Você está na página 1de 1

POSTES DE DISTRIBUIO

RESISTNCIA DO CONCRETO 25 MPa - REF.: PC 473/2015


CIMENTO CP V ARI-RS

BRITA 0 (19 mm)

AREIA 1,2 mm
DATA MOLDAGEM

AMOSTRAS

SLUMP
(mm)

03 DIA

07 DIAS

14 DIAS

28 DIAS

1
2

80
95

19.1
18.1

24.0
20.4

30.6
26.2

3/30/2015
4/23/2015

3
4

75
75

25
24.4

31.1
29.3

39.5
36.2

5/4/2015
5/5/2015

5
6
7

70
65
90

23.2
26.2
20.4

26.7
31.1
23.4

5/6/2015
5/7/2015
5/8/2015

10
11

80
75

31.3
28.8

42.3
35.1

5/11/2015
5/12/2015

12
13
14
17
18
19
20
21
24
25
26
27

90
90
80
65
70
70
70
85
80
85
75
100

23.9
22.9
20.1
21.6
23.4
26.7
22.9
24.2
35.7
20.4
25.2
31.8

27.5
26.5
23.9
25.5
30.6
30.3
24.2
30.6
40.3
23.4
-

5/13/2015
5/14/2015
5/15/2015
5/18/2015
5/19/2015
5/20/2015
5/21/2015
5/22/2015
5/25/2015
5/26/2015
5/27/2015
5/28/2015

40.0
30.0
20.0
10.0
0.0
03 DIA
07 DIAS
14 DIAS
28 DIAS
CORPOS-DE-PROVA MOLDADOS E ROMPIDOS DE ACORDO COM A NBR-5738 E 5739
SLUMP - TEST DE ACORDO COM A NBR - 7323
03 DIA
07 DIAS
14 DIAS
28 DIAS
N DE AMOSTRAS
21
19
0
4
MDIA ( Mpa )
25.2
29.5
37.9
DESVIO PADRO
4.2
5.5
2.3
CLIENTE: SAE TOWERS BRASIL TORRES DE TRANSMISSO LTDA
VALDEMIR XAVIER
DIOGO MATTOS
RESIST.: 05/2015
CONTROLE DE QUALIDADE

ENGENHEIRO RESPONSVEL

DATA: 02/06/2015