Você está na página 1de 3

Item

0 01
0 01.01
0 02
0 02.01
0 02.02
0 02.03
0 03
0 03.01
0 03.02
0 03.03
0 04
0 04.01
0 04.02
0 04.03
0 05
0 05.01
0 05.02
0 06
0 06.01
0 06.02
0 07
0 07.01
0 07.02
0 07.03
0 08
0 08.01
0 08.02
0 08.03
0 08.04
0 08.05
0 09
0 09.01
0 09.02
0 09.03
0 10
0 10.01
0 10.02
0 10.03
0 10.04
0 10.05
0 10.06
0 10.07
0 11
0 11.01
0 11.02
0 11.03
0 11.04
0 12
0 12.01

Descripcin
TRABAJOS PRELIMINARES
OBRAS PRELIMINARES GENERALES
PAVIMENTO RIGIDO
OBRAS PRELIMINARES
MOVIMIENTO DE TIERRA
OBRAS DE CONCRETO
VEREDAS
TRABAJOS PRELIMINARES
MOVIMIENTO DE TIERRA
OBRAS DE CONCRETO
MARTILLOS Y RAMPAS
TRABAJOS PRELIMINARES
MOVIMIENTO DE TIERRA
OBRAS DE CONCRETO
SARDINELES DE CONCRETO
MOVIMIENTO DE TIERRA
OBRAS DE CONCRETO
CUNETA DE CONCRETO
MOVIMIENTO DE TIERRA
OBRAS DE CONCRETO
CRUCE CANAL
TRABAJOS PRELIMINARES
MOVIMIENTO DE TIERRA
OBRAS DE CONCRETO
OBRAS COMPLEMENTARIAS
RECONEXION Y EMPALME A LA RED DE AGUA
REPOSICIONES DE TAPAS DE BUZONES
RECONEXION Y EMPALME A LA RED DE DESAGUE (COLECTOR 200MM)
SUMINISTRO Y COLOCACION DE TACHOS DE BASURA
LIMPIEZA FINAL DE OBRA
SEALIZACION
SEALES PREVENTIVAS E INFORMATIVAS
PINTURA DE TRANSITO PARA PASO PEATONAL
SEALES HORIZONTALES (MARCAS EN EL PAVIMENTO)
MITIGACION AMBIENTAL
ACONDICIONAMIENTO Y RESTAURACION DE BOTADERO (DME)
RESTAURACION DE AREA DE CAMPAMENTO Y PATIO DE MAQUINAS
PROGRAMA DE EDUCACION AMBIENTAL
PROGRAMA DE SEALIZACION AMBIENTAL Y SEGURIDAD
MANEJO DE RESIDUOS GENERADOS EN OBRA
REPOSICION DE DAOS AMBIENTALES
REPOSICION DE DAOS AMBIENTALES
SEGURIDAD Y SALUD
EQUIPOS DE SEGURIDAD INDIVIDUAL
EQUIPOS DE SEGURIDAD COLECTIVA
SEALIZACION TEMPORAL DE SEGURIDAD
CAPACITACION EN TEMAS DE SEGURIDAD Y SALUD
CAPACITACION Y SENSIBILIZACION
PROGRAMA DE EDUCACION Y SENSIBILIZACION A LA POBLACION

Und. Metrado

Precio (S/.)

Parcial (S/.)

PrecioIncluidoPie1

ParcialIncluidoPie1

PrecioIncluidoPie2

ParcialIncluidoPie2

52,961.23

52961.23

52,961.23

52961.23

2,084,577.60

2084577.6

41,633.22

41633.22

1,343,713.69

1343713.69

699,230.69

699230.69

409,928.36

409928.36

5,766.87

5766.87

258,945.80

258945.8

145,215.69

145215.69

79,125.31

79125.31

1,048.67

1048.67

48,131.31

48131.31

29,945.33

29945.33

295,090.89

295090.89

45,215.47

45215.47

249,875.42

249875.42

136,691.63

136691.63

40,890.47

40890.47

95,801.16

95801.16

7,927.66

7927.66

49.29

49.29

1,158.27

1158.27

6,720.10

6720.1

108,770.61

108770.61

und

164.00

185.04

30,346.56

185.04

30346.56

und

6.00

714.34

4,286.04

714.34

4286.04

und

164.00

275.21

45,134.44

275.21

45134.44

und

45.00

355.93

16,016.85

355.93

16016.85

m2

14,429.69

0.90

12,986.72

0.9

12986.72

20,966.68
und

20.00

376.88

7,537.60

m2

420.56

7.26

3,053.27

m2

772.01

13.44

10,375.81

20966.68
376.88

7537.6

7.26

3053.27

13.44

10375.81

23,076.32

23076.32

HA

1.50

3,182.19

4,773.29

3182.19

4773.29

HA

0.50

2,545.75

1,272.88

2545.75

1272.88

GLB

5.00

447.50

2,237.50

447.5

2237.5

und

10.00

484.55

4,845.50

484.55

4845.5

mes

5.00

426.38

2,131.90

426.38

2131.9

GLB

1.00

7,815.25

7,815.25

7815.25

7815.25

28,302.20

28302.2

und

80.00

284.71

22,776.80

284.71

22776.8

GLB

1.00

1,611.94

1,611.94

1611.94

1611.94

GLB

1.00

1,879.54

1,879.54

1879.54

1879.54

TALL

1.00

2,033.92

2,033.92

2033.92

2033.92

1,790.00
TALL

4.00

447.50

1,790.00

1790
447.5

1790

0
0

Você também pode gostar