Você está na página 1de 245

Proj.

1234
Project Schedule data
MS Project Schedule
Build Project Team
Import PlanView Data

Project Status and Performance Tracking Tool


Tasks Status
Major Milestones Status
Due Tasks List
Unfinished Tasks List

Cumm used hours

Tasks Audit Trail

Monthly used hours

Tasks x Res Alloc Plan

ResWE used hours

Resource Status

WERes monthly used


Refresh Cummulative Data

Resources Allocation
Extension Forecast

Allocation Variance

Res x A/c Task hours

WERes detail hours

A/c Task x Res hours

WERes total hours

Res monthly used hours

WERes Rem hours

Res Extension requests

racking Tool
Project Performance
Project Dashboard
Project level EVA
Resource Level EVA
Lead Resource Performance
EVA Setup

Quality Assurance

About this Project Tracking Tool


Description

- What was the need to create this tool?


To integrate and analyze project monitoring and control information
available from various sources.
Automate repeatative functions to save planner's time and direct
focus to Control and Decision Support functions

- What do you do with this tool?


Track Team Status
PlanView Allocation Planning
Track schedule status
Calculate PAR ext hours
EVA at Tasks level
EVA at Resource / Lead resource level
Track and balance EVA

Continuously improve Project Planning Processes.


What are the main features of this tool?
Using Quantitative Analysis for decision support
Focus on applying EVA
Interface with MS Project through MAP
Interface with Outlook for resources contact information
Interface with PlanView through export to Excel
Refresh macros for recalculating
Two dimensional organization of information

- What are the benefits of using this tool?


To increase effectiveness of project monitoring and control support to Project Manager
Saving of time and quick relection on demand by PM
Availability of additional analysis information

- What are the preconditions of successful use?


Tool functioning should match individual's work style
Formal Support
Desire to improve continuously

- What are the risks of using this tool?


Over relying on quantitative analysis may be harmful to team work
Possible overloading of work as now more can be done

- What improvements are planned in near future?


Interface with Primavera
Integrate with planning tool

- What is the purpose of this Presentation


To walkthrough and share views if this tool can be useful to PMs / Planners.

- Rating statements

Rating
Scale
1->
Lowest,
10 -> Highest
Does
this tool
provide
conprehensive
analytical information to monitor project status
and take control decisions?

Does this tool save project planner's time used for routine repeatative calculations and
bringing information togather in usable form ?
How much at ease are you with tool's user interface?
Would you recommond this tool to be used by other planners?
Would you recommond this tool to be evaluated by Project Office?

Remarks

12103

763-4256
766-8157
766-6872
735-6808

I
E
I
E

Y
N
Y
N

1014
40
65
12

Weidenbenner Ed
Gullixon Eric
Scott Gary

Ed Weidenbenner
Eric Gullixon
Gary Scott

1 Business Analyst
1 Systems Analyst
1 Planner(backup)

DEER417-888-61 I
M-4 766-8964
I
M-4 735-6017
E

Y
Y
Y

556
202
30

Murthy J
Nutt John
Shanmugam Kasi
Miller Kim

J Murthy
John Nutt
Kasi Shanmugam
Kim Miller

1
1
1
1

Systems Analyst
Systems Analyst
Systems Analyst
Systems Analyst
Reddy Lakshmi Narayana
Lakshmi Narayana Reddy
1 Systems Analyst
1 Systems Analyst
Mary Kasley Lee
Lee Mary Kasley
Celeschi Michelle
Michelle Celeschi
1 OSS(ASA)
Baugh Sally
Sally Baugh
1 Test Technicial
Ramachandran Santosh [H6Z5 Santosh Ramachandran1 Scripting
Durnan Steve
Steve Durnan
1 MQ series

L-3 735-9081
E
M-4 735-8786
I
M-3 763-5310
E
JACKS888-758-19 I

Y
N
N
N

1700
300
120
50

K-4
H-3

735-1199
763-3729

E
I

Y
N

302
124

M-4
M-4
K-4
M-2

766-7646
763-8058
763-3097
735-1604

I
I
E
I

N
N
N
N

354
20
25
162

Hall Steve
Witter Steve
Saha Sushit

Steve Hall
Steve Witter
Sushit Saha

1 Test Specialist
1 Systems Analyst
1 Security Analyst

L-4
L-3
K-4

763-7830
763-3870
766-4883

I
I
I

Y
N
N

775
775
117

Dobrinich Tina L
Hartness Ty
Dejaynes Vance
Awan Zafar
Woodman Andrew
McKinney Brian
Paige Charles
Lade Daniel
Sanders Dave
Saenz Gilbert
Ma Harry

Tina L Dobrinich
Ty Hartness
Vance Dejaynes
Zafar Awan
Andrew Woodman
Brian McKinney
Charles Paige
Daniel Lade
Dave Sanders
Gilbert Saenz
Harry Ma

1
1
1
1
2
2
2
2
2
2
2

K-4
M-1
K-4
H-2
M-4
Systems Analyst
M-4
Business Analyst
IIA-Team Coordinato H-3
IIA-Network Impact H-4
IIA-Windows PerformH-3
IIA-IBM MF Perform H-4
IIA-Proactive Perfor H-4

763-3613
766-6133
763-3867
763-8880
766-5076
766-0358
735-4568
763-9136
766-5836
763-4304
766-2968

I
I
I
I
I
I
E
E
E
E
E

Y
N
Y
N
N
N
Y
N
N
N
N

550
134
990
50
57
11
70
55
11
25
100

763-3958
766-8107

Fry Liz

2 ?
2

I
I

N
N

40

Y Michael Frey
Sherrill Leslie
Brenda Austin
Carey Voyles

2 Systems Analyst
VISAL625-6920
I
2 IIA-Network Perform H-4 735-3968
I
4 ISC Contact Person ALPH 770-521-70 I
4
K-4 763-5149
E

Y
N
N
N

212
25

Janie Houchin

M-4

766-5375

24
10
5
4
14
2
2
5
8
3
7
23
6
3
1
4
3
5
0
5
3
11
11
2
8
3
16
1
3
0
2
1
0
1
2
1
0
5
1
0
0
0

60%
25%
12%
9%
35%
5%
5%
12%
19%
8%
16%
58%
16%
7%
3%
10%
7%
12%
1%
14%
8%
26%
28%
6%
19%
8%
40%
3%
8%
1%
6%
3%
1%
1%
5%
3%
0%
12%
2%
0%
0%
0%

Liz Fry

C-3

766-0659

Y
Y
Y
Y
Y
Y
Y

K-4
C-3

SF Office
Tel No

Y John Isaacson
Y Lynn C Flannelly

76
73
61
45
73
22
34
3
73
62
5
73
47
40
43
73
42
73
43
5
50
73
70
49
73
42
62
49
19
28
30
51
51
46
51
30
17
43
37
0
0
0

Desk Loc

Average
Loading %

43

Hours /
week

Voyles Carey
Houchin Janie

No of
Weeks

42

12/18/03
09/30/03
12/18/03
09/30/03
09/30/03
09/30/03
05/27/03
05/16/03
09/30/03
07/16/03
06/16/03
09/30/03
09/15/03
09/30/03
09/30/03
09/30/03
05/07/03
09/30/03
09/30/03
05/30/03
09/30/03
09/30/03
11/18/03
09/30/03
09/30/03
05/06/03
09/30/03
09/30/03
07/31/03
09/30/03
05/07/03
09/30/03
09/30/03
08/26/03
09/30/03
02/28/03
02/28/03
02/28/03
06/25/03

0%

1747
514
193.5
100
547.5
12
75
8
499
117.5
4
1447
144
54
63
144
92.25
227
23.5
6
171.5
675
809
62
444.5
116
325
48
22
23.5
56.5
47.5
10.75
8
78.75
40.5
290
20

2
1
0
0
1
0
0
0
1
0
0
2
0
0
0
0
0
0
0
0
0
1
1
0
1
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

136
225
106.5
63.97
467
28.23
8
56.97
84.98
26
311
156
65.97
158
31.75
145
19
20.47
182
14.98
61.98
141
17.75
671
1.98
35.48
13.5
7.48
16.97
21.23

4.98

Available
Hrs/week

M-4
H-4
K-2
K-4

07/01/02
05/06/02
10/18/02
11/18/02
05/06/02
05/01/03
09/30/02
04/28/03
05/06/02
05/06/02
05/15/03
05/06/02
10/18/02
12/23/02
12/06/02
05/06/02
07/15/02
05/06/02
12/02/02
04/28/03
10/18/02
05/06/02
07/15/02
10/21/02
05/06/02
07/15/02
07/25/02
10/21/02
03/20/03
03/17/03
10/07/02
10/07/02
10/07/02
10/07/02
10/07/02
08/01/02
11/01/02
05/06/02
10/07/02

Remaining
Hrs

739
300
164

Business Analyst
Systems Analyst
Project Coordinator
Test Analyst

3300
Avg. Burn
Rate /Week

1827

N
N
Y

Isaacson John
Flannelly Lynn C
Frey Michael
Leslie Sherrill
Austin Brenda

9267
Todate Total
used Hrs

E
I
E

Finish date

Is a Lead?

735-3244
763-7598
766-9471

Assigned
Hours

735-9066

L-2
M-4
M-4

Elam Carol
Rogers Charlie
Stern David
Mohandass Duzianthan

1 Systems Analyst
1 Proj Planner
1 Systems Analyst
1 Systems Analyst
Carol Elam
1 Proj Manager
1
Charlie Rogers
1 Security Analyst
David Stern
Duzianthan Mohandass 1 Security Analyst

K-4

Ashok Kumar
Bill Malone
Brian Brown

ActiveStatu
s?

Amarnath Bommisetti

Kumar Ashok
Malone Bill
Brown Brian [GS03]

Assigned Role

07/15/02

PAR Information

Bommisetti Amarnath

Name as MS Outlook
Directory

07/25/01

Start date

06/10/03
Personal Details

Internal/External

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41

Name as in PlanView
Report R_DT_CD1

Authorized
(Y/N)

Sr No

Proj. 123448H Team Status as on

0
0
0
0
-1
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
-1
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

04/22/03
04/22/03
04/22/03
04/22/03
04/22/03

97
34
7
3
36
-91
3
-60
33
8
-30
95
5
-396
-460
9
5
15
-172
-45
6
44
43
2
29
6
17
2
-164
-176
2
2
0
0
3
2
0
19
1
0
0
0

-1650
-480
-187
-97
-512
-103
-72
-68
-466
-110
-34
-1352
-139
-450
-523
-135
-87
-212
-195
-51
-165
-631
-766
-60
-415
-110
-308
-46
-186
-199
-54
-46
-10
-8
-76
-38
0
-271
-19
0
0
0

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Amar

Liz

04/22/03
04/22/03
04/22/03
04/22/03
04/22/03

04/22/03
04/22/03
04/22/03

04/22/03
04/22/03
04/22/03
04/22/03
04/22/03
04/22/03
04/22/03
04/22/03

04/22/03
04/22/03
04/22/03
04/22/03
04/22/03
04/22/03
04/22/03
04/22/03
04/22/03

Resource
Name

Additional
PAR Hours

0%

Additional
Use
Forecast

-56
0
0
0
0
0
-10
-4
0
0
0
-58
0
0
-13
0
0
-18
-4
0
-30
-82
-49
-7
-36
0
-6
0
0
-13
0
0
0
0
0
-1
0
-78
0
0
0
0

Actual use
Forecast

1883
739
300
164
1014
40
75
16
556
202
30
1758
300
120
63
302
124
372
24
25
192
857
824
124
586
134
996
50
57
24
70
55
11
25
100
41
0
290
25
0
0
0

Allocation
till date

PV - UR

Used+Rem
Hours

Availablity
Req %
0%
-1%
0%
0%
-2%
0%
0%
0%
0%
0%
0%
-1%
-1%
0%
0%
-1%
0%
-1%
0%
0%
0%
-1%
0%
0%
-1%
0%
-2%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%

10526
Sch v/s PV Allocation variance

Ashok
Bill
Brian
Carol
Charlie
David
Duzianthan
Ed
Eric
Gary
Murthy
John
Kasi
Kim
Lakshmi
Mary
Michelle
Sally
Santosh
Durnan
SteveH
Witter
Sushit
Tina
Ty
Vance
Zafar
Andrew
Brian
Charles
Daniel
Dave
Gilbert
Harry
JohnI
Lynn
Michael
Sherrill
Brenda
Carey
Janie

-477
-87
67
-84
-30
-40
-29
-12
-49
-5
-30
-325
-45
-120
-50
145
96
88
-20
-25
43
-199
-187
-79
-114
58
14
-50
-57
-11
-20
-30
39
0
100
-40
41
-52
0
0
0
0
0

Total Sch
Hrs

-10333

Sch - PV
Hrs

-1067

PAR Extension Forecast

1350

984.4

10/06/03
09/30/03
09/15/03
07/15/03
09/30/03

10/13/03
09/30/03
07/10/03
09/30/03
09/30/03

36.26

09/30/03

05/27/03

506.9
197

09/30/03
06/25/03

09/30/03
06/20/03

1375
254.5

09/30/03
09/15/03
09/30/03
09/30/03
09/30/03
04/30/03
04/28/03
12/31/03

09/30/03
09/15/03
09/30/03
09/30/03
09/30/03
04/30/03
09/30/03
12/31/03

09/30/03
09/30/03
09/26/03
09/30/03
09/30/03
04/30/03
08/19/03
09/30/03

09/30/03
09/30/03
09/26/03
09/30/03
09/30/03
03/13/03
08/19/03
09/30/03

06/12/03
09/30/03
09/30/03
08/26/03
09/30/03
04/22/03
04/22/03
04/04/03
06/25/03

05/05/03
09/30/03
09/30/03
08/26/03
09/30/03
02/28/03
02/28/03
02/28/03
06/25/03

652
366.5
80

447.1
220
441.8
205
575.6
587.6
37.53
435.7
191.6
1004

50
25
50
25
200
41.2
160.3
25

Proj. 1234 Proj. 1234 All Tasks List


Lead

Task
Code
1
2

Carol

as on 06/10/03
Task Name

Auto Necho - Auto Apps Efficiency


Planning/Admin/Meetings/Coordination

MS: Project Activated

Project Admin & Cordination

% Work
Completed

Work in
Hours

Duration
in Days

87%

10,779.01 h

372.87 d
371.87 d

79%

4,287.01 h

100%

0h

0d

82%

3,514 h

342.35 d

Ashok

Project Management Activities

84%

750 h

342 d

Ashok

Project Coordination Activities

80%

964 h

281 d

Ashok

SSS activities

85%

350 h

342 d

Ashok

Team Weekly Meetings

83%

1,000 h

341.99 d

Ashok

Project Schedule / PlanView Maintenance, and Status Reporti

78%

450 h

267 d

100%

358 h

151.74 d

10

Project Charter, Plan & Schedule

Carol

11

Prepare & Review Project Charter

100%

67 h

35 d

Carol

12

MS: Project Charter Reviewed

100%

0h

0d

Carol

13

MS: Project Charter Authorized

100%

0h

0d

Carol

14

Facilitation management Processes

100%

33 h

55 d

Carol

15

Prepare & review Project Plan

100%

38 h

64 d

Carol

16

MS: Project Plan Reviewed

100%

0h

0d

Carol

17

MS: Project Plan Authorized

100%

0h

0d

Ashok

18

Project Schedule Development -1

100%

110 h

60 d

Ashok

19

MS: Performance Measurement Baseline - 1 Established

100%

0h

0d

Ashok

20

Project Schedule Development -2

100%

110 h

43 d

Ashok

21

MS: Performance Measurement Baseline - 2 Established

100%

0h

0d

22

SP/IP

Vance

23

Create Initial SPIP Participant Charts

Carol

24

Authorize final SPIP for transition

Ashok

24a

IIA
25
26

IIA Team (Performance Impact Accessment)


Reqs Analysis and Solution Def/Specs
SRA / SDS

50%

40 h

280 d

100%

20 h

86 d

0%

20 h

10 d

35%

375 h

230 d

35%

375 h

230 d

100%

2,054 h

126 d

100%

1,731 h

119.29 d

ED

27

Determine Business Requirements

100%

10 h

24 d

ED

28

Review Testable Business Requirements

100%

24 h

1d

ED

29

Review Business Requirements

100%

8h

1d

ED

30

MS: Business Req approved

100%

0h

0d

Ashok

32

Technical discussion meetings

100%

480 h

64 d

Amar

33

Create New ECHO Screen Layout

100%

5h

3d

34

Domain Specs

100%

13 h

42 d

Jill

35

DOMAIN - review existing territory validation

100%

3h

24 d

Jill

36

DOMAIN - review existing IRG validation

100%

3h

23 d

Jill

37

DOMAIN - review existing driver's license validation

100%

3h

23 d

Jill

38

Create SRA 4/SDS 3.1 identifying impacted reusable servi

100%

4h

18 d

100%

45 h

19 d

39

AUTO Specs

Eric

40

AUTO - review existing territory validation

100%

15 h

19 d

Eric

41

AUTO - review existing IRG validation

100%

15 h

19 d

Eric

42

AUTO - review existing driver's license validation

100%

15 h

19 d

Ty

43

Determine Validation Components for ECHO & AUI

100%

48 h

18 d

44

ECHO Specs

100%

988 h

105.71 d

Amar

45

Understand existing ECHO APPS System

100%

240 h

50 d

46

Address Standradisation- Auto Main Screen

100%

88 h

60 d

Amar

47

Analysing the requirements(69)

100%

36 h

46 d

Amar

48

Design the Highlevel Specs(70)

100%

44 h

10 d

Amar

49

Review of Highlevel Specs(71)

100%

8h

4d

100%

56 h

20.1 d

25 h

10 d

50

VIN Validation

Amar

51

Analysing the requirements(59)

100%

Amar

52

Design the Highlevel Specs-1(60)

100%

8h

4d

Amar

53

Design the Highlevel Specs-2(61)

100%

15 h

9.1 d

Amar

54

Review of Highlevel Specs(62)

100%

8h

1d

100%

88 h

53.32 d

Amar

55
56

Analysing the requirements(64)

100%

34 h

20 d

Amar

57

Design the Highlevel Specs-1(65)

100%

12 h

11 d

Amar

58

Design the Highlevel Specs-2(66)

100%

34 h

10 d

Amar

59

Review of Highlevel Specs(67)

100%

8h

2d

100%

91 h

47.43 d

60

MQseries/EUI Interface.

Driver's Licence Validation

Amar

61

Analysing the requirements(51)

100%

25 h

38 d

Amar

62

Design the Highlevel Specs(52)

100%

58 h

9d

Amar

63

Review of Highlevel Specs(53)

100%

8h

1d

100%

48 h

29 d

68

Address Standradisation- Residence Address Scrn

Amar

69

Analysing the requirements(73)

100%

20 h

15 d

Amar

70

Design the Highlevel Specs(74)

100%

20 h

10 d

Amar

71

Review of Highlevel Specs(75)

100%

8h

4d

100%

120 h

26 d

72

Teritory Validation

Amar

73

Analysing the requirements(47)

100%

48 h

24 d

Amar

74

Design the Highlevel Specs(48)

100%

64 h

10 d

Amar

75

Review of Highlevel Specs(49)

100%

8h

1d
81.71 d

76

AUI Driver Information Screen

100%

125 h

Amar

77

Design of New screen(77)

100%

20 h

5d

Amar

78

Analysis of Flow of Data(78)

100%

25 h

42 d

Amar

79

Analysis of Validations(79)

100%

32 h

20 d

Amar

80

Design the Highlevel Specs(80)

100%

32 h

8d

Amar

81

Review of Highlevel Specs(81)

100%

16 h

8d

100%

132 h

78.26 d

82

AUI request Screen

Amar

83

Design of New screen(83)

100%

20 h

3d

Amar

84

Analysis of Flow of Data(84)

100%

66 h

32 d

Amar

85

Design the Highlevel Specs-1(85)

100%

8h

24 d

Amar

86

Design the Highlevel Specs-2(86)

100%

28 h

10 d

Amar

87

Review of Highlevel Specs(87)

100%

10 h

1d

Amar

88

100%

0h

0d

100%

75 h

26 d

89

MS: ECHO Specs completed


AUI Specs

Witter

90

AUI - design address Std

100%

25 h

10 d

Witter

91

AUI - design driver's license validation

100%

25 h

16 d

Witter

92

AUI - design VIN validation

100%

25 h

16 d

ED

96

Update Delivery Specs Doc

100%

20 h

1d

ED

97

Review SDS Doc

100%

15 h

1d

Carol

98

MS: SDS Doc Authorized

100%

0h

0d

99

Testing Strategy and Test Plans

100%

111 h

41.87 d

100%

50 h

32 d

SteveH

100

Create Test Strategy (SRA 6.5) for AUI and ECHO enhanceme

SteveH

101

Review Test Strategy (SRA 6.5) for AUI and ECHO enhanceme

100%

11 h

31 d

SteveH

102

Create Defect Tracking Strategy

100%

40 h

10 d

SteveH

103

Review Defect Tracking Strategy

100%

10 h

5d

100%

212 h

99.61 d

108
109

AIP

100%

36 h

9d

Ty

110

Identify Architectural Constraints - AIP 1.1

100%

20 h

5d

Ty

111

Inventory Development Tools Standards and Procedures -

100%

4h

1d

Ty

112

Identify Existing Network Topology - AIP 1.2

100%

4h

1d

Ty

113

Inventory Existing Hardware and System Software - AIP 1.4

100%

4h

1d

Ty

114

Assemble Architecture Assessment - AIP 1.5

100%

4h

1d

115

AIP 1 - Assess Existing Technology Architecture

100%

140 h

81 d

Ty

116

Design Network - AIP 2.1

100%

10 h

10 d

Ty

117

Define Operating Systems - AIP 2.2

100%

10 h

10 d

Ty

118

Define Hardware Configuration - AIP 2.3

100%

20 h

13 d

Ty

119

Define Data Distribution - AIP 2.4

100%

20 h

10 d

Ty

120

Define Middleware Req. - AIP 2.5

100%

20 h

5d

Ty

121

Define Application Service Distribution - AIP 2.6

100%

20 h

10 d

Ty

122

Define Security Infrastructure - AIP 2.7

100%

20 h

41 d

Ty

123

Define System Topology - AIP 2.8

100%

20 h

5d

Ty

124

MS: Technology Architecture Documentation complete

100%

0h

0d

125

AIP 4 - Validate Technology Architecture

100%

36 h

20.83 d

100%

14 h

6d

126

AIP 2 - Design Technology Architecture

Engineer for Performance

Ty

127

Submit initial IIA questionnaire

100%

4h

1d

Ty

128

Infrastructure Impact Assessment - Level 2 review (if n

100%

10 h

5d

100%

22 h

20.83 d

Ty

129
130

Assemble information for SFTA review

100%

10 h

14 d

Ty

131

Submit SFTA Design Review

100%

2h

1d

Ty

132

SFTA Review process

100%

10 h

8d

Ty

133

100%

0h

0d

100%

479 h

84.29 d

201

SFTA Review

MS: Authorized SFTA documentation


Pkg -1 Design/Build/Test/Implement

202

MS: Pkg -1 work started

100%

0h

0d

203

AUI Address Std (TSD/TPD/UPD)

100%

85 h

34 d

Witter

204

AUI Address Std - RSC Entry

100%

2h

5d

Witter

205

AUI Address Std - Analysis & Design

100%

10 h

3d

Witter

206

AUI Address Std - Coding

100%

40 h

9d

Witter

207

AUI Address Std - Unit Test Cases/Testing

100%

20 h

5d

Witter

208

AUI Address Std - Integration Testing

100%

13 h

4d

100%

28 h

9.19 d

Witter

209
210

AUI VIN Validation - Analysis & Design

100%

10 h

2d

Witter

211

AUI VIN Validation - Coding

100%

10 h

7d

Witter

212

AUI VIN Validation - Unit Test cases/Testing

100%

8h

6d

213

AUI VIN Validation (TSD/TPD/UPD)

100%

121 h

59.84 d

Murthy

215

NECHO -DLV - Design Low level Specs (TSD3.2)

100%

20 h

3d

Murthy

216

NECHO -DLV - Design Test Cases (TSD8.3)

100%

40 h

6d

Murthy

217

NECHO - DLV - Coding

100%

30 h

6d

Murthy

218

NECHO -DLV - Unit Testing

100%

29 h

9d

Murthy

214

NECHO DLV - RSC Entry

100%

2h

1d

100%

50 h

29 d

100%

10 h

2d

219
Amar

220

NECHO DLV (TSD/TPD/UPD)

NECHO VIN Validation (TSD/TPD/UPD)


NECHO VIN Validation - Analysis (TSD3.2)

Amar

221

NECHO VIN Validation - Analysis (TSD8.3)

100%

15 h

Amar

222

NECHO VIN Validation - Coding

100%

15 h

2d

Amar

223

NECHO VIN Validation - Unit Testing

100%

10 h

23 d

100%

16 h

18.68 d

224

Pkg-1 Consolidated Tech Doc

2d

Ty

225

Pkg-1 - Review AUI Tech System Design - TSD 9.2

100%

3h

3d

Ty

226

Pkg-1 - Review NECHO Tech System Design - TSD 9.2

100%

10 h

5d

Ty

227

Pkg-1 - Review Consolidated Tech Doc - TPD 7.1

100%

3h

2d

100%

129 h

43.77 d

SteveH

228
229

Establish Test Environment Needs - Pkg-1

100%

10 h

2d

SteveH

230

Establish Test Environment - Pkg-1

100%

20 h

5d

ED

232

Create Acceptance Test Cases - Pkg-1

100%

10 h

2d

ED

233

AUI Acceptance Testing - Pkg-1

100%

29 h

4d

ED

234

NECHO Acceptance Testing - Pkg-1

100%

30 h

21 d

ED

235

MS: Pkg-1 SAT Completed

100%

0h

0d

SteveH

236

Create Acceptance Test Summary Report - Pkg-1

100%

10 h

9d

SteveH

237

Review / Authorize Acceptance Test Summary Report - Pkg-1

100%

20 h

5d

100%

25 h

56.19 d

238

Pkg -1 Systems Acceptance Test (SAT)

Pkg -1 Communication

ED

239

Pkg-1 Draft Communication

100%

10 h

2d

ED

240

Pkg-1 Communication Review by Proj Team

100%

5h

14 d

ED

241

Pkg-1 UPD Walkthrough with SPIP group

100%

5h

8d

Lynn

242

MS: Pkg-1 Create Agency pilot communications

100%

0h

0d

Lynn

243

MS: Pkg-1 Publish Agency pilot communications

100%

0h

0d

Lynn

244

MS: Pkg-1 Create Agency cowide communications

100%

0h

0d

Lynn

245

MS: Pkg-1 Publish Agency cowide communications

100%

0h

0d

ED

246

Pkg-1 Publish Communication

100%

5h

5d

100%

25 h

30.97 d

250

Pkg -1 Implementation

Amar

251

Necho Pkg-1 Prep for pilot issuance

100%

10 h

2d

Amar

252

MS: Pkg-1 Pilot Necho

100%

0h

0d

Amar

255

MS: NECHO Pkg-1 cowide Issuance

100%

0h

0d

ED

256

Pkg 1-Post implementation questions

100%

15 h

11 d

ED

257

MS: Pkg-1 Implemented

100%

0h

0d

301

Pkg -2 Design/Build/Test/Implement

201.81 d

92%

1,273 h

302

MS: Pkg -2 work started

100%

0h

0d

303

Security Support - David

100%

35 h

51.77 d

David

305

SDS 5.2 Specify Security and Control Requirements

100%

15 h

36 d

David

306

Build Test Ids/Rules

100%

10 h

26 d

David

604a

Create production ids/rules

100%

10 h

20 d
111.58 d

100%

90 h

SteveH

307
308

Establish Test Environment needs

100%

10 h

3d

SteveH

309

Set-up AUI Integration/System Test Environment

100%

20 h

18 d

SteveH

310

Set-up NECHO Integration/System Test Environment

100%

20 h

18 d

SteveH

311

Determine FIT Test Environment Needs

100%

20 h

9d

SteveH

312

Set-up FIT Test Environment

100%

20 h

91.87 d

91%

1,148 h

195.81 d

313
314

Test Environment Setup

AUI - DLV

100%

129 h

52.71 d

John

315

DLV - Mid Tier(TSD/TPD/UPD)


DLV - Mid Tier - RSC Entry

100%

4h

36 d

John

316

DLV - Mid Tier - Logical Design Interface

100%

24 h

5d

John

317

DLV - Mid Tier - Logical Design Interface Walkthrough

100%

9h

4d

John

318

DLV - Mid Tier - Coding

100%

60 h

18 d

John

319

DLV - Mid Tier - Code Walk Through

100%

6h

14 d

John

320

DLV - Mid Tier - Unit Test Review

100%

20 h

16 d

John

321

DLV - Mid Tier - Unit Testing

100%

6h

16 d

316 h

68 d

322

DLV - Host - (TSD/TPD/UPD)

100%

Bill

323

DLV - Host RSC Entry

100%

4h

11 d

Bill

324

DLV - Host - Develop Design Specs

100%

30 h

25 d

Bill

325

DLV - Host - Physical Design Interface

100%

20 h

4d

Bill

326

DLV - Host - Physical Design Interface Walkthrough

100%

6h

2d

Bill

327

DLV - Host - Design Specs Walkthrough

100%

6h

1d

Bill

328

DLV - Host - Code/Gen IMS transaction

100%

50 h

6d

Bill

329

DLV - Host - Code Wrapper

100%

50 h

6d

Bill

330

DLV - Host - Code Walkthrough

100%

6h

3d

Bill

331

DLV - Host - Unit test IMS transaction

100%

50 h

16 d

Bill

332

DLV - Host - Unit test Wrapper

100%

50 h

16 d

Bill

333

DLV - Host - Review Test Results

100%

6h

3d

Bill

334

DLV - Host - Security Analyst Setup

100%

10 h

5d

Bill

335

DLV - Host - AUI/DLV Security -NT

100%

20 h

11 d

Bill

336

DLV - Host - Mid Tier /Host Integration Test Reveiew

100%

8h

2d

100%

152 h

53.06 d

337

AUI - DLV (TSD/TPD/UPD)

Witter

339

AUI - DLV - Analysis & Design

100%

20 h

5d

Witter

340

AUI - DLV - Coding

100%

80 h

20 d

Witter

341

AUI - DLV - Unit Testing

100%

50 h

20 d

Witter

338

AUI - DLV - RSC Entry

100%

2h

5d

100%

115 h

94.35 d

342

AUI -Chgs for NECHO (TSD/TPD/UPD)

Witter

343

AUI -Chgs for NECHO - Analysis & design

100%

10 h

4d

Witter

344

AUI -Chgs for NECHO - Coding

100%

20 h

16 d

Witter

345

AUI -Chgs for NECHO - Unit Testing

100%

10 h

6d

Witter

345a

MVR Message Chnages - Coding/UT

100%

75 h

14 d

100%

230 h

66.84 d

346

AUI -DLV Int Testing

SteveH

347

AUI - Create AUI System Test Plan

100%

20 h

10 d

SteveH

348

AUI-DLV Mid Tier / Host Int Test

100%

60 h

14 d

SteveH

349

AUI-DLV Web / Mid Tier / Host System Testing (Initial)

100%

80 h

15 d

ED

350

AUI-DLV Acceptance Test Cases developed

100%

20 h

4d

Witter

350a

AUI-DLV Web / Mid Tier / Host System Testing (Additional)

100%

20 h

5d

ED

351

AUI-DLV Acceptance Testing

100%

30 h

28.19 d

Performance Testing Pkg-2

69%

90 h

74.45 d

100%

20 h

28 d

SteveH

351a

Setup Perf. Testing Pkg-2

SteveH

351b

Execute Perf. Testing Pkg-2

75%

50 h

45 d

SteveH

351c

Implementation testing execution pkg-2

25%

20 h

31 d

100%

6h

8d

AUI - DLV - Review Technical System Design - TSD 9.2

100%

3h

8d

Pkg-2 - Review AUI Technical System Design - TSD 9.2

100%

3h

8d

67%

45 h

97.32 d

352
Ty

353

Ty

354
355

Pkg-2 Consolidated Tech Doc

Pkg -2 Communication

ED

356

Pkg-2 Draft Communication

100%

10 h

1d

ED

357

Pkg-2 Communication Review by Proj Team

100%

5h

5d

ED

358

Pkg-2 UPD Walkthrough with SPIP group

100%

5h

4d

Lynn

359

MS: Pkg-2 Create Agency cowide communications

0%

0h

0d

Lynn

360

MS: Pkg-2 Publish Agency cowide communications

0%

0h

0d

ED

361

Pkg-2 Publish Communication

0%

5h

1d

Vance

362

Create Pkg-2 SFQ Solutions

100%

10 h

37 d

Vance

363

MS: ISC Review Pkg-2 SFQ Solutions

0%

0h

0d

Vance

364

Populate pkg-2 SFQ Solutions

0%

10 h

5d

0%

65 h

35 d

365

Pkg -2 Implementation

John

366

Mid Tier-Host Prep cowide issuance

0%

20 h

10 d

John

367

MS: Mid Tier-Host cowide issuance

0%

0h

0d

Witter

368

AUI Pkg-2 Prep for cowide issaunce

0%

20 h

5d

Witter

369

MS: AUI Pkg-2 cowide Issuance

0%

0h

0d

ED

370

Pkg 2-Post implemetation questions

0%

25 h

20 d

ED

371

MS: Pkg-2 Completed

0%

0h

0d
238.84 d

401

Pkg -3 Design/Build/Test/Implement

402

MS: Pkg -3 work started

403

NECHO - all Remaining Changes (TSD/TPD/UPD)

404

Security Support - Sushit

89%

2,610 h

100%

0h

0d

99%

2,164 h

167.16 d

100%

31 h

69.19 d

Sushit

405

SRA 4.2 Establish Security and Control, Requirements

100%

6h

23 d

Sushit

406

SDS 5.2 Specify Security and Control Requirements

100%

15 h

26 d

Sushit

407

Build Test Ids/Rules

100%

10 h

31 d

408
409

MQSeries
TSD 3.2 phase doc

97%

145 h

166.68 d

100%

55 h

20 d

Durnan

410

MQ Q/A High Level Review (reqd objects idd)

100%

20 h

17 d

Durnan

411

MQ design Infra Diagram (message flow)

100%

30 h

14 d

Durnan

412

MQ Q/A Detail Level Review (design Walkthrough)

100%

5h

5d

100%

30 h

17 d

413

TSD 8.3 phase doc

Durnan

414

MQ Objects on Dev Host (coding)

100%

10 h

7d

Durnan

415

MQ Create Host Test Cases

100%

10 h

5d

Durnan

416

MQ Execute & Doc Host Test Cases

100%

10 h

5d

92%

60 h

81.68 d
35 d

417

MQ Regional Office MVS Dev Environment

Durnan

418

MQ Support NECHO Unit Testing

100%

20 h

Durnan

420

MQ Q/A App Code walkthrough

100%

20 h

9d

Durnan

419

MQ Integration Testing

75%

20 h

49 d

100%

60 h

134.13 d

421

Host Addr Std/Terr

Brian

422

Host Addr Std/ terr-analysis

100%

20 h

30 d

Brian

423

Host Addr Std/ terr-Coding

100%

40 h

104.13 d

98%

726 h

154.77 d

424

NECHO - all Remaining Changes -(TSD)

Amar

425

Necho RSC Entry for Terr valid & Address Std

25%

2h

146 d

Murthy

426

AUI Request Vehicle Information Screen - TSD 3.2

100%

50 h

12 d

Murthy

427

MQ - Interface module - TSD 3.2

100%

30 h

15 d

Murthy

428

Incoming Interface - TSD 3.2

100%

20 h

15 d

Murthy

429

Outgoing Interface - TSD 3.2

100%

20 h

16 d

Murthy

430

Build Auto App Program - TSD 3.2

100%

20 h

15 d

Murthy

431

Warning Screen - TSD 3.2

100%

20 h

15 d

Amar

432

Auto Apps - Main Program - TSD 3.2

100%

40 h

17 d

Amar

433

Residence Address screen - TSD 3.2

100%

20 h

27 d

Amar

434

AUI Request Driver Information Screen - TSD 3.2

100%

50 h

20 d

Amar

435

Territory Validation (Options screen) - TSD 3.2

100%

30 h

19 d

Amar

436

Pf Key format /Branching Program (PCS5F) - TSD 3.2

100%

20 h

20 d

Amar

437

NECHO - all Remaining Changes - Review TSD 3.2 Docs

100%

12 h

18 d

Murthy

438

AUI Request Vehicle Information Screen - TSD 8.3

100%

60 h

18 d

Murthy

439

MQ - Interface module - TSD 8.3

100%

30 h

24 d

Murthy

440

Incoming Interface - TSD 8.3

100%

20 h

24 d

Murthy

441

Outgoing Interface - TSD 8.3

100%

20 h

21 d

Murthy

442

Build Auto App Program - TSD 8.3

100%

20 h

11 d

Murthy

443

Warning Screen - TSD 8.3

100%

20 h

15 d

Amar

444

Territory Validation (Options screen) - TSD 8.3

100%

30 h

20 d

Amar

445

Pf Key format /Branching Program (PCS5F) - TSD 8.3

100%

20 h

20 d

Amar

446

Auto Apps - Main Program - TSD 8.3

100%

40 h

20 d

Amar

447

Residence Address screen - TSD 8.3

100%

30 h

20 d

Amar

448

AUI Request Driver Information Screen - TSD 8.3

100%

60 h

24 d

Amar

449

NECHO - all Remaining Changes - Review TSD 8.3 Docs

100%

8h

4d

Amar

449a

Driver Info warning Screen - Analysis TSD 3.2, TSD 8.3

100%

24 h

3d

Durnan

450

MQ Q/A Transition to MQService Agreement

0%

10 h

5d

100%

120 h

63 d

100%

120 h

61 d

451
SteveH

452
453

Pkg-3 NECHO Integration Testing


Perform Integration Testing for NECHO Changes - pkg-2

100%

1,082 h

51.32 d

Murthy

454

AUI Request Vehicle Information Screen - Coding

100%

80 h

10 d

Murthy

455

AUI Request Vehicle Information Screen - UT/IT

100%

80 h

10 d

Murthy

456

MQ - Interface module - Coding

100%

50 h

38 d

Murthy

457

MQ - Interface module - UT/IT

100%

40 h

38 d

Murthy

458

Incoming Interface - Coding

100%

30 h

4d

Murthy

459

Incoming Interface - UT/IT

100%

30 h

4d

Murthy

460

Build Auto App Program - Coding

100%

40 h

19 d

Murthy

461

Build Auto App Program - UT/IT

100%

40 h

19 d

Murthy

462

Warning Screen - Coding

100%

30 h

13 d

Murthy

463

Warning Screen - UT/IT

100%

30 h

13 d

Murthy

464

Outgoing Interface - Coding

100%

30 h

5d

Murthy

465

Outgoing Interface - UT/IT

100%

30 h

5d

Amar

466

Auto Apps - Main Program - Coding

100%

60 h

8d

Amar

467

Auto Apps - Main Program - UT/IT

100%

60 h

8d

Amar

468

Residence Address screen - Coding

100%

40 h

10 d

Amar

469

Residence Address screen - UT/IT

100%

40 h

10 d

Amar

470

AUI Request Driver Information Screen - Coding

100%

80 h

15 d

Amar

471

AUI Request Driver Information Screen - UT/IT

100%

80 h

23 d

Amar

472

Territory Validation (Options screen) - Coding

100%

60 h

8d

Amar

473

Territory Validation (Options screen) - UT/IT

100%

60 h

15 d

Amar

474

Pf Key format /Branching Program (PCS5F) - Coding

100%

20 h

11 d

Amar

475

Pf Key format /Branching Program (PCS5F) - UT/IT

100%

40 h

4d

Amar

471a

Driver Info warning Screen -Coding, UT/IT

100%

32 h

6d

Amar

476

MS: NECHO - all Remaining Changes -Coding/UT/IT co

100%

0h

0d

100%

6h

40.69 d

Pkg-3 - Review NECHO Technical System Design TSD 9.2

100%

3h

39 d

Pkg-3 - Review Consolidated Technical Documentation TPD 7

100%

3h

29 d

49%

330 h

151.68 d
10 d

477
Ty

478

Ty

479
480

NECHO - all Remaining Changes -(TPD)

Pkg-3 Consolidated Tech Doc

Pkg-3 Systems Acceptance Test (SAT)

SteveH

481

SAT - Create System/Acceptance Test Plan

100%

20 h

SteveH

482

SAT - Create System/Acceptance Test Cases

100%

40 h

31 d

ED

483

SAT -Perform System/Acceptance Testing pkg-3

100%

50 h

36.68 d

SteveH

484

SAT - Create System/Acceptance Test Summary Report

0%

10 h

2d

SteveH

485

SAT - Authorize System/Acceptance Test Summary Report

0%

10 h

5d

46%

70 h

30.48 d

Pkg-3 Perf Testing

SteveH

491a

Setup Performance Test Environment -pkg3

SteveH

491b

Execute Performance Testing - pk3

486

Pkg-3 FIT Test (SAT)

100%

20 h

25%

50 h

15.48 d
15 d

15%

130 h

151.68 d

100%

20 h

34 d

SteveH

487

SAT - Create NECHO System/Acceptance Test Plan

ED

488

SAT - Create FIT Test Cases

0%

40 h

10 d

ED

489

SAT - Perform FIT Testing - Pkg-3

0%

50 h

18 d

SteveH

490

SAT - Create FIT Test Summary Report

0%

10 h

10 d

SteveH

491
492

SAT - Authorize FIT Test Summary Report


Pkg-3 Communication

0%

10 h

5d

11%

45 h

72.42 d

50%

10 h

46 d

ED

493

Pkg-3 Draft Communication

ED

494

Pkg-3 Communication Review by Proj Team

0%

5h

5d

ED

495

Pkg-3 UPD Walkthrough with SPIP group

0%

5h

5d

Lynn

496

MS: Pkg-3 Create Agency pilot communications

0%

0h

0d

Lynn

497

MS: Pkg-3 Publish Agency pilot communications

0%

0h

0d

Lynn

498

MS: Pkg-3 Create Agency cowide communications

0%

0h

0d

Lynn

499

MS: Pkg-3 Publish Agency cowide communications

0%

0h

0d

ED

500

Pkg-3 Publish Communication

0%

5h

5d

Vance

501

Create Pkg-3 SFQ Solutions

0%

10 h

10 d

Vance

502

MS: ISC Review Pkg-3 SFQ Solutions

0%

0h

0d

Vance

503

Populate pkg-3 SFQ Solutions

0%

10 h

5d

0%

65 h

53 d

Amar

504
505

Necho Pkg-3 Prep for pilot issuance

0%

10 h

8d

Amar

506

MS: Pkg-3 Pilot Necho

0%

0h

0d

Amar

507

MS: NECHO Pkg-3 cowide Issuance

0%

0h

0d

Durnan

508

MQ Pilot/Issuance

0%

20 h

10 d

ED

509

Pkg-3-Post implemetation questions

0%

35 h

20 d

ED

510

MS: Pkg-3 Completed

0%

0h

0d

601

Pkg-3 Implementation

0%

76 h

25 d

Ty

602

Transition
Update design documents (AIP 2.6) to reflect implemented syste

0%

2h

1d

Ty

603

Transition design documents to local architect

0%

4h

2d

Carol

604

MS: Lessons Learned doc

0%

0h

0d

Vance

605

Transition to Service

0%

30 h

20 d

Carol

606

Project Closure Tasks

0%

40 h

5d

Carol

607

MS: Project Completed

0%

0h

0d

32
Planned
Start Date

6/27/00
Planned Duration Successors
Finish date Completed

BaseLine Earned
Work Value

Summary
Yes/No

Indent Level

Predecessor

05/06/02

09/26/03

82%

10,709.01 h

8921.48 Yes

05/06/02

09/25/03

74%

4,287 h

3080.48 Yes

1.1

05/06/02

05/06/02

05/06/02

08/15/03

80%

3,514 h

05/06/02

08/15/03

81%

699 h

587.16 No

1.1.2.1

07/26/02

08/15/03

77%

964 h

771.2 No

1.1.2.2

05/06/02

08/15/03

81%

349 h

296.65 No

1.1.2.3

05/06/02

08/15/03

81%

712 h

590.96 No

1.1.2.4

08/15/02

08/15/03

76%

417 h

325.26 No

1.1.2.5

05/21/02

12/16/02

100%

358 h

358 Yes

05/21/02

07/05/02

100% 12,14,15,29FS-2

67 h

67 No

1.1.3.1

07/05/02

07/05/02

100% 13

0h

0 No

1.1.3.2

11

08/30/02

08/30/02

100% 23

0h

0 No

1.1.3.3

12

07/05/02

09/19/02

100%

33 h

33 No

1.1.3.4

11

07/05/02

10/01/02

100% 16,18FF

38 h

38 No

1.1.3.5

11

10/01/02

10/01/02

100% 17FS+3 d

0h

0 No

1.1.3.6

15

10/04/02

10/04/02

100%

0h

0 No

1.1.3.7

16FS+3 d

05/28/02

08/16/02

100% 19

110 h

110 No

1.1.3.8

15FF

08/16/02

08/16/02

100%

09/18/02

11/15/02

100% 21

12/16/02

12/16/02

09/06/02
09/06/02

0% 11

0h

0 No
2571.23 Yes

1.1.1
1.1.2

1.1.3

0h

0 No

1.1.3.9

18

110 h

110 No

1.1.3.10

92FS-40 d

100%

0h

0 No

1.1.3.11

20

09/25/03

90%

40 h

20 Yes

1.1.4

01/06/03

100%

20 h

20 No

1.1.4.1

13

09/11/03

09/25/03

0%

20 h

0 No

1.1.4.2

373FS-11 d

10/07/02

08/18/03

1%

0h

10/07/02

08/18/03

1%

375 h

06/13/02

12/04/02

100%

2,271 h

2054 Yes

1.2

06/13/02

11/22/02

100%

1,848 h

1731 Yes

1.2.1

06/13/02

07/16/02

100% 30FS+6 d,80,46S

10 h

10 No

1.2.1.1

11FS-2 d

07/24/02

07/25/02

100% 94,32FS+5 d,31

24 h

24 No

1.2.1.2

29FS+6 d

07/26/02

07/29/02

100% 34,41FS+1 d

8h

8 No

1.2.1.3

30FS+1 d

08/01/02

08/01/02

100% 33FS+2 d

0h

0 No

1.2.1.4

30FS+5 d

08/05/02

11/08/02

100%

480 h

480 No

1.2.1.5

91FF,32FS+2 d

07/29/02

08/01/02

100%

5h

5 No

1.2.1.6

31

07/30/02

09/25/02

100%

13 h

13 Yes

1.2.1.7

07/30/02

08/30/02

100%

3h

3 No

1.2.1.7.1

07/31/02

08/30/02

100%

3h

3 No

1.2.1.7.2

07/31/02

08/30/02

100% 44

3h

3 No

1.2.1.7.3

08/30/02

09/25/02

100% 90

4h

4 No

1.2.1.7.4

07/30/02

08/23/02

100%

45 h

45 Yes

1.2.1.8

07/30/02

08/23/02

100% 42FF,44,43FF

15 h

15 No

1.2.1.8.1

31FS+1 d

07/30/02

08/23/02

100%

15 h

15 No

1.2.1.8.2

41FF

07/30/02

08/23/02

100% 90

15 h

15 No

1.2.1.8.3

41FF

08/30/02

09/25/02

100% 39SS,87SS+10 d

48 h

48 No

1.2.1.9

41,38

06/13/02

11/04/02

100%

988 Yes

1.2.1.10

1,076 h

131.25 Yes

1.1.5

131.25 No

1.1.5.1

44SS

06/13/02

08/20/02

100%

240 h

07/29/02

10/18/02

100%

88 h

240 No
88 Yes

1.2.1.10.1
1.2.1.10.2

29SS

07/29/02

09/30/02

100% 49

36 h

36 No

1.2.1.10.2.1

09/30/02

10/14/02

100% 50

44 h

44 No

1.2.1.10.2.2

48

10/14/02

10/18/02

100% 77

8h

8 No

1.2.1.10.2.3

49

09/03/02

09/30/02

100%

56 h

56 Yes

1.2.1.10.3

09/03/02

09/16/02

100% 53,54

25 h

25 No

1.2.1.10.3.1

29

09/16/02

09/20/02

100%

8h

8 No

1.2.1.10.3.2

52

09/16/02

09/27/02

100% 55

15 h

15 No

1.2.1.10.3.3

52

09/27/02

09/30/02

100% 83

8h

8 No

1.2.1.10.3.4

54

08/05/02

10/15/02

100%

88 h

88 Yes

1.2.1.10.4

08/05/02

09/13/02

100% 58

34 h

34 No

1.2.1.10.4.1

29

08/13/02

09/27/02

100% 59

12 h

12 No

1.2.1.10.4.2

57

09/27/02

10/11/02

100% 60

34 h

34 No

1.2.1.10.4.3

58

1.2.1.10.4.4

59

10/11/02

10/15/02

100% 83

8h

8 No

08/02/02

10/07/02

100%

91 h

91 Yes

1.2.1.10.5

08/02/02

09/24/02

100% 63

25 h

25 No

1.2.1.10.5.1

29

09/20/02

10/04/02

100% 64

58 h

58 No

1.2.1.10.5.2

62

10/04/02

10/07/02

100% 77

8h

8 No

1.2.1.10.5.3

63

09/16/02

10/24/02

100%

48 h

48 Yes

1.2.1.10.6

09/16/02

10/04/02

100% 67

20 h

20 No

1.2.1.10.6.1

10/04/02

10/18/02

100% 68

20 h

20 No

1.2.1.10.6.2

66

10/18/02

10/24/02

100% 77

8h

8 No

1.2.1.10.6.3

67

09/10/02

10/15/02

100%

120 h

120 Yes

09/10/02

10/11/02

100%

48 h

48 No

1.2.1.10.7.1

09/30/02

10/14/02

100% 72

64 h

64 No

1.2.1.10.7.2

10/14/02

10/15/02

100% 77

8h

8 No

1.2.1.10.7.3

07/16/02

11/04/02

100%

125 h

125 Yes

07/16/02

07/23/02

100% 75

20 h

20 No

1.2.1.10.8.1

29

07/23/02

09/18/02

100% 76

25 h

25 No

1.2.1.10.8.2

74

08/06/02

10/07/02

100% 77

32 h

32 No

1.2.1.10.8.3

75

10/24/02

11/04/02

100% 78SS

32 h

32 No

1.2.1.10.8.4

76,64,68,50,72

10/24/02

11/04/02

100% 85

16 h

16 No

1.2.1.10.8.5

77SS

07/16/02

10/30/02

100%

132 h

132 Yes

07/16/02

07/19/02

100% 81

20 h

20 No

1.2.1.10.9.1

29

07/19/02

09/16/02

100% 82FF+2 d

66 h

66 No

1.2.1.10.9.2

80

08/02/02

09/18/02

100% 83

8h

8 No

1.2.1.10.9.3

81FF+2 d

10/15/02

10/29/02

100% 84

28 h

28 No

1.2.1.10.9.4

82,55,60

10/29/02

10/30/02

100% 85

10 h

10 No

1.2.1.10.9.5

83

11/04/02

11/04/02

100% 90

0h

0 No

1.2.1.10.10

78,84

09/13/02

10/18/02

100%

75 h

75 Yes

1.2.1.11

09/13/02

09/26/02

100% 88,89

25 h

25 No

1.2.1.11.1

44SS+10 d

09/27/02

10/18/02

100%

25 h

25 No

1.2.1.11.2

87

09/27/02

10/18/02

100%

25 h

25 No

1.2.1.11.3

87

11/04/02

11/05/02

100% 91

20 h

20 No

1.2.1.12

43,39,85

11/05/02

11/06/02

100% 33FF,92

15 h

15 No

1.2.1.13

90

11/22/02

11/22/02

100% 20FS-40 d

0h

0 No

1.2.1.14

91

07/25/02

09/20/02

100%

211 h

111 Yes

07/25/02

09/06/02

100%

50 h

50 No

1.2.1.10.7
29
71

1.2.1.10.8

1.2.1.10.9

1.2.2
1.2.2.1

30

08/09/02

09/20/02

100%

11 h

11 No

1.2.2.2

08/26/02

09/06/02

100% 97

40 h

40 No

1.2.2.3

09/06/02

09/13/02

100%

10 h

10 No

1.2.2.4

07/19/02

12/04/02

100%

212 h

212 Yes

07/19/02

07/31/02

100%

36 h

36 Yes

1.2.3.1

07/19/02

07/25/02

100% 101

20 h

20 No

1.2.3.1.1

07/25/02

07/26/02

100% 102

4h

4 No

1.2.3.1.2

100

07/26/02

07/29/02

100% 103

4h

4 No

1.2.3.1.3

101

07/29/02

07/30/02

100% 104

4h

4 No

1.2.3.1.4

102

07/30/02

07/31/02

100%

4h

4 No

1.2.3.1.5

103

08/14/02

12/04/02

100%

140 h

140 Yes

08/14/02

09/16/02

100% 107SS+9 d,108F

10 h

10 No

1.2.3.2.1

44SS+5 d

08/26/02

09/09/02

100%

10 h

10 No

1.2.3.2.2

106SS+9 d

09/09/02

09/25/02

100%

20 h

20 No

1.2.3.2.3

106FS-5 d

09/09/02

09/25/02

100% 111FS-4 d,110FF

20 h

20 No

1.2.3.2.4

44FF

09/19/02

09/25/02

100% 121SS+5 d

20 h

20 No

1.2.3.2.5

109FF

09/19/02

10/02/02

100% 112

20 h

20 No

1.2.3.2.6

109FS-4 d

10/02/02

11/29/02

100% 113

20 h

20 No

1.2.3.2.7

111

11/08/02

12/04/02

100% 114

20 h

20 No

1.2.3.2.8

112

12/04/02

12/04/02

100%

0h

0 No

1.2.3.3

113

09/10/02

10/08/02

100%

36 h

36 Yes

1.2.3.4

09/10/02

09/18/02

100%

14 h

14 Yes

1.2.3.4.1

09/10/02

09/11/02

100% 118

4h

4 No

1.2.3.4.1.1

106SS+20 d

09/11/02

09/18/02

100%

10 h

10 No

1.2.3.4.1.2

117

09/10/02

10/08/02

100%

22 h

22 Yes

1.2.3.4.2

09/10/02

09/27/02

100%

10 h

10 No

1.2.3.4.2.1

106SS+20 d

09/25/02

09/26/02

100% 122

2h

2 No

1.2.3.4.2.2

110SS+5 d

09/26/02

10/08/02

100% 123

10 h

10 No

1.2.3.4.2.3

121

10/08/02

10/08/02

100%

0h

0 No

1.2.3.4.3

122

10/21/02

02/14/03

100%

554 h

10/21/02

10/21/02

100% 128,137,161

10/21/02

12/06/02

11/22/02

12/03/02

10/21/02

10/23/02

10/23/02
11/22/02
12/03/02

489 Yes

96

1.2.3

1.2.3.2

1.3

0h

0 No

1.3.1

100%

85 h

85 Yes

1.3.2

100%

2h

2 No

1.3.2.1

130FF

100% 129,154

10 h

10 No

1.3.2.2

125

11/05/02

100% 130FS+13 d,148

40 h

40 No

1.3.2.3

128

12/03/02

100% 131,127FF

20 h

20 No

1.3.2.4

129FS+13 d

12/06/02

100% 133FS-2 d,155

13 h

13 No

1.3.2.5

130

12/05/02

12/17/02

100%

28 h

28 Yes

1.3.3

12/05/02

12/06/02

100% 134,154,135SS

10 h

10 No

1.3.3.1

131FS-2 d

12/06/02

12/17/02

100% 148

10 h

10 No

1.3.3.2

133

12/10/02

12/17/02

100% 155

8h

8 No

1.3.3.3

133SS

11/04/02

01/27/03

100%

121 h

121 Yes

11/04/02

11/06/02

100% 143SS,138,154

20 h

20 No

1.3.4.1

125

11/06/02

11/14/02

100% 139

40 h

40 No

1.3.4.2

137

11/14/02

11/22/02

100% 140SS+1 d,149

30 h

30 No

1.3.4.3

138

11/15/02

12/02/02

100% 156FS-5 d,277S

29 h

29 No

1.3.4.4

139SS+1 d

01/27/03

01/27/03

100%

2h

2 No

1.3.4.5

140

11/04/02

12/16/02

100%

50 h

50 Yes

1.3.5

11/04/02

11/05/02

100% 144

10 h

10 No

1.3.5.1

1.3.4

137SS

11/05/02

11/07/02

100% 145,154

15 h

15 No

1.3.5.2

143

11/07/02

11/11/02

100% 146,149

15 h

15 No

1.3.5.3

144

11/11/02

12/16/02

100% 156FS-5 d

10 h

10 No

1.3.5.4

145

11/22/02

12/20/02

100%

16 h

16 Yes

1.3.6

12/17/02

12/20/02

100% 150FF

3h

3 No

1.3.6.1

129,134

11/22/02

12/03/02

100%

10 h

10 No

1.3.6.2

139,145

12/18/02

12/20/02

100%

3h

3 No

1.3.6.3

148FF

11/11/02

01/13/03

100%

174 h

129 Yes

11/13/02

11/15/02

100%

10 h

10 No

1.3.7.1

11/11/02

11/15/02

100%

20 h

20 No

1.3.7.2

12/06/02

12/10/02

100%

10 h

10 No

1.3.7.3

128,133,137,144

12/17/02

12/23/02

100% 158,157

29 h

29 No

1.3.7.4

131,135

12/09/02

01/07/03

100% 170FS+7 d,158F

30 h

30 No

1.3.7.5

146FS-5 d,140FS

01/08/03

01/08/03

100%

0h

0 No

1.3.7.6

155,156

12/23/02

01/06/03

100% 159

10 h

10 No

1.3.7.7

155,156FS-1 d

01/06/03

01/13/03

100%

20 h

20 No

1.3.7.8

158

10/25/02

01/14/03

100%

25 h

25 Yes

1.3.8

10/25/02

10/28/02

100% 162

10 h

10 No

1.3.8.1

125

10/29/02

11/15/02

100% 163

5h

5 No

1.3.8.2

161

11/18/02

11/29/02

100%

5h

5 No

1.3.8.3

162

12/30/02

12/30/02

100%

0h

0 No

1.3.8.4

165FF-5 d

01/06/03

01/06/03

100% 164FF-5 d

0h

0 No

1.3.8.5

171FF-10 d

01/07/03

01/07/03

100%

0h

0 No

1.3.8.6

167FF-5 d

01/14/03

01/14/03

100% 166FF-5 d

0h

0 No

1.3.8.7

172FF-10 d

12/27/02

01/02/03

100%

5h

5 No

1.3.8.8

01/03/03

02/14/03

100%

55 h

35 Yes

1.3.9

01/03/03

01/07/03

100% 171

10 h

10 No

1.3.9.1

156FS+7 d

01/07/03

01/07/03

100% 165FF-10 d,172

0h

0 No

1.3.9.2

170

01/28/03

01/28/03

100% 173,167FF-10 d

0h

0 No

1.3.9.3

171FS+15 d

01/31/03

02/14/03

100% 174

25 h

25 No

1.3.9.4

172

02/14/03

02/14/03

100%

0h

0 No

1.3.9.5

173

10/28/02

07/31/03

88%

1,273 h

10/28/02

10/28/02

100% 212,190FS+6 d,

12/19/02

02/28/03

01/13/03
12/19/02

1065.5 Yes

1.3.7

1.4

0h

0 No

1.4.1

100%

25 h

35 Yes

1.4.2

02/28/03

100%

15 h

15 No

1.4.2.1

01/24/03

100%

10 h

10 No

1.4.2.2

01/06/03

01/31/03

100%

10 h

10 No

1.4.2.3

12/23/02

05/24/03

100%

90 h

90 Yes

1.4.3

12/23/02

12/27/02

100% 183SS,184SS,18

10 h

10 No

1.4.3.1

191,198,212,288F

12/23/02

01/17/03

100% 223

20 h

20 No

1.4.3.2

182SS

12/23/02

01/17/03

100% 304

20 h

20 No

1.4.3.3

182SS

12/23/02

01/06/03

100% 343

20 h

20 No

1.4.3.4

182SS

01/21/03

05/24/03

100% 345

20 h

20 No

1.4.3.5

182

11/04/02

07/31/03

83%

1,148 h

940.5 Yes

11/04/02

01/17/03

100%

129 h

129 Yes

11/28/02

01/17/03

100%

4h

4 No

1.4.4.1.1

192SS

11/04/02

11/18/02

100% 191,199,222

24 h

24 No

1.4.4.1.2

176FS+6 d

11/19/02

11/22/02

100% 192,182

9h

9 No

1.4.4.1.3

190

11/22/02

12/20/02

100% 189SS,193FF,19

60 h

60 No

1.4.4.1.4

191

1.4.4
1.4.4.1

11/28/02

12/20/02

100% 225,233

11/28/02

12/20/02

100%

6h

6 No

1.4.4.1.5

192FF

20 h

20 No

1.4.4.1.6

11/28/02

12/20/02

100% 223

192FF

6h

6 No

1.4.4.1.7

11/04/02

02/07/03

100%

192FF

01/06/03

01/20/03

100%

4h

4 No

1.4.4.2.1

202

11/04/02

12/11/02

100% 201,182

30 h

30 No

1.4.4.2.2

200FF+2 d

11/18/02

11/22/02

100% 200

20 h

20 No

1.4.4.2.3

190

316 h

316 Yes

1.4.4.2

11/26/02

11/29/02

100% 198FF+2 d

6h

6 No

1.4.4.2.4

199

12/12/02

12/12/02

100% 202,222

6h

6 No

1.4.4.2.5

198

12/12/02

12/20/02

100% 203SS,204FF,19

50 h

50 No

1.4.4.2.6

201

12/12/02

12/20/02

100% 204FF

50 h

50 No

1.4.4.2.7

202SS

12/17/02

12/20/02

100% 205,225,233

6h

6 No

1.4.4.2.8

202FF,203FF

12/20/02

01/14/03

100% 206SS,207

50 h

50 No

1.4.4.2.9

204

12/20/02

01/14/03

100% 207

50 h

50 No

1.4.4.2.10

205SS

01/14/03

01/17/03

100% 223

6h

6 No

1.4.4.2.11

206,205

01/10/03

01/17/03

100%

10 h

10 No

1.4.4.2.12

223FF-16 d

12/31/02

01/17/03

100%

20 h

20 No

1.4.4.2.13

223FF-17 d

02/05/03

02/07/03

100%

8h

8 No

1.4.4.2.14

223

11/18/02

01/31/03

100%

152 h

152 Yes

11/18/02

11/25/02

100% 222,182,225,213

20 h

20 No

1.4.4.3.1

176

01/06/03

01/31/03

100% 214SS,215SS

80 h

80 No

1.4.4.3.2

212

01/06/03

01/31/03

100%

50 h

50 No

1.4.4.3.3

213SS

01/27/03

01/31/03

100%

2h

2 No

1.4.4.3.4

213SS

11/18/02

03/28/03

100%

40 h

40 Yes

1.4.4.4

11/18/02

11/22/02

100% 218,222

10 h

10 No

1.4.4.4.1

176FS+16 d

11/22/02

12/17/02

100% 219

20 h

20 No

1.4.4.4.2

217

12/17/02

12/26/02

100% 223

10 h

10 No

1.4.4.4.3

218

0 No

1.4.4.4.4

03/11/03

03/28/03

100% 226

01/06/03

04/04/03

100%

210 h

210 Yes

01/06/03

01/17/03

100%

20 h

20 No

1.4.4.5.1

212,190,201,217

01/17/03

02/05/03

100% 209FF-17 d,208F

60 h

60 No

1.4.4.5.2

195,207,183,219

02/05/03

02/26/03

100% 227

80 h

80 No

1.4.4.5.3

223

02/11/03

02/14/03

100%

20 h

20 No

1.4.4.5.4

193,204,212

03/28/03

04/04/03

100% 227FF

0h

0 No

1.4.4.5.5

220

02/26/03

04/04/03

100% 246,242SS,229F

30 h

30 No

1.4.4.5.6

224,226FF

03/05/03

06/13/03

70 h

57.5 Yes

03/05/03

04/11/03

20 h

20 No

1.4.4.6.1

227FS-25 d

04/15/03

06/13/03

38% 246

50 h

37.5 No

1.4.4.6.2

229

05/02/03

06/13/03

1% 246

0h

0 No

1.4.4.6.3

229

12/24/02

01/06/03

100%

6h

6 Yes

1.4.4.7

12/24/02

01/06/03

100% 234SS

3h

3 No

1.4.4.7.1

193,204

12/24/02

01/06/03

100%

3h

3 No

1.4.4.7.2

233SS

02/17/03

06/27/03

89%

45 h

30 Yes

1.4.4.8

02/17/03

02/17/03

100% 237

10 h

10 No

1.4.4.8.1

176

02/17/03

02/24/03

100% 238

5h

5 No

1.4.4.8.2

236

02/24/03

02/28/03

100%

5h

5 No

1.4.4.8.3

237

06/20/03

06/20/03

0%

0h

0 No

1.4.4.8.4

240FF-5 d

06/27/03

06/27/03

0% 239FF-5 d

0h

0 No

1.4.4.8.5

249FF-5 d

06/23/03

06/23/03

0%

5h

0 No

1.4.4.8.6

249FF-9 d

44%
100% 230,231

0h

1.4.4.3

1.4.4.5

1.4.4.6

03/21/03

05/09/03

05/23/03

05/23/03

100% 243FS+10 d
0% 244

10 h

10 No

1.4.4.8.7

227SS

0h

0 No

1.4.4.8.8

05/23/03

05/30/03

242FS+10 d

0%

10 h

0 No

1.4.4.8.9

06/13/03

243

07/31/03

0%

65 h

0 Yes

1.4.4.9

06/13/03

06/27/03

0% 247

20 h

0 No

1.4.4.9.1

227,230,231

06/27/03

06/27/03

0% 248

0h

0 No

1.4.4.9.2

246

06/27/03

07/04/03

0% 249

20 h

0 No

1.4.4.9.3

247

07/04/03

07/04/03

0% 250,240FF-5 d,2

07/04/03

07/31/03

0% 251

07/31/03

07/31/03

10/28/02

09/19/03

10/28/02

10/28/02

10/28/02

06/13/03

87%

2,108 h

2091.5 Yes

11/01/02

02/07/03

100%

31 h

31 Yes

0h

0 No

1.4.4.9.4

248

25 h

0 No

1.4.4.9.5

249

0%

0h

0 No

1.4.4.9.6

250

79%

2,484 h

100% 256,261,273,349

0h

2232.5 Yes
0 No

1.5
1.5.1
1.5.2
1.5.2.1

11/01/02

12/05/02

100% 257,258

6h

6 No

1.5.2.1.1

253

12/19/02

01/24/03

100%

15 h

15 No

1.5.2.1.2

256

12/27/02

02/07/03

100%

10 h

10 No

1.5.2.1.3

256

10/28/02

06/13/03

84%

145 h

140 Yes

10/28/02

11/22/02

100%

55 h

55 Yes

1.5.2.2.1

10/28/02

11/19/02

100% 262SS+6 d

20 h

20 No

1.5.2.2.1.1

253

11/04/02

11/22/02

100% 263FF

30 h

30 No

1.5.2.2.1.2

261SS+6 d

11/15/02

11/22/02

100% 265FS+24 d

5h

5 No

1.5.2.2.1.3

262FF

12/30/02

01/22/03

100%

30 h

30 Yes

1.5.2.2.2

12/30/02

01/08/03

100% 266

10 h

10 No

1.5.2.2.2.1

263FS+24 d

01/08/03

01/15/03

100% 267

10 h

10 No

1.5.2.2.2.2

265

01/15/03

01/22/03

100% 269

10 h

10 No

1.5.2.2.2.3

266

02/24/03

06/13/03

75%

60 h

55 Yes

1.5.2.2.3

02/24/03

04/11/03

100%

20 h

20 No

1.5.2.2.3.1

267

03/26/03

04/07/03

100%

20 h

20 No

1.5.2.2.3.2

313FF-6 d

04/09/03

06/13/03

53%

20 h

15 No

1.5.2.2.3.3

313FF-5 d

11/12/02

05/16/03

100%

60 h

60 Yes

1.5.2.3

1.5.2.2

11/12/02

12/27/02

100% 274

20 h

20 No

1.5.2.3.1

253

12/27/02

05/16/03

100%

40 h

40 No

1.5.2.3.2

273

11/13/02

06/13/03

74%

702 h

11/25/02

06/13/03

2h

0.5 No

1.5.2.4.1

277SS

11/25/02

12/13/02

100% 278SS,279SS,28

50 h

50 No

1.5.2.4.2

140SS+6 d

12/03/02

12/23/02

100%

30 h

30 No

1.5.2.4.3

277SS

12/03/02

12/23/02

100%

20 h

20 No

1.5.2.4.4

277SS

12/03/02

12/24/02

100%

20 h

20 No

1.5.2.4.5

277SS

12/03/02

12/23/02

100%

20 h

20 No

1.5.2.4.6

277SS

12/03/02

12/23/02

100%

20 h

20 No

1.5.2.4.7

277SS

11/13/02

12/09/02

100% 318

40 h

40 No

1.5.2.4.8

11/13/02

12/23/02

100%

20 h

20 No

1.5.2.4.9

277FF

11/25/02

12/24/02

100%

50 h

50 No

1.5.2.4.10

277FF

11/25/02

12/23/02

100%

30 h

30 No

1.5.2.4.11

277FF

11/25/02

12/24/02

100% 288FS+2 d

20 h

20 No

1.5.2.4.12

277FF

12/27/02

01/22/03

100% 289SS,182FS-3

12 h

12 No

1.5.2.4.13

287FS+2 d

12/27/02

01/22/03

100% 334,335,306

60 h

60 No

1.5.2.4.14

288SS

12/27/02

01/30/03

100% 334,335

30 h

30 No

1.5.2.4.15

288SS

0%

690.5 Yes

1.5.2.4

12/27/02

01/30/03

100% 334,335

20 h

20 No

1.5.2.4.16

288SS

12/27/02

01/27/03

100% 334,335

20 h

20 No

1.5.2.4.17

288SS

12/27/02

01/10/03

100% 334,335

20 h

20 No

1.5.2.4.18

288SS

12/27/02

01/17/03

100% 334,335

20 h

20 No

1.5.2.4.19

288SS

12/27/02

01/24/03

100% 334,335

30 h

30 No

1.5.2.4.20

288SS

12/27/02

01/24/03

100% 334,335

20 h

20 No

1.5.2.4.21

288SS

12/27/02

01/31/03

100% 334,335

40 h

40 No

1.5.2.4.22

288SS

12/27/02

01/24/03

100% 334,335

30 h

30 No

1.5.2.4.23

288SS

12/27/02

01/30/03

100% 300FS+1 d,334,

60 h

60 No

1.5.2.4.24

288SS

01/31/03

02/05/03

100% 334,335

8h

8 No

1.5.2.4.25

299FS+1 d

04/01/03

04/03/03

100% 328

0h

0 No

1.5.2.4.26

06/09/03

06/13/03

0%

10 h

0 No

1.5.2.4.27

01/20/03

04/15/03

100%

120 h

120 Yes

1.5.2.5

01/20/03

04/15/03

100% 302,336FS-1 d

120 h

120 No

1.5.2.5.1

02/03/03

04/11/03

100%

02/03/03

02/14/03

100% 307FF

80 h

80 No

1.5.2.6.1

289

02/03/03

02/14/03

100% 308

80 h

80 No

1.5.2.6.2

306FF

02/14/03

04/08/03

100% 309FF

50 h

50 No

1.5.2.6.3

307

02/14/03

04/08/03

100% 310FS-7 d

40 h

40 No

1.5.2.6.4

308FF

03/07/03

03/13/03

100% 311FF

30 h

30 No

1.5.2.6.5

309FS-7 d

03/07/03

03/13/03

100% 312,314,316

30 h

30 No

1.5.2.6.6

310FF

03/13/03

04/08/03

100% 313FF

40 h

40 No

1.5.2.6.7

311

03/13/03

04/08/03

100% 271FF-5 d,270FF

40 h

40 No

1.5.2.6.8

312FF

03/24/03

04/09/03

100% 315FF

30 h

30 No

1.5.2.6.9

311

03/24/03

04/09/03

100%

30 h

30 No

1.5.2.6.10

314FF

04/03/03

04/09/03

100% 317FF

30 h

30 No

1.5.2.6.11

311

04/03/03

04/09/03

100% 329

30 h

30 No

1.5.2.6.12

316FF

02/03/03

02/12/03

100% 319FF

60 h

60 No

1.5.2.6.13

283

02/03/03

02/12/03

100% 320

60 h

60 No

1.5.2.6.14

318FF

02/12/03

02/26/03

100% 321FF

40 h

40 No

1.5.2.6.15

319

02/12/03

02/26/03

100% 322,324

40 h

40 No

1.5.2.6.16

320FF

02/26/03

03/18/03

100% 323FF

80 h

80 No

1.5.2.6.17

321

02/26/03

03/28/03

100% 328FF

80 h

80 No

1.5.2.6.18

322FF

03/14/03

03/25/03

100% 325FF,326SS

60 h

60 No

1.5.2.6.19

321

03/14/03

04/03/03

100%

60 h

60 No

1.5.2.6.20

324FF

03/14/03

03/28/03

100% 327

20 h

20 No

1.5.2.6.21

324SS

03/28/03

04/03/03

100%

40 h

40 No

1.5.2.6.22

326

04/03/03

04/11/03

100% 329

0h

0 No

1.5.2.6.23

301,323FF

04/11/03

04/11/03

100% 331FS-3 d,336

0h

0 No

1.5.2.6.24

317,328

04/04/03

05/30/03

100%

6h

6 Yes

1.5.3

04/04/03

05/30/03

100% 332FF

3h

3 No

1.5.3.1

329FS-3 d

04/04/03

05/30/03

100%

3h

3 No

1.5.3.2

331FF

01/06/03

07/30/03

67%

260 h

130 Yes

02/05/03

02/19/03

100%

20 h

20 No

1.5.4.1

289,290,291,292,

02/21/03

04/04/03

100%

40 h

40 No

1.5.4.2

289,290,291,292,

04/14/03

06/02/03

100% 337,344,345

50 h

50 No

1.5.4.3

304FS-1 d,329

06/02/03

06/04/03

0% 338

10 h

0 No

1.5.4.4

336

06/04/03

06/11/03

0%

10 h

0 No

1.5.4.5

337

05/05/03

06/13/03

55%

0h

0 Yes

1.5.4.6

1,050 h

1050 Yes

304
184

1.5.2.6

1.5.4

05/05/03

05/24/03

100% 341

0h

0 No

1.5.4.6.1

05/26/03

06/13/03

8% 345

0h

0 No

1.5.4.6.2

01/06/03

07/30/03

44%

130 h

20 Yes

1.5.4.7

01/06/03

02/20/03

100%

20 h

20 No

1.5.4.7.1

185

06/02/03

06/16/03

0% 345

40 h

0 No

1.5.4.7.2

336

06/16/03

07/10/03

0% 346,361,357SS

50 h

0 No

1.5.4.7.3

336,186,344,341

07/10/03

07/23/03

0% 347

10 h

0 No

1.5.4.7.4

345

07/23/03

07/30/03

0%

10 h

0 No

1.5.4.7.5

346

05/12/03

08/18/03

3%

45 h

5 Yes

1.5.5

05/12/03

07/11/03

5% 350

10 h

5 No

1.5.5.1

253

340

07/11/03

07/18/03

0% 351

5h

0 No

1.5.5.2

349

07/18/03

07/25/03

0%

5h

0 No

1.5.5.3

350

07/11/03

07/11/03

0%

0h

0 No

1.5.5.4

353FF-5 d

07/18/03

07/18/03

0% 352FF-5 d

0h

0 No

1.5.5.5

362FF-10 d

08/04/03

08/04/03

0%

0h

0 No

1.5.5.6

355FF-5 d

08/11/03

08/11/03

0% 354FF-5 d

0h

0 No

1.5.5.7

363FF-10 d

08/11/03

08/18/03

0%

5h

0 No

1.5.5.8

363FF-5 d

06/16/03

06/30/03

0% 358FS+10 d

10 h

0 No

1.5.5.9

345SS

07/11/03

07/11/03

0% 359

0h

0 No

1.5.5.10

357FS+10 d

07/11/03

07/18/03

0%

10 h

0 No

1.5.5.11

358

07/10/03

09/19/03

0%

65 h

0 Yes

1.5.6

07/10/03

07/21/03

0% 362FS+9 d

10 h

0 No

1.5.6.1

345

08/01/03

08/01/03

0% 353FF-10 d,363

0h

0 No

1.5.6.2

361FS+9 d

08/22/03

08/22/03

0% 355FF-10 d,356F

0h

0 No

1.5.6.3

362FS+16 d

07/18/03

08/01/03

0%

20 h

0 No

1.5.6.4

362FF

08/25/03

09/19/03

0% 366

35 h

0 No

1.5.6.5

363

09/19/03

09/19/03

0%

0h

0 No

1.5.6.6

365

08/25/03

09/26/03

0%

86 h

0 Yes

1.6

08/25/03

08/25/03

0%

2h

0 No

1.6.1

363

08/25/03

08/26/03

0%

4h

0 No

1.6.2

363

09/12/03

09/12/03

0%

0h

0 No

1.6.3

363FS+15 d

08/25/03

09/19/03

0% 372

30 h

0 No

1.6.4

363

09/19/03

09/26/03

0% 373

40 h

0 No

1.6.5

371

09/26/03

09/26/03

0% 24FS-11 d

0h

0 No

1.6.6

372

Resources

Baseline
Start date

Baseline
Finish date

Datelast
Updated

05/06/02

08/28/03 NA

05/06/02

09/12/03 NA

05/06/02

05/06/02 NA

05/06/02

09/05/03 NA

Carol[35%]

05/06/02

04/21/03 NA

Vance[63%]

07/26/02

04/21/03 NA

Michelle[17%]

05/06/02

04/21/03 NA

Carol[4%],Michelle[3%],Ashok[3%],Ed[3%],Eric[3%],Murthy

05/06/02

04/21/03 NA

Ashok[29%]

08/15/02

04/21/03 NA

05/21/02

11/20/02 NA

05/21/02

06/17/02 NA

06/17/02

06/17/02 NA

06/17/02

06/17/02 NA

Carol[4%],Ashok[3%],Michelle[3%],Ed[5%],Eric[5%],Murthy

06/17/02

07/08/02 NA

Carol[16%],Ashok[2%],Michelle[3%],Ed[5%],Eric[5%],Murth

06/17/02

07/05/02 NA

07/05/02

07/05/02 NA

07/05/02

07/05/02 NA

05/28/02

08/16/02 NA

08/16/02

08/16/02 NA

10/09/02

11/19/02 NA

11/19/02

11/20/02 NA

11/05/02

04/21/03 NA

Carol[16%],Ashok[3%],Michelle[3%],Ed[8%],Eric[8%],Murth

Ashok[10%],Carol[16%],Ed[8%],Eric[8%],Murthy[5%],Jill[5
Ashok[17%],Carol[16%],Ed[8%],Eric[8%],Murthy[5%],Jill[5

Carol[26%]

11/05/02

11/19/02 NA

Carol[26%]

04/07/03

04/21/03 NA

NA
Charles,Daniel,Sherrill,Dave,Harry[18%],Gilbert

NA
10/07/02

NA
08/18/03 NA

06/13/02

11/15/02 NA

06/13/02

10/30/02 NA

Ed[3%],Tina[3%]

06/13/02

07/16/02 NA

Ed[26%],Carol[50%],Ashok[40%],Eric[40%],Murthy,Jill[40%

07/24/02

07/25/02 NA

Ed,Carol[50%],Tina,Eric[26%]

07/26/02

07/29/02 NA

08/01/02

08/01/02 NA

Ed[8%],Eric[8%],Murthy[10%],Jill[8%],Lakshmi[11%],Witt

08/05/02

10/30/02 NA

Tina[22%]

07/29/02

08/01/02 NA

07/30/02

09/27/02 NA

Jill[39%]

07/30/02

07/31/02 NA

Jill[8%]

07/31/02

08/07/02 NA

Jill[8%]

07/31/02

08/07/02 NA

Jill[2%],Ed[40%],Tina[40%]

09/27/02

09/27/02 NA

07/30/02

08/23/02 NA

Eric[10%]

07/30/02

08/23/02 NA

Eric[10%]

07/30/02

08/23/02 NA

Eric[10%]

07/30/02

08/23/02 NA

Eric[6%],Ty,Mary,Tina,Jill[6%],Witter[6%]

08/23/02

09/26/02 NA

06/13/02

10/21/02 NA

Murthy[70%],Amar[70%]

06/13/02

07/12/02 NA

07/29/02

09/27/02 NA

Amar[52%]

07/29/02

08/09/02 NA

Amar[36%],Lakshmi,Tina

09/09/02

09/20/02 NA

Amar[6%],Lakshmi,Tina

09/23/02

09/27/02 NA

08/01/02

09/16/02 NA

Murthy[33%],Amar

08/01/02

08/14/02 NA

Murthy[26%]

08/14/02

09/02/02 NA

Murthy[9%],Amar,Lakshmi,Tina

09/02/02

09/13/02 NA

Murthy[103%],Amar,Lakshmi,Tina[39%]

09/13/02

09/16/02 NA

08/05/02

09/11/02 NA

Murthy[73%]

08/05/02

08/13/02 NA

Murthy[52%]

08/13/02

08/15/02 NA

Murthy[15%],Lakshmi,Tina

08/15/02

09/09/02 NA

Murthy[103%],Lakshmi[19%],Tina[19%]

09/09/02

09/11/02 NA

08/02/02

09/10/02 NA

Amar[32%]

08/02/02

08/16/02 NA

Murthy[29%],Amar,Lakshmi,Tina

08/16/02

09/09/02 NA

Murthy[103%],Lakshmi[26%],Tina[26%],Amar[26%]

09/09/02

09/10/02 NA

07/29/02

09/16/02 NA

Amar[30%],Lakshmi[2%]

07/29/02

08/28/02 NA

Amar[18%],Lakshmi,Tina

08/28/02

09/10/02 NA

Amar[6%],Lakshmi,Tina

09/10/02

09/16/02 NA

09/10/02

10/08/02 NA

Murthy[46%]

09/10/02

09/23/02 NA

Murthy[134%],Lakshmi,Tina

09/23/02

10/07/02 NA

Murthy[103%],Lakshmi[39%],Tina[39%]

10/07/02

10/08/02 NA

07/16/02

10/21/02 NA

Amar[46%],Lakshmi

07/16/02

07/23/02 NA

Amar[31%],Lakshmi

07/23/02

08/06/02 NA

Amar[46%]

08/06/02

08/16/02 NA

Amar[66%],Lakshmi[142%],Tina

10/08/02

10/21/02 NA

Amar[19%],Lakshmi,Tina

10/08/02

10/21/02 NA

07/16/02

10/01/02 NA

Murthy[68%],Amar,Lakshmi

07/16/02

07/19/02 NA

Murthy[77%],Amar,Lakshmi

07/19/02

08/02/02 NA

Murthy[34%]

08/02/02

08/07/02 NA

Murthy[21%],Amar,Lakshmi,Tina

09/16/02

09/30/02 NA

Murthy[52%],Amar,Lakshmi,Tina

09/30/02

10/01/02 NA

10/21/02

10/21/02 NA

09/06/02

10/17/02 NA

Witter[32%]

09/06/02

09/20/02 NA

Witter[25%]

09/20/02

10/03/02 NA

Witter[20%]

10/03/02

10/17/02 NA

Ed[129%],Tina[129%]

10/22/02

10/25/02 NA

Carol[97%],Michelle[13%],Ashok[13%],Ed[13%],Eric[13%],

10/25/02

10/29/02 NA

10/29/02

10/29/02 NA

07/25/02

11/15/02 NA

07/25/02

08/09/02 NA

SteveH[59%]

SteveH[0%],Carol[0%],Ashok[0%],Ed[0%],Murthy[1%],Eric[

08/09/02

08/26/02 NA

SteveH[52%]

08/26/02

09/06/02 NA

SteveH[1%],Carol[50%],Ashok[40%],Ed,Murthy,Eric[40%],Ji

09/06/02

09/13/02 NA

07/19/02

11/07/02 NA

07/19/02

07/31/02 NA

Mary[52%]

07/19/02

07/25/02 NA

Mary[52%]

07/25/02

07/26/02 NA

Mary[52%]

07/26/02

07/29/02 NA

Mary[52%]

07/29/02

07/30/02 NA

Mary[52%]

07/30/02

07/31/02 NA

08/14/02

11/07/02 NA

Mary[6%],Ty[9%]

08/14/02

09/11/02 NA

Mary[6%],Ty[9%]

09/11/02

09/24/02 NA

Mary[13%],Ty[19%]

09/11/02

09/24/02 NA

Mary[13%],Ty[19%]

09/13/02

09/26/02 NA

Mary[77%],Ty[52%]

09/27/02

10/10/02 NA

Mary[13%],Ty[19%]

09/27/02

10/10/02 NA

Mary[13%],Ty[19%]

10/10/02

10/24/02 NA

Mary[77%],Ty[52%]

10/24/02

11/07/02 NA

Mary[13%]

11/07/02

11/07/02 NA

09/10/02

09/25/02 NA

09/10/02

09/18/02 NA

Mary[26%],Ty

09/10/02

09/11/02 NA

Mary[13%],Ty

09/11/02

09/18/02 NA

09/10/02

09/25/02 NA

Mary[13%],Ty

09/10/02

09/17/02 NA

Mary[13%],Ty

09/17/02

09/18/02 NA

Mary[8%],Ty

09/18/02

09/25/02 NA

Mary[26%]

09/25/02

09/25/02 NA

10/21/02

03/12/03 NA

10/21/02

10/21/02 NA

10/21/02

12/06/02 NA

Witter[5%]

11/22/02

12/03/02 NA

Witter[43%]

10/21/02

10/23/02 NA

Witter[57%]

10/23/02

11/05/02 NA

Witter[52%]

11/22/02

12/03/02 NA

Witter[42%]

12/03/02

12/06/02 NA

12/05/02

12/17/02 NA

Witter[65%]

12/05/02

12/06/02 NA

Witter[18%]

12/06/02

12/17/02 NA

Witter[17%]

12/10/02

12/17/02 NA

11/04/02

01/02/03 NA

Murthy[86%]

11/04/02

11/06/02 NA

Murthy[86%]

11/06/02

11/14/02 NA

Murthy[65%]

11/14/02

11/22/02 NA

Murthy[13%],Amar[29%]

11/15/02

12/02/02 NA

Murthy[26%]

01/01/03

01/02/03 NA

11/04/02

12/16/02 NA

11/04/02

11/05/02 NA

Amar[65%]

Amar[97%]

11/05/02

Amar[97%]

11/07/02

11/11/02 NA

Amar[6%]

11/11/02

12/16/02 NA

11/22/02

12/20/02 NA

Ty[39%],Mary

12/17/02

12/20/02 NA

Ty[26%]

11/22/02

12/03/02 NA

Ty[39%],Mary[14%]

12/18/02

12/20/02 NA

11/11/02

01/13/03 NA

SteveH[65%]

11/13/02

11/15/02 NA

SteveH[52%]

11/11/02

11/15/02 NA

Ed[7%],Lynn[57%]

12/06/02

12/10/02 NA

Ed[26%],Lynn,SteveH[40%]

12/17/02

12/23/02 NA

Ed[11%],Lynn,SteveH[40%]

12/09/02

12/24/02 NA

01/08/03

01/08/03 NA

SteveH[65%]

12/23/02

01/06/03 NA

SteveH[52%]

01/06/03

01/13/03 NA

10/25/02

02/12/03 NA

Ed[65%]

10/25/02

10/28/02 NA

Ed[5%]

10/29/02

11/15/02 NA

Ed[13%]

11/18/02

11/29/02 NA

12/30/02

12/30/02 NA

01/06/03

01/06/03 NA

01/20/03

01/20/03 NA

01/27/03

01/27/03 NA

02/05/03

02/12/03 NA

01/03/03

03/12/03 NA

01/03/03

01/07/03 NA

01/20/03

01/20/03 NA

02/07/03

02/07/03 NA

02/12/03

03/12/03 NA

03/12/03

03/12/03 NA

10/28/02

06/20/03 NA

10/28/02

10/28/02 NA

12/19/02

05/14/03 NA

David[5%]

05/07/03

05/14/03 NA

David[5%]

12/19/02

03/03/03 NA

01/06/03

01/31/03 NA

Ed[13%]
Amar[65%]

Ed[18%]

11/07/02 NA

12/23/02

04/21/03 NA

SteveH[43%]

12/23/02

12/27/02 NA

SteveH[26%]

12/23/02

01/07/03 NA

SteveH[26%]

12/23/02

01/07/03 NA

SteveH[43%]

12/23/02

01/07/03 NA

SteveH[4%]

01/21/03

04/21/03 NA

11/04/02

06/20/03 NA

11/04/02

01/01/03 NA

Bill[5%],John

11/28/02

01/01/03 NA

John[62%]

11/04/02

11/18/02 NA

John[10%],EricH,Jeff

11/19/02

11/22/02 NA

John[52%]

11/22/02

12/20/02 NA

John[3%],Jeff[3%]

11/28/02

12/20/02 NA

John[258%]

11/28/02

12/20/02 NA

John[3%],Jeff[3%]

11/28/02

12/20/02 NA

11/04/02

02/10/03 NA

Bill[7%]

12/20/02

12/30/02 NA

Bill[19%]

11/04/02

12/11/02 NA

Bill[65%]

11/18/02

11/22/02 NA

Bill,EricH[19%]

11/26/02

11/29/02 NA

Bill[39%],EricH[39%]

12/12/02

12/12/02 NA

Bill[108%]

12/12/02

12/20/02 NA

Bill[108%]

12/12/02

12/20/02 NA

Bill[13%],EricH

12/17/02

12/20/02 NA

Bill[43%]

12/20/02

01/13/03 NA

Bill[43%]

12/20/02

01/13/03 NA

Bill[26%],EricH[13%]

01/13/03

01/16/03 NA

David[26%]

01/07/03

01/14/03 NA

Bill[26%]

12/31/02

01/14/03 NA

Bill[13%],John,EricH,Jeff

02/05/03

02/10/03 NA

11/18/02

01/08/03 NA

Witter[52%]

11/18/02

11/25/02 NA

Witter[103%]

12/13/02

12/24/02 NA

Witter[81%]

12/24/02

01/08/03 NA

Witter[5%]

01/01/03

01/08/03 NA

11/18/02

12/26/02 NA

Witter[32%]

11/18/02

11/22/02 NA

Witter[16%]

11/22/02

12/17/02 NA

Witter[22%]

12/17/02

12/26/02 NA

NA

NA

NA

12/20/02

03/05/03 NA

SteveH[26%]

01/06/03

01/17/03 NA

Bill[23%],John[36%],SteveH[23%]

01/16/03

02/05/03 NA

SteveH[40%],Witter[26%],John,Bill

02/05/03

02/26/03 NA

Ed[65%]

12/20/02
NA

Ed[18%]
SteveH[6%],PerTeam[5%]
SteveH[10%],PerTeam[40%]
SteveH[52%],Witter[6%],John,Bill

01/13/03 NA
NA

NA

02/26/03

03/05/03 NA

03/05/03

03/25/03 NA

03/05/03

03/11/03 NA

03/11/03
NA

03/25/03 NA
NA

NA

12/24/02

01/07/03 NA

Ty[2%],Mary[2%]

12/24/02

01/06/03 NA

Ty[26%],Mary[31%]

01/06/03

01/07/03 NA

12/31/02

05/19/03 NA

Ed[129%]

12/31/02

01/15/03 NA

Ed[13%]

01/15/03

01/22/03 NA

Ed[16%]

01/22/03

01/31/03 NA

05/12/03

05/12/03 NA

05/19/03

05/19/03 NA

05/05/03

05/12/03 NA

Ed[65%]

Vance[12%]
Vance[26%]
John[26%]
Witter[52%]
Ed[16%]

02/26/03

03/11/03 NA

03/25/03

03/25/03 NA

03/25/03

04/01/03 NA

04/21/03

06/20/03 NA

04/21/03

04/25/03 NA

05/12/03

05/12/03 NA

05/14/03

05/20/03 NA

05/26/03

05/26/03 NA

05/26/03

06/20/03 NA

06/20/03

06/20/03 NA

10/28/02

08/11/03 NA

10/28/02

10/28/02 NA

10/28/02

04/11/03 NA

11/01/02

02/07/03 NA

Sushit[3%]

11/01/02

12/05/02 NA

Sushit[13%]

12/19/02

01/24/03 NA

Sushit[5%]

12/27/02

02/07/03 NA

10/28/02

03/28/03 NA

10/28/02

11/22/02 NA

Durnan[15%]

10/28/02

11/19/02 NA

Durnan[28%]

11/04/02

11/22/02 NA

Durnan[13%]

11/15/02

11/22/02 NA

12/30/02

01/22/03 NA

Durnan[18%]

12/30/02

01/08/03 NA

Durnan[26%]

01/08/03

01/15/03 NA

Durnan[26%]

01/15/03

01/22/03 NA

02/24/03

03/28/03 NA

Durnan[14%]

02/24/03

03/19/03 NA

Durnan[43%]

03/17/03

03/28/03 NA

Durnan[18%]

03/17/03

03/28/03 NA

11/12/02

03/14/03 NA

Brian[14%]

11/12/02

12/27/02 NA

Brian[26%]

12/27/02

03/14/03 NA

11/13/02

04/11/03 NA

Amar[13%]

11/25/02

03/31/03 NA

Murthy[161%]

11/25/02

12/13/02 NA

Murthy[32%]

12/03/02

12/23/02 NA

Murthy[22%]

12/03/02

12/23/02 NA

Murthy[16%]

12/03/02

12/24/02 NA

Murthy[22%]

12/03/02

12/23/02 NA

Murthy[22%]

12/03/02

12/23/02 NA

Amar[30%]

11/13/02

12/09/02 NA

Amar[11%]

11/13/02

12/23/02 NA

Amar[32%]

11/25/02

12/24/02 NA

Amar[24%]

11/25/02

12/23/02 NA

Amar[13%]

11/25/02

12/24/02 NA

Amar[2%],Murthy[2%],Tina[2%],Lakshmi[2%],Ty,Mary

12/27/02

01/22/03 NA

Murthy[43%]

12/27/02

01/22/03 NA

Murthy[16%]

12/27/02

01/30/03 NA

Murthy[11%]

12/27/02

01/30/03 NA

Murthy[22%]

12/27/02

01/27/03 NA

Murthy[23%]

12/27/02

01/10/03 NA

Murthy[17%]

12/27/02

01/17/03 NA

Amar[48%]

12/27/02

01/24/03 NA

Amar[32%]

12/27/02

01/24/03 NA

Amar[32%]

12/27/02

01/31/03 NA

Amar[19%]

12/27/02

01/24/03 NA

Amar[32%]

12/27/02

01/30/03 NA

Amar[26%],Murthy[26%],Tina[26%],Lakshmi[26%]

01/31/03

02/05/03 NA

Amar[103%]

NA

Durnan[26%]
SteveH[3%],Murthy,Tina,Amar,Durnan,Brian

NA

NA

03/28/03

04/11/03 NA

01/20/03

03/28/03 NA

01/20/03

03/28/03 NA

02/03/03

03/28/03 NA

Murthy[103%]

02/03/03

02/14/03 NA

Lakshmi[103%]

02/03/03

02/14/03 NA

Murthy[54%]

02/14/03

03/04/03 NA

Murthy[43%]

02/14/03

03/04/03 NA

Murthy[97%]

03/04/03

03/10/03 NA

Lakshmi[97%]

03/04/03

03/10/03 NA

Murthy[129%]

03/10/03

03/17/03 NA

Lakshmi[129%]

03/10/03

03/17/03 NA

Murthy[32%]

03/17/03

03/20/03 NA

Lakshmi[32%]

03/17/03

03/20/03 NA

Murthy[97%]

03/20/03

03/26/03 NA

Lakshmi[97%]

03/20/03

03/26/03 NA

Amar[97%]

02/03/03

02/12/03 NA

Tina[97%]

02/03/03

02/12/03 NA

Amar[52%]

02/12/03

02/26/03 NA

Amar[52%]

02/12/03

02/26/03 NA

Amar[103%]

02/26/03

03/12/03 NA

Tina[103%]

02/26/03

03/12/03 NA

Amar[97%]

03/12/03

03/25/03 NA

Amar[48%],Tina

03/12/03

03/25/03 NA

Amar[23%]

03/25/03

03/28/03 NA

Tina[65%],Murthy

03/25/03

03/28/03 NA

Amar[103%]

NA

NA

NA

03/28/03

03/28/03 NA

03/28/03

04/01/03 NA

Ty[26%],Mary[31%]

03/28/03

03/31/03 NA

Ty[13%],Mary[26%]

03/31/03

04/01/03 NA

01/06/03

06/20/03 NA

SteveH[26%]

02/05/03

02/19/03 NA

SteveH[34%]

02/21/03

03/13/03 NA

Ed[26%]

03/31/03

04/25/03 NA

SteveH[65%]

04/25/03

04/30/03 NA

SteveH[26%]

04/30/03

05/07/03 NA

NA

NA

NA

NA

NA

NA

NA

NA
NA

01/06/03

06/20/03 NA

01/06/03

02/20/03 NA

Ed[52%]

04/11/03

04/25/03 NA

Ed[36%]

04/25/03

05/30/03 NA

SteveH[13%]

05/30/03

06/13/03 NA

SteveH[26%]

06/13/03

06/20/03 NA

04/07/03

07/08/03 NA

Ed[26%]

04/07/03

04/14/03 NA

Ed[13%]

04/14/03

04/21/03 NA

Ed[13%]

04/21/03

04/30/03 NA

06/04/03

06/04/03 NA

06/11/03

06/11/03 NA

06/24/03

06/24/03 NA

07/01/03

07/01/03 NA

Ed[13%]

07/01/03

07/08/03 NA

Vance[13%]

04/25/03

05/09/03 NA

05/22/03

05/22/03 NA

05/22/03

05/29/03 NA

05/30/03

08/11/03 NA

SteveH[17%]

Vance[26%]
Amar[16%]

05/30/03

06/11/03 NA

06/24/03

06/24/03 NA

07/15/03

07/15/03 NA

Durnan[26%]

06/11/03

06/24/03 NA

Ed[16%],Durnan

07/15/03

08/11/03 NA

08/11/03

08/11/03 NA

01/06/03

08/18/03 NA

Mary[19%],Ty[7%]

07/15/03

07/16/03 NA

Mary[9%],Ty[17%]

07/15/03

07/17/03 NA

08/05/03

08/05/03 NA

David,Sushit[4%],Amar[4%],John[4%],Bill[4%],Witter[2%]

07/15/03

08/11/03 NA

Carol[52%],Ashok[40%],Michelle[40%]

08/11/03

08/18/03 NA

08/18/03

08/18/03 NA
NA
NA

Proj. 1234 Proj. 1234 Watch List Status Tracking


Sr.No.

Task
Code

Description of item to be tracked or progress


monitored

Dates to meet
1
2
3
4
5
6
7
8
9
10
11

348
349
351
351b
367
369
452
483
489
506
507

AUI-DLV Mid Tier / Host Int Test


AUI-DLV Web / Mid Tier / Host System Testing
AUI-DLV Acceptance Testing
Execute Perf. Testing Pkg-2
MS: Mid Tier-Host cowide issuance
MS: AUI Pkg-2 cowide Issuance
Perform Integration Testing for NECHO Changes - pkg-2
SAT -Perform System/Acceptance Testing pkg-3
SAT - Perform FIT Testing - Pkg-3
MS: Pkg-3 Pilot Necho
MS: NECHO Pkg-3 cowide Issuance

Percent
As On
Target
Completio Complete 05/20/03
n

As On
05/13/03

02/05/03
02/26/03
03/05/03
03/25/03
05/12/03
05/26/03
03/28/03
04/25/03
05/30/03
06/24/03
07/15/03

100%
100%
100%
75%
0%
0%
100%
75%
0%
0%
0%

02/05/03
02/26/03
04/04/03
05/23/03
06/09/03
06/16/03
04/15/03
06/13/03
07/23/03
08/14/03
09/05/03

02/05/03
02/26/03
04/04/03
05/16/03
05/22/03
05/29/03
04/15/03
05/16/03
06/24/03
07/17/03
08/07/03

08/18/03
11/15/02
03/12/03
06/20/03
08/11/03

87%
100%
100%
91%
88%

10/09/03
12/04/02
02/14/03
07/11/03
10/02/03

09/10/03
12/04/02
02/14/03
06/25/03
09/04/03

Progress
1
2
3
4
5

1
25
201
301
401

zzz

Auto Necho - Auto Apps Efficiency


Reqs Analysis and Solution Def/Specs
Pkg -1 Design/Build/Test/Implement
Pkg -2 Design/Build/Test/Implement
Pkg -3 Design/Build/Test/Implement

As On
05/06/03

As On
04/29/03

As On
04/22/03

As On
04/15/03

02/05/03
02/26/03
04/04/03
05/02/03
05/13/03
05/26/03
04/15/03
05/16/03
06/24/03
07/17/03
08/07/03

02/05/03
02/26/03
04/04/03
05/02/03
05/13/03
05/26/03
04/15/03
05/16/03
06/11/03
07/03/03
07/25/03

02/05/03
02/26/03
04/04/03
05/01/03
05/12/03
05/26/03
04/15/03
05/16/03
06/11/03
07/03/03
07/24/03

02/05/03
02/26/03
04/04/03
04/21/03
04/28/03
05/26/03
04/15/03
05/16/03
06/11/03
07/03/03
07/24/03

09/10/03
12/04/02
02/14/03
06/20/03
09/04/03

08/28/03
12/04/02
02/14/03
06/20/03
08/21/03

08/28/03
12/04/02
02/14/03
06/20/03
08/21/03

08/28/03
12/04/02
02/14/03
06/20/03
08/21/03

Proj. 1234 Log of Schedule Updates


Update date

Lead

Task
Code

Task Name

% Work
Completed

Work in
Hours

Go Back to LeadsList
Duration
in Days

Planned
Start Date

Planned
Finish Date

Remarks

Proj. 1234 Track Status Changes


Lead

Code
1

Carol

Ashok

Ashok

Ashok

Ashok

Ashok

10

Carol

11

Task Name
Auto Necho - Auto Apps Efficiency

687
%WC
Hours
Duration
Start
Finish
Planning, Admin, meetings, Coord, phase-Docs
%WC
Hours
Duration
Start
Finish
MS: Project Activated
%WC
Hours
Duration
Start
Finish
Project Admin & Cordination
%WC
Hours
Duration
Start
Finish
Project Management Activities
%WC
Hours
Duration
Start
Finish
Project Coordination Activities
%WC
Hours
Duration
Start
Finish
SSS activities
%WC
Hours
Duration
Start
Finish
Team Weekly Meetings
%WC
Hours
Duration
Start
Finish
Project Schedule / PlanView Maintenance, and Status Reporti %WC
Hours
Duration
Start
Finish
Project Charter, Plan & Schedule
%WC
Hours
Duration
Start
Finish
Prepare & Review Project Charter
%WC

Baseline
09-03-2002
0%
11,910 h
268.06 d
05/06/02
04/22/03
0%
3,639 h
259 d
05/06/02
04/21/03
0%
0h
0d
05/06/02
05/06/02
0%
3,141 h
259 d
05/06/02
04/21/03
0%
699 h
259 d
05/06/02
04/21/03
0%
964 h
198 d
07/26/02
04/21/03
0%
349 h
259 d
05/06/02
04/21/03
0%
712 h
259 d
05/06/02
04/21/03
0%
417 h
183 d
08/15/02
04/21/03
0%
358 h
143.71 d
05/21/02
11/20/02
0%

10

12

Carol

Carol

Carol

Carol

Carol

Carol

12

13

14

15

16

17

MS: Project Charter Reviewed

MS: Project Charter Authorized

Facilitation management Processes

Prepare & review Project Plan

MS: Project Plan Reviewed

MS: Project Plan Authorized

Ashok

18

Project Schedule Development -1

Ashok

19

MS: Performance Measurement Baseline - 1 Established

Ashok

20

Project Schedule Development -2

Ashok

21

MS: Performance Measurement Baseline - 2 Established

Hours
Duration
Start
Finish
%WC
Hours
Duration
Start
Finish
%WC
Hours
Duration
Start
Finish
%WC
Hours
Duration
Start
Finish
%WC
Hours
Duration
Start
Finish
%WC
Hours
Duration
Start
Finish
%WC
Hours
Duration
Start
Finish
%WC
Hours
Duration
Start
Finish
%WC
Hours
Duration
Start
Finish
%WC
Hours
Duration
Start
Finish
%WC
Hours
Duration
Start
Finish

67 h
35 d
05/21/02
06/17/02
0%
0h
0d
06/17/02
06/17/02
0%
0h
0d
06/17/02
06/17/02
0%
33 h
16 d
06/17/02
07/08/02
0%
38 h
46 d
06/17/02
07/05/02
0%
0h
0d
07/05/02
07/05/02
0%
0h
0d
07/05/02
07/05/02
0%
110 h
60 d
05/28/02
08/16/02
0%
0h
0d
08/16/02
08/16/02
0%
110 h
30 d
10/09/02
11/19/02
0%
0h
1d
11/19/02
11/20/02

18

L
L

18
18

L
L

74
74

L
L

18
73

L
L

18
88

L
L

88
88

L
L

91
91

L
L

12
10

L
L

10
12

22

Vance

23

SP/IP

Create Initial SPIP Participant Charts

Carol

24

Authorize final SPIP for transition

ED

31

Write Announcement Memo

25

26

Reqs Analysis and Solution Def/Specs

SRA / SDS

ED

27

Determine Business Requirements

ED

28

Review Testable Business Requirements

ED

29

Review Business Requirements

ED

30

MS: Business Req approved

Ashok

32

Technical discussion meetings

%WC
Hours
Duration
Start
Finish
%WC
Hours
Duration
Start
Finish
%WC
Hours
Duration
Start
Finish
%WC
Hours
Duration
Start
Finish
%WC
Hours
Duration
Start
Finish
%WC
Hours
Duration
Start
Finish
%WC
Hours
Duration
Start
Finish
%WC
Hours
Duration
Start
Finish
%WC
Hours
Duration
Start
Finish
%WC
Hours
Duration
Start
Finish
%WC
Hours
Duration
Start

0%
40 h
114.03 d
11/05/02
04/21/03
0%
20 h
10 d
11/05/02
11/19/02
0%
20 h
10 d
04/07/03
04/21/03
0%
100 h
46 d
10/17/02
12/19/02
0%
2,271 h
122.71 d
06/13/02
11/15/02
0%
1,848 h
110.39 d
06/13/02
10/30/02
0%
10 h
24 d
06/13/02
07/16/02
0%
24 h
1d
07/24/02
07/25/02
0%
8h
1d
07/26/02
07/29/02
0%
0h
0d
08/01/02
08/01/02
0%
480 h
72.39 d
08/05/02

-60

E
E

-60
-4

L
L

7
6

12

12

Amar

33

34

Jill

35

Jill

36

Jill

37

Jill

38

39

Eric

40

Eric

41

Eric

42

Ty

43

Finish
%WC
Hours
Duration
Start
Finish
Domain Specs
%WC
Hours
Duration
Start
Finish
DOMAIN - review existing territory validation
%WC
Hours
Duration
Start
Finish
DOMAIN - review existing IRG validation
%WC
Hours
Duration
Start
Finish
DOMAIN - review existing driver's license validation
%WC
Hours
Duration
Start
Finish
Create SRA 4/SDS 3.1 identifying impacted reusable servi %WC
Hours
Duration
Start
Finish
AUTO Specs
%WC
Hours
Duration
Start
Finish
AUTO - review existing territory validation
%WC
Hours
Duration
Start
Finish
AUTO - review existing IRG validation
%WC
Hours
Duration
Start
Finish
AUTO - review existing driver's license validation
%WC
Hours
Duration
Start
Finish
Determine Validation Components for ECHO & AUI
%WC
Hours
Duration
Create New ECHO Screen Layout

10/30/02
0%
5h
3d
07/29/02
08/01/02
0%
13 h
45 d
07/30/02
09/27/02
0%
3h
1d
07/30/02
07/31/02
0%
3h
5d
07/31/02
08/07/02
0%
3h
5d
07/31/02
08/07/02
0%
4h
1d
09/27/02
09/27/02
0%
45 h
19 d
07/30/02
08/23/02
0%
15 h
19 d
07/30/02
08/23/02
0%
15 h
19 d
07/30/02
08/23/02
0%
15 h
19 d
07/30/02
08/23/02
0%
48 h
25 d

12

-2

30

23

23

E
E

-28
-2

44

Amar

ECHO Specs

45

Understand existing ECHO APPS System

46

Address Standradisation- Auto Main Screen

Amar

47

Analysing the requirements(69)

Amar

48

Design the Highlevel Specs(70)

Amar

49

50

Amar

Amar

Amar

Amar

51

52

53

54

Review of Highlevel Specs(71)

VIN Validation

Analysing the requirements(59)

Design the Highlevel Specs-1(60)

Design the Highlevel Specs-2(61)

Review of Highlevel Specs(62)

Start
Finish
%WC
Hours
Duration
Start
Finish
%WC
Hours
Duration
Start
Finish
%WC
Hours
Duration
Start
Finish
%WC
Hours
Duration
Start
Finish
%WC
Hours
Duration
Start
Finish
%WC
Hours
Duration
Start
Finish
%WC
Hours
Duration
Start
Finish
%WC
Hours
Duration
Start
Finish
%WC
Hours
Duration
Start
Finish
%WC
Hours
Duration
Start
Finish
%WC
Hours

08/23/02
09/26/02
0%
1,076 h
102.71 d
06/13/02
10/21/02
0%
240 h
50 d
06/13/02
07/12/02
0%
88 h
60 d
07/29/02
09/27/02
0%
36 h
46 d
07/29/02
08/09/02
0%
44 h
10 d
09/09/02
09/20/02
0%
8h
4d
09/23/02
09/27/02
0%
56 h
25.45 d
08/01/02
09/16/02
0%
25 h
10 d
08/01/02
08/14/02
0%
8h
4d
08/14/02
09/02/02
0%
15 h
9.1 d
09/02/02
09/13/02
0%
8h

L
E

7
-1

39

21

52

L
L

21
24

L
L

21
21

L
L

33
14

L
L

33
33

L
L

33
18

L
L

14
14

55

AUI-- LX375 DB updation

Amar

56

Analysing the requirements(64)

Amar

57

Design the Highlevel Specs-1(65)

Amar

58

Design the Highlevel Specs-2(66)

Amar

59

60

Review of Highlevel Specs(67)

Driver's Licence Validation

Amar

61

Analysing the requirements(51)

Amar

62

Design the Highlevel Specs(52)

Amar

63

64

Amar

65

Review of Highlevel Specs(53)

IRG Validation

Analysing the requirements(55)

Duration
Start
Finish
%WC
Hours
Duration
Start
Finish
%WC
Hours
Duration
Start
Finish
%WC
Hours
Duration
Start
Finish
%WC
Hours
Duration
Start
Finish
%WC
Hours
Duration
Start
Finish
%WC
Hours
Duration
Start
Finish
%WC
Hours
Duration
Start
Finish
%WC
Hours
Duration
Start
Finish
%WC
Hours
Duration
Start
Finish
%WC
Hours
Duration
Start
Finish
%WC

1d
09/13/02
09/16/02
0%
88 h
43.32 d
08/05/02
09/11/02
0%
34 h
11 d
08/05/02
08/13/02
0%
12 h
11 d
08/13/02
08/15/02
0%
34 h
10 d
08/15/02
09/09/02
0%
8h
1d
09/09/02
09/11/02
0%
91 h
37 d
08/02/02
09/10/02
0%
25 h
27 d
08/02/02
08/16/02
0%
58 h
9d
08/16/02
09/09/02
0%
8h
1d
09/09/02
09/10/02
0%
88 h
51.13 d
07/16/02
08/27/02
0%

L
L

14
14

33

31

43

L
L

43
32

L
L

32
33

27

39

L
L

35
25

L
L

25
27

28

Amar

66

Design the Highlevel Specs(56)

Amar

67

Review of Highlevel Specs(57)

68

Amar

Amar

Amar

69

70

71

72

Address Standradisation- Residence Address Scrn

Analysing the requirements(73)

Design the Highlevel Specs(74)

Review of Highlevel Specs(75)

Teritory Validation

Amar

73

Analysing the requirements(47)

Amar

74

Design the Highlevel Specs(48)

Amar

75

Review of Highlevel Specs(49)

Hours
Duration
Start
Finish
%WC
Hours
Duration
Start
Finish
%WC
Hours
Duration
Start
Finish
%WC
Hours
Duration
Start
Finish
%WC
Hours
Duration
Start
Finish
%WC
Hours
Duration
Start
Finish
%WC
Hours
Duration
Start
Finish
%WC
Hours
Duration
Start
Finish
%WC
Hours
Duration
Start
Finish
%WC
Hours
Duration
Start
Finish
%WC
Hours
Duration
Start
Finish

40 h
44 d
07/16/02
07/30/02
0%
40 h
29 d
07/30/02
08/26/02
0%
8h
2d
08/26/02
08/27/02
0%
48 h
25 d
07/29/02
09/16/02
0%
20 h
11 d
07/29/02
08/28/02
0%
20 h
10 d
08/28/02
09/10/02
0%
8h
4d
09/10/02
09/16/02
0%
120 h
21 d
09/10/02
10/08/02
0%
48 h
10 d
09/10/02
09/23/02
0%
64 h
10 d
09/23/02
10/07/02
0%
8h
1d
10/07/02
10/08/02

45

25

L
L

25
28

L
L

49
32

L
L

49
33

L
L

33
34

L
L

34
32

76

AUI Driver Information Screen

Amar

77

Design of New screen(77)

Amar

78

Analysis of Flow of Data(78)

Amar

79

Analysis of Validations(79)

Amar

80

Design the Highlevel Specs(80)

Amar

81

82

Review of Highlevel Specs(81)

AUI request Screen

Amar

83

Design of New screen(83)

Amar

84

Analysis of Flow of Data(84)

Amar

85

Design the Highlevel Specs-1(85)

Amar

86

Design the Highlevel Specs-2(86)

%WC
Hours
Duration
Start
Finish
%WC
Hours
Duration
Start
Finish
%WC
Hours
Duration
Start
Finish
%WC
Hours
Duration
Start
Finish
%WC
Hours
Duration
Start
Finish
%WC
Hours
Duration
Start
Finish
%WC
Hours
Duration
Start
Finish
%WC
Hours
Duration
Start
Finish
%WC
Hours
Duration
Start
Finish
%WC
Hours
Duration
Start
Finish
%WC
Hours
Duration
Start

0%
125 h
78.71 d
07/16/02
10/21/02
0%
20 h
5d
07/16/02
07/23/02
0%
25 h
21 d
07/23/02
08/06/02
0%
32 h
20 d
08/06/02
08/16/02
0%
32 h
9d
10/08/02
10/21/02
0%
16 h
9d
10/08/02
10/21/02
0%
132 h
69.81 d
07/16/02
10/01/02
0%
20 h
3d
07/16/02
07/19/02
0%
66 h
32 d
07/19/02
08/02/02
0%
8h
24 d
08/02/02
08/07/02
0%
28 h
10 d
09/16/02

43

52

L
L

10
9

L
L

10
9

28

45

42

28

Amar

Amar

87

88

89

Witter

Witter

Witter

Jill

Jill

Jill

ED

ED

90

91

92

93

94

95

96

97

Finish
%WC
Hours
Duration
Start
Finish
MS: ECHO Specs completed
%WC
Hours
Duration
Start
Finish
AUI Specs
%WC
Hours
Duration
Start
Finish
AUI - design address standardization
%WC
Hours
Duration
Start
Finish
AUI - design driver's license validation
%WC
Hours
Duration
Start
Finish
AUI - design VIN validation
%WC
Hours
Duration
Start
Finish
Logical Interface Designs (one per each reusable service mod %WC
Hours
Duration
Start
Finish
Logical Interface Design Walkthrough complete (one for each %WC
Hours
Duration
Start
Finish
Reusable Service Catalog entries are made
%WC
Hours
Duration
Start
Finish
Update Delivery Specs Doc
%WC
Hours
Duration
Start
Finish
Review SDS Doc
%WC
Hours
Duration
Review of Highlevel Specs(87)

09/30/02
0%
10 h
1d
09/30/02
10/01/02
0%
0h
0d
10/21/02
10/21/02
0%
75 h
30 d
09/06/02
10/17/02
0%
25 h
10 d
09/06/02
09/20/02
0%
25 h
10 d
09/20/02
10/03/02
0%
25 h
10 d
10/03/02
10/17/02
0%
25 h
5d
10/11/02
10/18/02
0%
2h
1d
10/18/02
10/21/02
0%
2h
1d
10/21/02
10/22/02
0%
20 h
4d
10/22/02
10/25/02
0%
15 h
2d

28

L
L

28
28

L
L

9
9

L
L

7
7

L
L

7
6

L
L

7
7

L
L

7
7

L
L

12
11

L
L

11
9

L
L

9
9

L
L

9
12

Carol

98

99

Steve

100

Steve

101

Steve

102

Steve

103

Steve

104

Steve

Steve

Steve

105

106

107

108

Start
Finish
MS: SDS Doc Authorized
%WC
Hours
Duration
Start
Finish
Testing Strategy and Test Plans
%WC
Hours
Duration
Start
Finish
Create Test Strategy (SRA 6.5) for AUI and ECHO enhanceme %WC
Hours
Duration
Start
Finish
Review Test Strategy (SRA 6.5) for AUI and ECHO enhanceme %WC
Hours
Duration
Start
Finish
Create Defect Tracking Strategy
%WC
Hours
Duration
Start
Finish
Review Defect Tracking Strategy
%WC
Hours
Duration
Start
Finish
Create FIT Test Plan
%WC
Hours
Duration
Start
Finish
Review & Approve FIT Test Plan
%WC
Hours
Duration
Start
Finish
Create Systems/Acceptance Test Plan
%WC
Hours
Duration
Start
Finish
Review & Approve Systems/Acceptance Test Plan
%WC
Hours
Duration
Start
Finish
AIP
%WC
Hours

10/25/02
10/29/02
0%
0h
0d
10/29/02
10/29/02
0%
211 h
91.71 d
07/25/02
11/15/02
0%
50 h
11 d
07/25/02
08/09/02
0%
11 h
5d
08/09/02
08/26/02
0%
40 h
10 d
08/26/02
09/06/02
0%
10 h
5d
09/06/02
09/13/02
0%
40 h
10 d
10/25/02
11/08/02
0%
10 h
5d
11/08/02
11/15/02
0%
40 h
10 d
10/25/02
11/08/02
0%
10 h
5d
11/08/02
11/15/02
0%
212 h

L
L

12
10

L
L

10
10

12

28

25

L
L

12
12

L
L

12
12

L
L

12
12

L
L

12
12

109

Ty

110

Ty

111

Ty

112

Ty

113

Ty

114

115

Ty

116

Ty

117

Ty

Ty

118

119

Duration
Start
Finish
AIP 1 - Assess Existing Technology Architecture
%WC
Hours
Duration
Start
Finish
Identify Architectural Constraints - AIP 1.1
%WC
Hours
Duration
Start
Finish
Inventory Development Tools Standards and Procedures - %WC
Hours
Duration
Start
Finish
Identify Existing Network Topology - AIP 1.2
%WC
Hours
Duration
Start
Finish
Inventory Existing Hardware and System Software - AIP 1.4 %WC
Hours
Duration
Start
Finish
Assemble Architecture Assessment - AIP 1.5
%WC
Hours
Duration
Start
Finish
AIP 2 - Design Technology Architecture
%WC
Hours
Duration
Start
Finish
Design Network - AIP 2.1
%WC
Hours
Duration
Start
Finish
Define Operating Systems - AIP 2.2
%WC
Hours
Duration
Start
Finish
Define Hardware Configuration - AIP 2.3
%WC
Hours
Duration
Start
Finish
Define Data Distribution - AIP 2.4
%WC

81.61 d
07/19/02
11/07/02
0%
36 h
9d
07/19/02
07/31/02
0%
20 h
5d
07/19/02
07/25/02
0%
4h
1d
07/25/02
07/26/02
0%
4h
1d
07/26/02
07/29/02
0%
4h
1d
07/29/02
07/30/02
0%
4h
1d
07/30/02
07/31/02
0%
140 h
63 d
08/14/02
11/07/02
0%
10 h
10 d
08/14/02
09/11/02
0%
10 h
10 d
09/11/02
09/24/02
0%
20 h
10 d
09/11/02
09/24/02
0%

-8

-8

E
E

-16
-15

E
L

-2
1

Ty

Ty

Ty

Ty

Ty

120

121

122

123

124

125

126

Define Middleware Req. - AIP 2.5

Define Application Service Distribution - AIP 2.6

Define Security Infrastructure - AIP 2.7

Define System Topology - AIP 2.8

MS: Technology Architecture Documentation complete

AIP 4 - Validate Technology Architecture

Engineer for Performance

Ty

127

Submit initial IIA questionnaire

Ty

128

Infrastructure Impact Assessment - Level 2 review (if n

129

SFTA Review

Hours
Duration
Start
Finish
%WC
Hours
Duration
Start
Finish
%WC
Hours
Duration
Start
Finish
%WC
Hours
Duration
Start
Finish
%WC
Hours
Duration
Start
Finish
%WC
Hours
Duration
Start
Finish
%WC
Hours
Duration
Start
Finish
%WC
Hours
Duration
Start
Finish
%WC
Hours
Duration
Start
Finish
%WC
Hours
Duration
Start
Finish
%WC
Hours
Duration
Start
Finish

20 h
10 d
09/13/02
09/26/02
0%
20 h
10 d
09/27/02
10/10/02
0%
20 h
10 d
09/27/02
10/10/02
0%
20 h
10 d
10/10/02
10/24/02
0%
20 h
10 d
10/24/02
11/07/02
0%
0h
0d
11/07/02
11/07/02
0%
36 h
14 d
09/10/02
09/25/02
0%
14 h
6d
09/10/02
09/18/02
0%
4h
1d
09/10/02
09/11/02
0%
10 h
5d
09/11/02
09/18/02
0%
22 h
14 d
09/10/02
09/25/02

E
E

-4
-1

E
E

-8
-15

E
E

-8
-8

E
E

-8
-8

E
E

-8
-8

E
E

-8
-8

13

13

Ty

130

Assemble information for SFTA review

Ty

131

Submit SFTA Design Review

Ty

Ty

Ashok

Ashok

132

133

134

SFTA Review process

MS: Authorized SFTA documentation

Budget for remaining phases

209

MS: Project Completed

210

External Dependencies

211

MS: Rxxxxx-Address Standerization Approved Specs

%WC
Hours
Duration
Start
Finish
%WC
Hours
Duration
Start
Finish
%WC
Hours
Duration
Start
Finish
%WC
Hours
Duration
Start
Finish
%WC
Hours
Duration
Start
Finish
%WC
Hours
Duration
Start
Finish
%WC
Hours
Duration
Start
Finish
%WC
Hours
Duration
Start
Finish

0%
10 h
5d
09/10/02
09/17/02
0%
2h
1d
09/17/02
09/18/02
0%
10 h
8d
09/18/02
09/25/02
0%
0h
0d
09/25/02
09/25/02
0%
6,000 h
129 d
10/29/02
04/22/03
0%
0h
0d
04/22/03
04/22/03
0%
0h
0d
07/29/02
07/29/02
0%
0h
0d
07/29/02
07/29/02

10

L
L

8
8

L
L

8
13

L
L

13
13

L
L

10
10

9/30/02
20%
12,345 h
268.06 d
05/06/02
05/02/03
33%
4,014 h
259 d
05/06/02
04/21/03
100%
0h
0d
05/06/02
05/06/02
34%
3,141 h
259 d
05/06/02
04/21/03
42%
699 h
259 d
05/06/02
04/21/03
25%
964 h
198 d
07/26/02
04/21/03
42%
349 h
259 d
05/06/02
04/21/03
42%
712 h
259 d
05/06/02
04/21/03
19%
417 h
183 d
08/15/02
04/21/03
67%
358 h
143.71 d
05/21/02
12/02/02
100%

08/31/02
14%
11,910 h
268.06 d
05/06/02
05/02/03
27%
3,639 h
259 d
05/06/02
04/21/03
100%
0h
0d
05/06/02
05/06/02
26%
3,141 h
259 d
05/06/02
04/21/03
35%
699 h
259 d
05/06/02
04/21/03
15%
964 h
198 d
07/26/02
04/21/03
35%
349 h
259 d
05/06/02
04/21/03
35%
712 h
259 d
05/06/02
04/21/03
10%
417 h
183 d
08/15/02
04/21/03
52%
358 h
143.71 d
05/21/02
12/02/02
100%

67 h
35 d
05/21/02
07/05/02
100%
0h
0d
07/05/02
07/05/02
100%
0h
0d
08/30/02
08/30/02
100%
33 h
55 d
07/05/02
09/19/02
75%
38 h
64 d
07/05/02
10/01/02
0%
0h
0d
10/01/02
10/01/02
0%
0h
0d
10/04/02
10/04/02
100%
110 h
60 d
05/28/02
08/16/02
100%
0h
0d
08/16/02
08/16/02
0%
110 h
30 d
10/21/02
11/29/02
0%
0h
1d
11/29/02
12/02/02

67 h
35 d
05/21/02
07/05/02
100%
0h
0d
07/05/02
07/05/02
0%
0h
0d
08/30/02
08/30/02
0%
33 h
16 d
07/05/02
07/29/02
25%
38 h
46 d
07/05/02
09/06/02
0%
0h
0d
09/13/02
09/13/02
0%
0h
0d
09/20/02
09/20/02
100%
110 h
60 d
05/28/02
08/16/02
100%
0h
0d
08/16/02
08/16/02
0%
110 h
30 d
10/21/02
11/29/02
0%
0h
1d
11/29/02
12/02/02

37%
40 h
166.23 d
09/06/02
04/21/03
75%
20 h
52 d
09/06/02
11/15/02
0%
20 h
10 d
04/07/03
04/21/03
0%
100 h
46 d
10/24/02
12/25/02
53%
2,271 h
122.71 d
06/13/02
11/27/02
51%
1,848 h
110.39 d
06/13/02
11/11/02
100%
10 h
24 d
06/13/02
07/16/02
100%
24 h
1d
07/24/02
07/25/02
100%
8h
1d
07/26/02
07/29/02
100%
0h
0d
08/01/02
08/01/02
20%
480 h
72.39 d
08/05/02

0%
40 h
114.03 d
11/15/02
04/21/03
0%
20 h
10 d
11/15/02
11/29/02
0%
20 h
10 d
04/07/03
04/21/03
0%
100 h
46 d
10/17/02
12/19/02
32%
2,271 h
122.71 d
06/13/02
11/27/02
33%
1,848 h
110.39 d
06/13/02
11/11/02
100%
10 h
24 d
06/13/02
07/16/02
100%
24 h
1d
07/24/02
07/25/02
100%
8h
1d
07/26/02
07/29/02
100%
0h
0d
08/01/02
08/01/02
20%
480 h
72.39 d
08/05/02

11/11/02
100%
5h
3d
07/29/02
08/01/02
100%
13 h
42 d
07/30/02
09/25/02
100%
3h
24 d
07/30/02
08/30/02
100%
3h
23 d
07/31/02
08/30/02
100%
3h
23 d
07/31/02
08/30/02
100%
4h
18 d
08/30/02
09/25/02
100%
45 h
19 d
07/30/02
08/23/02
100%
15 h
19 d
07/30/02
08/23/02
100%
15 h
19 d
07/30/02
08/23/02
100%
15 h
19 d
07/30/02
08/23/02
100%
48 h
18 d

11/11/02
100%
5h
3d
07/29/02
08/01/02
17%
13 h
45 d
07/30/02
09/27/02
25%
3h
1d
07/30/02
07/31/02
25%
3h
5d
07/31/02
08/07/02
25%
3h
5d
07/31/02
08/07/02
0%
4h
1d
09/27/02
09/27/02
100%
45 h
19 d
07/30/02
08/23/02
100%
15 h
19 d
07/30/02
08/23/02
100%
15 h
19 d
07/30/02
08/23/02
100%
15 h
19 d
07/30/02
08/23/02
0%
48 h
25 d

08/30/02
09/25/02
64%
1,076 h
102.71 d
06/13/02
10/30/02
100%
240 h
50 d
06/13/02
08/20/02
41%
88 h
60 d
07/29/02
10/18/02
100%
36 h
46 d
07/29/02
09/30/02
0%
44 h
10 d
09/30/02
10/14/02
0%
8h
4d
10/14/02
10/18/02
100%
56 h
20.1 d
09/03/02
09/30/02
100%
25 h
10 d
09/03/02
09/16/02
100%
8h
4d
09/16/02
09/20/02
100%
15 h
9.1 d
09/16/02
09/27/02
100%
8h

08/23/02
09/26/02
39%
1,076 h
102.71 d
06/13/02
10/30/02
100%
240 h
50 d
06/13/02
08/20/02
20%
88 h
60 d
07/29/02
10/18/02
50%
36 h
46 d
07/29/02
09/30/02
0%
44 h
10 d
09/30/02
10/14/02
0%
8h
4d
10/14/02
10/18/02
0%
56 h
25.45 d
08/30/02
10/03/02
0%
25 h
10 d
08/30/02
09/13/02
0%
8h
4d
09/16/02
09/19/02
0%
15 h
9.1 d
09/19/02
10/02/02
0%
8h

1d
09/27/02
09/30/02
52%
88 h
52.32 d
08/05/02
10/14/02
100%
34 h
20 d
08/05/02
09/13/02
100%
12 h
11 d
08/13/02
09/27/02
0%
34 h
10 d
09/27/02
10/11/02
0%
8h
1d
10/11/02
10/14/02
59%
91 h
47.43 d
08/02/02
10/07/02
100%
25 h
38 d
08/02/02
09/24/02
50%
58 h
9d
09/20/02
10/04/02
0%
8h
1d
10/04/02
10/07/02
45%
88 h
51.13 d
07/16/02
09/24/02
50%

1d
10/02/02
10/03/02
23%
88 h
43.32 d
08/05/02
10/02/02
50%
34 h
11 d
08/05/02
09/02/02
25%
12 h
11 d
08/13/02
09/16/02
0%
34 h
10 d
09/16/02
09/30/02
0%
8h
1d
09/30/02
10/02/02
7%
91 h
37 d
08/02/02
09/23/02
25%
25 h
27 d
08/02/02
09/09/02
0%
58 h
9d
09/09/02
09/20/02
0%
8h
1d
09/20/02
09/23/02
23%
88 h
51.13 d
07/16/02
09/24/02
25%

40 h
44 d
07/16/02
09/13/02
50%
40 h
29 d
07/30/02
09/20/02
0%
8h
2d
09/20/02
09/24/02
31%
48 h
25 d
09/16/02
10/18/02
75%
20 h
11 d
09/16/02
09/30/02
0%
20 h
10 d
09/30/02
10/14/02
0%
8h
4d
10/14/02
10/18/02
30%
120 h
21 d
09/10/02
10/08/02
75%
48 h
15 d
09/10/02
09/30/02
0%
64 h
5d
09/30/02
10/07/02
0%
8h
1d
10/07/02
10/08/02

40 h
44 d
07/16/02
09/13/02
25%
40 h
29 d
07/30/02
09/20/02
0%
8h
2d
09/20/02
09/24/02
0%
48 h
25 d
09/16/02
10/18/02
0%
20 h
11 d
09/16/02
09/30/02
0%
20 h
10 d
09/30/02
10/14/02
0%
8h
4d
10/14/02
10/18/02
0%
120 h
21 d
09/10/02
10/08/02
0%
48 h
10 d
09/10/02
09/23/02
0%
64 h
10 d
09/23/02
10/07/02
0%
8h
1d
10/07/02
10/08/02

55%
125 h
78.71 d
07/16/02
10/30/02
100%
20 h
5d
07/16/02
07/23/02
100%
25 h
42 d
07/23/02
09/18/02
75%
32 h
20 d
08/06/02
10/07/02
0%
32 h
9d
10/18/02
10/30/02
0%
16 h
9d
10/18/02
10/30/02
71%
132 h
77.26 d
07/16/02
10/29/02
100%
20 h
3d
07/16/02
07/19/02
100%
66 h
32 d
07/19/02
09/16/02
100%
8h
24 d
08/02/02
09/18/02
0%
28 h
10 d
10/14/02

45%
125 h
78.71 d
07/16/02
10/30/02
100%
20 h
5d
07/16/02
07/23/02
50%
25 h
21 d
07/23/02
08/20/02
75%
32 h
20 d
08/06/02
09/06/02
0%
32 h
9d
10/18/02
10/30/02
0%
16 h
9d
10/18/02
10/30/02
43%
132 h
69.81 d
07/16/02
10/18/02
100%
20 h
3d
07/16/02
07/19/02
50%
66 h
32 d
07/19/02
09/16/02
50%
8h
24 d
08/02/02
09/18/02
0%
28 h
10 d
10/03/02

10/28/02
0%
10 h
1d
10/28/02
10/29/02
0%
0h
0d
10/30/02
10/30/02
0%
75 h
30 d
09/13/02
10/24/02
0%
25 h
10 d
09/13/02
09/26/02
0%
25 h
10 d
09/27/02
10/10/02
0%
25 h
10 d
10/10/02
10/24/02
0%
25 h
5d
10/23/02
10/29/02
0%
2h
1d
10/29/02
10/30/02
0%
2h
1d
10/30/02
10/31/02
0%
20 h
4d
10/31/02
11/06/02
0%
15 h
2d

10/17/02
0%
10 h
1d
10/17/02
10/18/02
0%
0h
0d
10/30/02
10/30/02
0%
75 h
30 d
09/06/02
10/17/02
0%
25 h
10 d
09/06/02
09/20/02
0%
25 h
10 d
09/20/02
10/03/02
0%
25 h
10 d
10/03/02
10/17/02
0%
25 h
5d
10/23/02
10/29/02
0%
2h
1d
10/29/02
10/30/02
0%
2h
1d
10/30/02
10/31/02
0%
20 h
4d
10/31/02
11/06/02
0%
15 h
2d

11/06/02
11/08/02
0%
0h
0d
11/08/02
11/08/02
53%
211 h
91.71 d
07/25/02
11/27/02
100%
50 h
32 d
07/25/02
09/06/02
100%
11 h
31 d
08/09/02
09/20/02
100%
40 h
10 d
08/26/02
09/06/02
100%
10 h
5d
09/06/02
09/13/02
0%
40 h
10 d
11/06/02
11/20/02
0%
10 h
5d
11/20/02
11/27/02
0%
40 h
10 d
11/06/02
11/20/02
0%
10 h
5d
11/20/02
11/27/02
75%
212 h

11/06/02
11/08/02
0%
0h
0d
11/08/02
11/08/02
32%
211 h
91.71 d
07/25/02
11/27/02
100%
50 h
11 d
07/25/02
08/09/02
75%
11 h
5d
08/09/02
08/26/02
25%
40 h
10 d
08/26/02
09/06/02
0%
10 h
5d
09/06/02
09/13/02
0%
40 h
10 d
11/06/02
11/20/02
0%
10 h
5d
11/20/02
11/27/02
0%
40 h
10 d
11/06/02
11/20/02
0%
10 h
5d
11/20/02
11/27/02
19%
212 h

75.61 d
07/19/02
10/30/02
100%
36 h
9d
07/19/02
07/31/02
100%
20 h
5d
07/19/02
07/25/02
100%
4h
1d
07/25/02
07/26/02
100%
4h
1d
07/26/02
07/29/02
100%
4h
1d
07/29/02
07/30/02
100%
4h
1d
07/30/02
07/31/02
68%
140 h
57 d
08/14/02
10/30/02
100%
10 h
10 d
08/14/02
09/16/02
100%
10 h
10 d
08/26/02
09/09/02
100%
20 h
13 d
09/09/02
09/25/02
100%

81.61 d
07/19/02
11/07/02
100%
36 h
9d
07/19/02
07/31/02
100%
20 h
5d
07/19/02
07/25/02
100%
4h
1d
07/25/02
07/26/02
100%
4h
1d
07/26/02
07/29/02
100%
4h
1d
07/29/02
07/30/02
100%
4h
1d
07/30/02
07/31/02
4%
140 h
63 d
08/14/02
11/07/02
25%
10 h
10 d
08/14/02
09/11/02
25%
10 h
10 d
08/26/02
09/09/02
0%
20 h
10 d
09/11/02
09/24/02
0%

20 h
10 d
09/09/02
09/25/02
100%
20 h
5d
09/19/02
09/25/02
75%
20 h
10 d
09/19/02
10/02/02
0%
20 h
10 d
10/02/02
10/16/02
0%
20 h
10 d
10/16/02
10/30/02
0%
0h
0d
10/30/02
10/30/02
79%
36 h
20.83 d
09/10/02
10/08/02
100%
14 h
6d
09/10/02
09/18/02
100%
4h
1d
09/10/02
09/11/02
100%
10 h
5d
09/11/02
09/18/02
66%
22 h
20.83 d
09/10/02
10/08/02

20 h
10 d
09/13/02
09/26/02
0%
20 h
10 d
09/27/02
10/10/02
0%
20 h
10 d
09/27/02
10/10/02
0%
20 h
10 d
10/10/02
10/24/02
0%
20 h
10 d
10/24/02
11/07/02
0%
0h
0d
11/07/02
11/07/02
0%
36 h
14 d
09/10/02
09/27/02
0%
14 h
6d
09/10/02
09/18/02
0%
4h
1d
09/10/02
09/11/02
0%
10 h
5d
09/11/02
09/18/02
0%
22 h
14 d
09/10/02
09/27/02

100%
10 h
14 d
09/10/02
09/27/02
100%
2h
1d
09/25/02
09/26/02
25%
10 h
8d
09/26/02
10/08/02
0%
0h
0d
10/08/02
10/08/02
0%
6,000 h
129 d
11/08/02
05/02/03
0%
0h
0d
04/22/03
04/22/03
0%
0h
0d
07/29/02
07/29/02
0%
0h
0d
07/29/02
07/29/02

0%
10 h
5d
09/10/02
09/17/02
0%
2h
1d
09/17/02
09/18/02
0%
10 h
8d
09/18/02
09/27/02
0%
0h
0d
09/27/02
09/27/02
0%
6,000 h
129 d
11/08/02
05/02/03
0%
0h
0d
04/22/03
04/22/03
0%
0h
0d
07/29/02
07/29/02
0%
0h
0d
07/29/02
07/29/02

Proj. 1234 Schedule Tasks Status Summary as on

06/10/03

1. General Information:
Schedule Tasks
Status related
Statistics (based on
MS Project Schedule)
Leadwise details are
given on "TaskSum"
tab

Earned Value Analysis


done as on
7/31/2002

Total number of Tasks in the Schedule:

303

Total number of Tasks Finished till date:

250

Total number of in-progress Tasks:

12

Total number of Tasks slipped on Finish

Total number of Tasks slipped on Start

Total Schedule Hours for all Tasks

10779

Total completed hours for all Tasks

9408

Total hours completed as % of Total Schedule hours

87%

Schedule Performance Index (SPI) as on 7/31/2002

90%

Cost Performance Index (CPI as on 7/31/2002

103%

Total basline-1 scheduled hours as on 7/31/02

11910

Total baselined Earned hours as on 7/31/2002

8661

Total hours actually used by team as on 6/10/2003

9267

Total remaining balance hours as on 6/10/2003

3300
1290

Total Remaining Hours to complete the project

10557

Total Hours Estimated to Complete

Tasks status updates


from resource Leads
PARs submitted
Authorizations done
Attention Required
(General comments)

Page 63 of 245

Proj. 1234 Tasks that are over due to finish or start as on


Sr. No. Lead

Code Task Name

06/10/03

%WC

Start

Finish

Remarks

Durnan

450

MQ Q/A Transition to MQService Agreement

0%

06/09/03

06/13/03 Start date needs revision.

ED

488

SAT - Create FIT Test Cases

0%

06/02/03

06/16/03 Start date needs revision.

SteveH

484

SAT - Create System/Acceptance Test Summary Report

0%

06/02/03

06/04/03 Start/Finish dates need revision.

SteveH

485

SAT - Authorize System/Acceptance Test Summary Report

0%

06/04/03

06/11/03 Start date needs revision.

Vance

363

MS: ISC Review Pkg-2 SFQ Solutions

0%

05/23/03

05/23/03 Start/Finish dates need revision.

Vance

364

Populate pkg-2 SFQ Solutions

0%

05/23/03

05/30/03 Start/Finish dates need revision.

NOTE: Start / Finish dates may be needed to be revized if these dates are less than the as on status date.

Proj. 1234
Sr. No. Lead
1

Amar

All Unfinished Tasks List as on


Code Task Name

05/13/03
%WC

Start

Finish

25%

11/25/02

06/13/03

Necho Pkg-3 Prep for pilot issuance

0%

06/24/03

07/04/03

506

MS: Pkg-3 Pilot Necho

0%

07/17/03

07/17/03

507

MS: NECHO Pkg-3 cowide Issuance

0%

08/07/03

08/07/03

425

Necho RSC Entry for Terr valid & Address Std

505

3
4
5

Brian

423

Host Addr Std/ terr-Coding

75%

12/27/02

05/16/03

Carol

604

MS: Lessons Learned doc

0%

08/28/03

08/28/03

24

Authorize final SPIP for transition

0%

08/27/03

09/09/03

606

Project Closure Tasks

0%

09/04/03

09/10/03

607

MS: Project Completed

0%

09/10/03

09/10/03

10

419

MQ Integration Testing

50%

04/09/03

05/28/03

11

450

MQ Q/A Transition to MQService Agreement

0%

06/09/03

06/13/03

12

508

MQ Pilot/Issuance

0%

07/03/03

07/17/03

483

SAT -Perform System/Acceptance Testing pkg-3

75%

04/14/03

05/16/03

14

493

Pkg-3 Draft Communication

0%

05/12/03

05/16/03

15

361

Pkg-2 Publish Communication

0%

05/12/03

05/19/03

16

494

Pkg-3 Communication Review by Proj Team

0%

05/16/03

05/23/03

17

488

SAT - Create FIT Test Cases

0%

05/16/03

05/30/03

18

495

Pkg-3 UPD Walkthrough with SPIP group

0%

05/23/03

05/30/03

19

489

SAT - Perform FIT Testing - Pkg-3

0%

05/30/03

06/24/03

20

370

Pkg 2-Post implemetation questions

0%

05/29/03

06/25/03

21

371

MS: Pkg-2 Completed

0%

06/25/03

06/25/03

22

500

Pkg-3 Publish Communication

0%

07/24/03

07/31/03

23

509

Pkg-3-Post implemetation questions

0%

08/07/03

09/04/03

510

MS: Pkg-3 Completed

0%

09/04/03

09/04/03

366

Mid Tier-Host Prep cowide issuance

0%

05/16/03

05/22/03

367

MS: Mid Tier-Host cowide issuance

0%

05/22/03

05/22/03

13

Durnan

ED

24
25

John

26
27

359

MS: Pkg-2 Create Agency cowide communications

0%

05/15/03

05/15/03

28

360

MS: Pkg-2 Publish Agency cowide communications

0%

05/22/03

05/22/03

29

496

MS: Pkg-3 Create Agency pilot communications

0%

06/26/03

06/26/03

30

497

MS: Pkg-3 Publish Agency pilot communications

0%

07/03/03

07/03/03

31

498

MS: Pkg-3 Create Agency cowide communications

0%

07/18/03

07/18/03

32

499

MS: Pkg-3 Publish Agency cowide communications

0%

07/24/03

07/24/03

312

Set-up FIT Test Environment

75%

01/21/03

05/16/03

33

Lynn

SteveH

34

351b Execute Perf. Testing Pkg-2

75%

04/15/03

05/16/03

35

351c

25%

05/02/03

05/16/03

36

491a Setup Performance Test Environment -pkg3

50%

05/05/03

05/16/03

Implementation testing execution pkg-2

37

484

0%

05/16/03

05/21/03

38

491b Execute Performance Testing - pk3

0%

05/16/03

05/23/03

39

485

SAT - Authorize System/Acceptance Test Summary Report

0%

05/21/03

05/28/03

40

490

SAT - Create FIT Test Summary Report

0%

06/24/03

07/08/03

491

SAT - Authorize FIT Test Summary Report

0%

07/08/03

07/15/03

478

Pkg-3 - Review NECHO Technical System Design TSD 9.2

75%

04/04/03

05/16/03

43

479

Pkg-3 - Review Consolidated Technical Documentation TPD 7.1

75%

04/04/03

05/16/03

44

602

Update design documents (AIP 2.6) to reflect implemented system

0%

08/07/03

08/08/03

45

603

Transition design documents to local architect

0%

08/07/03

08/11/03

362

Create Pkg-2 SFQ Solutions

75%

03/21/03

05/09/03

41
42

46

Ty

Vance

SAT - Create System/Acceptance Test Summary Report

47

363

MS: ISC Review Pkg-2 SFQ Solutions

0%

05/23/03

05/23/03

48

364

Populate pkg-2 SFQ Solutions

0%

05/23/03

05/30/03

49

501

Create Pkg-3 SFQ Solutions

0%

05/30/03

06/12/03

50

502

MS: ISC Review Pkg-3 SFQ Solutions

0%

06/26/03

06/26/03

51

503

Populate pkg-3 SFQ Solutions

0%

06/26/03

07/03/03

52

605

Transition to Service

0%

08/07/03

09/04/03

368

AUI Pkg-2 Prep for cowide issaunce

0%

05/22/03

05/29/03

369

MS: AUI Pkg-2 cowide Issuance

0%

05/29/03

05/29/03

53
54

Witter

Remarks

Proj. 1234 Team Allocation Status as on


12103
Sr
No

Resource Name

1 Amarnath Bommisetti

06/10/03

9267

3300

Total PAR
Hours

Start date

End date

Total used
Hours

Avg. Burn
Rate /Week

Remaining
Hours

Available
Hrs/week

1827

07/01/02

12/18/03

1747

136

Availablity
Req %
0%

Proj. 1234 PAR Extension Forecast as on

1 Ashok Kumar

7518
Current Remaining
Hours from
PlanView

Hours use Forecast


for Remaining
period

Resource required
to be on project till
date

04/22/03 -93887

Total hours
allocated in
schedule
Schedule
Allocation Rate /
week
Average of
Schedule Alloc
Rate & Burn Rate
Use this Burn Rate
for Forecasting

10740
Current Average
Burn Rate / Week

Current Total used


Hrs from PlanView

Allocation Finish
date

3472
Allocation Start
date

Name as MS
Outlook
Directory

Current Total
AlloCation Hours

11960
Sr
No

06/10/03

500

05/06/02

04/22/03

293

652

13

10

04/22/03

-7157

216

2 Amarnath Bommiset

1700

07/01/02

04/22/03

744

1254

30

15

27

04/22/03

-19455

1069

3 Carol Elam

1000

05/06/02

04/22/03

317

984

20

10

14

04/22/03

-10339

697

4 Ed Weidenbenner

1000

05/06/02

04/22/03

282

327

04/22/03

-5358

122

5 Eric Gullixon

1200

05/06/02

04/22/03

91

247

04/22/03

-2608

110

6 J Murthy

1700

05/06/02

04/22/03

530

1376

27

14

13

04/22/03

-9358

1170

05/06/02

10/14/02

161

11/30/02

-1043

120

8 Lakshmi Narayana

300

05/06/02

04/22/03

41

447

04/22/03

-2102

259

9 Mary Kasley Lee

135

07/15/02

11/21/02

81

238

12

11/30/02

-4017

57

10 Michelle Celeschi

500

05/06/02

04/22/03

127

442

04/22/03

-4505

373

11 Steve Hall

760

05/06/02

04/22/03

153

590

12

04/22/03

-3986

607

12 Steve Witter

200

07/15/02

04/22/03

203

705

18

04/22/03

-2279

331

13 Tina L Dobrinich

525

05/06/02

04/22/03

126

426

04/22/03

-2931

399

14 Ty Hartness

135

07/15/02

11/21/02

92

264

13

11/30/02

-3948

43

15 Vance Dejaynes

990

07/25/02

06/28/03

164

964

25

13

17

04/22/03

-12172

827

16 John Isaacson

16

08/01/02

04/22/03

24

04/22/03

-713

17 Michael Frey

44

05/06/02

04/04/03

56

04/22/03

-1914

7 Jill Kastello

160

18 Brenda Austin

04/22/03

19 Carey Voyles

04/22/03

20 Janie Houchin

04/22/03

21 Liz Fry

04/22/03

22 Lynn C Flannelly

41

04/22/03

23 Sherrill Leslie

25

10/07/02

04/30/02

25

04/22/03

18

24 Bill Malone

300

10/18/02

04/22/03

25

362

14

04/22/03

275

25 Brian Brown

100

11/18/02

05/31/03

20

100

04/22/03

80

26 David Stern

50

42

04/22/03

50

27 John Nutt
28 Steve Durnan
29 Sushit Saha

300

10/18/02

04/22/03

13

230

04/22/03

287

30

10/18/02

04/22/03

16

316

12

04/22/03

19

38

04/22/03

97

100

30 Charles Paige

50

10/07/02

04/30/02

24

50

04/22/03

26

31 Daniel Lade

25

10/07/02

04/30/02

25

04/22/03

16

32 Dave Sanders

50

10/07/02

04/30/02

50

04/22/03

45

33 Gilbert Saenz

25

10/07/02

04/30/02

25

04/22/03

23

200

10/07/02

04/30/02

17

200

04/22/03

183

34 Harry Ma

Average Net Hours


Available / week

11960
Net Allocation
hours after
extension

0
Final Decision on
Hours extension

Active / Inactive ?

Forecasted Hours Remaining Hours

Is Authorized?

Y Y

500

10

1700

40

1000

20

1000

20

1200

24

1700

34

300

135

500

10

760

15

200

525

10

135

990

26

0 Y

16

0 Y

44

25

300

11

100

50

300

11

30

100

50

25

50

25

200

Remarks

Proj. 1234 Team Contact List


SrNo Name

Role

ID

Loc

Tel No

From

Amarnath BommisettSystems Analyst

L0MK

K-4

735-9066

Satyam

Ashok Kumar

Proj Planner

JD16

L-2

735-3244

HTC

Carol Elam

Proj Manager

A22H

M-4

763-4256

SF

Ed Weidenbenner

Business Analyst C53Q

DEERF417-888-61 SF

Eric Gullixon

Systems Analyst

GYUV

M-4

766-8964

SF

J Murthy

Systems Analyst

HKCE

L-3

735-9081

Satyam

Jill Kastello

Systems Analyst

GH4V

M-3

766-9060

SF

Lakshmi Narayana Systems Analyst

H503

K-4

735-1199

Satyam

Mary Kasley Lee

Systems Analyst

A2KO

H-3

763-3729

SF

10

Michelle Celeschi

OSS(ASA)

L2O5

M-4

766-7646

SF

11

Steve Hall

Test Specialist

JH2T

L-4

763-7830

SF

12

Steve Witter

Systems Analyst

GBHZ

L-3

763-3870

SF

13

Tina L Dobrinich

Business Analyst A1BO

K-4

763-3613

SF

14

Ty Hartness

Systems Analyst

BR7P

M-1

766-6133

SF

15

Vance Dejaynes

Project CoordinatoGJ78

K-4

763-3867

SF

16

Charles Paige

IIA-Team CoordinaLL7M

H-3

735-4568

ROSE INT

17

Daniel Lade

IIA-Network ImpacJ4SV

H-4

763-9136

AVIANT

18

Dave Sanders

IIA-Windows Perf NBUD

H-3

766-5836

LEVI,RAY

19

Gilbert Saenz

IIA-IBM MF Perfo J5OY

H-4

763-4304

NATIONAL

20

Harry Ma

IIA-Proactive Per NAKR

H-4

766-2968

SCB COMP

21

John Isaacson

GDP4

K-4

763-3958

SF

22

Michael Frey

Systems Analyst

CS8K

VISAL 625-6920

SF

23

Sherrill Leslie

IIA-Network Perfo H48H

H-4

SF

735-3968

Proj. 1234

Schedule v/s PlanView Allocation Analysis


Schedule Load (Hours)

Resource Name
Amarnath Bommisetti
Ashok Kumar
Bill Malone
Carol Elam
Charles Paige
Daniel Lade
Dave Sanders
David Stern
Steve Durnan

Admin

SRA/SDS/AIP

Package-1

Package-2

Total Sch

PV Hrs

PV-Sch Hrs

51
652
20
984
50
25
50

441

77

696

1700
500
300
1000
50
25
50
50

135
500
1700
25
760
100
525
135
990
200

435
-152
-62
16
0
0
0
8
-185
673
953
-17
0
0
-11
70
-147
-51
-103
58
324
0
170
62
99
-129
26
-507

11770

1530

492

112

674

134

120

99
30
964

133
139

35

250
38
194
60

98

127

118

364

1265
652
362
984
50
25
50
42
185
327
247
17
25
200
11
230
447
51
238
442
1376
25
590
38
426
264
964
707

4243

1977

596

3424

10240

96
98

Ed Weidenbenner
Eric Gullixon
EricH
Gilbert Saenz
Harry Ma
Jeff
John Nutt

342

63
99

68
15

42
185
100
35
17

25
200

Lakshmi Narayana Reddy


Lynn C Flannelly
Mary Kasley Lee
Michelle Celeschi
J Murthy
Sherrill Leslie
Steve Hall
Sushit Saha
Tina L Dobrinich
Ty Hartness
Vance Dejaynes
Steve Witter

Totals

20
100

41
133

30
442
99
25
86

175

11
169
214
51
33

1000
1200
25
200
300
300

Remarks
Excess allocation in PV
Extend PAR
Extend PAR

Extend PAR
Excess allocation in PV
Excess allocation in PV

Excess allocation in PV

Extend PAR
Extend PAR
Extend PAR
Excess allocation in PV
Excess allocation in PV
Excess allocation in PV
Excess allocation in PV
Extend PAR
Extend PAR

25
100

300
302
124
354
1700
25
775
117
550
134
990
775

958
50
25
50

80

772
340

63
99

58

30
429
99

100

1
205
190

17

25
200
98
20
100

80
20

35
96
98

7
10
7

11

63
41
133
175
3
492

187
41
2

101

7
214
6

3
10

684
49

25
86

134

99

133

30
964
98

139

14

127

113

70

156

2
20
247

130
31
204
4
20

7
3
3

1277
483
335
80
741
26
25
26
35
160
318
162
17
25
4
11
126
243
409
41
213
343
1340
35
25
498
31
400
185
781
525

8755 1684 3215

PlanView Used
hours "

R10481 - Pkg -3
Design/Build/Test/Im
plement

441
4

0 8920
Schedule completed
hours

R10481 - Pkg -2
Design/Build/Test/Im
plement

51
638
20

76
R10481 - Transition

2540

R10481 - Pkg -1
Design/Build/Test/Im
plement

Sch Hrs
1350
652
367
80
984
50
25
50
36
205
507
197
17
25
200
11
161
255
447
41
220
442
1375
49
25
576
38
436
192
1004
588

1168

1747
514
194
100
548
57
48
11
75
172
499
118
8
79

144
144
92
227
1447
20
675
62
445
116
325
809
59
24
0
0

-1614
Sch Unifinished PV Remaining hours

1827
739
300
164
1014
70
55
11
65
162
556
202

479

PlanView Remaining
hours

-477
-87
67
-84
-30
-20
-30
39
-29
43
-49
-5
17
0
100
11
161
-45
145
41
96
88
-325
49
0
-199
-79
-114
58
14
-187

2054

06/10/03
Schedule Unfinished
hours

Amar
Ashok
Bill
Brian
Carol
Charles
Daniel
Dave
David
Durnan
Ed
Eric
EricH
Gilbert
Harry
Jeff
Jill
John
Lakshmi
Lynn
Mary
Michelle
Murthy
PerTeam
Sherrill
SteveH
Sushit
Tina
Ty
Vance
Witter

PV Hrs

Sch - PV Hrs

Resource Name

4287

R10481 - Reqs
Analysis and
Solution Def/Specs

-832 11436 10604

R10481 Planning/Admin/Mee
tings/Coordination

Proj. 1234Schedule v/s PlanView Allocation Variance as on

74
170
32
0
244
24
0
24
1
45
189
35
0
0
196
0
35
12
38
0
6
98
36
14
0
78
7
36
7
223
62
0
0
0
0

136
225
107
64
467
14
7

-62
-55
-75
-64
-223
11
-7
24
1
25
132
-50
0
-17
175
0
35
-144
-120
0
-25
-47
-275
14
-5
-104
-55
-105
-11
-448
47
-59
-24
-50
-50

20
57
85
0
17
21
0
0
156
158
32
145
311
0
5
182
62
141
18
671
15
0
0
50
50

Bommisetti Amarnath
Kumar Ashok
Malone Bill
Brown Brian [GS03]
Elam Carol
Paige Charles
Lade Daniel
Sanders Dave
Stern David
Durnan Steve
Weidenbenner Ed
Gullixon Eric
EricH
Saenz Gilbert
Ma Harry
Jeff
Jill
Nutt John
Reddy Lakshmi Narayana
Flannelly Lynn C
Lee Mary Kasley
Celeschi Michelle
Murthy J
PerTeam
Leslie Sherrill
Hall Steve
Saha Sushit
Dobrinich Tina L
Hartness Ty
Dejaynes Vance
Witter Steve
Frey Michael
Isaacson John
Awan Zafar
Miller Kim

x
x

Schedule completed hours


PlanView Used hours "
Schedule Unfinished hours
PlanView Remaining hours
Sch Unifinished - PV Remaining hours

-832
###
###
4287
2054
479
1168
2540
76
0
8920
8755
1684
3115
-1514

-477
1827
1350
51
441
80

-87
739
652
638
4

340
772
7

10

1277
1747
74
136
-62

483
514
170
225
-55

335
194
32
107
-75

-20
70
50
50

-30
55
25
25

39
11
50
50

David Stern

Dave Sanders

Daniel Lade

-84
-30
164 1014
80
984
958
6

Charles Paige

67
300
367
20

Carol Elam

Brian Brown

Schedule - PlanView Alloc Difference


Current PlanView Allocation Hours
Current Schedule Assignment Hours
Planning/Admin/Meetings/Coordination
Reqs Analysis and Solution Def/Specs
Pkg -1 Design/Build/Test/Implement
Pkg -2 Design/Build/Test/Implement
Pkg -3 Design/Build/Test/Implement
Transition

Amarnath
Bommisetti

Total

Resource Name

Bill Malone

Schedule v/s PlanView Allocation Var


Ashok Kumar

Proj. 1234

-29
65
36

35
80
20
80
100
0
64
-64

741
548
244
467
-223

1
26
57
24
14
11

25
48
0
7
-7

26
11
24

35
75
1

24

43
162
205

205

-49
556
507
96
63
58
100
190

160
172
45
20
25

318
499
189
57
132

-5
202
197
98
99

17
17

0
25
25
25

100
100
200
200

17

11

161

11

161
98
63

11

-45.5
300
255
20
41

145
302
447
99.9
133

187
214
6.53

162
118
35
85
-50

17
0
0
0

25
8
0
17
-17

4
79
196
21
175

11

126

0
0
0

35
0
35

243
409
144
144
11.53 37.62
156
158
-144 -120

41.2 95.96 87.76 -325 49.36


124
354 1700
41.2
220
442 1375 49.36
29.84
429 98.78
175
3
492
41.2 2.16
101
3.88
49.36
6.36
684
2.8
10
41.2

Tina L
Dobrinich

Sushit Saha

Steve Hall

Sherrill Leslie

PerTeam

J Murthy

Michelle
Celeschi

Mary Kasley
Lee

Lynn C
Flannelly

Lakshmi
Narayana
Reddy

John Nutt

Jill

Jeff

Harry Ma

Gilbert Saenz

EricH

Eric Gullixon

Ed
Weidenbenner

Steve Durnan

Allocation Var 06/10/03

0 -199 -79.5 -114


25
775
117
550
25
576 37.53
436
25 85.75
98.78
134
133
70.11
156
130
31
204
6.53

213
343 1340
35
25
498
31 399.7
92.25
227 1447
20
675
62 444.5
0 6.49 98.31 35.84 14.36
0 77.95 6.53 35.99
31.75
145
311
0 4.98
182 61.98
141
0 -25.3 -46.7 -275 14.36 -4.98 -104 -55.5 -105

Steve Witter

Vance
Dejaynes

Ty Hartness

57.56
14 -187
134
990
775
192 1004
588
29.84
964 97.75
139
127
13.84
113
2.12
20
247
3.64
20
3.2
2.61
185 781.2
525
116
325
809
6.89 222.8 62.42
17.75
671 14.98
-10.9 -448 47.44

59
0
0
-59

24
0
0
-24

Proj. 1234 PARs Status Details

as on 06/10/03

PAR Assignment & PlanView Allocation


Assigned to

Submited Approved Alloc.


on Date
on Date Hours

PAR - Submission Details


Team
Status

PAR Key Project Role


Ref No

Work Entity

From
Date

To
Alloc.
Date Hours

Ashok Kumar
Carol Elam

05/01/02
05/01/02

05/01/02
05/01/02

500
1000

Up
Up

Initial Alloc
Initial Alloc

Proj Planner
Proj Manager

R10481--RESERVED PROJECT TE 05/06/02


R10481--RESERVED PROJECT TE 5/6/2002

04/22/03
04/22/03

500
1000

Ed Weidenbenner

05/01/02

05/01/02

1000

Up

Initial Alloc

Business Analyst

R10481--RESERVED PROJECT TE 5/6/2002

04/22/03

1000

Eric Gullixon

05/01/02

05/01/02

1200

Up

Initial Alloc

Systems Analyst

R10481--RESERVED PROJECT TE 5/6/2002

04/22/03

1200

Jill Kastello

05/01/02

05/01/02

120

Up

Initial Alloc

Systems Analyst

R10481--RESERVED PROJECT TE 5/6/2002

07/26/02

120

Michael Frey

05/01/02

05/01/02

30

Up

Initial Alloc

Systems Analyst

R10481--RESERVED PROJECT TE 5/6/2002

4/4/2003

30

Michelle Celeschi

05/01/02

05/01/02

494

Up

Initial Alloc

OSS(ASA)

R10481--RESERVED PROJECT TE 5/6/2002

04/22/03

500

Steve Hall

05/01/02

05/01/02

750

Up

Initial Alloc

Test Specialist

R10481--RESERVED PROJECT TE 5/6/2002

04/22/03

750

sion Details
Skills

Role Steward

Project Planning and Tracking


Project Management

DONNA ANDREWS

???Requirements Ananlysis, Acceptance


criteria
Design/Development ( ? )
Design/Development ( ? )
Design/Development ( ? )
Administrattive Support
Testing Coordination

Auto- Increase Underwriting Product Order Abatement & Automated Issuance


Lead

Task
Code
22

Task Name
SRA / SDS

Work in
Hours

Duration
in Days

Planned
Start Date

Planned Predecessor
Finish date

Successors

1,226 h

194.68 d

02/18/02

11/07/02

ED

23

Determine Business Requirements

10 h

23 d

06/13/02

07/15/02

24FS+6 d

ED

24

Review Testable Business Requirements

24 h

1d

07/23/02

07/24/02 23FS+6 d

61,26FS+5 d,25

ED

25

Review Business Requirements

8h

1d

07/25/02

07/25/02 24FS+1 d

27,29FS+1 d,34

ED

26

MS: Business Req approved

0h

0d

07/30/02

07/30/02 24FS+5 d

91

Tina

27

Create New ECHO Screen Layout

5h

3d

07/26/02

07/30/02 25

28

Domain Specs

13 h

47.01 d

07/26/02

09/30/02

Jill

29

DOMAIN - review existing territory validation

3h

1d

07/26/02

07/29/02 25FS+1 d

30

Jill

30

DOMAIN - review existing IRG validation

3h

5d

07/29/02

08/05/02 29

31SS

Jill

32

DOMAIN - review existing driver's license validation

3h

5d

07/29/02

08/05/02 30SS

37

Jill

33

Create SRA 4/SDS 3.1 identifying impacted reusable servic

4h

1d

09/27/02

09/30/02 37

69

45 h

128.68 d

02/18/02

08/09/02

34

AUTO Specs

Eric

35

AUTO - review existing territory validation

15 h

5d

07/26/02

08/02/02 25FS+1 d

Eric

36

AUTO - review existing IRG validation

15 h

5d

08/02/02

08/09/02 34

Eric

38

AUTO - review existing driver's license validation

15 h

5d

02/18/02

02/22/02

69

Jill

39

Determine Validation Components for ECHO & AUI

48 h

40.01 d

08/05/02

09/27/02 34,31

32,54

41

ECHO Specs

721 h

45 d

07/26/02

09/26/02

42

237 h

30 d

08/16/02

09/26/02

57

Tina

42a

ECHO - New Territory Info Screen

79 h

10 d

08/16/02

08/30/02 34FS+10 d

41,44SS

Tina

42b

ECHO - New Territory Info Program

79 h

10 d

08/30/02

09/12/02 40

42

Tina

42c

ECHO - New Territory Info Interfaces

79 h

10 d

09/12/02

09/26/02 41

43

ECHO - design territory validation

35,37,40FS+10 d

237 h

30 d

08/16/02

09/26/02

Tina

43a

ECHO - New IRG Info Screen

79 h

10 d

08/16/02

08/30/02 40SS

45,48SS

Tina

43b

ECHO - New IRG Info Program

79 h

10 d

08/30/02

09/12/02 44

46

Tina

43c

ECHO - New IRG Info Interfaces

79 h

10 d

09/12/02

09/26/02 45

57

237 h

30 d

08/16/02

09/26/02

45

ECHO - design IRG validation

ECHO - design driver's license validation

Tina

45a

ECHO - New Driver's Info Screen

79 h

10 d

08/16/02

08/30/02 44SS

49

Tina

45b

ECHO - New Driver's Info Program

79 h

10 d

08/30/02

09/12/02 48

50

Tina

45c

ECHO - New Driver's Info Interfaces

79 h

10 d

09/12/02

09/26/02 49

57

Tina

46

ECHO - Design Auto App AUI Request Screen

5h

3d

07/26/02

07/31/02 25FS+1 d

52SS

Tina

47

ECHO - Design ECHO Residence Address Screen

5h

3d

07/26/02

07/31/02 51SS

69

75 h

30 d

09/27/02

11/07/02

48

AUI Specs

MiChae50

AUI - design address standardization

25 h

10 d

09/27/02

10/11/02 37

55

MiChae52

AUI - design driver's license validation

25 h

10 d

10/11/02

10/24/02 54

56

MiChae54

AUI - design VIN validation

25 h

10 d

10/24/02

11/07/02 55

Jill

55

Logical Interface Designs (one per each reusable service modi

25 h

5d

09/26/02

10/03/02 46,50,39

58

Jill

56

Logical Interface Design Walkthrough complete (one for each

2h

1d

10/03/02

10/04/02 57

59

Jill

57

Reusable Service Catalog entries are made

2h

1d

10/04/02

10/07/02 58

69

58

Testing Strategy and Test Plans

213 h

74 d

07/24/02

10/31/02

Steve 59

Create Test Strategy (SRA 6.5) for AUI and ECHO enhan

50 h

10 d

07/24/02

08/06/02 24

62

Steve 60

Review Test Strategy (SRA 6.5) for AUI and ECHO enhanc

13 h

5d

08/06/02

08/13/02 61

63

Steve 61

Create Defect Tracking Strategy

40 h

10 d

08/13/02

08/27/02 62

64

Steve 62

Review Defect Tracking Strategy

10 h

5d

08/27/02

09/03/02 63

Steve 63

Create Implementation Test Plan

40 h

10 d

10/11/02

10/24/02 69

66

Auto- Increase Underwriting Product Order Abatement & Automated Issuance


Lead

Task
Code

Task Name

Work in
Hours

Duration
in Days

Planned
Start Date

Planned Predecessor
Finish date

Steve 64

Review Implementation Test Plan

10 h

5d

10/24/02

10/31/02 65

Steve 65

Create Acceptance Test Plan

40 h

10 d

10/11/02

10/24/02 69

Steve 66

Review Acceptance Test Plan

10 h

5d

10/24/02

10/31/02 67

Successors

68

ED

67

Update Delivery Specs Doc

20 h

4d

10/07/02

10/11/02 59,36,52,32

65,67,70

ED

68

Review SDS Doc

15 h

1d

10/11/02

10/14/02 69

71

Carol

69

SDS Doc Authorized

0h

0d

10/14/02

10/14/02 70

74,75

209 h

114 d

07/30/02

01/01/03

36 h

8d

10/14/02

10/23/02

20 h

5d

10/14/02

70
71

AIP
AIP 1 - Assess Existing Technology Architecture

Ty

72

Identify Architectural Constraints - AIP 1.1

10/21/02 71

76

Ty

73

Inventory Development Tools Standards and Procedures - A

4h

1d

10/14/02

10/15/02 71

77

Ty

74

Identify Existing Network Topology - AIP 1.2

4h

1d

10/21/02

10/21/02 74

77

Ty

75

Inventory Existing Hardware and System Software - AIP 1.4

4h

1d

10/21/02

10/22/02 75,76

78

Ty

76

Assemble Architecture Assessment - AIP 1.5

4h

1d

10/22/02

10/23/02 77

80,83

140 h

40 d

10/23/02

12/17/02

77

AIP 2 - Design Technology Architecture

Ty

78

Design Network - AIP 2.1

10 h

10 d

10/23/02

11/06/02 78

Ty

79

Define Operating Systems - AIP 2.2

10 h

10 d

11/06/02

11/20/02 80

Ty

80

Define Hardware Configuration - AIP 2.3

20 h

10 d

11/06/02

11/20/02 80

84

Ty

81

Define Data Distribution - AIP 2.4

20 h

10 d

10/23/02

11/06/02 78

84,85

Ty

82

Define Middleware Req. - AIP 2.5

20 h

10 d

11/20/02

12/03/02 82,83

Ty

83

Define Application Service Distribution - AIP 2.6

20 h

10 d

11/06/02

11/20/02 83

86

Ty

84

Define Security Infrastructure - AIP 2.7

20 h

10 d

11/20/02

12/03/02 85

87

Ty

85

Define System Topology - AIP 2.8

20 h

10 d

12/03/02

12/17/02 86

88

Ty

86

MS: Technology Architecture Documentation complete

0h

0d

12/17/02

12/17/02 87

94

87

AIP 4 - Validate Technology Architecture

33 h

114 d

07/30/02

01/01/03

12 h

6d

07/30/02

08/07/02

2h

1d

07/30/02

07/31/02 26

10 h

5d

07/31/02

08/07/02 91

21 h

11 d

12/17/02

01/01/03

10 h

5d

12/17/02

12/24/02 88

95

1h

1d

12/24/02

12/25/02 94

96

10 h

5d

12/25/02

01/01/03 95

97

0h

0d

01/01/03

01/01/03 96

88

Engineer for Performance

Ty

89

Submit initial IIA questionnaire

Ty

90

Infrastructure Impact Assessment - Level 2 review (if ne

91

SFTA Review

Ty

92

Assemble information for SFTA review

Ty

93

Submit SFTA Design Review

Ty

94

SFTA Review process

Ty

95

MS: Authorized SFTA documentation

81,82

92

Resources

Ed[0.03],Tina[0.03]
Ed[0.26],Carol[0.5],Ashok[0.4],Eric[0.4],Murthy,Jill[0.4],Lakshmi,Michael[0.4],Steve[0.4],Tina,Amarnath,Michelle[0.4]
Ed,Carol[0.5],Tina,Eric[0.26]
Tina[0.22]
Jill[0.39]
Jill[0.08]
Jill[0.08]
Jill[0.26],Ed[0.4],Tina[0.4]
Eric[0.39]
Eric[0.39]
Eric[0.39]
Eric[0.03],Ty,Mary,Tina,Jill[0.03],Michael[0.03]

Tina[0.13],Lakshmi[0.19],Murthy[0.35],Amarnath[0.35]
Tina[0.13],Lakshmi[0.19],Murthy[0.35],Amarnath[0.35]
Tina[0.13],Lakshmi[0.19],Murthy[0.35],Amarnath[0.35]
Tina[0.13],Lakshmi[0.19],Murthy[0.35],Amarnath[0.35]
Tina[0.13],Lakshmi[0.19],Murthy[0.35],Amarnath[0.35]
Tina[0.13],Lakshmi[0.19],Murthy[0.35],Amarnath[0.35]
Tina[0.13],Lakshmi[0.19],Murthy[0.35],Amarnath[0.35]
Tina[0.13],Lakshmi[0.19],Murthy[0.35],Amarnath[0.35]
Tina[0.13],Lakshmi[0.19],Murthy[0.35],Amarnath[0.35]

Michael[0.32]
Michael[0.32]
Michael[0.32]
Jill[0.13],Ed[0.13],Tina[0.13],Analyst
Analyst[0.26]
Analyst[0.26]
Steve[0.65]
Steve[0.03],Carol[0.5],Ashok[0.4],Ed,Murthy,Eric[0.4],Jill[0.4],Lakshmi,Michael[0.4],Tina,Amarnath,Ty,Mary
Steve[0.52]
Steve[0.01],Carol[0.5],Ashok[0.4],Ed,Murthy,Eric[0.4],Jill[0.4],Lakshmi,Michael[0.4],Tina,Amarnath,Ty,Mary
Steve[0.52]

Resources
Steve[0.01],Carol[0.5],Ashok[0.4],Ed,Murthy,Eric[0.4],Jill[0.4],Lakshmi,Michael[0.4],Tina,Amarnath,Ty,Mary
Steve[0.52]
Steve[0.01],Carol[0.5],Ashok[0.4],Ed,Murthy,Eric[0.4],Jill[0.4],Lakshmi,Michael[0.4],Tina,Amarnath,Ty,Mary

Mary[0.52]
Mary[0.52]
Mary[0.52]
Mary[0.52]
Mary[0.52]
Mary[0.13]
Mary[0.13]
Mary[0.26]
Mary[0.26]
Mary[0.26]
Mary[0.26]
Mary[0.26]
Mary[0.26]
Mary[0.13]

Mary[0.26]
Mary[0.26]
Mary[0.26]
Mary[0.13]
Mary[0.26]
Mary[0.26]

Proj. 1234 Leadwise Tasks Summary as on


Sr. No. Lead Name

Total

Finished

WIP

DueOn Finish

DueOn Start

6/10/2003
Total Hours

Compl Hours

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16

Amar
Ashok
Bill
Brian
Carol
David
Durnan
ED
Eric
Jill
John
Lynn
Murthy
SteveH
Sushit
Ty

69
11
14
2
13
3
11
33
3
4
9
10
29
29
3
30

65
5
14
2
9
3
8
22
3
4
7
4
29
22
3
28

1
6
0
0
0
0
1
1
0
0
0
0
0
3
0
0

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
1
1
0
0
0
0
0
2
0
0

2021
4589
316
60
198
35
175
486
45
13
149
0
961
821
31
294

2010
3711
316
60
138
35
140
311
45
13
129
0
961
716
31
288

17
18

Vance
Witter
Total

8
22
303

0
0
12

0
0
0

2
0
6

90
495
10779

30
475
9408

20
250

Compl %ge

99%
81%
100%
100%
70%
100%
80%
64%
100%
100%
87%
0%
100%
87%
100%
98%
33%
96%
87%

Proj. 1234
Task Group
G0101
G0102
G0102
G0102
G0102
G0102
G0102
G0102
G0102
G0102
G0102
G0102
G0102
G0102
G0102
G0102
G0102
G0102
G0102
G0102
G0102
G0102
G0102
G0102
G0102
G0102
G0102
G0102
G0103
G0103
G0103
G0103
G0103
G0103
G0105
G0105
G0105
G0105
G0105
G0105
G0105
G0105
G0105
G0105
G0105
G0105
G0105
G0105
G0105
G0105
G0105
G0105
G0105
G0105
G0105
G0105
G0105
G0105

Resource
Name
Amar
Amar
Amar
Amar
Amar
Amar
Amar
Amar
Amar
Amar
Amar
Amar
Amar
Amar
Amar
Amar
Amar
Amar
Amar
Amar
Amar
Amar
Amar
Amar
Amar
Amar
Amar
Amar
Amar
Amar
Amar
Amar
Amar
Amar
Amar
Amar
Amar
Amar
Amar
Amar
Amar
Amar
Amar
Amar
Amar
Amar
Amar
Amar
Amar
Amar
Amar
Amar
Amar
Amar
Amar
Amar
Amar
Amar

Tasks uses details for Resourcewise EVA as on


%Work
Completed
Team Weekly Meetings
100%
Design of New screen(83)
100%
Analysis of Flow of Data(84)
100%
Design of New screen(77)
100%
Review Testable Business Requirements
100%
Understand existing ECHO APPS System
100%
Analysing the requirements(59)
100%
Review Defect Tracking Strategy
100%
Review Test Strategy (SRA 6.5) for AUI and ECHO enhance
100%
Design the Highlevel Specs-2(61)
100%
Analysis of Flow of Data(78)
100%
Analysing the requirements(51)
100%
Analysing the requirements(73)
100%
Design the Highlevel Specs(52)
100%
Review of Highlevel Specs(62)
100%
Analysing the requirements(69)
100%
Analysis of Validations(79)
100%
Review of Highlevel Specs(53)
100%
Design the Highlevel Specs(70)
100%
Design the Highlevel Specs-2(86)
100%
Review of Highlevel Specs(71)
100%
Design the Highlevel Specs(74)
100%
Review of Highlevel Specs(75)
100%
Review of Highlevel Specs(87)
100%
Design the Highlevel Specs(80)
100%
Review of Highlevel Specs(81)
100%
Review SDS Doc
100%
Technical discussion meetings
100%
NECHO VIN Validation - Analysis (TSD3.2)
100%
NECHO VIN Validation - Analysis (TSD8.3)
100%
NECHO VIN Validation - Coding
100%
NECHO -DLV - Unit Testing
100%
NECHO VIN Validation - Unit Testing
100%
Necho Pkg-1 Prep for pilot issuance
100%
Auto Apps - Main Program - TSD 3.2
100%
Residence Address screen - TSD 3.2
100%
Territory Validation (Options screen) - TSD 3.2
100%
AUI Request Driver Information Screen - TSD 3.2
100%
Pf Key format /Branching Program (PCS5F) - TSD 3.2
100%
NECHO - all Remaining Changes - Review TSD 3.2 Docs
100%
Territory Validation (Options screen) - TSD 8.3
100%
Pf Key format /Branching Program (PCS5F) - TSD 8.3
100%
Residence Address screen - TSD 8.3
100%
Perform Integration Testing for NECHO Changes - pkg-2
100%
AUI Request Driver Information Screen - TSD 8.3
100%
Auto Apps - Main Program - TSD 8.3
100%
NECHO - all Remaining Changes - Review TSD 8.3 Docs
100%
Auto Apps - Main Program - Coding
100%
Residence Address screen - Coding
100%
Residence Address screen - UT/IT
100%
AUI Request Driver Information Screen - Coding
100%
Territory Validation (Options screen) - Coding
100%
Pf Key format /Branching Program (PCS5F) - Coding
100%
Territory Validation (Options screen) - UT/IT
100%
Driver Info warning Screen - Analysis TSD 3.2, TSD 8.3
100%
Driver Info warning Screen -Coding, UT/IT
100%
Necho RSC Entry for Terr valid & Address Std
25%
Necho Pkg-3 Prep for pilot issuance
0%
Task Name

BaseLine
Work hrs
51 h
2.11 h
2h
18 h
2h
120 h
2.03 h
1.07 h
1h
2h
23.85 h
25 h
18 h
20 h
1h
36 h
32 h
2h
28 h
4h
2h
14 h
2h
2h
28 h
12 h
1h
40 h
10 h
15 h
15 h
20 h
10 h
10 h
40 h
20 h
30 h
50 h
20 h
2h
30 h
20 h
30 h
30 h
60 h
40 h
2h
60 h
40 h
40 h
80 h
60 h
20 h
30 h
0h
0h
2h
10 h

Current
Work hrs
51 h
2.11 h
2h
18 h
2h
120 h
2.03 h
1.07 h
0.85 h
2h
23.85 h
25 h
18 h
20 h
1h
36 h
32 h
2h
28 h
4h
2h
14 h
2h
2h
28 h
12 h
1h
40 h
10 h
15 h
15 h
20 h
10 h
10 h
40 h
20 h
30 h
50 h
20 h
2h
30 h
20 h
30 h
30 h
60 h
40 h
2h
60 h
40 h
40 h
80 h
60 h
20 h
30 h
24 h
32 h
2h
10 h

G0106
G0101
G0101
G0101
G0101
G0101
G0101
G0101
G0102
G0102
G0102
G0102
G0106
G0101
G0104
G0104
G0104
G0104
G0104
G0104
G0104
G0104
G0104
G0104
G0104
G0104
G0104
G0104
G0104
G0104
G0104
G0106
G0105
G0105
G0105
G0101
G0101
G0101
G0101
G0101
G0101
G0101
G0101
G0101
G0102
G0102
G0102
G0102
G0102
G0106
G0101
G0101
G0101
G0104
G0104
G0104
G0106
G0105
G0105
G0105
G0105
G0105
G0105

Amar
Ashok
Ashok
Ashok
Ashok
Ashok
Ashok
Ashok
Ashok
Ashok
Ashok
Ashok
Ashok
Bill
Bill
Bill
Bill
Bill
Bill
Bill
Bill
Bill
Bill
Bill
Bill
Bill
Bill
Bill
Bill
Bill
Bill
Bill
Brian
Brian
Brian
Carol
Carol
Carol
Carol
Carol
Carol
Carol
Carol
Carol
Carol
Carol
Carol
Carol
Carol
Carol
Charles
Daniel
Dave
David
David
David
David
Durnan
Durnan
Durnan
Durnan
Durnan
Durnan

Transition to Service
Prepare & Review Project Charter
Facilitation management Processes
Project Schedule Development -1
Prepare & review Project Plan
Project Schedule Development -2
Team Weekly Meetings
Project Schedule / PlanView Maintenance, and Status Repor
Review Testable Business Requirements
Review Defect Tracking Strategy
Review Test Strategy (SRA 6.5) for AUI and ECHO enhance
Review SDS Doc
Project Closure Tasks
Team Weekly Meetings
DLV - Host - Physical Design Interface
DLV - Host - Physical Design Interface Walkthrough
DLV - Host - Develop Design Specs
DLV - Host - Design Specs Walkthrough
DLV - Host - Code/Gen IMS transaction
DLV - Host - Code Wrapper
DLV - Host - Code Walkthrough
DLV - Host - Unit test IMS transaction
DLV - Host - Unit test Wrapper
DLV - Host - Review Test Results
DLV - Host - AUI/DLV Security -NT
DLV - Mid Tier - RSC Entry
DLV - Host RSC Entry
AUI-DLV Mid Tier / Host Int Test
DLV - Host - Mid Tier /Host Integration Test Reveiew
AUI-DLV Web / Mid Tier / Host System Testing (Initial)
Implementation testing execution pkg-2
Transition to Service
Host Addr Std/ terr-analysis
Perform Integration Testing for NECHO Changes - pkg-2
Host Addr Std/ terr-Coding
Prepare & Review Project Charter
Project Schedule Development -1
Prepare & review Project Plan
Facilitation management Processes
Project Schedule Development -2
Create Initial SPIP Participant Charts
Project Management Activities
Team Weekly Meetings
Authorize final SPIP for transition
Review Testable Business Requirements
Review Business Requirements
Review Defect Tracking Strategy
Review Test Strategy (SRA 6.5) for AUI and ECHO enhance
Review SDS Doc
Project Closure Tasks
IIA Team (Performance Impact Accessment)
IIA Team (Performance Impact Accessment)
IIA Team (Performance Impact Accessment)
DLV - Host - Security Analyst Setup
Build Test Ids/Rules
SDS 5.2 Specify Security and Control Requirements
Transition to Service
MQ Q/A High Level Review (reqd objects idd)
MQ design Infra Diagram (message flow)
MQ Q/A Detail Level Review (design Walkthrough)
MQ Objects on Dev Host (coding)
MQ Create Host Test Cases
MQ Execute & Doc Host Test Cases

0%
100%
100%
100%
100%
100%
80%
78%
100%
100%
100%
100%
0%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
39%
0%
100%
100%
100%
100%
100%
100%
100%
100%
100%
84%
80%
0%
100%
100%
100%
100%
100%
0%
52%
100%
52%
100%
100%
100%
0%
100%
100%
100%
100%
100%
100%

6.53 h
8.14 h
2h
48 h
6h
48 h
51 h
417 h
2h
0.43 h
1h
1h
10 h
0h
20 h
3h
30 h
3h
50 h
50 h
3h
50 h
50 h
3h
20 h
2h
4h
25 h
2h
20 h
0h
6.53 h
20 h
20 h
40 h
9.98 h
20 h
15 h
14.02 h
20 h
20 h
699 h
60 h
20 h
2h
2h
0.53 h
1h
1h
20 h
50 h
25 h
50 h
10 h
10 h
15 h
1.26 h
20 h
30 h
5h
10 h
10 h
10 h

6.53 h
8.14 h
2h
48 h
6h
48 h
75.76 h
450 h
2h
0.43 h
0.85 h
1h
10 h
20 h
20 h
3h
30 h
3h
50 h
50 h
3h
50 h
50 h
3h
20 h
2h
4h
25 h
2h
20 h
5h
6.53 h
20 h
20 h
40 h
9.98 h
20 h
15 h
14.02 h
20 h
20 h
750 h
88.98 h
20 h
2h
2h
0.53 h
0.85 h
1h
20 h
50 h
25 h
50 h
10 h
10 h
15 h
1.26 h
20 h
30 h
5h
10 h
10 h
10 h

G0105
G0105
G0105
G0105
G0105
G0105
G0105
G0101
G0101
G0101
G0101
G0101
G0101
G0102
G0102
G0102
G0102
G0102
G0102
G0102
G0102
G0102
G0103
G0103
G0103
G0103
G0103
G0103
G0103
G0103
G0104
G0104
G0104
G0104
G0104
G0104
G0104
G0105
G0105
G0105
G0105
G0105
G0105
G0105
G0105
G0101
G0101
G0101
G0101
G0101
G0101
G0102
G0102
G0102
G0102
G0102
G0102
G0102
G0102
G0102
G0102
G0104
G0104

Durnan
Durnan
Durnan
Durnan
Durnan
Durnan
Durnan
Ed
Ed
Ed
Ed
Ed
Ed
Ed
Ed
Ed
Ed
Ed
Ed
Ed
Ed
Ed
Ed
Ed
Ed
Ed
Ed
Ed
Ed
Ed
Ed
Ed
Ed
Ed
Ed
Ed
Ed
Ed
Ed
Ed
Ed
Ed
Ed
Ed
Ed
Eric
Eric
Eric
Eric
Eric
Eric
Eric
Eric
Eric
Eric
Eric
Eric
Eric
Eric
Eric
Eric
EricH
EricH

Perform Integration Testing for NECHO Changes - pkg-2


MQ Q/A App Code walkthrough
MQ Support NECHO Unit Testing
MQ Integration Testing
MQ Q/A Transition to MQService Agreement
MQ Pilot/Issuance
Pkg-3-Post implemetation questions
Prepare & Review Project Charter
Project Schedule Development -1
Facilitation management Processes
Prepare & review Project Plan
Project Schedule Development -2
Team Weekly Meetings
Determine Business Requirements
Review Testable Business Requirements
Review Business Requirements
Create SRA 4/SDS 3.1 identifying impacted reusable servic
Review Defect Tracking Strategy
Review Test Strategy (SRA 6.5) for AUI and ECHO enhance
Update Delivery Specs Doc
Review SDS Doc
Technical discussion meetings
Pkg-1 Draft Communication
Pkg-1 Communication Review by Proj Team
Pkg-1 UPD Walkthrough with SPIP group
Create Acceptance Test Cases - Pkg-1
AUI Acceptance Testing - Pkg-1
Pkg-1 Publish Communication
NECHO Acceptance Testing - Pkg-1
Pkg 1-Post implementation questions
AUI-DLV Acceptance Test Cases developed
Pkg-2 Draft Communication
Pkg-2 Communication Review by Proj Team
Pkg-2 UPD Walkthrough with SPIP group
AUI-DLV Acceptance Testing
Pkg-2 Publish Communication
Pkg 2-Post implemetation questions
SAT -Perform System/Acceptance Testing pkg-3
SAT - Create FIT Test Cases
SAT - Perform FIT Testing - Pkg-3
Pkg-3 Draft Communication
Pkg-3 Communication Review by Proj Team
Pkg-3 UPD Walkthrough with SPIP group
Pkg-3 Publish Communication
Pkg-3-Post implemetation questions
Prepare & Review Project Charter
Project Schedule Development -1
Facilitation management Processes
Prepare & review Project Plan
Project Schedule Development -2
Team Weekly Meetings
Review Testable Business Requirements
Review Business Requirements
AUTO - review existing territory validation
AUTO - review existing IRG validation
AUTO - review existing driver's license validation
Review Defect Tracking Strategy
Review Test Strategy (SRA 6.5) for AUI and ECHO enhance
Determine Validation Components for ECHO & AUI
Review SDS Doc
Technical discussion meetings
DLV - Mid Tier - Logical Design Interface Walkthrough
DLV - Host - Physical Design Interface Walkthrough

100%
100%
100%
75%
0%
0%
0%
100%
100%
100%
100%
100%
80%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
0%
0%
100%
0%
0%
50%
0%
0%
0%
0%
100%
100%
100%
100%
100%
80%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%

20 h
20 h
20 h
20 h
10 h
20 h
10 h
5.99 h
6h
2h
2h
6h
50 h
5h
2h
2h
1h
1.07 h
1h
10 h
1h
40 h
10 h
5h
5h
1.14 h
8h
5h
8.55 h
25 h
20 h
10 h
5h
5h
30 h
5h
25 h
50 h
40 h
50 h
10 h
5h
5h
5h
25 h
5.99 h
6h
2h
2h
6h
51 h
2h
2h
15 h
15 h
15 h
0.43 h
1h
8h
1h
40 h
3h
3h

20 h
20 h
20 h
20 h
10 h
20 h
10 h
5.99 h
6h
2h
2h
6h
74.28 h
5h
2h
2h
1h
1.07 h
0.85 h
10 h
1h
40 h
10 h
5h
5h
1.14 h
8h
5h
8.55 h
15 h
20 h
10 h
5h
5h
30 h
5h
25 h
50 h
40 h
50 h
10 h
5h
5h
5h
25 h
5.99 h
6h
2h
2h
6h
75.76 h
2h
2h
15 h
15 h
15 h
0.43 h
0.85 h
8h
1h
40 h
3h
3h

G0104
G0104
G0104
G0104
G0101
G0101
G0104
G0104
G0104
G0104
G0101
G0101
G0101
G0101
G0101
G0101
G0102
G0102
G0102
G0102
G0102
G0102
G0102
G0102
G0102
G0102
G0101
G0102
G0102
G0104
G0104
G0104
G0104
G0104
G0104
G0104
G0104
G0104
G0104
G0104
G0104
G0106
G0101
G0101
G0101
G0101
G0101
G0101
G0102
G0102
G0102
G0102
G0102
G0102
G0102
G0102
G0102
G0102
G0102
G0102
G0102
G0102
G0102

EricH
EricH
EricH
EricH
Gilbert
Harry
Jeff
Jeff
Jeff
Jeff
Jill
Jill
Jill
Jill
Jill
Jill
Jill
Jill
Jill
Jill
Jill
Jill
Jill
Jill
Jill
Jill
John
John
John
John
John
John
John
John
John
John
John
John
John
John
John
John
Lakshmi
Lakshmi
Lakshmi
Lakshmi
Lakshmi
Lakshmi
Lakshmi
Lakshmi
Lakshmi
Lakshmi
Lakshmi
Lakshmi
Lakshmi
Lakshmi
Lakshmi
Lakshmi
Lakshmi
Lakshmi
Lakshmi
Lakshmi
Lakshmi

DLV - Host - Design Specs Walkthrough


DLV - Host - Code Walkthrough
DLV - Host - Review Test Results
DLV - Host - Mid Tier /Host Integration Test Reveiew
IIA Team (Performance Impact Accessment)
IIA Team (Performance Impact Accessment)
DLV - Mid Tier - Logical Design Interface Walkthrough
DLV - Mid Tier - Code Walk Through
DLV - Mid Tier - Unit Testing
DLV - Host - Mid Tier /Host Integration Test Reveiew
Prepare & Review Project Charter
Project Schedule Development -1
Facilitation management Processes
Prepare & review Project Plan
Project Schedule Development -2
Team Weekly Meetings
Review Testable Business Requirements
DOMAIN - review existing territory validation
DOMAIN - review existing IRG validation
DOMAIN - review existing driver's license validation
Review Defect Tracking Strategy
Review Test Strategy (SRA 6.5) for AUI and ECHO enhance
Create SRA 4/SDS 3.1 identifying impacted reusable servic
Determine Validation Components for ECHO & AUI
Review SDS Doc
Technical discussion meetings
Team Weekly Meetings
Review SDS Doc
Technical discussion meetings
DLV - Mid Tier - Logical Design Interface
DLV - Mid Tier - Logical Design Interface Walkthrough
DLV - Mid Tier - RSC Entry
DLV - Mid Tier - Coding
DLV - Mid Tier - Code Walk Through
DLV - Mid Tier - Unit Test Review
DLV - Mid Tier - Unit Testing
AUI-DLV Mid Tier / Host Int Test
DLV - Host - Mid Tier /Host Integration Test Reveiew
AUI-DLV Web / Mid Tier / Host System Testing (Initial)
Implementation testing execution pkg-2
Mid Tier-Host Prep cowide issuance
Transition to Service
Prepare & Review Project Charter
Project Schedule Development -1
Facilitation management Processes
Prepare & review Project Plan
Project Schedule Development -2
Team Weekly Meetings
Design of New screen(77)
Design of New screen(83)
Analysis of Flow of Data(84)
Analysis of Flow of Data(78)
Review Testable Business Requirements
Review Test Strategy (SRA 6.5) for AUI and ECHO enhance
Review Defect Tracking Strategy
Design the Highlevel Specs-2(61)
Design the Highlevel Specs(52)
Review of Highlevel Specs(62)
Design the Highlevel Specs-2(66)
Design the Highlevel Specs(48)
Design the Highlevel Specs(70)
Analysing the requirements(73)
Design the Highlevel Specs(74)

100%
100%
100%
100%
100%
2%
100%
100%
100%
100%
100%
100%
100%
100%
100%
80%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
39%
0%
0%
100%
100%
100%
100%
100%
79%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%

3h
3h
3h
2h
25 h
200 h
3h
3h
3h
2h
5.99 h
6h
2h
2h
6h
51 h
2h
3h
3h
3h
0.43 h
1h
2h
8h
1h
40 h
40 h
1h
40 h
24 h
3h
2h
60 h
3h
20 h
3h
25 h
2h
20 h
0h
20 h
6.53 h
5.99 h
6h
2h
2h
6h
51 h
2h
2.11 h
4h
1.15 h
2h
0.85 h
1.07 h
5h
13 h
2h
14 h
8h
12 h
2h
3h

3h
3h
3h
2h
25 h
200 h
3h
3h
3h
2h
5.99 h
6h
2h
2h
6h
75.76 h
2h
3h
3h
3h
0.43 h
0.85 h
2h
8h
1h
40 h
20 h
1h
40 h
24 h
3h
2h
60 h
3h
20 h
3h
25 h
2h
20 h
5h
20 h
6.53 h
5.99 h
6h
2h
2h
6h
77.91 h
2h
2.11 h
4h
1.15 h
2h
0.85 h
1.07 h
5h
13 h
2h
14 h
8h
12 h
2h
3h

G0102
G0102
G0102
G0102
G0102
G0102
G0102
G0102
G0102
G0102
G0102
G0105
G0105
G0105
G0105
G0105
G0105
G0105
G0103
G0103
G0103
G0101
G0102
G0102
G0102
G0102
G0102
G0102
G0102
G0102
G0102
G0102
G0102
G0102
G0102
G0102
G0102
G0102
G0102
G0102
G0102
G0102
G0102
G0102
G0102
G0102
G0102
G0103
G0103
G0104
G0104
G0105
G0105
G0105
G0106
G0106
G0101
G0101
G0101
G0101
G0101
G0102
G0102

Lakshmi
Lakshmi
Lakshmi
Lakshmi
Lakshmi
Lakshmi
Lakshmi
Lakshmi
Lakshmi
Lakshmi
Lakshmi
Lakshmi
Lakshmi
Lakshmi
Lakshmi
Lakshmi
Lakshmi
Lakshmi
Lynn
Lynn
Lynn
Mary
Mary
Mary
Mary
Mary
Mary
Mary
Mary
Mary
Mary
Mary
Mary
Mary
Mary
Mary
Mary
Mary
Mary
Mary
Mary
Mary
Mary
Mary
Mary
Mary
Mary
Mary
Mary
Mary
Mary
Mary
Mary
Mary
Mary
Mary
Michelle
Michelle
Michelle
Michelle
Michelle
Michelle
Michelle

Review of Highlevel Specs(53)


Review of Highlevel Specs(71)
Review of Highlevel Specs(49)
Review of Highlevel Specs(67)
Design the Highlevel Specs-2(86)
Review of Highlevel Specs(75)
Design the Highlevel Specs(80)
Review of Highlevel Specs(81)
Review of Highlevel Specs(87)
Technical discussion meetings
Review SDS Doc
NECHO - all Remaining Changes - Review TSD 3.2 Docs
NECHO - all Remaining Changes - Review TSD 8.3 Docs
AUI Request Vehicle Information Screen - UT/IT
Incoming Interface - UT/IT
Build Auto App Program - UT/IT
Warning Screen - UT/IT
Outgoing Interface - UT/IT
Create Acceptance Test Cases - Pkg-1
NECHO Acceptance Testing - Pkg-1
AUI Acceptance Testing - Pkg-1
Team Weekly Meetings
Identify Architectural Constraints - AIP 1.1
Inventory Development Tools Standards and Procedures - A
Identify Existing Network Topology - AIP 1.2
Inventory Existing Hardware and System Software - AIP 1.4
Assemble Architecture Assessment - AIP 1.5
Determine Validation Components for ECHO & AUI
Review Defect Tracking Strategy
Define Operating Systems - AIP 2.2
Submit initial IIA questionnaire
Design Network - AIP 2.1
Review Test Strategy (SRA 6.5) for AUI and ECHO enhance
Infrastructure Impact Assessment - Level 2 review (if necess
Define Data Distribution - AIP 2.4
Define Hardware Configuration - AIP 2.3
Define Middleware Req. - AIP 2.5
Submit SFTA Design Review
Assemble information for SFTA review
Define Application Service Distribution - AIP 2.6
SFTA Review process
MS: Authorized SFTA documentation
Review SDS Doc
Technical discussion meetings
Define Security Infrastructure - AIP 2.7
Define System Topology - AIP 2.8
MS: Technology Architecture Documentation complete
Pkg-1 - Review AUI Tech System Design - TSD 9.2
Pkg-1 - Review Consolidated Tech Doc - TPD 7.1
AUI - DLV - Review Technical System Design - TSD 9.2
Pkg-2 - Review AUI Technical System Design - TSD 9.2
NECHO - all Remaining Changes - Review TSD 3.2 Docs
Pkg-3 - Review NECHO Technical System Design TSD 9.2
Pkg-3 - Review Consolidated Technical Documentation TPD
Update design documents (AIP 2.6) to reflect implemented
Transition design documents to local architect
Prepare & Review Project Charter
Facilitation management Processes
Prepare & review Project Plan
SSS activities
Team Weekly Meetings
Review Testable Business Requirements
Review SDS Doc

100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
0%
0%
100%
100%
100%
85%
80%
100%
100%

2h
3h
3h
3h
4h
3h
0h
0h
2h
40 h
1h
2h
2h
80 h
30 h
40 h
30 h
30 h
8.86 h
16.34 h
16 h
26 h
20 h
4h
4h
4h
4h
8h
1.07 h
5h
2h
5h
1h
5h
10 h
10 h
10 h
1h
5h
10 h
5h
0h
1h
40 h
10 h
10 h
0h
0h
2.16 h
1.5 h
2.38 h
2h
2.38 h
1.98 h
1.44 h
1.36 h
1h
1h
1h
349 h
51 h
2h
1h

2h
3h
3h
3h
4h
3h
0h
0h
2h
40 h
1h
2h
2h
80 h
30 h
40 h
30 h
30 h
8.86 h
16.34 h
16 h
29.84 h
20 h
4h
4h
4h
4h
8h
1.07 h
5h
2h
5h
0.85 h
5h
10 h
10 h
10 h
1h
5h
10 h
5h
0h
1h
40 h
10 h
10 h
0h
0h
2.16 h
1.5 h
2.38 h
2h
2.38 h
1.98 h
1.44 h
1.36 h
1h
1h
1h
350 h
75.76 h
2h
1h

G0106
G0101
G0101
G0101
G0101
G0101
G0101
G0102
G0102
G0102
G0102
G0102
G0102
G0102
G0102
G0102
G0102
G0102
G0102
G0102
G0102
G0102
G0102
G0102
G0102
G0102
G0102
G0102
G0102
G0102
G0102
G0103
G0103
G0103
G0103
G0103
G0105
G0105
G0105
G0105
G0105
G0105
G0105
G0105
G0105
G0105
G0105
G0105
G0105
G0105
G0105
G0105
G0105
G0105
G0105
G0105
G0105
G0105
G0105
G0104
G0104
G0101
G0101

Michelle
Murthy
Murthy
Murthy
Murthy
Murthy
Murthy
Murthy
Murthy
Murthy
Murthy
Murthy
Murthy
Murthy
Murthy
Murthy
Murthy
Murthy
Murthy
Murthy
Murthy
Murthy
Murthy
Murthy
Murthy
Murthy
Murthy
Murthy
Murthy
Murthy
Murthy
Murthy
Murthy
Murthy
Murthy
Murthy
Murthy
Murthy
Murthy
Murthy
Murthy
Murthy
Murthy
Murthy
Murthy
Murthy
Murthy
Murthy
Murthy
Murthy
Murthy
Murthy
Murthy
Murthy
Murthy
Murthy
Murthy
Murthy
Murthy
PerTeam
PerTeam
Sherrill
SteveH

Project Closure Tasks


Prepare & Review Project Charter
Project Schedule Development -1
Facilitation management Processes
Prepare & review Project Plan
Project Schedule Development -2
Team Weekly Meetings
Design of New screen(83)
Review Testable Business Requirements
Understand existing ECHO APPS System
Review Defect Tracking Strategy
Analysing the requirements(64)
Analysis of Flow of Data(84)
Analysing the requirements(59)
Design the Highlevel Specs-1(85)
Review Test Strategy (SRA 6.5) for AUI and ECHO enhance
Design the Highlevel Specs-1(60)
Design the Highlevel Specs-1(65)
Design the Highlevel Specs-2(61)
Review of Highlevel Specs(62)
Design the Highlevel Specs(52)
Review of Highlevel Specs(53)
Design the Highlevel Specs-2(66)
Analysing the requirements(47)
Review of Highlevel Specs(67)
Design the Highlevel Specs(48)
Review of Highlevel Specs(49)
Design the Highlevel Specs-2(86)
Review of Highlevel Specs(87)
Technical discussion meetings
Review SDS Doc
NECHO -DLV - Design Low level Specs (TSD3.2)
NECHO -DLV - Design Test Cases (TSD8.3)
NECHO - DLV - Coding
NECHO -DLV - Unit Testing
NECHO DLV - RSC Entry
AUI Request Vehicle Information Screen - TSD 3.2
MQ - Interface module - TSD 3.2
Incoming Interface - TSD 3.2
Build Auto App Program - TSD 3.2
Warning Screen - TSD 3.2
Outgoing Interface - TSD 3.2
Build Auto App Program - TSD 8.3
Warning Screen - TSD 8.3
NECHO - all Remaining Changes - Review TSD 3.2 Docs
AUI Request Vehicle Information Screen - TSD 8.3
Outgoing Interface - TSD 8.3
Perform Integration Testing for NECHO Changes - pkg-2
MQ - Interface module - TSD 8.3
Incoming Interface - TSD 8.3
NECHO - all Remaining Changes - Review TSD 8.3 Docs
AUI Request Vehicle Information Screen - Coding
Incoming Interface - Coding
Pf Key format /Branching Program (PCS5F) - UT/IT
MQ - Interface module - Coding
MQ - Interface module - UT/IT
Build Auto App Program - Coding
Warning Screen - Coding
Outgoing Interface - Coding
Setup Perf. Testing Pkg-2
Execute Perf. Testing Pkg-2
IIA Team (Performance Impact Accessment)
Prepare & Review Project Charter

0%
100%
100%
100%
100%
100%
80%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
75%
100%
100%

10 h
5.99 h
6h
2h
2h
6h
51 h
15.79 h
2h
120 h
1.07 h
34 h
60 h
22.97 h
8h
1h
8h
12 h
6h
2h
20 h
2h
12 h
48 h
2h
52 h
2h
16 h
4h
40 h
1h
20 h
40 h
30 h
9h
2h
50 h
30 h
20 h
20 h
20 h
20 h
20 h
20 h
2h
60 h
20 h
30 h
30 h
20 h
2h
80 h
30 h
20 h
50 h
40 h
40 h
30 h
30 h
5h
40 h
25 h
5.99 h

10 h
5.99 h
6h
2h
2h
6h
76.79 h
15.79 h
2h
120 h
1.07 h
34 h
60 h
22.97 h
8h
0.85 h
8h
12 h
6h
2h
20 h
2h
12 h
48 h
2h
52 h
2h
16 h
4h
40 h
1h
20 h
40 h
30 h
9h
2h
50 h
30 h
20 h
20 h
20 h
20 h
20 h
20 h
2h
60 h
20 h
30 h
30 h
20 h
2h
80 h
30 h
20 h
50 h
40 h
40 h
30 h
30 h
9.36 h
40 h
25 h
5.99 h

G0101
G0101
G0101
G0102
G0102
G0102
G0102
G0102
G0102
G0102
G0103
G0103
G0103
G0103
G0103
G0103
G0104
G0104
G0104
G0104
G0104
G0104
G0104
G0104
G0104
G0104
G0104
G0105
G0105
G0105
G0105
G0105
G0105
G0105
G0105
G0105
G0105
G0105
G0106
G0101
G0101
G0101
G0101
G0101
G0101
G0102
G0102
G0102
G0102
G0102
G0102
G0102
G0102
G0102
G0102
G0102
G0102
G0102
G0102
G0102
G0102
G0102
G0102

SteveH
SteveH
SteveH
SteveH
SteveH
SteveH
SteveH
SteveH
SteveH
SteveH
SteveH
SteveH
SteveH
SteveH
SteveH
SteveH
SteveH
SteveH
SteveH
SteveH
SteveH
SteveH
SteveH
SteveH
SteveH
SteveH
SteveH
SteveH
SteveH
SteveH
SteveH
SteveH
SteveH
SteveH
SteveH
Sushit
Sushit
Sushit
Sushit
Tina
Tina
Tina
Tina
Tina
Tina
Tina
Tina
Tina
Tina
Tina
Tina
Tina
Tina
Tina
Tina
Tina
Tina
Tina
Tina
Tina
Tina
Tina
Tina

Facilitation management Processes


Prepare & review Project Plan
Team Weekly Meetings
Review Testable Business Requirements
Create Test Strategy (SRA 6.5) for AUI and ECHO enhanc
Create Defect Tracking Strategy
Review Defect Tracking Strategy
Review Test Strategy (SRA 6.5) for AUI and ECHO enhance
Review SDS Doc
Technical discussion meetings
Establish Test Environment Needs - Pkg-1
Establish Test Environment - Pkg-1
NECHO Acceptance Testing - Pkg-1
AUI Acceptance Testing - Pkg-1
Create Acceptance Test Summary Report - Pkg-1
Review / Authorize Acceptance Test Summary Report - Pkg
Establish Test Environment needs
Determine FIT Test Environment Needs
Set-up AUI Integration/System Test Environment
Set-up NECHO Integration/System Test Environment
AUI - Create AUI System Test Plan
AUI-DLV Mid Tier / Host Int Test
AUI-DLV Web / Mid Tier / Host System Testing (Initial)
Setup Perf. Testing Pkg-2
Implementation testing execution pkg-2
Set-up FIT Test Environment
Execute Perf. Testing Pkg-2
SAT - Create System/Acceptance Test Plan
SAT - Create NECHO System/Acceptance Test Plan
SAT - Create System/Acceptance Test Cases
Perform Integration Testing for NECHO Changes - pkg-2
SAT - Create System/Acceptance Test Summary Report
SAT - Authorize System/Acceptance Test Summary Report
SAT - Create FIT Test Summary Report
SAT - Authorize FIT Test Summary Report
SRA 4.2 Establish Security and Control, Requirements
SDS 5.2 Specify Security and Control Requirements
Build Test Ids/Rules
Transition to Service
Prepare & Review Project Charter
Project Schedule Development -1
Facilitation management Processes
Prepare & review Project Plan
Project Schedule Development -2
Team Weekly Meetings
Determine Business Requirements
Review Testable Business Requirements
Review Business Requirements
Create New ECHO Screen Layout
Review Test Strategy (SRA 6.5) for AUI and ECHO enhance
Create SRA 4/SDS 3.1 identifying impacted reusable servic
Determine Validation Components for ECHO & AUI
Review Defect Tracking Strategy
Design the Highlevel Specs-2(61)
Design the Highlevel Specs(52)
Review of Highlevel Specs(62)
Design the Highlevel Specs-2(66)
Design the Highlevel Specs(70)
Design the Highlevel Specs(48)
Design the Highlevel Specs(74)
Review of Highlevel Specs(53)
Review of Highlevel Specs(71)
Review of Highlevel Specs(49)

100%
100%
80%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
20%
100%
75%
100%
100%
100%
100%
0%
0%
0%
0%
100%
100%
100%
0%
100%
100%
100%
100%
100%
80%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%

2h
2h
51 h
2h
50 h
40 h
0.28 h
1h
1h
40 h
10 h
20 h
5.11 h
5h
10 h
20 h
10 h
20 h
20 h
20 h
20 h
10 h
10 h
15 h
0h
20 h
10 h
20 h
20 h
40 h
10 h
10 h
10 h
10 h
10 h
6h
15 h
10 h
6.53 h
5.99 h
6h
2h
2h
6h
51 h
5h
2h
2h
5h
0.84 h
1h
8h
1.07 h
2h
5h
3h
8h
4h
4h
3h
2h
3h
3h

2h
2h
75.76 h
2h
50 h
40 h
0.28 h
0.85 h
1h
40 h
10 h
20 h
5.11 h
5h
10 h
20 h
10 h
20 h
20 h
20 h
20 h
10 h
10 h
10.64 h
5h
20 h
10 h
20 h
20 h
40 h
10 h
10 h
10 h
10 h
10 h
6h
15 h
10 h
6.53 h
5.99 h
6h
2h
2h
6h
76.79 h
5h
2h
2h
5h
0.84 h
1h
8h
1.07 h
2h
5h
3h
8h
4h
4h
3h
2h
3h
3h

G0102
G0102
G0102
G0102
G0102
G0102
G0102
G0102
G0102
G0105
G0105
G0105
G0105
G0105
G0105
G0105
G0101
G0102
G0102
G0102
G0102
G0102
G0102
G0102
G0102
G0102
G0102
G0102
G0102
G0102
G0102
G0102
G0102
G0102
G0102
G0103
G0103
G0103
G0104
G0104
G0105
G0105
G0105
G0106
G0106
G0101
G0104
G0104
G0105
G0105
G0101
G0101
G0101
G0101
G0101
G0101
G0102
G0102
G0102
G0102
G0102
G0102
G0102

Tina
Tina
Tina
Tina
Tina
Tina
Tina
Tina
Tina
Tina
Tina
Tina
Tina
Tina
Tina
Tina
Ty
Ty
Ty
Ty
Ty
Ty
Ty
Ty
Ty
Ty
Ty
Ty
Ty
Ty
Ty
Ty
Ty
Ty
Ty
Ty
Ty
Ty
Ty
Ty
Ty
Ty
Ty
Ty
Ty
Vance
Vance
Vance
Vance
Vance
Witter
Witter
Witter
Witter
Witter
Witter
Witter
Witter
Witter
Witter
Witter
Witter
Witter

Review of Highlevel Specs(67)


Design the Highlevel Specs-2(86)
Review of Highlevel Specs(75)
Design the Highlevel Specs(80)
Review of Highlevel Specs(81)
Review of Highlevel Specs(87)
Update Delivery Specs Doc
Review SDS Doc
Technical discussion meetings
NECHO - all Remaining Changes - Review TSD 3.2 Docs
Perform Integration Testing for NECHO Changes - pkg-2
NECHO - all Remaining Changes - Review TSD 8.3 Docs
Auto Apps - Main Program - UT/IT
Territory Validation (Options screen) - UT/IT
AUI Request Driver Information Screen - UT/IT
Pf Key format /Branching Program (PCS5F) - UT/IT
Team Weekly Meetings
Determine Validation Components for ECHO & AUI
Define Operating Systems - AIP 2.2
Review Defect Tracking Strategy
Submit initial IIA questionnaire
Assemble information for SFTA review
Design Network - AIP 2.1
Infrastructure Impact Assessment - Level 2 review (if necess
Review Test Strategy (SRA 6.5) for AUI and ECHO enhance
Define Hardware Configuration - AIP 2.3
Define Data Distribution - AIP 2.4
Define Middleware Req. - AIP 2.5
Submit SFTA Design Review
SFTA Review process
Define Application Service Distribution - AIP 2.6
Define Security Infrastructure - AIP 2.7
Review SDS Doc
Technical discussion meetings
Define System Topology - AIP 2.8
Pkg-1 - Review NECHO Tech System Design - TSD 9.2
Pkg-1 - Review Consolidated Tech Doc - TPD 7.1
Pkg-1 - Review AUI Tech System Design - TSD 9.2
Pkg-2 - Review AUI Technical System Design - TSD 9.2
AUI - DLV - Review Technical System Design - TSD 9.2
NECHO - all Remaining Changes - Review TSD 3.2 Docs
Pkg-3 - Review NECHO Technical System Design TSD 9.2
Pkg-3 - Review Consolidated Technical Documentation TPD
Update design documents (AIP 2.6) to reflect implemented
Transition design documents to local architect
Project Coordination Activities
Create Pkg-2 SFQ Solutions
Populate pkg-2 SFQ Solutions
Create Pkg-3 SFQ Solutions
Populate pkg-3 SFQ Solutions
Prepare & Review Project Charter
Project Schedule Development -1
Facilitation management Processes
Prepare & review Project Plan
Project Schedule Development -2
Team Weekly Meetings
Review Testable Business Requirements
Review Defect Tracking Strategy
Review Test Strategy (SRA 6.5) for AUI and ECHO enhance
Determine Validation Components for ECHO & AUI
AUI - design address Std
AUI - design driver's license validation
AUI - design VIN validation

100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
0%
0%
80%
100%
0%
0%
0%
100%
100%
100%
100%
100%
80%
100%
100%
100%
100%
100%
100%
100%

3h
4h
3h
4h
4h
2h
10 h
1h
40 h
2h
10 h
2h
60 h
30 h
80 h
20 h
26 h
8h
5h
1.07 h
2h
5h
5h
5h
1h
10 h
10 h
10 h
1h
5h
10 h
10 h
1h
40 h
10 h
10 h
0.84 h
3h
0.62 h
1.5 h
2h
0.62 h
1.02 h
0.56 h
2.64 h
964 h
10 h
10 h
10 h
10 h
5.99 h
6h
2h
2h
6h
51 h
2h
0.43 h
1h
8h
25 h
25 h
25 h

3h
4h
3h
4h
4h
2h
10 h
1h
40 h
2h
10 h
2h
60 h
30 h
80 h
20 h
29.84 h
8h
5h
1.07 h
2h
5h
5h
5h
0.85 h
10 h
10 h
10 h
1h
5h
10 h
10 h
1h
40 h
10 h
10 h
0.84 h
3h
0.62 h
1.5 h
2h
0.62 h
1.02 h
0.56 h
2.64 h
964 h
10 h
10 h
10 h
10 h
5.99 h
6h
2h
2h
6h
75.76 h
2h
0.43 h
0.85 h
8h
25 h
25 h
25 h

G0102
G0102
G0103
G0103
G0103
G0103
G0103
G0103
G0103
G0103
G0104
G0104
G0104
G0104
G0104
G0104
G0104
G0104
G0104
G0104
G0106
G0101
G0101
G0101
G0102
G0102
G0102
G0102
G0102
G0102
G0102
G0102
G0102
G0102
G0102
G0102
G0102
G0101
G0101
G0102
G0102
G0102
G0102
G0102
G0101
G0102
G0102
G0102
G0102
G0102
G0102
G0102
G0102
G0102
G0102
G0102
G0102
G0102
G0102
G0102
G0102
G0101
G0102

Witter
Witter
Witter
Witter
Witter
Witter
Witter
Witter
Witter
Witter
Witter
Witter
Witter
Witter
Witter
Witter
Witter
Witter
Witter
Witter
Witter

Review SDS Doc


Technical discussion meetings
AUI Address Std - Analysis & Design
AUI Address Std - Coding
AUI Address Std - RSC Entry
AUI Address Std - Unit Test Cases/Testing
AUI Address Std - Integration Testing
AUI VIN Validation - Analysis & Design
AUI VIN Validation - Coding
AUI VIN Validation - Unit Test cases/Testing
AUI -Chgs for NECHO - Analysis & design
AUI - DLV - Analysis & Design
AUI -Chgs for NECHO - Coding
AUI -Chgs for NECHO - Unit Testing
AUI - DLV - Coding
AUI - DLV - Unit Testing
AUI - DLV - RSC Entry
AUI-DLV Web / Mid Tier / Host System Testing (Initial)
Implementation testing execution pkg-2
AUI Pkg-2 Prep for cowide issaunce
Transition to Service
MS: Project Activated
Prepare & Review Project Charter
MS: Project Charter Reviewed
Determine Business Requirements
Design of New screen(83)
Design of New screen(77)
Review Testable Business Requirements
Identify Architectural Constraints - AIP 1.1
Inventory Development Tools Standards and Procedures - A
Review Business Requirements
Identify Existing Network Topology - AIP 1.2
Inventory Existing Hardware and System Software - AIP 1.4
R10481 - AIP 1 - Assess Existing Technology Architecture
Assemble Architecture Assessment - AIP 1.5
MS: Business Req approved
Create New ECHO Screen Layout
Project Schedule Development -1
MS: Performance Measurement Baseline - 1 Established
Understand existing ECHO APPS System
R10481 - AUTO Specs
AUTO - review existing territory validation
AUTO - review existing IRG validation
AUTO - review existing driver's license validation
MS: Project Charter Authorized
DOMAIN - review existing territory validation
DOMAIN - review existing IRG validation
DOMAIN - review existing driver's license validation
Create Test Strategy (SRA 6.5) for AUI and ECHO enhanc
Create Defect Tracking Strategy
Define Operating Systems - AIP 2.2
Submit initial IIA questionnaire
Review Defect Tracking Strategy
Analysing the requirements(64)
Design Network - AIP 2.1
Analysis of Flow of Data(84)
Analysing the requirements(59)
Analysis of Flow of Data(78)
R10481 - Engineer for Performance
Infrastructure Impact Assessment - Level 2 review (if necess
Design the Highlevel Specs-1(85)
Facilitation management Processes
R10481 - Testing Strategy and Test Plans

100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
2%
0%
0%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%

1h
40 h
10 h
40 h
2h
20 h
13 h
10 h
10 h
8h
10 h
20 h
20 h
10 h
80 h
50 h
2h
30 h
0h
20 h
2.61 h
0h
67 h
0h
10 h
20 h
20 h
24 h
20 h
4h
8h
4h
4h
36 h
4h
0h
5h
110 h
0h
240 h
45 h
15 h
15 h
15 h
0h
3h
3h
3h
50 h
40 h
10 h
4h
10 h
34 h
10 h
66 h
25 h
25 h
14 h
10 h
8h
33 h
211 h

1h
40 h
10 h
40 h
2h
20 h
13 h
10 h
10 h
8h
10 h
20 h
20 h
10 h
80 h
50 h
2h
30 h
5h
20 h
2.61 h
0h
67 h
0h
10 h
20 h
20 h
24 h
20 h
4h
8h
4h
4h
36 h
4h
0h
5h
110 h
0h
240 h
45 h
15 h
15 h
15 h
0h
3h
3h
3h
50 h
40 h
10 h
4h
10 h
34 h
10 h
66 h
25 h
25 h
14 h
10 h
8h
33 h
111 h

G0102
G0102
G0102
G0102
G0102
G0102
G0102
G0102
G0102
G0102
G0102
G0102
G0102
G0102
G0102
G0102
G0102
G0101
G0101
G0102
G0102
G0102
G0101
G0102
G0102
G0102
G0102
G0102
G0102
G0102
G0102
G0102
G0102
G0102
G0102
G0102
G0102
G0102
G0102
G0102
G0102
G0102
G0102
G0102
G0103
G0103
G0102
G0102
G0104
G0105
G0103
G0102
G0102
G0102
G0102
G0102
G0102
G0102
G0102
G0103
G0102
G0103
G0102

Review Test Strategy (SRA 6.5) for AUI and ECHO enhance
Design the Highlevel Specs-1(60)
Analysing the requirements(51)
R10481 - Domain Specs
Create SRA 4/SDS 3.1 identifying impacted reusable servic
Determine Validation Components for ECHO & AUI
Define Data Distribution - AIP 2.4
Define Hardware Configuration - AIP 2.3
Define Middleware Req. - AIP 2.5
Submit SFTA Design Review
AUI - design address Std
Design the Highlevel Specs-1(65)
Design the Highlevel Specs-2(61)
Assemble information for SFTA review
R10481 - VIN Validation
Review of Highlevel Specs(62)
Analysing the requirements(69)
Prepare & review Project Plan
MS: Project Plan Reviewed
Define Application Service Distribution - AIP 2.6
Design the Highlevel Specs(52)
Analysing the requirements(73)
MS: Project Plan Authorized
Analysis of Validations(79)
R10481 - Driver's Licence Validation
Review of Highlevel Specs(53)
R10481 - AIP 4 - Validate Technology Architecture
R10481 - SFTA Review
SFTA Review process
MS: Authorized SFTA documentation
Design the Highlevel Specs-2(66)
Analysing the requirements(47)
Design the Highlevel Specs(70)
Design the Highlevel Specs(48)
R10481 - Teritory Validation
Review of Highlevel Specs(49)
R10481 - MQseries/EUI Interface.
Review of Highlevel Specs(67)
R10481 - Address Standradisation- Auto Main Screen
Review of Highlevel Specs(71)
Design the Highlevel Specs(74)
R10481 - AUI Specs
AUI - design driver's license validation
AUI - design VIN validation
MS: Pkg -1 work started
AUI Address Std - Analysis & Design
R10481 - Address Standradisation- Residence Address Scr
Review of Highlevel Specs(75)
MS: Pkg -2 work started
MS: Pkg -3 work started
Pkg-1 Draft Communication
Design the Highlevel Specs-2(86)
R10481 - AUI request Screen
Review of Highlevel Specs(87)
R10481 - ECHO Specs
R10481 - AUI Driver Information Screen
Design the Highlevel Specs(80)
Review of Highlevel Specs(81)
MS: ECHO Specs completed
AUI Address Std - Coding
Update Delivery Specs Doc
NECHO VIN Validation - Analysis (TSD3.2)
Review SDS Doc

100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%

11 h
8h
25 h
13 h
4h
48 h
20 h
20 h
20 h
2h
25 h
12 h
15 h
10 h
56 h
8h
36 h
38 h
0h
20 h
58 h
20 h
0h
32 h
91 h
8h
36 h
22 h
10 h
0h
34 h
48 h
44 h
64 h
120 h
8h
88 h
8h
88 h
8h
20 h
75 h
25 h
25 h
0h
10 h
48 h
8h
0h
0h
10 h
28 h
132 h
10 h
1,076 h
125 h
32 h
16 h
0h
40 h
20 h
10 h
15 h

11 h
8h
25 h
13 h
4h
48 h
20 h
20 h
20 h
2h
25 h
12 h
15 h
10 h
56 h
8h
36 h
38 h
0h
20 h
58 h
20 h
0h
32 h
91 h
8h
36 h
22 h
10 h
0h
34 h
48 h
44 h
64 h
120 h
8h
88 h
8h
88 h
8h
20 h
75 h
25 h
25 h
0h
10 h
48 h
8h
0h
0h
10 h
28 h
132 h
10 h
988 h
125 h
32 h
16 h
0h
40 h
20 h
10 h
15 h

G0103
G0103
G0102
G0103
G0103
G0101
G0103
G0103
G0103
G0104
G0105
G0102
G0102
G0104
G0105
G0105
G0105
G0103
G0104
G0104
G0104
G0102
G0103
G0104
G0103
G0103
G0103
G0103
G0102
G0102
G0102
G0102
G0102
G0105
G0103
G0103
G0103
G0105
G0103
G0104
G0104
G0105
G0101
G0101
G0103
G0103
G0103
G0104
G0103
G0103
G0104
G0104
G0103
G0103
G0103
G0104
G0104
G0104
G0104
G0104
G0103
G0105
G0105

NECHO -DLV - Design Low level Specs (TSD3.2)


NECHO VIN Validation - Analysis (TSD8.3)
Technical discussion meetings
NECHO VIN Validation - Coding
NECHO -DLV - Design Test Cases (TSD8.3)
Project Schedule Development -2
Pkg-1 Communication Review by Proj Team
Establish Test Environment Needs - Pkg-1
Establish Test Environment - Pkg-1
DLV - Mid Tier - Logical Design Interface
MQ Q/A High Level Review (reqd objects idd)
R10481 - SRA / SDS
MS: SDS Doc Authorized
AUI -Chgs for NECHO - Analysis & design
R10481 - TSD 3.2 phase doc
MQ design Infra Diagram (message flow)
MQ Q/A Detail Level Review (design Walkthrough)
NECHO - DLV - Coding
DLV - Host - Physical Design Interface
DLV - Mid Tier - Logical Design Interface Walkthrough
AUI - DLV - Analysis & Design
Define Security Infrastructure - AIP 2.7
Pkg-1 UPD Walkthrough with SPIP group
DLV - Host - Physical Design Interface Walkthrough
NECHO -DLV - Unit Testing
AUI Address Std - RSC Entry
AUI Address Std - Unit Test Cases/Testing
Pkg-1 - Review NECHO Tech System Design - TSD 9.2
R10481 - Reqs Analysis and Solution Def/Specs
R10481 - AIP
R10481 - AIP 2 - Design Technology Architecture
Define System Topology - AIP 2.8
MS: Technology Architecture Documentation complete
SRA 4.2 Establish Security and Control, Requirements
R10481 - AUI Address Std (TSD/TPD/UPD)
AUI Address Std - Integration Testing
AUI VIN Validation - Analysis & Design
Auto Apps - Main Program - TSD 3.2
Create Acceptance Test Cases - Pkg-1
DLV - Host - Develop Design Specs
DLV - Host - Design Specs Walkthrough
AUI Request Vehicle Information Screen - TSD 3.2
R10481 - Project Charter, Plan & Schedule
MS: Performance Measurement Baseline - 2 Established
R10481 - NECHO VIN Validation (TSD/TPD/UPD)
NECHO VIN Validation - Unit Testing
AUI VIN Validation - Coding
AUI -Chgs for NECHO - Coding
R10481 - AUI VIN Validation (TSD/TPD/UPD)
AUI VIN Validation - Unit Test cases/Testing
DLV - Mid Tier - Coding
DLV - Mid Tier - Code Walk Through
R10481 - Pkg-1 Consolidated Tech Doc
Pkg-1 - Review AUI Tech System Design - TSD 9.2
Pkg-1 - Review Consolidated Tech Doc - TPD 7.1
DLV - Host - Code/Gen IMS transaction
DLV - Host - Code Wrapper
DLV - Host - Code Walkthrough
DLV - Mid Tier - Unit Test Review
DLV - Mid Tier - Unit Testing
AUI Acceptance Testing - Pkg-1
MQ - Interface module - TSD 3.2
Incoming Interface - TSD 3.2

100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%

20 h
15 h
480 h
15 h
40 h
110 h
5h
10 h
20 h
24 h
20 h
1,848 h
0h
10 h
55 h
30 h
5h
30 h
20 h
9h
20 h
20 h
5h
6h
29 h
2h
20 h
10 h
2,271 h
212 h
140 h
20 h
0h
6h
85 h
13 h
10 h
40 h
10 h
30 h
6h
50 h
358 h
0h
50 h
10 h
10 h
20 h
28 h
8h
60 h
6h
16 h
3h
3h
50 h
50 h
6h
20 h
6h
29 h
30 h
20 h

20 h
15 h
480 h
15 h
40 h
110 h
5h
10 h
20 h
24 h
20 h
1,731 h
0h
10 h
55 h
30 h
5h
30 h
20 h
9h
20 h
20 h
5h
6h
29 h
2h
20 h
10 h
2,054 h
212 h
140 h
20 h
0h
6h
85 h
13 h
10 h
40 h
10 h
30 h
6h
50 h
358 h
0h
50 h
10 h
10 h
20 h
28 h
8h
60 h
6h
16 h
3h
3h
50 h
50 h
6h
20 h
6h
29 h
30 h
20 h

G0105
G0105
G0105
G0105
G0105
G0105
G0105
G0104
G0105
G0104
G0103
G0103
G0101
G0104
G0104
G0104
G0103
G0103
G0104
G0103
G0103
G0103
G0103
G0105
G0103
G0105
G0103
G0103
G0104
G0104
G0103
G0103
G0105
G0104
G0104
G0104
G0104
G0104
G0105
G0104
G0104
G0104
G0104
G0105
G0105
G0105
G0105
G0105
G0105
G0105
G0105
G0104
G0105
G0103
G0103
G0103
G0105
G0105
G0105
G0105
G0104
G0104
G0104

Build Auto App Program - TSD 3.2


Warning Screen - TSD 3.2
Residence Address screen - TSD 3.2
Territory Validation (Options screen) - TSD 3.2
Outgoing Interface - TSD 3.2
AUI Request Driver Information Screen - TSD 3.2
Pf Key format /Branching Program (PCS5F) - TSD 3.2
AUI -Chgs for NECHO - Unit Testing
Host Addr Std/ terr-analysis
Establish Test Environment needs
MS: Pkg-1 Create Agency pilot communications
Pkg-1 Publish Communication
Create Initial SPIP Participant Charts
R10481 - Pkg-2 Consolidated Tech Doc
AUI - DLV - Review Technical System Design - TSD 9.2
Pkg-2 - Review AUI Technical System Design - TSD 9.2
Create Acceptance Test Summary Report - Pkg-1
MS: Pkg-1 Publish Agency pilot communications
Determine FIT Test Environment Needs
NECHO Acceptance Testing - Pkg-1
MS: Pkg-1 Create Agency cowide communications
Necho Pkg-1 Prep for pilot issuance
MS: Pkg-1 Pilot Necho
MQ Objects on Dev Host (coding)
MS: Pkg-1 SAT Completed
Build Auto App Program - TSD 8.3
R10481 - Pkg -1 Systems Acceptance Test (SAT)
Review / Authorize Acceptance Test Summary Report - Pkg
DLV - Host - Unit test IMS transaction
DLV - Host - Unit test Wrapper
R10481 - Pkg -1 Communication
MS: Pkg-1 Publish Agency cowide communications
MQ Create Host Test Cases
DLV - Host - Review Test Results
Set-up AUI Integration/System Test Environment
Set-up NECHO Integration/System Test Environment
DLV - Host - Security Analyst Setup
DLV - Host - AUI/DLV Security -NT
Warning Screen - TSD 8.3
AUI - Create AUI System Test Plan
R10481 - DLV - Mid Tier(TSD/TPD/UPD)
DLV - Mid Tier - RSC Entry
DLV - Host RSC Entry
R10481 - TSD 8.3 phase doc
MQ Execute & Doc Host Test Cases
NECHO - all Remaining Changes - Review TSD 3.2 Docs
AUI Request Vehicle Information Screen - TSD 8.3
SDS 5.2 Specify Security and Control Requirements
Territory Validation (Options screen) - TSD 8.3
Pf Key format /Branching Program (PCS5F) - TSD 8.3
Residence Address screen - TSD 8.3
Build Test Ids/Rules
Outgoing Interface - TSD 8.3
R10481 - NECHO DLV (TSD/TPD/UPD)
NECHO DLV - RSC Entry
MS: NECHO Pkg-1 cowide Issuance
MQ - Interface module - TSD 8.3
Incoming Interface - TSD 8.3
AUI Request Driver Information Screen - TSD 8.3
Auto Apps - Main Program - TSD 8.3
AUI - DLV - Coding
AUI - DLV - Unit Testing
Create production ids/rules

100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%

20 h
20 h
20 h
30 h
20 h
50 h
20 h
10 h
20 h
10 h
0h
5h
20 h
6h
3h
3h
10 h
0h
20 h
30 h
0h
10 h
0h
10 h
0h
20 h
174 h
20 h
50 h
50 h
25 h
0h
10 h
6h
20 h
20 h
10 h
20 h
20 h
20 h
129 h
4h
4h
30 h
10 h
12 h
60 h
15 h
30 h
20 h
30 h
10 h
20 h
121 h
2h
0h
30 h
20 h
60 h
40 h
80 h
50 h
10 h

20 h
20 h
20 h
30 h
20 h
50 h
20 h
10 h
20 h
10 h
0h
5h
20 h
6h
3h
3h
10 h
0h
20 h
30 h
0h
10 h
0h
10 h
0h
20 h
129 h
20 h
50 h
50 h
25 h
0h
10 h
6h
20 h
20 h
10 h
20 h
20 h
20 h
129 h
4h
4h
30 h
10 h
12 h
60 h
15 h
30 h
20 h
30 h
10 h
20 h
121 h
2h
0h
30 h
20 h
60 h
40 h
80 h
50 h
10 h

G0104
G0104
G0104
G0105
G0105
G0105
G0104
G0104
G0105
G0105
G0103
G0103
G0103
G0103
G0105
G0105
G0104
G0104
G0105
G0105
G0104
G0104
G0105
G0105
G0104
G0104
G0104
G0105
G0105
G0105
G0105
G0105
G0105
G0104
G0104
G0105
G0105
G0105
G0105
G0104
G0104
G0104
G0105
G0105
G0105
G0105
G0105
G0105
G0105
G0105
G0105
G0105
G0104
G0105
G0105
G0105
G0105
G0105
G0104
G0105
G0105
G0104
G0104

R10481 - AUI - DLV (TSD/TPD/UPD)


AUI - DLV - RSC Entry
AUI-DLV Mid Tier / Host Int Test
NECHO - all Remaining Changes - Review TSD 8.3 Docs
R10481 - Security Support - Sushit
Build Test Ids/Rules
R10481 - DLV - Host - (TSD/TPD/UPD)
DLV - Host - Mid Tier /Host Integration Test Reveiew
Auto Apps - Main Program - Coding
Auto Apps - Main Program - UT/IT
R10481 - Pkg -1 Design/Build/Test/Implement
R10481 - Pkg -1 Implementation
Pkg 1-Post implementation questions
MS: Pkg-1 Implemented
AUI Request Vehicle Information Screen - Coding
AUI Request Vehicle Information Screen - UT/IT
AUI-DLV Acceptance Test Cases developed
Pkg-2 Draft Communication
SAT - Create System/Acceptance Test Plan
SAT - Create NECHO System/Acceptance Test Plan
Pkg-2 Communication Review by Proj Team
AUI-DLV Web / Mid Tier / Host System Testing (Initial)
Residence Address screen - Coding
Residence Address screen - UT/IT
Pkg-2 UPD Walkthrough with SPIP group
R10481 - Security Support - David
SDS 5.2 Specify Security and Control Requirements
Incoming Interface - Coding
Incoming Interface - UT/IT
AUI Request Driver Information Screen - Coding
Territory Validation (Options screen) - Coding
Pf Key format /Branching Program (PCS5F) - Coding
AUI Request Driver Information Screen - UT/IT
R10481 - AUI -Chgs for NECHO (TSD/TPD/UPD)
MVR Message Chnages - Coding/UT
Territory Validation (Options screen) - UT/IT
Pf Key format /Branching Program (PCS5F) - UT/IT
Driver Info warning Screen - Analysis TSD 3.2, TSD 8.3
SAT - Create System/Acceptance Test Cases
R10481 - AUI -DLV Int Testing
AUI-DLV Web / Mid Tier / Host System Testing (Additional)
AUI-DLV Acceptance Testing
MQ Q/A App Code walkthrough
MQ - Interface module - Coding
MQ - Interface module - UT/IT
Build Auto App Program - Coding
Build Auto App Program - UT/IT
Warning Screen - Coding
Warning Screen - UT/IT
Outgoing Interface - Coding
Outgoing Interface - UT/IT
MQ Support NECHO Unit Testing
Setup Perf. Testing Pkg-2
R10481 - NECHO - all Remaining Changes -(TPD)
Driver Info warning Screen -Coding, UT/IT
MS: NECHO - all Remaining Changes -Coding/UT/IT comple
R10481 - Pkg-3 NECHO Integration Testing
Perform Integration Testing for NECHO Changes - pkg-2
Create Pkg-2 SFQ Solutions
R10481 - Host Addr Std/Terr
Host Addr Std/ terr-Coding
MS: ISC Review Pkg-2 SFQ Solutions
R10481 - Test Environment Setup

100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
0%
100%

152 h
2h
60 h
8h
31 h
10 h
316 h
8h
60 h
60 h
554 h
55 h
25 h
0h
80 h
80 h
20 h
10 h
20 h
20 h
5h
80 h
40 h
40 h
5h
25 h
15 h
30 h
30 h
80 h
60 h
20 h
80 h
40 h
0h
60 h
40 h
0h
40 h
210 h
0h
30 h
20 h
50 h
40 h
40 h
40 h
30 h
30 h
30 h
30 h
20 h
20 h
1,050 h
0h
0h
120 h
120 h
10 h
60 h
40 h
0h
90 h

152 h
2h
60 h
8h
31 h
10 h
316 h
8h
60 h
60 h
479 h
25 h
15 h
0h
80 h
80 h
20 h
10 h
20 h
20 h
5h
80 h
40 h
40 h
5h
35 h
15 h
30 h
30 h
80 h
60 h
20 h
80 h
115 h
75 h
60 h
40 h
24 h
40 h
230 h
20 h
30 h
20 h
50 h
40 h
40 h
40 h
30 h
30 h
30 h
30 h
20 h
20 h
1,082 h
32 h
0h
120 h
120 h
10 h
60 h
40 h
0h
90 h

G0104
G0105
G0105
G0105
G0105
G0104
G0105
G0105
G0105
G0104
G0105
G0105
G0105
G0105
G0105
G0104
G0104
G0105
G0105
G0105
G0105
G0105
G0104
G0104
G0104
G0104
G0104
G0104
G0105
G0104
G0104
G0105
G0105
G0105
G0105
G0105
G0105
G0105
G0105
G0105
G0105
G0105
G0105
G0105
G0104
G0104
G0104
G0104
G0104
G0105
G0105
G0105
G0105
G0101
G0101
G0101
G0101
G0101
G0101
G0105
G0105
G0101
G0101

Set-up FIT Test Environment


Setup Performance Test Environment -pkg3
R10481 - Pkg-3 Consolidated Tech Doc
Pkg-3 - Review NECHO Technical System Design TSD 9.2
Pkg-3 - Review Consolidated Technical Documentation TPD
Populate pkg-2 SFQ Solutions
SAT -Perform System/Acceptance Testing pkg-3
SAT - Create System/Acceptance Test Summary Report
SAT - Authorize System/Acceptance Test Summary Report
Implementation testing execution pkg-2
R10481 - MQSeries
R10481 - MQ Regional Office MVS Dev Environment
MQ Integration Testing
R10481 - Pkg-3 Perf Testing
Execute Performance Testing - pk3
R10481 - Performance Testing Pkg-2
Execute Perf. Testing Pkg-2
MQ Q/A Transition to MQService Agreement
R10481 - NECHO - all Remaining Changes (TSD/TPD/UPD
R10481 - NECHO - all Remaining Changes -(TSD)
Necho RSC Entry for Terr valid & Address Std
SAT - Create FIT Test Cases
MS: Pkg-2 Create Agency cowide communications
Pkg-2 Publish Communication
R10481 - Pkg -2 Communication
MS: Pkg-2 Publish Agency cowide communications
Mid Tier-Host Prep cowide issuance
MS: Mid Tier-Host cowide issuance
Create Pkg-3 SFQ Solutions
AUI Pkg-2 Prep for cowide issaunce
MS: AUI Pkg-2 cowide Issuance
SAT - Perform FIT Testing - Pkg-3
Pkg-3 Draft Communication
MS: Pkg-3 Create Agency pilot communications
MS: ISC Review Pkg-3 SFQ Solutions
Pkg-3 Communication Review by Proj Team
MS: Pkg-3 Publish Agency pilot communications
Populate pkg-3 SFQ Solutions
Necho Pkg-3 Prep for pilot issuance
SAT - Create FIT Test Summary Report
Pkg-3 UPD Walkthrough with SPIP group
R10481 - Pkg-3 Systems Acceptance Test (SAT)
R10481 - Pkg-3 FIT Test (SAT)
SAT - Authorize FIT Test Summary Report
R10481 - Pkg -2 Design/Build/Test/Implement
R10481 - AUI - DLV
R10481 - Pkg -2 Implementation
Pkg 2-Post implemetation questions
MS: Pkg-2 Completed
MS: Pkg-3 Pilot Necho
MQ Pilot/Issuance
MS: Pkg-3 Create Agency cowide communications
MS: Pkg-3 Publish Agency cowide communications
Project Coordination Activities
SSS activities
Project Management Activities
Team Weekly Meetings
R10481 - Project Admin & Cordination
Project Schedule / PlanView Maintenance, and Status Repor
R10481 - Pkg-3 Communication
Pkg-3 Publish Communication
R10481 - IIA
IIA Team (Performance Impact Accessment)

100%
100%
100%
100%
100%
0%
100%
0%
0%
25%
97%
92%
75%
46%
25%
69%
75%
0%
99%
98%
25%
0%
0%
0%
67%
0%
0%
0%
0%
0%
0%
0%
50%
0%
0%
0%
0%
0%
0%
0%
0%
49%
15%
0%
92%
91%
0%
0%
0%
0%
0%
0%
0%
80%
85%
84%
83%
82%
78%
11%
0%
35%
35%

20 h
0h
6h
3h
3h
10 h
50 h
10 h
10 h
0h
145 h
60 h
20 h
0h
0h
70 h
50 h
10 h
2,108 h
702 h
2h
40 h
0h
5h
45 h
0h
20 h
0h
10 h
20 h
0h
50 h
10 h
0h
0h
5h
0h
10 h
10 h
10 h
5h
260 h
130 h
10 h
1,273 h
1,148 h
65 h
25 h
0h
0h
20 h
0h
0h
964 h
349 h
699 h
712 h
3,514 h
417 h
45 h
5h
0h
375 h

20 h
20 h
6h
3h
3h
10 h
50 h
10 h
10 h
20 h
145 h
60 h
20 h
70 h
50 h
90 h
50 h
10 h
2,164 h
726 h
2h
40 h
0h
5h
45 h
0h
20 h
0h
10 h
20 h
0h
50 h
10 h
0h
0h
5h
0h
10 h
10 h
10 h
5h
330 h
130 h
10 h
1,273 h
1,148 h
65 h
25 h
0h
0h
20 h
0h
0h
964 h
350 h
750 h
1,000 h
3,514 h
450 h
45 h
5h
375 h
375 h

G0105
G0106
G0106
G0106
G0105
G0105
G0105
G0105
G0106
G0101
G0101
G0101
G0100
G0106
G0106
G0106

MS: NECHO Pkg-3 cowide Issuance


Update design documents (AIP 2.6) to reflect implemented
Transition design documents to local architect
MS: Lessons Learned doc
R10481 - Pkg -3 Design/Build/Test/Implement
R10481 - Pkg-3 Implementation
Pkg-3-Post implemetation questions
MS: Pkg-3 Completed
Transition to Service
R10481 - Planning/Admin/Meetings/Coordination
R10481 - SP/IP
Authorize final SPIP for transition
R10481 - Auto Necho - Auto Apps Efficiency
R10481 - Transition
Project Closure Tasks
MS: Project Completed

0%
0h
0%
2h
0%
4h
0%
0h
89%
2,484 h
0%
65 h
0%
35 h
0%
0h
0%
30 h
79%
4,287 h
50%
40 h
0%
20 h
87% 10,709.01 h
0%
86 h
0%
40 h
0%
0h

0h
2h
4h
0h
2,610 h
65 h
35 h
0h
30 h
4,287.01 h
40 h
20 h
10,779.01 h
76 h
40 h
0h

06/10/03
Duration in
Days
341.99 d
3d
32 d
5d
1d
50 d
10 d
5d
31 d
9.1 d
42 d
38 d
15 d
9d
1d
46 d
20 d
1d
10 d
10 d
4d
10 d
4d
1d
8d
8d
1d
64 d
2d
2d
2d
9d
23 d
2d
17 d
27 d
19 d
20 d
20 d
18 d
20 d
20 d
20 d
61 d
24 d
20 d
4d
8d
10 d
10 d
15 d
8d
11 d
15 d
3d
6d
146 d
8d

Start Date Finish Date


05/06/02
07/16/02
07/19/02
07/16/02
07/24/02
06/13/02
09/03/02
09/06/02
08/09/02
09/16/02
07/23/02
08/02/02
09/16/02
09/20/02
09/27/02
07/29/02
08/06/02
10/04/02
09/30/02
10/15/02
10/14/02
10/04/02
10/18/02
10/29/02
10/24/02
10/24/02
11/05/02
08/05/02
11/04/02
11/05/02
11/07/02
11/15/02
11/11/02
01/03/03
11/13/02
11/13/02
11/25/02
11/25/02
11/25/02
12/27/02
12/27/02
12/27/02
12/27/02
01/20/03
12/27/02
12/27/02
01/31/03
02/03/03
02/12/03
02/12/03
02/26/03
03/14/03
03/14/03
03/14/03
04/01/03
04/03/03
11/25/02
07/10/03

05/14/02
07/16/02
07/19/02
07/23/02
07/24/02
08/20/02
09/03/02
09/06/02
09/16/02
09/16/02
09/18/02
09/24/02
09/25/02
09/26/02
09/27/02
09/30/02
10/07/02
10/07/02
10/14/02
10/16/02
10/18/02
10/18/02
10/24/02
10/29/02
11/04/02
11/04/02
11/05/02
11/08/02
11/05/02
11/07/02
11/11/02
12/02/02
12/16/02
01/07/03
12/09/02
12/23/02
12/23/02
12/24/02
12/24/02
01/22/03
01/24/03
01/24/03
01/24/03
01/27/03
01/30/03
01/31/03
02/05/03
02/12/03
02/26/03
02/26/03
03/18/03
03/25/03
03/28/03
04/03/03
04/03/03
04/11/03
06/13/03
07/21/03

Indent
Level No
1.1.2.4
1.2.1.10.9.1
1.2.1.10.9.2
1.2.1.10.8.1
1.2.1.2
1.2.1.10.1
1.2.1.10.3.1
1.2.2.4
1.2.2.2
1.2.1.10.3.3
1.2.1.10.8.2
1.2.1.10.5.1
1.2.1.10.6.1
1.2.1.10.5.2
1.2.1.10.3.4
1.2.1.10.2.1
1.2.1.10.8.3
1.2.1.10.5.3
1.2.1.10.2.2
1.2.1.10.9.4
1.2.1.10.2.3
1.2.1.10.6.2
1.2.1.10.6.3
1.2.1.10.9.5
1.2.1.10.8.4
1.2.1.10.8.5
1.2.1.13
1.2.1.5
1.3.5.1
1.3.5.2
1.3.5.3
1.3.4.4
1.3.5.4
1.3.9.1
1.5.2.4.8
1.5.2.4.9
1.5.2.4.11
1.5.2.4.10
1.5.2.4.12
1.5.2.4.13
1.5.2.4.20
1.5.2.4.21
1.5.2.4.23
1.5.2.5.1
1.5.2.4.24
1.5.2.4.22
1.5.2.4.25
1.5.2.6.13
1.5.2.6.15
1.5.2.6.16
1.5.2.6.17
1.5.2.6.19
1.5.2.6.21
1.5.2.6.20
1.5.2.4.26
1.5.2.6.23
1.5.2.4.1
1.5.6.1

5
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
7
7
7
7
7
7
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9

20 d
35 d
55 d
60 d
64 d
43 d
341.99 d
267 d
1d
5d
31 d
1d
5d
341.99 d
4d
2d
25 d
1d
6d
6d
3d
16 d
16 d
3d
11 d
36 d
11 d
14 d
2d
15 d
31 d
20 d
30 d
61 d
104.13 d
35 d
60 d
64 d
55 d
43 d
86 d
342 d
341.99 d
10 d
1d
1d
5d
31 d
1d
5d
230 d
230 d
230 d
5d
26 d
36 d
20 d
17 d
14 d
5d
7d
5d
5d

08/25/03
05/21/02
07/05/02
05/28/02
07/05/02
09/18/02
05/06/02
08/15/02
07/24/02
09/06/02
08/09/02
11/05/02
09/19/03
09/16/02
11/18/02
11/26/02
11/04/02
12/12/02
12/12/02
12/12/02
12/17/02
12/20/02
12/20/02
01/14/03
12/31/02
11/29/02
01/06/03
01/17/03
02/05/03
02/05/03
05/02/03
08/25/03
11/12/02
01/20/03
12/27/02
05/21/02
05/28/02
07/05/02
07/12/02
09/18/02
09/06/02
05/06/02
05/06/02
09/11/03
07/24/02
07/26/02
09/06/02
08/09/02
11/05/02
09/19/03
10/07/02
10/07/02
10/07/02
01/10/03
12/19/02
01/13/03
08/25/03
10/28/02
11/04/02
11/15/02
12/30/02
01/08/03
01/15/03

09/19/03
07/05/02
07/19/02
08/16/02
10/01/02
11/15/02
08/15/03
08/15/03
07/25/02
09/06/02
09/16/02
11/06/02
09/24/03
09/19/02
11/22/02
11/26/02
12/11/02
12/12/02
12/20/02
12/20/02
12/20/02
01/14/03
01/14/03
01/15/03
01/17/03
01/17/03
01/20/03
02/05/03
02/07/03
02/10/03
05/02/03
09/19/03
12/27/02
01/24/03
05/16/03
05/30/02
06/18/02
07/23/02
09/19/02
10/10/02
01/06/03
08/15/03
08/15/03
09/25/03
07/24/02
07/26/02
09/06/02
09/16/02
11/05/02
09/26/03
10/15/02
10/10/02
10/15/02
01/17/03
01/24/03
02/28/03
08/25/03
11/19/02
11/22/02
11/22/02
01/08/03
01/15/03
01/22/03

1.6.4
1.1.3.1
1.1.3.4
1.1.3.8
1.1.3.5
1.1.3.10
1.1.2.4
1.1.2.5
1.2.1.2
1.2.2.4
1.2.2.2
1.2.1.13
1.6.5
1.1.2.4
1.4.4.2.3
1.4.4.2.4
1.4.4.2.2
1.4.4.2.5
1.4.4.2.6
1.4.4.2.7
1.4.4.2.8
1.4.4.2.9
1.4.4.2.10
1.4.4.2.11
1.4.4.2.13
1.4.4.1.1
1.4.4.2.1
1.4.4.5.2
1.4.4.2.14
1.4.4.5.3
1.4.4.6.3
1.6.4
1.5.2.3.1
1.5.2.5.1
1.5.2.3.2
1.1.3.1
1.1.3.8
1.1.3.5
1.1.3.4
1.1.3.10
1.1.4.1
1.1.2.1
1.1.2.4
1.1.4.2
1.2.1.2
1.2.1.3
1.2.2.4
1.2.2.2
1.2.1.13
1.6.5
1.1.5.1
1.1.5.1
1.1.5.1
1.4.4.2.12
1.4.2.2
1.4.2.1
1.6.4
1.5.2.2.1.1
1.5.2.2.1.2
1.5.2.2.1.3
1.5.2.2.2.1
1.5.2.2.2.2
1.5.2.2.2.3

10
5
5
5
5
5
5
5
6
6
6
6
10
5
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
10
9
9
9
5
5
5
5
5
5
5
5
5
6
6
6
6
6
10
5
5
5
8
8
8
10
9
9
9
9
9
9

61 d
9d
35 d
49 d
5d
10 d
20 d
35 d
60 d
55 d
64 d
43 d
341.99 d
24 d
1d
1d
18 d
5d
31 d
1d
1d
64 d
2d
14 d
8d
2d
4d
5d
21 d
11 d
4d
1d
5d
4d
28.19 d
1d
20 d
36.68 d
10 d
18 d
46 d
5d
5d
5d
20 d
35 d
60 d
55 d
64 d
43 d
341.99 d
1d
1d
19 d
19 d
19 d
5d
31 d
18 d
1d
64 d
4d
2d

01/20/03
03/26/03
02/24/03
04/09/03
06/09/03
07/18/03
08/25/03
05/21/02
06/10/02
07/12/02
07/12/02
09/18/02
05/06/02
06/13/02
07/24/02
07/26/02
08/30/02
09/06/02
08/09/02
11/04/02
11/05/02
08/05/02
10/25/02
10/29/02
11/18/02
12/06/02
12/17/02
12/27/02
12/09/02
01/31/03
02/11/03
02/17/03
02/17/03
02/24/03
02/26/03
06/23/03
07/04/03
04/14/03
06/02/03
06/16/03
05/12/03
07/11/03
07/18/03
08/11/03
08/25/03
05/21/02
06/10/02
07/12/02
07/12/02
09/18/02
05/06/02
07/24/02
07/26/02
07/30/02
07/30/02
07/30/02
09/06/02
08/09/02
08/30/02
11/05/02
08/05/02
11/19/02
11/26/02

01/24/03
04/07/03
04/11/03
06/13/03
06/13/03
08/01/03
08/26/03
05/31/02
06/21/02
07/19/02
07/19/02
10/02/02
08/15/03
07/16/02
07/25/02
07/26/02
08/30/02
09/06/02
09/16/02
11/05/02
11/06/02
11/08/02
10/28/02
11/15/02
11/29/02
12/10/02
12/23/02
01/02/03
01/07/03
02/14/03
02/14/03
02/17/03
02/24/03
02/28/03
04/04/03
06/23/03
07/31/03
06/02/03
06/16/03
07/10/03
07/11/03
07/18/03
07/25/03
08/18/03
09/19/03
05/31/02
06/21/02
07/19/02
07/19/02
10/02/02
08/15/03
07/25/02
07/29/02
08/23/02
08/23/02
08/23/02
09/06/02
09/16/02
09/25/02
11/06/02
11/08/02
11/19/02
11/29/02

1.5.2.5.1
1.5.2.2.3.2
1.5.2.2.3.1
1.5.2.2.3.3
1.5.2.4.27
1.5.6.4
1.5.6.5
1.1.3.1
1.1.3.8
1.1.3.4
1.1.3.5
1.1.3.10
1.1.2.4
1.2.1.1
1.2.1.2
1.2.1.3
1.2.1.7.4
1.2.2.4
1.2.2.2
1.2.1.12
1.2.1.13
1.2.1.5
1.3.8.1
1.3.8.2
1.3.8.3
1.3.7.3
1.3.7.4
1.3.8.8
1.3.7.5
1.3.9.4
1.4.4.5.4
1.4.4.8.1
1.4.4.8.2
1.4.4.8.3
1.4.4.5.6
1.4.4.8.6
1.4.4.9.5
1.5.4.3
1.5.4.7.2
1.5.4.7.3
1.5.5.1
1.5.5.2
1.5.5.3
1.5.5.8
1.5.6.5
1.1.3.1
1.1.3.8
1.1.3.4
1.1.3.5
1.1.3.10
1.1.2.4
1.2.1.2
1.2.1.3
1.2.1.8.1
1.2.1.8.2
1.2.1.8.3
1.2.2.4
1.2.2.2
1.2.1.9
1.2.1.13
1.2.1.5
1.4.4.1.3
1.4.4.2.4

9
9
9
9
9
9
9
5
5
5
5
5
5
6
6
6
6
6
6
6
6
6
7
7
7
7
7
7
7
7
8
8
8
8
8
8
8
9
9
9
9
9
9
9
9
5
5
5
5
5
5
6
6
6
6
6
6
6
6
6
6
8
8

1d
3d
3d
2d
230 d
230 d
4d
14 d
16 d
2d
35 d
60 d
55 d
64 d
43 d
341.99 d
1d
24 d
23 d
23 d
5d
31 d
18 d
18 d
1d
64 d
341.99 d
1d
64 d
5d
4d
36 d
18 d
14 d
16 d
16 d
14 d
2d
15 d
31 d
10 d
20 d
35 d
60 d
55 d
64 d
43 d
341.99 d
5d
3d
32 d
42 d
1d
31 d
5d
9.1 d
9d
1d
10 d
10 d
10 d
15 d
10 d

12/12/02
12/17/02
01/14/03
02/05/03
10/07/02
10/07/02
11/19/02
11/29/02
11/29/02
02/05/03
05/21/02
06/03/02
07/12/02
07/12/02
09/18/02
05/06/02
07/24/02
07/30/02
07/31/02
07/31/02
09/06/02
08/09/02
08/30/02
08/30/02
11/05/02
08/05/02
05/06/02
11/05/02
08/05/02
11/04/02
11/19/02
11/29/02
11/22/02
11/29/02
11/29/02
11/29/02
01/17/03
02/05/03
02/05/03
05/02/03
06/13/03
08/25/03
05/21/02
06/03/02
07/12/02
07/12/02
09/18/02
05/06/02
07/16/02
07/16/02
07/19/02
07/23/02
07/24/02
08/26/02
09/06/02
09/16/02
09/20/02
09/27/02
09/27/02
09/30/02
09/30/02
09/16/02
10/04/02

12/12/02
12/18/02
01/17/03
02/06/03
10/10/02
08/18/03
11/19/02
12/20/02
12/20/02
02/06/03
06/07/02
06/21/02
07/19/02
07/19/02
10/09/02
08/15/03
07/25/02
08/30/02
08/30/02
08/30/02
09/06/02
09/16/02
09/25/02
09/25/02
11/06/02
11/08/02
05/08/02
11/05/02
11/08/02
11/18/02
11/22/02
11/29/02
12/20/02
12/20/02
12/20/02
12/20/02
01/30/03
02/06/03
02/10/03
05/02/03
06/27/03
09/19/03
06/07/02
06/21/02
07/19/02
07/19/02
10/09/02
08/15/03
07/16/02
07/16/02
07/22/02
07/23/02
07/24/02
08/27/02
09/06/02
09/17/02
09/25/02
09/27/02
10/01/02
10/01/02
10/02/02
10/04/02
10/04/02

1.4.4.2.5
1.4.4.2.8
1.4.4.2.11
1.4.4.2.14
1.1.5.1
1.1.5.1
1.4.4.1.3
1.4.4.1.5
1.4.4.1.7
1.4.4.2.14
1.1.3.1
1.1.3.8
1.1.3.4
1.1.3.5
1.1.3.10
1.1.2.4
1.2.1.2
1.2.1.7.1
1.2.1.7.2
1.2.1.7.3
1.2.2.4
1.2.2.2
1.2.1.7.4
1.2.1.9
1.2.1.13
1.2.1.5
1.1.2.4
1.2.1.13
1.2.1.5
1.4.4.1.2
1.4.4.1.3
1.4.4.1.1
1.4.4.1.4
1.4.4.1.5
1.4.4.1.6
1.4.4.1.7
1.4.4.5.2
1.4.4.2.14
1.4.4.5.3
1.4.4.6.3
1.4.4.9.1
1.6.4
1.1.3.1
1.1.3.8
1.1.3.4
1.1.3.5
1.1.3.10
1.1.2.4
1.2.1.10.8.1
1.2.1.10.9.1
1.2.1.10.9.2
1.2.1.10.8.2
1.2.1.2
1.2.2.2
1.2.2.4
1.2.1.10.3.3
1.2.1.10.5.2
1.2.1.10.3.4
1.2.1.10.4.3
1.2.1.10.7.2
1.2.1.10.2.2
1.2.1.10.6.1
1.2.1.10.6.2

8
8
8
8
5
5
8
8
8
8
5
5
5
5
5
5
6
6
6
6
6
6
6
6
6
6
5
6
6
8
8
8
8
8
8
8
8
8
8
8
8
10
5
5
5
5
5
5
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6

1d
4d
1d
2d
10 d
4d
8d
8d
1d
64 d
1d
18 d
4d
10 d
4d
19 d
13 d
5d
2d
21 d
4d
341.99 d
5d
1d
1d
1d
1d
18 d
5d
10 d
1d
10 d
31 d
5d
10 d
13 d
5d
1d
14 d
10 d
8d
0d
1d
64 d
41 d
5d
0d
3d
2d
8d
8d
18 d
39 d
29 d
1d
2d
35 d
55 d
64 d
342 d
341.99 d
1d
1d

10/04/02
10/14/02
10/14/02
10/11/02
10/15/02
10/18/02
10/24/02
10/24/02
10/29/02
09/04/02
11/05/02
12/27/02
01/31/03
02/03/03
03/07/03
03/13/03
03/24/03
04/03/03
12/06/02
12/09/02
12/17/02
05/06/02
07/19/02
07/25/02
07/26/02
07/29/02
07/30/02
08/30/02
09/06/02
08/26/02
09/10/02
08/14/02
08/09/02
09/11/02
09/09/02
09/09/02
09/19/02
09/25/02
09/10/02
09/19/02
09/26/02
10/08/02
11/05/02
08/05/02
10/02/02
11/08/02
12/04/02
12/17/02
12/18/02
12/24/02
12/24/02
12/27/02
04/04/03
04/04/03
08/25/03
08/25/03
05/21/02
07/05/02
07/05/02
05/06/02
05/06/02
07/24/02
11/05/02

10/07/02
10/14/02
10/15/02
10/15/02
10/16/02
10/18/02
10/24/02
10/24/02
10/29/02
11/06/02
11/06/02
01/22/03
02/05/03
02/14/03
03/13/03
04/08/03
04/09/03
04/09/03
12/10/02
12/11/02
12/19/02
12/02/02
07/25/02
07/26/02
07/29/02
07/30/02
07/31/02
09/02/02
09/06/02
09/09/02
09/11/02
09/16/02
09/16/02
09/18/02
09/25/02
09/25/02
09/25/02
09/26/02
09/27/02
10/02/02
10/08/02
10/08/02
11/06/02
11/08/02
11/29/02
12/04/02
12/04/02
12/17/02
12/20/02
01/06/03
01/06/03
12/30/02
05/30/03
05/30/03
08/25/03
08/26/03
05/24/02
07/12/02
07/12/02
08/15/03
08/15/03
07/25/02
11/06/02

1.2.1.10.5.3
1.2.1.10.2.3
1.2.1.10.7.3
1.2.1.10.4.4
1.2.1.10.9.4
1.2.1.10.6.3
1.2.1.10.8.4
1.2.1.10.8.5
1.2.1.10.9.5
1.2.1.5
1.2.1.13
1.5.2.4.13
1.5.2.4.25
1.5.2.6.2
1.5.2.6.6
1.5.2.6.8
1.5.2.6.10
1.5.2.6.12
1.3.7.3
1.3.7.5
1.3.7.4
1.1.2.4
1.2.3.1.1
1.2.3.1.2
1.2.3.1.3
1.2.3.1.4
1.2.3.1.5
1.2.1.9
1.2.2.4
1.2.3.2.2
1.2.3.4.1.1
1.2.3.2.1
1.2.2.2
1.2.3.4.1.2
1.2.3.2.4
1.2.3.2.3
1.2.3.2.5
1.2.3.4.2.2
1.2.3.4.2.1
1.2.3.2.6
1.2.3.4.2.3
1.2.3.4.3
1.2.1.13
1.2.1.5
1.2.3.2.7
1.2.3.2.8
1.2.3.3
1.3.6.1
1.3.6.3
1.4.4.7.1
1.4.4.7.2
1.5.2.4.13
1.5.3.1
1.5.3.2
1.6.1
1.6.2
1.1.3.1
1.1.3.4
1.1.3.5
1.1.2.3
1.1.2.4
1.2.1.2
1.2.1.13

6
6
6
6
6
6
6
6
6
6
6
9
9
9
9
9
9
9
7
7
7
5
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
7
7
8
8
9
9
9
10
10
5
5
5
5
5
6
6

5d
35 d
60 d
55 d
64 d
43 d
341.99 d
3d
1d
50 d
5d
20 d
32 d
10 d
24 d
31 d
4d
11 d
9.1 d
1d
9d
1d
10 d
24 d
2d
10 d
1d
10 d
1d
64 d
1d
3d
6d
6d
9d
1d
12 d
15 d
15 d
15 d
15 d
16 d
11 d
15 d
18 d
18 d
21 d
61 d
24 d
24 d
4d
10 d
4d
4d
38 d
38 d
19 d
13 d
5d
28 d
45 d
230 d
35 d

09/19/03
05/21/02
06/03/02
07/12/02
07/12/02
09/18/02
05/06/02
07/16/02
07/24/02
06/13/02
09/06/02
08/05/02
07/19/02
09/03/02
08/02/02
08/09/02
09/16/02
08/13/02
09/16/02
09/27/02
09/20/02
10/04/02
09/27/02
09/10/02
10/11/02
09/30/02
10/14/02
10/15/02
10/29/02
08/05/02
11/05/02
11/04/02
11/06/02
11/14/02
11/15/02
01/27/03
11/25/02
12/03/02
12/03/02
12/03/02
12/03/02
12/03/02
12/27/02
12/27/02
12/27/02
12/27/02
12/27/02
01/20/03
12/27/02
12/27/02
01/31/03
02/03/03
03/07/03
03/28/03
02/14/03
02/14/03
03/13/03
03/24/03
04/03/03
03/05/03
04/15/03
10/07/02
05/21/02

09/24/03
06/07/02
06/21/02
07/19/02
07/19/02
10/09/02
08/15/03
07/19/02
07/24/02
08/16/02
09/06/02
09/13/02
09/16/02
09/16/02
09/18/02
09/20/02
09/20/02
09/27/02
09/27/02
09/27/02
10/04/02
10/04/02
10/11/02
10/11/02
10/11/02
10/14/02
10/14/02
10/29/02
10/30/02
11/01/02
11/06/02
11/06/02
11/14/02
11/22/02
12/02/02
01/27/03
12/13/02
12/23/02
12/23/02
12/23/02
12/23/02
12/24/02
01/10/03
01/17/03
01/22/03
01/22/03
01/27/03
01/27/03
01/30/03
01/30/03
02/05/03
02/14/03
03/13/03
04/02/03
04/08/03
04/08/03
04/08/03
04/09/03
04/09/03
04/11/03
06/13/03
10/10/02
06/07/02

1.6.5
1.1.3.1
1.1.3.8
1.1.3.4
1.1.3.5
1.1.3.10
1.1.2.4
1.2.1.10.9.1
1.2.1.2
1.2.1.10.1
1.2.2.4
1.2.1.10.4.1
1.2.1.10.9.2
1.2.1.10.3.1
1.2.1.10.9.3
1.2.2.2
1.2.1.10.3.2
1.2.1.10.4.2
1.2.1.10.3.3
1.2.1.10.3.4
1.2.1.10.5.2
1.2.1.10.5.3
1.2.1.10.4.3
1.2.1.10.7.1
1.2.1.10.4.4
1.2.1.10.7.2
1.2.1.10.7.3
1.2.1.10.9.4
1.2.1.10.9.5
1.2.1.5
1.2.1.13
1.3.4.1
1.3.4.2
1.3.4.3
1.3.4.4
1.3.4.5
1.5.2.4.2
1.5.2.4.3
1.5.2.4.4
1.5.2.4.6
1.5.2.4.7
1.5.2.4.5
1.5.2.4.18
1.5.2.4.19
1.5.2.4.13
1.5.2.4.14
1.5.2.4.17
1.5.2.5.1
1.5.2.4.15
1.5.2.4.16
1.5.2.4.25
1.5.2.6.1
1.5.2.6.5
1.5.2.6.22
1.5.2.6.3
1.5.2.6.4
1.5.2.6.7
1.5.2.6.9
1.5.2.6.11
1.4.4.6.1
1.4.4.6.2
1.1.5.1
1.1.3.1

10
5
5
5
5
5
5
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
7
7
7
7
7
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
8
8
5
5

55 d
64 d
341.99 d
1d
32 d
10 d
5d
31 d
1d
64 d
2d
5d
21 d
4d
9d
5d
3d
9d
18 d
18 d
10 d
14 d
15 d
28 d
31 d
91.87 d
45 d
10 d
34 d
31 d
61 d
2d
5d
10 d
5d
23 d
26 d
31 d
20 d
35 d
60 d
55 d
64 d
43 d
341.99 d
24 d
1d
1d
3d
31 d
18 d
18 d
5d
9.1 d
9d
1d
10 d
10 d
10 d
10 d
1d
4d
1d

07/12/02
07/12/02
05/06/02
07/24/02
07/25/02
08/26/02
09/06/02
08/09/02
11/05/02
08/05/02
11/13/02
11/11/02
12/09/02
12/17/02
12/23/02
01/06/03
12/23/02
12/23/02
12/23/02
12/23/02
01/06/03
01/17/03
02/05/03
03/05/03
05/02/03
01/21/03
04/15/03
02/05/03
01/06/03
02/21/03
01/20/03
06/02/03
06/04/03
07/10/03
07/23/03
11/01/02
12/19/02
12/27/02
08/25/03
05/21/02
05/28/02
07/12/02
07/12/02
09/18/02
05/06/02
06/13/02
07/24/02
07/26/02
07/29/02
08/19/02
08/30/02
08/30/02
09/06/02
09/16/02
09/20/02
09/27/02
09/27/02
09/30/02
09/30/02
10/04/02
10/04/02
10/14/02
10/14/02

07/19/02
07/19/02
08/15/03
07/25/02
09/06/02
09/06/02
09/13/02
09/16/02
11/06/02
11/08/02
11/15/02
11/15/02
12/10/02
12/19/02
01/06/03
01/13/03
12/27/02
01/06/03
01/17/03
01/17/03
01/17/03
01/24/03
02/11/03
04/11/03
05/05/03
05/23/03
06/13/03
02/19/03
02/20/03
04/04/03
04/15/03
06/04/03
06/11/03
07/23/03
07/30/03
12/05/02
01/24/03
02/07/03
09/19/03
06/07/02
06/14/02
07/19/02
07/19/02
10/07/02
08/15/03
07/16/02
07/24/02
07/26/02
08/01/02
08/19/02
08/30/02
09/02/02
09/06/02
09/16/02
09/24/02
09/30/02
09/30/02
10/01/02
10/01/02
10/04/02
10/07/02
10/14/02
10/15/02

1.1.3.4
1.1.3.5
1.1.2.4
1.2.1.2
1.2.2.1
1.2.2.3
1.2.2.4
1.2.2.2
1.2.1.13
1.2.1.5
1.3.7.1
1.3.7.2
1.3.7.5
1.3.7.4
1.3.7.7
1.3.7.8
1.4.3.1
1.4.3.4
1.4.3.2
1.4.3.3
1.4.4.5.1
1.4.4.5.2
1.4.4.5.3
1.4.4.6.1
1.4.4.6.3
1.4.3.5
1.4.4.6.2
1.5.4.1
1.5.4.7.1
1.5.4.2
1.5.2.5.1
1.5.4.4
1.5.4.5
1.5.4.7.4
1.5.4.7.5
1.5.2.1.1
1.5.2.1.2
1.5.2.1.3
1.6.4
1.1.3.1
1.1.3.8
1.1.3.4
1.1.3.5
1.1.3.10
1.1.2.4
1.2.1.1
1.2.1.2
1.2.1.3
1.2.1.6
1.2.2.2
1.2.1.7.4
1.2.1.9
1.2.2.4
1.2.1.10.3.3
1.2.1.10.5.2
1.2.1.10.3.4
1.2.1.10.4.3
1.2.1.10.2.2
1.2.1.10.7.2
1.2.1.10.6.2
1.2.1.10.5.3
1.2.1.10.2.3
1.2.1.10.7.3

5
5
5
6
6
6
6
6
6
6
7
7
7
7
7
7
8
8
8
8
8
8
8
8
8
8
8
9
9
9
9
9
9
9
9
9
9
9
10
5
5
5
5
5
5
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6

2d
10 d
4d
8d
8d
1d
1d
1d
64 d
18 d
61 d
4d
8d
15 d
23 d
4d
341.99 d
18 d
10 d
5d
1d
14 d
10 d
5d
31 d
13 d
10 d
5d
1d
8d
10 d
41 d
1d
64 d
5d
5d
2d
3d
8d
8d
18 d
39 d
29 d
1d
2d
281 d
37 d
5d
10 d
5d
35 d
60 d
55 d
64 d
43 d
341.99 d
1d
5d
31 d
18 d
10 d
16 d
16 d

10/11/02
10/15/02
10/18/02
10/24/02
10/24/02
10/29/02
11/04/02
11/05/02
08/19/02
12/27/02
01/20/03
01/31/03
02/03/03
03/14/03
02/26/03
03/28/03
05/06/02
08/30/02
08/26/02
09/06/02
09/10/02
09/10/02
08/14/02
09/11/02
08/09/02
09/09/02
09/09/02
09/19/02
09/25/02
09/26/02
09/19/02
10/02/02
11/05/02
08/05/02
11/08/02
11/22/02
12/18/02
12/17/02
12/24/02
12/24/02
12/27/02
04/04/03
04/04/03
08/25/03
08/25/03
07/26/02
03/21/03
05/23/03
06/16/03
07/11/03
05/21/02
05/28/02
07/12/02
07/12/02
09/18/02
05/06/02
07/24/02
09/06/02
08/09/02
08/30/02
09/13/02
09/27/02
09/27/02

10/15/02
10/16/02
10/18/02
10/24/02
10/24/02
10/29/02
11/05/02
11/06/02
11/08/02
01/22/03
01/23/03
02/05/03
02/12/03
03/19/03
03/28/03
04/03/03
12/02/02
09/02/02
09/04/02
09/06/02
09/10/02
09/11/02
09/11/02
09/11/02
09/16/02
09/17/02
09/19/02
09/25/02
09/25/02
09/27/02
09/27/02
10/11/02
11/06/02
11/08/02
12/04/02
12/03/02
12/18/02
12/20/02
12/26/02
01/06/03
12/30/02
04/07/03
05/30/03
08/25/03
08/26/03
08/15/03
05/09/03
05/30/03
06/30/03
07/18/03
06/07/02
06/14/02
07/19/02
07/19/02
10/07/02
08/15/03
07/25/02
09/06/02
09/16/02
09/25/02
09/26/02
10/18/02
10/18/02

1.2.1.10.4.4
1.2.1.10.9.4
1.2.1.10.6.3
1.2.1.10.8.4
1.2.1.10.8.5
1.2.1.10.9.5
1.2.1.12
1.2.1.13
1.2.1.5
1.5.2.4.13
1.5.2.5.1
1.5.2.4.25
1.5.2.6.14
1.5.2.6.20
1.5.2.6.18
1.5.2.6.22
1.1.2.4
1.2.1.9
1.2.3.2.2
1.2.2.4
1.2.3.4.1.1
1.2.3.4.2.1
1.2.3.2.1
1.2.3.4.1.2
1.2.2.2
1.2.3.2.3
1.2.3.2.4
1.2.3.2.5
1.2.3.4.2.2
1.2.3.4.2.3
1.2.3.2.6
1.2.3.2.7
1.2.1.13
1.2.1.5
1.2.3.2.8
1.3.6.2
1.3.6.3
1.3.6.1
1.4.4.7.2
1.4.4.7.1
1.5.2.4.13
1.5.3.1
1.5.3.2
1.6.1
1.6.2
1.1.2.2
1.4.4.8.7
1.4.4.8.9
1.5.5.9
1.5.5.11
1.1.3.1
1.1.3.8
1.1.3.4
1.1.3.5
1.1.3.10
1.1.2.4
1.2.1.2
1.2.2.4
1.2.2.2
1.2.1.9
1.2.1.11.1
1.2.1.11.2
1.2.1.11.3

6
6
6
6
6
6
6
6
6
9
9
9
9
9
9
9
5
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
7
7
7
8
8
9
9
9
10
10
5
8
8
9
9
5
5
5
5
5
5
6
6
6
6
6
6
6

1d
64 d
3d
9d
5d
5d
4d
2d
7d
6d
4d
5d
16 d
6d
20 d
20 d
5d
15 d
31 d
5d
20 d
0d
35 d
0d
24 d
3d
5d
1d
5d
1d
1d
1d
1d
9d
1d
0d
3d
60 d
0d
50 d
19 d
19 d
19 d
19 d
0d
24 d
23 d
23 d
32 d
10 d
10 d
1d
5d
20 d
10 d
32 d
10 d
42 d
6d
5d
24 d
55 d
41.87 d

11/05/02
08/05/02
10/21/02
10/23/02
11/22/02
11/22/02
12/03/02
12/05/02
12/06/02
12/10/02
11/18/02
11/18/02
11/22/02
12/17/02
01/06/03
01/06/03
01/27/03
02/05/03
05/02/03
06/27/03
08/25/03
05/06/02
05/21/02
07/05/02
06/13/02
07/16/02
07/16/02
07/24/02
07/19/02
07/25/02
07/26/02
07/26/02
07/29/02
07/19/02
07/30/02
08/01/02
07/29/02
05/28/02
08/16/02
06/13/02
07/30/02
07/30/02
07/30/02
07/30/02
08/30/02
07/30/02
07/31/02
07/31/02
07/25/02
08/26/02
08/26/02
09/10/02
09/06/02
08/05/02
08/14/02
07/19/02
09/03/02
07/23/02
09/10/02
09/11/02
08/02/02
07/05/02
07/25/02

11/06/02
11/08/02
10/23/02
11/05/02
12/03/02
12/03/02
12/06/02
12/06/02
12/17/02
12/17/02
11/22/02
11/25/02
12/17/02
12/26/02
01/31/03
01/31/03
01/31/03
02/26/03
06/13/03
07/04/03
09/19/03
05/06/02
07/05/02
07/05/02
07/16/02
07/19/02
07/23/02
07/25/02
07/25/02
07/26/02
07/29/02
07/29/02
07/30/02
07/31/02
07/31/02
08/01/02
08/01/02
08/16/02
08/16/02
08/20/02
08/23/02
08/23/02
08/23/02
08/23/02
08/30/02
08/30/02
08/30/02
08/30/02
09/06/02
09/06/02
09/09/02
09/11/02
09/13/02
09/13/02
09/16/02
09/16/02
09/16/02
09/18/02
09/18/02
09/18/02
09/18/02
09/19/02
09/20/02

1.2.1.13
1.2.1.5
1.3.2.2
1.3.2.3
1.3.2.1
1.3.2.4
1.3.2.5
1.3.3.1
1.3.3.2
1.3.3.3
1.4.4.4.1
1.4.4.3.1
1.4.4.4.2
1.4.4.4.3
1.4.4.3.2
1.4.4.3.3
1.4.4.3.4
1.4.4.5.3
1.4.4.6.3
1.4.4.9.3
1.6.4
1.1.1
1.1.3.1
1.1.3.2
1.2.1.1
1.2.1.10.9.1
1.2.1.10.8.1
1.2.1.2
1.2.3.1.1
1.2.3.1.2
1.2.1.3
1.2.3.1.3
1.2.3.1.4
1.2.3.1
1.2.3.1.5
1.2.1.4
1.2.1.6
1.1.3.8
1.1.3.9
1.2.1.10.1
1.2.1.8
1.2.1.8.1
1.2.1.8.2
1.2.1.8.3
1.1.3.3
1.2.1.7.1
1.2.1.7.2
1.2.1.7.3
1.2.2.1
1.2.2.3
1.2.3.2.2
1.2.3.4.1.1
1.2.2.4
1.2.1.10.4.1
1.2.3.2.1
1.2.1.10.9.2
1.2.1.10.3.1
1.2.1.10.8.2
1.2.3.4.1
1.2.3.4.1.2
1.2.1.10.9.3
1.1.3.4
1.2.2

6
6
7
7
7
7
7
7
7
7
8
8
8
8
8
8
8
8
8
8
10

31 d
4d
38 d
42 d
18 d
18 d
10 d
13 d
5d
1d
10 d
11 d
9.1 d
14 d
20.1 d
1d
46 d
64 d
0d
10 d
9d
15 d
0d
20 d
47.43 d
1d
20.83 d
20.83 d
8d
0d
10 d
24 d
10 d
10 d
26 d
1d
53.32 d
2d
60 d
4d
10 d
26 d
16 d
16 d
0d
3d
29 d
4d
0d
0d
2d
10 d
78.26 d
1d
105.71 d
81.71 d
8d
8d
0d
9d
1d
2d
1d

08/09/02
09/16/02
08/02/02
07/30/02
08/30/02
08/30/02
09/09/02
09/09/02
09/19/02
09/25/02
09/13/02
08/13/02
09/16/02
09/10/02
09/03/02
09/27/02
07/29/02
07/05/02
10/01/02
09/19/02
09/20/02
09/16/02
10/04/02
08/06/02
08/02/02
10/04/02
09/10/02
09/10/02
09/26/02
10/08/02
09/27/02
09/10/02
09/30/02
09/30/02
09/10/02
10/14/02
08/05/02
10/11/02
07/29/02
10/14/02
10/04/02
09/13/02
09/27/02
09/27/02
10/21/02
10/21/02
09/16/02
10/18/02
10/28/02
10/28/02
10/25/02
10/15/02
07/16/02
10/29/02
06/13/02
07/16/02
10/24/02
10/24/02
11/04/02
10/23/02
11/04/02
11/04/02
11/05/02

09/20/02
09/20/02
09/24/02
09/25/02
09/25/02
09/25/02
09/25/02
09/25/02
09/25/02
09/26/02
09/26/02
09/27/02
09/27/02
09/27/02
09/30/02
09/30/02
09/30/02
10/01/02
10/01/02
10/02/02
10/04/02
10/04/02
10/04/02
10/07/02
10/07/02
10/07/02
10/08/02
10/08/02
10/08/02
10/08/02
10/11/02
10/11/02
10/14/02
10/14/02
10/15/02
10/15/02
10/15/02
10/15/02
10/18/02
10/18/02
10/18/02
10/18/02
10/18/02
10/18/02
10/21/02
10/23/02
10/24/02
10/24/02
10/28/02
10/28/02
10/28/02
10/29/02
10/30/02
10/30/02
11/04/02
11/04/02
11/04/02
11/04/02
11/04/02
11/05/02
11/05/02
11/05/02
11/06/02

1.2.2.2
1.2.1.10.3.2
1.2.1.10.5.1
1.2.1.7
1.2.1.7.4
1.2.1.9
1.2.3.2.4
1.2.3.2.3
1.2.3.2.5
1.2.3.4.2.2
1.2.1.11.1
1.2.1.10.4.2
1.2.1.10.3.3
1.2.3.4.2.1
1.2.1.10.3
1.2.1.10.3.4
1.2.1.10.2.1
1.1.3.5
1.1.3.6
1.2.3.2.6
1.2.1.10.5.2
1.2.1.10.6.1
1.1.3.7
1.2.1.10.8.3
1.2.1.10.5
1.2.1.10.5.3
1.2.3.4
1.2.3.4.2
1.2.3.4.2.3
1.2.3.4.3
1.2.1.10.4.3
1.2.1.10.7.1
1.2.1.10.2.2
1.2.1.10.7.2
1.2.1.10.7
1.2.1.10.7.3
1.2.1.10.4
1.2.1.10.4.4
1.2.1.10.2
1.2.1.10.2.3
1.2.1.10.6.2
1.2.1.11
1.2.1.11.2
1.2.1.11.3
1.3.1
1.3.2.2
1.2.1.10.6
1.2.1.10.6.3
1.4.1
1.5.1
1.3.8.1
1.2.1.10.9.4
1.2.1.10.9
1.2.1.10.9.5
1.2.1.10
1.2.1.10.8
1.2.1.10.8.4
1.2.1.10.8.5
1.2.1.10.10
1.3.2.3
1.2.1.12
1.3.5.1
1.2.1.13

3d
2d
64 d
2d
6d
43 d
14 d
2d
5d
5d
17 d
119.29 d
0d
4d
20 d
14 d
5d
6d
4d
4d
5d
41 d
8d
2d
9d
5d
5d
5d
126 d
99.61 d
81 d
5d
0d
23 d
34 d
4d
2d
17 d
2d
25 d
1d
12 d
151.74 d
0d
29 d
23 d
7d
16 d
9.19 d
6d
18 d
14 d
18.68 d
3d
2d
6d
6d
3d
16 d
16 d
4d
15 d
15 d

11/04/02
11/05/02
08/05/02
11/07/02
11/06/02
09/18/02
10/29/02
11/13/02
11/11/02
11/04/02
10/28/02
06/13/02
11/22/02
11/18/02
10/28/02
11/04/02
11/15/02
11/14/02
11/18/02
11/19/02
11/18/02
10/02/02
11/18/02
11/26/02
11/15/02
11/22/02
11/22/02
11/22/02
06/13/02
07/19/02
08/14/02
11/08/02
12/04/02
11/01/02
10/21/02
12/03/02
12/05/02
11/13/02
12/06/02
11/04/02
12/12/02
11/25/02
05/21/02
12/16/02
11/04/02
11/11/02
12/06/02
11/22/02
12/05/02
12/10/02
11/22/02
11/28/02
11/22/02
12/17/02
12/18/02
12/12/02
12/12/02
12/17/02
11/28/02
11/28/02
12/17/02
12/03/02
12/03/02

11/06/02
11/07/02
11/08/02
11/11/02
11/14/02
11/15/02
11/15/02
11/15/02
11/15/02
11/18/02
11/19/02
11/22/02
11/22/02
11/22/02
11/22/02
11/22/02
11/22/02
11/22/02
11/22/02
11/22/02
11/25/02
11/29/02
11/29/02
11/29/02
12/02/02
12/03/02
12/03/02
12/03/02
12/04/02
12/04/02
12/04/02
12/04/02
12/04/02
12/05/02
12/06/02
12/06/02
12/06/02
12/09/02
12/10/02
12/11/02
12/12/02
12/13/02
12/16/02
12/16/02
12/16/02
12/16/02
12/17/02
12/17/02
12/17/02
12/17/02
12/20/02
12/20/02
12/20/02
12/20/02
12/20/02
12/20/02
12/20/02
12/20/02
12/20/02
12/20/02
12/23/02
12/23/02
12/23/02

1.3.4.1
1.3.5.2
1.2.1.5
1.3.5.3
1.3.4.2
1.1.3.10
1.3.8.2
1.3.7.1
1.3.7.2
1.4.4.1.2
1.5.2.2.1.1
1.2.1
1.2.1.14
1.4.4.4.1
1.5.2.2.1
1.5.2.2.1.2
1.5.2.2.1.3
1.3.4.3
1.4.4.2.3
1.4.4.1.3
1.4.4.3.1
1.2.3.2.7
1.3.8.3
1.4.4.2.4
1.3.4.4
1.3.2.1
1.3.2.4
1.3.6.2
1.2
1.2.3
1.2.3.2
1.2.3.2.8
1.2.3.3
1.5.2.1.1
1.3.2
1.3.2.5
1.3.3.1
1.5.2.4.8
1.3.7.3
1.4.4.2.2
1.4.4.2.5
1.5.2.4.2
1.1.3
1.1.3.11
1.3.5
1.3.5.4
1.3.3.2
1.4.4.4.2
1.3.3
1.3.3.3
1.4.4.1.4
1.4.4.1.5
1.3.6
1.3.6.1
1.3.6.3
1.4.4.2.6
1.4.4.2.7
1.4.4.2.8
1.4.4.1.6
1.4.4.1.7
1.3.7.4
1.5.2.4.3
1.5.2.4.4

15 d
15 d
27 d
19 d
16 d
20 d
20 d
6d
30 d
3d
0d
5d
86 d
8d
8d
8d
9d
0d
9d
21 d
0d
2d
0d
7d
0d
11 d
43.77 d
5d
16 d
16 d
56.19 d
0d
5d
3d
18 d
18 d
5d
11 d
15 d
10 d
52.71 d
36 d
11 d
17 d
5d
18 d
18 d
26 d
20 d
20 d
20 d
26 d
21 d
59.84 d
1d
0d
24 d
24 d
24 d
20 d
20 d
20 d
20 d

12/03/02
12/03/02
11/13/02
11/25/02
12/03/02
11/25/02
11/25/02
12/17/02
11/12/02
12/23/02
12/30/02
12/27/02
09/06/02
12/24/02
12/24/02
12/24/02
12/23/02
01/06/03
12/23/02
12/09/02
01/07/03
01/03/03
01/07/03
12/30/02
01/08/03
12/27/02
11/11/02
01/06/03
12/20/02
12/20/02
10/25/02
01/14/03
01/08/03
01/14/03
12/23/02
12/23/02
01/10/03
12/31/02
12/27/02
01/06/03
11/04/02
11/28/02
01/06/03
12/30/02
01/15/03
12/27/02
12/27/02
12/19/02
12/27/02
12/27/02
12/27/02
12/19/02
12/27/02
11/04/02
01/27/03
01/28/03
12/27/02
12/27/02
12/27/02
12/27/02
01/06/03
01/06/03
01/06/03

12/23/02
12/23/02
12/23/02
12/23/02
12/24/02
12/24/02
12/24/02
12/26/02
12/27/02
12/27/02
12/30/02
01/02/03
01/06/03
01/06/03
01/06/03
01/06/03
01/06/03
01/06/03
01/06/03
01/07/03
01/07/03
01/07/03
01/07/03
01/08/03
01/08/03
01/10/03
01/13/03
01/13/03
01/14/03
01/14/03
01/14/03
01/14/03
01/15/03
01/17/03
01/17/03
01/17/03
01/17/03
01/17/03
01/17/03
01/17/03
01/17/03
01/17/03
01/20/03
01/22/03
01/22/03
01/22/03
01/22/03
01/24/03
01/24/03
01/24/03
01/24/03
01/24/03
01/27/03
01/27/03
01/27/03
01/28/03
01/30/03
01/30/03
01/30/03
01/31/03
01/31/03
01/31/03
01/31/03

1.5.2.4.6
1.5.2.4.7
1.5.2.4.9
1.5.2.4.11
1.5.2.4.5
1.5.2.4.10
1.5.2.4.12
1.4.4.4.3
1.5.2.3.1
1.4.3.1
1.3.8.4
1.3.8.8
1.1.4.1
1.4.4.7
1.4.4.7.1
1.4.4.7.2
1.3.7.7
1.3.8.5
1.4.3.4
1.3.7.5
1.3.8.6
1.3.9.1
1.3.9.2
1.5.2.2.2.1
1.3.7.6
1.5.2.4.18
1.3.7
1.3.7.8
1.4.4.2.9
1.4.4.2.10
1.3.8
1.3.8.7
1.5.2.2.2.2
1.4.4.2.11
1.4.3.2
1.4.3.3
1.4.4.2.12
1.4.4.2.13
1.5.2.4.19
1.4.4.5.1
1.4.4.1
1.4.4.1.1
1.4.4.2.1
1.5.2.2.2
1.5.2.2.2.3
1.5.2.4.13
1.5.2.4.14
1.5.2.1.2
1.5.2.4.20
1.5.2.4.21
1.5.2.4.23
1.4.2.2
1.5.2.4.17
1.3.4
1.3.4.5
1.3.9.3
1.5.2.4.15
1.5.2.4.16
1.5.2.4.24
1.5.2.4.22
1.4.4.3.2
1.4.4.3.3
1.4.2.3

53.06 d
5d
14 d
4d
69.19 d
31 d
68 d
2d
8d
8d
84.29 d
30.97 d
11 d
0d
10 d
10 d
4d
1d
10 d
34 d
5d
15 d
10 d
10 d
4d
51.77 d
36 d
4d
4d
15 d
8d
11 d
23 d
94.35 d
14 d
15 d
4d
3d
31 d
66.84 d
5d
28.19 d
9d
38 d
38 d
19 d
19 d
13 d
13 d
5d
5d
35 d
28 d
51.32 d
6d
0d
63 d
61 d
37 d
134.13 d
104.13 d
0d
111.58 d

11/18/02
01/27/03
01/17/03
01/31/03
11/01/02
12/27/02
11/04/02
02/05/03
02/03/03
02/03/03
10/21/02
01/03/03
01/31/03
02/14/03
02/03/03
02/03/03
02/11/03
02/17/03
02/05/03
01/06/03
02/17/03
02/05/03
02/12/03
02/12/03
02/24/03
12/19/02
01/13/03
03/07/03
03/07/03
02/26/03
03/14/03
03/14/03
02/26/03
11/18/02
03/11/03
03/14/03
03/28/03
04/01/03
02/21/03
01/06/03
03/28/03
02/26/03
03/26/03
02/14/03
02/14/03
03/13/03
03/13/03
03/24/03
03/24/03
04/03/03
04/03/03
02/24/03
03/05/03
02/03/03
04/03/03
04/11/03
01/20/03
01/20/03
03/21/03
11/12/02
12/27/02
05/23/03
12/23/02

01/31/03
01/31/03
02/05/03
02/05/03
02/07/03
02/07/03
02/07/03
02/07/03
02/12/03
02/12/03
02/14/03
02/14/03
02/14/03
02/14/03
02/14/03
02/14/03
02/14/03
02/17/03
02/19/03
02/20/03
02/24/03
02/26/03
02/26/03
02/26/03
02/28/03
02/28/03
02/28/03
03/13/03
03/13/03
03/18/03
03/25/03
03/28/03
03/28/03
03/28/03
03/28/03
04/03/03
04/03/03
04/03/03
04/04/03
04/04/03
04/04/03
04/04/03
04/07/03
04/08/03
04/08/03
04/08/03
04/08/03
04/09/03
04/09/03
04/09/03
04/09/03
04/11/03
04/11/03
04/11/03
04/11/03
04/11/03
04/15/03
04/15/03
05/09/03
05/16/03
05/16/03
05/23/03
05/24/03

1.4.4.3
1.4.4.3.4
1.4.4.5.2
1.5.2.4.25
1.5.2.1
1.5.2.1.3
1.4.4.2
1.4.4.2.14
1.5.2.6.13
1.5.2.6.14
1.3
1.3.9
1.3.9.4
1.3.9.5
1.5.2.6.1
1.5.2.6.2
1.4.4.5.4
1.4.4.8.1
1.5.4.1
1.5.4.7.1
1.4.4.8.2
1.4.4.5.3
1.5.2.6.15
1.5.2.6.16
1.4.4.8.3
1.4.2
1.4.2.1
1.5.2.6.5
1.5.2.6.6
1.5.2.6.17
1.5.2.6.19
1.5.2.6.21
1.5.2.6.18
1.4.4.4
1.4.4.4.4
1.5.2.6.20
1.5.2.6.22
1.5.2.4.26
1.5.4.2
1.4.4.5
1.4.4.5.5
1.4.4.5.6
1.5.2.2.3.2
1.5.2.6.3
1.5.2.6.4
1.5.2.6.7
1.5.2.6.8
1.5.2.6.9
1.5.2.6.10
1.5.2.6.11
1.5.2.6.12
1.5.2.2.3.1
1.4.4.6.1
1.5.2.6
1.5.2.6.23
1.5.2.6.24
1.5.2.5
1.5.2.5.1
1.4.4.8.7
1.5.2.3
1.5.2.3.2
1.4.4.8.8
1.4.3

91.87 d
15.48 d
40.69 d
39 d
29 d
5d
36.68 d
2d
5d
31 d
166.68 d
81.68 d
49 d
30.48 d
15 d
74.45 d
45 d
5d
167.16 d
154.77 d
146 d
10 d
0d
1d
97.32 d
0d
10 d
0d
10 d
5d
0d
18 d
46 d
0d
0d
5d
0d
5d
8d
10 d
5d
151.68 d
151.68 d
5d
201.81 d
195.81 d
35 d
20 d
0d
0d
10 d
0d
0d
281 d
342 d
342 d
341.99 d
342.35 d
267 d
72.42 d
5d
230 d
230 d

01/21/03
05/05/03
04/04/03
04/04/03
04/04/03
05/23/03
04/14/03
06/02/03
06/04/03
05/02/03
10/28/02
02/24/03
04/09/03
05/05/03
05/26/03
03/05/03
04/15/03
06/09/03
10/28/02
11/13/02
11/25/02
06/02/03
06/20/03
06/23/03
02/17/03
06/27/03
06/13/03
06/27/03
06/16/03
06/27/03
07/04/03
06/16/03
05/12/03
07/11/03
07/11/03
07/11/03
07/18/03
07/11/03
07/10/03
07/10/03
07/18/03
01/06/03
01/06/03
07/23/03
10/28/02
11/04/02
06/13/03
07/04/03
07/31/03
08/01/03
07/18/03
08/04/03
08/11/03
07/26/02
05/06/02
05/06/02
05/06/02
05/06/02
08/15/02
05/12/03
08/11/03
10/07/02
10/07/02

05/24/03
05/24/03
05/30/03
05/30/03
05/30/03
05/30/03
06/02/03
06/04/03
06/11/03
06/13/03
06/13/03
06/13/03
06/13/03
06/13/03
06/13/03
06/13/03
06/13/03
06/13/03
06/13/03
06/13/03
06/13/03
06/16/03
06/20/03
06/23/03
06/27/03
06/27/03
06/27/03
06/27/03
06/30/03
07/04/03
07/04/03
07/10/03
07/11/03
07/11/03
07/11/03
07/18/03
07/18/03
07/18/03
07/21/03
07/23/03
07/25/03
07/30/03
07/30/03
07/30/03
07/31/03
07/31/03
07/31/03
07/31/03
07/31/03
08/01/03
08/01/03
08/04/03
08/11/03
08/15/03
08/15/03
08/15/03
08/15/03
08/15/03
08/15/03
08/18/03
08/18/03
08/18/03
08/18/03

1.4.3.5
1.5.4.6.1
1.5.3
1.5.3.1
1.5.3.2
1.4.4.8.9
1.5.4.3
1.5.4.4
1.5.4.5
1.4.4.6.3
1.5.2.2
1.5.2.2.3
1.5.2.2.3.3
1.5.4.6
1.5.4.6.2
1.4.4.6
1.4.4.6.2
1.5.2.4.27
1.5.2
1.5.2.4
1.5.2.4.1
1.5.4.7.2
1.4.4.8.4
1.4.4.8.6
1.4.4.8
1.4.4.8.5
1.4.4.9.1
1.4.4.9.2
1.5.5.9
1.4.4.9.3
1.4.4.9.4
1.5.4.7.3
1.5.5.1
1.5.5.4
1.5.5.10
1.5.5.2
1.5.5.5
1.5.5.11
1.5.6.1
1.5.4.7.4
1.5.5.3
1.5.4
1.5.4.7
1.5.4.7.5
1.4
1.4.4
1.4.4.9
1.4.4.9.5
1.4.4.9.6
1.5.6.2
1.5.6.4
1.5.5.6
1.5.5.7
1.1.2.2
1.1.2.3
1.1.2.1
1.1.2.4
1.1.2
1.1.2.5
1.5.5
1.5.5.8
1.1.5
1.1.5.1

0d
1d
2d
0d
238.84 d
53 d
20 d
0d
20 d
371.87 d
280 d
10 d
372.87 d
25 d
5d
0d

08/22/03
08/25/03
08/25/03
09/12/03
10/28/02
07/10/03
08/25/03
09/19/03
08/25/03
05/06/02
09/06/02
09/11/03
05/06/02
08/25/03
09/19/03
09/26/03

08/22/03
08/25/03
08/26/03
09/12/03
09/19/03
09/19/03
09/19/03
09/19/03
09/19/03
09/25/03
09/25/03
09/25/03
09/26/03
09/26/03
09/26/03
09/26/03

1.5.6.3
1.6.1
1.6.2
1.6.3
1.5
1.5.6
1.5.6.5
1.5.6.6
1.6.4
1.1
1.1.4
1.1.4.2
1
1.6
1.6.5
1.6.6

39 zzz$?

4
4
2
10

5
5
56
1
8
14
36
9
29
70
3
78

2
27
21

2
1

2
4
4
10

5
5
20
15
37
6
19
5
3
6
15
9

1
29
6
19
61
11

Dec-02

Jun-03
6

Jan-03

46
24
1747
100
225
325
439
165
547
271
118
625
116
41
514
48
92
20
79
194
22
46
8
1445
142
57
6
144
9
8
56
11
3
46
75
495
802
18
9123

Feb-03

Celeschi Michelle
Michelle Celeschi
Dejaynes Vance
Vance Dejaynes
Dobrinich Tina L
Tina L Dobrinich
Durnan Steve
Steve Durnan
Elam Carol
Carol Elam
Frey Michael
Michael Frey
Gullixon Eric
Eric Gullixon
Hall Steve
Steve Hall
Hartness Ty
Ty Hartness
Isaacson John
John Isaacson
Kumar Ashok
Ashok Kumar
Lade Daniel
Daniel Lade
Mary Kasley Lee
Lee Mary Kasley
Leslie Sherrill
Sherrill Leslie
Ma Harry
Harry Ma
Malone Bill
Bill Malone
McKinney Brian
Brian McKinney
Miller Kim
Kim Miller
Mohandass Duziantha Duzianthan Mohandass
Murthy J
J Murthy
Nutt John
John Nutt
Paige Charles
Charles Paige
Ramachandran SantosSantosh Ramachandran
Reddy Lakshmi Naray Lakshmi Narayana Reddy
Rogers Charlie
Charlie Rogers
Saenz Gilbert
Gilbert Saenz
Saha Sushit
Sushit Saha
Sanders Dave
Dave Sanders
Scott Gary
Gary Scott
Shanmugam Kasi
Kasi Shanmugam
Stern David
David Stern
Weidenbenner Ed
Ed Weidenbenner
Witter Steve
Steve Witter
Woodman Andrew
Andrew Woodman

Total Used
Hours

Mar-03

Name as in PV
Name as in OL
Awan Zafar
Zafar Awan
Baugh Sally
Sally Baugh
Bommisetti Amarna Amarnath Bommisetti
Brown Brian [GS03] Brian Brown

5
6
9
11
4
4
140 191 177
3
9
17
18
12
16
25
122
48
20
25
30
31
27
22
18
91
12
8
2
5
8
112
49
57
3
1
2
3
1
33
31
31
10
1
1
1
1
5
9
6
8
17
17
15
6
5
2
2
115 174 171
22
6
4
11
1
3

193

156
65
19
36
37
14
48
10
3
75
3
6
38
1
4
2
10
54

Apr-03

Sr.No.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38

May-03

Proj. 1234 Monthly Actual Hours History

19
39
32
31
48
12
5
69
6
7
44
4
0
1
16
38

2
179
4
6

166
26
6

69

10

1
3
1

1
10
0

1
15

3
6
3

32
37
102

6
41
82

10
8
1
9
13
38
32
27
110 109 125
2
6

51 631 ### 813 801 947 927

Nov-02

Oct-02

Sep-02

Aug-02

Jul-02

Jun-02

May-02

Apr-02

134
32
24
45
29
22
58
8
1
56
13
4
41
4
12

151

161

168

220

17
41
26

10
54
29

19
33
16

16
11
24

17

30

12

10

47
6
19
24
29
4
37

40
12
13
43
17
13
41

68
11
33
30
24

40
9
11
19
7

56
6
8
4

44

49

44

22

20

16

18
27

47
7
7
9
10
5
54
7
11
7
5
6

125
72
10

117
3
18

139

69

132

33

14

60
8

43

27

11
2

2
3
4

4
39
3

39
116

42
48

47
28

793 716 683 577 705 250 197

8/19/2002

8/26/2002

9/2/2002

9/9/2002

9/16/2002

9/23/2002

9/30/2002

10/7/2002

25
8
18
4
4
3
3
3
5
3
5

21
8
20
1
1
5
5
5
5
3
5

21
8
20
4
4
3
3
3
3
1
4

23
10
21
5
4
3
3
3
1
1
2

28
8
21
6
5
5
5
5
5
5
6

24
8
20
2
1
1
1
1
1
1
2

16
8
9
2
1
1
1
1
1
1
2

15
8
9
1
1
1
1
1
1
1
1

19
10
11
5
5
3
3
3
3
18
7

15
8
9
1
17
1
9
1
1
27
4

16
8
10
2
18
2
4
2
3
11
10

15
8
9
1
3
5
3
3
3
15
3

15
8
9
1
3
43
3
24
14
22
17

16
8
10
2
3
44
3
25
16
7
17

15
8
9
1
3
43
3
24
16
1
17

15
8
9
2
1
43
3
24
14
1
18

15
8
9
1
1
43
1
24
14
1
17

19
8
15
5
3
32
4
19
14
1
15
10
30
8
4

21
8
18
8
4
3
7
3
3
1
7
3

21
8
18
2
2
3
3
3
3
7
3
1

2
4

21

11

1
9
9

4
10
4

42
11
4

43
20
8

42
19
7

42
15
26

42
15
16

7
2

10/28/2002

8/12/2002

20
9
11
4
4
3
3
3
3
3
3

10/21/2002

8/5/2002

15
8
9
1
1
1
1
1
1
1
1

10/14/2002

7/29/2002

10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26
7/22/2002

7/15/2002

7/8/2002

7/1/2002

6/24/2002

6/17/2002

6/10/2002

477 15
211 8
358 9
67 1
108 16
298 1
77 1
189 1
136 1
210 1
171 1
14
249
116
117

6/3/2002

Week
Start
--------->

5/27/2002

5/20/2002

Week No --

5/13/2002

Resource
Name
|
V
Carol
Michelle
Ashok
Ed
Eric
Murthy
Jill
Lakshmi
Michael
Steve
Tina
Analyst
Amarnath
Ty
Mary

Weekly Allocation as per schedule


5/6/2002

Proj. 1234

18
8
18
1
1
2
2
2
1
42
1

16
8
18
3
2
3
2
3
2
33
3

15
8
18
1
1
1
1
1
1
1
1

2
2
2

Proj. 1234 Resourcewise Earned Value Analysis


Resource
Name

Baseline
Work Hrs

Schedule
Work Hrs

%Work
Complete

Earned
hrs

Actaul
Hrs

CPI
(Earned/Actual)

Amar

1295

1350

99%

1277

1747

Ashok

595

652

483

514

73%
94%

Bill

342

367

98%

335

194

173%

Brian

80

80

100%

80

100

80%

Carol

905

984

82%

741

548

135%

Charles

50

50

52%

26

57

46%

Daniel

25

25

100%

25

48

53%

Dave

50

50

52%

26

11

242%

David

36

36

97%

35

75

47%

Durnan

205

205

78%

160

172

93%

Ed

493

507

64%

318

499

64%

Eric

172

197

94%

162

118

138%

17

17

100%

17

EricH
Gilbert

25

25

100%

25

313%

Harry

200

200

2%

79

5%

11

11

100%

11

Jill

136

161

93%

126

John
Lakshmi
Lynn
Mary
Michelle
Murthy
PerTeam
Sherrill
SteveH
Sushit

270

255

90%

243

144

169%

420

447

97%

409

144

284%

41

41

100%

41

216

220

99%

213

92

231%

416

442

83%

343

227

151%

1350

1375

99%

1340

1447

93%

45

49

78%

35

25

25

100%

25

20

125%

550
38

576
38

90%

498

83%

31

675
62

74%
50%

Tina

410

436

98%

400

445

90%

Ty

188

192

98%

185

116

159%

Vance

1004

1004

78%

781

325

240%

Witter

558

588 0.9412039

525

809

65%

Jeff

0%

Remarks

Proj. 1234 Earned Value Analysis

WBS
1.1
1.2
1.3
1.4
1.5
1.4

Project No:
Project Name:
Initial Budget:
Start date:
End date:
Analysis Period:

Proj. 1234
Auto Necho - Auto Apps Efficiency
10,000
5/6/2002
9/15/2003
Monthly

Group Tab Name


Planning
SRASDS
PKG1
PKG2
PKG3
TRA

EVA Group Description


Planning/Admin/meetings/Coordination
Reqs Analysis and Solution Def/Specs
Pkg -1 Design/Build/Test/Implemen
Pkg -1 Design/Build/Test/Implemen
Pkg -1 Design/Build/Test/Implemen
Transition

Steps to follow for Initial Setup.


1. Read comments to various cells to know more about what value to enter.
2. Fill in Project No, Name, Initial budget, Start, End dates, Analysis Period, and Groups Tab
Name and Group Description in the format given on left hand side..
3. Click on

It will create a tab for each group you have entered.


Follow steps 1 to 3 if you need to update setup.
In case setup updates require deletion of some group tabs, these tabs will be renamed as
deleted I.e. not physically deleted. You can physically delete these tabs mannually.

Definitions:
BCWS: Budgeted Cost of Work Scheduled (as per Baseline Values)
BCWP: Budgeted Cost of Work Performed (Progress or Earned Value)
ACWP: Actual Cost of Work Performed (Actual or Burnt Value)
SPI: Schedule Performance Index = BCWP / BCWS
CPI: Cost Performance Index = BCWP / ACWP
EAT: Estimate cost at completion = ACWP +[(BAC-BCWP)/CPI
ETC: Estimate cost to complete = (BAC - BCWP)/CPI
(BAC is the cummulative value of BCWS at completion)

Earned Value Analisys

Period

sys

Proj. 1234 Auto Necho - Auto Apps Efficiency


#

12000
10000
8000
6000
4000
2000

09/01/03

08/01/03

07/01/03

06/01/03

05/01/03

04/01/03

03/01/03

02/01/03

01/01/03

12/01/02

11/01/02

0
10/01/02

CPI
1.32##
1.50##
1.16##
0.96##
1.00 #
1.16 #
1.10##
1.12 #
1.10 #
1.12##
1.09##
1.03##
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0

09/01/02

SPI
0.97
1.07
1.05
0.77
0.76
0.85
0.85
0.87
0.86
0.89
0.87
0.90
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

08/01/02

BCWP ACWP
260
197
674
448
1336
1153
1665
1730
2408
2413
3628
3125
4316
3923
5430
4850
6355
5797
7358
6596
8047
7397
8661
8373
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Budgeted Hours 1078


Earned Hours
Actual Hours

SPI = 90%
CPI = 103%
EAC = 10557

07/01/02

BCWS
269
629
1278
2166
3185
4277
5065
6217
7366
8264
9246
9599
9940
10269
10527
10797
10920
0
0
0
0
0
0
0
0
0
0
0

EVA for Whole project


28

06/01/02

For The Period


As on
Date
BCWS BCWP ACWP
05/31/02
269
260
197
06/30/02
360
414
251
07/31/02
649
662
705
08/31/02
888
329
577
09/30/02
1019
743
683
10/31/02
1092
1220
712
11/30/02
788
688
798
12/31/02
1153
1114
927
01/31/03
1149
925
947
02/28/03
898
1003
799
03/31/03
982
689
801
04/30/03
353
614
976
05/31/03
341
0
0
06/30/03
329
0
0
07/31/03
258
0
0
08/31/03
270
0
0
09/30/03
123
0
0
10/31/03
0
0
0
11/30/03
0
0
0
12/31/03
0
0
0
01/31/04
0
0
0
02/29/04
0
0
0
03/31/04
0
0
0
04/30/04
0
0
0
05/31/04
0
0
0
06/30/04
0
0
0
07/31/04
0
0
0
08/31/04
0
0
0

Period: Monthly
17
Group:
10920
8661
8373
Cummulative

05/01/02

Sr
No
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28

5/6/2002
9/15/2003

Values

Start date:
End date:

09/01/03

08/01/03

07/01/03

Proj. 1234 Auto Necho - Auto Apps Efficiency


#

1078

5000
4500
4000
3500
3000
2500
2000
1500
1000
500
09/01/03

08/01/03

07/01/03

06/01/03

05/01/03

04/01/03

03/01/03

02/01/03

01/01/03

12/01/02

11/01/02

0
10/01/02

CPI
1.32 ##
1.49 ##
1.31 ##
1.15 ##
1.18 ##
1.18 ##
1.11 ##
1.10 ##
1.08 ##
1.14 ##
1.13 ##
1.15 ##
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0

09/01/02

SPI
0.97
1.04
0.94
0.86
0.84
0.75
0.76
0.78
0.79
0.83
0.84
0.86
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

08/01/02

BCWP ACWP
260
197
513
344
705
537
900
786
1203
1019
1524
1295
1709
1535
1929
1761
2141
1978
2410
2113
2617
2316
2886
2509
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Budgeted Hours
Earned Hours
Actual Hours

SPI = 86%
CPI = 115%
EAC = 3727

07/01/02

BCWS
269
494
749
1049
1433
2024
2251
2467
2702
2906
3120
3344
3569
3783
4017
4223
4287
0
0
0
0
0
0
0
0
0
0
0

EVA for Planning


28

06/01/02

For The Period


As on
Date
BCWS BCWP ACWP
05/31/02
269
260
197
06/30/02
225
253
147
07/31/02
255
192
193
08/31/02
300
195
249
09/30/02
384
303
233
10/31/02
591
321
276
11/30/02
228
185
240
12/31/02
216
220
226
01/31/03
235
212
217
02/28/03
204
269
135
03/31/03
214
207
203
04/30/03
224
269
193
05/31/03
224
06/30/03
214
07/31/03
235
08/31/03
206
09/30/03
64
10/31/03
11/30/03
12/31/03
01/31/04
02/29/04
03/31/04
04/30/04
05/31/04
06/30/04
07/31/04
08/31/04

Period: Monthly
17
Group:
1.1
4287
2886
2509
Cummulative

05/01/02

Sr
No
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28

5/6/2002
9/15/2003

Values

Start date:
End date:

09/01/03

08/01/03

07/01/03

Proj. 1234 Auto Necho - Auto Apps Efficiency


CPI
#

2500

2000

1500

1000

500

135.18h

393.74h 588.56h 635.17h 446.68h

71.67h

11/01/02

0
10/01/02

CPI
0.00 0
1.55 ##
1.02 ##
0.81 ##
0.86 ##
1.18 ##
1.10###
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0

09/01/02

SPI
0.00
1.19
1.19
0.68
0.69
0.92
0.90
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

08/01/02

BCWP ACWP
0
0
161
104
631
616
765
944
1205
1394
2029
1724
2054
1874
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Budgeted Hours 1078


Earned Hours
Actual Hours

SPI = 90%
CPI = 110%
EAC = 2072

07/01/02

BCWS
0
135
529
1117
1753
2199
2271
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

EVA for SRASDS


28

06/01/02

For The Period


As on
Date
BCWS BCWP ACWP
05/31/02
0
0
0
06/30/02
135
161
104
07/31/02
394
470
512
08/31/02
589
134
328
09/30/02
635
440
450
10/31/02
447
824
330
11/30/02
72
25
150
12/31/02
01/31/03
02/28/03
03/31/03
04/30/03
05/31/03
06/30/03
07/31/03
08/31/03
09/30/03
10/31/03
11/30/03
12/31/03
01/31/04
02/29/04
03/31/04
04/30/04
05/31/04
06/30/04
07/31/04
08/31/04

Period: Monthly
17
Group:
1.2
2271
2054
1874
Cummulative

05/01/02

Sr
No
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28

5/6/2002
9/15/2003

Values

Start date:
End date:

11/01/02

Proj. 1234 Auto Necho - Auto Apps Efficiency


##

700
600
500
400
300
200
100

03/01/03

02/01/03

01/01/03

12/01/02

11/01/02

0
10/01/02

CPI
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.71
###
0.74##
0.79##
0.78
###
0.79
###
0.78 9
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0

09/01/02

SPI
0.00
0.00
0.00
0.00
0.00
1.53
0.93
0.98
0.90
0.90
0.88
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

08/01/02

BCWP ACWP
0
0
0
0
0
0
0
0
0
0
75
106
267
360
441
558
471
606
489
622
489
627
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Budgeted Hours 1078


Earned Hours
Actual Hours

SPI = 88%
CPI = 78%
EAC = 710

07/01/02

BCWS
0
0
0
0
0
49
288
452
524
545
554
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

EVA for ECHO


28

06/01/02

For The Period


As on
Date
BCWS BCWP ACWP
05/31/02
0
06/30/02
0
07/31/02
0
08/31/02
0
09/30/02
0
10/31/02
49
75
106
11/30/02
239
192
254
12/31/02
164
174
198
01/31/03
72
30
48
02/28/03
21
18
16
03/31/03
9
0
5
04/30/03
05/31/03
06/30/03
07/31/03
08/31/03
09/30/03
10/31/03
11/30/03
12/31/03
01/31/04
02/29/04
03/31/04
04/30/04
05/31/04
06/30/04
07/31/04
08/31/04

Period: Monthly
17
Group:
1.3
554
489
627
Cummulative

05/01/02

Sr
No
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28

5/6/2002
9/15/2003

Values

Start date:
End date:

03/01/03

02/01/03

Proj. 1234 Auto Necho - Auto Apps Efficiency


#

1400
1200
1000
800
600
400
200

06/01/03

05/01/03

04/01/03

03/01/03

02/01/03

01/01/03

12/01/02

11/01/02

0
10/01/02

CPI
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.90##
1.32##
1.30##
1.16##
1.04##
0.87 8
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0

09/01/02

SPI
0.00
0.00
0.00
0.00
0.00
0.00
1.03
0.81
0.94
1.02
0.93
0.95
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

08/01/02

BCWP ACWP
0
0
0
0
0
0
0
0
0
0
0
0
138
154
457
346
781
603
971
839
998
956
1033
1193
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Budgeted Hours 1078


Earned Hours
Actual Hours

SPI = 95%
CPI = 87%
EAC = 1326

07/01/02

BCWS
0
0
0
0
0
0
133
561
830
952
1075
1083
1129
1148
0
0
0
0
0
0
0
0
0
0
0
0
0
0

EVA for AUI


28

06/01/02

For The Period


As on
Date
BCWS BCWP ACWP
05/31/02
06/30/02
07/31/02
08/31/02
09/30/02
10/31/02
11/30/02
133
138
154
12/31/02
428
319
192
01/31/03
268
324
257
02/28/03
122
190
236
03/31/03
124
27
117
04/30/03
8
35
237
05/31/03
46
06/30/03
19
07/31/03
08/31/03
09/30/03
10/31/03
11/30/03
12/31/03
01/31/04
02/29/04
03/31/04
04/30/04
05/31/04
06/30/04
07/31/04
08/31/04

Period: Monthly
17
Group:
1.4
1148
1033
1193
Cummulative

05/01/02

Sr
No
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28

5/6/2002
9/15/2003

Values

Start date:
End date:

06/01/03

05/01/03

04/01/03

Proj. 1234 Auto Necho - Auto Apps Efficiency


#

3000
2500
2000
1500
1000
500

09/01/03

08/01/03

07/01/03

06/01/03

05/01/03

04/01/03

03/01/03

02/01/03

01/01/03

12/01/02

11/01/02

0
10/01/02

CPI
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00##
1.77##
1.23##
1.25##
1.16##
1.01##
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0

09/01/02

SPI
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.18
0.87
0.90
0.85
0.94
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

08/01/02

BCWP ACWP
0
0
0
0
0
0
0
0
0
0
0
0
148
0
549
311
908
736
1434
1148
1889
1624
2199
2170
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Budgeted Hours 1078


Earned Hours
Actual Hours

SPI = 94%
CPI = 101%
EAC = 2540

07/01/02

BCWS
0
0
0
0
0
5
121
466
1040
1591
2226
2346
2417
2513
2536
2566
2574
0
0
0
0
0
0
0
0
0
0
0

EVA for AUI


28

06/01/02

For The Period


As on
Date
BCWS BCWP ACWP
05/31/02
06/30/02
07/31/02
08/31/02
09/30/02
10/31/02
5
11/30/02
116
148
0
12/31/02
344
401
311
01/31/03
574
359
425
02/28/03
551
526
412
03/31/03
635
455
476
04/30/03
121
310
546
05/31/03
71
06/30/03
96
07/31/03
23
08/31/03
30
09/30/03
8
10/31/03
11/30/03
12/31/03
01/31/04
02/29/04
03/31/04
04/30/04
05/31/04
06/30/04
07/31/04
08/31/04

Period: Monthly
17
Group:
1.5
2574
2199
2170
Cummulative

05/01/02

Sr
No
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28

5/6/2002
9/15/2003

Values

Start date:
End date:

09/01/03

08/01/03

07/01/03

Proj. 1234 Auto Necho - Auto Apps Efficiency


0

100
90
80
70
60
50
40
30
20
10
03/01/03

02/01/03

01/01/03

12/01/02

0
11/01/02

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

10/01/02

CPI
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

09/01/02

SPI
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

08/01/02

BCWP ACWP
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

SPI = #DIV/0!
CPI = 0%
EAC = 0

07/01/02

BCWS
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
34
86
0
0
0
0
0
0
0
0
0
0
0

EVA for TRA


28

06/01/02

For The Period


As on
Date
BCWS BCWP ACWP
05/31/02
06/30/02
07/31/02
08/31/02
09/30/02
10/31/02
11/30/02
12/31/02
01/31/03
02/28/03
03/31/03
04/30/03
05/31/03
06/30/03
07/31/03
08/31/03
34
09/30/03
52
10/31/03
11/30/03
12/31/03
01/31/04
02/29/04
03/31/04
04/30/04
05/31/04
06/30/04
07/31/04
08/31/04

Period: Monthly
17
Group:
1.4
86
0
0
Cummulative

05/01/02

Sr
No
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28

5/6/2002
9/15/2003

Values

Start date:
End date:

09/01/03

08/01/03

07/01/03

06/01/03

05/01/03

04/01/03

03/01/03

02/01/03

01/01/03

12/01/02

11/01/02

10/01/02

09/01/02

Budgeted Hours 1078


Earned Hours
Actual Hours

Proj. 1234 Planning Tasks Estimations


Project Start date
Project End date
Weekly meetings Start date
Weekly meetings End date
Project Duration in Calender days
Project Duration in Calender Weeks
Work days per week
Project Duration in Work days
Core Team Size (Number of Persons)
No of weekly meetings
Duration of a weekly meeting
Total work hours spent per weekly meeting
Hours per work unit
Total work units spent per weekly meeting
Total time to spend on weekly meetings
Hours per person to attend weekly meeting
Total Hours required for Schedule creation
Total Hours required for Replanning
Hours spent per week on Project Status Reporting
Total Hours spent on Project Status Reporting
Hours spent per week on PlanView Maintenance
Total Hours spent on PlanView maintenance / Reporting
Hours spent per week on Project Schedule maintenance
Total Hours spent on Project Schedule maintenance
Hours spent per week on Earned Value Analysis
Total Hours spent on Earned Value Analysis
Total hours for Project Planner
Hours/week

5/6/2002
7/15/2003
5/6/2002
7/15/2003
435 days
62 weeks
5 days
311 days
16 Nos
62 Nos
1 hour
16 Hours
6 Hours
2.7 Units
994 hours
62 hours
80 Hours
50 Hours
2 hours
124 hours
2 hour
124 hours
2 hours
124 hours
1 hour
62 hours
627 hours
10 hours

Elapsed Time % (from start to today) ###

Recurring Activity Description


Project Manager's Activities
OSS / TSS activities
Team Activities (Weekly Meetings)
Project Coordinator Activities
Project Schedule / PlanView Maintenance, a

Start date Finish


date
05/06/02
05/06/02
05/06/02
07/26/02
08/15/02

07/15/03
07/15/03
07/15/03
07/15/03
07/15/03

Weeks
Duration

Burn
Rate

62
62
62
51
48

12
10
12
12
10

Total Elapsed
Hours Time in %
746
621
746
607
477

1232%
1232%
1232%
1491%
1575%

PlanView Work Entity Structure


Auto Necho - Auto Apps Efficiency
Planning Admin, Meetings, Coord

Resource Name

Current PlanView
Allocation

Total Schedule
Allocation

R10481 - Planning
Admin, Meetings,
Coord after 8/5/02

R10481 - Reqs
Analysis and
Solution Def/Specs

R10481 - AUI (Design,


Build, Test, and
Transition)

R10481 - ECHO
(Design, Build, Test,
and Transition)

PlanView - Schedule
Alloc Difference

Reqs Analysis and Solution Def/Specs


AUI (Design, Build, Test, and Transition)
ECHO (Design, Build, Test, and Transition)

Ashok
Carol
Michelle
Vance

500
1000
500
980

500
1000
500
980

500
1000
500
980

0
0
0
0

0
0
0
0

0
0
0
0

0
0
0
0

Amarnath
Ed
Eric
Jill
Lakshmi
Mary
Michael
Murthy
Steve
Tina
Ty
Witter
Total Alloc

1700 1774
1000 1075
1200 1275
120
220
300
378
135
356
500
674
1700 1776
750
827
520
597
135
325
200
290
11240 12547

270
210
130
75
100
100
100
230
130
125
105
85
4640

74
75
75
75
78
76
74
76
77
77
75
75

300
170
100
70
185
180
100
300
215
185
145
130
2080

Finish date

5/6/2002

4/22/2003

5/6/2002
10/31/2002
10/31/2002

10/31/2002
4/22/2003
4/22/2003

Remarks

Carol/Ashok/Michelle/Vance will have


total allocation only to Planning, Admin,
Meetings, Coord

143
168
69
0

1130
620
970

-74
-75
-75
-100
-78
-221
-174
-76
-77
-77
-190
-90
-1307

Allocation to remaining work entities will


be done after planning for remaining
phases is completed. 6000 hours are
reserved for remaining schedule for
Design/Build/Test/Transition.

196
135
55
0
22
24
26
154
53
48
30
10
1133

15
400
1170
405
210
0

Start date

Already used as on
8/5/02

Proj. 1234

4920

Proj. 1234PlanView Work Entity x Resource Allocation Hours Plan

Proj. 1234Auto Necho - Auto Apps Efficiency Status Trac Schedul

10598

1294 652 362

PARed

11712

1827 730 300

chedule

4287

51 638

20

958

PARed

5582

366 730

20

1001

Planning/Admin/Meetings/Coordination

Reqs Analysis and Solution Def/Specs

Schedule
PARed

Pkg -1 Design/Build/Test/Implement

Schedule
PARed

Pkg -2 Design/Build/Test/Implement

Pkg -3 Design/Build/Test/Implement

Transition

984

0 1001

2054 440.9 4.28


1403.5

6.38

580

479

80

712.25

156

7.25

Schedule

1148

335

PARed

1596

266

Schedule

2554

716

PARed

2380

715

Schedule

75.99

6.53

10 6.53

39

10

PARed

80

Carol Elam

Brian Brown

Bill Malone

Ashok Kumar

Amarnath
Bommisetti

Total

Finish Date

Start Date

Work-Entity

80

20

25

50

36 205 507 197

17

25 200

50

55

50

53 162 501 202

25 100

50

25

50

50

55

50

98

25 200

205 168

96

25 100

63

0 300 300
98

20 99.9
111

99

63

76

35

80
100

50 18.5 101

1.26

Ty Hartness

Tina L Dobrinich

Sushit Saha

54

3 491.7

134

15

6.53

Steve Hall

30

3.88

214

Sherrill Leslie

99
41 235

182
214

PerTeam

86

182

25

25 765 115 544 134

25 283

47

138

38 436 192

25

175

205 190

1700

25 600

524

20

41.2 2.16

11

90

59 280

1
17

1375

30 429 98.78

15

J Murthy

Michelle Celeschi

0 121 300

41 133

58
6

Mary Kasley Lee

11 161 250 447 41.2 220 442

90 18.5

Lynn C Flannelly

Lakshmi Narayana
Reddy

John Nutt

Jill

Jeff

Harry Ma

Gilbert Saenz

EricH

Eric Gullixon

Ed Weidenbenner

Steve Durnan

David Stern

Dave Sanders

Daniel Lade

Charles Paige
50

297

56

101

70

175

95
45

6.36

684
704

2.8

10

45

133 139
63

65
14

42

155

5
2.12

176

24

155

31 204 3.64

155

50 204
6.53

5
3.2

964

98

920

67

17

0 36.5 120

50

84.5

100

50

36.5

Zafar Awan

Sally Baugh

Kim Miller

Michael Frey

Kasi Shanmugam

980 769 164

John Isaacson

Chad McCue

Brian [GS03]
Brown

Steve Witter

Vance Dejaynes

1004 583

84.5

127
158
113
20 107
20 242
20 422 96.5

120

50

50

20
20

50.5
2.61
15

100

Proj. 1234Auto Necho - Auto Apps Efficiency Stat


Pkg -1 Design/Build/Test/Implement

56

24

Pkg -3 Design/Build/Test/Implement
Planning/Admin/Meetings/Coordination
Reqs Analysis and Solution Def/Specs
Transition

323
2637

225

107

225

36
102
10

467

51

0
37

64

Carol Elam

36

Brian [GS03]
Brown

136

Bill Malone

3301

Ashok Kumar

Andrew
Woodman

Finish
Amarnath
Bommisetti

Start

Total Hrs

Work Entity Description

Brian McKinney

Proj. 1234Remaining Hours : WorkEntity x Resource

14

467

0
14

14
28

28
8

8
0

Eric Gullixon
Gary Scott

8
57
85
26

8
5
79
26

17

17

21

21

311

311

0
156

25
108
5

66
0
158

31

32

126
17

Michael Frey

Mary Kasley Lee

Lakshmi Narayana Reddy

Kim Miller

Kasi Shanmugam

John Nutt

John Isaacson

J Murthy

Harry Ma

Gilbert Saenz

Ed
Weidenbenner

David Stern

Dave Sanders

Daniel Lade

Charlie Rogers

Charles Paige

Chad McCue

Duzianthan
Mohandass

0
0

145

145
0
19

19
5

5
21
182
15

21
182
15

62

27

141

35
141

18
671

4
20

2
20

7
631

Zafar Awan

Vance Dejaynes

Ty Hartness

Tina L Dobrinich

Sushit Saha

Steve Witter

Steve Hall

Steve Durnan

Sherrill Leslie

Santosh [H6Z5] Ramachandran

Sally Baugh

Michelle Celeschi

Proj. 1234Auto Necho - Auto Apps Efficiency Stat


Pkg -1 Design/Build/Test/Implement

661

132

Pkg -3 Design/Build/Test/Implement

2253

771

Planning/Admin/Meetings/Coordination

3236

264

Reqs Analysis and Solution Def/Specs

1402

580

Transition

505

194

Carol Elam

Brian [GS03]
Brown

22

Bill Malone

9199 1747

Ashok Kumar

Andrew
Woodman

Finish
Amarnath
Bommisetti

Start

Total Hrs

Work Entity Description

Brian McKinney

Proj. 1234 - Actual Used Hours : WorkEntity x Resource

100

24

534

24

534

7
15
505

12

0
57

57
12

12
48

48
11

11

Gary Scott

8
495
117
4

81
9

2
200
90

90
19

50
8
79

79 1447

213

176

761

40
144

40
3

297
2

54
63
142

Michael Frey

Mary Kasley Lee

Lakshmi Narayana Reddy

Kim Miller

Kasi Shanmugam

John Nutt

John Isaacson

J Murthy

Harry Ma

Gilbert Saenz

Eric Gullixon

David Stern

Dave Sanders

Daniel Lade

Charlie Rogers

Charles Paige

Chad McCue

Ed
Weidenbenner

Duzianthan
Mohandass

75

88

89
288

45
42
178

9
47

227

227
24
6

6
20
172
665
803

6
95
109

147
156

101
70

56
158

Vance Dejaynes

439
116
315

42
1

15
223
3

14
94
47

81
65

289

Zafar Awan

Ty Hartness

62

Tina L Dobrinich

Sushit Saha

Steve Witter

Sherrill Leslie

Santosh [H6Z5] Ramachandran

Sally Baugh

Michelle Celeschi

Steve Hall

24
Steve Durnan

20
48

###
###
###
136

0
0
22
36

438 80
712 156
661 132
56 24
1075
1596
1646
248

Pkg -3 Design/Bui Schedule


PARed
Used
Remaining

2429 716
2380 715
2253 771
323

Planning/Admin/M Schedule
PARed
Used
Remaining

4189 51
5582 366
3236 264
2637 102

638
730
505
225

Reqs Analysis andSchedule


PARed
Used
Remaining

1991 441
1404 580
1402 580
0

Schedule
PARed
Used
Remaining

76
39
2
37

7
10
10

50
50
11
0

15
36

51

10

20
20
12
8

17
4
14

958
###
24 534
467

50
50
57
14

12
28

25
55
48
8

50
50
11

7
7
7

20

63
90
90
1

Sherrill Leslie

Santosh [H6Z5] Ramachandran

Sally Baugh

Michelle Celeschi

Michael Frey

Mary Kasley Lee

Kim Miller

Lakshmi Narayana Reddy

447 220
0 442
0
300 121 85 300 100
142 89 288 227 24
158 32
0 145
0

0
0
6
19

25
25
20
5

6
19

25
25
20
5

1
182
182 120
139 54
43 66
684
704
761

99
19
19

0
50
63
0

100
101
6 74
27

96 98
205 168
200 90
5 79

250
0
300 120
144 54
156 66

101
175
176

15
9
7

190
25
2 50
8 25

51

0
37
40
0

Kasi Shanmugam

Carol Elam

97
97

25 200 ###
25 100 ###
8 79 ###
17 21 311

John Nutt

35
50
72

25
55
48
8

John Isaacson

335
266
174
92

0
0
12
28

J Murthy

58
80
81

50
50
57
14

Harry Ma

3
3

0
0
0
0

David Stern

7
7

984
###
534
467

Daniel Lade

0
0
4
26

0
0
24
0

Gilbert Saenz

Duzianthan
Mohandass
Ed
Weidenbenner

Dave Sanders

Charlie Rogers

0 507 197
0 501 202
8 495 117
8 57 85

362
0
300 164
194 100
107 64

Chad McCue

36
53
75
0

Bill Malone

652
730
505
225

Pkg -2 Design/Bui Schedule


PARed
Used
Remaining

Transition

Gary Scott

Pkg -1 Design/Bui Schedule


PARed
Used
Remaining

10198
11712
9199
3301

Eric Gullixon

Proj. 1234Auto Necho Schedule


PARed
Used
Remaining

Brian [GS03]
Brown
Brian McKinney

Finish
Amarnath
Bommisetti
Andrew
Woodman
Ashok Kumar

Start

Total Hrs

Work-Entity

Charles Paige

Proj. 1234 - WorkEntity x Resource wise Schedule/Allocated/Used/Remaining hours

4
26

25 200 99
25 100 524
8 79 213
17 21 311
492
297
297

4
15
1 110
15

50
63
214
214
88
126

37
40

20
111
3
108

100
76
45
31

6
100
24
30
429
59 85 280
42 178 227
17
145

41

133 175
9 47
9 47

3
20

7
7
2
5

10

6
6

70 113
95 107
95 109

155 242
19 176 422
19 257 466
205 155
138 155
147 156
21
86
283
101
182

98
67
70

42
42

15

20

Ty Hartness

24
33

20
20
26

31 204
50 204
15 223
35

4
5
3
2

20
20

99
41 235
14 94
27 141

30
54
47
7

964
920
289
631

133 139
63 65
81 65
7

0
50
48
2

20

2
5
1
4

134 127
56 158
56 158
3
15

14
5
1
4

Zafar Awan

Vance Dejaynes

Tina L Dobrinich

Sushit Saha

Steve Hall

600 583 38 436 192 ###


765 769 115 544 134 980
665 803 62 439 116 315
182 15 62 141 18 671

Steve Witter

Steve Durnan
205
162
172
21

20

50
48
2

Proj. 1234

Resouce x Work Entity wise allocation Dates, Used and Remaining hours

Name

Work Entity

Amarnath Bommisetti

Planning/Admin/Meetings/Coordination
Reqs Analysis and Solution Def/Specs
Pkg -1 Design/Build/Test/Implement
Pkg -3 Design/Build/Test/Implement
Transition
Pkg -2 Design/Build/Test/Implement
Pkg -3 Design/Build/Test/Implement
Planning/Admin/Meetings/Coordination
Planning/Admin/Meetings/Coordination
Pkg -1 Design/Build/Test/Implement
Pkg -2 Design/Build/Test/Implement
Transition
Planning/Admin/Meetings/Coordination
Pkg -2 Design/Build/Test/Implement
Pkg -3 Design/Build/Test/Implement
Planning/Admin/Meetings/Coordination
Planning/Admin/Meetings/Coordination
Pkg -1 Design/Build/Test/Implement
Planning/Admin/Meetings/Coordination
Planning/Admin/Meetings/Coordination
Planning/Admin/Meetings/Coordination
Planning/Admin/Meetings/Coordination
Pkg -1 Design/Build/Test/Implement
Pkg -2 Design/Build/Test/Implement
Planning/Admin/Meetings/Coordination
Pkg -2 Design/Build/Test/Implement
Pkg -3 Design/Build/Test/Implement
Planning/Admin/Meetings/Coordination
Reqs Analysis and Solution Def/Specs
Pkg -1 Design/Build/Test/Implement
Pkg -2 Design/Build/Test/Implement
Pkg -3 Design/Build/Test/Implement
Planning/Admin/Meetings/Coordination
Reqs Analysis and Solution Def/Specs
Pkg -1 Design/Build/Test/Implement
Planning/Admin/Meetings/Coordination
Planning/Admin/Meetings/Coordination
Planning/Admin/Meetings/Coordination
Planning/Admin/Meetings/Coordination
Reqs Analysis and Solution Def/Specs
Pkg -1 Design/Build/Test/Implement
Pkg -3 Design/Build/Test/Implement
Planning/Admin/Meetings/Coordination
Planning/Admin/Meetings/Coordination
Pkg -2 Design/Build/Test/Implement
Transition

Andrew Woodman
Ashok Kumar
Bill Malone

Brian [GS03] Brown

Brian McKinney
Carol Elam
Chad McCue
Charles Paige
Charlie Rogers
Daniel Lade
Dave Sanders
David Stern
Duzianthan Mohandass

Ed Weidenbenner

Eric Gullixon

Gary Scott
Gilbert Saenz
Harry Ma
J Murthy

John Isaacson
John Nutt

Start

Finish

UsedHrs

RemHrs

04/29/02

09/30/03

264

102

08/01/02

03/14/03

580

09/30/02

08/07/03

132

24

771

10

12/02/02
04/21/03

01/23/04

10/21/02

7.5

12/02/02

07/31/03

14.5

35.5

04/29/02

09/30/03

505

225

04/29/02

07/10/03

12

09/30/02

7.25

174.25

91.5

10/21/02

06/30/03

04/21/03

01/23/04

04/29/02

06/13/03

3.5

13.5

96.5

50.5

10/21/02
12/02/02

09/30/03

04/29/02

23.5

09/30/03

534

467

04/29/02

06/10/03

56.5

13.5

04/29/02

09/30/03

12

28.25

04/29/02

08/11/03

47.5

7.5

04/29/02

10.75

09/30/02

10/21/02

72

04/29/02

10/21/02

04/29/02
09/30/02

12/02/02

06/10/03

04/29/02

06/09/03

200

08/01/02

03/14/03

90

09/30/02

81

74

27

10/21/02

09/30/03

12/02/02

06/25/03

50

25

04/29/02

06/23/03

89.5

78.5

08/01/02

03/14/03

18.5

09/30/02

08/05/03

8.5

6.5

04/29/02

06/17/03

26

04/29/02

08/26/03

17

04/29/02

09/30/03

78.75

21.25

04/29/02

09/15/03

213

311

08/01/02

03/14/03

297

176

12/02/02

761

04/29/02

39.5

09/30/02

04/29/02

09/15/03

108

10/21/02

07/08/03

139

43

04/21/03

08/01/03

Pkg -2 Design/Build/Test/Implement
Pkg -2 Design/Build/Test/Implement
Kim Miller
Lakshmi Narayana ReddyPlanning/Admin/Meetings/Coordination
Reqs Analysis and Solution Def/Specs
Pkg -1 Design/Build/Test/Implement
Pkg -3 Design/Build/Test/Implement
Planning/Admin/Meetings/Coordination
Mary Kasley Lee
Reqs Analysis and Solution Def/Specs
Pkg -2 Design/Build/Test/Implement
Transition
Planning/Admin/Meetings/Coordination
Michael Frey
Pkg -2 Design/Build/Test/Implement
Planning/Admin/Meetings/Coordination
Michelle Celeschi
Pkg -3 Design/Build/Test/Implement
Sally Baugh
Santosh [H6Z5] RamachaPlanning/Admin/Meetings/Coordination
Planning/Admin/Meetings/Coordination
Sherrill Leslie
Pkg -1 Design/Build/Test/Implement
Steve Durnan
Pkg -2 Design/Build/Test/Implement
Pkg -3 Design/Build/Test/Implement
Planning/Admin/Meetings/Coordination
Steve Hall
Reqs Analysis and Solution Def/Specs
Pkg -1 Design/Build/Test/Implement
Pkg -2 Design/Build/Test/Implement
Pkg -3 Design/Build/Test/Implement
Planning/Admin/Meetings/Coordination
Steve Witter
Reqs Analysis and Solution Def/Specs
Pkg -1 Design/Build/Test/Implement
Pkg -2 Design/Build/Test/Implement
Transition
Planning/Admin/Meetings/Coordination
Sushit Saha
Pkg -2 Design/Build/Test/Implement
Pkg -3 Design/Build/Test/Implement
Planning/Admin/Meetings/Coordination
Tina L Dobrinich
Reqs Analysis and Solution Def/Specs
Pkg -1 Design/Build/Test/Implement
Pkg -3 Design/Build/Test/Implement
Planning/Admin/Meetings/Coordination
Ty Hartness
Reqs Analysis and Solution Def/Specs
Pkg -1 Design/Build/Test/Implement
Pkg -2 Design/Build/Test/Implement
Pkg -3 Design/Build/Test/Implement
Transition
Planning/Admin/Meetings/Coordination
Vance Dejaynes
Pkg -1 Design/Build/Test/Implement
Pkg -2 Design/Build/Test/Implement
Pkg -3 Design/Build/Test/Implement
Pkg -2 Design/Build/Test/Implement
Zafar Awan
Kasi Shanmugam

10/21/02

09/30/03

10/21/02

54

66

63

04/29/02

06/12/03

45

31

08/01/02

03/14/03

09/30/02

06/09/03

12/02/02

09/30/03

88

126

04/29/02

06/11/03

41.75

17.25

08/01/02

03/14/03

47

10/21/02

06/10/03

0.5

14.5

04/21/03

04/29/02

178

10/21/02

110

226.75

145

23.5

04/29/02

09/30/03

12/02/02
04/29/02

06/11/03

19

04/29/02

06/24/03

20

09/30/02
10/21/02

18.5

12/02/02

09/30/03

147

20.5

04/29/02

07/11/03

101

182

08/01/02

03/14/03

56

09/30/02

95

10/21/02

257

12/02/02

156

04/29/02
08/01/02

03/14/03

09/30/02
10/21/02

70

158

109

466

04/21/03

12/24/03

15

04/29/02

06/12/03

14

27

33

10/21/02
12/02/02

09/30/03

15

35

04/29/02

07/03/03

93.5

141

08/01/02

03/14/03

81

09/30/02

42

12/02/02

222.5

46.75

04/29/02

06/09/03

08/01/02

03/14/03

65

09/30/02

06/09/03

0.75

4.25

10/21/02

06/09/03

0.75

4.25

12/02/02

06/09/03

2.75

2.25

04/29/02

10/02/03

289

631

09/30/02

08/15/03

20

04/21/03

10/21/02

25.5

12/02/02

08/19/03

20

10/21/02

06/30/03

48

TotAlloc
580
156
771
10
7.5
50
730
20
7.25
265.75
7
17
96.5
50.5
23.5
1001
0
70
40.25
55
10.75
3
72
0
6
10
205
90
81
101
75
168
18.5
15
30
25
100
524
297
176
761
39.5
111
182
7

120
63
76
9
1
214
59
47
15
0
178
110
371.75
23.5
25
25
6
18.5
167.5
283
56
95
257
156
70
158
109
466
15
41
33
50
234.5
81
42
222.5
53.75
65
5
5
5
0
920
20
25.5
20
50

R10481 - AUTO-INCREASE UNDERWRITING PRODUCT ORDER


R10481 - Planning/Admin/Meetings/Coordination
Leslie Sherrill
Nutt John
Paige Charles
Dobrinich Tina L
Celeschi Michelle
Scott Gary
Hall Steve
Brown Brian [GS03]
Murthy J
Reddy Lakshmi Narayana
Ramachandran Santosh [H6Z5]
Kumar Ashok
Bommisetti Amarnath
Elam Carol
Lee Mary Kasley
Hartness Ty
Dejaynes Vance
Gullixon Eric
Malone Bill
Saha Sushit
Weidenbenner Ed
Lade Daniel
Saenz Gilbert
Ma Harry
Rogers Charlie
Frey Michael
Isaacson John
Witter Steve
Sanders Dave
McKinney Brian

Apr-02

May-02

Jun-02

10
30.25

11.5
17

19

6
6

33
7

44

49

56

39.5
5.25
6.5

11

27

43

8.5

197.25

250.25

4
R10481 - Reqs Analysis and Solution Def/Specs
Dobrinich Tina L
Bommisetti Amarnath
Weidenbenner Ed
Murthy J
Gullixon Eric
Hartness Ty
Hall Steve
Witter Steve
Lee Mary Kasley
Reddy Lakshmi Narayana

R10481 - Pkg -1 Design/Build/Test/Implement


Reddy Lakshmi Narayana
Bommisetti Amarnath
Hartness Ty
Dejaynes Vance
Gullixon Eric
Weidenbenner Ed
Murthy J
Malone Bill
Hall Steve
Durnan Steve
Dobrinich Tina L
Stern David
Witter Steve

R10481 - Pkg -2 Design/Build/Test/Implement


Awan Zafar
Nutt John
Shanmugam Kasi
Lee Mary Kasley
Hartness Ty
Malone Bill
Weidenbenner Ed
Witter Steve
Miller Kim
Hall Steve
Saha Sushit
Brown Brian [GS03]
Durnan Steve
Stern David
Dejaynes Vance
Woodman Andrew
Mohandass Duzianthan
Frey Michael

R10481 - Pkg -3 Design/Build/Test/Implement


Woodman Andrew
Brown Brian [GS03]
Reddy Lakshmi Narayana
Hartness Ty
Dejaynes Vance
Durnan Steve
Mohandass Duzianthan
Saha Sushit
Weidenbenner Ed
Dobrinich Tina L
Murthy J
Hall Steve
Bommisetti Amarnath
Baugh Sally

R10481 - Transition
Nutt John
Witter Steve
Bommisetti Amarnath
Malone Bill

197.25

250.25

Jul-02

Aug-02

Sep-02

Oct-02
7

25
9.5

17.75
7
17

24
16

4.5
18.5

30

132
9

16

3
7

6
3

44
220
67.5
15.75
24
10.5
33

41
19
39.5
8.25
0.25
32.5
11.5

37
3
46.5
2
1.25
53.5
4

54
5
46.5
4.5
4.5
40.5
6.5

60

23

12

11
8

12
12.5
9

6
3.5
19

7
4.5
5
4.25

704.75

248.5

232.25

276

11
149
24
53
1.5
16.75
42
19
11.75

4
158
30
129
15
27.25
24
29
20
7

15
102
22
65
0.5
5.75

328

443.25

329.75

3
13
7
2
5

111
6.5
2

44

4
46
6.25
2
4

106.25

704.75

576.5

682.5

716

Nov-02

Dec-02

Jan-03
1

10.25
3
23.5

2
1
5.75
5
18.5

5.65
4
18.5

3.35
1
17.5

22

2
5

41
4
58
2.5
1.25
45
1

18

38
2
48
1.75
1
35.5
1
2
1
7
1
3
10

44
2
48
0.25
2.5
32.5
4
2.5
1
3
4
1
16.25

31
2
18
0.25
2
24.5
3.5
2
1
3
0.5
1
8

8
4

10
5.5

12
7
4

8
0.5

2.25

239.75

227

217.15

135.35

19
44
13
50

7
127
5

10

8
4
4

11.5

1.5
1.5

3
9.25

2.5

149.75

144.5

86

2
0.75

22
73
1
56
6
7
3

25
39

Feb-03

0.25

2.25

12.25

1
20

4.5
6

34

24.5

6.5

82

254

207.25

35.5

10.5

72

8
25

7
4

9
4
8
0.5

51.5
2

0.75
35
13
93

13
17
125

52
14

39
9

32
6

13

256.75

237.5

11

31

30.5

2
124
4
25

1
11
176
13
191

1
13
169
17
175
4

166

425

411.5

926.75

946.65

800.85

26.25

3
32
15.5
1

2
15
5
64.5
3
6

149.75

182

793.25

Mar-03

0.5
1
17.25

2
10
31
2
21.5
0.5
11.5
4
0.5

Apr-03

May-03

Jun-03

5
2
10.5

5
36.58
13.5
124
31
26
124
13.5
83.58
31
19
55.53
30.35
100
17.25
7
124
78.5
6.67
27
5
3.87
10.1
4.78
8.27

9.25
2
3
1

33
3
26.5
0.75
2.5
3.5
2
1

5.5
11.5
3
27

152.75

10.25
1
9.25

2.75
10
2
15
0.5
4
6
27
2
29.85

6.5
1
4
1
20.75

61

4.75
12
19

1
5.5

17

193

190.1

985.48

1
14.38
4.25
11.37
3.3

12

12

1
4
8

22

30

34.3

6
6

5
18
9.5

7
7
36.5

16.5
20
82
2
21
2

16
15
88
5
68

16
5
68
54
61

2
34.6
20.67
14.5
4.25
91.5
10.43
10

9
4.5
5.5

1
8
2
2
30

6
7
4
70

10

267.5

341.5

177.95

14.5

17.52
19.88
32.52
2.25
12.53
4.13
8
14.22
25

174.5

0.75

69
0.25

15
0.5

30

24.5

6
4
34.5
172
28
189
4

5
23
122
106
42
137
11

16
2
4
17
42
14
52
54
4.5

468.25

539.75

235.5

812.5

136.05

2.07

2.07

1032.25

772.1

1335.85

Jul-03

Aug-03

Sep-03

37.38

25.57

8.47

17
41.78

37.98

34.23

104.9

87.78

34.73

65.75
35.02
134.78

54.88
22.07
120.73

48.82
14.55
111.48

170.5

162.75

162.75

2.85
4.65
5.68
8.62

0.77
2.23
5.42
6.15

5.35
5.22

688.25

526.33

425.6

8.78

0.83

7.23
2.83

1.4
0.37

Oct-03

58

11

1.33

11

18.85

2.6

8.4
25.08

12.83

7.42

5.72

5.42

5.43

39.2

18.25

12.85

17.98
17.7
42.63

7.48
32.58

5.43
18.27

5.8
5.68

1.67
5.42

5.27

10.08

5.43

5.25

99.88

52.58

34.22

2.83

0.1

2.83

0.1

849.02

599.87

472.67

11

Nov-03

Dec-03

Jan-04 Total
5
108
13.5
141
145
26
182
13.5
311
31
19
224.98
101.98
467
17.25
7
631
78.5
8
27
5
7.48
16.98
21.23
28.25
180
40.5
72
10.75
23.5
2636.67
84
580
94
297
18.5
65
66
162
50
9
1425.5
1
24
4.25
20
6.5
81
176
7.25
95
6
42
3
109

55.75
2
43
66
14.5
4.25
91.5
27
466
63
257
33
96.5
18.5
72
25.5
7.5
6
110
248.25
35.5
50.5
126
2.25
20
20.5
8
34.98
25
222.5
761
156
771
23.5
322.73

3.87
1.55
2.2

11.13
5.68
2.83

2.77
1.97

5
15
10
7

7.62

19.65

4.73

37

7.62

19.65

4.73

3300.4

37782
[R_TR_001]

Resource Planned vs Actual Work

Page:

NECHO Auto Apps Efficiency

Planned
Start

Kumar Ashok
Planning/Admin/Meetings/Coordinatio
SUBTOTAL
Brown Brian [GS03]
Pkg -2 Design/Build/Test/Implement
Pkg -3 Design/Build/Test/Implement
Planning/Admin/Meetings/Coordinatio
SUBTOTAL
Bommisetti Amarnath
Planning/Admin/Meetings/Coordinatio
Reqs Analysis and Solution Def/Specs
Pkg -1 Design/Build/Test/Implement
Pkg -3 Design/Build/Test/Implement
Transition

Actual
Finish

37781

37781
37781

37781

37894

37894
37785

37894

37781

37840

37944

38009

Start

Finish

37375

37550
37592
37375

37375
37469
37529
37592
37732

SUBTOTAL
Mohandass Duzianthan
Pkg -3 Design/Build/Test/Implement
Planning/Admin/Meetings/Coordination
Pkg -2 Design/Build/Test/Implement

37781

37782

Hours

37592
37375
37550

37694

Actual

Remain

505

225

505

225

96.5
0
3.5

0
50.5
13.5

100

64

264
580
132
771
0

102
0
24
0
10

1747

136

2
0
6

8
0
0

SUBTOTAL
Murthy J
Planning/Admin/Meetings/Coordinatio
Reqs Analysis and Solution Def/Specs
Pkg -1 Design/Build/Test/Implement
Pkg -3 Design/Build/Test/Implement
SUBTOTAL
Ramachandran Santosh [H6Z5]
Planning/Admin/Meetings/Coordinatio
SUBTOTAL
Reddy Lakshmi Narayana
Planning/Admin/Meetings/Coordinatio
Reqs Analysis and Solution Def/Specs
Pkg -1 Design/Build/Test/Implement
Pkg -3 Design/Build/Test/Implement
SUBTOTAL
Saha Sushit
Planning/Admin/Meetings/Coordinatio
Pkg -2 Design/Build/Test/Implement
Pkg -3 Design/Build/Test/Implement
SUBTOTAL
Shanmugam Kasi
Pkg -2 Design/Build/Test/Implement
SUBTOTAL
Lade Daniel
Planning/Admin/Meetings/Coordinatio
SUBTOTAL
Ma Harry

37781

37781

37781
37781
37781

37879

37783

37784
37781
37894

37781

37784

37781

37894

37781

37781

37894

37844

37375
37469
37529
37592

37694

37375

37375
37469
37529
37592

37375
37550
37592

37550

37375

37694

213
297
176
761

311
0
0
0

1447

311

19

19

45
9
0
88

31
0
1
126

142

158

14
33
15

27
0
35

62

62

54

66

54

66

47.5

7.5

47.5

7.5

Planning/Admin/Meetings/Coordinatio
SUBTOTAL
Rogers Charlie
Planning/Admin/Meetings/Coordinatio

37781

37781

37894

37894

37375

37375

SUBTOTAL
Saenz Gilbert
Planning/Admin/Meetings/Coordinatio

37781

37859

37375

SUBTOTAL
Sanders Dave
Planning/Admin/Meetings/Coordination
SUBTOTAL
Scott Gary
Planning/Admin/Meetings/Coordinatio
SUBTOTAL
Paige Charles
Planning/Admin/Meetings/Coordinatio

37375

37781

37781

37789

37782

SUBTOTAL
McKinney Brian
Planning/Admin/Meetings/Coordination
SUBTOTAL
Woodman Andrew
Pkg -2 Design/Build/Test/Implement
Pkg -3 Design/Build/Test/Implement
SUBTOTAL
Dobrinich Tina L
Planning/Admin/Meetings/Coordinatio
Reqs Analysis and Solution Def/Specs

37375

37375

37375

37781

37781

37833

37805

37550
37592

37375
37469

37694

78.75

21.25

78.75

21.25

12

28.25

12

28.25

17

17

10.75

10.75

26

26

56.5

13.5

56.5

13.5

23.5

23.5

7.5
14.5

0
35.5

22

35.5

93.5
81

141
0

Pkg -1 Design/Build/Test/Implement
Pkg -3 Design/Build/Test/Implement

37529
37592

SUBTOTAL
Frey Michael
Planning/Admin/Meetings/Coordination
Pkg -2 Design/Build/Test/Implement

37375
37550

SUBTOTAL
Isaacson John
Planning/Admin/Meetings/Coordination
SUBTOTAL
Witter Steve
Planning/Admin/Meetings/Coordination
Reqs Analysis and Solution Def/Specs
Pkg -1 Design/Build/Test/Implement
Pkg -2 Design/Build/Test/Implement
Transition

37375

37944

37979

37375
37469
37529
37550
37732

SUBTOTAL
Dejaynes Vance
Planning/Admin/Meetings/Coordinatio
Pkg -1 Design/Build/Test/Implement
Pkg -2 Design/Build/Test/Implement
Pkg -3 Design/Build/Test/Implement

37781
37781

37896
37848

37781

37852

37375
37529
37550
37592

SUBTOTAL
Malone Bill
Pkg -1 Design/Build/Test/Implement
Pkg -2 Design/Build/Test/Implement
Planning/Admin/Meetings/Coordinatio
Transition
SUBTOTAL

37781
37781
37929

37802
37812
38009

37529
37550
37375
37732

37694

42
222.5

0
0

439

141

178
110

0
0

288

39.5

39.5

70
158
109
466
0

0
0
0
0
15

803

15

289
0
25.5
0

631
20
0
20

314.5

671

7.25
174.25
12
0

0
91.5
8
7

193.5

106.5

Nutt John
Pkg -2 Design/Build/Test/Implement
Transition
Planning/Admin/Meetings/Coordinatio
SUBTOTAL
Awan Zafar
Pkg -2 Design/Build/Test/Implement

37781
37781
37781

37781

37810
37834
37879

37802

SUBTOTAL
Baugh Sally
Pkg -3 Design/Build/Test/Implement

37550
37732
37375

37550

37592

SUBTOTAL
Durnan Steve
Pkg -1 Design/Build/Test/Implement
Pkg -2 Design/Build/Test/Implement
Pkg -3 Design/Build/Test/Implement
SUBTOTAL
Leslie Sherrill
Planning/Admin/Meetings/Coordinatio

37781

37781

37894

37796

37529
37550
37592

37375

SUBTOTAL
McCue Chad
Pkg -1 Design/Build/Test/Implement

37529

SUBTOTAL
Miller Kim
Pkg -2 Design/Build/Test/Implement
SUBTOTAL
Stern David
Pkg -2 Design/Build/Test/Implement
Pkg -1 Design/Build/Test/Implement

37550

37550
37529

139
2
3

43
5
108

144

156

48

48

23.5

23.5

6
18.5
147

0
0
20.5

171.5

20.5

20

20

63

63

72
3

0
0

SUBTOTAL
Celeschi Michelle
Planning/Admin/Meetings/Coordinatio
SUBTOTAL
Hall Steve
Planning/Admin/Meetings/Coordinatio
Reqs Analysis and Solution Def/Specs
Pkg -1 Design/Build/Test/Implement
Pkg -2 Design/Build/Test/Implement
Pkg -3 Design/Build/Test/Implement

37781

37781

37894

37813

37375

37375
37469
37529
37550
37592

37694

SUBTOTAL
Elam Carol
Planning/Admin/Meetings/Coordinatio

37781

37894

37375

SUBTOTAL
Gullixon Eric
Planning/Admin/Meetings/Coordinatio
Reqs Analysis and Solution Def/Specs
Pkg -1 Design/Build/Test/Implement

37781
37781

37795
37838

37375
37469
37529

37694

SUBTOTAL
Hartness Ty
Planning/Admin/Meetings/Coordinatio
Reqs Analysis and Solution Def/Specs
Pkg -1 Design/Build/Test/Implement
Pkg -2 Design/Build/Test/Implement
Pkg -3 Design/Build/Test/Implement
Transition
SUBTOTAL
Lee Mary Kasley
Planning/Admin/Meetings/Coordinatio

37781
37781
37781
37781

37781

37781
37781
37781
37781

37783

37375
37469
37529
37550
37592
37732

37375

37694

75

226.75

145

226.75

145

101
56
95
257
156

182
0
0
0
0

665

182

534

467

534

467

89.5
18.5
8.5

78.5
0
6.5

116.5

85

46.75
65
0.75
0.75
2.75
0

7
0
4.25
4.25
2.25
0

116

17.75

41.75

17.25

Reqs Analysis and Solution Def/Specs


Pkg -2 Design/Build/Test/Implement
Transition
SUBTOTAL
Weidenbenner Ed
Planning/Admin/Meetings/Coordinatio
Reqs Analysis and Solution Def/Specs
Pkg -1 Design/Build/Test/Implement
Pkg -2 Design/Build/Test/Implement
Pkg -3 Design/Build/Test/Implement
SUBTOTAL
TOTAL

37781

37781

37781
37781

37782

37781

37894
37797

37469
37550
37732

37375
37469
37529
37550
37592

37694

37694

47
0.5
0

0
14.5
0

89.25

31.75

200
90
81
74
50

5
0
0
27
25

495

57

9199

3300.5

Report Run Date:


06/10/03

Project Title

AUTO-INCREASE UNDERWRITING PRODUCT ORDER


Awan Zafar
Bommisetti Amarnath
Brown Brian [GS03]
Celeschi Michelle
Dejaynes Vance
Dobrinich Tina L
Durnan Steve
Elam Carol
Frey Michael
Gullixon Eric
Hall Steve
Hartness Ty
Kumar Ashok
Lade Daniel
Lee Mary Kasley
Leslie Sherrill
Ma Harry
Malone Bill
McKinney Brian
Mohandass Duzianthan
Murthy J
Nutt John
Paige Charles
Ramachandran Santosh [H6Z5]
Reddy Lakshmi Narayana
Rogers Charlie
Saenz Gilbert
Saha Sushit
Scott Gary
Shanmugam Kasi
Stern David

Releasesw/actualhours.

Weidenbenner Ed
Witter Steve
Woodman Andrew

Page:

Actual
Hrs.

50.75
6

3.5
4
2
10

2.25

2
1

2
4

1.

4
10

Report Run Date:


06/10/03

Project Title

AUTO-INCREASE UNDERWRITING PRODUCT ORDER


Upd Team
Upd Team
Upd Team
Upd Team
Upd Team
Upd Team
Upd Team
Upd Team
Upd Team
Upd Team
Upd Team
Upd Team
Upd Team
Upd Team
Upd Team
Upd Team
Upd Team
Upd Team
Upd Team
Upd Team
Upd Team
Upd Team
Upd Team
Upd Team
Upd Team
Upd Team
Upd Team
Upd Team
Upd Team
Upd Team
Upd Team

Awan Zafar
Baugh Sally
Bommisetti Amarnath
Brown Brian [GS03]
Celeschi Michelle
Dejaynes Vance
Dobrinich Tina L
Durnan Steve
Elam Carol
Frey Michael
Gullixon Eric
Hall Steve
Hartness Ty
Isaacson John
Kumar Ashok
Lade Daniel
Lee Mary Kasley
Leslie Sherrill
Ma Harry
Malone Bill
McKinney Brian
Miller Kim
Mohandass Duzianthan
Murthy J
Nutt John
Paige Charles
Ramachandran Santosh [H6Z5]
Reddy Lakshmi Narayana
Rogers Charlie
Saenz Gilbert
Saha Sushit

Releasesw/actualhours.

Upd Team
Upd Team
Upd Team
Upd Team
Upd Team
Upd Team
Upd Team

Sanders Dave
Scott Gary
Shanmugam Kasi
Stern David
Weidenbenner Ed
Witter Steve
Woodman Andrew

Page:

Remaining Actual
Hrs.
Hrs.

3299.98

9266.5

1.98

48
23.5
1747
100
226.75
325
444.5
171.5
547.5
290
117.5
675
116
40.5
514
47.5
92.25
20
78.75
193.5
23.5
63
8
1447
144
56.5
6
144
12
8
62

135.93
63.97
144.97
671
141
20.47
466.98
84.98
182
17.75
224.98
7.48
31.75
4.98
21.23
106.5

8
310.98
155.98
13.5
19
157.97
28.23
16.97
61.98

1.

26
65.97
56.97
14.98
35.48

10.75
4
54
75
499
809
22

37782 Actual and Remaining Work with Resource (Time Phased)


[P_DT_A10]

NECHO Auto Apps Efficiency


From:
Period:

Month

37347
Description

Remain

AUTO-INCREASE UNDERWRITING PRODUCT ORDER


Planning/Admin/Meetings/Coordination
Leslie Sherrill
Nutt John
Paige Charles
Dobrinich Tina L
Celeschi Michelle
Scott Gary
Hall Steve
Brown Brian [GS03]
Murthy J
Reddy Lakshmi Narayana
Ramachandran Santosh [H6Z5]
Kumar Ashok
Bommisetti Amarnath
Elam Carol
Lee Mary Kasley
Hartness Ty
Dejaynes Vance
Gullixon Eric
Malone Bill
Saha Sushit
Weidenbenner Ed
Lade Daniel
Saenz Gilbert
Ma Harry
Rogers Charlie
Frey Michael
Isaacson John
Witter Steve
Sanders Dave
McKinney Brian
Subtotal
Reqs Analysis and Solution Def/Specs
Dobrinich Tina L
Bommisetti Amarnath

Weidenbenner Ed
Murthy J
Gullixon Eric
Hartness Ty
Hall Steve
Witter Steve
Lee Mary Kasley
Reddy Lakshmi Narayana
Subtotal
Pkg -1 Design/Build/Test/Implement
Reddy Lakshmi Narayana
Bommisetti Amarnath
Hartness Ty
Dejaynes Vance
Gullixon Eric
Weidenbenner Ed
Murthy J
Malone Bill
Hall Steve
Durnan Steve
Dobrinich Tina L
Stern David
Witter Steve
Subtotal
Pkg -2 Design/Build/Test/Implement
Awan Zafar
Nutt John
Shanmugam Kasi
Lee Mary Kasley
Hartness Ty
Malone Bill
Weidenbenner Ed
Witter Steve
Miller Kim
Hall Steve
Saha Sushit
Brown Brian [GS03]
Durnan Steve
Stern David
Dejaynes Vance
Woodman Andrew
Mohandass Duzianthan
Frey Michael
Subtotal
Pkg -3 Design/Build/Test/Implement
Woodman Andrew

Brown Brian [GS03]


Reddy Lakshmi Narayana
Hartness Ty
Dejaynes Vance
Durnan Steve
Mohandass Duzianthan
Saha Sushit
Weidenbenner Ed
Dobrinich Tina L
Murthy J
Hall Steve
Bommisetti Amarnath
Baugh Sally
Subtotal
Transition
Nutt John
Witter Steve
Bommisetti Amarnath
Malone Bill
Subtotal
Project Total

37377
Remain

37408
Remain

37438
Remain

37469
Remain

10
30.25

11.5
17

24
16

4.5
18.5

19

30

6
6

33
7

132
9

16

44

49

56

39.5
5.25
6.5

11

44
220
67.5
15.75
24
10.5
33

41
19
39.5
8.25
0.25
32.5
11.5

27

43

60

23

8.5

11
8

12
12.5
9

704.75

248.5

197.25

250.25

11
149

24
53
1.5
16.75
42
19
11.75

328

197.25

250.25

704.75

576.5

37500
Remain

37530
Remain

37561
Remain

25
9.5

17.75
7
17

37591
Remain

10.25
3
23.5

2
1
5.75
5
18.5
22

3
7

6
3

37
3
46.5
2
1.25
53.5
4

54
5
46.5
4.5
4.5
40.5
6.5

41
4
58
2.5
1.25
45
1

3
13
7
2
5

8
4
4
18

38
2
48
1.75
1
35.5
1
2
1
7
1
3
10

12

6
3.5
19

7
4.5
5
4.25

8
4

10
5.5

2.25

232.25

276

239.75

227

4
158

15
102

19
44

7
127

30
129
15
27.25
24
29
20
7

22
65
0.5
5.75

443.25

13
50

11.5

1.5
1.5

111
6.5
2

3
9.25

2.5

329.75

149.75

144.5

44

86

2
0.75

4
46
6.25
2

22
73
1
56
6
7
3

25
39

34
24.5
82

106.25

254

207.25

72

8
25

26.25

3
32
15.5
1

2
15
5
64.5
3
6

149.75

182

51.5
2

11

2
124
4
25

166

682.5

716

793.25

926.75

37622
Remain

37653
Remain

37681
Remain

37712
Remain

1
5.65
4
18.5

3.35
1
17.5

0.5
1
17.25

2
5

2
10

44
2
48
0.25
2.5
32.5
4
2.5
1
3
4
1
16.25

31
2
18
0.25
2
24.5
3.5
2
1
3
0.5
1
8

31
2
21.5
0.5

12
7
4

8
0.5

11.5
3
27

11.5
4
0.5

5
2
10.5
9.25
2
3
1

33
3
26.5
0.75
2.5
3.5
2
1

5.5

0.25

10.25
1
9.25
61

1
5.5

217.15

135.35

152.75

10

12

193

2.25

12.25

12

1
20

4.5
6

1
4
8

3
6.5
5

22

35.5

10.5

30

7
4

9
4
8
0.5

6
6

5
18
9.5

0.75
35
13
93

13
17
125

52
14

39
9

16.5
20
82
2
21
2

16
15
88
5
68

32
6

13

9
4.5
5.5

1
8
2
2
30

256.75

237.5

174.5

267.5

0.75

69
0.25

30.5

30

24.5

1
11
176
13
191

1
13
169
17
175
4

6
4
34.5
172
28
189
4

5
23
122
106
42
137
11

425

411.5

468.25

539.75

31

2
946.65

800.85

812.5

1032.25

37742
Remain

37773
Remain

5
2.75
10
2
15
0.5
4
6
27
2
29.85

6.5
1
4
1
20.75
4.75
12
19

37803
Remain

5
36.58
13.5
124
31
26
124
13.5
83.58
31
19
55.53
30.35
100
17.25
7
124
78.5
6.67
27
5
3.87
10.1
4.78
8.27

17

190.1

985.48

37834
Remain

37.38

25.57

17
41.78

37.98

58
104.9

87.78

65.75
35.02
134.78

54.88
22.07
120.73

170.5

162.75

1.33

2.85
4.65
5.68
8.62

0.77
2.23
5.42
6.15

688.25

526.33

1
14.38
4.25
11.37
3.3

8.78

0.83

7.23
2.83

1.4
0.37

18.85

2.6

8.4
25.08

12.83

5.72

5.42

18.25

34.3

7
7
36.5

2
34.6
20.67
14.5
4.25
91.5
10.43
10

16
5
68
54
61

6
7

4
70

10

341.5

177.95

39.2

14.5

17.52

17.98

15
0.5
16
2
4
17
42
14
52
54
4.5
235.5

772.1

19.88
32.52
2.25
12.53
4.13
8
14.22
25

17.7
42.63

7.48
32.58

5.8
5.68

1.67
5.42

10.08

5.43

136.05

99.88

52.58

2.07

2.83

0.1

2.07

2.83

0.1

1335.85

849.02

599.87

37865
Remain

37895
Remain

8.47

34.23

34.73

48.82
14.55
111.48

162.75

11

5.35
5.22

425.6

37926
Remain

11

37956
Remain

7.42

5.43

12.85

5.43
18.27

5.27
5.25

34.22

472.67

11

3.87
1.55
2.2

11.13
5.68
2.83

7.62

19.65

7.62

19.65

Remain

37987 Total
Remain

5
108
13.5
141
145
26
182
13.5
311
31
19
224.98
101.98
467
17.25
7
631
78.5
8
27
5
7.48
16.98
21.23
28.25
180
40.5
72
10.75
23.5
2636.67
84
580

94
297
18.5
65
66
162
50
9
1425.5
1
24
4.25
20
6.5
81
176
7.25
95
6
42
3
109
55.75
2
43
66
14.5
4.25
91.5
27
466
63
257
33
96.5
18.5
72
25.5
7.5
6
110
248.25
35.5

50.5
126
2.25
20
20.5
8
34.98
25
222.5
761
156
771
23.5
322.73

2.77
1.97

5
15
10
7

4.73

37

4.73

3300.4

Proj. 1234 All Tasks List


Lead

Task
Code

as on 06/10/03
Task Name

% Work
Completed

Work in
Hours

Duration
in Days

Amar

83

Design of New screen(83)

100%

20 h

3d

Amar

77

Design of New screen(77)

100%

20 h

5d

Amar

33

Create New ECHO Screen Layout

100%

5h

3d

Amar

45

Understand existing ECHO APPS System

100%

240 h

50 d

Amar

56

Analysing the requirements(64)

100%

34 h

20 d

Amar

84

Analysis of Flow of Data(84)

100%

66 h

32 d

Amar

51

Analysing the requirements(59)

100%

25 h

10 d

Amar

78

Analysis of Flow of Data(78)

100%

25 h

42 d

Amar

85

Design the Highlevel Specs-1(85)

100%

8h

24 d

Amar

52

Design the Highlevel Specs-1(60)

100%

8h

4d

Amar

61

Analysing the requirements(51)

100%

25 h

38 d

Amar

57

Design the Highlevel Specs-1(65)

100%

12 h

11 d

Amar

53

Design the Highlevel Specs-2(61)

100%

15 h

9.1 d

Amar

54

Review of Highlevel Specs(62)

100%

8h

1d

Amar

47

Analysing the requirements(69)

100%

36 h

46 d

Amar

62

Design the Highlevel Specs(52)

100%

58 h

9d

Amar

69

Analysing the requirements(73)

100%

20 h

15 d

Amar

79

Analysis of Validations(79)

100%

32 h

20 d

Amar

63

Review of Highlevel Specs(53)

100%

8h

1d

Amar

58

Design the Highlevel Specs-2(66)

100%

34 h

10 d

Amar

73

Analysing the requirements(47)

100%

48 h

24 d

Amar

48

Design the Highlevel Specs(70)

100%

44 h

10 d

Amar

74

Design the Highlevel Specs(48)

100%

64 h

10 d

Amar

75

Review of Highlevel Specs(49)

100%

8h

1d

Amar

59

Review of Highlevel Specs(67)

100%

8h

2d

Amar

49

Review of Highlevel Specs(71)

100%

8h

4d

Amar

70

Design the Highlevel Specs(74)

100%

20 h

10 d

Amar

71

Review of Highlevel Specs(75)

100%

8h

4d

Amar

86

Design the Highlevel Specs-2(86)

100%

28 h

10 d

Amar

87

Review of Highlevel Specs(87)

100%

10 h

1d

Amar

80

Design the Highlevel Specs(80)

100%

32 h

8d

Amar

81

Review of Highlevel Specs(81)

100%

16 h

8d

Amar

88

MS: ECHO Specs completed

100%

0h

0d

Amar

220

NECHO VIN Validation - Analysis (TSD3.2)

100%

10 h

2d

Amar

221

NECHO VIN Validation - Analysis (TSD8.3)

100%

15 h

2d

Amar

222

NECHO VIN Validation - Coding

100%

15 h

2d

Amar

432

Auto Apps - Main Program - TSD 3.2

100%

40 h

17 d

Amar

223

NECHO VIN Validation - Unit Testing

100%

10 h

23 d

Amar

433

Residence Address screen - TSD 3.2

100%

20 h

27 d

Amar

435

Territory Validation (Options screen) - TSD 3.2

100%

30 h

19 d

Amar

434

AUI Request Driver Information Screen - TSD 3.2

100%

50 h

20 d

Amar

436

Pf Key format /Branching Program (PCS5F) - TSD 3.2

100%

20 h

20 d

Amar

251

Necho Pkg-1 Prep for pilot issuance

100%

10 h

2d

Amar

252

MS: Pkg-1 Pilot Necho

100%

0h

0d

Amar

437

NECHO - all Remaining Changes - Review TSD 3.2 Docs

100%

12 h

18 d

Amar

444

Territory Validation (Options screen) - TSD 8.3

100%

30 h

20 d

Amar

445

Pf Key format /Branching Program (PCS5F) - TSD 8.3

100%

20 h

20 d

Amar

447

Residence Address screen - TSD 8.3

100%

30 h

20 d

Amar

255

MS: NECHO Pkg-1 cowide Issuance

100%

0h

0d

Amar

448

AUI Request Driver Information Screen - TSD 8.3

100%

60 h

24 d

Amar

446

Auto Apps - Main Program - TSD 8.3

100%

40 h

20 d

Amar

449

NECHO - all Remaining Changes - Review TSD 8.3 Docs

100%

8h

4d

Amar

466

Auto Apps - Main Program - Coding

100%

60 h

8d

Amar

467

Auto Apps - Main Program - UT/IT

100%

60 h

8d

Amar

468

Residence Address screen - Coding

100%

40 h

10 d

Amar

469

Residence Address screen - UT/IT

100%

40 h

10 d

Amar

470

AUI Request Driver Information Screen - Coding

100%

80 h

15 d

Amar

472

Territory Validation (Options screen) - Coding

100%

60 h

8d

Amar

474

Pf Key format /Branching Program (PCS5F) - Coding

100%

20 h

11 d

Amar

471

AUI Request Driver Information Screen - UT/IT

100%

80 h

23 d

Amar

473

Territory Validation (Options screen) - UT/IT

100%

60 h

15 d

Amar

475

Pf Key format /Branching Program (PCS5F) - UT/IT

100%

40 h

4d

Amar

449a

Driver Info warning Screen - Analysis TSD 3.2, TSD 8.3

100%

24 h

3d

Amar

471a

Driver Info warning Screen -Coding, UT/IT

100%

32 h

6d

Amar

476

MS: NECHO - all Remaining Changes -Coding/UT/IT completed

100%

0h

0d

Amar

425

Necho RSC Entry for Terr valid & Address Std

25%

2h

146 d

Amar

505

Necho Pkg-3 Prep for pilot issuance

0%

10 h

8d

Amar

506

MS: Pkg-3 Pilot Necho

0%

0h

0d

Amar

507

MS: NECHO Pkg-3 cowide Issuance

0%

0h

0d

Ashok

18

Project Schedule Development -1

100%

110 h

60 d

Ashok

19

MS: Performance Measurement Baseline - 1 Established

100%

0h

0d

Ashok

32

Technical discussion meetings

100%

480 h

64 d

Ashok

20

Project Schedule Development -2

100%

110 h

43 d

Ashok

21

MS: Performance Measurement Baseline - 2 Established

100%

0h

0d

Ashok

Project Coordination Activities

80%

964 h

281 d

Ashok

SSS activities

85%

350 h

342 d

Ashok

Project Management Activities

84%

750 h

342 d

Ashok

Team Weekly Meetings

83%

1,000 h

341.99 d

Ashok

Project Schedule / PlanView Maintenance, and Status Reporting

78%

450 h

267 d

Ashok

24a

IIA Team (Performance Impact Accessment)

35%

375 h

230 d

Bill

325

DLV - Host - Physical Design Interface

100%

20 h

4d

Bill

326

DLV - Host - Physical Design Interface Walkthrough

100%

6h

2d

Bill

324

DLV - Host - Develop Design Specs

100%

30 h

25 d

Bill

327

DLV - Host - Design Specs Walkthrough

100%

6h

1d

Bill

328

DLV - Host - Code/Gen IMS transaction

100%

50 h

6d

Bill

329

DLV - Host - Code Wrapper

100%

50 h

6d

Bill

330

DLV - Host - Code Walkthrough

100%

6h

3d

Bill

331

DLV - Host - Unit test IMS transaction

100%

50 h

16 d

Bill

332

DLV - Host - Unit test Wrapper

100%

50 h

16 d

Bill

333

DLV - Host - Review Test Results

100%

6h

3d

Bill

334

DLV - Host - Security Analyst Setup

100%

10 h

5d

Bill

335

DLV - Host - AUI/DLV Security -NT

100%

20 h

11 d

Bill

323

DLV - Host RSC Entry

100%

4h

11 d

Bill

336

DLV - Host - Mid Tier /Host Integration Test Reveiew

100%

8h

2d

Brian

422

Host Addr Std/ terr-analysis

100%

20 h

30 d

Brian

423

Host Addr Std/ terr-Coding

100%

40 h

104.13 d

Carol

MS: Project Activated

100%

0h

0d

Carol

11

Prepare & Review Project Charter

100%

67 h

35 d

Carol

12

MS: Project Charter Reviewed

100%

0h

0d

Carol

13

MS: Project Charter Authorized

100%

0h

0d

Carol

14

Facilitation management Processes

100%

33 h

55 d

Carol

15

Prepare & review Project Plan

100%

38 h

64 d

Carol

16

MS: Project Plan Reviewed

100%

0h

0d

Carol

17

MS: Project Plan Authorized

100%

0h

0d

Carol

98

MS: SDS Doc Authorized

100%

0h

0d

Carol

604

MS: Lessons Learned doc

0%

0h

0d

Carol

24

Authorize final SPIP for transition

0%

20 h

10 d

Carol

606

Project Closure Tasks

0%

40 h

5d

Carol

607

MS: Project Completed

0%

0h

0d

David

306

Build Test Ids/Rules

100%

10 h

26 d

David

604a

Create production ids/rules

100%

10 h

20 d

David

305

SDS 5.2 Specify Security and Control Requirements

100%

15 h

36 d

Durnan

410

MQ Q/A High Level Review (reqd objects idd)

100%

20 h

17 d

Durnan

411

MQ design Infra Diagram (message flow)

100%

30 h

14 d

Durnan

412

MQ Q/A Detail Level Review (design Walkthrough)

100%

5h

5d

Durnan

414

MQ Objects on Dev Host (coding)

100%

10 h

7d

Durnan

415

MQ Create Host Test Cases

100%

10 h

5d

Durnan

416

MQ Execute & Doc Host Test Cases

100%

10 h

5d

Durnan

420

MQ Q/A App Code walkthrough

100%

20 h

9d

Durnan

418

MQ Support NECHO Unit Testing

100%

20 h

35 d

Durnan

419

MQ Integration Testing

75%

20 h

49 d

Durnan

450

MQ Q/A Transition to MQService Agreement

0%

10 h

5d

Durnan

508

MQ Pilot/Issuance

0%

20 h

10 d

ED

27

Determine Business Requirements

100%

10 h

24 d

ED

28

Review Testable Business Requirements

100%

24 h

1d

ED

29

Review Business Requirements

100%

8h

1d

ED

30

MS: Business Req approved

100%

0h

0d

ED

239

Pkg-1 Draft Communication

100%

10 h

2d

ED

96

Update Delivery Specs Doc

100%

20 h

1d

ED

97

Review SDS Doc

100%

15 h

1d

ED

240

Pkg-1 Communication Review by Proj Team

100%

5h

14 d

ED

241

Pkg-1 UPD Walkthrough with SPIP group

100%

5h

8d

ED

232

Create Acceptance Test Cases - Pkg-1

100%

10 h

2d

ED

233

AUI Acceptance Testing - Pkg-1

100%

29 h

4d

ED

246

Pkg-1 Publish Communication

100%

5h

5d

ED

234

NECHO Acceptance Testing - Pkg-1

100%

30 h

21 d

ED

235

MS: Pkg-1 SAT Completed

100%

0h

0d

ED

256

Pkg 1-Post implementation questions

100%

15 h

11 d

ED

257

MS: Pkg-1 Implemented

100%

0h

0d

ED

350

AUI-DLV Acceptance Test Cases developed

100%

20 h

4d

ED

356

Pkg-2 Draft Communication

100%

10 h

1d

ED

357

Pkg-2 Communication Review by Proj Team

100%

5h

5d

ED

358

Pkg-2 UPD Walkthrough with SPIP group

100%

5h

4d

ED

351

AUI-DLV Acceptance Testing

100%

30 h

28.19 d

ED

483

SAT -Perform System/Acceptance Testing pkg-3

100%

50 h

36.68 d

ED

488

SAT - Create FIT Test Cases

0%

40 h

10 d

ED

361

Pkg-2 Publish Communication

0%

5h

1d

ED

489

SAT - Perform FIT Testing - Pkg-3

ED

493

Pkg-3 Draft Communication

ED

494

ED
ED

0%

50 h

18 d

50%

10 h

46 d

Pkg-3 Communication Review by Proj Team

0%

5h

5d

495

Pkg-3 UPD Walkthrough with SPIP group

0%

5h

5d

370

Pkg 2-Post implemetation questions

0%

25 h

20 d

ED

371

MS: Pkg-2 Completed

0%

0h

0d

ED

500

Pkg-3 Publish Communication

0%

5h

5d

ED

509

Pkg-3-Post implemetation questions

0%

35 h

20 d

ED

510

MS: Pkg-3 Completed

0%

0h

0d

Eric

40

AUTO - review existing territory validation

100%

15 h

19 d

Eric

41

AUTO - review existing IRG validation

100%

15 h

19 d

Eric

42

AUTO - review existing driver's license validation

100%

15 h

19 d

Jill

35

DOMAIN - review existing territory validation

100%

3h

24 d

Jill

36

DOMAIN - review existing IRG validation

100%

3h

23 d

Jill

37

DOMAIN - review existing driver's license validation

100%

3h

23 d

Jill

38

Create SRA 4/SDS 3.1 identifying impacted reusable service areas

100%

4h

18 d

John

316

DLV - Mid Tier - Logical Design Interface

100%

24 h

5d

John

317

DLV - Mid Tier - Logical Design Interface Walkthrough

100%

9h

4d

John

318

DLV - Mid Tier - Coding

100%

60 h

18 d

John

319

DLV - Mid Tier - Code Walk Through

100%

6h

14 d

John

320

DLV - Mid Tier - Unit Test Review

100%

20 h

16 d

John

321

DLV - Mid Tier - Unit Testing

100%

6h

16 d

John

315

DLV - Mid Tier - RSC Entry

100%

4h

36 d

John

366

Mid Tier-Host Prep cowide issuance

0%

20 h

10 d

John

367

MS: Mid Tier-Host cowide issuance

0%

0h

0d

Lynn

242

MS: Pkg-1 Create Agency pilot communications

100%

0h

0d

Lynn

243

MS: Pkg-1 Publish Agency pilot communications

100%

0h

0d

Lynn

244

MS: Pkg-1 Create Agency cowide communications

100%

0h

0d

Lynn

245

MS: Pkg-1 Publish Agency cowide communications

100%

0h

0d

Lynn

359

MS: Pkg-2 Create Agency cowide communications

0%

0h

0d

Lynn

360

MS: Pkg-2 Publish Agency cowide communications

0%

0h

0d

Lynn

496

MS: Pkg-3 Create Agency pilot communications

0%

0h

0d

Lynn

497

MS: Pkg-3 Publish Agency pilot communications

0%

0h

0d

Lynn

498

MS: Pkg-3 Create Agency cowide communications

0%

0h

0d

Lynn

499

MS: Pkg-3 Publish Agency cowide communications

0%

0h

0d

Murthy

215

NECHO -DLV - Design Low level Specs (TSD3.2)

100%

20 h

3d

Murthy

216

NECHO -DLV - Design Test Cases (TSD8.3)

100%

40 h

6d

Murthy

217

NECHO - DLV - Coding

100%

30 h

6d

Murthy

218

NECHO -DLV - Unit Testing

100%

29 h

9d

Murthy

426

AUI Request Vehicle Information Screen - TSD 3.2

100%

50 h

12 d

Murthy

427

MQ - Interface module - TSD 3.2

100%

30 h

15 d

Murthy

428

Incoming Interface - TSD 3.2

100%

20 h

15 d

Murthy

430

Build Auto App Program - TSD 3.2

100%

20 h

15 d

Murthy

431

Warning Screen - TSD 3.2

100%

20 h

15 d

Murthy

429

Outgoing Interface - TSD 3.2

100%

20 h

16 d

Murthy

442

Build Auto App Program - TSD 8.3

100%

20 h

11 d

Murthy

443

Warning Screen - TSD 8.3

100%

20 h

15 d

Murthy

438

AUI Request Vehicle Information Screen - TSD 8.3

100%

60 h

18 d

Murthy

441

Outgoing Interface - TSD 8.3

100%

20 h

21 d

Murthy

214

NECHO DLV - RSC Entry

100%

2h

1d

Murthy

439

MQ - Interface module - TSD 8.3

100%

30 h

24 d

Murthy

440

Incoming Interface - TSD 8.3

100%

20 h

24 d

Murthy

454

AUI Request Vehicle Information Screen - Coding

100%

80 h

10 d

Murthy

455

AUI Request Vehicle Information Screen - UT/IT

100%

80 h

10 d

Murthy

458

Incoming Interface - Coding

100%

30 h

4d

Murthy

459

Incoming Interface - UT/IT

100%

30 h

4d

Murthy

456

MQ - Interface module - Coding

100%

50 h

38 d

Murthy

457

MQ - Interface module - UT/IT

100%

40 h

38 d

Murthy

460

Build Auto App Program - Coding

100%

40 h

19 d

Murthy

461

Build Auto App Program - UT/IT

100%

40 h

19 d

Murthy

462

Warning Screen - Coding

100%

30 h

13 d

Murthy

463

Warning Screen - UT/IT

100%

30 h

13 d

Murthy

464

Outgoing Interface - Coding

100%

30 h

5d

Murthy

465

Outgoing Interface - UT/IT

100%

30 h

5d

SteveH

100

Create Test Strategy (SRA 6.5) for AUI and ECHO enhancements

100%

50 h

32 d

SteveH

102

Create Defect Tracking Strategy

100%

40 h

10 d

SteveH

103

Review Defect Tracking Strategy

100%

10 h

5d

SteveH

101

Review Test Strategy (SRA 6.5) for AUI and ECHO enhancements

100%

11 h

31 d

SteveH

229

Establish Test Environment Needs - Pkg-1

100%

10 h

2d

SteveH

230

Establish Test Environment - Pkg-1

100%

20 h

5d

SteveH

308

Establish Test Environment needs

100%

10 h

3d

SteveH

236

Create Acceptance Test Summary Report - Pkg-1

100%

10 h

9d

SteveH

311

Determine FIT Test Environment Needs

100%

20 h

9d

SteveH

237

Review / Authorize Acceptance Test Summary Report - Pkg-1

100%

20 h

5d

SteveH

309

Set-up AUI Integration/System Test Environment

100%

20 h

18 d

SteveH

310

Set-up NECHO Integration/System Test Environment

100%

20 h

18 d

SteveH

347

AUI - Create AUI System Test Plan

100%

20 h

10 d

SteveH

348

AUI-DLV Mid Tier / Host Int Test

100%

60 h

14 d

SteveH

481

SAT - Create System/Acceptance Test Plan

100%

20 h

10 d

SteveH

487

SAT - Create NECHO System/Acceptance Test Plan

100%

20 h

34 d

SteveH

349

AUI-DLV Web / Mid Tier / Host System Testing (Initial)

100%

80 h

15 d

SteveH

482

SAT - Create System/Acceptance Test Cases

100%

40 h

31 d

SteveH

351a

Setup Perf. Testing Pkg-2

100%

20 h

28 d

SteveH

452

Perform Integration Testing for NECHO Changes - pkg-2

100%

120 h

61 d

SteveH

312

Set-up FIT Test Environment

100%

20 h

91.87 d

SteveH

491a

Setup Performance Test Environment -pkg3

100%

20 h

15.48 d

SteveH

484

SAT - Create System/Acceptance Test Summary Report

0%

10 h

2d

SteveH

485

SAT - Authorize System/Acceptance Test Summary Report

0%

10 h

5d

SteveH

351c

Implementation testing execution pkg-2

25%

20 h

31 d

SteveH

491b

Execute Performance Testing - pk3

25%

50 h

15 d

SteveH

351b

Execute Perf. Testing Pkg-2

75%

50 h

45 d

SteveH

490

SAT - Create FIT Test Summary Report

0%

10 h

10 d

SteveH

491

SAT - Authorize FIT Test Summary Report

0%

10 h

5d

Sushit

405

SRA 4.2 Establish Security and Control, Requirements

100%

6h

23 d

Sushit

406

SDS 5.2 Specify Security and Control Requirements

100%

15 h

26 d

Sushit

407

Build Test Ids/Rules

100%

10 h

31 d

Ty

110

Identify Architectural Constraints - AIP 1.1

100%

20 h

5d

Ty

111

Inventory Development Tools Standards and Procedures - AIP 1.3

100%

4h

1d

Ty

112

Identify Existing Network Topology - AIP 1.2

100%

4h

1d

Ty

113

Inventory Existing Hardware and System Software - AIP 1.4

100%

4h

1d

Ty

114

Assemble Architecture Assessment - AIP 1.5

100%

4h

1d

Ty

117

Define Operating Systems - AIP 2.2

100%

10 h

10 d

Ty

127

Submit initial IIA questionnaire

100%

4h

1d

Ty

116

Design Network - AIP 2.1

100%

10 h

10 d

Ty

128

Infrastructure Impact Assessment - Level 2 review (if necessary)

100%

10 h

5d

Ty

43

Determine Validation Components for ECHO & AUI

100%

48 h

18 d

Ty

119

Define Data Distribution - AIP 2.4

100%

20 h

10 d

Ty

118

Define Hardware Configuration - AIP 2.3

100%

20 h

13 d

Ty

120

Define Middleware Req. - AIP 2.5

100%

20 h

5d

Ty

131

Submit SFTA Design Review

100%

2h

1d

Ty

130

Assemble information for SFTA review

100%

10 h

14 d

Ty

121

Define Application Service Distribution - AIP 2.6

100%

20 h

10 d

Ty

132

SFTA Review process

100%

10 h

8d

Ty

133

MS: Authorized SFTA documentation

100%

0h

0d

Ty

122

Define Security Infrastructure - AIP 2.7

100%

20 h

41 d

Ty

226

Pkg-1 - Review NECHO Tech System Design - TSD 9.2

100%

10 h

5d

Ty

123

Define System Topology - AIP 2.8

100%

20 h

5d

Ty

124

MS: Technology Architecture Documentation complete

100%

0h

0d

Ty

225

Pkg-1 - Review AUI Tech System Design - TSD 9.2

100%

3h

3d

Ty

227

Pkg-1 - Review Consolidated Tech Doc - TPD 7.1

100%

3h

2d

Ty

353

AUI - DLV - Review Technical System Design - TSD 9.2

100%

3h

8d

Ty

354

Pkg-2 - Review AUI Technical System Design - TSD 9.2

100%

3h

8d

Ty

478

Pkg-3 - Review NECHO Technical System Design TSD 9.2

100%

3h

39 d

Ty

479

Pkg-3 - Review Consolidated Technical Documentation TPD 7.1

100%

3h

29 d

Ty

602

Update design documents (AIP 2.6) to reflect implemented system

0%

2h

1d

Ty

603

Transition design documents to local architect

0%

4h

2d

Vance

23

Create Initial SPIP Participant Charts

100%

20 h

86 d

Vance

362

Create Pkg-2 SFQ Solutions

100%

10 h

37 d

Vance

363

MS: ISC Review Pkg-2 SFQ Solutions

0%

0h

0d

Vance

364

Populate pkg-2 SFQ Solutions

0%

10 h

5d

Vance

501

Create Pkg-3 SFQ Solutions

0%

10 h

10 d

Vance

502

MS: ISC Review Pkg-3 SFQ Solutions

0%

0h

0d

Vance

503

Populate pkg-3 SFQ Solutions

0%

10 h

5d

Vance

605

Transition to Service

0%

30 h

20 d

Witter

90

AUI - design address Std

100%

25 h

10 d

Witter

91

AUI - design driver's license validation

100%

25 h

16 d

Witter

92

AUI - design VIN validation

100%

25 h

16 d

Witter

205

AUI Address Std - Analysis & Design

100%

10 h

3d

Witter

206

AUI Address Std - Coding

100%

40 h

9d

Witter

343

AUI -Chgs for NECHO - Analysis & design

100%

10 h

4d

Witter

339

AUI - DLV - Analysis & Design

100%

20 h

5d

Witter

204

AUI Address Std - RSC Entry

100%

2h

5d

Witter

207

AUI Address Std - Unit Test Cases/Testing

100%

20 h

5d

Witter

208

AUI Address Std - Integration Testing

100%

13 h

4d

Witter

210

AUI VIN Validation - Analysis & Design

100%

10 h

2d

Witter

211

AUI VIN Validation - Coding

100%

10 h

7d

Witter

344

AUI -Chgs for NECHO - Coding

100%

20 h

16 d

Witter

212

AUI VIN Validation - Unit Test cases/Testing

100%

8h

6d

Witter

345

AUI -Chgs for NECHO - Unit Testing

100%

10 h

6d

Witter

340

AUI - DLV - Coding

100%

80 h

20 d

Witter

341

AUI - DLV - Unit Testing

100%

50 h

20 d

Witter

338

AUI - DLV - RSC Entry

100%

2h

5d

Witter

345a

MVR Message Chnages - Coding/UT

100%

75 h

14 d

Witter

350a

AUI-DLV Web / Mid Tier / Host System Testing (Additional)

100%

20 h

5d

Witter

368

AUI Pkg-2 Prep for cowide issaunce

0%

20 h

5d

Witter

369

MS: AUI Pkg-2 cowide Issuance

0%

0h

0d

zzz$?

109

AIP 1 - Assess Existing Technology Architecture

100%

36 h

9d

zzz$?

39

AUTO Specs

100%

45 h

19 d

zzz$?

126

Engineer for Performance

100%

14 h

6d

zzz$?

99

Testing Strategy and Test Plans

100%

111 h

41.87 d

zzz$?

34

Domain Specs

100%

13 h

42 d

zzz$?

50

VIN Validation

100%

56 h

20.1 d

zzz$?

60

Driver's Licence Validation

100%

91 h

47.43 d

zzz$?

125

AIP 4 - Validate Technology Architecture

100%

36 h

20.83 d

zzz$?

129

SFTA Review

100%

22 h

20.83 d

zzz$?

72

Teritory Validation

100%

120 h

26 d

zzz$?

55

MQseries/EUI Interface.

100%

88 h

53.32 d

zzz$?

46

Address Standradisation- Auto Main Screen

100%

88 h

60 d

zzz$?

89

AUI Specs

100%

75 h

26 d

zzz$?

202

MS: Pkg -1 work started

100%

0h

0d

zzz$?

68

Address Standradisation- Residence Address Scrn

100%

48 h

29 d

zzz$?

302

MS: Pkg -2 work started

100%

0h

0d

zzz$?

402

MS: Pkg -3 work started

100%

0h

0d

zzz$?

82

AUI request Screen

100%

132 h

78.26 d

zzz$?

44

ECHO Specs

100%

988 h

105.71 d

zzz$?

76

AUI Driver Information Screen

100%

125 h

81.71 d

zzz$?

26

SRA / SDS

100%

1,731 h

119.29 d

zzz$?

409

TSD 3.2 phase doc

100%

55 h

20 d

zzz$?

25

Reqs Analysis and Solution Def/Specs

100%

2,054 h

126 d

zzz$?

108

AIP

100%

212 h

99.61 d

zzz$?

115

AIP 2 - Design Technology Architecture

100%

140 h

81 d

zzz$?

203

AUI Address Std (TSD/TPD/UPD)

100%

85 h

34 d

zzz$?

10

Project Charter, Plan & Schedule

100%

358 h

151.74 d

zzz$?

219

NECHO VIN Validation (TSD/TPD/UPD)

100%

50 h

29 d

zzz$?

209

AUI VIN Validation (TSD/TPD/UPD)

100%

28 h

9.19 d

zzz$?

224

Pkg-1 Consolidated Tech Doc

100%

16 h

18.68 d

zzz$?

352

Pkg-2 Consolidated Tech Doc

100%

6h

8d

zzz$?

228

Pkg -1 Systems Acceptance Test (SAT)

100%

129 h

43.77 d

zzz$?

238

Pkg -1 Communication

100%

25 h

56.19 d

zzz$?

314

DLV - Mid Tier(TSD/TPD/UPD)

100%

129 h

52.71 d

zzz$?

413

TSD 8.3 phase doc

100%

30 h

17 d

zzz$?

213

NECHO DLV (TSD/TPD/UPD)

100%

121 h

59.84 d

zzz$?

337

AUI - DLV (TSD/TPD/UPD)

100%

152 h

53.06 d

zzz$?

404

Security Support - Sushit

100%

31 h

69.19 d

zzz$?

322

DLV - Host - (TSD/TPD/UPD)

100%

316 h

68 d

zzz$?

201

Pkg -1 Design/Build/Test/Implement

100%

479 h

84.29 d

zzz$?

250

Pkg -1 Implementation

100%

25 h

30.97 d

zzz$?

303

Security Support - David

100%

35 h

51.77 d

zzz$?

342

AUI -Chgs for NECHO (TSD/TPD/UPD)

100%

115 h

94.35 d

zzz$?

346

AUI -DLV Int Testing

100%

230 h

66.84 d

zzz$?

453

NECHO - all Remaining Changes -(TPD)

100%

1,082 h

51.32 d

zzz$?

451

Pkg-3 NECHO Integration Testing

100%

120 h

63 d

zzz$?

421

Host Addr Std/Terr

100%

60 h

134.13 d

zzz$?

307

Test Environment Setup

100%

90 h

111.58 d

zzz$?

477

Pkg-3 Consolidated Tech Doc

100%

6h

40.69 d

zzz$?

408

MQSeries

97%

145 h

166.68 d

zzz$?

417

R10481 - MQ Regional Office MVS Dev Environment

92%

60 h

81.68 d

zzz$?

Pkg-3 Perf Testing

46%

70 h

30.48 d

zzz$?

Performance Testing Pkg-2

69%

90 h

74.45 d

zzz$?

403

NECHO - all Remaining Changes (TSD/TPD/UPD)

99%

2,164 h

167.16 d

zzz$?

424

NECHO - all Remaining Changes -(TSD)

98%

726 h

154.77 d

zzz$?

355

Pkg -2 Communication

67%

45 h

97.32 d

zzz$?

480

Pkg-3 Systems Acceptance Test (SAT)

49%

330 h

151.68 d

zzz$?

486

Pkg-3 FIT Test (SAT)

15%

130 h

151.68 d

zzz$?

301

Pkg -2 Design/Build/Test/Implement

92%

1,273 h

201.81 d

zzz$?

313

AUI - DLV

91%

1,148 h

195.81 d

zzz$?

365

Pkg -2 Implementation

0%

65 h

35 d

zzz$?

Project Admin & Cordination

82%

3,514 h

342.35 d

zzz$?

492

Pkg-3 Communication

11%

45 h

72.42 d

zzz$?

IIA

35%

375 h

230 d

zzz$?

401

Pkg -3 Design/Build/Test/Implement

89%

2,610 h

238.84 d

zzz$?

504

Pkg-3 Implementation

0%

65 h

53 d

zzz$?

Planning/Admin/Meetings/Coordination

79%

4,287.01 h

371.87 d

zzz$?

22

SP/IP

50%

40 h

280 d

zzz$?

Auto Necho - Auto Apps Efficiency

87%

10,779.01 h

372.87 d

zzz$?

601

Transition

0%

76 h

25 d

70

1/9/01

Planned
Start Date

Planned
Finish date

07/16/02

07/19/02

20 81

20 h

07/16/02

07/23/02

20 75

07/29/02

08/01/02

06/13/02

08/20/02

240

08/05/02

09/13/02

07/19/02

09/16/02

09/03/02

Compl
Work Hrs

Successors

BaseLine Earned
Work Value

Summary
Yes/No

Indent Level

Predecessor

20 No

1.2.1.10.9.1

29

20 h

20 No

1.2.1.10.8.1

29

5h

5 No

1.2.1.6

31

240 h

240 No

1.2.1.10.1

29SS

34 58

34 h

34 No

1.2.1.10.4.1

29

66 82FF+2 d

66 h

66 No

1.2.1.10.9.2

80

09/16/02

25 53,54

25 h

25 No

1.2.1.10.3.1

29

07/23/02

09/18/02

25 76

25 h

25 No

1.2.1.10.8.2

74

08/02/02

09/18/02

8 83

8h

8 No

1.2.1.10.9.3

81FF+2 d

09/16/02

09/20/02

8h

8 No

1.2.1.10.3.2

52

08/02/02

09/24/02

25 63

25 h

25 No

1.2.1.10.5.1

29

08/13/02

09/27/02

12 59

12 h

12 No

1.2.1.10.4.2

57

09/16/02

09/27/02

15 55

15 h

15 No

1.2.1.10.3.3

52

09/27/02

09/30/02

8 83

8h

8 No

1.2.1.10.3.4

54

07/29/02

09/30/02

36 49

36 h

36 No

1.2.1.10.2.1

09/20/02

10/04/02

58 64

58 h

58 No

1.2.1.10.5.2

09/16/02

10/04/02

20 67

20 h

20 No

1.2.1.10.6.1

08/06/02

10/07/02

32 77

32 h

32 No

1.2.1.10.8.3

75

10/04/02

10/07/02

8 77

8h

8 No

1.2.1.10.5.3

63

09/27/02

10/11/02

34 60

34 h

34 No

1.2.1.10.4.3

58

09/10/02

10/11/02

48

48 h

48 No

1.2.1.10.7.1

29

09/30/02

10/14/02

44 50

44 h

44 No

1.2.1.10.2.2

48

09/30/02

10/14/02

64 72

64 h

64 No

1.2.1.10.7.2

10/14/02

10/15/02

8 77

8h

8 No

1.2.1.10.7.3

71

62

10/11/02

10/15/02

8 83

8h

8 No

1.2.1.10.4.4

59

10/14/02

10/18/02

8 77

8h

8 No

1.2.1.10.2.3

49

10/04/02

10/18/02

20 68

20 h

20 No

1.2.1.10.6.2

66

10/18/02

10/24/02

8 77

8h

8 No

1.2.1.10.6.3

67

10/15/02

10/29/02

28 84

28 h

28 No

1.2.1.10.9.4

82,55,60

10/29/02

10/30/02

10 85

10 h

10 No

1.2.1.10.9.5

83

10/24/02

11/04/02

32 78SS

32 h

32 No

1.2.1.10.8.4

76,64,68,50,72

10/24/02

11/04/02

16 85

16 h

16 No

1.2.1.10.8.5

77SS

11/04/02

11/04/02

0 90

0h

0 No

1.2.1.10.10

78,84

11/04/02

11/05/02

10 144

10 h

10 No

1.3.5.1

137SS

11/05/02

11/07/02

15 145,154

15 h

15 No

1.3.5.2

143

11/07/02

11/11/02

15 146,149

15 h

15 No

1.3.5.3

144

11/13/02

12/09/02

40 318

40 h

40 No

1.5.2.4.8

11/11/02

12/16/02

10 156FS-5 d

10 h

10 No

1.3.5.4

145

11/13/02

12/23/02

20

20 h

20 No

1.5.2.4.9

277FF

11/25/02

12/23/02

30

30 h

30 No

1.5.2.4.11

277FF

11/25/02

12/24/02

50

50 h

50 No

1.5.2.4.10

277FF

11/25/02

12/24/02

20 288FS+2 d

20 h

20 No

1.5.2.4.12

277FF

01/03/03

01/07/03

10 171

10 h

10 No

1.3.9.1

156FS+7 d

01/07/03

01/07/03

0 165FF-10 d,172

0h

0 No

1.3.9.2

170

12/27/02

01/22/03

12 289SS,182FS-3

12 h

12 No

1.5.2.4.13

287FS+2 d

12/27/02

01/24/03

30 334,335

30 h

30 No

1.5.2.4.20

288SS

12/27/02

01/24/03

20 334,335

20 h

20 No

1.5.2.4.21

288SS

12/27/02

01/24/03

30 334,335

30 h

30 No

1.5.2.4.23

288SS

01/28/03

01/28/03

0 173,167FF-10 d

0h

0 No

1.3.9.3

171FS+15 d

12/27/02

01/30/03

60 300FS+1 d,334,

60 h

60 No

1.5.2.4.24

288SS

12/27/02

01/31/03

40 334,335

40 h

40 No

1.5.2.4.22

288SS

01/31/03

02/05/03

8 334,335

8h

8 No

1.5.2.4.25

299FS+1 d

02/03/03

02/12/03

60 319FF

60 h

60 No

1.5.2.6.13

283

02/03/03

02/12/03

60 320

60 h

60 No

1.5.2.6.14

318FF

02/12/03

02/26/03

40 321FF

40 h

40 No

1.5.2.6.15

319

02/12/03

02/26/03

40 322,324

40 h

40 No

1.5.2.6.16

320FF

02/26/03

03/18/03

80 323FF

80 h

80 No

1.5.2.6.17

321

03/14/03

03/25/03

60 325FF,326SS

60 h

60 No

1.5.2.6.19

321

03/14/03

03/28/03

20 327

20 h

20 No

1.5.2.6.21

324SS

02/26/03

03/28/03

80 328FF

80 h

80 No

1.5.2.6.18

322FF

03/14/03

04/03/03

60

60 h

60 No

1.5.2.6.20

324FF

03/28/03

04/03/03

40

40 h

40 No

1.5.2.6.22

326

04/01/03

04/03/03

24 328

0h

0 No

1.5.2.4.26

04/03/03

04/11/03

32 329

0h

0 No

1.5.2.6.23

301,323FF

04/11/03

04/11/03

0 331FS-3 d,336

0h

0 No

1.5.2.6.24

317,328

11/25/02

06/13/03

07/10/03

07/21/03

0 362FS+9 d

2h

0.5 No

1.5.2.4.1

277SS

10 h

0 No

1.5.6.1

08/01/03

08/01/03

345

0 353FF-10 d,363

0h

0 No

1.5.6.2

08/22/03

08/22/03

361FS+9 d

0 355FF-10 d,356F

0h

0 No

1.5.6.3

362FS+16 d

05/28/02

08/16/02

110 19

08/16/02

08/16/02

110 h

110 No

1.1.3.8

15FF

0h

0 No

1.1.3.9

08/05/02

11/08/02

18

480

480 h

480 No

1.2.1.5

91FF,32FS+2 d

09/18/02
12/16/02

11/15/02

110 21

110 h

110 No

1.1.3.10

92FS-40 d

12/16/02

0h

0 No

1.1.3.11

07/26/02

20

08/15/03

771

964 h

771.2 No

1.1.2.2

05/06/02

08/15/03

298

349 h

296.65 No

1.1.2.3

05/06/02

08/15/03

630

699 h

587.16 No

1.1.2.1

05/06/02

08/15/03

830

712 h

590.96 No

1.1.2.4

08/15/02

08/15/03

351

417 h

325.26 No

1.1.2.5

10/07/02

08/18/03

131

375 h

131.25 No

1.1.5.1

11/18/02

11/22/02

20 h

20 No

1.4.4.2.3

190

11/26/02

11/29/02

6h

6 No

1.4.4.2.4

199

20 200
6 198FF+2 d

11/04/02

12/11/02

30 201,182

30 h

30 No

1.4.4.2.2

200FF+2 d

12/12/02

12/12/02

6 202,222

6h

6 No

1.4.4.2.5

198

12/12/02

12/20/02

50 203SS,204FF,19

50 h

50 No

1.4.4.2.6

201

12/12/02

12/20/02

50 204FF

50 h

50 No

1.4.4.2.7

202SS

12/17/02

12/20/02

6h

6 No

1.4.4.2.8

202FF,203FF

12/20/02

01/14/03

50 206SS,207

50 h

50 No

1.4.4.2.9

204

12/20/02

01/14/03

50 207

50 h

50 No

1.4.4.2.10

205SS

01/14/03

01/17/03

6h

6 No

1.4.4.2.11

206,205

01/10/03

01/17/03

10

10 h

10 No

1.4.4.2.12

223FF-16 d

12/31/02

01/17/03

20

20 h

20 No

1.4.4.2.13

223FF-17 d

01/06/03

01/20/03

4h

4 No

1.4.4.2.1

202

02/05/03

02/07/03

8h

8 No

1.4.4.2.14

223

6 205,225,233

6 223

11/12/02

12/27/02

20 274

20 h

20 No

1.5.2.3.1

253

12/27/02

05/16/03

40

40 h

40 No

1.5.2.3.2

273

05/06/02

05/06/02

0h

0 No

05/21/02

07/05/02

67 h

67 No

1.1.3.1

07/05/02

07/05/02

0 13

0h

0 No

1.1.3.2

11

08/30/02

08/30/02

0 23

0h

0 No

1.1.3.3

12

07/05/02

09/19/02

33

33 h

33 No

1.1.3.4

11

07/05/02

10/01/02

38 16,18FF

38 h

38 No

1.1.3.5

11

10/01/02

10/01/02

0 17FS+3 d

0h

0 No

1.1.3.6

15

10/04/02

10/04/02

0h

0 No

1.1.3.7

16FS+3 d

0 11
67 12,14,15,29FS-2

1.1.1

11/22/02

11/22/02

0 20FS-40 d

0h

0 No

1.2.1.14

91

09/12/03

09/12/03

0h

0 No

1.6.3

363FS+15 d

09/11/03

09/25/03

20 h

0 No

1.1.4.2

373FS-11 d

09/19/03

09/26/03

0 373

40 h

0 No

1.6.5

371

09/26/03

09/26/03

0h

0 No

1.6.6

372

12/19/02

01/24/03

10

10 h

10 No

1.4.2.2

01/06/03

01/31/03

10

10 h

10 No

1.4.2.3

01/13/03

02/28/03

15

15 h

15 No

1.4.2.1

10/28/02

11/19/02

20 262SS+6 d

20 h

20 No

1.5.2.2.1.1

253

11/04/02

11/22/02

30 263FF

30 h

30 No

1.5.2.2.1.2

261SS+6 d

0 24FS-11 d

11/15/02

11/22/02

5h

5 No

1.5.2.2.1.3

262FF

12/30/02

01/08/03

10 266

5 265FS+24 d

10 h

10 No

1.5.2.2.2.1

263FS+24 d

01/08/03

01/15/03

10 267

10 h

10 No

1.5.2.2.2.2

265

01/15/03

01/22/03

10 269

10 h

10 No

1.5.2.2.2.3

266

03/26/03

04/07/03

20

20 h

20 No

1.5.2.2.3.2

313FF-6 d

02/24/03

04/11/03

20

20 h

20 No

1.5.2.2.3.1

267

04/09/03

06/13/03

15

20 h

15 No

1.5.2.2.3.3

313FF-5 d

06/09/03

06/13/03

10 h

0 No

1.5.2.4.27

304

07/18/03

08/01/03

20 h

0 No

1.5.6.4

362FF

06/13/02

07/16/02

10 30FS+6 d,80,46S

10 h

10 No

1.2.1.1

11FS-2 d

07/24/02

07/25/02

24 94,32FS+5 d,31

24 h

24 No

1.2.1.2

29FS+6 d

07/26/02

07/29/02

8 34,41FS+1 d

8h

8 No

1.2.1.3

30FS+1 d

08/01/02

08/01/02

0 33FS+2 d

0h

0 No

1.2.1.4

30FS+5 d

10/25/02

10/28/02

10 162

10 h

10 No

1.3.8.1

125

11/04/02

11/05/02

20 91

20 h

20 No

1.2.1.12

43,39,85

11/05/02

11/06/02

15 33FF,92

15 h

15 No

1.2.1.13

90

10/29/02

11/15/02

5h

5 No

1.3.8.2

161

5 163

11/18/02

11/29/02

5h

5 No

1.3.8.3

162

12/06/02

12/10/02

10

10 h

10 No

1.3.7.3

128,133,137,144

12/17/02

12/23/02

29 158,157

29 h

29 No

1.3.7.4

131,135

12/27/02

01/02/03

5h

5 No

1.3.8.8

12/09/02

01/07/03

30 h

30 No

1.3.7.5

146FS-5 d,140FS

01/08/03

01/08/03

0h

0 No

1.3.7.6

155,156

01/31/03

02/14/03

25 h

25 No

1.3.9.4

172

02/14/03

02/14/03

0h

0 No

1.3.9.5

173

02/11/03

02/14/03

20

20 h

20 No

1.4.4.5.4

193,204,212

02/17/03

02/17/03

10 237

10 h

10 No

1.4.4.8.1

176

02/17/03

02/24/03

5 238

5h

5 No

1.4.4.8.2

236

02/24/03

02/28/03

5h

5 No

1.4.4.8.3

237

5
30 170FS+7 d,158F
0
15 174

02/26/03

04/04/03

30 246,242SS,229F

30 h

30 No

1.4.4.5.6

224,226FF

04/14/03

06/02/03

50 337,344,345

50 h

50 No

1.5.4.3

304FS-1 d,329

06/02/03

06/16/03

0 345

40 h

0 No

1.5.4.7.2

336

06/23/03

06/23/03

5h

0 No

1.4.4.8.6

249FF-9 d

06/16/03

07/10/03

0 346,361,357SS

50 h

0 No

1.5.4.7.3

336,186,344,341

05/12/03

07/11/03

5 350

10 h

5 No

1.5.5.1

253

07/11/03

07/18/03

0 351

5h

0 No

1.5.5.2

349

07/18/03

07/25/03

07/04/03

07/31/03

0 251

07/31/03

07/31/03

08/11/03

08/18/03

08/25/03

09/19/03

0 366

09/19/03

09/19/03

07/30/02

08/23/02

07/30/02
07/30/02
07/30/02

08/30/02

07/31/02
07/31/02

5h

0 No

1.5.5.3

350

25 h

0 No

1.4.4.9.5

249

0h

0 No

1.4.4.9.6

250

5h

0 No

1.5.5.8

363FF-5 d

35 h

0 No

1.5.6.5

363

0h

0 No

1.5.6.6

365

15 42FF,44,43FF

15 h

15 No

1.2.1.8.1

31FS+1 d

08/23/02

15

15 h

15 No

1.2.1.8.2

41FF

08/23/02

15 90

15 h

15 No

1.2.1.8.3

41FF

3h

3 No

1.2.1.7.1

08/30/02

3h

3 No

1.2.1.7.2

08/30/02

3 44

3h

3 No

1.2.1.7.3

08/30/02

09/25/02

4 90

4h

4 No

1.2.1.7.4

44SS

11/04/02

11/18/02

24 h

24 No

1.4.4.1.2

176FS+6 d

11/19/02

11/22/02

9h

9 No

1.4.4.1.3

190

11/22/02

12/20/02

60 h

60 No

1.4.4.1.4

191

11/28/02

12/20/02

6h

6 No

1.4.4.1.5

192FF

11/28/02

12/20/02

20 h

20 No

1.4.4.1.6

192FF

11/28/02

12/20/02

6 223

6h

6 No

1.4.4.1.7

192FF

11/28/02

01/17/03

4h

4 No

1.4.4.1.1

192SS

06/13/03

06/27/03

0 247

20 h

0 No

1.4.4.9.1

227,230,231

06/27/03

06/27/03

0 248

0h

0 No

1.4.4.9.2

246

12/30/02

12/30/02

0h

0 No

1.3.8.4

165FF-5 d

01/06/03

01/06/03

0 164FF-5 d

0h

0 No

1.3.8.5

171FF-10 d

01/07/03

01/07/03

0h

0 No

1.3.8.6

167FF-5 d

01/14/03

01/14/03

0 166FF-5 d

0h

0 No

1.3.8.7

172FF-10 d

06/20/03

06/20/03

0h

0 No

1.4.4.8.4

240FF-5 d

06/27/03

06/27/03

0 239FF-5 d

0h

0 No

1.4.4.8.5

249FF-5 d

07/11/03

07/11/03

0h

0 No

1.5.5.4

353FF-5 d

07/18/03

07/18/03

0 352FF-5 d

0h

0 No

1.5.5.5

362FF-10 d

08/04/03

08/04/03

0h

0 No

1.5.5.6

355FF-5 d

08/11/03

08/11/03

0 354FF-5 d

0h

0 No

1.5.5.7

363FF-10 d

11/04/02

11/06/02

20 143SS,138,154

20 h

20 No

1.3.4.1

125

11/06/02

11/14/02

40 139

40 h

40 No

1.3.4.2

137

11/14/02

11/22/02

30 140SS+1 d,149

30 h

30 No

1.3.4.3

138

11/15/02

12/02/02

29 156FS-5 d,277S

29 h

29 No

1.3.4.4

139SS+1 d

11/25/02

12/13/02

50 278SS,279SS,28

50 h

50 No

1.5.2.4.2

140SS+6 d

12/03/02

12/23/02

30

30 h

30 No

1.5.2.4.3

277SS

12/03/02

12/23/02

20

20 h

20 No

1.5.2.4.4

277SS

12/03/02

12/23/02

20

20 h

20 No

1.5.2.4.6

277SS

12/03/02

12/23/02

20

20 h

20 No

1.5.2.4.7

277SS

12/03/02

12/24/02

20

20 h

20 No

1.5.2.4.5

277SS

24 191,199,222
9 192,182
60 189SS,193FF,19
6 225,233
20

12/27/02

01/10/03

20 334,335

20 h

20 No

1.5.2.4.18

288SS

12/27/02

01/17/03

20 334,335

20 h

20 No

1.5.2.4.19

288SS

12/27/02

01/22/03

60 334,335,306

60 h

60 No

1.5.2.4.14

288SS

12/27/02

01/27/03

20 334,335

20 h

20 No

1.5.2.4.17

288SS

01/27/03

01/27/03

2h

2 No

1.3.4.5

140

12/27/02

01/30/03

30 334,335

30 h

30 No

1.5.2.4.15

288SS

12/27/02

01/30/03

20 334,335

20 h

20 No

1.5.2.4.16

288SS

02/03/03

02/14/03

80 307FF

80 h

80 No

1.5.2.6.1

289

02/03/03

02/14/03

80 308

80 h

80 No

1.5.2.6.2

306FF

03/07/03

03/13/03

30 311FF

30 h

30 No

1.5.2.6.5

309FS-7 d

03/07/03

03/13/03

30 312,314,316

30 h

30 No

1.5.2.6.6

310FF

02/14/03

04/08/03

50 309FF

50 h

50 No

1.5.2.6.3

307

02/14/03

04/08/03

40 310FS-7 d

40 h

40 No

1.5.2.6.4

308FF

03/13/03

04/08/03

40 313FF

40 h

40 No

1.5.2.6.7

311

03/13/03

04/08/03

40 271FF-5 d,270FF

40 h

40 No

1.5.2.6.8

312FF

03/24/03

04/09/03

30 315FF

30 h

30 No

1.5.2.6.9

311

03/24/03

04/09/03

30

30 h

30 No

1.5.2.6.10

314FF

04/03/03

04/09/03

30 317FF

30 h

30 No

1.5.2.6.11

311

04/03/03

04/09/03

30 329

30 h

30 No

1.5.2.6.12

316FF

07/25/02

09/06/02

50

50 h

50 No

1.2.2.1

30

08/26/02

09/06/02

40 97

40 h

40 No

1.2.2.3

09/06/02

09/13/02

10

10 h

10 No

1.2.2.4

08/09/02

09/20/02

11

11 h

11 No

1.2.2.2

11/13/02

11/15/02

10

10 h

10 No

1.3.7.1

96

11/11/02

11/15/02

20

20 h

20 No

1.3.7.2

12/23/02

12/27/02

10 183SS,184SS,18

10 h

10 No

1.4.3.1

191,198,212,288F

12/23/02

01/06/03

10 159

10 h

10 No

1.3.7.7

155,156FS-1 d

12/23/02

01/06/03

20 343

20 h

20 No

1.4.3.4

182SS

01/06/03

01/13/03

20

20 h

20 No

1.3.7.8

158

12/23/02

01/17/03

20 223

20 h

20 No

1.4.3.2

182SS

12/23/02

01/17/03

20 304

20 h

20 No

1.4.3.3

182SS

01/06/03

01/17/03

20

20 h

20 No

1.4.4.5.1

212,190,201,217

01/17/03

02/05/03

60 209FF-17 d,208F

60 h

60 No

1.4.4.5.2

195,207,183,219

02/05/03

02/19/03

20

20 h

20 No

1.5.4.1

289,290,291,292,

01/06/03

02/20/03

20

20 h

20 No

1.5.4.7.1

185

02/05/03

02/26/03

80 227

80 h

80 No

1.4.4.5.3

223

02/21/03

04/04/03

40

40 h

40 No

1.5.4.2

289,290,291,292,

03/05/03

04/11/03

01/20/03

04/15/03

01/21/03

05/24/03

05/05/03

20 230,231

20 h

20 No

1.4.4.6.1

227FS-25 d

120 h

120 No

1.5.2.5.1

184

20 345

20 h

20 No

1.4.3.5

182

05/24/03

20 341

0h

0 No

1.5.4.6.1

06/02/03

06/04/03

0 338

10 h

0 No

1.5.4.4

336

06/04/03

06/11/03

10 h

0 No

1.5.4.5

337

05/02/03

06/13/03

5 246

0h

0 No

1.4.4.6.3

229

05/26/03

06/13/03

13 345

0h

0 No

1.5.4.6.2

340

04/15/03

06/13/03

38 246

50 h

37.5 No

1.4.4.6.2

229

07/10/03

07/23/03

0 347

10 h

0 No

1.5.4.7.4

345

07/23/03

07/30/03

10 h

0 No

1.5.4.7.5

346

11/01/02

12/05/02

6 257,258

6h

6 No

1.5.2.1.1

253

120 302,336FS-1 d

12/19/02

01/24/03

15

15 h

15 No

1.5.2.1.2

256

12/27/02

02/07/03

10

10 h

10 No

1.5.2.1.3

256

07/19/02

07/25/02

20 101

20 h

20 No

1.2.3.1.1

07/25/02

07/26/02

4 102

4h

4 No

1.2.3.1.2

100

07/26/02

07/29/02

4 103

4h

4 No

1.2.3.1.3

101

07/29/02

07/30/02

4 104

4h

4 No

1.2.3.1.4

102

07/30/02

07/31/02

4h

4 No

1.2.3.1.5

103

08/26/02

09/09/02

10

10 h

10 No

1.2.3.2.2

106SS+9 d

09/10/02

09/11/02

4h

4 No

1.2.3.4.1.1

106SS+20 d

08/14/02

09/16/02

10 107SS+9 d,108F

10 h

10 No

1.2.3.2.1

44SS+5 d

4 118

09/11/02

09/18/02

10

10 h

10 No

1.2.3.4.1.2

117

08/30/02

09/25/02

48 39SS,87SS+10 d

48 h

48 No

1.2.1.9

41,38

09/09/02

09/25/02

20 111FS-4 d,110FF

20 h

20 No

1.2.3.2.4

44FF

09/09/02

09/25/02

20

20 h

20 No

1.2.3.2.3

106FS-5 d

09/19/02

09/25/02

20 121SS+5 d

20 h

20 No

1.2.3.2.5

109FF

09/25/02

09/26/02

2h

2 No

1.2.3.4.2.2

110SS+5 d

09/10/02

09/27/02

10

10 h

10 No

1.2.3.4.2.1

106SS+20 d

09/19/02

10/02/02

20 112

20 h

20 No

1.2.3.2.6

109FS-4 d

09/26/02

10/08/02

10 123

10 h

10 No

1.2.3.4.2.3

121

10/08/02

10/08/02

0h

0 No

1.2.3.4.3

122

2 122

10/02/02

11/29/02

20 113

20 h

20 No

1.2.3.2.7

111

11/22/02

12/03/02

10

10 h

10 No

1.3.6.2

139,145

11/08/02

12/04/02

20 114

20 h

20 No

1.2.3.2.8

112

12/04/02

12/04/02

0h

0 No

1.2.3.3

113

12/17/02

12/20/02

3 150FF

3h

3 No

1.3.6.1

129,134

12/18/02

12/20/02

3h

3 No

1.3.6.3

148FF

12/24/02

01/06/03

3 234SS

3h

3 No

1.4.4.7.1

193,204

12/24/02

01/06/03

3h

3 No

1.4.4.7.2

233SS

04/04/03

05/30/03

3 332FF

3h

3 No

1.5.3.1

329FS-3 d

04/04/03

05/30/03

3h

3 No

1.5.3.2

331FF

08/25/03

08/25/03

2h

0 No

1.6.1

363

08/25/03

08/26/03

4h

0 No

1.6.2

363

09/06/02

01/06/03

20

20 h

20 No

1.1.4.1

13

03/21/03

05/09/03

10 243FS+10 d

10 h

10 No

1.4.4.8.7

227SS

05/23/03

05/23/03

0 244

0h

0 No

1.4.4.8.8

242FS+10 d

05/23/03

05/30/03

10 h

0 No

1.4.4.8.9

243

06/16/03

06/30/03

0 358FS+10 d

10 h

0 No

1.5.5.9

345SS

07/11/03

07/11/03

0 359

0h

0 No

1.5.5.10

357FS+10 d

07/11/03

07/18/03

10 h

0 No

1.5.5.11

358

08/25/03

09/19/03

0 372

30 h

0 No

1.6.4

363

09/13/02

09/26/02

25 88,89

25 h

25 No

1.2.1.11.1

44SS+10 d

09/27/02

10/18/02

25

25 h

25 No

1.2.1.11.2

87

09/27/02

10/18/02

25

25 h

25 No

1.2.1.11.3

87

10/21/02

10/23/02

10 129,154

10 h

10 No

1.3.2.2

125

10/23/02

11/05/02

40 130FS+13 d,148

40 h

40 No

1.3.2.3

128

11/18/02

11/22/02

10 218,222

10 h

10 No

1.4.4.4.1

176FS+16 d

11/18/02

11/25/02

20 222,182,225,213

20 h

20 No

1.4.4.3.1

176

11/22/02

12/03/02

2h

2 No

1.3.2.1

130FF

11/22/02

12/03/02

20 h

20 No

1.3.2.4

129FS+13 d

2
20 131,127FF

12/03/02

12/06/02

13 133FS-2 d,155

13 h

13 No

1.3.2.5

130

12/05/02

12/06/02

10 134,154,135SS

10 h

10 No

1.3.3.1

131FS-2 d

12/06/02

12/17/02

10 148

10 h

10 No

1.3.3.2

133

11/22/02

12/17/02

20 219

20 h

20 No

1.4.4.4.2

217

12/10/02

12/17/02

8 155

8h

8 No

1.3.3.3

133SS

12/17/02

12/26/02

10 223

10 h

10 No

1.4.4.4.3

218

01/06/03

01/31/03

80 214SS,215SS

80 h

80 No

1.4.4.3.2

212

01/06/03

01/31/03

50

50 h

50 No

1.4.4.3.3

213SS

01/27/03

01/31/03

2h

2 No

1.4.4.3.4

213SS

03/11/03

03/28/03

75 226

0h

0 No

1.4.4.4.4

03/28/03

04/04/03

20 227FF

06/27/03

07/04/03

0 249

07/04/03

07/04/03

0 250,240FF-5 d,2

07/19/02

07/31/02

07/30/02
09/10/02

0h

0 No

1.4.4.5.5

220

20 h

0 No

1.4.4.9.3

247

0h

0 No

1.4.4.9.4

248

100%

36 h

36 Yes

1.2.3.1

08/23/02

100%

45 h

45 Yes

1.2.1.8

09/18/02

100%

14 h

14 Yes

1.2.3.4.1

07/25/02

09/20/02

100%

211 h

111 Yes

07/30/02

09/25/02

100%

13 h

13 Yes

1.2.1.7

09/03/02

09/30/02

100%

56 h

56 Yes

1.2.1.10.3

08/02/02

10/07/02

100%

91 h

91 Yes

1.2.1.10.5

09/10/02

10/08/02

100%

36 h

36 Yes

1.2.3.4

09/10/02

10/08/02

100%

22 h

22 Yes

1.2.3.4.2

09/10/02

10/15/02

100%

120 h

120 Yes

1.2.1.10.7

08/05/02

10/15/02

100%

88 h

88 Yes

1.2.1.10.4

07/29/02

10/18/02

100%

88 h

88 Yes

1.2.1.10.2

09/13/02

10/18/02

100%

75 h

75 Yes

1.2.1.11

10/21/02

10/21/02

100% 128,137,161

0h

0 No

09/16/02

10/24/02

100%

48 h

48 Yes

10/28/02

10/28/02

100% 212,190FS+6 d,

0h

0 No

1.4.1

10/28/02

10/28/02

100% 256,261,273,349

0h

0 No

1.5.1

07/16/02

10/30/02

100%

132 h

132 Yes

1.2.1.10.9

06/13/02

11/04/02

100%

1,076 h

988 Yes

1.2.1.10

07/16/02

11/04/02

100%

125 h

125 Yes

1.2.1.10.8

06/13/02

11/22/02

100%

1,848 h

1731 Yes

10/28/02

11/22/02

100%

55 h

55 Yes

06/13/02

12/04/02

100%

2,271 h

2054 Yes

07/19/02

12/04/02

100%

212 h

212 Yes

1.2.3

08/14/02

12/04/02

100%

140 h

140 Yes

1.2.3.2

10/21/02

12/06/02

100%

85 h

85 Yes

1.3.2

05/21/02

12/16/02

100%

358 h

358 Yes

1.1.3

11/04/02

12/16/02

100%

50 h

50 Yes

1.3.5

12/05/02

12/17/02

100%

28 h

28 Yes

1.3.3

11/22/02

12/20/02

100%

16 h

16 Yes

1.3.6

12/24/02

01/06/03

100%

6h

6 Yes

1.2.2

1.3.1
1.2.1.10.6

1.2.1
1.5.2.2.1
1.2

1.4.4.7

11/11/02

01/13/03

100%

174 h

129 Yes

1.3.7

10/25/02

01/14/03

100%

25 h

25 Yes

1.3.8

11/04/02

01/17/03

100%

129 h

129 Yes

12/30/02

01/22/03

100%

30 h

30 Yes

11/04/02

01/27/03

100%

121 h

121 Yes

1.4.4.1
1.5.2.2.2
1.3.4

11/18/02

01/31/03

100%

152 h

152 Yes

1.4.4.3

11/01/02

02/07/03

100%

31 h

31 Yes

1.5.2.1

11/04/02

02/07/03

100%

316 h

316 Yes

1.4.4.2

10/21/02

02/14/03

100%

554 h

489 Yes

1.3

01/03/03

02/14/03

100%

55 h

35 Yes

1.3.9

12/19/02

02/28/03

100%

25 h

35 Yes

1.4.2

11/18/02

03/28/03

100%

40 h

40 Yes

1.4.4.4

01/06/03

04/04/03

100%

210 h

210 Yes

1.4.4.5

02/03/03

04/11/03

100%

1,050 h

1050 Yes

1.5.2.6

01/20/03

04/15/03

100%

120 h

120 Yes

1.5.2.5

11/12/02

05/16/03

100%

60 h

60 Yes

1.5.2.3

12/23/02

05/24/03

100%

90 h

90 Yes

1.4.3

04/04/03

05/30/03

100%

6h

6 Yes

1.5.3

10/28/02

06/13/03

84%

145 h

140 Yes

02/24/03

06/13/03

75%

60 h

55 Yes

05/05/03

06/13/03

55%

0h

0 Yes

1.5.4.6

03/05/03

06/13/03

44%

70 h

57.5 Yes

1.4.4.6

10/28/02

06/13/03

87%

2,108 h

2091.5 Yes

11/13/02

06/13/03

74%

702 h

690.5 Yes

1.5.2.4

02/17/03

06/27/03

89%

45 h

30 Yes

1.4.4.8

01/06/03

07/30/03

67%

260 h

130 Yes

01/06/03

07/30/03

44%

130 h

20 Yes

10/28/02

07/31/03

88%

1,273 h

1065.5 Yes

11/04/02

07/31/03

83%

1,148 h

940.5 Yes

06/13/03

07/31/03

0%

65 h

0 Yes

05/06/02

08/15/03

80%

3,514 h

2571.23 Yes

1.1.2

05/12/03

08/18/03

3%

45 h

5 Yes

1.5.5

10/07/02

08/18/03

1%

0h

131.25 Yes

1.1.5

10/28/02

09/19/03

79%

2,484 h

2232.5 Yes

1.5

07/10/03

09/19/03

0%

65 h

0 Yes

05/06/02

09/25/03

74%

4,287 h

3080.48 Yes

09/06/02

09/25/03

90%

40 h

20 Yes

05/06/02

09/26/03

82%

10,709.01 h

8921.48 Yes

08/25/03

09/26/03

0%

86 h

0 Yes

1.5.2.2
1.5.2.2.3

1.5.2

1.5.4
1.5.4.7
1.4
1.4.4
1.4.4.9

1.5.6
1.1
1.1.4
1
1.6

Resources

Baseline
Start date

Baseline
Finish date

Datelast
Updated

Murthy[68%],Amar,Lakshmi

07/16/02

08/28/03 NA

Amar[46%],Lakshmi

07/16/02

09/12/03 NA

Tina[22%]

07/29/02

05/06/02 NA

Murthy[70%],Amar[70%]

06/13/02

09/05/03 NA

Murthy[73%]

08/05/02

04/21/03 NA

Murthy[77%],Amar,Lakshmi

07/19/02

04/21/03 NA

Murthy[33%],Amar

08/01/02

04/21/03 NA

Amar[31%],Lakshmi

07/23/02

04/21/03 NA

Murthy[34%]

08/02/02

04/21/03 NA

Murthy[26%]

08/14/02

11/20/02 NA

Amar[32%]

08/02/02

06/17/02 NA

Murthy[52%]

08/13/02

06/17/02 NA

Murthy[9%],Amar,Lakshmi,Tina

09/02/02

06/17/02 NA

Murthy[103%],Amar,Lakshmi,Tina[39%]

09/13/02

07/08/02 NA

Amar[52%]

07/29/02

07/05/02 NA

Murthy[29%],Amar,Lakshmi,Tina

08/16/02

07/05/02 NA

Amar[30%],Lakshmi[2%]

07/29/02

07/05/02 NA

Amar[46%]

08/06/02

08/16/02 NA

Murthy[103%],Lakshmi[26%],Tina[26%],Amar[26%]

09/09/02

08/16/02 NA

Murthy[15%],Lakshmi,Tina

08/15/02

11/19/02 NA

Murthy[46%]

09/10/02

11/20/02 NA

Amar[36%],Lakshmi,Tina

09/09/02

04/21/03 NA

Murthy[134%],Lakshmi,Tina

09/23/02

11/19/02 NA

Murthy[103%],Lakshmi[39%],Tina[39%]

10/07/02

04/21/03 NA

Murthy[103%],Lakshmi[19%],Tina[19%]

09/09/02 NA

Amar[6%],Lakshmi,Tina

09/23/02

Amar[18%],Lakshmi,Tina

08/28/02

11/15/02 NA

Amar[6%],Lakshmi,Tina

09/10/02

10/30/02 NA

Murthy[21%],Amar,Lakshmi,Tina

09/16/02

07/16/02 NA

Murthy[52%],Amar,Lakshmi,Tina

09/30/02

07/25/02 NA

Amar[66%],Lakshmi[142%],Tina

10/08/02

07/29/02 NA

Amar[19%],Lakshmi,Tina

10/08/02

08/01/02 NA

10/21/02

10/30/02 NA

Amar[65%]

11/04/02

08/01/02 NA

Amar[97%]

11/05/02

09/27/02 NA

Amar[97%]

11/07/02

07/31/02 NA

Amar[30%]

11/13/02

08/07/02 NA

Amar[6%]

11/11/02

08/07/02 NA

Amar[11%]

11/13/02

09/27/02 NA

Amar[24%]

11/25/02

08/23/02 NA

Amar[32%]

11/25/02

08/23/02 NA

Amar[13%]

11/25/02

08/23/02 NA

Amar[65%]

01/03/03

08/23/02 NA

01/20/03

09/26/02 NA

12/27/02

10/21/02 NA

Amar[2%],Murthy[2%],Tina[2%],Lakshmi[2%],Ty,Mary

NA
08/18/03 NA

Amar[48%]

12/27/02

07/12/02 NA

Amar[32%]

12/27/02

09/27/02 NA

Amar[19%]

12/27/02

08/09/02 NA

02/07/03

09/20/02 NA

Amar[32%]

12/27/02

09/27/02 NA

Amar[32%]

12/27/02

09/16/02 NA

Amar[26%],Murthy[26%],Tina[26%],Lakshmi[26%]

01/31/03

08/14/02 NA

Amar[97%]

02/03/03

09/02/02 NA

Tina[97%]

02/03/03

09/13/02 NA

Amar[52%]

02/12/03

09/16/02 NA

Amar[52%]

02/12/03

09/11/02 NA

Amar[103%]

02/26/03

08/13/02 NA

Amar[97%]

03/12/03

08/15/02 NA

Amar[23%]

03/25/03

09/09/02 NA

Tina[103%]

02/26/03

09/11/02 NA

Amar[48%],Tina

03/12/03

09/10/02 NA

Tina[65%],Murthy

03/25/03

08/16/02 NA

Amar[103%]

NA

Amar[103%]

NA

09/09/02 NA
09/10/02 NA
03/28/03

09/16/02 NA

Amar[13%]

11/25/02

08/28/02 NA

Amar[16%]

05/30/03

09/10/02 NA

06/24/03

09/16/02 NA

07/15/03

10/08/02 NA

05/28/02

09/23/02 NA

08/16/02

10/07/02 NA

Ed[8%],Eric[8%],Murthy[10%],Jill[8%],Lakshmi[11%],Witt

08/05/02

10/08/02 NA

Ashok[17%],Carol[16%],Ed[8%],Eric[8%],Murthy[5%],Jill[5

10/09/02

10/21/02 NA

11/19/02

07/23/02 NA

Vance[63%]

07/26/02

08/06/02 NA

Michelle[17%]

05/06/02

08/16/02 NA

Carol[35%]

05/06/02

10/21/02 NA

Carol[4%],Michelle[3%],Ashok[3%],Ed[3%],Eric[3%],Murthy

05/06/02

10/21/02 NA

Ashok[29%]

08/15/02

10/01/02 NA

Charles,Daniel,Sherrill,Dave,Harry[18%],Gilbert

10/07/02

07/19/02 NA

Bill[65%]

11/18/02

08/02/02 NA

Bill,EricH[19%]

11/26/02

08/07/02 NA

Bill[19%]

11/04/02

09/30/02 NA

Bill[39%],EricH[39%]

12/12/02

10/01/02 NA

Bill[108%]

12/12/02

10/21/02 NA

Bill[108%]

12/12/02

10/17/02 NA

Bill[13%],EricH

12/17/02

09/20/02 NA

Bill[43%]

12/20/02

10/03/02 NA

Bill[43%]

12/20/02

10/17/02 NA

Bill[26%],EricH[13%]

01/13/03

10/25/02 NA

David[26%]

01/07/03

10/29/02 NA

Bill[26%]

12/31/02

10/29/02 NA

Bill[7%]

12/20/02

11/15/02 NA

Bill[13%],John,EricH,Jeff

02/05/03

08/09/02 NA

Ashok[10%],Carol[16%],Ed[8%],Eric[8%],Murthy[5%],Jill[5

Brian[14%]

11/12/02

08/26/02 NA

Brian[26%]

12/27/02

09/06/02 NA

05/06/02

09/13/02 NA

05/21/02

11/07/02 NA

06/17/02

07/31/02 NA

06/17/02

07/25/02 NA

Carol[4%],Ashok[3%],Michelle[3%],Ed[5%],Eric[5%],Murthy

06/17/02

07/26/02 NA

Carol[16%],Ashok[2%],Michelle[3%],Ed[5%],Eric[5%],Murth

06/17/02

07/29/02 NA

07/05/02

07/30/02 NA

07/05/02

07/31/02 NA

10/29/02

11/07/02 NA

Carol[16%],Ashok[3%],Michelle[3%],Ed[8%],Eric[8%],Murth

08/05/03

09/11/02 NA

Carol[26%]

04/07/03

09/24/02 NA

Carol[52%],Ashok[40%],Michelle[40%]

08/11/03

09/24/02 NA

08/18/03

09/26/02 NA

12/19/02

10/10/02 NA

01/06/03

10/10/02 NA

David[5%]

05/07/03

10/24/02 NA

Durnan[15%]

10/28/02

11/07/02 NA

Durnan[28%]

11/04/02

11/07/02 NA

Durnan[13%]

11/15/02

09/25/02 NA

Durnan[18%]

12/30/02

09/18/02 NA

Durnan[26%]

01/08/03

09/11/02 NA

Durnan[26%]

01/15/03

09/18/02 NA

Durnan[43%]

03/17/03

09/25/02 NA

Durnan[14%]

02/24/03

09/17/02 NA

Durnan[18%]

03/17/03

09/18/02 NA

Durnan[26%]

03/28/03

09/25/02 NA

Durnan[26%]

06/11/03

09/25/02 NA

Ed[3%],Tina[3%]

06/13/02

03/12/03 NA

Ed[26%],Carol[50%],Ashok[40%],Eric[40%],Murthy,Jill[40%

07/24/02

10/21/02 NA

Ed,Carol[50%],Tina,Eric[26%]

07/26/02

12/06/02 NA

08/01/02

12/03/02 NA

Ed[65%]

10/25/02

10/23/02 NA

Ed[129%],Tina[129%]

10/22/02

11/05/02 NA

Carol[97%],Michelle[13%],Ashok[13%],Ed[13%],Eric[13%],

10/25/02

12/03/02 NA

Ed[5%]

10/29/02

12/06/02 NA

Ed[13%]

11/18/02

12/17/02 NA

Ed[7%],Lynn[57%]

12/06/02

12/06/02 NA

Ed[26%],Lynn,SteveH[40%]

12/17/02

12/17/02 NA

Ed[13%]

02/05/03

12/17/02 NA

Ed[11%],Lynn,SteveH[40%]

12/09/02

01/02/03 NA

01/08/03

11/06/02 NA

02/12/03

11/14/02 NA

David[5%]

Ed[18%]

03/12/03

11/22/02 NA

Ed[65%]

12/20/02

12/02/02 NA

Ed[129%]

12/31/02

01/02/03 NA

Ed[13%]

01/15/03

12/16/02 NA

Ed[16%]

01/22/03

11/05/02 NA

Ed[18%]

02/26/03

Ed[26%]

03/31/03

11/07/02 NA
11/11/02 NA

Ed[52%]

04/11/03

12/16/02 NA

Ed[65%]

05/05/03

12/20/02 NA

Ed[36%]

04/25/03

12/20/02 NA

Ed[26%]

04/07/03

12/03/02 NA

Ed[13%]

04/14/03

12/20/02 NA

Ed[13%]

04/21/03

01/13/03 NA

Ed[16%]

05/26/03

11/15/02 NA

06/20/03

11/15/02 NA

Ed[13%]

07/01/03

12/10/02 NA

Ed[16%],Durnan

07/15/03

12/23/02 NA

08/11/03

12/24/02 NA

Eric[10%]

07/30/02

01/08/03 NA

Eric[10%]

07/30/02

01/06/03 NA

Eric[10%]

07/30/02

01/13/03 NA

Jill[39%]

07/30/02

02/12/03 NA

Jill[8%]

07/31/02

10/28/02 NA

Jill[8%]

07/31/02

11/15/02 NA

Jill[2%],Ed[40%],Tina[40%]

09/27/02

11/29/02 NA

John[62%]

11/04/02

12/30/02 NA

John[10%],EricH,Jeff

11/19/02

01/06/03 NA

John[52%]

11/22/02

01/20/03 NA

John[3%],Jeff[3%]

11/28/02

01/27/03 NA

John[258%]

11/28/02

02/12/03 NA

John[3%],Jeff[3%]

11/28/02

03/12/03 NA

Bill[5%],John

11/28/02

01/07/03 NA

John[26%]

04/21/03

01/20/03 NA

05/12/03

02/07/03 NA

12/30/02

03/12/03 NA

01/06/03

03/12/03 NA

01/20/03

06/20/03 NA

01/27/03

10/28/02 NA

05/12/03

05/14/03 NA

05/19/03

05/14/03 NA

06/04/03

03/03/03 NA

06/11/03

01/31/03 NA

06/24/03

04/21/03 NA

07/01/03

12/27/02 NA

Murthy[86%]

11/04/02

01/07/03 NA

Murthy[86%]

11/06/02

01/07/03 NA

Murthy[65%]

11/14/02

01/07/03 NA

Murthy[13%],Amar[29%]

11/15/02

04/21/03 NA

Murthy[161%]

11/25/02

06/20/03 NA

Murthy[32%]

12/03/02

01/01/03 NA

Murthy[22%]

12/03/02

01/01/03 NA

Murthy[22%]

12/03/02

11/18/02 NA

Murthy[22%]

12/03/02

11/22/02 NA

Murthy[16%]

12/03/02

12/20/02 NA

Murthy[23%]

12/27/02

12/20/02 NA

Murthy[17%]

12/27/02

12/20/02 NA

Murthy[43%]

12/27/02

12/20/02 NA

Murthy[22%]

12/27/02

02/10/03 NA

Murthy[26%]

01/01/03

12/30/02 NA

Murthy[16%]

12/27/02

12/11/02 NA

Murthy[11%]

12/27/02

11/22/02 NA

Murthy[103%]

02/03/03

11/29/02 NA

Lakshmi[103%]

02/03/03

12/12/02 NA

Murthy[97%]

03/04/03

12/20/02 NA

Lakshmi[97%]

03/04/03

12/20/02 NA

Murthy[54%]

02/14/03

12/20/02 NA

Murthy[43%]

02/14/03

01/13/03 NA

Murthy[129%]

03/10/03

01/13/03 NA

Lakshmi[129%]

03/10/03

01/16/03 NA

Murthy[32%]

03/17/03

01/14/03 NA

Lakshmi[32%]

03/17/03

01/14/03 NA

Murthy[97%]

03/20/03

02/10/03 NA

Lakshmi[97%]

03/20/03

01/08/03 NA

SteveH[59%]

07/25/02

11/25/02 NA

SteveH[52%]

08/26/02

12/24/02 NA

SteveH[1%],Carol[50%],Ashok[40%],Ed,Murthy,Eric[40%],Ji

09/06/02

01/08/03 NA

SteveH[0%],Carol[0%],Ashok[0%],Ed[0%],Murthy[1%],Eric[

08/09/02

01/08/03 NA

SteveH[65%]

11/13/02

12/26/02 NA

SteveH[52%]

11/11/02

11/22/02 NA

SteveH[43%]

12/23/02

12/17/02 NA

SteveH[65%]

12/23/02

12/26/02 NA

SteveH[43%]

12/23/02 NA

SteveH[52%]

01/06/03

03/05/03 NA

SteveH[26%]

12/23/02

01/17/03 NA

SteveH[26%]

12/23/02

02/05/03 NA

SteveH[26%]

01/06/03

02/26/03 NA

Bill[23%],John[36%],SteveH[23%]

01/16/03

01/13/03 NA

SteveH[26%]

02/05/03 NA

SteveH[17%]

01/06/03

03/05/03 NA

SteveH[40%],Witter[26%],John,Bill

02/05/03

03/25/03 NA

SteveH[34%]

02/21/03

03/11/03 NA

SteveH[6%],PerTeam[5%]

03/05/03

03/25/03 NA

SteveH[3%],Murthy,Tina,Amar,Durnan,Brian

01/20/03 NA

SteveH[4%]

01/21/03
NA

NA

NA

NA
01/07/03 NA
01/06/03 NA

SteveH[65%]

04/25/03

01/07/03 NA

SteveH[26%]

04/30/03

05/19/03 NA

SteveH[52%],Witter[6%],John,Bill

NA

01/15/03 NA

NA

01/22/03 NA

SteveH[10%],PerTeam[40%]

03/11/03

01/31/03 NA

SteveH[13%]

05/30/03

05/12/03 NA

SteveH[26%]

06/13/03

05/19/03 NA

Sushit[3%]

11/01/02

05/12/03 NA

Sushit[13%]

12/19/02

03/11/03 NA

Sushit[5%]

12/27/02

03/25/03 NA

Mary[52%]

07/19/02

04/01/03 NA

Mary[52%]

07/25/02

06/20/03 NA

Mary[52%]

07/26/02

04/25/03 NA

Mary[52%]

07/29/02

05/12/03 NA

Mary[52%]

07/30/02

05/20/03 NA

Mary[6%],Ty[9%]

09/11/02

05/26/03 NA

Mary[26%],Ty

09/10/02

06/20/03 NA

Mary[6%],Ty[9%]

08/14/02

06/20/03 NA

Mary[13%],Ty

09/11/02

08/11/03 NA

Eric[6%],Ty,Mary,Tina,Jill[6%],Witter[6%]

08/23/02

10/28/02 NA

Mary[13%],Ty[19%]

09/13/02

04/11/03 NA

Mary[13%],Ty[19%]

09/11/02

02/07/03 NA

Mary[77%],Ty[52%]

09/27/02

12/05/02 NA

Mary[13%],Ty

09/17/02

01/24/03 NA

Mary[13%],Ty

09/10/02

02/07/03 NA

Mary[13%],Ty[19%]

09/27/02

03/28/03 NA

Mary[8%],Ty

09/18/02

11/22/02 NA

Mary[26%]

09/25/02

11/19/02 NA

Mary[13%],Ty[19%]

10/10/02

11/22/02 NA

Ty[26%]

11/22/02

11/22/02 NA

Mary[77%],Ty[52%]

10/24/02

01/22/03 NA

Mary[13%]

11/07/02

01/08/03 NA

Ty[39%],Mary

12/17/02

01/15/03 NA

Ty[39%],Mary[14%]

12/18/02

01/22/03 NA

Ty[2%],Mary[2%]

12/24/02

03/28/03 NA

Ty[26%],Mary[31%]

01/06/03

03/19/03 NA

Ty[26%],Mary[31%]

03/28/03

03/28/03 NA

Ty[13%],Mary[26%]

03/31/03

03/28/03 NA

Mary[19%],Ty[7%]

07/15/03

03/14/03 NA

Mary[9%],Ty[17%]

07/15/03

12/27/02 NA

Carol[26%]

11/05/02

03/14/03 NA

Vance[12%]

02/26/03

04/11/03 NA

03/25/03

03/31/03 NA

Vance[26%]

03/25/03

12/13/02 NA

Vance[13%]

04/25/03

12/23/02 NA

05/22/03

12/23/02 NA

Vance[26%]

05/22/03

12/24/02 NA

David,Sushit[4%],Amar[4%],John[4%],Bill[4%],Witter[2%]

07/15/03

12/23/02 NA

Witter[32%]

09/06/02

12/23/02 NA

Witter[25%]

09/20/02

12/09/02 NA

Witter[20%]

10/03/02

12/23/02 NA

Witter[43%]

10/21/02

12/24/02 NA

Witter[57%]

10/23/02

12/23/02 NA

Witter[32%]

11/18/02

12/24/02 NA

Witter[52%]

11/18/02

01/22/03 NA

Witter[5%]

11/22/02

01/22/03 NA

Witter[52%]

11/22/02

01/30/03 NA

Witter[42%]

12/03/02

01/30/03 NA

Witter[65%]

12/05/02

01/27/03 NA

Witter[18%]

12/06/02

01/10/03 NA

Witter[16%]

11/22/02

01/17/03 NA

Witter[17%]

12/10/02

01/24/03 NA

Witter[22%]

12/17/02

01/24/03 NA

Witter[103%]

12/13/02

01/31/03 NA

Witter[81%]

12/24/02

01/24/03 NA

Witter[5%]

01/01/03

01/30/03 NA

NA

02/05/03 NA

NA
Witter[52%]

NA

NA

05/14/03

04/11/03 NA

05/26/03

03/28/03 NA

07/19/02

03/28/03 NA

07/30/02

03/28/03 NA

09/10/02

02/14/03 NA

07/25/02

02/14/03 NA

07/30/02

03/04/03 NA

08/01/02

03/04/03 NA

08/02/02

03/10/03 NA

09/10/02

03/10/03 NA

09/10/02

03/17/03 NA

09/10/02

03/17/03 NA

08/05/02

03/20/03 NA

07/29/02

03/20/03 NA

09/06/02

03/26/03 NA

10/21/02

03/26/03 NA

07/29/02

02/12/03 NA

10/28/02

02/12/03 NA

10/28/02

02/26/03 NA

07/16/02

02/26/03 NA

06/13/02

03/12/03 NA

07/16/02

03/12/03 NA

06/13/02

03/25/03 NA

10/28/02

03/25/03 NA

06/13/02

03/28/03 NA

07/19/02

03/28/03 NA

08/14/02 NA

NA

10/21/02

03/28/03 NA

05/21/02

04/01/03 NA

11/04/02

03/31/03 NA

12/05/02

04/01/03 NA

11/22/02

06/20/03 NA

12/24/02

02/19/03 NA

11/11/02

03/13/03 NA

10/25/02

04/25/03 NA

11/04/02

04/30/03 NA

12/30/02

05/07/03 NA

11/04/02 NA

NA

11/18/02 NA
11/01/02 NA

NA
NA

11/04/02

06/20/03 NA

10/21/02

02/20/03 NA

01/03/03

04/25/03 NA

12/19/02

05/30/03 NA

11/18/02

06/13/03 NA

12/20/02

06/20/03 NA

02/03/03

07/08/03 NA

01/20/03

04/14/03 NA

11/12/02

04/21/03 NA

12/23/02

04/30/03 NA

03/28/03

06/04/03 NA

10/28/02

06/11/03 NA

02/24/03

06/24/03 NA

NA

07/01/03 NA
03/05/03

07/08/03 NA

10/28/02

05/09/03 NA

11/13/02

05/22/03 NA

12/31/02

05/29/03 NA

01/06/03

08/11/03 NA

01/06/03

06/11/03 NA

10/28/02

06/24/03 NA

11/04/02

07/15/03 NA

04/21/03

06/24/03 NA

05/06/02

08/11/03 NA

04/07/03

08/11/03 NA

NA

08/18/03 NA
10/28/02

07/16/03 NA

05/30/03

07/17/03 NA

05/06/02

08/05/03 NA

11/05/02

08/11/03 NA

05/06/02

08/18/03 NA

01/06/03

08/18/03 NA
NA
NA

Proj. 1234 Schedule Maintenance Procedure


Project Planner will be responsible to keep Project Schedule updated with current status of tasks. Following procedure will be
followed by all resource leads and the project planner. This procedure is intended to ensure that schedule with latest status is
available to team members during weekly team meeting on Wednesday.
1

Schedule maintenance cycle time will be of one week i.e. schedule maintenance tasks will happen on predetermined days and times.

On every Monday between 2:30PM to 3:30PM, planner will send an email to team resource leads (henceforth called as leads). This email will
have two attached files as described bellow..
File 1: An Excel file (henceforth to be refered as 'Status Excel' ) will have as many worksheet tabs as the number of leads. These worksheet
tabs will have lead's name mentioned on it and will contain lists of tasks assigned to leads. Tasks included in each tab are the tasks for which
current status is needed.
Link to see Sample of Status Excel format. This sample contains only one tab.
File 2: A .pdf file (henceforth to be refered as 'Schedule Status') and will contain schedule status to be used for reference by leads.
Link to see Sample of Schedule Status format. Though the format shown is in excel, actual file will be in pdf format.
Leads may save attachments (xls and pdf files) in a folder on their workstation's hard disk (C: or D:).

The .xls file has several worksheet tabs having leads' name mentioned on these tabs. Please locate the named tab and open it. It will contain all
tasks assigned to named lead. Pdf file contains Complete Schedule Status with tasks status as first column.
Link to see tasks status definitions (Defs tab)

Task Status inputs are expected for all WIP tasks (tasks under execution), tasks that should have started by now but not started, and tasks that
are going to start during next week. In the tasks list, tasks with yellow background color mean that status inputs are expected for these tasks.
For other tasks, status inputs are not expected at that moment and should be ignored but not deleted from the list.

Tasks status inputs should be provided by overwriting any cell with RED foreground color. It will help planner to identify the changes made by by
leads. Otherwise, to identify changes, Planner has to compare whole worksheet with MS schedule file and this is not practical. Therefore, for
updating inputs onto MS Schedule file, Planner will need that all changes are made with RED color.

Changes may include start and end dates, work / duration estimates, and % work completed. However, the most important change is % work
completion (%WC). If changes relate to start or end date, dependencies must be carefully studied for possible impacts on other tasks' start and
end dates.

A task will be treated as started when value of %WC becomes more than 0. Sometimes it happens that the task is started but leads forget to
give this input. If leads do not know the exact amount of work done since the task is started and till the time of updating inputs in the excel,
please assume a 5% figure. As soon as the %WC cell becomes more than 0, tasks is assumed to be started.

When ready with tasks status update inputs, please open the .xls file and update tasks status & save the changes on to the same file i.e. please
do not change the file name. If backup is needed , create a separate subfolder for this purpose.

Mail this Excel as an attachment to planner on or before 2:30 PM on Tuesday. If planner does not receive reply mail with attached excel, leads
will be reminded by 2:40PM on Tuesday.

10

After mailing this excel, please deletion or retaining the excel file depend upon leads' needs. It is suggested that lead may retain it till next week
i.e. Leads will have two excels at any time - one the most current one and other the previous one.

11

Generally, planner will collect all these mails into a mail subfolder. On Tuesday, 3:30 PM, planner will save all these excels into a folder on D:
drive. Then planner will copy MS Project file from N: drive to local workstation and rename it reflecting Tuesday's date. Next planner will open
these excels one by one and make changes to MS Project file that has just copied from N: drive. After finishing this update exercise, planner will
again copy this MS Project File to N: drive. In between, planner takes care of all backup requirements if any.

12

This is the way the whole operations of collecting inputs from project team leads and updating to MS Project file will happen.

Proj. 1234 Weekly Tasks Plan


Day of Week Task Name
Monday
1) Extract Tasks assigned to each lead resource and put these extracted tasks into an excel.
2) Create Schedule Status Reports in pdf format.
3) Send this excel and pdf file to lead resources for getting schedule status update inputs (to be received by 2:30 PM on Tuesday).
Tueday

1) Copy files of 'Current Status' folder on N: drive to 'Previous Status' folder on N: drive.
2) Update schedule status in "Current Status" folder. Resolve conflicts arising during updating schedule.
3) Identify status of tasks and update this status on MS schedule file. Definition of tasks status is given in sheet with tab as "Defs"
4) Create Schedule Status report in pdf format and save it to N: drive.
5) Analyze Schedule status and note down problems ahead for executing schedule.
6) Send schedule status reports in pdf format and analysis commnets to lead resources and project manager
schedule.
7) Prepare for Wednesday's meeting.

Wednesday

1) Attend Project meeting and do briefing to core team on Schedule Status.


Take notes of feedback on Schedule Status given by core team.
2) Project Planning Work

Thursday

1) Project Planning Work

Friday

1) Project Planning Work

Proj. 1234 Schedule Tasks Status definitions


Status Code
(blank)
(scheduled for future

SOF
(Sliped on Finish)

SOS
(Sliped on Start)

SNW
(Start Next week)

Status Description

Status definitions
Tasks that are schedule to Tasks which are scheduled to start in future. These tasks will have %work-completion as 0%. This is the
start in future.
default and initial value for status of any task.
WIP Tasks scheduled to
complete this week but
not completed:

Tasks having %work-completion less than 100% and schedule completion date less than or equal to this
Wednesday's Date.
This status gives warning signal to lead resource to remove all bottlenecks for immediately finishing these
tasks. If a task with this status is on critical path and is a critical task, there is already impact on schedule
finish date and lead resource should ensure that the impact is minimum.

Tasks scheduled to start


upto this week but not
started:

Tasks having %work-completed as 0% and schedule start date is less than or equal to this Wednesday's
date.
This status is a warning signal to lead resource to remove all bottlenecks for immediately starting these tasks.
If a task with this status is on critical path and is a critical task, lead resource should ensure that the impact
on schedule finish date is minimum. There is all possibility that now task duration is to be reduced either by
increasing resources or by extra working or by some other means.

Tasks that are scheduled Tasks having %work-completed as 0% and schedule start date is during next week (this Thursday to next
to start during next week: Wednesday).
This status will give a reminder to lead resource for ensuring that these tasks are start next week.

FNW
(Finish Next Week)

Tasks that are scheduled


to complete during next
week:

Tasks having %work-completed as greater than 0% and planed completion date is during next week (this
Thursday to next Wednesday).
This status will give a reminder to lead resource for ensuring that these tasks are completed next week.

TIF
(Task is Finished)

Tasks that are finished

Tasks having %work-completed as 100% will have this status. Also if a task is abondoned before its
completion (I.e. during execution) , it will be marked as 100% complete and task status as TIF.

Schedule Status 8-20-01


Last Updated Mon 8/20/01
Lead

Code

Task Name

Project Schedule Status

Project Manager:

Gantt Chart

%WC

Project Planner:
Work

Duration

Start date

Finish date Predecessor

Resources

Proj. 1234 Project Planner Role


Area

Tasks

Remarks

Organize & co-facilitate Impact Analysis - Pre- Project Planning


planning sessions:
Project Charter
Project Plan
Work Breakdown Structure
Estimating Workbook

MS Project / WBS tool


? Excel

Network Diagram
Schedule Development

MS Project Schedule

Facilitating Processes
Re-planning efforts
Earned Value:

Develop procedures for utilizing Earned Value


Track project using Earned Value procedures
Present Earned Value statistics to appropriate parties

? EVA excel
?
?

Develop procedures for Project schedules tasks status


updating
Allocations and Authorizations in Plan View
Gather actuals start, Finish and worked hours for tasks
Analyze, update, and
tract schedule:

People Allocation
Requests

Collecting Tasks status from leads and updating it on


schedule
Analyzing Critical Path, Slipped Tasks, Finish dates impacts

MS Project Schedule

etc
Actuals (taken from resource tracking tool into schedule
tool)
Submit PARs
Track PARs for allocations

Team allocations
/Authorizations

Monitor resource tracking tool for over allocations

Resource Forecasting

Help in determining resources, tasks, hours, dates, and


numbers for future phases
Lead role for schedule and related issues

Status Meetings
Prepare Reports

Excel

PlanView
MS project resourse usage

Update allocations as necessary

The schedule tool


The resource tracking pool
Executive Summary

R_DT_CD1 Actual and Remaining Hours


R_TR_001 Resourse Planned v/s Actual work
Word doc

Proj. 1234 Earned Value Analysis


EVA Start date:

07/01/01

EVA End date:

5/31/2001

Period:

Monthly

7000
6000

Value s

5000
4000
3000
2000
1000
0
Jul-01

Aug-01

Sep-01

Oct-01

Nov-01

Dec-01

Budgeted Hours

Jan-02

Feb-02

Mar-02

Date
Jul-01
Aug-01
Sep-01
Oct-01
Nov-01
Dec-01
Jan-02
Feb-02
Mar-02
Apr-02
May-02
Jun-02
Jul-02
Aug-02
Sep-02
Oct-02
Nov-02

BCWS
110
373
605
962
1368
1730
2193
2695
4093
5314
5960
6554
7386
8237
8904
9666
10101

BCWP
105
335
644
994
1393
1704
1809
2288
2467
0
0
0
0
0
0
0
0

ACWP
115
437
742
1135
1533
1846.65
2377.65
2912.95
3028.05
0
197.25
447.5
924.25
1500.75
2183.25
2899.25
3692.5

SV
CV
-5
-10
-38
-102
39
-98
32
-141
25
-140
-26 -142.65
-384 -568.65
-407 -624.95
-1626 -561.05
0
0
-5960 -197.25
-6554
-447.5
-7386 -924.25
-8237 -1500.75
-8904 -2183.25
-9666 -2899.25
-10101 -3692.5

May-02

Earned Hours

Actual Hours

Cummulative
Till

Apr-02

For the period


SPI
0.95
0.90
1.06
1.03
1.02
0.98
0.82
0.85
0.60
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

CPI
0.91
0.77
0.87
0.88
0.91
0.92
0.76
0.79
0.81
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

BCWS
110
263
232
357
406
362
463
502
1398
1221
646
594
832
851
667
762
435

BCWP
105
230
309
350
399
311
105
479
179
0
0
0
0
0
0
0
0

ACWP
115
322
305
393
398
314
531
535
115
0
197
250
477
577
683
716
793

SV
-5
-33
77
-7
-7
-51
-358
-23
-1219
0
-646
-594
-832
-851
-667
-762
-435

CV
-10
-92
4
-43
1
-2.65
-426
-56.3
63.9
0
-197.25
-250.25
-476.75
-576.5
-682.5
-716
-793.25

SPI
0.95
0.87
1.33
0.98
0.98
0.86
0.23
0.95
0.13
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

CPI
0.91
0.71
1.01
0.89
1.00
0.99
0.20
0.89
1.56
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Dec-02
Jan-03
Feb-03

10404
10811
10893

0
0
0

4619.25
5565.9
6364.75

-10404 -4619.25
-10811 -5565.9
-10893 -6364.75

0.00
0.00
0.00

0.00
0.00
0.00

303
407
82

0
0
0

927
947
799

-303
-407
-82

-926.75
-946.65
-798.85

0.00
0.00
0.00

0.00
0.00
0.00

Proj. 1234 Macros Index


MacroName

What the macro does?

Import Tasks Status Info from


MS Project file

This macro imports tasks status information in required format from Microsoft
Project .mpp file. This process needs defining a MAP in MS Project.
The extracted information includes Lead name, Task Code, Tasks name, % work
completed, Work Efforts in Hours, Duration in days, Task Start date, Task Finish
Date, % Duration completed, Successors, Baseline work, Earned Value,
Summary(Y/N), Indenting Level,Predecesors, and Resource names. This macro
does not do any thing further other than formating of few columns of sheet
[AllTasks].

Mannual method to import Tasks Also you can mannually import Tasks Status information from MS Project .mpp file
Status info from MS Project File to sheet [AllTasks] of this excel by copy and paste technique as described here in.
Mannual method is an alternate method.

Update Tasks Status Summary

This macro extracts following information from schedule tasks imported into this
excel.
1. Statistical information like total number of tasks, Number of finished tasks,
Number of WIP tasks, Number of tasks slipped on finish, Number of tasks slipped
on start, total schedule hours for all tasks etc.
2. For each resource lead, statistical information like number of assigned tasks,
number of WIP tasks, number of finished tasks, number of tasks slipped on finish,
number of tasks slipped on start, schedule estimated hours for assigned tasks,
earned hours for completed work, cost performance index-CPI (earned/actual)
3. Extracts list of tasks that are due on finish / start as on now or one week from
now.

UpdMonthlyActualHours

This macro performs following functions:


1. Reads PlanView report R_DT_CD1 and insert resourcewise actual hours in a
new column in sheet "ActHist".
2. Updates total actual hours for the project for the processing month in Sheet
"EVA". This figure is required for Earned Value Analysis.

UpdWeeklyRemandActualHours
UpdResEVA

Instructions to use the macro


How to create a MAP. To create a MAP, open Microsoft schedule file. Select "Save
as" from file menu of microsoft project. Then select "Microsoft Excel" as file type to
save. Next it will display a list of existing MAPs to select from. If the required MAP is
not in this list, click on "New" button to create new MAP. It will open form for creating
new MAP. Complete it and Save the form. MAP should contain columns of information
as per tab "AllTasks" of this excel. Sequence and format of columns of MAP should be
identical to sequence and format of columns of tab "AllTasks".

- Open Microsoft schedule file in Gantt Chart view. Insert or hide columns to match
sequence and contents of columns of tab "AllTasks" of the excel. Once you have
created the desired view, copy all the rows into buffer by selecting and pressing
Ctrl+C.
- Go to excel on tab "AllTasks" and position cursor on cell "A3" and press Ctrl+V to
paste the buffer content.
- Inspect if pasting has been done correctly.
This macro is run mostly once a week to generates information going into Weekly
Project Status Report.
1. Create a view of MS Project schedule - Gantt Chart containing columns as Lead
Resourse, Task Code, Tasks Name, % work completed, Work hours, Duration, Start
Date, Finish date, %duration completion, predecesors, resource names.
2. Copy this information for all tasks from MS Project to "AllTasks" tab of this excel by
simple cut paste.
3. On successful completion of step 2., Run the macro.
4. After running of macro is over, visually inspect the following sheets for desired
results:
- StatSum for point 1 of purpose
- TasksSum for point 3 of purpose
- DueTasks for point 2 of pupose

This macro is run only once a month. Do following in steps.


1. Generate report R_DT_CD1 for desired period by spefifying the period in
Parameters of report menu of PlanView and export this report into excel file.
2. Open this generated excel file and cut - paste this sheet content onto sheet
"RDTCD1" of Project Tracking template excel.
3. Run the macro. Go to sheet "ActHist" and varify that a new column is inserted and
actual hours updated. Also varify the update in sheet "EVA" .

Proj. 1234
1

2
3
4

10

Mail SubJect
Mail Message
Text

Steps to follow for using this excel by Project Planners.


Following are steps that a planner should understand for using this excel.
Copy or Save the excel in a folder where mirosoft schedule .mpp file is also kept. However, you will learn it later
that excel and .mpp files can be kept in different folders. After saving the excel, open it. While opening the excel,
enable the macros.
Click on tab "TabsIndex" and enter Release no in "R0nnnn - " format in cell "A1" and as-on-date in cell "D1".
Click on Tab "AllTasks". Take a print of this sheet. Read the column information and sequence carefully.
Open Microsoft schedule file. Create a MAP containing columns of information as per tab "AllTasks" of this
excel. Sequence and format of columns of MAP should be identical to sequence and format of columns of tab
"AllTasks". To create new MAP, select "Save as" from file menu of microsoft project. Select "Microsoft Excel" as
file type to save. Next it will display a list of existing MAPs to select from. If the required MAP is not in this list,
click on "New" button to create new MAP. It will open form for creating new MAP. Complete it and Save the form.
Once the MAP is ready, you can run the macro to import information into tab "AllTasks" from mirosoft schedule.
Step 4 is required only when you opt for importing "AllTasks" information from microsoft schedule using excel
macro. However, you can import this information by copy and paste technique as described here in.
- Open Microsoft schedule file in Gantt Chart view. Insert or hide columns to match sequence and contents of
columns of tab "AllTasks" of the excel. Once you have created the desired view, copy all the rows into buffer by
selecting and pressing Ctrl+C.
- Go to excel on tab "AllTasks" and position cursor on cell "A3" and press Ctrl+V to paste the buffer content.
- Inspect if pasting has been done correctly.
Send this excel to all team members by using appropriate macro. Excel is sent to resources having "ActiveStatu"
as 1 or 2. However, you can send the excel directly through outlook mannully. Following is a sample message
text for the mail sending mails mannually.
Project Status Report - Status as on mm/dd/yyyy.
Attached is an excel for collecting tasks status updates from resource leads. This excel contains macros.
Please disable the macros while opening the excel.
Please open the excel, click on tab having your name on it, make the updates, save, and send it back to me.
In case the task is not started and the schedule start date is already passed, please revise the start date.
Similarly for cases where the task is started but not finished and the finish date is already passed, you should
revise the finish date.
You have to pay attention to tasks that are due. For easy identification, these tasks are shown with yellow
background color. If you do not have any due tasks, you may not respond to this mail. However, you may always
make and send the changes even though those tasks may be executed in future. Please refer to [ReadMe] tab
in excel for useful information.
This mail has been sent to resource leads who have some tasks assigned to them.
Please feel free to ask questions or clarifications.
Ashok kumar

Proj. 1234 Auto Necho - Auto Apps Efficiency Status Tracking


Tab Name

06/10/03

Tab Description

RDTCD1
RDTCD1MM
RTR001
PDTA10
AllTasks
Team
MileStones
StatSum
DueTasks

R_DT_CD1 PlanView Report (Cummulative used hours)


R_DT_CD1 PlanView Report (Monthly used hours)
R_TR_001 PlanView Report (Res x Work Entity wise Used & Remaining hrs)
P_DT_A10 PalnView Report (Work Entity x Resource x Monthly used hours)
Import information of all tasks from Microsoft Shedule (.mpp file)
Resource Status information
Major MileStones Status Tracking
Schedule Tasks Status Summary

UnFinished
PARTrns
AllocStat
PAREFC
TaskSum
Sch_PV
EVAProject
ResEVA
AuditTrail
WEResAllocPlan
ReWEHrs
WEResHrs
ActHist
ActHrs
RemHrs
WRMHrs
Scratch
PTE

UnFinished Tasks Status(Useful during project end phase)


PARs submitted Transactions
Resources Allocation Status
PAR hours extenstion Forecasting
Leadwise Tasks Statistical Summary
Resourcewise schedule hours v/s PV allocation hours variance
Earned Value Analysis Project Level Sheet, (EVA Setup sheet is adjesent ot it)
Resourcewise Earned Value Analysis
Track Tasks Status Changes
PlanView Work Entity x Resources Allocated Hours Plan
Resource x Work Entity wise Allocation, Used and Remaining hours
PlanView Work Entity x Resources Schedule, Plan, Used & Rem Hours
Resource x Period wise actual used hours history
Work Entity x Resource wise total actual used hours
Work Entity x Resource wise remaining hours
Work Entity x Resource x Monthly used hours
Sheet for temporary work - used as scratch pad
Time Estimation for Team meetings, Planner's Tasks

Tasks that are due to finish / start by now or one week from now

ResUses
SMP
WTP
Defs
SchStatus
Role
Marocs

Resourcewise Tasks Usage view of Microsoft Project


Schedule Maintenance Procedure
Weekly Task Plan for Project Planner
Schedule Tasks Status definitions
Schedule Status Template
Project Planner's Role
Information about macros used in this excel
Mail this excel to team