Você está na página 1de 32

Deepwater Well Integrity Challenges

DeepAssurance Cementing
Solution Suite
May 2014

Cementing History of Innovation


1919

1922

First cementing job


transforms oil and gas
wellbore architecture

1953

1957

X-ray diffraction
added to
The HT-400
cement
pump goes
research
into field use

2001

WellLife service
predicts risk of
cement failure

1962
Halliburton
cements the
first geothermal well

2004

First remotely
operated &
monitored offshore
cementing operation

Halliburton 2014. All rights reserved.

1930

1923

The two-plug
system patented

Re-circulating
jet mixer

1976
Halliburton
Energy
Institute
established

2005

1932

Chemical
research lab
established

1981

R&D
laboratory
earns Lab
of the Year
from IR&D

2011

First foam
cement jobs
pumped:
remediation &
primary

1940

1938

First
RedBook
published

Cementing
shallow-water
wells

1982
Billionth
sack of
cement
pumped

1991

Commander eRedBook
1000 Cementing mobile app
Head + Remote

2000

Opticem software,
Halliburton
extinguishes 725 dynamic modeling
of cementing
well fires in
operations
Kuwait

2012

3-D
iCem Service,
cementing- predictive-analysis
operation software
simulator

1947

First truly
Bulk handling
offshore well
of cement
cemented
introduced

2013

WellLock Resin,
an annular barricade
against well leaks

TergoVis I Efficiency
Fluid & CleanSpacer
III spacer fluid

Wellbore Integrity Issues


CONDUCTOR
CASING

SURFACE
CASING

INTERMEDIATE
CASING

INTERMEDIATE
CASING

PRODUCTION
CASING

Halliburton 2014. All rights reserved.

Deepwater Cementing Challenges

Annular Pressures
Corrosive Environments (CO2 / Salt)
Narrow Pressure Margins
Plug Setting
Reliability Wellbore Integrity
Riserless Cementing
Temperature Variance

Halliburton 2014. All rights reserved.

DeepAssurance Cementing Solution Suite

Halliburton 2014. All rights reserved.

DeepAssurance Cementing Solution Suite


Overview

Solutions
Challenges

Halliburton 2014. All rights reserved.

New Technologies: Centralizer


Protech Flex Centralizer

Protech Flex Centralizers

Solid-type blades for standoff


without compromise
Withstand dynamic thermal-pressure
environments with shear strength
rated to 880 psi
Torque and drag resistance reduced to 0.25

Halliburton 2014. All rights reserved.

Bonded Directly to Casing, Liners, Drill Pipe


Protech Flex Centralizers

Halliburton 2014. All rights reserved.

Enhanced Rig Floor Safety


Protech Flex Centralizers

Halliburton 2014. All rights reserved.

10

Uncompromised Standoff
Protech Flex Centralizers

Halliburton 2014. All rights reserved.

11

Enhanced Flow Area


Protech Flex Centralizers

Halliburton 2014. All rights reserved.

12

New Technologies: Offshore System


HCS AdvantageOne Cementing
Offshore System

HCS AdvantageOne Cementing System

Advanced mixing system for accuracy and reliability


Unit health monitoring
Pre-job systems check, automated
valve configuration
Faster, simpler installation
with a reduced footprint

Halliburton 2014. All rights reserved.

14

HCS AdvantageOne Cementing System

HSE:
Dust collection
Non-radioactive
densometer

Halliburton 2014. All rights reserved.

15

HCS AdvantageOne Cementing System

Onboard high-pressure test system

Halliburton 2014. All rights reserved.

16

HCS AdvantageOne Cementing System

Integrated liquid additive system with slide-out


automated metering pumps

Halliburton 2014. All rights reserved.

17

HCS AdvantageOne Cementing System

Integrated remote controls for off-unit operation

Halliburton 2014. All rights reserved.

18

New Technologies: Software


Simulations
HCS AdvantageOne Cementing
Offshore System

iCem Service

Predictive bond logs


Lost Circulation Modeling
Enhanced equivalent circulating density modeling
Managed-pressure cementing operations module

Halliburton 2014. All rights reserved.

20

iCem Service ECD

Halliburton 2014. All rights reserved.

21

iCem Service Hook Load

Halliburton 2014. All rights reserved.

22

iCem Service Displacement Efficiency

Halliburton 2014. All rights reserved.

23

Actual Bond Log Comparison to


iCem Service Data

Bond Log

iCem Service

Halliburton 2014. All rights reserved.

Bond Log

iCem Service

24

Bond Log

iCem Service

New Technologies: Cementing System


SaltShield Cement

Salt Zone Challenges

Reactive salt zones could gel slurry


during placement
Formation salt could dissolve into slurry
affecting curing
Salt creep / movement could damage
cement sheath and/or casing

Halliburton 2014. All rights reserved.

26

SaltShield Cement

Withstands loads due to salt creep


Resistant to gelation upon salt contamination
Low permeability and good compressive strength
WellLife Service Modeling of Plastic Salt Flow

Halliburton 2014. All rights reserved.

27

SaltShield Cement Remains Pumpable


In Spite of Salt Contamination

Halliburton 2014. All rights reserved.

28

SaltShield Cement Remains Pumpable


In Spite of Salt Contamination

Halliburton 2014. All rights reserved.

29

SaltShield Cement Remains Pumpable


In Spite of Salt Contamination

Halliburton 2014. All rights reserved.

30

SaltShield Cement Remains Pumpable


In Spite of Salt Contamination

Halliburton 2014. All rights reserved.

31

Questions

Halliburton 2014. All rights reserved.

32

Você também pode gostar