MALAYSIA (CIDB)
TINGKAT 10, MENARA DATO ONN, PUSAT
DAGANGAN DUNIA PUTRA (PWTC),
NO. 45, JLN TUN ISMAIL, 50480 KUALA LUMPUR
KERTAS PENERANGAN
(INFORMATION SHEET)
KOD DAN NAMA
PROGRAM /
PROGRAMS CODE &
NAME
BC-061-1:2015
BASIC SCAFFOLD ERECTION, ALTERATION AND
DISMANTLING
TAHAP / LEVEL
BC-061-1:2015-C03
INDEPENDENT SCAFFOLD ERECTION, ALTERATION AND
DISMANTLING
BC-061-1:2015C03/P(1/1)
TAJUK / TITLE:
INDEPENDENT SCAFFOLD ERECTION, ALTERATION AND DISMANTLING
TUJUAN / PURPOSE:
This Information Sheet is intended to describe on tubular, modular and frame scaffold
so the trainee able to ensure the Independent Scaffold erected, altered and dismantled
safely and correctly.
BC-061-1:2015C03/P(1/1)
PENERANGAN / INFORMATION:
1. INTRODUCTION
i) An independent scaffold consists of a double row of standards, with each row
parallel to the building. The inner row is set as close to the building as is
practicable.
ii) The distance between the lines of standards should be the minimum
necessary to accommodate the required number of boards and toe boards .
BC-061-1:2015C03/P(1/1)
BC-061-1:2015C03/P(1/1)
built.
Mechanical means i.e. cranes; forklift, should be used over manual
handling wherever possible.
BC-061-1:2015C03/P(1/1)
Figure 1: Step 1
ii)
Form
side
by side on the
base
RAC
transom
using
and
make
levelling.
BC-061-1:2015C03/P(1/1)
Figure 2: Step 2
iii)
Install and tie two (2) ledgers over the transom on two (2) standards,
make levelling and measures 90 between the ledger and transom.
Figure 3: Step 3
iv)
Measure and place the bay length in the middle base to plan
requirement. Install transom and make levelling. (Tanye en. Burn)
Figure 4: Step 4
v)
Make
measurement
and
BC-061-1:2015C03/P(1/1)
coupler for the first uft and install the second ledger and transom.
Find the levelling and install the bracing at each standard using
correct coupler.
Figure 5:
vi)
Step 5
Figure 6:
vii)
Step 6
Install
planks/board
or
Cantilever
300
mm
maximum
board
or
four
times
(4)
thicker.
BC-061-1:2015C03/P(1/1)
Figure 7: Step 7
viii) Install and tie ladder and board as well as install guardrail,
puncheons and toe board. Open the temporary board.
Make sure trainee wear and use the correct and appropriate
hand tool and Personal Protective Equipment (PPE).
Figure 8: Step 8
BC-061-1:2015C03/P(1/1)
4.2. Alteration
All alteration to existing scaffoldings should be carried out in such a way that the
stability of the scaffold is not impaired. As a general rule, supplementary
components should be added before those which have to be removed are
uncoupled and taken away.
4.2.1. Alteration process
i)
Open guardrail and toe board if it prevent entry process or material
goods.
According to the job requirements.
Figure 9: Step 1
ii)
Re-install
board
after
the
work
relating finish.
Make sure trainee wear and use the correct and appropriate
hand tool and Personal Protective Equipment (PPE).
requirements
dismantling, no
BC-061-1:2015C03/P(1/1)
ii)
Open board and putlog tube. Open bracing, ledger and transom on
the
down
BC-061-1:2015C03/P(1/1)
iv)
Figure 14:
v)
Step 4
Remove
ledger
and
transom at other
side,
carry
out
housekeeping. Remove all base plate and sole plate. Segregates all
the scaffold component and return to storage area. Apply proper
method of manual lifting technique. Collect all the wastage and
debris.
BC-061-1:2015C03/P(1/1)
Make sure trainee wear and use the correct and appropriate
hand tool and Personal Protective Equipment (PPE).
Figure 15:
Step 5
Figure 15:
Step 1
ii)
Install
Figure
Step
16:
iii)
BC-061-1:2015C03/P(1/1)
Figure 17:
Step
iv)
Figure 18:
Step
v)
4
Place
the
Figure 19:
vi)
Step
Use
temporary
vii)
BC-061-1:2015C03/P(1/1)
working
platform.
Install
edge
protection.
Make sure trainee wear and use the correct and appropriate
hand tool and Personal Protective Equipment (PPE).
5.2. Alteration
All alteration to existing scaffoldings should be carried out in such a way that the
stability of the scaffold is not impaired. As a general rule, supplementary
BC-061-1:2015C03/P(1/1)
5.4. Dismantling
5.4.1. Dismantling requirements
i) During dismantling, no component which endangers the stability of the
remaining structure should be removed. If the scaffold is defective, it
should be made good before dismantling. The procedure for
dismantling should proceed generally from top in horizontal section.
Scaffold should never be dismantled in vertical sections from one end
towards the other.
ii) Materials should be lowered to the ground as the scaffold is
dismantled progressively. They should not be staked on scaffold.
Components should not be thrown down to ground; they should be
BC-061-1:2015C03/P(1/1)
ii) Open working platform, bracing, ledger and transom at second lift and
go down to the first lift.
Figure 26:
Step 2
iii) Open
standard,
ledger
and
transom at
the
next lift.
BC-061-1:2015C03/P(1/1)
v)
Remove ledger
and transom at
other side, carry
out housekeeping. Remove all base plate and sole plate. Segregates
all the scaffold component and return to storage area. Apply proper
method of manual lifting technique. Collect all the wastage and debris.
Make sure trainee wear and use the correct and appropriate hand
tool and Personal Protective Equipment (PPE).
BC-061-1:2015C03/P(1/1)
Diagram 4:
Erection
for
Independent Scaffold
i) Measure and position sole boards. Set out base plates / adjustable base
plate on sole boards. Adjustable baseplate at the maximum height of 2/3.
BC-061-1:2015C03/P(1/1)
ii) Fixed main frame on the top adjustable base plate. Aligned the horizontal
frame by adjusting adjustable base plate.
cross
the
brace
BC-061-1:2015C03/P(1/1)
BC-061-1:2015C03/P(1/1)
vi) Install arm locking device at lash pin for all frame standard.
Make it properly lock.
BC-061-1:2015C03/P(1/1)
viii) Fix / connect railing pole to the end frames. Connect between both side of
railing pole by using of hand railing tube.
Make sure trainee wear and use the correct and appropriate hand
tool and Personal Protective Equipment (PPE).
guardrail
and
toe board
if it prevent entry
process
or
goods.
According to the
job
material
requirements.
BC-061-1:2015C03/P(1/1)
ii)
Re-install guardrail and toe board after the work relating finish.
Make sure trainee wear and use the correct and appropriate hand
tool and Personal Protective Equipment (PPE).
process
dismantling of the
independent
.
Figure 40: Step 1
ii)
BC-061-1:2015C03/P(1/1)
Remove Working platform from the second lift and disconnect horizontal
brace.
iii)
Remove cross brace from the latch pin. Remove main frame and joint pin.
Prevent from dropping hazard. Use temporary working platform.
iv)
BC-061-1:2015C03/P(1/1)
Remove cat walk. Remove cross brace from the latch pin.
vi)
BC-061-1:2015C03/P(1/1)
SOALAN/QUESTION:
1. What is the minimum size of square base plate?
2. Why must adjustable base plate be used on frame scaffold?
BC-061-1:2015C03/P(1/1)
RUJUKAN/REFERENCE :
1. Law of Malaysia, Factories and Machinery Act with Regulations, Act 139, (2009),
MDC Publisher Sdn Bhd, ISBN: 967-70-1235-5
2. Department of Standards Malaysia, Metal Scaffolding Part 1: Prefabricates
scaffold Specification for Steel Frame Scaffolding, 2012, Sirim Berhad
3. Occupational Safety and Health Act (OSHA) and Regulations, MDC Publishers
Sdn Bhd, Malaysia
4. Davies, V. J. & Tomasin, K. 1996. Construction Safety Handbook. Thomas
Telford. ISBN: 9780727725196
5. Hughes, P. & Ferrett, E. 2007. Introduction to Health and Safety in Construction.
Routledge. ISBN: 9780750681117
6. Basic Scaffolding Certificate, Holmesglen Institute of Tafe, National Occupational
Health and Safety Certification Standard for Users and Operators of Industrial
Plant, July 1995
7. Course Of Scaffolding, The Design Specifications Of A Scaffold Can Either Be A
Comple Set Of Drawings Or Held In Mind Of The Responsible Scaffolder,
AS/NZS 4576:1995 Guideline For Scaffolding
8. Scaffolding Inspection Course