Mayo 2012
@copyright Siemens Energy 2012
Crecimiento de la poblacin
Liberalizacin
mundial
Competitividad
Globalizacin
Privatizacin
Incremento de demanda
energtica per-cpita global
Precios de la energa y la
Nuevos
requisitos del mercado
electricidad
Cambios estructurales de la
industria
Incremento global de potencia
instalada y mejora eficiencia
Impacto
Ambiental
Fiabilidad de
Suministro
@copyright Siemens Energy 2012
Poblacin Rural
[bn]
Poblacin Urbana
8 bn
% Nivel de electrificacin
8
6.8 bn
6.1 bn
7.5 bn
5.3 bn
82%
80%
Mega-urbes
Poblacin
(millones)
Metro Manila
Moscow
Cairo
in 2003
in 2015
Beijing
Karachi
77%
Rio de Janeiro
73%
65%
64%
Osaka-Kobe
Dhaka
Los Angeles
64%
Jakarta
62%
Shanghai
Buenos Aires
57%
Calcutta
44%
Delhi
94%
92%
Bombay
Sao Paulo
92%
New York
91%
90%
Mexico City
Tokyo
0
1990
2000
2010
2020
2030
10
20
30
40
SGT5-4000F
(V94.3A)
SGT5-4000F
(V94.3A)
SGT5-8000H
> 52%
> 56%
> 58%
> 60%
CC efficiency
CC efficiency
CC efficiency
CC efficiency
CCPP Killingholme,
2 x 450 MW
1992
1996
2001
CCPP Irsching 4,
> 530 MW
2010
375
SGT5-8000H
SGT5-4000F
292
SGT6-5000F
208
SGT6-4000F
187
SGT5-2000E
168
SGT6-2000E
113
SGT-800
45
SGT-700
30
SGT-600
25
SGT-500
17
SGT-400
13
SGT-300
SGT-200
SGT-100
Compressor
Multi-stage, Axial-flow,
Variable-pitch inlet guide vanes
(6) Turbine
Four-stage, Thermal barrier blade coatings,
Air cooling of blades
(7) Exhaust Axial
(8) Generator Coupling At cold end
Natural Gas,
Distillate
Power output
228 MW
Efficiency
38.3 %
Weight
210 t
Length
9,96 m
Height
4,55 m
Diameter 3,96 m
CCPP SCC6-5000F (2x1)
Power output
675 MW
Net efficiency
57.6 %
LP
Gas Oil
IP
G
~
GT
HP
IP
LP
Air
HP
Heat-recovery
steam generator
Exhaust gas
@copyright Siemens Energy 2012
Meses de actividad
-Notice to Proceed
-1
9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
NTP
- HRSG
- Turbina de Vapor
Montaje
-Condensador
Suministro y Transporte
- Generador
Suministro y Transporte
Montaje
-Turbina de Gas
Suministro y Transporte
Montaje
Montaje
Ignicin y Sincronizacin
-Air Intake
- Difusor
- CCMs
- SEE y SFC
- Puesta en Marcha
Suministro y Transporte
Suministro y Transporte
Suministro y Transporte
Suministro y Transporte
SGT5-8000H
SGT-8000H Prestaciones
Siemens Gas Turbine*
50 Hz
60 Hz
SGT5-8000H
375
40
19.2
625/1,157
820
1,808
SGT6-8000H
274
40
20.0
620/1,148
600
1,330
SGT5-8000H
25
10
SGT6-8000H
25
10
SGT5-8000H
440
13.2
5
5.5
SGT6-8000H
280
11
4.2
4.2
SGT5-8000H
Diseo constructivo y mejoras tecnolgicas
Advanced
Ultra Low NOx (ULN)
combustion system
Evolutionary 3Dcompressor blading
Integrated combined
cycle process
for economy and low
emissions
SCC-8000H
Prestaciones en ciclo combinado
Siemens Combined Cycle Power Plant
Single-shaft
Net power output [MW]
Net efficiency [%]
Net heat rate [kJ/kWh]
Net heat rate [Btu/kWh]
Start-up time
[minutes hot start expected]
50 Hz
60 Hz
SCC5-8000H
570
> 60
6,000
5,687
~ 40
SCC6-8000H
410
> 60
6,000
5,687
~ 40
50 Hz
60 Hz
SCC5-8000H
170/600
35/600
5/300
SCC6-8000H
170/600
35/600
5/300
SST5-5000
(600C)
Condenser
HRSG/Benson, 3P/
RH 600C/170 bar
SSS Clutch
SGen5-3000W
Lube oil system
SGT5-8000H
@copyright Siemens Energy 2012
High-capacity
attemperators
Steam
Turbine
Gas Turbine
HRSG stand-by
heating
Maximum GT load
ramp
Generator
CPP
Implementation of
condensate polishing plant
SGT5-8000H
Plan de desarrollo de un
nuevo producto: SGT8000H
Product Development Process
Strategic Product Planning
Product
Strategy
Design
Product &
Development
Planning, Tech.
Acquisition
Conceptual
Design
Sales
Preparation
Basic
Design
Commercialization
Planning
Design Implementation
Erection,
Final Design Manufacturing
Install.,
Com&
&
missioning &
Assembly
Procurement
Trial Operation
Parts testing
Validation
Product
Monitoring &
Validation
Prototype
GT field
testing
Component testing
Combustion system
rig test
Cover plate rig test
Mock up
Prototype
CC field
operation
System testing
Compressor test and
Combustion system test
at test bed Berlin
1st Engine
ex Works
Berlin
1st
Synchronizati
on to grid
1st Fire
April
2005
December
2006
End of Test
and Validation
Phase
Extension to
combined
cycle
Start of
commercial
operation
2010
2011
1st Base
Load
March
2007
April
2008
August
2009
Disclaimer
This document contains forward-looking statements and information that is,statements related to future, not
past, events. These statements may be identified either orally or in writing by words as expects,
anticipates, intends, plans, believes, seeks, estimates, will or words of similar meaning. Such
statements are based on our current expectations and certain assumptions, and are, therefore, subject to
certain risks and uncertainties. A variety of factors, many of which are beyond Siemens control, affect its
operations, performance, business strategy and results and could cause the actual results, performance or
achievements of Siemens worldwide to be materially different from any future results, performance or
achievements that may be expressed or implied by such forward-looking statements. For us, particular
uncertainties arise, among others, from changes in general economic and business conditions, changes in
currency exchange rates and interest rates, introduction of competing products or technologies by other
companies, lack of acceptance of new products or services by customers targeted by Siemens worldwide,
changes in business strategy and various other factors. More detailed information about certain of these
factors is contained in Siemens filings with the SEC, which are available on the Siemens website,
www.siemens.com and on the SECs website, www.sec.gov. Should one or more of these risks or
uncertainties materialize, or should underlying assumptions prove incorrect, actual results may vary
materially from those described in the relevant forward-looking statement as anticipated, believed, estimated,
expected, intended, planned or projected. Siemens does not intend or assume any obligation to update or
revise these forward-looking statements in light of developments which differ from those anticipated.
Trademarks mentioned in this document are the property of Siemens AG, it's affiliates or their respective