Você está na página 1de 1

420'0"E

250000

Turkish Gas Pipeline constructing 30 inch pipeline


extension to Turkish-Kurdistan border.

Tawke Field (DNO)


Discovery well: Tawke-1 (2006)
Reservoirs: Tertiary (24 API), Cretaceous (27 API) and Jurassic (27 API)
Reserves: 543 mmbbls (2P) + 82.5 mmbbls (2C)
Production: 104,000 bopd (H1 2016)
Work over plan ongoing to increase production. 8 workovers completed
to date. DNO also planning to drill an additional 5 production wells

440'0"E

400000

500000

460'0"E

550000

600000

Swara Tika Discovery (HKN)


Discovery well: Swara Tika-1 (2011)
Reservoirs: Jurassic,Triassic (35 API)
Production: ~4,000 bopd ramping up to 9,000 bopd
Swara Tika-2 TD ~3700m. (Triassic). Tested 15,000 bopd.
Swara Tika-4 spud Oct 2015. Results unknown.
Sarsang FDP approved Nov 2015.

Sheikh Adi Discovery (Gulf Keystone)


Discovery well: Sheikh Adi-2 (2012)
Reservoirs: Jurassic (15-18 API)
Resources: 112 mmbbls (2C)
SA-2 tested 4235 bopd (aggregate 4 Jurassic zones)
SA-3 Triassic owed oil with high water cut. Jurassic
tested oil.
Block Relinquishment to KRG announced Mar 2016

Ber Behr Discovery (Genel)


Discovery well: Ber Bahr-1 ST (2013)
Reservoirs: Jurassic Sargelu (15 API)
Resources: 23 mmbbls (2C)
Block Relinquishment to KRG underway

450'0"E

450000

MARAGHEN

Peshkabir Discovery
Discovery well: Peshkabir-1 (2012)
Reservoir: Jurassic tested oil/water cut (~28 API)
Reserves: 32 mmbbls (2P) + 63 mmboe (2C)
Peshkabir-2 planned for H2 2016. Target
Cretaceous/Jurassic up dip from PK-1.

SINDI
AMEDI WEST

=
=)
)
))
==
=)
)
=
=Q)
)
=
)
=
)
=
)
=
=
)
=
)
=
)
=
)
=
)
=
)
=
)
=)
)
Tawke
=
)
=
5000= BOPD

MT1

B(2011)

SHERWAN
MAZIN

SINDI
AMEDI EAST

PK1

4100000

Q(2012)
)
=

#
*ST3

BER BEHR

=
)

SHEIKH
ADI

BB1
(2011)

Q
)
=

Ain Zalah Field (NOC)


Reservoirs: Cretaceous (31 API)
Reserves: ~100 mmbbls (2P)
Production: ~2,000 bopd through Iraq-Turkey pipeline.
Kurdish Peshmerga have total control of the area

SM_E1

Q(2007)

DOHUK

AL QUSH
ExxonMobil 80%
KRG 20 %

KH1
(2006)

)
)
)

)
)
)

)
)

)
)

=
)

SH3

SH10

DINARTA

BM2
BM1
(2012)

Q
Q

SH5

= SH6
) SH2)
=
=SH11)
) Gulf SHAIKAN
=
=
)
Keystone 58%

SH1

(2009)
)
=
=SH7
SH8

Harir PSC (Marathon)


Harir-1 TD 3800m (Triassic). Abandoned
Jisik-1 Tested 6100 bopd (Jurassic) + 10-15 mmcfd (Triassic).
Completed Nov 2014 and suspended as a future producer
Mirawa-1 Jurassic tested 11,000 bopd (39-45 API). Triassic tested 72 mmscfd.
Mirawa-2 spud Dec 2014. Triassic testing completed.
No current operations planned.

AKRE-BIJEEL

MOL (Kalegran) 14.5%


KRG 27.5 %

MAHABAD

BJ3

SM1

(2009)
)
Q
=
Q
=
)
SM4
SM3
Q
=
)

Safen PSC (Total)


Safen-1 TD 4282m (Triassic). Dry hole.

BJ6

AIN SIFNI
Hunt 60%
Afren 20%
KRG 20 %

BJ1

)(2009)
=
BJ2
B
B
Q
=
)

ROVI

BE1

BJ4

Q(2011)

CHOMAN
Turkish entity 80%
KRG 20 %

BJ7

Shakrok-1 TD 3538m (Triassic) Non-commercial Triassic gas


discovery. Jurassic zones failed to ow hydrocarbons to surface

GL1
(2012)

RN1

RS1
Q (2013))
)
=
Q(2010)
=

=
)

Masief-1 spud Dec 2013


Well testing completed -abandoned Apr 2015

HR1
(2012)

Simrit Discovery (Hunt)


Discovery well: Simrit-1 (2011)
Reservoir: Jurassic (14 API)/Triassic (36 API)
Resources: 157 mmbbls contingent
Production: 8,000 bopd by June. Projecting 18,000 bopd by end of year
Simrit-2 Cret/Jurassic/Triassic aggregate ow rate 19,641 bopd.
Work over of S-2 Dec 2015
=
)
Simrit-4 spud Feb 2014. Suspended Jan 2015
DSTs conducted in Jurassic Sargelu (6,089 bopd) and
Naokelekan (5,743 bopd). Triassic owed oil and water
Simrit-5 currently testing
FDP approved Nov 2014

S4

ML1

Q(2013)
Kazak
10000 BOPD

=
)

=
)

BR2 BR1
BR4
(2010)
BR5
BR3BARDA

Q)
)
=
QQ
=

Maqlub-1 spud May 2013. FTD Triassic


2016 complete testing after Simrit-5

Q
Q
=
)

BASHIQA
ExxonMobil 80%
KRG 20 %

Q
)

HARIR
Marathon 45%
Total 35%
KRG 20 %

#
*

S3

SARTA
Chevron 60%
OMV 15%
KRG 25%

RASH

JS1
(2013)

Q S2
Q S1
=
)
Q(2010)
=
)

#
*S5

MR2

BETWATA
ExxonMobil 80%
KRG 20 %

BN1

(2007)
BN3
BN4
Q

)
BN2
Q)
=
Q)
)
=
Q

AAS2
AAS1
(2013)

Q
Q
=
)
MOSEL

Barda Rash Field


Discovery well: Barda Rash-1 (2009)
Reservoir: Cretaceous, Jurassic (Mus/Adaiyah), Triassic
Resources: 247 mmbbls (2C) 2P reserves eliminated/2C
resources downsized. Development put on hold
due to high water cuts making production uneconomical

ERBIL
DNO 40%
New Age 40%
KRG 20 %

BS2

BS1A
Q
)
=
Q
=
)

PIRMAM
ExxonMobil 80%
KRG 20 %

Kalak
100000 BOPD

ERBIL

HAWLER
Oryx 65%
KNOC 15%
KRG 20 %

SK1

B(2013)

MO1
(2011)

GWER-HAMDANYA
Komet Group 80%
KRG 20 %

SF1

B(2013)

Taq Taq Field (TTOPCO)


Discovered: 1961
Reservoirs: Pilaspi (26 API) , Shiranish/Kometan/Qamchuqa (46 API)
Reserves: 356 mmbbls (2P) (downgraded Feb 2016)
Production: 62,000 bopd.
TT-23 deviated well and TT-24 horizontal completed mid 2015
Sidetracks and workovers of existing wells to reduce production declines
are ongoing. Horizontal well drilling on the anks of the eld late 2016

MS1

Q(2013)
BB5
Q

MALA
OMAR

SHAKROK
SAFEEN
Total 80%
KRG 20 %

BB4

BN2

4000000

Ain al Safra-1 TD 3000m (L Jurassic).


Tested 850 bopd from L Jurassic
Ain al Safra-2 spud Mar 2014. Target Jurassic/Triassic.
Operations suspended since August 2014

BN1
(2013)

Q
)
=

BB2
BB1

(2006)
BB3
B
Q)
Q

DD5 DD2
DD10
DD8
DD4DD7
DD6
DD3
DD9

Q =
Q
=
Q))

=
)
BQ
=
)

IRBIL

360'0"N

Q
)
=

=
)

Iraq

SR1
(2009)

ZEG1

BS1

B(2014)

QUSH
TAPPA

B
TAQ TAQ
TTOPCO* 80%
KRG 20 %

CCGT
560 MW

=
)

SW3
SW1
(2013)
SW2

#
*

KHALAKAN
Gas Plus Khalakhan 80%
KRG 20 %

QT1

Miran Field (Genel Energy)


Discovery well: Miran West-1 (2009)
Reservoirs: U.Cretaceous (15-18 API), L.Cretaceous/Jurassic (wet gas)
Reserves: 30 mmbbls (2P) + 4.3 TCF + 62 mmbbls (mean contingent)
Miran/Bina Bawi Gas Development
4 bcma of gas exports from 2018, rising to 10 bcma by 2020.
Gas Sales Offtake Agreement not yet nalised - anticipated by end 2016
Pre-FEED and Gas Development Plan awarded - expected completion
by end-2016. Genel progressing securing a Turkish anchor farm-in partner.
Miran West-3 Jurassic tested 22 mmcfd (Butmah) and 17 mmcfd (Sargelu)
Miran West-4 tested 1,350 bopd in U.Cretaceous

Dokan HPP
400MW

_)
^

KHURMALA
DOME

Demir Dagh Discovery (Oryx)


Discovery well: Demir Dagh-1 (1960)
Reservoir: Cretaceous (22 API)/Jurassic (~30 API)
Resources: 102 mmbbls Cretaceous + 67 mmbbls Jurassic (2P)
Production: 3500 bopd. 2 wells shut in due to water production.
40,000 bopd EPF commissioned Sep 2015
Demir Dagh-2 TD 4020m (Triassic) Tested 2210
- 2780 bopd (Jurassic) and 6700bopd (Cretaceous)
11 wells drilled - 6 completed as Cretaceous producers

Bazian-1 TD 4091m (Cretaceous - Chia Gara)


Tested 500 bopd in Qamchuqa

KH1
(2012)

=
)
))
=
=)
=)
=
=
=)
)
=)
)
=
=
)
=
=
)
=
)
=
)
#
Q
=
)
*)
=
)
=
=
=)
)
B)
=
=)
)
=

C Erbil
1312 (1500)MW

KHURMALA
Khurmala Khurmala CGT
C 640 (1000)MW

Banan Discovery (Oryx)


Resources: 85 mmbbls (2P) Cretaceous
Banan-1 TD 4153m (Triassic) tested 820 bopd (Cretaceous) and 3,500 bopd (L Jurassic)
Banan-2 spud June 2014.Operations suspended since August 2014

KC2

B(2010)

Mosul
750 MW

=
)

Dokan
20000 BOPD

=
)

Qaiyarah and Najmah Fields


Reservoirs: Jeribe, Euphrates, Hartha (15.5 API)
Reserves: 424 mmbbls and 200 mmbbls oil recoverable
Fields remain under ISIS control

TaqTaq -> Khurmala 150,000 bopd oil pipeline

KEWA
CHIRMILA

Qayarah
16000 BOPD

Dibis ICE
640 MW

C
KC1z

B(2009)

Khurmala Field (Kar Oil and Gas)


Reservoirs:)
Eocene, Shiranish/Kometan + Qamchuqa (34 API)
Production Capacity: 105,000 bopd + 80 mmscfd.
Production projected to increase by 50,000 bopd by end 2016

Zey Gawra Discovery (Oryx)


Resources: 112 mmbbls (2P) Cretaceous
ZEG-1 TD 4398m (Triassic) tested 4800 bopd
(35 API) from Cretaceous
2016 plan to sidetrack ZEG1 & reenter ZAB1
Investment deal with ZEG Oil and Gas to
complete phase 1 development

MIRAN
Genel Energy 100%
KRG %

BZ2

=
)

Bai Hassan Field (KAR Oil and Gas)


Discovered: 1953
Reservoirs: Oligocene, Shiranish/Kometan and Qamchuqa
Reserves: 1700 mmbbls + 8.9 TCF recoverable remaining
Production Capacity: ~250,000 (see Kirkuk comments)

=
)

Bazian CGT
420 MW

=
)
=
)

Q
=
C )

Proposed Kurdistan-Iraq
250,000 bopd oil pipeline

ME1
(2012)

PENJWIN

MW3
MW1
(2008)

Tasluja ICE
51MW

)
Q
)
=

QARA HANJEER
ExxonMobil 80%
KRG 20 %

MW5

)
=
=
)

Chemchemal
1000 (1500)MW

SULAYMANIYAH

Mullah Abdullah CGT


402MW

CKirkuk

Rizgari
29MW

=
)
)
=

ARBAT
Turkish entity 80%
KRG 20 %

KIRKUK

Khabbaz Field (North Oil Co)


Discovered: 1976
Reservoirs: Jeribe, Oligocene, Kometan and Qamchuqa
Resources: 2000 mmbbls + 3 TCF recoverable remaining
Production Capacity: 29,000 bopd
(see Kirkuk comments)

=
)

#
*

QD2

BARANAN
Total 60%
Murphy 20%
KRG 20 %

3900000

=
)

350'0"N

)
=
=
)
=
)
=
)

Kor Mor Field


Discovery well: Kor Mor-1 (1928)
Reservoirs: Jeribe, Euphrates, Oligocene (Gas); Shiranish (Oil)
=
Resources: 1.8 TCF recoverable )
Production: 340 mmcfd + 16,000 bpd condensate

HPP
C Darbandikhan
249MW
M-1

Q(2014)
)
=
K-2
Q

)
K-3 K-1
Q(2009)

Q )
=
)

PULKHANA
Turkish entity 40%
UNASSIGNED 40%
KRG 20 %

TZ1

(2012)
)
Q

B-1

B(2013)
)
=
ALYAN
QULIJAN

CHWAR

=
)

QULA

BB PU9
)
=
Q PU8
=
)
Q
=
)
B
BB

GARMIAN
WesternZagros 40%
Gazprom Neft 40%
KRG 20 %

#
*

Baram-1 TD 3730m (Eocene)


Sub-commercial oil (42 API) and water in Oligocene

S1
(2008)
H1
(2013)
MQ1
(2011)

)
=
Q
=
)
Q
=
)

SH1

Q(2008)
)
=
SH2
Q
SH3

ZARDI

MIL
QASIM

CS11

Q CS10
)
=
B
B
Q(2012)
=
)
Q

B
B
=
)
B
=
)
B)
_
^

Q
Taza Discovery (Oilsearch)
Discovery well: Taza-1 (2013)
Reservoirs: Jeribe/Dhiban + Euphrates
Resources: 250-500 mmbbls recoverable
Taza-1 200-250 bpd oil/water (Jeribe). 1100 bopd + 2900 bwpd (Euphrates)
T-2 & T-3 encountered tight reservoir and tested low uid
rate - mostly water. Both wells have been plugged and abandoned
Taza-4 deferred spud Q1 2017. Targeting fractures identied on 3D seismic.

1,000,000

Average Daily (bbls/day)

)y
a
d
/s 800,000
l
b
b
(
yli 600,000
a
D
e
ga 400,000
r
e
v
A
200,000

Kurdamir Field (Repsol)


Discovery well: Kurdamir-1 (2010)
Reservoirs: Oligocene (38 API) and Eocene (45 API)
Resources: 600 mmbbls oil/cond + 2.26 TCF (mean contingent)
+ 1321 mmbbls (mean prospective)
Kurdamir-2 completed as an Oligocene producer. 44 day EWT
produced over 88,000 bbls light oil and gas - no water.
Kurdamir-3 DST#4 tested 948 bopd + ~800 bwpd (Oligocene).
Repsol submitted the Kurdamir Block FDP May 2016.

AWASPI

1,200,000

Chia Surkh Field (Genel Energy)


Reservoirs: Miocene - L. Fars (38 API) Jeribe/Dhiban (41 API)
Euphrates (47 API)
Resources: 250 mmboe (mean contingent)
Chia Surkh-10 TD 1696m (Miocene)
L Fars tested up to 3200 bopd + 8.4 mmscfd
Jeribe tested up to 11,950 bopd + 15 mmscfd.
Chia Surkh-11 TD ~3000m (Oligocene)
Jeribe/Dhiban tested 3550 and 2060 bopd. Euphrates tested 1600 bopd
Chia Surkh-12 TD 2500m Oligocene & Eocene waterbearing. Testing
ongoing in hydrocarbon bearing Miocene section.
Operatorship of the block being transferred to Petoil for the
duration of the CS-12 well.

CS 12

SHAKAL
Gazprom Neft 80%
KRG 20 %

CHIA SURKH
Genel Energy 40%
Petoil 40%
KRG 20 %

=
)

Topkhana Discovery (Repsol)


Discovery well: Topkhana-1 (2011)
Reservoir: Oligocene
Resources: 1665 BCF + 55 mmbbls condensate (contingent)
Topkhana-1 tested up to 7.45 mmscfd + 350 bcpd from Oligocene
T-2 U Oligocene tested 2146 bpd oil/cond (49 API) + 30.6 mmcfd
Repsol submitted the Topkhana Block FDP May 2016

Sarqala Complex (WesternZagros)


Discovery well: Sarqala-1RE (2011) / Mil Qasim-1 (2011)
Reservoir: Jeribe (40 API), Euphrates (32 API), Upper Fars (43 API)
Reserves: 26.5 mmbbls (3P) + 66 mmbbls (P50 prospective)
Production: 5,000 - 5,500 bopd
Sarqala-1RE tested 11,500 bopd from Jeribe/Dhiban following workover
Hasira-1 TD 4181m (Oligocene)
Encountered operational difculties testing of Mio-Oligocene reservoir.
Sarqala-2 Jeribe/Dhiban development well planned spud H1 2017.
Garmian FDP approved May 2016.

KHANAQIN

Aug Sept Oct Nov Dec Jan Feb Mar Apr May Jun

Pulkhana Field (Turkish Entity)


Discovery well: Pulkhana-5 (1956)

)
Reservoirs: Euphrates, Jaddala, Shiranish/Balambo (32 API)
Resources: 113 mmbbls (2C)
Pulkana-9 (2011) tested limited oil from Shiranish/Balambo
Pulkana-8 re-entry (2010) tested 2,650 bopd Shiranish.

2016

2015
2015
Haditha HPP
660MW

Export NOC Fields

C Export KRG Fields

Domes c Consump on
=
)

250000

420'0"E

Massoyi-1 TD 3084m (Eocene)


Reported oil tested from Oligocene and Eocene
Massoyi-2 results unknown

KURDAMIR
Repsol 40%
WesternZagros 40%
KRG 20 %

TZ3

Hamrin Field (North Oil Co)


Discovered :1961
Reservoirs: Jeribe, Euphrates/Serikagni and Oilgocene
Resources: 1,800 mmbbls + 750 BCF recoverable remaining
Production: 60,000 bopd + 60 mmcfd (currently shut in)
Field under Iraqi forces control.

Sources: KRG MNR Monthly Export Reports & Iraq Oil Report Customer Research Service

QARA DAGH
Chevron 80%
KRG 20 %

M-2

KADIR
KARAM

2015/16 Average Daily Export for


KRG and NOC operated elds & Domes c Consump on

HALABJA
Gazprom Neft 80%
KRG 20 %

)
Q

TAZA
Oilsearch 60%
Total 20%
KRG 20 %

#
*

T-1

(2011)
Q
T-2

TZ4

=
)

SANGAW SOUTH
KNOC 30%
UNASSIGNED 50%
KRG 20 %

TZ2

Q(2010)
)
=

SS1
(2011)

B KM9

KOR MOR

QD1

TOPKHANA
Repsol 60%
UNASSIGNED 20%
KRG 20 %

Baiji North
170000 BOPD

Ajeel Field (North Oil Co)


Discovered :1961
Reservoirs: Jeribe and Euphrates
Resources: 500 mmbbls + 496 BCF recoverable
Production: 28,000 bopd (currently shut in)
Field under Iraqi forces control

Halabja PSC
1000km 2D seismic acquisition completed
2015 Project currently on hold.

Jambur Field (North Oil Co)


Discovered: 1929
Reservoirs: Jeribe, Euphrates, Eocene, Shiranish and Qamchuqa
Resources: 3000 mmbbls + 9.0 TCF recoverable remaining
Production Capacity: 36,000 bopd + 120 mmcfd
(See Kirkuk comments)

BR1

Q (2015)

SN1
(2010)

=
)

Baiji Salahedden
140000 BOPD

Sangaw South-1 TD 3820m (Jurassic)


Tested small amount of gas, condensate
(55 API) and water from Shiranish

SANGAW
NORTH

Taza CGT
330MW

3800000

Baranan-1 spud May 2015


Target: Cretaceous reservoirs
Results unknown

SE MIRAN

Chemchemal Field
Discovered: 1930
Reservoir: Pila Spi (43 API) Condensate
Resources: 2.07 TCF recoverable

Jul

Sangaw North-1 TD 4190m (Triassic)


Jurassic/Triassic tested uncommercial rates
of gas + water. (high H2S)

ARBAT EAST
ExxonMobil 80%
KRG 20 %

27000 BOPD

Baiji Renery and Iraq-Turkey Pipeline


Baiji renery has been on the frontline of ghting
between IS and government troops. Multiple attacks on
the Iraq-Turkey Pipeline and renery. Signicant damage
caused with repairs estimated to take over 1 year.

Apr May Jun

Qara Dagh-2 spud deferred into 2017


2D Seismic program completed 2015
Qara Dagh-1 TD 3908m (Cretaceous)
Cretaceous tested oil (43-46 API) at non-commercial rates.

BAZIAN
KNOC Bazian* 80%
KRG 20%

)
=
=
)
=
)
=
)
=
)
=
)

))
=
=
=
)
=)
)
=)
)
== )
)
=

= )
)
=)
)
=
=

Kirkuk Field - Baba (KAR) and Avanah domes (NOC)


Discovered: 1927
Reservoirs: Oligocene, Shiranish and Qamchuqa
Resources: 8,700 mmbbls + 2.7 TCF recoverable remaining
KAR Production: Avanah + Bai Hassan: ~230,000 bopd (sent via Kurdish pipeline to Turkey)
NOC Production: Baba/Khabbaz/Jambur ~155,000 bopd.
Suspended exports via Kurdish Export Pipeline in March. Gas used to provide powerstations.
Some oil sent for reneries and local sales.

Bazian
34000 BOPD
MW2
MW4

CHEMCHEMAL

=
)

=
)

ZW1

B(2013)

BZ1

Q(2009)
)
=

=
)
North Salah ad Din (Sonoro Energy)
Resources: 140 mmbbls recoverable
Target: Jeribe asphalt
July 2014 company provided notice
of "Force Majeure"

MAWAT
PIRAMAGRUN

=
)
3950000

=(2013)
)
Q

=
)

3850000

Shewashan Discovery (Gas Plus Khalakan)


Reserves:75 mmbbls (2P) in Cretaceous (46 API)
Production: ~4000 bopd from Shewashan-2.
10,000 bopd EPF completed
Shewashan-1 work over and horizontal sidetrack ongoing.
Rig then moving to spud Shewashan-3
FDP approved Sept 2015

BINA BAWI
Genel Energy 100%
KRG %

SHORISH

#
*ZEG2
=

QALA DZE

BB6

Erbil
29MW

Benenan/Bastora Discoveries (DNO)


Reservoir: Cretaceous (Bekhme and Qamchuqa)
18-19 API. Jurassic (Najmah) 16 API
Reserves: 58 mmbbls (Benenan) 11.3 mmbbls (Bastora)
Production: Currently not producing (10,000 bopd EPF)
EWT for BN-4 and Erbil-2 show good reservoir communication

Iran

Bina Bawi Field (Genel)


Discovery well: Bina Bawi-1
Reservoirs: Jurassic (45 API), Jurassic and Triassic (dry gas)
Resources: 7.1 TCF + 17 mmbbls (mean contingent)
Production: See Miran
BB-3 2 Jurassic tests aggregate ow 4000bopd + 15mmcfd
BB-4 and BB-5 tested 20 mmscfd + 10 mmscfd in
2 Triassic reservoirs, conrming 1500m H/C column.

HINDREN
Turkish entity 80%
KRG 20 %

MR1
Q
Q (2013)

4000000

4050000

ATRUSH
TAQA 53.2%
Shamaran 26.8%
Marathon 20%

JABAL KAND
Turkish entity 40%
UNASSIGNED 40%
KRG 20 %

Mosul Dam
1052MW

Rovi PSC
Relinquished by Chevron Q4 2015
Rovi North-1 Re-entry April 2015
Rovi South-1 Oil shows

Q Q
)
=
AT3
CK8 AT2
CK5
Q #
=
)
QQ
=
)
CK6
AT4
QAT1
=
)
Q
)
=
*
Q CK7 )
=
)
Q
=
(2010)

SM2

)
Q
=^
_

=
)

Q
)
=

SA2

Q SA1 SA3
)
=
Q(2010)
=
)
Q
=
)
SH4

)
Badriya
ICE
AQ1
Q(2014) 150MW
SM5

))
=
=
)
=

EST1

Q(2013)
)
=

MIANDOAB

Shakal Discovery (GazProm Neft)


Discovery well: Shakal-1 (2009)
Reservoir: Jaddala, Aaliji (35 API)
Resources: 45 mmbbls
Shakal-1 Jaddala 3 test aggregate max of 2,450 bopd
Shakal-2 and Shakal-3. Test results not known .

Qamar Field (North Oil Co)


Discovery well: Qamar-1 (1979)
Reservoir: Jeribe (42 API)
Resources: 200 mmbbls + 250 BCF recoverable
QM-1 tested: 2200 bopd; GOR 4000

=
)

=
)

Samarra
300000

430'0"E

350000

400000

450000

440'0"E

500000

550000

450'0"E

460'0"E

600000

Abbreviations
Well Status

#
*

Planned

_
^

Drilling/Testing

Q
B
=

Suspended

Oil Field/Discovery
Gas/Condensate Field/Discovery

Pipelines

Plugged and Abandoned

Oil, Active

Location

Oil, Construction

Hydrocarbons

)
=

Facility - Active

Fields

Oil

Oil, Proposed
Gas, Active

Oil and Gas

Gas, Construction

Gas/Condensate

Gas, Proposed
Inactive-Shutdown

Metering Station

Power Station

Development (FDP submitted)


Appraisal
Exploration
Renery

Facility - Constructing

Kurdistan Blocks

Open

Power Station

Kurdamir PSC

Renery

Garmian PSC
Extent of Kurdish military control - Nov 2015
Country Boundaries
Urban Areas

mmbbls
TCF
BCF
bopd
mmcfd
EWT
EPF
CPF
FDP
OIP
PSC
MW
HPP
ICE
CGT
CCGT
DF

360'0"N

Shaikan Field (Gulf Keystone)


Discovery well: Shaikan-1 (2009)
Reservoirs: Jurassic (17 API) /Triassic (36 API)
Reserves: 639 mmbbls (2P) + 239 mmbbls (2C)
Production: ~35,000 bopd (Trucked to Fish Khabur for
=
)
pipeline export)
FDP updated 2015 to incorporate horizontal well drilling
(mostly Jurassic reservoir)
Capital restrictions preventing company from carry
out workovers drilling require to maintain production rate

SM1

(2011)

SM3
SM2

SR1

B(2014)

ST1
ST1A
(2010) ST2 ST4

Dohuk
29MW

DOHUK

Sarta Discovery (Chevron)


Sarta Central-A1 TD 2702m (Jurassic). Tested 1,000 bopd heavy oil.
Sarta-2 spud July 2013. ~TD 4200m. Susp Aug 2014.
Reentry Feb 2015. Testing completed
Sarta-4 drilled 2015. Results under evaluation
Chevron announced that it plans to farm down assets Apr 2015

4050000

Q(2012)

SULEVANI

B(2012)

SWARA TIKA
HKN 42%
Marathon 20%
Maersk 18%
KRG 20 %

LN1

C Dohuk
1000 (1500)MW

Shireen-1 TD 1430m (Jurassic).


Signicant operational difculties and
SIDAKAN
lack of conclusive well results
Hess relinquished PSC March 2015

GA1

MN1Z

Q(2012)

CENTRAL
DOHUK

3950000

Summail Discovery
Discovery well: Summail-1 (2011)
Reservoirs: Cretaceous (gas), Jurassic (heavy oil)
Production and Resources: Due to unpredictable
production reserves removed.
DNO is process of relinquishing block to KRG

370'0"N

SARSANG

Million barrels (oil)


Trillion cubic feet (gas)
Billion cubic feet (gas)
Barrels of oil per day
Million cubic feet gas per day
Extended well test
Early production facility (temporary)
Central production facility (permenant)
Field Development Plan
Oil in place
Production Sharing Contract
Mega watts
Hydro Power Plant
Internal Combustion (Heavy Fuel Oil)
Single Cycle Gas Turbine
Combined Cycle Gas Turbine
Dual fuel (Gas + Fuel Oil)

Text box information


Red text indicates recently updated information

10

20
30
Kilometers

40

Data shown is to the best knowledge of WesternZagros at time of printing, however we cannot be
held responsible for outdated or incorrect information. To inform us of any discrepancies, please contact:
investorrelations@westernzagros.com

Kurdistan & Northern Iraq


Operator Activity Map
July 2016

50

No Copying or Distribution without


permission of WesternZagros

3900000

#
*PK2

Akri Bijeel
Jan 2016 MOL announces relinquishment of Akri Bijeel
Determined development currently uneconomical
Bijeel Discovery
Reservoirs: Jurassic (13 API)
.Resources: 4 mmbbls (2P)
BJ-1B production~2,200 bopd.Delineation wells unsuccessful
Bakrman Discovery
Bakrman-1 Triassic EWT : 3192 bopd and 10.19 mmcfd.
Bakrman-2 Geological complexity and High H2S.

350'0"N

TAWKE
DNO 55%
Genel Energy 25%
KRG 20 %

10,000

3850000

FISH
KHABUR

Chiya Khere Discovery (TAQA)


Discovery well: Atrush-1 (2011)
Reservoirs: Jurassic (10-27 API)
Resources: 85 mmboe (2P) + 304 mmboe (2C)
Production: Phase 1: 30,000 bopd EPF being commissioned.
CK-7 Phase 1 well planned spud Q1 2017.
AT-2 & AT-4 being completed mid 2016. Feeder pipeline scoping
is underway. First oil deferred to Q4 2016.

East Swara Tika Discovery (HKN)


Reservoir: Triassic Kurra Chine
East Swara Tika-1 tested aggregate rates over
8000 bopd. Declared commercial Nov 2015

Projection: WGS 84 UTM38N


Date printed:

28 July, 2016

Date last saved:

28 July, 2016

File location:

I:\AppData\ArcGIS\Maps\Activity Maps\160728_operator_activity_EXTERNAL.cdr

3800000

4100000

350000

BONAB

Khurmala --> Fish Khabur oil pipeline


Capacity increased to 720,000 bopd
Pipeline Exports 514,000 kbopd for June 2016

370'0"N

430'0"E

300000