Example:
Building Name: Office building / Structure: RC construction /
Building scale: Multiple storey
(1) Design outdoor temperature/ humidty
Shanghai city
(2) Design room temperature/ humidity
Dry bulb
DB()
Humidity
RH(%)
Summer
24
50
Winter
22
50
8mx2m
6000
4.4
9000
N
8400
15000
(4) Construction condition:
Outside wall: Type V Conductivity factor K=2.95
7200
2100
4mx2m
Floor: 2
Ventilation equipment:
Total heat exchanger
Ventilation fan
System No. :1
Calculation time:
8:00-18:00, same as default, no need to change in this case.
Fresh air:
Summer30.0 m3/Hperson
Winter30.0 m3/Hperson
60.0
Infiltration:
Summer: 0.2 Times floor areaceiling Hm3/H
Winter: 0.2 Times floor areaceiling Hm3/H
Lighting:
Fluoscent lamp 30.0 W/ m2
Bulb
W/ m2
NE
SE S
SW
NW
OW length (m)
8.4
0.0
0.0
0.0 0.0
0.0
15.0
0.0
Height (m)
4.4
0.0
0.0
0.0 0.0
0.0
4.4
0.0
OG length (m)
4.0
0.0
0.0
0.0 0.0
0.0
8.0
0.0
Height (m)
2.0
0.0
0.0
0.0 0.0
0.0
2.0
0.0
IW length (m)
0.0
0.0
0.0
0.0
0.0
Height (m)
0.0
0.0
4.4
0.0
0.0
0.0
Neighbour Rm facing
outside air
Neighbour Rm is boiler
room
Neighbour
Rm
is
kitchen
Neighbour Rm not
facing outside air
Summary report
Display unit
Kcal/h, Kw
0.0 0.0
Printing items:
Cover
A/C system division table
Individual rooms peak load at different timing
Cover:
Title:
Submit to:
Designer:
Date: Month____ Day____ Year____
Printing report