Escolar Documentos
Profissional Documentos
Cultura Documentos
Bill Group
Bill 1
General
0.00
Bill 2
Site Clearance
0.00
Bill 3
Drainage
0.00
Bill 4
Earthworks
0.00
Bill 5
0.00
Bill 8
Structures
0.00
Bill 9
Ancillary
0.00
AMOUNT IN USD
Subtotal
0.00
PS
18,000.00
Bill 10
Dayworks
0.00
18,000.00
0.00
18,000.00
Amount
Qty.
USD
USD
12.01
No
2
0.00
0.00
0.00
13.01
16
16.01
L.S
LS
0.00
Pay Item
No.
Unit
Rate
Amount
Qty.
USD
USD
ha
0.00
No.
385
0.00
No.
150
0.00
No.
30
0.00
0.00
Amount
Qty.
USD
USD
Bill 3, Drainage
3000: DRAINAGE
31
3100: DRAINS
31.01 Excavation for open drains
(a) Common/normal and intermediate excavation or shaping of open drains (intercepting
ditches, turn-outs, culvert in-/outlet drains, etc.) in all type of soil material of all class within
any depth rates below the surface level, loading and hauling, and re-use in embankments incl.
spreading, shaping and compaction to 95% of modified AASHTO density including all lead
and lift within the project.
32
8,500
230
0.00
216
505
0.00
0.00
84
0.00
10
0.00
0.00
20
0.00
108
0.00
Common/normal and intermediate excavation of trench within any depth rates below the
32.01 surface level for foundation at new pipe culvert location or for replacement of existing culvert
and for inlet and outlet structures incl. trimming/compaction of bottom of excavation, backfill
with suitable material from the excavation and compaction, disposal of surplus and unsuitable
material.
32.02 Provide approved material for backfill at
trimming/compaction of bottom of excavation.
culvert
location
and
compact
M3
incl.
M3
supply, Installation, and placement of precast reinforced concrete pipe culvert 900mm
diameter, with details shown on the drawings
M
M
M
32.05 Provide and construct apron/slab with cut-off wall (toe wall), and head and wing walls at box
culverts and slab culvert including all ancillary works:
(a) Concrete Class 30/20 for apron/slab and cut-off wall (toe wall);
M3
t
(b) High yield reinforcement steel for apron/slab and cut-off wall (toe wall) (Grade 60)
(c) Cement-mortared (1:3) medium pointed Class A stone masonry for head and wing walls of
slab culvert and/or drifts
34
M3
34.01 Provide and construct cement-mortared 1:4 fine pointed Class A stone masonry for cascades,
inlet and outlet structures for concrete pipe culverts, and where instructed including
foundation and all ancillary works
TOTAL FOR BILL 3, 3000 DRAINAGE (carried to summary)
0.00
Description
Unit
Rate
Amount
Qty.
USD
USD
Bill 4, Earthworks
4000 EARTHWORKS
41.04
43
43.01
M
7,000
0.00
10,500
0.00
0.00
Qty.
USD
Amount
USD
10,500
0.00
0.00
Unit
Rate
USD
Quantity
Amount
USD
Division 8100
Structure Excavation
81.02
83.01
84.01
89.01
cu. m.
150.00
0.00
ton
0.50
0.00
cu. m.
10.00
0.00
cu. m.
10.00
0.00
cu. m.
10.00
0.00
Total Bill No :8
For UNOPS
Project Engineer:
0.00
Page No.(9)
Quantity Surveyor:
Amount
USD
Qty.
Delivery, assembly, installation and rock filling of Standard sized Gabion Boxes, including the preparation of the
91.01 foundation and surface for bedding, as per standard specifications or instruction from the Engineer.
10
No
No
5
3
0
0
0.00
Description
Unit
Dayworks
10.1.A
10.1.B
10.1.C
10.1.D
10.1.E
10.1.F
10.1.G
10.1.H
10.1.I
10.1.J
10.1.K
10.1.L
10.1.M
10.1.N
10.1.M
10.1.N
hr
hr
hr
hr
hr
hr
hr
hr
hr
hr
hr
hr
hr
hr
hr
hr
10.2.A
10.2.B
10.2.C
t
m3
t
10.2.D
10.2.E
Plywood 6mm
Sand
No.
m3
10.2.F
Stone
m3
10.3.A
hr
10.3.B
hr
10.3.C
10.3.D
10.3.E
10.3.F
10.3.G
10.3.H
10.3.I
10.3.J
10.3.K
10.3.L
10.3.M
10.3.N
10.3.O
10.3.P
10.3.Q
10.3.R
10.3.S
10.3.T
10.3.U
hr
hr
hr
hr
hr
hr
hr
hr
hr
hr
hr
hr
hr
hr
hr
hr
hr
hr
hr
biapai Road
Rate
USD
Works Contract
Amount
Qty.
USD
8
8
0.00
0.00
8
8
8
8
8
8
8
8
8
8
8
8
8
8
Sub-Total
actor's Overheads,Profit,etc (15%).
UR (Carried to Daywork Summary)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
15.00%
0.00
0.00
0.00
1
5
0.00
0.00
15
0.00
15
0.00
Sub-Total
0.00
15.00%
0.00
0.00
0.00
8
4
4
4
8
8
8
4
8
4
8
4
4
4
4
4
4
4
4
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
15.00%
0.00
0.00
Sub-Total
Rehabilitation of Yambio-Nabiapai
Bill of Quantity
Item
No
PS 1
Description
Provisional Sum Items
Insurances
Provisional Sum Items - PS1
Unit
Qty
Provisional Sum
Unit Rate
(USD)
Amount
(USD)
18,000.00
18,000.00