

650

25

1.94

9.81

4.905

122.625

675

25

0.36

2.3

1.15

28.75

700

25

10.81

11.17

5.585

139.625

725

25

7.36

18.17

9.085

227.125

750

25

5.01

12.37

6.185

154.625

775

25

11.76

16.77

8.385

209.625

800

25

16.34

28.1

14.05

351.25

825

25

16.97

33.31

16.655

416.375

850

25

15.71

32.68

16.34

408.5

875

25

15.99

31.7

15.85

396.25

900

25

6.97

22.96

11.48

287

925

25

10.24

17.21

8.605

215.125

950

25

7.15

17.39

8.695

217.375

975

25

4.39

11.54

5.77

144.25

1000

25

10.99

15.38

192.25

7.69
Total

6589.375

A..E.E
PMGSY Sub-Division
Mendhar

Total

Executive Engineer
PMGSY Division
Mendhar

Earth work chart for construction of Road from Mendhar to Jaranwali Gali
Distt. Poonch
Block Mendhar
KM

RD

L=21.00 Km
Length (M

Earth work in cutting

Area (m2)

Total Area

Earth Work in Filling

Mean Area

Qty. M3

Area (m2)

Total Area

Mean Area

Qty. M3

21st
0

10.99

25
50

25

14.6

25.59

12.795

319.875

25

24.12

38.72

19.36

484

75

25

14.14

38.26

19.13

478.25

100

25

4.35

18.49

9.245

231.125

125

25

19.86

24.21

12.105

302.625

150

25

14.14

34

17

425

175

25

9.24

23.38

11.69

292.25

200

25

10.99

20.23

10.115

252.875

225

25

2.43

13.42

6.71

167.75

250

25

17.39

19.82

9.91

247.75

275

25

22.99

40.38

20.19

504.75

300

25

35.81

58.8

29.4

735

325

25

10.14

45.95

22.975

574.375

350

25

0.36

10.5

5.25

131.25

375

25

0.36

0.72

0.36

400

25

0.36

0.72

0.36

425

25

0.36

0.72

0.36

450

25

7.36

7.72

3.86

96.5

475

25

0.76

8.12

4.06

101.5

500

25

18.99

19.75

9.875

246.875

525

25

9.62

28.61

14.305

357.625

550

25

5.76

15.38

7.69

192.25

575

25

3.01

8.77

4.385

109.625

600

25

13.87

16.88

8.44

211

625

25

13.87

6.935

173.375

650

25

11.66

11.66

5.83

145.75

675

25

20.91

32.57

16.285

407.125

700

25

7.98

28.89

14.445

361.125

725

25

5.84

13.82

6.91

172.75

750

25

12.79

18.63

9.315

232.875

775

25

7.78

20.57

10.285

257.125

800

25

10.14

17.92

8.96

224

825

25

26.86

37

18.5

462.5

850

25

18.69

45.55

22.775

569.375

875

25

15.43

34.12

17.06

426.5

900

25

37.61

53.04

26.52

663

925

25

0.36

37.97

18.985

474.625

950

25

13.11

13.47

6.735

168.375

975

25

8.11

21.22

10.61

265.25

1000

25

10.24

18.35

9.175

229.375

Total

11722.38

A..E.E
PMGSY Sub-Division
Mendhar

Total

Executive Engineer
PMGSY Division
Mendhar

Earth work chart for construction of Road from Mendhar to Jaranwali Gali
Distt. Poonch
Block Mendhar
KM

RD

L=21.00 Km
Length (M

Earth work in cutting

Area (m2)
8th

Total Area

Earth Work in Filling

Mean Area

Qty. M3

Area (m2)

Total Area

Mean Area

Qty. M3

25

25

6.01

6.01

3.005

75.125

50

25

4.86

10.87

5.435

135.875

75

25

4.11

8.97

4.485

112.125

100

25

4.66

8.77

4.385

109.625

125

25

3.88

8.54

4.27

106.75

150

25

2.08

5.96

2.98

74.5

175

25

1.11

3.19

1.595

39.875

200

25

4.16

5.27

2.635

65.875

225

25

3.48

7.64

3.82

95.5

250

25

2.66

6.14

3.07

76.75

275

25

6.08

8.74

4.37

109.25

300

25

3.48

9.56

4.78

119.5

325

25

7.48

10.96

5.48

137

350

25

3.82

11.3

5.65

141.25

375

25

6.27

10.09

5.045

126.125

400

25

7.11

13.38

6.69

167.25

425

25

1.76

8.87

4.435

110.875

450

25

3.76

5.52

2.76

69

475

25

1.61

5.37

2.685

67.125

500

25

5.76

7.37

3.685

92.125

525

25

6.21

11.97

5.985

149.625

550

25

1.16

7.37

3.685

92.125

575

25

0.72

1.88

0.94

23.5

600

25

0.72

1.44

0.72

18

625

25

1.92

2.64

1.32

33

650

25

2.56

4.48

2.24

56

675

25

0.72

3.28

1.64

41

700

25

0.72

1.44

0.72

18

725

25

3.12

3.84

1.92

48

750

25

7.29

10.41

5.205

130.125

775

25

5.46

12.75

6.375

159.375

800

25

13.97

19.43

9.715

242.875

825

25

4.36

18.33

9.165

229.125

850

25

6.14

10.5

5.25

131.25

875

25

8.2

14.34

7.17

179.25

900

25

4.46

12.66

6.33

158.25

925

25

11.11

15.57

7.785

194.625

950

25

17.11

8.555

213.875

975

25

3.21

9.21

4.605

115.125

1000

25

1.11

4.32

2.16

54

Total

4318.625

A..E.E
PMGSY Sub-Division
Mendhar

Total

Executive Engineer
PMGSY Division
Mendhar

Earth work chart for construction of Road from Mendhar to Jaranwali Gali
Distt. Poonch
Block Mendhar
KM

RD

L=21.00 Km
Length (M

Earth work in cutting

Area (m2)
9th

Total Area

Earth Work in Filling

Mean Area

Qty. M3

Area (m2)

Total Area

Mean Area

Qty. M3

#REF!

#REF!

#REF!

25

25

3.78

3.78

1.89

47.25

50

25

1.57

5.35

2.675

66.875

75

25

1.49

3.06

1.53

38.25

100

25

1.49

0.745

18.625

18.625

125

25

0.85

2.85

1.425

150

25

0.09

0.94

0.47

175

25

8.03

8.03

4.015

100.375

0.09

0.045

4.516875

200

25

12.91

20.94

10.47

261.75

225

25

12.61

25.52

12.76

319

2.4

2.4

1.2

382.8

250

25

0.36

12.97

6.485

162.125

2.4

1.2

194.55

275

25

14.41

14.77

7.385

184.625

300

25

6.34

20.75

10.375

259.375

325

25

0.36

6.7

3.35

83.75

2.2

2.2

1.1

92.125

350

25

9.09

9.45

4.725

118.125

2.2

1.1

129.9375

375

25

4.96

14.05

7.025

175.625

400

25

5.11

10.07

5.035

125.875

425

25

1.39

6.5

3.25

81.25

450

25

7.11

8.5

4.25

106.25

475

25

6.36

13.47

6.735

168.375

500

25

4.49

10.85

5.425

135.625

525

25

9.76

14.25

7.125

178.125

550

25

1.72

11.48

5.74

143.5

575

25

4.41

6.13

3.065

76.625

0.18

0.18

0.09

6.89625

600

25

3.67

8.08

4.04

101

0.18

0.09

9.09

625

25

4.66

8.33

4.165

104.125

650

25

0.86

5.52

2.76

69

2.5

2.5

1.25

86.25

675

25

0.36

1.22

0.61

15.25

1.25

3.75

1.875

28.59375

700

25

0.36

0.18

4.5

1.9

3.15

1.575

7.0875

725

25

4.26

4.26

2.13

53.25

1.9

0.95

50.5875

750

25

3.66

7.92

3.96

99

775

25

4.91

8.57

4.285

107.125

800

25

4.66

9.57

4.785

119.625

825

25

5.66

10.32

5.16

129

850

25

5.86

11.52

5.76

144

875

25

2.26

8.12

4.06

101.5

900

25

3.56

5.82

2.91

72.75

925

25

5.01

8.57

4.285

107.125

1.51

1.51

0.755

80.879375

950

25

10.71

15.72

7.86

196.5

0.9

2.41

1.205

236.7825

975

25

1.01

11.72

5.86

146.5

0.9

0.45

65.925

1000

25

4.36

5.37

2.685

67.125

Total

4488.75

A..E.E
PMGSY Sub-Division
Mendhar

Total

Executive Engineer
PMGSY Division
Mendhar

Earth work chart for construction of Road from Mendhar to Jaranwali Gali
Distt. Poonch
Block Mendhar
KM

RD

L=21.00 Km
Length (M

Earth work in cutting

Area (m2)
10th

Total Area

Earth Work in Filling

Mean Area

Qty. M3

Area (m2)

Total Area

Mean Area

Qty. M3

#REF!

#REF!

#REF!

25

25

7.51

7.51

3.755

93.875

0.00

50

25

7.55

15.06

7.53

188.25

0.00

75

25

7.09

14.64

7.32

183

0.00

100

25

6.86

13.95

6.975

174.375

0.00

125

25

6.83

13.69

6.845

171.125

0.00

150

25

10.91

17.74

8.87

221.75

0.00

175

25

14.75

25.66

12.83

320.75

0.00

200

25

9.72

24.47

12.235

305.875

0.00

225

25

3.98

13.7

6.85

171.25

0.00

250

25

1.36

5.34

2.67

66.75

0.00

275

25

3.58

4.94

2.47

61.75

0.00

300

25

0.36

3.94

1.97

49.25

0.3

0.3

0.15

7.39

325

25

0.72

1.08

0.54

13.5

0.00

350

25

0.72

1.44

0.72

18

0.00

375

25

0.72

0.36

1.12

1.12

0.56

5.04

400

25

6.81

6.81

3.405

85.125

0.00

425

25

7.48

14.29

7.145

178.625

0.00

450

25

17.16

24.64

12.32

308

0.00

475

25

2.78

19.94

9.97

249.25

0.00

500

25

0.36

3.14

1.57

39.25

0.00

525

25

1.9

2.26

1.13

28.25

0.36

0.36

0.18

5.09

550

25

0.36

2.26

1.13

28.25

0.00

575

25

0.36

0.18

4.5

0.5

0.5

0.25

1.13

600

25

0.36

0.36

0.18

4.5

0.00

625

25

0.36

0.18

4.5

0.00

650

25

0.36

0.36

0.18

4.5

0.00

675

25

0.36

0.72

0.36

0.00

700

25

1.86

2.22

1.11

27.75

0.00

725

25

4.12

5.98

2.99

74.75

0.00

750

25

1.01

5.13

2.565

64.125

0.00

775

25

5.96

6.97

3.485

87.125

0.00

800

25

2.31

8.27

4.135

103.375

0.00

825

25

1.71

4.02

2.01

50.25

0.00

850

25

3.21

4.92

2.46

61.5

0.00

875

25

4.46

7.67

3.835

95.875

0.00

900

25

2.01

6.47

3.235

80.875

0.00

925

25

3.16

5.17

2.585

64.625

0.00

950

25

3.36

6.52

3.26

81.5

0.00

975

25

8.98

12.34

6.17

154.25

0.00

1000

25

2.68

11.66

5.83

145.75

0.00

Total

4084

A..E.E
PMGSY Sub-Division
Mendhar

Total

Executive Engineer
PMGSY Division
Mendhar

Earth work chart for construction of Road from Mendhar to Jaranwali Gali
Distt. Poonch
Block Mendhar
KM

RD

L=21.00 Km
Length (M

Earth work in cutting

Area (m2)
11th

Total Area

Earth Work in Filling

Mean Area

Qty. M3

Area (m2)

Total Area

Mean Area

Qty. M3

#REF!

#REF!

#REF!

25

25

6.46

6.46

3.23

80.75

0.00

50

25

3.26

9.72

4.86

121.5

0.00

75

25

4.69

7.95

3.975

99.375

0.00

100

25

0.36

5.05

2.525

63.125

0.00

125

25

8.19

8.55

4.275

106.875

0.00

150

25

8.65

16.84

8.42

210.5

0.00

175

25

10.06

18.71

9.355

233.875

0.00

200

25

1.91

11.97

5.985

149.625

0.00

225

25

4.31

6.22

3.11

77.75

0.00

250

25

3.87

8.18

4.09

102.25

0.00

275

25

5.11

8.98

4.49

112.25

0.00

300

25

0.36

5.47

2.735

68.375

0.00

325

25

3.96

4.32

2.16

54

0.00

350

25

3.76

7.72

3.86

96.5

0.00

375

25

8.25

12.01

6.005

150.125

0.00

400

25

6.08

14.33

7.165

179.125

0.00

425

25

1.28

7.36

3.68

92

0.00

450

25

4.9

6.18

3.09

77.25

0.00

475

25

4.86

9.76

4.88

122

0.00

500

25

11.31

16.17

8.085

202.125

0.00

525

25

3.76

15.07

7.535

188.375

0.00

550

25

7.96

11.72

5.86

146.5

0.00

575

25

3.59

11.55

5.775

144.375

0.00

600

25

21.46

25.05

12.525

313.125

0.00

625

25

2.36

23.82

11.91

297.75

0.00

650

25

0.36

2.72

1.36

34

0.00

675

25

5.156

5.516

2.758

68.95

0.52

0.52

0.26

17.93

700

25

3.56

8.716

4.358

108.95

0.00

725

25

8.76

12.32

6.16

154

0.00

750

25

5.01

13.77

6.885

172.125

0.00

775

25

3.86

8.87

4.435

110.875

0.00

800

25

1.26

5.12

2.56

64

0.00

825

25

7.26

8.52

4.26

106.5

0.00

850

25

4.46

11.72

5.86

146.5

0.00

875

25

7.96

12.42

6.21

155.25

0.00

900

25

8.86

16.82

8.41

210.25

0.00

925

25

7.76

16.62

8.31

207.75

0.00

950

25

6.6

14.36

7.18

179.5

0.00

975

25

17.21

23.81

11.905

297.625

0.00

1000

25

7.58

24.79

12.395

309.875

0.00

Total

5815.65

A..E.E
PMGSY Sub-Division
Mendhar

Total

Executive Engineer
PMGSY Division
Mendhar

Earth work chart for construction of Road from Mendhar to Jaranwali Gali
Distt. Poonch
Block Mendhar
KM

RD

L=21.00 Km
Length (M

Earth work in cutting

Area (m2)
12th

Total Area

Earth Work in Filling

Mean Area

Qty. M3

Area (m2)

Total Area

Mean Area

Qty. M3

#REF!

#REF!

#REF!

25

25

9.56

9.56

4.78

119.5

0.00

50

25

5.41

14.97

7.485

187.125

0.00

75

25

5.61

11.02

5.51

137.75

0.00

100

25

2.56

8.17

4.085

102.125

0.00

125

25

0.36

2.92

1.46

36.5

0.00

150

25

6.34

6.7

3.35

83.75

0.00

175

25

5.06

11.4

5.7

142.5

0.00

200

25

6.36

11.42

5.71

142.75

0.00

225

25

9.46

15.82

7.91

197.75

0.00

250

25

4.86

14.32

7.16

179

0.00

275

25

9.34

14.2

7.1

177.5

0.00

300

25

0.36

9.7

4.85

121.25

0.00

325

25

5.06

5.42

2.71

67.75

0.00

350

25

3.56

8.62

4.31

107.75

0.00

375

25

5.76

9.32

4.66

116.5

0.00

400

25

2.65

8.41

4.205

105.125

0.00

425

25

5.16

7.81

3.905

97.625

0.00

450

25

6.31

11.47

5.735

143.375

0.00

475

25

7.56

13.87

6.935

173.375

0.00

500

25

2.86

10.42

5.21

130.25

0.00

525

25

2.86

1.43

35.75

0.00

550

25

2.71

2.71

1.355

33.875

0.00

575

25

1.86

4.57

2.285

57.125

0.00

600

25

0.36

2.22

1.11

27.75

0.00

625

25

3.54

3.9

1.95

48.75

0.00

650

25

1.36

4.9

2.45

61.25

0.00

675

25

2.69

4.05

2.025

50.625

0.00

700

25

0.36

3.05

1.525

38.125

0.00

725

25

0.36

0.72

0.36

0.00

750

25

3.26

3.62

1.81

45.25

0.00

775

25

1.76

5.02

2.51

62.75

0.00

800

25

3.76

1.88

47

0.00

825

25

1.26

3.26

1.63

40.75

0.00

850

25

1.48

2.74

1.37

34.25

0.00

875

25

1.48

0.74

18.5

0.00

900

25

1.45

1.45

0.725

18.125

0.00

925

25

4.91

6.36

3.18

79.5

0.00

950

25

0.96

5.87

2.935

73.375

0.00

975

25

4.43

5.39

2.695

67.375

0.00

1000

25

2.63

7.06

3.53

88.25

0.00

Total

3506.625

A..E.E
PMGSY Sub-Division
Mendhar

Total

Executive Engineer
PMGSY Division
Mendhar

Earth work chart for construction of Road from Mendhar to Jaranwali Gali
Distt. Poonch
Block Mendhar
KM

RD

L=21.00 Km
Length (M

Earth work in cutting

Area (m2)
13th

Total Area

Earth Work in Filling

Mean Area

Qty. M3

Area (m2)

Total Area

Mean Area

Qty. M3

#REF!

#REF!

#REF!

25

25

2.81

2.81

1.405

35.125

0.00

50

25

3.46

6.27

3.135

78.375

0.00

75

25

5.57

9.03

4.515

112.875

0.00

100

25

7.46

13.03

6.515

162.875

0.00

125

25

6.48

12.02

6.01

150.25

0.00

150

25

4.56

7.38

3.69

92.25

0.00

175

25

2.82

5.18

2.59

64.75

0.00

200

25

2.36

3.95

1.975

49.375

0.00

225

25

1.59

5.15

2.575

64.375

0.00

250

25

3.56

8.5

4.25

106.25

0.00

275

25

4.94

10.19

5.095

127.375

0.00

300

25

5.25

5.25

2.625

65.625

0.00

325

25

2.11

1.055

26.375

0.00

350

25

2.11

2.11

1.055

26.375

0.00

375

25

5.66

7.77

3.885

97.125

0.00

400

25

2.56

8.22

4.11

102.75

0.00

425

25

2.47

5.03

2.515

62.875

0.00

450

25

8.47

4.235

105.875

0.00

475

25

13.89

19.89

9.945

248.625

0.00

500

25

8.96

22.85

11.425

285.625

0.00

525

25

5.35

14.31

7.155

178.875

0.00

550

25

0.36

5.71

2.855

71.375

0.00

575

25

2.56

2.92

1.46

36.5

0.00

600

25

3.01

5.57

2.785

69.625

0.00

625

25

6.98

9.99

4.995

124.875

0.00

650

25

0.36

7.34

3.67

91.75

0.00

675

25

9.99

10.35

5.175

129.375

0.00

700

25

9.72

19.71

9.855

246.375

0.00

725

25

6.36

16.08

8.04

201

0.00

750

25

4.86

11.22

5.61

140.25

0.00

775

25

4.58

9.44

4.72

118

0.00

800

25

1.19

5.77

2.885

72.125

0.00

825

25

4.39

5.58

2.79

69.75

0.00

850

25

0.36

4.75

2.375

59.375

0.00

875

25

0.36

0.72

0.36

0.00

900

25

3.01

3.37

1.685

42.125

0.00

925

25

2.04

5.05

2.525

63.125

0.00

950

25

2.71

4.75

2.375

59.375

0.00

975

25

1.85

4.56

2.28

57

0.00

1000

25

0.36

2.21

1.105

27.625

0.00

Total

3932.625

A..E.E
PMGSY Sub-Division
Mendhar

Total

Executive Engineer
PMGSY Division
Mendhar

Earth work chart for construction of Road from Mendhar to Jaranwali Gali
Distt. Poonch
Block Mendhar
KM

RD

L=21.00 Km
Length (M

Earth work in cutting

Area (m2)
14th

Total Area

Earth Work in Filling

Mean Area

Qty. M3

Area (m2)

Total Area

Mean Area

Qty. M3

#REF!

#REF!

#REF!

25

25

1.76

1.76

1.76

44

0.00

50

25

3.29

5.05

2.525

63.125

0.00

75

25

0.36

3.65

1.825

45.625

0.00

100

25

0.36

0.72

0.36

0.00

125

25

0.36

0.72

0.36

0.00

150

25

0.36

0.72

0.36

0.00

175

25

0.36

0.72

0.36

0.00

200

25

0.36

2.22

1.11

27.75

0.00

225

25

1.86

4.34

2.17

54.25

0.00

250

25

2.48

2.84

1.42

35.5

0.00

275

25

0.36

7.63

3.815

95.375

0.00

300

25

7.27

9.55

4.775

119.375

0.00

325

25

2.28

5.64

2.82

70.5

0.00

350

25

3.36

5.64

2.82

70.5

0.00

375

25

0.36

3.72

1.86

46.5

0.00

400

25

6.96

7.32

3.66

91.5

0.00

425

25

3.56

10.52

5.26

131.5

0.00

450

25

0.81

4.37

2.185

54.625

0.00

475

25

0.36

1.17

0.585

14.625

0.00

500

25

0.36

0.72

0.36

0.00

525

25

2.46

2.82

1.41

35.25

0.00

550

25

0.36

2.82

1.41

35.25

0.00

575

25

1.76

2.12

1.06

26.5

0.00

600

25

1.69

3.45

1.725

43.125

0.00

625

25

3.62

5.31

2.655

66.375

0.00

650

25

0.36

3.98

1.99

49.75

0.00

675

25

6.7

7.06

3.53

88.25

0.00

700

25

0.36

7.06

3.53

88.25

0.00

725

25

0.36

0.72

0.36

0.00

750

25

0.36

0.72

0.36

0.00

775

25

5.11

5.47

2.735

68.375

0.00

800

25

3.36

8.47

4.235

105.875

0.00

825

25

0.36

3.72

1.86

46.5

0.00

850

25

2.61

2.97

1.485

37.125

0.00

875

25

4.81

7.42

3.71

92.75

0.00

900

25

0.36

5.17

2.585

64.625

0.00

925

25

1.16

1.52

0.76

19

0.00

950

25

0.86

2.02

1.01

25.25

0.00

975

25

0.36

1.22

0.61

15.25

0.00

1000

25

1.71

2.07

1.035

25.875

0.00

Total

1961.125

Total

A..E.E
PMGSY Sub-Division
Mendhar

Executive Engineer
PMGSY Division
Mendhar

Classification chart for construction of Road from Mendhar to Jaranwali Gali


L=21.0 Km
KM

RD

Hard soil
%age

qty.

Soft rock
%age

Hard rock

qty.

%age

Total Qty

qty.

1st

0-1000

0.50

474.50

0.30

284.70

0.20

189.80

949.00

2nd

0-1000

0.45

724.86

0.30

483.24

0.25

402.70

1610.80

3rd

0-1000

0.55 1494.35

0.20

543.40

0.25

679.25

2717.00

4th
5th

0-1000
0-1000

0.50 1961.25
0.45 1607.18

0.25
0.30

980.63
1071.45

0.25
0.25

980.63
892.88

3922.50
3571.50

6th

0-1000

0.50

996.25

0.30

597.75

0.20

398.50

1992.50

7th

0-1000

0.55

915.92

0.20

333.06

0.25

416.33

1665.30

8th

0-1000

0.55 2375.24

0.25

1079.66

0.20

863.73

4318.63

9th

0-1000

0.55 2468.81

0.20

897.75

0.25

1122.19

4488.75

10th 0-1000

0.60 2450.40

0.20

816.80

0.20

816.80

4084.00

11th 0-1000

0.50 2907.83

0.30

1744.70

0.20

1163.13

5815.65

12th 0-1000

0.55 1928.64

0.20

701.33

0.25

876.66

3506.63

13th 0-1000

0.50 1966.31

0.30

1179.79

0.20

786.53

3932.63

14th 0-1000

0.55 1078.89

0.20

392.33

0.25

490.41

1961.63

15th 0-1000

0.55 1598.99

0.20

581.45

0.25

726.81

2907.25

16th 0-1000

0.55 1056.83

0.30

576.45

0.15

288.23

1921.50

17th 0-1000

0.60 2232.60

0.20

744.20

0.20

744.20

3721.00

18th 0-1000

0.50 3552.50

0.25

1776.25

0.25

1776.25

7105.00

19th 0-1000

0.50 3369.00

0.30

2021.40

0.20

1347.60

6738.00

20th 0-1000

0.45 2965.22

0.30

1976.81

0.25

1647.34

6589.38

21th 0-1000

0.55 6447.31

0.25

2930.59

0.20

2344.48 11722.38

Total

### Total

A..E.E
PMGSY Sub-Division
Mendhar

21713.72 Total

18954.41 85241.00

Executive Engineer
PMGSY Division
Mendhar

Cost Estimate for the construction of 10.00M Span RCC Culvert


NAME OF ROAD :- Mendhar to JaranWali Gali
BLOCK :- MENDHAR
PACKAGE No. :- JK11-146
DISTRICT :- POONCH
LENGTH OF ROAD :- 21.00 Kms.
S.No.
Description of Item
Unit
Quantity
Rate in Rs.
Amount in Rs.
1

2
3
4
5
6
7

Earth work in Bulk excavation ( 50% hard soil,


25% soft rock & 25% Hard Rock

CuM

2400

174.25

418200

Earth work excavation in structures ( 70%


hard soil, 20% soft rock & 10% Hard Rock

CuM

304.14

243.60

74088.504

PCC M-10 grade using 40-10 MM aggregates

CuM

21.37

3534.00

75521.58

CuM

264.12

3683.00

972753.96

CuM

54.52

4910.00

267693.2

MT
CuM

5.0
38.8

72531
621

362655
24088.59

CuM

97.49

527.00

51377.23

PCC M-15 grade using (40-10)mm agg.&


10mm aggregates
RCC M-25 grade using 20mm-10mm
aggregates (Slab)
H.Y.S.D. Steel (TMT)
Supply and Filling of Stone
Back filling with granular material behind
abutments, wing wall, R/wall

15mm Plaster in 1:3 Cement Mortor

Sqm

430.82

133.40

57471.388

9
10

Rndom Rubble Masonary 1:5 mix


R.C.C Railing M25 grade

CuM
Rm

33.66
25

2910.00
2652.00

97950.6
66300

11

Carriages

TOTAL

Sand

cum
cum

Stone Aggregate

MT

Cement

cum
MT

Stone
Steel

Total
Grand Total

Say Rs38.14 Lacs

592.98
306.77
119.00
72.46
5.00

2468100.052
1477.32
961.4
1198.5
353.42
1212.50

876021.21
294928.68
142621.50
25608.81
6062.50
1345242.70
3813342.76

Asstt. Executive Engineer


PMGSY Sub.Division
Mendhar

Executive Engineer
PMGSY Division
Mendhar

Cost Estimate for the construction of Rigid Pavement For Block (3.0x2.75)
NAME OF ROAD :- Mendhar to JaranWali Gali
BLOCK :- MENDHAR
DISTRICT :- POONCH
S.No.

PACKAGE No. :- JK11-146


LENGTH OF ROAD :- 21.00 Kms.
Quantit
Rate in Rs.
Amount in Rs.
y

Description of Item

Unit

PCC M-10 grade using 40-10 MM


aggregates

CuM

0.825

3534.00

2915.55

RCC M-25 grade using 20mm-10mm


aggregates

CuM

1.2375

4910.00

6076.125

5
6

H.Y.S.D. Steel (TMT)


Providing and fixing filler joint

Qtls
Rm

0.06
8.5

72531
24.00

4351.86
204

Carriages
cum
cum
MT
MT

0.93
1.86
0.90
0.06

TOTAL

Sand
Stone Aggregate
Cement
Steel

Total
Grand Total

13547.535
1477.32
961.4
1198.5
1212.50

1373.91
1788.20
1078.65
72.75
4313.51
17657.00

Rs 17657 for 8.25Sqm

For 1 sqm

Asstt. Executive Engineer


PMGSY Sub.Division
Mendhar

Rs.2140

Executive Engineer
PMGSY Division
Mendhar