S.
No.
State:- J&K
Name of Road
Name of
Block
Mendhar
Type
Propose
of
Cost of
d
Propo
pavement
Length
sal
District : POONCH
Cost of CD
No. of CD
works/prot
works
ection
Total
Estimated
cost
Av. Cost / km
(Rs. in lacs)
From
To
N/U
Km
(Rs. in lacs)
Nos.
(Rs. in
lacs)
(Rs. in lacs)
Mendhar
Jaranwali
Gali
21.000
1809.64
122
1421.14
3230.78
8.40
4.20
166.80
259.47
Total
3502.85
Signature
Checked by:
Signature
Name
Designation
Draftsman
Name :
Signature
Changez Khan
Name :
Designation:J.E
Superintendi Engineer
PMGSY Circle
Jammu
Technical ScrutSignature
done by:
Name
Designation
Co-ordinator
STA:
Jammu
Signature
Name
BHARAT NIRMAN
Formate F- 1
SUMMARY SHEET
NAME OF ROAD :
BLOCK :- Mendhar
Unconnected Habitations
500-1000
250-500
<250
Mendhar
District :- Poonch
Type of work
No. of
Roads
Total Length
No of New
of Road
CD Works
(KM)
upgradation
one
21.000
CD Work
Pavement from
Formate F-5
1809.64
1421.14
3230.78
8.40
4.20
259.47
Total
No. of Vilage
Connected
Estimate Cost
3502.85
Executive Engineer
PMGSY Division
Mendhar
SC/ST
Villages
9
. :- JK11-146
BHARAT NIRMAN
ROAD PROPOSED IN PMGSY FOR RURAL CONNECTIVITY (PAVEMENT LAYERS)
NAME OF ROAD :- Mendhar to JaranWali Gali
BLOCK
:-
DISTRICT
Formate F-5
Mendhar
:- POONCH
Name of places
villages connected by
road
Facilit
New
Road Enstin
y
Const.
acces lengt
g
upgrad
sed
suefac
h
ation
use
Km. e type
N/U
ABCD
From
To
Mendhar
Jaranwali
Gali
Surface
Detail
S.No
21
Earth Work
10
Earth Work in
Excavation
Qty in cum
Earth Work /
Subgrade
Prepration
GSB /
WBM -I
11
GSB
29232.00 cum
H.S 44572.87 29232.00 cum
@ 106.00
@ Rs 106.00
@ Rs 633.00
= 47.25
= 30.99
= 185.04
Rs
Berm Filling
S.R 21713.72
@ 183.00
= 39.74
Rs
WBM-II
WBM-III
Prime coat
MSS
/ Carriage item
12
13
14
16
17
18
WBM-II
Primer Coat
Tack Coat
Bitumin Macadam
Carriage Stone
Aggregate
(6mm-63mm)
20mm thick
Premix
112612.50 cum
5630.60 cum
8043.75 cum
@ Rs 1032.00
= 83.01
112612.50 cum
@ Rs 43.00
= 48.42
@ Rs 16.00
= 18.02
WBM-II
2590.00 cum
@ Rs 6820.00
= 384.01
Tack Coat
cum
@ Rs 57.00
= 1.48
Total pravement
upto col. To FW
statvs
Tack Coat
112612.50 cum
@ Rs
=
@ Rs 16.00
= 18.02
77757.81 cum
@ Rs 962.40
= 485.51
Carriage of
Bitumen
761.48 MT
@ Rs 1227.50
= 9.35
112612.50 cum
@ Rs 140.00
= 157.66
Seal Coat
112612.50 cum
@ Rs 52.00
= 58.56
Rigid Pavement
8662.50 cum
H.R 18954.41
@ 302.00
= 57.24
Rs
Total
144.23
@ Rs 2140.00
= 185.38
32.46
185.04
268.39
48.42
18.02
402.02
494.86
Executive Engineer
PMGSY Division
Mendhar
19
216.22
1809.65
BHARAT NIRMAN
ROAD PROPOSED IN PMGSY FOR RURAL CONNECTIVITY (PAVEMENT LAYERS)
NAME OF ROAD :- Mendhar to JaranWali Gali
BLOCK
:-Mendhar
:-POONCH
New
Const. Road
Name of
upgrad length
the Road
ation
Km.
N/U
Detail
S.No
DISTRICT
Hume Pipe
Culverts
Mendhar
to
Jaranwali
Gali
21
RCC Culvert
Retaining wall
length in Mtr.
Breast wall
length in Mtr.
Drain length in
Mtr.
Parapets No.
Edge wall
length
10.0 Mtr
Span Bridge
Crated wires
in Mtr.
Dia.
No.
in Mtr.
7
8
No.
1
Formate F-6
HPC
43.00 NO
@ Rs. 2.22
95.46
Span
9
No.
10
11
3.0mtr ht.
Breast wall
12
13
Pucca Drain
14
Parapets
15
Edge wall
16
1500.00 Rmt.
2100.00 Rmt.
2000.00 Rmt.
2000.00 Rmt
2350.00 Rmt
3.00
NO
@ Rs. 10591.00 @ Rs. 5757.00 @ Rs. 1366.00 @ Rs. 1865.00
@ Rs. 2650.00 @ Rs. 38.14
158.87
120.90
= 27.32
= 37.30
= 62.28
= 114.42
Total
eart
h
Total Cost work
of
and
proposed sub
structure grad
s
e
prep
arati
on
17
Create Wire
300.00 No.
@ Rs. 18246.00
= 54.74
1421.16
@ Rs. 11.61
325.08
Total
95.46
749.88
158.87
120.90
27.32
37.30
62.28
114.42
54.74
Executive Engineer
PMGSY Division
Mendhar
18
Total
cost
of
road
upto
FW
status
(15+1
6)
19
Proforma C
Pradhan Mantri Gram Sadak yojana (PMGSY)
Check list for P.I.U. & S.T.A
(For Individual Road Works)
To be filled by PIU
Location :- State :1
Name of Road :-
Length (Km) :-
From :Total
21.00 kms
DISTT:POONCH
Item
Rigid
Pavement
Type of Proposal :-
In Open area :
Average Cost;
Total Coat
in Lakhs
Km
Lakhs
Cost per Km
in
185.38
Lakhs
8.83
Flexible
Pavement
1624.26
77.35
CD + others
1433.74
68.27
3243.38
154.45
Total
6
BLOCK:- Mendhar
New connectivity
Name of the unconnected Target Habitation (to be cross checked with CN-6)
Yes
a)
b)
(b)
If (b), indicate the nature of road to which the proposed road leads.
RR
PCI value
No
7. a) Whether the Proposed Road has the desired carriageway width, roadway width and road land width
(RLW).
Indicate the actual widths adopted for the Upgradation/Widening road
b) . a)
b)
c)
Yes
In the Built Up
Area (m)
In the Open
Area (m)
Carriageway
5.50
5.50
Roadway
7.50
7.50
15.00
15.00
a.
b.
Days
Trucks
Cars, Jeep
Motorised
vans,Three
two wheeler
wheelers
day 1
50
80
Cycle
70
10
10
OL
30
25
OL
8
8
60
85
75
32
27
55
90
65
10
35
23
Average
55
85
70
10
32
25
6%
10
75
10
"A/2"= 153
Cummalative EASL =
Animal Drawn
Num.Tyre
d
SWC
day 3
"A" = 305
Cycle
Rickshaw
OL
213.83288
285003
A.
Buses
day 2
Chainage
10
Tractor trailer
LCV
Km 1st,2nd,3rd,4th,5th,7th,9th,11th,12th,14th,15th,16th,17th,18th,19th &20th
5-6%
Cost Details
7-9%
Cost
Unit
Cost /Km
Quantity
(Rs. in
(Rs. in Lakhs)
Lakhs)
General Costs
Cost of Perparation of DPR , Check Survey & CBR Testing
Km.
21.00
4.20
0.20
Pavement Components
Cost
Description of the layer
B.
Unit
Cost /Km
Quantity
(Rs. in
Lakhs)
6.87
(Rs. in Lakhs)
144.23
Cum
85241.00
Cum
Nil
Nil
Cum
Nil
Nil,
Cum
29232.00
30.98
1.48
Berm Filling
Cum
2590.00
1.48
0.07
( G. S. B )
Cum
29232.00
185.03
8.81
WBM-II
Cum
8043.75
83.01
3.95
WBM-III
Cum
Rigid Pavement
0.00
Cum
8662.5
185.38
8.83
Prime Coat
Sqm
112612.50
48.42
2.31
Tack Coat
Sqm
112612.50
18.02
0.86
Bituminous Macadam
Cum
5630.60
384.00
18.29
Tack Coat
Sqm
112612.50
18.02
0.86
Sqm
112612.50
157.65
7.51
Sqm
112612.50
58.56
2.79
51994.00
485.51
23.12
761.48
9.35
0.45
1809.64
86.17
Bituminous Layers
MPM
Surface Dressing
PMC with Seal Coat
Carriage item (B - C)
(6mm-63mm)
Bitumen
CD Works
No. of Existing CD works
If yes, cost of improvement
Location - Chainge ( Similar of CD's may be grouped together )
TOTAL No.
Unit
43.0
Cost
(Rs. in Lakhs)
No.
No.
48.00
424.80
No.
28.00
325.08
3.00
114.42
122.00
959.76
No.
Protection Works
Unit
95.46
Cost /Km
Cost
(Rs. in Lakhs)
(Rs. in
Lakhs)
Protection Works
F.
B/Wall
Length :2100
Rmt.
120.89
5.76
R/Wall
Length :1500
Rmt.
158.86
7.56
Pucca Drain
Length :2000
Rmt.
27.32
1.30
Parapit
Length :2000
Rmt.
37.30
1.78
Edge Wall
Length :2350
Rmt.
62.27
2.97
No.
54.74
2.61
461.38
21.97
CRATED WIRES
300
8.40
3243.38
11.
12.
13.
14
Year
Cost in Lakhs
% of Const. Cost
25.95
0.80%
1.24
II
38.92
1.20%
1.85
II
51.89
1.60%
2.47
IV
61.62
1.90%
2.93
81.08
2.50%
3.86
259.47
8.00%
12.36
Whether the road has Geometrics as per Rural Roads Manual (RRM) /Circular of NRRDA.
Latest
Whether CD Works / Protection works are provided as per RRM / Circular of NRRDA /
Respective Codes.
Latest
Whether the Cost estimates are as per standard data analysis and S.S.R
Lead Distance
(Km)
Material
Source
Local
30
Cement
Jammu
215
Murrum (Subgrade)
Chhatyari
95
Emulsion
Jammu
215
Aggregate
Chhatyari
95
Bitumen
Jammu
215
Sand
Akhnoor
195
Steel
Jammu
215
Material
Stone
Prepared By
Checked by
Executive Engineer
PMGSY Division
Mendhar
Scrutinized by
Superintending Engineer
PMGSY Circle
Jammu
Countersigned by
Technical Authority
State
To be filled by S.T.A
Yes / No
Yes / No
Yes / No
Yes / No
16
Yes / No
Yes / No
Yes / No
Hydraulic Studies
Yes / No
18 In case, traffic is projected beyond 45CVPD, are you satisfied with the reason given
Yes / No
19 In case, sub grade CBR is less than 3, has soil stabilization etc. been proposed
Yes / No
20
Yes / No
Pavement Design
Yes / No
Yes / No
Side Drains
Yes / No
Yes / No
Yes / No
Yes / No
Km / Hm stones
Yes / No
Yes / No
Yes / No
Technical Scrutiny
Coordinator
Done by
S.T.A.
Signature
Signature
Name
Name
Designation
Designation
ABSTRACT OF COST
NAME OF ROAD :- Mendhar to JaranWali Gali
BLOCK
:-Mendhar
DISTRICT
:- Poonch
S.NO
1
Items
Unit
Rate
Amount
(Rs. inLacs)
Hard Soil
44572.87 cum
106.00
47.25
Soft Rock
21713.72 cum
183.00
39.74
Hard Rock
18954.41 cum
302.00
57.24
Construction of Sub-Grade
29232.00 Cum
106.00
30.99
Berm Filling
2590.00 cum
57.00
1.48
G.S.B
29232.00 cum
633.00
185.04
8043.75 cum
1032.00
83.01
Rigid Pavement
8662.50 Sqm.
2140.00
185.38
Primer Coat
112612.50 Sqm.
43.00
48.42
Tack Coat
112612.50 Sqm.
16.00
18.02
10
Bituminous Macadam
5630.60 cum
6820.00
384.01
11
Tack Coat
112612.50 Sqm.
16.00
18.02
12
112612.50 Sqm.
140.00
157.66
13
Seal Coat
112612.50 Sqm.
52.00
58.56
14
Carriage item (1 - 7)
a) (6mm-63mm)
(D/d cost of Stone 50%
b) Bitumen
15
0.00
cum.
962.40
485.51
761.44 M.T
1227.50
9.35
Breast Wall
2100.00 Rmt.
5757.00
120.90
16
Retaining Wall
1500.00 Rmt.
10591.00
158.87
17
Crate
300.00 No.
18246.00
54.74
18
Pucca Drain
1366
27.32
51994.00
2000.00 Rmt.
S.NO
Items
Quantity
Unit
Rate
Amount
(Rs. inLacs)
19
H.P.C
43.00 No.
2.22
95.46
20
48.00 No.
8.85
424.80
21
28.00 No.
11.61
325.08
22
3.00 No.
38.14
114.42
23
Edge Wall
2350.00 Rmt.
2650.00
62.28
24
Parapit
2000.00 No.
1865.00
37.30
25
26
27
Total
8.40
259.47
4.20
3502.88
Executive Engineer
PMGSY Division
Mendhar
BHARAT NIRMAN
CARRIAGE OF MATERIAL BY MECHNICAL TRANSPORT CHART
NAME OF ROAD :- Mendhar to JaranWali Gali
BLOCK
:- MENDHAR
:-POONCH
Distance
(in Km)
S.
N
o
Items
1 Sand
Loading
Un
loading
B.T
Gravel
Kacha
Total
(in R.s)
A=
(d+e)
Density
DISTRICT
Total Haulage
Grand Total
as per
(in R.s)
Distance
Haulage
B=
For BT @
For Gravel @
For Kacha @
R.s 4.49/mt Km Rs. 5.40/mt Km R.s 10.86/mt Km
(f
[g+h+i+] )
g = a x 4.49
h =b x 5.40
i = c x 10.86
(A+B)
195.00
0.00
2.50
24
33.00
1.60
875.55
27.15
1444.32
1477.32
95.00
0.00
2.50
45
54.00
2.00
426.55
27.15
907.40
961.40
30.00
0.00
2.50
45
54.00
1.85
134.7
27.15
299.42
353.42
4 Cement
215.00
0.00
2.50
103
103
206.00
1.00
965.35
27.15
992.50
1198.50
5 Steel
215.00
0.00
2.50
110
110
220.00
1.00
965.35
27.15
992.50
1212.50
7 Bituman
215.00
0.00
2.50
122
113.00
235.00
1.00
965.35
27.15
992.50
1227.50
95.00
0.00
2.50
45
10.00
55.00
2.00
426.55
27.15
907.40
962.40
245.00
0.00
2.50
74.00
329.00
403.00
1.13
1100.05
27.15
1268.10
1671.10
Stone
2 Aggrega
te
3 Stone
8 GSB
NP3
9 1000mm
dia. H/P
Executive Engineer
PMGSY Division
Mendhar
Mendhar
BHARAT NIRMAN
NAME OF ROAD :- Mendhar to JaranWali Gali
:- Mendhar
DISTRICT
:-POONCH
1 (a)
S.No
BLOCK
Description
Total
Earth work in Soil in Hill Road : Bulk excavation in hilly area in all kinds of soil by mechanical means
including cutting & trimming of side slopes upto a depth of 300 MM and above & disposing of excavated
earth with lift upto 1.5 M and lead upto 50.0 M complete as per technical specifications clause 1603.1
( 1.50m Length for Rigid Pavement)
1500.00
5.8
0.1
870.00
11500.00
5.8
0.3
20010.00
8000.00
5.8
0.15
6960.00
1(b)
Construction of embankment with approved material deposited at site from roadway cutting and
excavation from drain and foundation of other structures graded and compacted to meet requirement of
table 300.1 and 300.2 as per technical specification clause 301.5
Rate /
Unit
29232.00
CuM
106.00
30.99
2590.00
CuM
57.00
1.48
29232.00 CuM
633.00
185.04
1392.00
29232.00
5000.00
1.40
0.13
910.00
16000.00
1.40
0.08
1680.00
Total
Const. of GSB by providing well graded material, spreading in uniform layers with tractor grade by
mixing in place method with rotavotor at OMC and compacting with smooth wheel roller at achieve the
desired denesity completed as per technical specification clause 402 grade II material
Amount
(Rs.
inLacs)
Quantity Unit
2590.00
1500.00
5.8
0.1
870.00
11500.00
5.8
0.3
20010.00
8000.00
5.8
0.15
6960.00
1392.00
29232.00
Providind and laying rectangular cement concrete block pavement of size 3.0mx2.75m Top layer
thikness 250mm of R.C.C M25 and Bottom layer of thickness 150mm of M10
5
83.01
19500.00
5.50
0.075
1500.00
5.50
8250.00
412.50
Total
8043.75
8662.50
8043.75
CuM
1032.00
185.38
8662.50
CuM
2140.00
Primer Coat
6
(1) Low Porosity Providing and applying primer coat with bitumen
emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying
primer at the rate of 0.70-1.0 Kg/Sqm using mechanical means as per technical specification clause 502
of MOST.
19500.00
5.50
###
48.42
5362.50
112612.50 112612.50 CuM
43.00
S.No
Description
Total
19500.00
5.50
###
Quantity Unit
Rate /
Unit
Amount
(Rs.
inLacs)
Tack Coat
Providing and applying tack coat with bitumen emulsion (RS-1) using
emulsion distributor at the rate of 0.25 to 0.30Kg per Sqm on the prepared granular surface treated with
primer and cleaned with hydraulic broom as per technical specification clause 503 of MOST.
Bituminous Macadam
Providing and laying bituminous macadam with hot mix plant using crushed aggregates of grading as
per table 500.4 premixed with bituminous binder transported to site upto a lead of 1000m laid over a
previously prepared surface with paver finisher to the required grade level and alignment and roller to
avhieve the desired compaction as per technical specification clause 504
Tack Coat
Providing and applying tack coat with bitumen emulsion (RS-1) using
emulsion distributor at the rate of 0.25 to 0.30Kg per Sqm on the prepared granular surface treated with
primer and cleaned with hydraulic broom as per technical specification clause 503 of MOST.
19500.00
5362.50
268.13
5.50
10
11
20mm thick open graded premix carpet providing laying and rolling of open graded premix carpet of
20mm thickness composed of 13.2mm to 5.6mm Aggregate Wither using penetration grade bitumen or
emulsion to required line grade and level to serve as wearing course on a previously prepared base
including mixing in a suitable plant, laying and rolling with a three wheel 80-100KN static roller capacity
finished to required level and grades to be followed by seal coat type B as per technical specification
clause 508 of MOST.Using Bitumin (S-90)
By hot mix plant and pavers.
Seal Coat
Providing and laying of seal coat sealing the voids in a bituminous
surface laid to the specified levels, grade and cross fall using type B as per Technical specification
clause 510 of MOST.
By mechanical means (type-B).
5362.50
5.50
19500.00
5.50
18.02
5630.63
Total
19500.00
5.50
Add 5% for Passing Place&
curves
Total
384.01
5630.63
cum
6820.00
###
5362.50
112612.50
16.00
18.02
112612.50 CuM
16.00
###
157.66
5362.50
112612.50 112612.50 CuM
140.00
###
58.56
5362.50
112612.50 112612.50 CuM
52.00
Total
1170.57
Executive Engineer
PMGSY Division
Mendhar
BHARAT NIRMAN
CARRIAGE OF MATERIAL BY MECHNICAL TRANSPORT CHART
NAME OF ROAD :- Mendhar to JaranWali Gali
BLOCK
:- Mendhar
DISTRICT
:- Poonch
S.No
Item
Stone Aggregate
GSB
b
c
Particular
WBM II
Screening
8043.75
WBM III
Screening
1850.00
x21%
1689.19
Quantity
Unit
28755.70
CuM
8043.75
CuM
1689.19
CuM
1850.00
CuM
x (21+8)%
Rate /
Unit
Amount (Rs.
In Lacs)
962.40
500.39
CuM
5630.60
1.41
112612.50
Seal Coat
CRUSHER DUST
112612.50
cum
x 0.027 Cu m/ Sqm =
x 0.006 Cu m/ Sqm =
7939.15
3040.54
675.68
Total Quantity
7939.15
3040.54
CuM
675.68
CuM
51994.00
CuM
Total
B
a
500.39
Bitumen
Bitumen
b
bitumin for Macadam
5630.00
353.6
761.47
MT
1227.50
407.87
Total
Less cost of Available stone
9.35
6615
225.00
9.35
14.88
494.86 Lacs
Executive Engineer
PMGSY Division
Mendhar
Mendhar
BHARAT NIRMAN
Cost Estimate for the Construction of Cement Concrete Drain (Pucca Drain) 10.00 mtr length.
NAME OF ROAD :- Mendhar to JaranWali Gali
BLOCK
:- MENDHAR
DISTRICT
:- POONCH
S.No
1
2
3
Description of Item
Earth work excavation in structures ( 70 % hard soil, 20 % soft rock
& 10 % Hard Rock
PCC M-10 grade using 40-10 MM aggregates
PCC M-15 grade 20mm & 10mm aggregate in foundation
Unit
CuM
CuM
CuM
1.23
0.825
1.68
243.6
3534
3683
299.628
2915.55
6187.44
Total
5
(in Rs.)
9402.62
Carriages
Sand
CuM
Stone Aggregate
CuM
MT
Cement
Say Rs.
1.12
2.06
0.52
1477.32
961.4
1198.5
1654.5984
1980.484
623.22
Total
4258.30
Grand Total
13660.92
Executive Engineer
PMGSY Division
Mendhar
Item of works
No.
(m)
(m)
(m)
Quantity
Unit
Rate(Rs.)
Amount
Rs. In Lac.
no.
2907
0.03
21
21
no.
1712
0.36
105
105
no.
417
0.44
840
840
no.
369
3.10
272.37
no.
79
0.22
1462
3.45
42
42
no.
189
189
no.
no.
236
each
School
Men at work
Falling rocks
Total
30
30
Sqm
Total
2709
0.81
8.40
Executive Engineer
PMGSY Division
Mendhar
BHARAT NIRMAN
Cost Estimate for the Construction of Retaining Wall (3Mtr Height) 10.00 mtr length.
NAME OF ROAD :- Mendhar to JaranWali Gali
BLOCK
DISTRICT
:- MENDHAR
:- POONCH
S.No
1
2
3
4
5
6
Description of Item
Earth work excavation in structures ( 70 % hard
soil, 20 % soft rock & 10 % Hard Rock
PCC M-10 grade using 40-10 MM aggregates
PCC M-20 coaping using(20mm-10mm) agg.
R.R Masonary in 1:5 mix
(less
50% stone Available)
R.R Masonary dry(less 50% stone Available)
Back Filling stones behind Abutment, wing wall,
R/ Wall (less 50% stone Available)
Unit
CuM
CuM
CuM
CuM
CuM
CuM
243.6
3534
4236
3573.61
5124.30
1270.80
18.27
13.34
2785
1330
50881.95
17742.20
11.25
448
5040
Total
7
Carriages
Sand
Stone Aggregate
Cement
Stone (less 50% stone Available)
CuM
CuM
MT
CuM
7.18
1.57
2.14
21.48
1477.32
961.4
1198.5
353.42
Total
Grand Total
Say Rs.
83632.86
10607.16
1509.40
2564.79
7591.46
22272.81
105905.67
Executive Engineer
PMGSY Division
Mendhar
BHARAT NIRMAN
Cost Estimate for The Construction of Crated Wall for 6.00mtr length
NAME OF ROAD :- Mendhar to JaranWali Gali
BLOCK
DISTRICT
S.No.
1
:-MENDHAR
:- POONCH
Description of Item
Unit
CuM
5.76
243.6
1403.136
CuM
8.64
1596
13789.44
Total
15192.576
CuM
Say
Rs.
8.64
353.42
Total
Grand Total
3053.55
3053.55
18246.12
Executive Engineer
PMGSY Division
Mendhar
BHARAT NIRMAN
Cost Estimate for the Construction of Breast wall for 10.00 mtr length.
NAME OF ROAD :- Mendhar to JaranWali Gali
BLOCK
DISTRICT
:- MENDHAR
:- POONCH
S.No
1
2
3
4
4
Description of Item
Earth work excavation in structures ( 70 % hard
soil, 20 % soft rock & 10 % Hard Rock
PCC M-10 grade using 40-10 MM aggregates
PCC M-20 coaping using(20mm-10mm) agg.
R.R Masonary in 1:6 mix
R.R Masonary dry
Quantity
13.26
1.69
0.525
7.74
5.13
(in
243.6
3534
4236
2910
1455
Total
5
Carriages
Sand
Stone Aggregate
CuM
CuM
Cement
MT
Stone
4.45
3.14
1.68
12.87
3230.14
5972.46
2223.90
22523.40
7464.15
41414.05
1477.32
961.4
1198.5
353.42
Total
Grand Total
Say Rs.
Rs.)
6574.07
3018.80
2013.48
4548.52
16154.87
57568.91
Executive Engineer
PMGSY Division
Mendhar
BHARAT NIRMAN
Cost Estimate for The Construction of Edge Wall 10 mtr. Length
NAME OF ROAD :- Mendhar to JaranWali Gali
BLOCK
DISTRICT
S.No.
:-MENDHAR
:-POONCH
Description of Item
Quantit
y
(in
CuM
2.12
243.60
516.43
CuM
1.70
3534.00
6007.80
CuM
0.30
3683.00
1104.90
CuM
2.45
527.00
1291.15
CuM
7.25
1455.00
Total
6
Carriages
Sand
Stone Aggregate
Cement
Stone
CuM
CuM
MT
CuM
0.900
1.800
0.450
9.700
1477.32
961.4
1198.5
353.42
Total
Say Rs.
10548.75
19469.03
1329.59
1730.52
539.33
3428.17
7027.61
Grand Total
26496.64
2650 .00 Per R mtr.
Executive Engineer
PMGSY Division
Mendhar
BHARAT NIRMAN
Description of Item
(M)
Height /
Thickne
ss (M)
Unit
Amount
(in Rs.)
Qty.
(in Rs.)
1.50
(0.30+0.45)/2
0.60
CuM
0.34
3683.00
Total
1252.22
1252.22
Carriages
Sand
CuM
0.153
1477.32
226.03
Stone Aggregate
CuM
0.30
961.4
288.42
MT
0.082
1198.5
98.28
612.73
1864.95
Cement
Total
Grand Total
Say Rs.
Executive Engineer
PMGSY Division
Mendhar
Description of items
2
Earth excavation in structures
hard soil 70% soft
rock20% H.R 10%
M10 grade using 40mm
40-10mm
aggregate
PCC M15
to 20mm
and 10mm
aggregate
Back filling with stone behind abutment.
Earth filling in trenches
Add cost of Hume pipe NP-3
Unit
Quantity
Rate
Amount
6
Cum
Cum
Cum
Cum
Cum
RM
7
56.93
7.13
17.36
3.5
2.76
10
8
243.6
3534
3683
527
340
5950
9
13868.15
25197.42
63936.88
1844.50
938.40
59500.00
TOTAL
8
1
2
3
165285.35
Carriage.
Material
Sand
Aggregate
Stone
Cum
Cum
Cum
Total
Grand Total
1477.32
961.4
1198.5
15068.664
18362.74
10978.26
56521.988
221807.34
10.2
19.1
9.16
Executive Engineer
PMGSY Division
Mendhar
Description of Item
Unit
CuM
140.7
243.60
34274.52
CuM
12.34
3534.00
43609.56
CuM
123.1
3683.00
453377.3
CuM
5.46
4910.00
26808.6
MT
0.55
72531
39892.05
CuM
14.06
527.00
7409.62
Carriages
TOTAL
Sand
cum
68.14
Stone Aggregate
cum
128.40
38.75
25.30
0.55
MT
Cement
cum
MT
Stone
Steel
Total
Grand Total
605371.65
1477.32
100664.58
961.4
1198.5
353.42
1212.50
123443.76
46441.88
8941.53
666.88
280158.62
885530.27
Executive Engineer
PMGSY Division
Mendhar
Description of Item
Earth work excavation in structures ( 70% hard
soil, 20% soft rock & 10% Hard Rock
PCC M-10 grade using 40-10 MM aggregates
PCC M-15 grade using (40-10)mm agg.& 10mm
aggregates
RCC M-25 grade using 20mm-10mm aggregates
(Slab)
H.Y.S.D. Steel (TMT)
Back filling with granular material behind
abutments, wing wall, R/wall
Carriages
Sand
Unit
CuM
160.77
243.60
39163.572
CuM
20.2
3534.00
71386.8
CuM
155.45
3683.00
572522.35
CuM
4910.00
44190
MT
0.9
72531
65277.9
CuM
22.5
527.00
11857.5
TOTAL
cum
cum
Stone Aggregate
MT
Cement
cum
MT
Stone
Steel
Total
Grand Total
83.50
167.00
46.60
44.75
0.90
804398.122
1477.32
961.4
1198.5
353.42
1212.50
123356.22
160553.80
55850.10
15815.55
1091.25
356666.92
1161065.04
1161065.04
Executive Engineer
PMGSY Division
Mendhar
Earth work chart for construction of Road from Mendhar to Jaranwali Gali
Distt. Poonch
Block Mendhar
KM
1st
L=21.00 Km
RD
Area (m2) Length (MTotal Area Mean Area Qty. M3 Area (m2) Total Area Mean Area
0
0.36
25
0
0
0
0
25
0.36
25
0.72
0.36
9
0
0
0
50
0.36
25
0.72
0.36
9
1.17
1.17
0.585
75
0.36
25
0.72
0.36
9
0
1.17
0.585
100
0.36
25
0.72
0.36
9
0
0
0
125
0.36
25
0.72
0.36
9
1
1
0.5
150
0.36
25
0.72
0.36
9
1.44
2.44
1.22
175
0.36
25
0.72
0.36
9
0
1.44
0.72
200
0.36
25
0.72
0.36
9
0
0
0
225
0.36
25
0.72
0.36
9
0
0
0
250
0.36
25
0.72
0.36
9
1
1
0.5
275
0.36
25
0.72
0.36
9
1.6
2.6
1.3
300
0.36
25
0.72
0.36
9
3.3
4.9
2.45
325
0.36
25
0.72
0.36
9
4.35
7.65
3.825
350
0.36
25
0.72
0.36
9
5.7
10.05
5.025
375
0.36
25
0.72
0.36
9
0
5.7
2.85
400
0.36
25
0.72
0.36
9
4.6
4.6
2.3
425
0.36
25
0.72
0.36
9
3.1
7.7
3.85
450
0.36
25
0.72
0.36
9
1.2
4.3
2.15
475
0.36
25
0.72
0.36
9
1.89
3.09
1.545
500
0.36
25
0.72
0.36
9
4.25
6.14
3.07
525
0.36
25
0.72
0.36
9
3.4
7.65
3.825
550
0.36
25
0.72
0.36
9
0
3.4
1.7
575
0.36
25
0.72
0.36
9
0
0
0
600
0.36
25
0.72
0.36
9
0
0
0
625
0.36
25
0.72
0.36
9
0
0
0
650
0.36
25
0.72
0.36
9
0
0
0
675
0.36
25
0.72
0.36
9
0
0
0
700
0.36
25
0.72
0.36
9
0
0
0
725
0.36
25
0.72
0.36
9
0
0
0
750
0.36
25
0.72
0.36
9
0
0
0
775
0.36
25
0.72
0.36
9
0
0
0
800
0.36
25
0.72
0.36
9
0.5
0.5
0.25
825
0.36
25
0.72
0.36
9
0
0.5
0.25
850
5.16
25
5.52
2.76
69
0
0
0
875
5.26
25
10.42
5.21 130.25
0
0
0
900
2.53
25
7.79
3.895 97.375
0
0
0
925
9.86
25
12.39
6.195 154.88
0
0
0
950
2.55
25
12.41
6.205 155.13
0
0
0
975
0.36
25
2.91
1.455 36.375
0.9
0.9
0.45
1000
0.36
25
0.72
0.36
9
1.5
2.4
1.2
Total
949
Total
A..E.E
Executive Engineer
Qty. M3
0
14.625
29.25
0
25
61
36
0
0
25
65
122.5
191.25
251.25
142.5
115
192.5
107.5
77.25
153.5
191.25
85
0
0
0
0
0
0
0
0
0
12.5
12.5
0
0
0
0
0
22.5
60
1992.875
PMGSY Sub-Division
Mendhar
PMGSY Division
Mendhar
Earth work chart for construction of Road from Mendhar to Jaranwali Gali
Distt. Poonch
Block Mendhar
KM
2nd
RD
L=21.00 Km
Area (m2) Length (MTotal Area Mean Area Qty. M3 Area (m2) Total Area Mean Area
0
0.36
25
0
0
0
0
25
0.36
25
0.72
0.36
9
0
0
0
50
0.36
25
0.72
0.36
9
0
0
0
75
0.36
25
0.72
0.36
9
0
0
0
100
0.36
25
0.72
0.36
9
0
0
0
125
0.36
25
0.72
0.36
9
0
0
0
150
1.86
25
2.22
1.11 27.75
0
0
0
175
1.16
25
3.02
1.51 37.75
0
0
0
200
1.86
25
3.02
1.51 37.75
0
0
0
225
1.86
25
3.72
1.86
46.5
0
0
0
250
0.36
25
2.22
1.11 27.75
0
0
0
275
0.36
25
0.72
0.36
9
0
0
0
300
0.36
25
0.72
0.36
9
0
0
0
325
0.66
25
1.02
0.51 12.75
0
0
0
350
0.36
25
1.02
0.51 12.75
0
0
0
375
0.36
25
0.72
0.36
9
0
0
0
400
0.36
25
0.72
0.36
9
0
0
0
425
0.36
25
0.72
0.36
9
0
0
0
450
0.36
25
0.72
0.36
9
0
0
0
475
0.36
25
0.72
0.36
9
0
0
0
500
1.11
25
1.47
0.735 18.375
0
0
0
525
0.36
25
1.47
0.735 18.375
0
0
0
550
2.86
25
3.22
1.61 40.25
0
0
0
575
4.36
25
7.22
3.61 90.25
0
0
0
600
5.56
25
9.92
4.96
124
0
0
0
625
5.91
25
11.47
5.735 143.38
0
0
0
650
0.36
25
6.27
3.135 78.375
0
0
0
675
5.63
25
5.99
2.995 74.875
1.27
1.27
0.635
700
0.36
25
5.99
2.995 74.875
0
1.27
0.635
725
1
25
1.36
0.68
17
0
0
0
750
0.36
25
1.36
0.68
17
0.85
0.85
0.425
775
0.36
25
0.72
0.36
9
2.3
3.15
1.575
800
0.36
25
0.72
0.36
9
0.51
2.81
1.405
825
2.53
25
2.89
1.445 36.125
0.52
1.03
0.515
850
1.63
25
4.16
2.08
52
0
0.52
0.26
875
3.43
25
5.06
2.53 63.25
0
0
0
900
2.68
25
6.11
3.055 76.375
0
0
0
925
9.86
25
12.54
6.27 156.75
0
0
0
950
2.55
25
12.41
6.205 155.13
0
0
0
975
0.36
25
2.91
1.455 36.375
0
0
0
1000
0.36
25
0.72
0.36
9
0
0
0
Total
1610.8
0
Total
Qty. M3
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
31.75
31.75
0
21.25
78.75
70.25
25.75
13
0
0
0
0
0
0
272.5
A..E.E
PMGSY Sub-Division
Mendhar
Executive Engineer
PMGSY Division
Mendhar
Earth work chart for construction of Road from Mendhar to Jaranwali Gali
Distt. Poonch
Block Mendhar
KM
3rd
RD
L=21.00 Km
Area (m2) Length (MTotal Area Mean Area Qty. M3 Area (m2) Total Area Mean Area
0
0.36
25
0
0
0
0
25
0.36
25
0.72
0.36
9
0
0
0
50
0.36
25
0.72
0.36
9
0
0
0
75
0.36
25
0.72
0.36
9
0
0
0
100
6.81
25
7.17
3.585 89.625
0
0
0
125
7.56
25
14.37
7.185 179.63
0
0
0
150
5.36
25
12.92
6.46 161.5
0
0
0
175
4.06
25
9.42
4.71 117.75
0
0
0
200
2.81
25
6.87
3.435 85.875
0
0
0
225
0.36
25
3.17
1.585 39.625
0
0
0
250
2.46
25
2.82
1.41 35.25
0
0
0
275
5.48
25
7.94
3.97 99.25
0
0
0
300
6.66
25
12.14
6.07 151.75
0
0
0
325
7.41
25
14.07
7.035 175.88
0
0
0
350
0.36
25
7.77
3.885 97.125
0
0
0
375
0.36
25
0.72
0.36
9
0
0
0
400
0.96
25
1.32
0.66
16.5
0
0
0
425
1.41
25
2.37
1.185 29.625
0
0
0
450
0.36
25
1.77
0.885 22.125
0
0
0
475
2.66
25
3.02
1.51 37.75
0
0
0
500
3.81
25
6.47
3.235 80.875
0
0
0
525
4.11
25
7.92
3.96
99
0
0
0
550
4.16
25
8.27
4.135 103.38
0
0
0
575
2.61
25
6.77
3.385 84.625
0
0
0
600
2.83
25
5.44
2.72
68
0
0
0
625
0.36
25
3.19
1.595 39.875
0
0
0
650
3.96
25
4.32
2.16
54
0
0
0
675
3.43
25
7.39
3.695 92.375
0
0
0
700
0.36
25
3.79
1.895 47.375
0
0
0
725
0.36
25
0.72
0.36
9
0
0
0
750
0.36
25
0.72
0.36
9
0
0
0
775
2.11
25
2.47
1.235 30.875
0
0
0
800
0.36
25
2.47
1.235 30.875
0
0
0
825
3.11
25
3.47
1.735 43.375
0
0
0
850
3.16
25
6.27
3.135 78.375
0
0
0
875
2.51
25
5.67
2.835 70.875
0
0
0
900
1.53
25
4.04
2.02
50.5
0
0
0
925
2.51
25
4.04
2.02
50.5
0
0
0
950
3.51
25
6.02
3.01 75.25
0
0
0
975
5.86
25
9.37
4.685 117.125
0
0
0
1000
2.66
25
8.52
4.26 106.5
0
0
0
Qty. M3
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Total
A..E.E
PMGSY Sub-Division
Mendhar
2717
Total
Executive Engineer
PMGSY Division
Mendhar
Earth work chart for construction of Road from Mendhar to Jaranwali Gali
Distt. Poonch
Block Mendhar
KM
4th
RD
L=21.00 Km
Area (m2) Length (MTotal Area Mean Area Qty. M3 Area (m2) Total Area Mean Area
0
2.66
25
0
0
0
0
25
5.98
25
8.64
4.32
108
0
0
0
50
0.36
25
6.34
3.17 79.25
0
0
0
75
0.36
25
0.72
0.36
9
0
0
0
100
4.76
25
5.12
2.56
64
0
0
0
125
1.76
25
6.52
3.26
81.5
0
0
0
150
0.78
25
2.54
1.27 31.75
0
0
0
175
0.36
25
1.14
0.57 14.25
0
0
0
200
0.36
25
0.72
0.36
9
0
0
0
225
0.36
25
0.72
0.36
9
0
0
0
250
0.36
25
0.72
0.36
9
0
0
0
275
0.36
25
0.72
0.36
9
0
0
0
300
0.36
25
0.72
0.36
9
0
0
0
325
3.51
25
3.87
1.935 48.375
0
0
0
350
2.08
25
5.59
2.795 69.875
0
0
0
375
1.96
25
4.04
2.02
50.5
0
0
0
400
2.66
25
4.62
2.31 57.75
0
0
0
425
1.11
25
3.77
1.885 47.125
0
0
0
450
1.96
25
3.07
1.535 38.375
0
0
0
475
6.76
25
8.72
4.36
109
0
0
0
500
7.6
25
14.36
7.18 179.5
0
0
0
525
9.36
25
16.96
8.48
212
0
0
0
550
14.76
25
24.12
12.06 301.5
0
0
0
575
12.36
25
27.12
13.56
339
0
0
0
600
10.36
25
22.72
11.36
284
0
0
0
625
1.43
25
11.79
5.895 147.38
0
0
0
650
2.85
25
4.28
2.14
53.5
0
0
0
675
7.41
25
10.26
5.13 128.25
0
0
0
700
4.36
25
11.77
5.885 147.13
0
0
0
725
0.36
25
4.72
2.36
59
0
0
0
750
5.26
25
5.62
2.81 70.25
0
0
0
775
11.21
25
16.47
8.235 205.88
0
0
0
800
0.36
25
11.57
5.785 144.63
0
0
0
825
0.36
25
0.72
0.36
9
0
0
0
850
0.36
25
0.72
0.36
9
0
0
0
875
5.4
25
5.76
2.88
72
0
0
0
900
6.56
25
11.96
5.98 149.5
0
0
0
925
3.36
25
9.92
4.96
124
0
0
0
950
4.56
25
7.92
3.96
99
0
0
0
Qty. M3
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
975
1000
9.56
3.06
25
25
14.12
12.62
Total
A..E.E
PMGSY Sub-Division
Mendhar
7.06 176.5
6.31 157.75
3922.5
0
0
0
0
0
0
0
0
0
0
Total
Executive Engineer
PMGSY Division
Mendhar
Earth work chart for construction of Road from Mendhar to Jaranwali Gali
Distt. Poonch
Block Mendhar
KM
5th
RD
L=21.00 Km
Area (m2) Length (MTotal Area Mean Area Qty. M3 Area (m2) Total Area Mean Area
0
3.06
25
0
0
0
0
25
5.42
25
8.48
4.24
106
0
0
0
50
3.26
25
8.68
4.34 108.5
0
0
0
75
0.36
25
3.62
1.81 45.25
0
0
0
100
1.58
25
1.94
0.97 24.25
0
0
0
125
2.11
25
3.69
1.845 46.125
0
0
0
150
4.71
25
6.82
3.41 85.25
0
0
0
175
4.61
25
9.32
4.66
116.5
0
0
0
200
8.61
25
13.22
6.61 165.25
0
0
0
225
5.61
25
14.22
7.11 177.75
0
0
0
250
3.81
25
9.42
4.71 117.75
0
0
0
275
4.23
25
8.04
4.02 100.5
0
0
0
300
6.11
25
10.34
5.17 129.25
0
0
0
325
10.86
25
16.97
8.485 212.13
0
0
0
350
9.11
25
19.97
9.985 249.63
0
0
0
375
3.48
25
12.59
6.295 157.38
0
0
0
400
6.96
25
10.44
5.22 130.5
0
0
0
425
4.86
25
11.82
5.91 147.75
0
0
0
450
6.36
25
11.22
5.61 140.25
0
0
0
475
5.76
25
12.12
6.06 151.5
0
0
0
500
1.56
25
7.32
3.66
91.5
0
0
0
525
0.36
25
1.92
0.96
24
0
0
0
550
2.56
25
2.92
1.46
36.5
0
0
0
575
0.36
25
2.92
1.46
36.5
0
0
0
600
0.36
25
0.72
0.36
9
0
0
0
625
1.98
25
2.34
1.17 29.25
0
0
0
650
0.36
25
2.34
1.17 29.25
0
0
0
675
0.36
25
0.72
0.36
9
0
0
0
700
2.81
25
3.17
1.585 39.625
0
0
0
725
2.76
25
5.57
2.785 69.625
0
0
0
750
2.81
25
5.57
2.785 69.625
0
0
0
775
0.36
25
3.17
1.585 39.625
0
0
0
800
0.36
25
0.72
0.36
9
0
0
0
825
0.56
25
0.92
0.46
11.5
0
0
0
850
3.06
25
3.62
1.81 45.25
0
0
0
875
4.26
25
7.32
3.66
91.5
0
0
0
900
6.96
25
11.22
5.61 140.25
0
0
0
Qty. M3
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
925
950
975
1000
7.16
3.98
0.36
0.36
25
25
25
25
14.12
11.14
4.34
0.72
Total
A..E.E
PMGSY Sub-Division
Mendhar
7.06 176.5
5.57 139.25
2.17 54.25
0.36
9
3571.5
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Total
Executive Engineer
PMGSY Division
Mendhar
Earth work chart for construction of Road from Mendhar to Jaranwali Gali
Distt. Poonch
Block Mendhar
KM
6th
RD
L=21.00 Km
Area (m2) Length (MTotal Area Mean Area Qty. M3 Area (m2) Total Area Mean Area
0
0.36
25
0
0
0
0
25
6.16
25
6.52
3.26
81.5
0
0
0
50
0.36
25
6.52
3.26
81.5
0
0
0
75
0.36
25
0.72
0.36
9
0
0
0
100
0.36
25
0.72
0.36
9
0
0
0
125
2.74
25
3.1
1.55 38.75
0
0
0
150
2.04
25
4.78
2.39 59.75
0
0
0
175
2.56
25
4.6
2.3
57.5
0
0
0
200
3.26
25
5.82
2.91 72.75
0
0
0
225
1.01
25
4.27
2.135 53.375
0
0
0
250
0.36
25
1.37
0.685 17.125
0
0
0
275
0.46
25
0.82
0.41 10.25
0
0
0
300
1.86
25
2.32
1.16
29
0
0
0
325
1.86
25
3.72
1.86
46.5
0
0
0
350
7.48
25
9.34
4.67 116.75
0
0
0
375
9.21
25
16.69
8.345 208.63
0
0
0
400
0.36
25
9.57
4.785 119.625
0
0
0
425
0.36
25
0.72
0.36
9
0
0
0
450
1.86
25
2.22
1.11 27.75
0
0
0
475
0.36
25
2.22
1.11 27.75
0
0
0
500
0.36
25
0.72
0.36
9
0
0
0
525
0.36
25
0.72
0.36
9
0
0
0
550
0.36
25
0.72
0.36
9
0
0
0
575
0.85
25
1.21
0.605 15.125
0
0
0
600
0.36
25
1.21
0.605 15.125
0
0
0
625
0.36
25
0.72
0.36
9
0
0
0
650
0.36
25
0.72
0.36
9
0
0
0
675
0.36
25
0.72
0.36
9
0
0
0
700
0.36
25
0.72
0.36
9
0
0
0
725
6.26
25
6.62
3.31 82.75
0
0
0
750
0.36
25
6.62
3.31 82.75
0
0
0
775
0.36
25
0.72
0.36
9
0
0
0
800
3.81
25
4.17
2.085 52.125
0
0
0
825
0.36
25
4.17
2.085 52.125
0
0
0
850
0.36
25
0.72
0.36
9
0
0
0
Qty. M3
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
875
900
925
950
975
1000
6.39
4.26
0.36
0.56
7.56
4.26
25
25
25
25
25
25
6.75
10.65
4.62
0.92
8.12
11.82
3.375 84.375
5.325 133.13
2.31 57.75
0.46
11.5
4.06 101.5
5.91 147.75
Total
1992.5
A..E.E
PMGSY Sub-Division
Mendhar
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Total
Executive Engineer
PMGSY Division
Mendhar
Earth work chart for construction of Road from Mendhar to Jaranwali Gali
Distt. Poonch
Block Mendhar
KM
7th
RD
L=21.00 Km
Area (m2) Length (MTotal Area Mean Area Qty. M3 Area (m2) Total Area Mean Area
0
4.26
25
0
0
0
0
25
0.36
25
4.62
2.31 57.75
0
0
0
50
4.1
25
4.46
2.23 55.75
0
0
0
75
0.36
25
4.46
2.23 55.75
0
0
0
100
1.89
25
2.25
1.125 28.125
0
0
0
125
1.96
25
3.85
1.925 48.125
0
0
0
150
0.36
25
2.32
1.16
29
0
0
0
175
0.36
25
0.72
0.36
9
0
0
0
200
0.36
25
0.72
0.36
9
0
0
0
225
0.36
25
0.72
0.36
9
0
0
0
250
0.36
25
0.72
0.36
9
0
0
0
275
0.36
25
0.72
0.36
9
0
0
0
300
0.36
25
0.72
0.36
9
0
0
0
325
0.36
25
0.72
0.36
9
0
0
0
350
0.36
25
0.72
0.36
9
0
0
0
375
0.36
25
0.72
0.36
9
0
0
0
400
0.36
25
0.72
0.36
9
0
0
0
425
0.36
25
0.72
0.36
9
0
0
0
450
0.36
25
0.72
0.36
9
0
0
0
475
0.36
25
0.72
0.36
9
0
0
0
500
0.36
25
0.72
0.36
9
0
0
0
525
0.36
25
0.72
0.36
9
0
0
0
550
0.36
25
0.72
0.36
9
0
0
0
575
1.29
25
1.65
0.825 20.625
0
0
0
600
0.36
25
1.65
0.825 20.625
0
0
0
625
0.36
25
0.72
0.36
9
0
0
0
650
0.36
25
0.72
0.36
9
0
0
0
675
0.36
25
0.72
0.36
9
0
0
0
700
0.36
25
0.72
0.36
9
0
0
0
725
0.36
25
0.72
0.36
9
0
0
0
750
9.36
25
9.72
4.86 121.5
0
0
0
775
2.53
25
11.89
5.945 148.63
0
0
0
800
6.66
25
9.19
4.595 114.875
0
0
0
Qty. M3
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
825
850
875
900
925
950
975
1000
0.36
8.76
11.1
6.21
0.36
0.36
0.36
0.36
25
25
25
25
25
25
25
25
7.02
9.12
19.86
17.31
6.57
0.72
0.72
0.72
3.51 87.75
4.56
114
9.93 248.25
8.655 216.38
3.285 82.125
0.36
9
0.36
9
0.36
9
Total
1665.3
A..E.E
PMGSY Sub-Division
Mendhar
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Total
0
0
0
0
0
0
0
0
0
Executive Engineer
PMGSY Division
Mendhar
Earth work chart for construction of Road from Mendhar to Jaranwali Gali
Distt. Poonch
Block Mendhar
KM
15th
L=21.00 Km
RD Length (M
Area (m2)
Total Area
Mean Area
Mean Area
Qty. M3
Total Area
0
25
25
0.36
0.36
0.18
4.5
50
25
0.36
0.72
0.36
75
25
0.36
0.72
0.36
100
25
0.36
0.72
0.36
125
25
0.36
0.72
0.36
150
25
0.36
0.72
0.36
175
25
0.36
0.72
0.36
200
25
0.36
0.18
4.5
225
25
2.26
2.26
1.13
28.25
250
25
3.16
5.42
2.71
67.75
275
25
2.46
5.62
2.81
70.25
300
25
2.36
4.82
2.41
60.25
325
25
5.56
7.92
3.96
99
350
25
7.56
13.12
6.56
164
375
25
0.36
7.92
3.96
99
400
25
2.16
2.52
1.26
31.5
425
25
1.81
3.97
1.985
49.625
450
25
3.26
5.07
2.535
63.375
475
25
0.36
3.62
1.81
45.25
500
25
4.76
5.12
525
25
4.86
9.62
550
25
7.26
12.12
575
25
8.73
15.99
7.995
199.875
600
25
6.41
15.14
625
25
4.16
10.57
5.285
132.125
650
25
2.06
6.22
3.11
77.75
675
25
3.36
5.42
2.71
67.75
700
25
3.96
7.32
3.66
91.5
725
25
5.02
8.98
4.49
112.25
750
25
3.51
8.53
4.265
106.625
775
25
4.46
7.97
3.985
99.625
800
25
8.96
13.42
6.71
167.75
825
25
2.26
11.22
5.61
140.25
850
25
4.16
6.42
3.21
80.25
875
25
2.01
6.17
3.085
77.125
900
25
2.2
4.21
2.105
52.625
925
25
4.82
7.02
3.51
87.75
950
25
11.26
16.08
8.04
201
975
25
9.06
20.32
10.16
254
1000
25
0.36
9.42
4.71
117.75
Total
2907.25
A..E.E
PMGSY Sub-Division
Mendhar
Total
Executive Engineer
PMGSY Division
Mendhar
Earth work chart for construction of Road from Mendhar to Jaranwali Gali
Distt. Poonch
Block Mendhar
KM
L=21.00 Km
RD Length (M)
16th
Total Area
Total Area
Mean Area
Qty. M3
0.36
25
25
0.36
0.72
0.36
50
25
1.16
1.52
0.76
19
75
25
1.31
2.47
1.235
30.875
100
25
5.66
6.97
3.485
87.125
125
25
0.36
6.02
3.01
75.25
150
25
0.71
1.07
0.535
13.375
175
25
3.36
4.07
2.035
50.875
200
25
2.06
5.42
2.71
67.75
225
25
1.71
3.77
1.885
47.125
250
25
3.36
5.07
2.535
63.375
275
25
1.86
5.22
2.61
65.25
300
25
1.86
0.93
23.25
325
25
2.26
2.26
1.13
28.25
350
25
3.26
5.52
2.76
69
375
25
3.36
6.62
3.31
82.75
400
25
5.76
9.12
4.56
114
425
25
0.36
6.12
3.06
76.5
450
25
1.86
2.22
1.11
27.75
475
25
3.26
5.12
2.56
64
500
25
3.36
6.62
3.31
82.75
525
25
5.21
8.57
4.285
107.125
550
25
0.86
6.07
3.035
75.875
575
25
5.76
6.62
3.31
82.75
600
25
2.16
7.92
3.96
99
625
25
3.26
5.42
2.71
67.75
650
25
0.36
3.62
1.81
45.25
675
25
0.36
0.18
4.5
700
25
0.36
0.36
0.18
4.5
725
25
0.36
0.72
0.36
750
25
1.26
1.62
0.81
20.25
775
25
1.26
0.63
15.75
800
25
0.36
0.36
0.18
4.5
825
25
0.36
0.72
0.36
850
25
1.06
1.42
0.71
17.75
875
25
2.76
3.82
1.91
47.75
900
25
3.26
6.02
3.01
75.25
925
25
3.26
1.63
40.75
950
25
1.86
1.86
0.93
23.25
975
25
1.86
3.72
1.86
46.5
1000
25
0.36
2.22
1.11
27.75
Total
1921.5
Total
A..E.E
PMGSY Sub-Division
Mendhar
Executive Engineer
PMGSY Division
Mendhar
Earth work chart for construction of Road from Mendhar to Jaranwali Gali
Distt. Poonch
Block Mendhar
KM
L=21.00 Km
Length
RD (M)
17th
Total Area
Mean Area
Qty. M3
0.36
25
25
0.86
1.22
0.61
15.25
50
25
0.36
1.22
0.61
15.25
75
25
6.36
6.72
3.36
84
100
25
1.36
7.72
3.86
96.5
125
25
2.61
3.97
1.985
49.625
150
25
0.72
3.33
1.665
41.625
175
25
0.36
1.08
0.54
13.5
200
25
0.36
0.72
0.36
225
25
3.36
3.72
1.86
46.5
250
25
24.46
27.82
13.91
347.75
275
25
0.72
25.18
12.59
314.75
300
25
0.36
1.08
0.54
13.5
325
25
8.18
8.54
4.27
106.75
350
25
5.05
13.23
6.615
165.375
375
25
4.98
10.03
5.015
125.375
400
25
0.79
5.77
2.885
72.125
425
25
4.96
5.75
2.875
71.875
450
25
0.36
5.32
2.66
66.5
475
25
2.15
2.51
1.255
31.375
500
25
9.82
11.97
5.985
149.625
525
25
0.36
10.18
5.09
127.25
550
25
4.61
4.97
2.485
62.125
575
25
0.69
5.3
2.65
66.25
600
25
4.71
5.4
2.7
67.5
625
25
4.74
9.45
4.725
118.125
650
25
0.86
5.6
2.8
70
675
25
0.36
1.22
0.61
15.25
700
25
0.36
0.72
0.36
725
25
0.36
0.72
0.36
750
25
0.36
0.72
0.36
775
25
11.21
11.57
5.785
144.625
800
25
0.36
11.57
5.785
144.625
825
25
0.36
0.72
0.36
850
25
0.66
1.02
0.51
12.75
875
25
1.86
2.52
1.26
31.5
900
25
12.14
14
175
925
25
12.41
24.55
12.275
306.875
950
25
3.89
16.3
8.15
203.75
975
25
7.95
11.84
5.92
148
1000
25
4.46
12.41
6.205
155.125
Total
3721
A..E.E
PMGSY Sub-Division
Mendhar
Total
Executive Engineer
PMGSY Division
Mendhar
Earth work chart for construction of Road from Mendhar to Jaranwali Gali
Distt. Poonch
Block Mendhar
KM
RD
L=21.00 Km
Length
(M)
18th
Total Area
Mean Area
Qty. M3
25
25
4.46
6.22
3.11
77.75
50
25
1.76
3.82
1.91
47.75
75
25
2.06
2.42
1.21
30.25
100
25
0.36
0.72
0.36
125
25
0.36
5.37
2.685
67.125
150
25
5.01
5.37
2.685
67.125
175
25
0.36
5.22
2.61
65.25
200
25
4.86
11.75
5.875
146.875
225
25
6.89
7.88
3.94
98.5
250
25
0.99
8.32
4.16
104
275
25
7.33
11.54
5.77
144.25
300
25
4.21
8.42
4.21
105.25
325
25
4.21
4.21
2.105
52.625
350
25
375
25
1.61
0.805
20.125
400
25
1.61
2.52
1.26
31.5
425
25
0.91
1.27
0.635
15.875
450
25
0.36
0.72
0.36
475
25
0.36
1.6
0.8
20
500
25
1.24
3.23
1.615
40.375
525
25
1.99
2.35
1.175
29.375
550
25
0.36
4.5
2.25
56.25
575
25
4.14
4.14
2.07
51.75
600
25
11.46
5.73
143.25
Area (m2)
Total Area
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Mean Area
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Qty. M3
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
625
25
11.46
28.51
14.255
356.375
650
25
17.05
23.64
11.82
295.5
675
25
6.59
7.7
3.85
96.25
700
25
1.11
1.47
0.735
18.375
725
25
0.36
0.72
0.36
750
25
0.36
3.37
1.685
42.125
775
25
3.01
23.86
11.93
298.25
800
25
20.85
39.81
19.905
497.625
825
25
18.96
53.52
26.76
669
850
25
34.56
82.95
41.475 1036.875
875
25
48.39
53.25
26.625
665.625
900
25
4.86
39.83
19.915
497.875
925
25
34.97
51.04
25.52
638
950
25
16.07
24.38
12.19
304.75
975
25
8.31
14
175
1000
25
5.69
5.69
2.845
71.125
Total
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
7105
A..E.E
PMGSY Sub-Division
Mendhar
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Total
Executive Engineer
PMGSY Division
Mendhar
Earth work chart for construction of Road from Mendhar to Jaranwali Gali
Distt. Poonch
Block Mendhar
KM
RD
L=21.00 Km
Length (M
19th
Total Area
Mean Area
Qty. M3
5.69
25
25
12.86
23.12
11.56
289
50
25
10.26
14.12
7.06
176.5
75
25
3.86
9.77
4.885
122.125
100
25
5.91
12.2
6.1
152.5
125
25
6.29
12.2
6.1
152.5
150
25
5.91
22.02
11.01
275.25
175
25
16.11
21.53
10.765
269.125
200
25
5.42
6.03
3.015
75.375
225
25
0.61
9.07
4.535
113.375
250
25
8.46
12.27
6.135
153.375
275
25
3.81
14.38
7.19
179.75
300
25
10.57
10.93
5.465
136.625
325
25
0.36
3.24
1.62
40.5
350
25
2.88
2.88
1.44
36
375
25
400
25
3.96
1.98
49.5
425
25
3.96
10.77
5.385
134.625
450
25
6.81
8.82
4.41
110.25
475
25
2.01
2.37
1.185
29.625
500
25
0.36
0.72
0.36
525
25
0.36
0.36
0.18
4.5
550
25
0.36
0.18
4.5
575
25
0.36
15.3
7.65
191.25
Area (m2)
Total Area
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Mean Area
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Qty. M3
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
600
25
14.94
24.75
12.375
309.375
625
25
9.81
22.97
11.485
287.125
650
25
13.16
21.83
10.915
272.875
675
25
8.67
17.88
8.94
223.5
700
25
9.21
17.64
8.82
220.5
725
25
8.43
36.08
18.04
451
750
25
27.65
41.79
20.895
522.375
775
25
14.14
14.5
7.25
181.25
800
25
0.36
0.72
0.36
825
25
0.36
4.95
2.475
61.875
850
25
4.59
4.95
2.475
61.875
875
25
0.36
5.64
2.82
70.5
900
25
5.28
13.32
6.66
166.5
925
25
8.04
29.17
14.585
364.625
950
25
21.13
43.78
21.89
547.25
975
25
22.65
22.65
11.325
283.125
1000
25
Total
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
6738.00
A..E.E
PMGSY Sub-Division
Mendhar
Executive Engineer
PMGSY Division
Mendhar
Earth work chart for construction of Road from Mendhar to Jaranwali Gali
Distt. Poonch
Block Mendhar
KM
RD
L=21.00 Km
Length (M
Area (m2)
Total Area
Mean Area
Qty. M3
Area (m2)
Total Area
Mean Area
Qty. M3
20th
0
25
25
2.89
2.89
1.445
36.125
50
25
4.16
7.05
3.525
88.125
75
25
1.96
6.12
3.06
76.5
100
25
3.96
5.92
2.96
74
125
25
1.99
5.95
2.975
74.375
150
25
0.36
2.35
1.175
29.375
175
25
0.36
0.72
0.36
200
25
13.46
13.82
6.91
172.75
225
25
16.97
30.43
15.215
380.375
250
25
8.12
25.09
12.545
313.625
275
25
14.16
22.28
11.14
278.5
300
25
4.41
18.57
9.285
232.125
325
25
9.51
13.92
6.96
174
350
25
5.04
14.55
7.275
181.875
375
25
0.36
5.4
2.7
67.5
400
25
5.16
5.52
2.76
69
425
25
2.89
8.05
4.025
100.625
450
25
4.94
7.83
3.915
97.875
475
25
0.36
5.3
2.65
66.25
500
25
0.36
0.72
0.36
525
25
0.36
0.72
0.36
550
25
5.01
5.37
2.685
67.125
575
25
6.51
11.52
5.76
144
600
25
5.91
12.42
6.21
155.25
625
25
7.87
13.78
6.89
172.25
650
25
1.94
9.81
4.905
122.625
675
25
0.36
2.3
1.15
28.75
700
25
10.81
11.17
5.585
139.625
725
25
7.36
18.17
9.085
227.125
750
25
5.01
12.37
6.185
154.625
775
25
11.76
16.77
8.385
209.625
800
25
16.34
28.1
14.05
351.25
825
25
16.97
33.31
16.655
416.375
850
25
15.71
32.68
16.34
408.5
875
25
15.99
31.7
15.85
396.25
900
25
6.97
22.96
11.48
287
925
25
10.24
17.21
8.605
215.125
950
25
7.15
17.39
8.695
217.375
975
25
4.39
11.54
5.77
144.25
1000
25
10.99
15.38
192.25
7.69
Total
6589.375
A..E.E
PMGSY Sub-Division
Mendhar
Total
Executive Engineer
PMGSY Division
Mendhar
Earth work chart for construction of Road from Mendhar to Jaranwali Gali
Distt. Poonch
Block Mendhar
KM
RD
L=21.00 Km
Length (M
Area (m2)
Total Area
Mean Area
Qty. M3
Area (m2)
Total Area
Mean Area
Qty. M3
21st
0
10.99
25
50
25
14.6
25.59
12.795
319.875
25
24.12
38.72
19.36
484
75
25
14.14
38.26
19.13
478.25
100
25
4.35
18.49
9.245
231.125
125
25
19.86
24.21
12.105
302.625
150
25
14.14
34
17
425
175
25
9.24
23.38
11.69
292.25
200
25
10.99
20.23
10.115
252.875
225
25
2.43
13.42
6.71
167.75
250
25
17.39
19.82
9.91
247.75
275
25
22.99
40.38
20.19
504.75
300
25
35.81
58.8
29.4
735
325
25
10.14
45.95
22.975
574.375
350
25
0.36
10.5
5.25
131.25
375
25
0.36
0.72
0.36
400
25
0.36
0.72
0.36
425
25
0.36
0.72
0.36
450
25
7.36
7.72
3.86
96.5
475
25
0.76
8.12
4.06
101.5
500
25
18.99
19.75
9.875
246.875
525
25
9.62
28.61
14.305
357.625
550
25
5.76
15.38
7.69
192.25
575
25
3.01
8.77
4.385
109.625
600
25
13.87
16.88
8.44
211
625
25
13.87
6.935
173.375
650
25
11.66
11.66
5.83
145.75
675
25
20.91
32.57
16.285
407.125
700
25
7.98
28.89
14.445
361.125
725
25
5.84
13.82
6.91
172.75
750
25
12.79
18.63
9.315
232.875
775
25
7.78
20.57
10.285
257.125
800
25
10.14
17.92
8.96
224
825
25
26.86
37
18.5
462.5
850
25
18.69
45.55
22.775
569.375
875
25
15.43
34.12
17.06
426.5
900
25
37.61
53.04
26.52
663
925
25
0.36
37.97
18.985
474.625
950
25
13.11
13.47
6.735
168.375
975
25
8.11
21.22
10.61
265.25
1000
25
10.24
18.35
9.175
229.375
Total
11722.38
A..E.E
PMGSY Sub-Division
Mendhar
Total
Executive Engineer
PMGSY Division
Mendhar
Earth work chart for construction of Road from Mendhar to Jaranwali Gali
Distt. Poonch
Block Mendhar
KM
RD
L=21.00 Km
Length (M
Area (m2)
8th
Total Area
Mean Area
Qty. M3
Area (m2)
Total Area
Mean Area
Qty. M3
25
25
6.01
6.01
3.005
75.125
50
25
4.86
10.87
5.435
135.875
75
25
4.11
8.97
4.485
112.125
100
25
4.66
8.77
4.385
109.625
125
25
3.88
8.54
4.27
106.75
150
25
2.08
5.96
2.98
74.5
175
25
1.11
3.19
1.595
39.875
200
25
4.16
5.27
2.635
65.875
225
25
3.48
7.64
3.82
95.5
250
25
2.66
6.14
3.07
76.75
275
25
6.08
8.74
4.37
109.25
300
25
3.48
9.56
4.78
119.5
325
25
7.48
10.96
5.48
137
350
25
3.82
11.3
5.65
141.25
375
25
6.27
10.09
5.045
126.125
400
25
7.11
13.38
6.69
167.25
425
25
1.76
8.87
4.435
110.875
450
25
3.76
5.52
2.76
69
475
25
1.61
5.37
2.685
67.125
500
25
5.76
7.37
3.685
92.125
525
25
6.21
11.97
5.985
149.625
550
25
1.16
7.37
3.685
92.125
575
25
0.72
1.88
0.94
23.5
600
25
0.72
1.44
0.72
18
625
25
1.92
2.64
1.32
33
650
25
2.56
4.48
2.24
56
675
25
0.72
3.28
1.64
41
700
25
0.72
1.44
0.72
18
725
25
3.12
3.84
1.92
48
750
25
7.29
10.41
5.205
130.125
775
25
5.46
12.75
6.375
159.375
800
25
13.97
19.43
9.715
242.875
825
25
4.36
18.33
9.165
229.125
850
25
6.14
10.5
5.25
131.25
875
25
8.2
14.34
7.17
179.25
900
25
4.46
12.66
6.33
158.25
925
25
11.11
15.57
7.785
194.625
950
25
17.11
8.555
213.875
975
25
3.21
9.21
4.605
115.125
1000
25
1.11
4.32
2.16
54
Total
4318.625
A..E.E
PMGSY Sub-Division
Mendhar
Total
Executive Engineer
PMGSY Division
Mendhar
Earth work chart for construction of Road from Mendhar to Jaranwali Gali
Distt. Poonch
Block Mendhar
KM
RD
L=21.00 Km
Length (M
Area (m2)
9th
Total Area
Mean Area
Qty. M3
Area (m2)
Total Area
Mean Area
Qty. M3
#REF!
#REF!
#REF!
25
25
3.78
3.78
1.89
47.25
50
25
1.57
5.35
2.675
66.875
75
25
1.49
3.06
1.53
38.25
100
25
1.49
0.745
18.625
18.625
125
25
0.85
2.85
1.425
150
25
0.09
0.94
0.47
175
25
8.03
8.03
4.015
100.375
0.09
0.045
4.516875
200
25
12.91
20.94
10.47
261.75
225
25
12.61
25.52
12.76
319
2.4
2.4
1.2
382.8
250
25
0.36
12.97
6.485
162.125
2.4
1.2
194.55
275
25
14.41
14.77
7.385
184.625
300
25
6.34
20.75
10.375
259.375
325
25
0.36
6.7
3.35
83.75
2.2
2.2
1.1
92.125
350
25
9.09
9.45
4.725
118.125
2.2
1.1
129.9375
375
25
4.96
14.05
7.025
175.625
400
25
5.11
10.07
5.035
125.875
425
25
1.39
6.5
3.25
81.25
450
25
7.11
8.5
4.25
106.25
475
25
6.36
13.47
6.735
168.375
500
25
4.49
10.85
5.425
135.625
525
25
9.76
14.25
7.125
178.125
550
25
1.72
11.48
5.74
143.5
575
25
4.41
6.13
3.065
76.625
0.18
0.18
0.09
6.89625
600
25
3.67
8.08
4.04
101
0.18
0.09
9.09
625
25
4.66
8.33
4.165
104.125
650
25
0.86
5.52
2.76
69
2.5
2.5
1.25
86.25
675
25
0.36
1.22
0.61
15.25
1.25
3.75
1.875
28.59375
700
25
0.36
0.18
4.5
1.9
3.15
1.575
7.0875
725
25
4.26
4.26
2.13
53.25
1.9
0.95
50.5875
750
25
3.66
7.92
3.96
99
775
25
4.91
8.57
4.285
107.125
800
25
4.66
9.57
4.785
119.625
825
25
5.66
10.32
5.16
129
850
25
5.86
11.52
5.76
144
875
25
2.26
8.12
4.06
101.5
900
25
3.56
5.82
2.91
72.75
925
25
5.01
8.57
4.285
107.125
1.51
1.51
0.755
80.879375
950
25
10.71
15.72
7.86
196.5
0.9
2.41
1.205
236.7825
975
25
1.01
11.72
5.86
146.5
0.9
0.45
65.925
1000
25
4.36
5.37
2.685
67.125
Total
4488.75
A..E.E
PMGSY Sub-Division
Mendhar
Total
Executive Engineer
PMGSY Division
Mendhar
Earth work chart for construction of Road from Mendhar to Jaranwali Gali
Distt. Poonch
Block Mendhar
KM
RD
L=21.00 Km
Length (M
Area (m2)
10th
Total Area
Mean Area
Qty. M3
Area (m2)
Total Area
Mean Area
Qty. M3
#REF!
#REF!
#REF!
25
25
7.51
7.51
3.755
93.875
0.00
50
25
7.55
15.06
7.53
188.25
0.00
75
25
7.09
14.64
7.32
183
0.00
100
25
6.86
13.95
6.975
174.375
0.00
125
25
6.83
13.69
6.845
171.125
0.00
150
25
10.91
17.74
8.87
221.75
0.00
175
25
14.75
25.66
12.83
320.75
0.00
200
25
9.72
24.47
12.235
305.875
0.00
225
25
3.98
13.7
6.85
171.25
0.00
250
25
1.36
5.34
2.67
66.75
0.00
275
25
3.58
4.94
2.47
61.75
0.00
300
25
0.36
3.94
1.97
49.25
0.3
0.3
0.15
7.39
325
25
0.72
1.08
0.54
13.5
0.00
350
25
0.72
1.44
0.72
18
0.00
375
25
0.72
0.36
1.12
1.12
0.56
5.04
400
25
6.81
6.81
3.405
85.125
0.00
425
25
7.48
14.29
7.145
178.625
0.00
450
25
17.16
24.64
12.32
308
0.00
475
25
2.78
19.94
9.97
249.25
0.00
500
25
0.36
3.14
1.57
39.25
0.00
525
25
1.9
2.26
1.13
28.25
0.36
0.36
0.18
5.09
550
25
0.36
2.26
1.13
28.25
0.00
575
25
0.36
0.18
4.5
0.5
0.5
0.25
1.13
600
25
0.36
0.36
0.18
4.5
0.00
625
25
0.36
0.18
4.5
0.00
650
25
0.36
0.36
0.18
4.5
0.00
675
25
0.36
0.72
0.36
0.00
700
25
1.86
2.22
1.11
27.75
0.00
725
25
4.12
5.98
2.99
74.75
0.00
750
25
1.01
5.13
2.565
64.125
0.00
775
25
5.96
6.97
3.485
87.125
0.00
800
25
2.31
8.27
4.135
103.375
0.00
825
25
1.71
4.02
2.01
50.25
0.00
850
25
3.21
4.92
2.46
61.5
0.00
875
25
4.46
7.67
3.835
95.875
0.00
900
25
2.01
6.47
3.235
80.875
0.00
925
25
3.16
5.17
2.585
64.625
0.00
950
25
3.36
6.52
3.26
81.5
0.00
975
25
8.98
12.34
6.17
154.25
0.00
1000
25
2.68
11.66
5.83
145.75
0.00
Total
4084
A..E.E
PMGSY Sub-Division
Mendhar
Total
Executive Engineer
PMGSY Division
Mendhar
Earth work chart for construction of Road from Mendhar to Jaranwali Gali
Distt. Poonch
Block Mendhar
KM
RD
L=21.00 Km
Length (M
Area (m2)
11th
Total Area
Mean Area
Qty. M3
Area (m2)
Total Area
Mean Area
Qty. M3
#REF!
#REF!
#REF!
25
25
6.46
6.46
3.23
80.75
0.00
50
25
3.26
9.72
4.86
121.5
0.00
75
25
4.69
7.95
3.975
99.375
0.00
100
25
0.36
5.05
2.525
63.125
0.00
125
25
8.19
8.55
4.275
106.875
0.00
150
25
8.65
16.84
8.42
210.5
0.00
175
25
10.06
18.71
9.355
233.875
0.00
200
25
1.91
11.97
5.985
149.625
0.00
225
25
4.31
6.22
3.11
77.75
0.00
250
25
3.87
8.18
4.09
102.25
0.00
275
25
5.11
8.98
4.49
112.25
0.00
300
25
0.36
5.47
2.735
68.375
0.00
325
25
3.96
4.32
2.16
54
0.00
350
25
3.76
7.72
3.86
96.5
0.00
375
25
8.25
12.01
6.005
150.125
0.00
400
25
6.08
14.33
7.165
179.125
0.00
425
25
1.28
7.36
3.68
92
0.00
450
25
4.9
6.18
3.09
77.25
0.00
475
25
4.86
9.76
4.88
122
0.00
500
25
11.31
16.17
8.085
202.125
0.00
525
25
3.76
15.07
7.535
188.375
0.00
550
25
7.96
11.72
5.86
146.5
0.00
575
25
3.59
11.55
5.775
144.375
0.00
600
25
21.46
25.05
12.525
313.125
0.00
625
25
2.36
23.82
11.91
297.75
0.00
650
25
0.36
2.72
1.36
34
0.00
675
25
5.156
5.516
2.758
68.95
0.52
0.52
0.26
17.93
700
25
3.56
8.716
4.358
108.95
0.00
725
25
8.76
12.32
6.16
154
0.00
750
25
5.01
13.77
6.885
172.125
0.00
775
25
3.86
8.87
4.435
110.875
0.00
800
25
1.26
5.12
2.56
64
0.00
825
25
7.26
8.52
4.26
106.5
0.00
850
25
4.46
11.72
5.86
146.5
0.00
875
25
7.96
12.42
6.21
155.25
0.00
900
25
8.86
16.82
8.41
210.25
0.00
925
25
7.76
16.62
8.31
207.75
0.00
950
25
6.6
14.36
7.18
179.5
0.00
975
25
17.21
23.81
11.905
297.625
0.00
1000
25
7.58
24.79
12.395
309.875
0.00
Total
5815.65
A..E.E
PMGSY Sub-Division
Mendhar
Total
Executive Engineer
PMGSY Division
Mendhar
Earth work chart for construction of Road from Mendhar to Jaranwali Gali
Distt. Poonch
Block Mendhar
KM
RD
L=21.00 Km
Length (M
Area (m2)
12th
Total Area
Mean Area
Qty. M3
Area (m2)
Total Area
Mean Area
Qty. M3
#REF!
#REF!
#REF!
25
25
9.56
9.56
4.78
119.5
0.00
50
25
5.41
14.97
7.485
187.125
0.00
75
25
5.61
11.02
5.51
137.75
0.00
100
25
2.56
8.17
4.085
102.125
0.00
125
25
0.36
2.92
1.46
36.5
0.00
150
25
6.34
6.7
3.35
83.75
0.00
175
25
5.06
11.4
5.7
142.5
0.00
200
25
6.36
11.42
5.71
142.75
0.00
225
25
9.46
15.82
7.91
197.75
0.00
250
25
4.86
14.32
7.16
179
0.00
275
25
9.34
14.2
7.1
177.5
0.00
300
25
0.36
9.7
4.85
121.25
0.00
325
25
5.06
5.42
2.71
67.75
0.00
350
25
3.56
8.62
4.31
107.75
0.00
375
25
5.76
9.32
4.66
116.5
0.00
400
25
2.65
8.41
4.205
105.125
0.00
425
25
5.16
7.81
3.905
97.625
0.00
450
25
6.31
11.47
5.735
143.375
0.00
475
25
7.56
13.87
6.935
173.375
0.00
500
25
2.86
10.42
5.21
130.25
0.00
525
25
2.86
1.43
35.75
0.00
550
25
2.71
2.71
1.355
33.875
0.00
575
25
1.86
4.57
2.285
57.125
0.00
600
25
0.36
2.22
1.11
27.75
0.00
625
25
3.54
3.9
1.95
48.75
0.00
650
25
1.36
4.9
2.45
61.25
0.00
675
25
2.69
4.05
2.025
50.625
0.00
700
25
0.36
3.05
1.525
38.125
0.00
725
25
0.36
0.72
0.36
0.00
750
25
3.26
3.62
1.81
45.25
0.00
775
25
1.76
5.02
2.51
62.75
0.00
800
25
3.76
1.88
47
0.00
825
25
1.26
3.26
1.63
40.75
0.00
850
25
1.48
2.74
1.37
34.25
0.00
875
25
1.48
0.74
18.5
0.00
900
25
1.45
1.45
0.725
18.125
0.00
925
25
4.91
6.36
3.18
79.5
0.00
950
25
0.96
5.87
2.935
73.375
0.00
975
25
4.43
5.39
2.695
67.375
0.00
1000
25
2.63
7.06
3.53
88.25
0.00
Total
3506.625
A..E.E
PMGSY Sub-Division
Mendhar
Total
Executive Engineer
PMGSY Division
Mendhar
Earth work chart for construction of Road from Mendhar to Jaranwali Gali
Distt. Poonch
Block Mendhar
KM
RD
L=21.00 Km
Length (M
Area (m2)
13th
Total Area
Mean Area
Qty. M3
Area (m2)
Total Area
Mean Area
Qty. M3
#REF!
#REF!
#REF!
25
25
2.81
2.81
1.405
35.125
0.00
50
25
3.46
6.27
3.135
78.375
0.00
75
25
5.57
9.03
4.515
112.875
0.00
100
25
7.46
13.03
6.515
162.875
0.00
125
25
6.48
12.02
6.01
150.25
0.00
150
25
4.56
7.38
3.69
92.25
0.00
175
25
2.82
5.18
2.59
64.75
0.00
200
25
2.36
3.95
1.975
49.375
0.00
225
25
1.59
5.15
2.575
64.375
0.00
250
25
3.56
8.5
4.25
106.25
0.00
275
25
4.94
10.19
5.095
127.375
0.00
300
25
5.25
5.25
2.625
65.625
0.00
325
25
2.11
1.055
26.375
0.00
350
25
2.11
2.11
1.055
26.375
0.00
375
25
5.66
7.77
3.885
97.125
0.00
400
25
2.56
8.22
4.11
102.75
0.00
425
25
2.47
5.03
2.515
62.875
0.00
450
25
8.47
4.235
105.875
0.00
475
25
13.89
19.89
9.945
248.625
0.00
500
25
8.96
22.85
11.425
285.625
0.00
525
25
5.35
14.31
7.155
178.875
0.00
550
25
0.36
5.71
2.855
71.375
0.00
575
25
2.56
2.92
1.46
36.5
0.00
600
25
3.01
5.57
2.785
69.625
0.00
625
25
6.98
9.99
4.995
124.875
0.00
650
25
0.36
7.34
3.67
91.75
0.00
675
25
9.99
10.35
5.175
129.375
0.00
700
25
9.72
19.71
9.855
246.375
0.00
725
25
6.36
16.08
8.04
201
0.00
750
25
4.86
11.22
5.61
140.25
0.00
775
25
4.58
9.44
4.72
118
0.00
800
25
1.19
5.77
2.885
72.125
0.00
825
25
4.39
5.58
2.79
69.75
0.00
850
25
0.36
4.75
2.375
59.375
0.00
875
25
0.36
0.72
0.36
0.00
900
25
3.01
3.37
1.685
42.125
0.00
925
25
2.04
5.05
2.525
63.125
0.00
950
25
2.71
4.75
2.375
59.375
0.00
975
25
1.85
4.56
2.28
57
0.00
1000
25
0.36
2.21
1.105
27.625
0.00
Total
3932.625
A..E.E
PMGSY Sub-Division
Mendhar
Total
Executive Engineer
PMGSY Division
Mendhar
Earth work chart for construction of Road from Mendhar to Jaranwali Gali
Distt. Poonch
Block Mendhar
KM
RD
L=21.00 Km
Length (M
Area (m2)
14th
Total Area
Mean Area
Qty. M3
Area (m2)
Total Area
Mean Area
Qty. M3
#REF!
#REF!
#REF!
25
25
1.76
1.76
1.76
44
0.00
50
25
3.29
5.05
2.525
63.125
0.00
75
25
0.36
3.65
1.825
45.625
0.00
100
25
0.36
0.72
0.36
0.00
125
25
0.36
0.72
0.36
0.00
150
25
0.36
0.72
0.36
0.00
175
25
0.36
0.72
0.36
0.00
200
25
0.36
2.22
1.11
27.75
0.00
225
25
1.86
4.34
2.17
54.25
0.00
250
25
2.48
2.84
1.42
35.5
0.00
275
25
0.36
7.63
3.815
95.375
0.00
300
25
7.27
9.55
4.775
119.375
0.00
325
25
2.28
5.64
2.82
70.5
0.00
350
25
3.36
5.64
2.82
70.5
0.00
375
25
0.36
3.72
1.86
46.5
0.00
400
25
6.96
7.32
3.66
91.5
0.00
425
25
3.56
10.52
5.26
131.5
0.00
450
25
0.81
4.37
2.185
54.625
0.00
475
25
0.36
1.17
0.585
14.625
0.00
500
25
0.36
0.72
0.36
0.00
525
25
2.46
2.82
1.41
35.25
0.00
550
25
0.36
2.82
1.41
35.25
0.00
575
25
1.76
2.12
1.06
26.5
0.00
600
25
1.69
3.45
1.725
43.125
0.00
625
25
3.62
5.31
2.655
66.375
0.00
650
25
0.36
3.98
1.99
49.75
0.00
675
25
6.7
7.06
3.53
88.25
0.00
700
25
0.36
7.06
3.53
88.25
0.00
725
25
0.36
0.72
0.36
0.00
750
25
0.36
0.72
0.36
0.00
775
25
5.11
5.47
2.735
68.375
0.00
800
25
3.36
8.47
4.235
105.875
0.00
825
25
0.36
3.72
1.86
46.5
0.00
850
25
2.61
2.97
1.485
37.125
0.00
875
25
4.81
7.42
3.71
92.75
0.00
900
25
0.36
5.17
2.585
64.625
0.00
925
25
1.16
1.52
0.76
19
0.00
950
25
0.86
2.02
1.01
25.25
0.00
975
25
0.36
1.22
0.61
15.25
0.00
1000
25
1.71
2.07
1.035
25.875
0.00
Total
1961.125
Total
A..E.E
PMGSY Sub-Division
Mendhar
Executive Engineer
PMGSY Division
Mendhar
RD
Hard soil
%age
qty.
Soft rock
%age
Hard rock
qty.
%age
Total Qty
qty.
1st
0-1000
0.50
474.50
0.30
284.70
0.20
189.80
949.00
2nd
0-1000
0.45
724.86
0.30
483.24
0.25
402.70
1610.80
3rd
0-1000
0.55 1494.35
0.20
543.40
0.25
679.25
2717.00
4th
5th
0-1000
0-1000
0.50 1961.25
0.45 1607.18
0.25
0.30
980.63
1071.45
0.25
0.25
980.63
892.88
3922.50
3571.50
6th
0-1000
0.50
996.25
0.30
597.75
0.20
398.50
1992.50
7th
0-1000
0.55
915.92
0.20
333.06
0.25
416.33
1665.30
8th
0-1000
0.55 2375.24
0.25
1079.66
0.20
863.73
4318.63
9th
0-1000
0.55 2468.81
0.20
897.75
0.25
1122.19
4488.75
10th 0-1000
0.60 2450.40
0.20
816.80
0.20
816.80
4084.00
11th 0-1000
0.50 2907.83
0.30
1744.70
0.20
1163.13
5815.65
12th 0-1000
0.55 1928.64
0.20
701.33
0.25
876.66
3506.63
13th 0-1000
0.50 1966.31
0.30
1179.79
0.20
786.53
3932.63
14th 0-1000
0.55 1078.89
0.20
392.33
0.25
490.41
1961.63
15th 0-1000
0.55 1598.99
0.20
581.45
0.25
726.81
2907.25
16th 0-1000
0.55 1056.83
0.30
576.45
0.15
288.23
1921.50
17th 0-1000
0.60 2232.60
0.20
744.20
0.20
744.20
3721.00
18th 0-1000
0.50 3552.50
0.25
1776.25
0.25
1776.25
7105.00
19th 0-1000
0.50 3369.00
0.30
2021.40
0.20
1347.60
6738.00
20th 0-1000
0.45 2965.22
0.30
1976.81
0.25
1647.34
6589.38
21th 0-1000
0.55 6447.31
0.25
2930.59
0.20
2344.48 11722.38
Total
### Total
A..E.E
PMGSY Sub-Division
Mendhar
21713.72 Total
18954.41 85241.00
Executive Engineer
PMGSY Division
Mendhar
2
3
4
5
6
7
CuM
2400
174.25
418200
CuM
304.14
243.60
74088.504
CuM
21.37
3534.00
75521.58
CuM
264.12
3683.00
972753.96
CuM
54.52
4910.00
267693.2
MT
CuM
5.0
38.8
72531
621
362655
24088.59
CuM
97.49
527.00
51377.23
Sqm
430.82
133.40
57471.388
9
10
CuM
Rm
33.66
25
2910.00
2652.00
97950.6
66300
11
Carriages
TOTAL
Sand
cum
cum
Stone Aggregate
MT
Cement
cum
MT
Stone
Steel
Total
Grand Total
592.98
306.77
119.00
72.46
5.00
2468100.052
1477.32
961.4
1198.5
353.42
1212.50
876021.21
294928.68
142621.50
25608.81
6062.50
1345242.70
3813342.76
Executive Engineer
PMGSY Division
Mendhar
Cost Estimate for the construction of Rigid Pavement For Block (3.0x2.75)
NAME OF ROAD :- Mendhar to JaranWali Gali
BLOCK :- MENDHAR
DISTRICT :- POONCH
S.No.
Description of Item
Unit
CuM
0.825
3534.00
2915.55
CuM
1.2375
4910.00
6076.125
5
6
Qtls
Rm
0.06
8.5
72531
24.00
4351.86
204
Carriages
cum
cum
MT
MT
0.93
1.86
0.90
0.06
TOTAL
Sand
Stone Aggregate
Cement
Steel
Total
Grand Total
13547.535
1477.32
961.4
1198.5
1212.50
1373.91
1788.20
1078.65
72.75
4313.51
17657.00
For 1 sqm
Rs.2140
Executive Engineer
PMGSY Division
Mendhar