HydroStructure
ChinaTCC
No.
ItemNumber
Building
andstructuredescription
EarthWork
T15R17BQ
unit
total
Fieldlevelling
m2
51235
Excavation
m3
169554.85
itemname
Transportationofsoil(Distanceisnotmorethan1Km)
62137.5
m3
65011.46
Backfill
m3
27360.7
Mechanicalrollercompactedsoil
m3
45120
100mmthicknesssiltsand
15960
100mmthicknesssiltsoil
m3
15960
500mmgranularcrushedstone
m3
19600
stonewithbigsize
66640
stonewillsmallersize
m3
31825
1mmthicknessHDPEmembrane
m2
159600
Dambodywork
500g/m2geotextiles
13300
C15leanconcrete
m3
766
granularcrushedstone
m3
79800
Slopeprotectionwithgrass
T15R17BQofHydroStructure/hydrostructure
1/4
3800
PakistanSiddiqsons350MWCoalfiredPowerPlant
HydroStructure
ChinaTCC
No.
T15R17BQ
unit
total
WindScreen,4mheight
m2
6400
Stoneandgravelmixturerreplacement
m3
18181.5
Soilgroundimprovementforashpond
m2
159600
itemname
ItemNumber
Subground
work
Soilgroundimprovementforbuilding
1199.25
m3
300
Crushedstonefoundationbed
m3
780
Concretefoundationbed
m3
538.994
C20concrete(HPC)foundationbed
m3
39.2
CastinSiteR.C.isolatedFoundation
m3
168
CastinSiteR.C.EquipmentFoundation
m3
444.451
AdhesivebitumenprimerCoatingforUndergroundFoundation
m2
9311.42
BitumenCoatingforUndergroundFoundation
m2
83806.96
Retainingwallunderground
m3
2355
Paving
m2
250
CastinSiteRectangleColumn
m3
42
CastinSiteGroundBeam,GroundRingBeam
m3
24.096
CastinSiteRectangleBeam
m3
23.7
CastinSiteSlab(withbeam)
m3
68.568
CastinSiteR.C.Pond
m3
foundationwork
T15R17BQofHydroStructure/hydrostructure
2/4
PakistanSiddiqsons350MWCoalfiredPowerPlant
HydroStructure
ChinaTCC
No.
T15R17BQ
unit
total
CastinSiteR.C.SmallComponents
m3
Pecastconcreteboxculvert
m3
11880
Roundprecastconcretewaterintakingstructure
m3
587.808
Roundprecastconcretewaterintakingcoverplate
m3
88.3125
BottomslabofCastinSiteR.C.Pond
m3
1499.7663
WallofCastinSiteR.C.Pond
m3
3263.716
TopslabofCastinSiteR.C.Pond
m3
66.98
Bolt
1.2
EmbededSteelMember
20.9
SteelColumnProductionandInstallation
37
CranebeamProductionandInstallationlessthan5t
HShapeSteelBeamProductionandInstallationlessthan3t
28.5
itemname
ItemNumber
precast
concretestructure
engineering
Special
StructureWorkk
SteelIron
Work
SteelStructure
Work
T15R17BQofHydroStructure/hydrostructure
3/4
PakistanSiddiqsons350MWCoalfiredPowerPlant
HydroStructure
ChinaTCC
No.
10
T15R17BQ
unit
total
SteelRoofTrussProductionandInstallationlessthan3t
14.5
SteelBraceProductionandInstallation
SteelPlatformProductionandInstallation
1.5
HandrailProductionandInstallation
105.5
SteelStairProductionandInstallation
5.5
LadderProductionandInstallation
3.9
Steelgrating
m2
43
Bottomslabofditch
m3
Wallofditch
m3
Masonryditch
m3
1480
itemname
ItemNumber
Outdoorworks
Note:thisBQtableincludesthematerialquantityforashpond,breakwaterembankment,seawaterintake&
discharge,complexwaterpumpstation,sanitarywastertreatmentunit,oilywastewatertreatmentunit,reused
waterpumpstation,coalblackwatertreatmentunit.
T15R17BQofHydroStructure/hydrostructure
4/4