REISTÃÅNCIA SAE TOWERS 06.2015
REISTÃÅNCIA SAE TOWERS 06.2015
REISTÃÅNCIA SAE TOWERS 06.2015
AREIA 1,2 mm
DATA MOLDAGEM
AMOSTRAS
SLUMP
(mm)
03 DIA
07 DIAS
14 DIAS
28 DIAS
1
2
80
95
19.1
18.1
24.0
20.4
30.6
26.2
3/30/2015
4/23/2015
3
4
75
75
25
24.4
31.1
29.3
39.5
36.2
5/4/2015
5/5/2015
5
6
7
70
65
90
23.2
26.2
20.4
26.7
31.1
23.4
5/6/2015
5/7/2015
5/8/2015
10
11
80
75
31.3
28.8
42.3
35.1
5/11/2015
5/12/2015
12
13
14
17
18
19
20
21
24
25
26
27
90
90
80
65
70
70
70
85
80
85
75
100
23.9
22.9
20.1
21.6
23.4
26.7
22.9
24.2
35.7
20.4
25.2
31.8
27.5
26.5
23.9
25.5
30.6
30.3
24.2
30.6
40.3
23.4
-
5/13/2015
5/14/2015
5/15/2015
5/18/2015
5/19/2015
5/20/2015
5/21/2015
5/22/2015
5/25/2015
5/26/2015
5/27/2015
5/28/2015
40.0
30.0
20.0
10.0
0.0
03 DIA
07 DIAS
14 DIAS
28 DIAS
CORPOS-DE-PROVA MOLDADOS E ROMPIDOS DE ACORDO COM A NBR-5738 E 5739
SLUMP - TEST DE ACORDO COM A NBR - 7323
03 DIA
07 DIAS
14 DIAS
28 DIAS
N DE AMOSTRAS
21
19
0
4
MDIA ( Mpa )
25.2
29.5
37.9
DESVIO PADRO
4.2
5.5
2.3
CLIENTE: SAE TOWERS BRASIL TORRES DE TRANSMISSO LTDA
VALDEMIR XAVIER
DIOGO MATTOS
RESIST.: 05/2015
CONTROLE DE QUALIDADE
ENGENHEIRO RESPONSVEL
DATA: 02/06/2015