Escolar Documentos
Profissional Documentos
Cultura Documentos
0 01
0 01.01
0 02
0 02.01
0 02.02
0 02.03
0 03
0 03.01
0 03.02
0 03.03
0 04
0 04.01
0 04.02
0 04.03
0 05
0 05.01
0 05.02
0 06
0 06.01
0 06.02
0 07
0 07.01
0 07.02
0 07.03
0 08
0 08.01
0 08.02
0 08.03
0 08.04
0 08.05
0 09
0 09.01
0 09.02
0 09.03
0 10
0 10.01
0 10.02
0 10.03
0 10.04
0 10.05
0 10.06
0 10.07
0 11
0 11.01
0 11.02
0 11.03
0 11.04
0 12
0 12.01
Descripcin
TRABAJOS PRELIMINARES
OBRAS PRELIMINARES GENERALES
PAVIMENTO RIGIDO
OBRAS PRELIMINARES
MOVIMIENTO DE TIERRA
OBRAS DE CONCRETO
VEREDAS
TRABAJOS PRELIMINARES
MOVIMIENTO DE TIERRA
OBRAS DE CONCRETO
MARTILLOS Y RAMPAS
TRABAJOS PRELIMINARES
MOVIMIENTO DE TIERRA
OBRAS DE CONCRETO
SARDINELES DE CONCRETO
MOVIMIENTO DE TIERRA
OBRAS DE CONCRETO
CUNETA DE CONCRETO
MOVIMIENTO DE TIERRA
OBRAS DE CONCRETO
CRUCE CANAL
TRABAJOS PRELIMINARES
MOVIMIENTO DE TIERRA
OBRAS DE CONCRETO
OBRAS COMPLEMENTARIAS
RECONEXION Y EMPALME A LA RED DE AGUA
REPOSICIONES DE TAPAS DE BUZONES
RECONEXION Y EMPALME A LA RED DE DESAGUE (COLECTOR 200MM)
SUMINISTRO Y COLOCACION DE TACHOS DE BASURA
LIMPIEZA FINAL DE OBRA
SEALIZACION
SEALES PREVENTIVAS E INFORMATIVAS
PINTURA DE TRANSITO PARA PASO PEATONAL
SEALES HORIZONTALES (MARCAS EN EL PAVIMENTO)
MITIGACION AMBIENTAL
ACONDICIONAMIENTO Y RESTAURACION DE BOTADERO (DME)
RESTAURACION DE AREA DE CAMPAMENTO Y PATIO DE MAQUINAS
PROGRAMA DE EDUCACION AMBIENTAL
PROGRAMA DE SEALIZACION AMBIENTAL Y SEGURIDAD
MANEJO DE RESIDUOS GENERADOS EN OBRA
REPOSICION DE DAOS AMBIENTALES
REPOSICION DE DAOS AMBIENTALES
SEGURIDAD Y SALUD
EQUIPOS DE SEGURIDAD INDIVIDUAL
EQUIPOS DE SEGURIDAD COLECTIVA
SEALIZACION TEMPORAL DE SEGURIDAD
CAPACITACION EN TEMAS DE SEGURIDAD Y SALUD
CAPACITACION Y SENSIBILIZACION
PROGRAMA DE EDUCACION Y SENSIBILIZACION A LA POBLACION
Und. Metrado
Precio (S/.)
Parcial (S/.)
PrecioIncluidoPie1
ParcialIncluidoPie1
PrecioIncluidoPie2
ParcialIncluidoPie2
52,961.23
52961.23
52,961.23
52961.23
2,084,577.60
2084577.6
41,633.22
41633.22
1,343,713.69
1343713.69
699,230.69
699230.69
409,928.36
409928.36
5,766.87
5766.87
258,945.80
258945.8
145,215.69
145215.69
79,125.31
79125.31
1,048.67
1048.67
48,131.31
48131.31
29,945.33
29945.33
295,090.89
295090.89
45,215.47
45215.47
249,875.42
249875.42
136,691.63
136691.63
40,890.47
40890.47
95,801.16
95801.16
7,927.66
7927.66
49.29
49.29
1,158.27
1158.27
6,720.10
6720.1
108,770.61
108770.61
und
164.00
185.04
30,346.56
185.04
30346.56
und
6.00
714.34
4,286.04
714.34
4286.04
und
164.00
275.21
45,134.44
275.21
45134.44
und
45.00
355.93
16,016.85
355.93
16016.85
m2
14,429.69
0.90
12,986.72
0.9
12986.72
20,966.68
und
20.00
376.88
7,537.60
m2
420.56
7.26
3,053.27
m2
772.01
13.44
10,375.81
20966.68
376.88
7537.6
7.26
3053.27
13.44
10375.81
23,076.32
23076.32
HA
1.50
3,182.19
4,773.29
3182.19
4773.29
HA
0.50
2,545.75
1,272.88
2545.75
1272.88
GLB
5.00
447.50
2,237.50
447.5
2237.5
und
10.00
484.55
4,845.50
484.55
4845.5
mes
5.00
426.38
2,131.90
426.38
2131.9
GLB
1.00
7,815.25
7,815.25
7815.25
7815.25
28,302.20
28302.2
und
80.00
284.71
22,776.80
284.71
22776.8
GLB
1.00
1,611.94
1,611.94
1611.94
1611.94
GLB
1.00
1,879.54
1,879.54
1879.54
1879.54
TALL
1.00
2,033.92
2,033.92
2033.92
2033.92
1,790.00
TALL
4.00
447.50
1,790.00
1790
447.5
1790
0
0