Você está na página 1de 2

LCM50

Version:
Issue Date:
Review By Date:
Owned By:
Authorised By:

1.0
August 2006
June 2008
Engineering Manager D & P
Executive Manager D & P

LINE CONSTRUCTION MANUAL LCM50

TENDER SCHEDULE
REVISION TABLE
Version No

Date of Revision

1.0

August 2006

Details of Amendment
Initial Release

The above table lists in summary the amendments which have been made with most recent issues of this standard.
The table is updated with each re-issue. The latest amendments within the documents are marked with a change
indicator (|) in the outer margin.

CONTACT
This standard is the responsibility of the
Development and Projects Division, ElectraNet.
Please contact the indicated owner of the standard
with any inquiries.

ElectraNet
52-55 East Terrace, Adelaide, South Australia 5000
PO Box 7096, Hutt Street Post Office,
Adelaide, South Australia 5000
Ph (08) 8404 7966, Fx (08) 8404 7104

L I M I TATI O N O F L I A B I L I T Y AN D
D I S C L A I M E R O F W AR R A N T Y
ElectraNet makes no representation or warranty as
to the accuracy, reliability, completeness or
suitability for particular purposes of the information
in this document. ElectraNet and its employees,
agents and consultants shall have no liability
(including liability to any person by reason of
negligence or negligent misstatement) for any
statements, opinions, information or matter
(expressed or implied) arising out of, contained in
or derived from or for any omissions from the
information in this document, except in so far as
liability under any statute cannot be excluded.

2006 ElectraNet Pty Limited trading as ElectraNet. No part of this document may be reproduced
or copied in any form or by any means (graphic, electronic, mechanical, including photocopying,
recording, taping or information retrieval systems) without the prior written permission of ElectraNet.

LCM50

ElectraNet

PROJECT SCHEDULE

24
25

SCHEDULE
ITEM NO.
1
2
3
4
5
6
7
8
9
10
11

12
13
14

15
16
17
18
19
20
21
22
23

Version: 1.0

PROJECT
REQUIREMENTS
Project Name
Contractor
Project Manager
Project Location
Line Length
Voltage
Materials to be supplied by
Superintendent
Site to collect Materials from
Site Description
Location
Extent of Works

Buried Services (insert


locations)
Other services (eg pipes above
ground, cathodic protection)

PROJECT DETAILS

Commencement Date
Completion Date
Reference Documents
ElectraNet Environment Plan
ElectraNet Safety Plan
ElectraNet Quality Plan
ElectraNet Request for
Tender Document
Progress Reporting
Requirements and Frequency
Progress Meeting
Requirements and Frequency
List of Drawings
Transmission Lines (insert
names)
Distribution Lines (insert
names)
Highways (insert names)
Roads (insert names)
Railways(insert names)
Rivers (insert names)

LCM50 Tender Schedule

Page 2 of 2

Você também pode gostar