RATING SHEET FOR DEMONSTRATION


Candidate name:
Assessor name:
Qualification:

CONTACT CENTER SERVICES NC II

Unit of Competency

PREPARE MEAT DISHES

Date of assessment:

JUNE 5, 2016

Time of assessment:

8:00 AM 5:00 PM

Instructions for demonstration


Given the necessary materials, tools and equipment, the candidate must be able to weld
carbon steel pipe in horizontal pipe position (5G position).
Materials and equipment

to show if evidence is
demonstrated

OBSERVATION
During the demonstration of skills, did the candidate:

Yes

The candidates demonstration was:


Satisfactory

Reference No.
To be filled out by Competency Assessor

Not Satisfactory

No

N/A

TESDA-SOP-CACO-07-F30
RATING SHEET FOR OBSERVATION
Candidate name:
Assessor name:
Qualification:
Unit of Competency

SHIELDED METAL ARC WELDING (SMAW) NC


II
Weld Carbon Steel Plates and Pipes Using SMAW

Date of assessment:
Time of assessment:
Instructions for demonstration
Given the necessary materials, tools and equipment, the candidate must be able to weld
carbon steel pipe in horizontal pipe position (5G position).
Materials and equipment
Welding machine (AC or AC/DC), Welding table or jig, Portable grinder, Welding booth,
Portable oven, Welding mask, Steel brush, Clear glass, Chipping hammer, Dark glass,
Electrodes, Carbon steel pipe, Cutting grinding disk, Safety shoes, Apron, leggings, Safety
goggles, Gloves, Arc welding manuals, Welding procedures specifications (WPS), Welding
standards.
to show if evidence is
demonstrated

OBSERVATION
During the demonstration of skills, did the candidate:
Performed Root pass in accordance with WPS and/or client
specifications.
Performed Task in accordance with company or industry
requirement and safety procedure.

Yes

Checked weld visually for defects and repaired, as required.


Weld is visually acceptable in accordance with applicable
codes and standards
Performed Task in accordance with approved WPS
Root pass is cleaned and free from defects and discontinuities
Performed subsequent/filling passes in accordance with
approved WPS
Performed capping pass in accordance with approved WPS
The candidates demonstration was:
Satisfactory

Not Satisfactory

Reference No.
To be filled out by Competency Assessor

DEMONSTRATION WITH ORAL QUESTIONING

No

N/A

TESDA-SOP-CACO-07-F30
Candidate name:
Assessor name:
Qualification:
Unit of Competency

SHIELDED METAL ARC WELDING (SMAW) NC


II
Weld Carbon Steel Plates and Pipes Using SMAW

Date of assessment:
Time of assessment:
Instructions for demonstration
Materials and equipment

to show if evidence is
demonstrated

OBSERVATION
During the demonstration of skills, did the candidate:

Yes

The candidates demonstration was:


Satisfactory

Not Satisfactory

Reference No.
To be filled out by Competency Assessor

DEMONSTRATION WITH ORAL QUESTIONING


PROBABLE ANSWER
Candidate name:

No

N/A

TESDA-SOP-CACO-07-F30
Assessor name:
Qualification:

NC II

Unit of Competency

Weld Carbon Steel Plates and Pipes Using SMAW

Date of assessment:
Time of assessment:
Instructions for demonstration
Given the necessary materials, tools and equipment, the candidate must be able to weld
carbon steel pipe in horizontal pipe position (5G position).
Materials and equipment
Welding machine (AC or AC/DC), Welding table or jig, Portable grinder, Welding booth,
Portable oven, Welding mask, Steel brush, Clear glass, Chipping hammer, Dark glass,
Electrodes, Carbon steel pipe, Cutting grinding disk, Safety shoes, Apron, leggings, Safety
goggles, Gloves, Arc welding manuals, Welding procedures specifications (WPS), Welding
standards.
to show if evidence is
demonstrated

OBSERVATION
During the demonstration of skills, did the candidate:
Performed Root pass in accordance with WPS and/or client
specifications.

Yes

Performed Task in accordance with company or industry


requirement and safety procedure
Weld is checked visually for defects, and repaired, as required.
Weld is visually acceptable in accordance with applicable
codes and standards
Performed Task in accordance with approved WPS
Root pass is cleaned and free from defects and
discontinuities
Performed subsequent/filling passes in accordance with
approved WPS
Performed capping pass in accordance with approved WPS
The candidates demonstration was:
Satisfactory

Not Satisfactory

No