Escolar Documentos
Profissional Documentos
Cultura Documentos
LOCALIDAD:
MUNICIPIO:
ESTADO:
OAXACA
Duracin: 30 das naturales
PRESUPUESTO DE OBRA
Cdigo
Concepto
PALENQUE SAN LUIS AMATLAN
Unidad
Cantidad
A1
PRELIMINARES
TZO500
TRAZO
Y
NIVELACION
CON
EQUIPO M2
TOPOGRFICO, ESTABLECIENDO EJES DE
REFERENCIA Y BANCOS DE NIVEL, INCLUYE:
MATERIALES, MANO DE OBRA, EQUIPO Y
HERRAMIENTA. (HASTA 500 M2)
A1
TOTAL PRELIMINARES
A2
CIMENTACION
EAM02IIB
12.0800
PLANH5
ACERC3
P. Unitario
255.5426
$7.96
Importe
$2,034.12
1.83%
$2,034.12
1.83%
$241.50
$2,917.32
2.62%
16.1000
$166.89
$2,686.93
2.41%
0.0545
$27,767.96
$1,513.35
1.36%
CIMCF
5.4000
$214.32
$1,157.33
1.04%
CCH200
1.0500
$3,019.78
$3,170.77
2.85%
REMPEV
6.9000
$100.62
$694.28
0.62%
MPBRAZA
13.6500
$1,638.30
$22,362.80
20.07%
A2
TOTAL CIMENTACION
$34,502.78
30.96%
A3
ESTRUCTURA
ACERE3
0.2455
$28,646.88
$7,032.81
6.31%
ACERE2
0.1340
$34,282.60
$4,593.87
4.12%
CIMAEC
$214.92
$14,571.58
13.08%
Pgina 2 de 2
CEH200V
4.2600
A3
TOTAL ESTRUCTURA
A4
ALBAILERIA
CONSTG01
7.0000
SUMPIEPAL
FCA1010
A4
TOTAL ALBAILERIA
$3,005.86
$12,804.96
11.49%
$39,003.22
35.00%
$288.53
$2,019.71
1.81%
7.7960
$1,616.80
$12,604.57
11.31%
62.4200
$340.91
$21,279.60
19.09%
$35,903.88
32.22%
$111,444.00
100.00%
$111,444.00