Project no.:
Date:
Sheet No.:
1 of
Computed by:
Subject:
Checked by:
Building:
Parking
Approved by:
Ordinary group I
130
1500
Density (gpm/ft )
0.15
225
* For a 90 min operation of the fire pump the total flow from sprinklers is
Gal
76545 liters
*Adopting a flow of 225 gpm or 14.19 l/s for a sump pump means that:
1. All sprinklers are activated within 1500 ft2
2. The sump pump will remove all the water dishcarged instantaneously in 90 min
* If the total amount of 20250 gal are to be removed in 3 hours the pump flow rate would be
7.1
* If the total amount of 20250 gal are to be removed in 4 hours the pump flow rate would be
5.3
11.54
say
l/s
l/s
12
0.15
45
6.75
7.5 l/s
3.75 l/s
* Based on the above, three significant flow rate figures are simulated in the Table below
14
14
14
30
60
90
30
60
90
30
60
90
2300
2300
2300
2300
2300
2300
2300
2300
2300
76545
76545
76545
76545
76545
76545
76545
76545
76545
25200
50400
75600
12600
25200
37800
7200
14400
21600
6750
6750
6750
6750
6750
6750
6750
6750
6750
44595
19395
-5805
57195
44595
31995
62595
55395
48195
1.94
0.84
-0.25
2.49
1.94
1.39
2.72
2.41
2.10
Sheet No.:
2 of
Computed by:
Subject:
Checked by:
Building:
Parking
Approved by:
4 l/s
Selecting Duplex operation of the the sump pumps, the flow rate of each one to be selected is 2l/s
Thus when water reach a high level in the pit, the second pump operate and the total flow rate would be 4 l/s
V req=
Where:
T min Q
4
Vreq
is the required sump volume between the start level and stop level of the pump
Tmin
Tmin
600 seconds
Tmin
10 min
2 l/sec
Vreq
300 Liters
OR
0.3 m3
Vtot
Total sump volume between the start level and stop level of the pump
The constatnt height between the start up of two pumps (in meters)
n
H
S
Vtot
2
0.2 m
1 m2
0.5 m3
The Total Volume for the sump with 2 pumps with cyclic alternation
n
H
S
Vtot
2
0.2 m
1 m2
0.35 m3
Date:
Sheet No.:
3 of
Computed by:
Subject:
Checked by:
Building:
Parking
Approved by:
Static
5.0
5.0
130
3.0
50
2.3
Residual
1.0
Total Head
9.0
Safety
9.9
Pump head
10 m
Pump Flow
2 l/s
Notes:
1- In pumping stations do not use 2 1/2" on the discharge of waste, use 3" pipe