Item

1.00
1.01
1.02
1.03
2.00
2.01
02.01.01
02.01.02
02.01.03
2.02
2.03
2.04
2.05
02.05.01
02.05.02
02.05.03
2.06
3.00
3.01
3.02
3.03
3.04
3.05
3.06
3.07
4.00
4.01
4.02
4.03
4.04
4.05
4.06
4.07
4.08
4.09
4.10
4.11
4.12
4.13
4.14
4.15
4.16
4.17

Descripcin

OBRAS PRELIMINARES
MOVILIZACION Y DESMOVILIZACION DE EQUIPOS
TRAZO Y REPLANTEO
CARTEL DE OBRA 3.60 x 7.20
MOVIMIENTO DE TIERRAS
EXCAVACION PARA EXPLANACIONES
CORTE EN MATERIAL SUELTO
CORTE EN ROCA SUELTA
CORTE EN ROCA FIJA
PERFILADO, NIVELACION Y COMPACTACION DE SUBRASANTE EN ZONAS D
MEJORAMIENTO DE SUB RASANTE
LIMPIEZA DE TERRENO PARA RECIBIR RELLENO
TERRAPLEN
RELLENO CON MATERIAL PROPIO
RELLENO CON MATERIAL EXCEDENTE DE CORTE
RELLENO CON MATERIAL DE CANTERA (MATERIAL CONSIDERADO EN TRAN
REMOCION DE DERRUMBES (SOLO REFINE Y LIMPIEZA)
PAVIMENTO
SUB BASE GRANULAR
BASE GRANULAR
IMPRIMACION BITUMINOSA
CARPETA ASFALTICA EN CALIENTE (e=0.075 m.)
ASFALTO DILUIDO MC-30
CEMENTO ASFALTICO PEN 120 -150
ADITIVO MEJORADOR DE ADHERENCIA
OBRAS DE ARTE Y DRENAJE
EXCAVACION PARA ESTRUCTURAS
EXCAVACION PARA ESTRUCTURAS BAJO AGUA
DEMOLICION DE CONCRETO CICLOPEO
DEMOLICION DE MAMPOSTERIA DE PIEDRA
ENCOFRADO Y DESENCOFRADO
ENCOFRADO Y DESENCOFRADO CARA VISTA
ENCOFRADO Y DESENCOFRADO BAJO AGUA
ACERO DE REFUERZO FY=4,200 KG/CM2
CONCRETO CICLOPEO f'c = 175 KG/CM2 + 30 % PIEDRA MEDIANA
CONCRETO SIMPLE f'c = 100 KG/CM2
CONCRETO SIMPLE f'c = 210 KG/CM2 EN SECO
CONCRETO SIMPLE f'c = 210 KG/CM2 BAJO AGUA
CONCRETO SIMPLE f'c = 280 KG/CM2
RELLENO DE ESTRUCTURAS
ALCANTARILLA TMC 0 36"
ALCANTARILLA TMC 0 48"
ALCANTARILLA TMC 0 60"

4.18
4.19
4.20
4.21
4.22
4.23
4.24
4.25
4.26
4.27
4.28
4.29
4.3
4.31
4.32
4.33
4.34
4.35
4.36
4.37
4.38
5.00
5.01
5.02
5.03
5.04
5.05
5.06
6.00
6.01
6.02
6.03
06.03.01
06.03.02
06.03.03
6.04
6.05
6.06
6.07
6.08
6.09
7.00
7.01
7.02
8.00

ALIVIADERO DE EMBOQUILLADO DE PIEDRA (E=0.15 M)


CUNETAS TRIANGULARES REVESTIDAS 1.00X0.40
CUNETAS TRIANGULARES REVESTIDAS 0.75X0.35
CUNETAS TRIANGULARES REVESTIDAS 0.50X0.30
CUNETAS RECTANGULARES REVESTIDAS
ZANJAS REVESTIDAS
JUNTA PARA MUROS
FILTRO
MATERIAL IMPERMEABLE
GEOTEXTIL
DREN PVC D=3"
SUBDRENAJE
POLIESTILENO EXPANDIDO
BARANDAS METALICAS
BRUA ROMPE AGUA EN LOSA
ACABADO DE VEREDAS
JUNTA DE DILATACION EXPANDIBLES
APOYO DE NEOPRENO
TUBOS DE DRENAJE PVC D = 3" X 0.50 M.
FALSO PUENTE
LOSA DE APROXIMACION
TRANSPORTES
TRANSPORTE DE ESCOMBROS PARA D<=1.00 KM
TRANSPORTE DE ESCOMBROS PARA D>1.00 KM
TRANSPORTE DE MATERIALES GRANULARES PARA D<=1.00 KM
TRANSPORTE DE MATERIALES GRANULARES PARA D>1.00 KM
TRANSPORTE DE MEZCLA ASFALTICA PARA D<=1.00 KM
TRANSPORTE DE MEZCLA ASFALTICA PARA D>1.00 KM
SEALIZACION
SEAL PREVENTIVA (0.75 m. x 0.75 m.)
SEAL REGLAMENTARIA
SEAL INFORMATIVA
PANEL INFORMATIVO
ESTRUCTURA DE SOPORTE
CIMENTACION Y MONTAJE
POSTES KILOMETRICOS
DEMARCACION EN EL PAVIMENTO
GUARDAVIAS (Incluye Terminal)
POSTES DELINEADORES
TACHAS REFLECTIVAS BIDIRECCIONALES
PINTADO DE MUROS Y PARAPETOS
VARIOS
MANTENIMIENTO DE TRANSITO TEMPORAL Y SEGURIDAD VIAL
CONSTRUCCION DE PASE PROVISIONAL
MEDIO AMBIENTE

8.01
8.02
8.03
8.04
8.05
8.06
8.07
8.08
8.09
8.10
8.11

ACONDICIONAMIENTO DE DEPOSITOS DE MATERIAL EXCEDENTE


RESTAURACION DE AREA AFECTADA POR CAMPAMENTO
RESTAURACION DE CANTERAS
REVEGETALIZACION
RESTAURACION DE AREA AFECTADA POR PLANTA DE ASFALTO Y CHANCAD
RESTAURACION DE AREA AFECTADA POR PATIO DE MAQUINAS
SELLADO DE LETRINAS
PROGRAMA DE EDUCACION AMBIENTAL
PROGRAMA DE SEALIZACION AMBIENTAL
PROGRAMA DE CONTINGENCIAS
PROGRAMA DE SEGUIMIENTO Y VIGILANCIA
COSTO DIRECTO
UTILIDAD (10%)
GASTOS GENRALES (19.38%)
SUBTOTAL
IGV (19%)
PRSUPUESTO TOTAL

cripcin

SUBRASANTE EN ZONAS DE CORTE

L CONSIDERADO EN TRANSP.)
PIEZA)

PIEDRA MEDIANA

Und.

Metrado

GLB
KM
und

1.00
31.76
2.00

m3
m3
m3
m2
m3
m2

65,986.17
92,573.52
8,715.76
69,540.19
17,384.36
75,179.04

m3
m3
m3
m3

55,428.55
66,078.76
22,553.71
2,905.32

m3
m3
m2
m3
gln
gln
kg

53,128.45
49,316.77
240,667.14
17,511.09
72,200.00
638,629.41
24,172.00

m3
m3
m3
m3
m2
m2
m2
kg
m3
m3
m3
m3
m3
m3
m
m
m

14,755.92
1,423.33
98.00
3,448.44
6,462.80
1,513.36
475.11
89,713.11
1,325.05
64.42
484.43
789.56
115.66
8,958.89
1,010.20
296.50
94.90

0.15 M)
0
5
0

m2
m
m
m
m
m
m2
m3
m3
m2
m
m
m2
m
m
m
m
CM3
und
m
m

742.26
26,742.10
2,950.00
2,233.00
1,062.00
1,087.50
48.88
148.07
31.56
638.60
278.45
4,793.00
1.80
30.00
30.00
30.00
18.00
29,120.00
4.00
32.50
21.00

m3K
m3K
m3K
m3K
M3K
M3K

67,453.98
770,042.15
142,383.29
809,732.73
17,511.09
153,922.50

und
und

110.00
22.00

m2
m
und
und
m2
m
und
und
m2

20.53
106.60
11.00
31.00
8,822.22
440.00
361.00
261.00
157.80

GLB
m

1.00
60.00

A D<=1.00 KM
A D>1.00 KM
1.00 KM
00 KM

GURIDAD VIAL

IAL EXCEDENTE
MENTO

A DE ASFALTO Y CHANCADORA
DE MAQUINAS

m3
m2
m2
HA
m2
m2
und
mes
und
GLB
mes

74,972.94
1,500.00
30,000.00
10.00
15,000.00
4,000.00
15.00
15.00
15.00
1.00
15.00

Precio S/.
1,177,828.16
1,379.95
2,589.17

4.70
14.43
23.99
0.90
13.58
1.26
5.22
12.50
11.85
2.58
28.73
48.67
0.75
211.70
7.53
5.81
16.37
11.43
21.45
34.71
36.50
32.81
54.19
55.92
4.18
250.27
247.08
344.37
367.40
394.92
42.31
356.75
527.95
786.32

Parcial S/.
1,226,833.71
1,177,828.16
43,827.21
5,178.34
3,638,532.07
2,248,453.35
310,135.00
1,335,835.89
209,091.08
62,586.17
236,079.61
94,725.59
1,390,078.72
289,337.03
825,984.50
267,261.46
7,495.73
12,464,024.18
1,526,380.37
2,400,247.20
180,500.36
3,707,097.75
543,666.00
3,710,436.87
395,695.64
8,334,752.05
168,660.17
30,530.43
3,401.58
125,868.06
212,044.47
82,008.98
26,568.15
375,000.80
331,620.26
15,916.89
166,823.16
290,084.34
45,676.45
379,050.64
360,388.85
156,537.18
74,621.77

51.45
120.08
99.07
78.75
121.39
106.33
8.61
99.11
41.50
6.45
16.27
279.25
15.77
466.78
13.68
5.46
15.77
0.12
46.85
3,459.98
1,590.12
18.26
1.29
8.70
1.18
13.90
1.50
695.25
820.95
584.52
168.62
566.86
92.70
18.52
188.01
89.83
14.97
10.41
638,524.36
1,553.46

38,189.28
3,211,191.37
292,256.50
175,848.75
128,916.18
115,633.88
420.86
14,675.22
1,309.74
4,118.97
4,530.38
1,338,445.25
28.39
14,003.40
410.40
163.80
283.86
3,494.40
187.40
112,449.35
33,392.52
4,893,571.19
1,231,709.67
993,354.37
1,238,734.62
955,484.62
243,404.15
230,883.75
417,713.06
76,477.50
18,060.90
323,174.66
12,000.20
17,974.89
6,235.46
2,873.70
163,387.51
82,724.40
32,428.63
3,907.17
1,642.70
731,731.96
638,524.36
93,207.60
499,715.89

2.87
2.77
2.25
1,211.84
2.77
2.77
397.54
3,500.00
410.47
8,520.00
5,000.00

215,172.34
4,155.00
67,500.00
12,118.40
41,550.00
11,080.00
5,963.10
52,500.00
6,157.05
8,520.00
75,000.00
32,206,874.11
3,220,687.41
6,241,692.20
41,669,253.73
7,917,158.21
49,586,411.94

PARTIDAS

OBRAS PRELIMINARES
EXPLANACIONES
PAVIMENTO
OBRAS DE ARTE Y DRENAJE
SEALIZACIN
TRANSPORTE
MEDIO AMBIENTE
VARIOS

MESES
1

MESES
7
8
9

10

11

12

13

14

15

PARTIDAS
OBRAS PRELIMINARES
EXPLANACIONES

1
616,006.03
50.21%
191,501.69

PAVIMENTO
OBRAS DE ARTE Y DRENAJE
TRANSPORTE

174,770.40

SEALIZACIN
VARIOS

48,782.13

MEDIO AMBIENTE

62,464.49

COSTO DIRECTO
GASTOS GENERALES 19.38%
UTILIDAD 10%
SUB TOTAL
IGV
TOTALES
AVANCE DE OBRA POR MES (%)
AVANCE DE OBRA ACUMULADO (%)

1,093,524.73
211,956.42
109,352.47
1,414,833.62
268,818.39
1,683,652.01
3.40%
3.40%

2
21,913.61
1.79%
383,003.37

383,003.37

383,003.37

383,003.37

1,083,828.19

1,083,828.19

1,083,828.19

362,380.53

724,761.05

724,761.05

724,761.05

349,540.80

349,540.80

349,540.80

349,540.80

48,782.13

48,782.13

48,782.13

48,782.13

62,464.49

1,165,620.43
225,930.63
116,562.04
1,508,113.11
286,541.49
1,794,654.60
3.62%
7.01%

2,652,380.03
514,107.23
265,238.00
3,431,725.27
652,027.80
4,083,753.07
8.24%
15.25%

62,464.49

2,589,915.54
501,999.83
258,991.55
3,350,906.93
636,672.32
3,987,579.24
8.04%
23.29%

2,652,380.03
514,107.23
265,238.00
3,431,725.27
652,027.80
4,083,753.07
8.24%
31.53%

MESES
8

383,003.37

383,003.37

383,003.37

383,003.37

1,083,828.19

1,083,828.19

1,083,828.19

1,083,828.19

724,761.05

724,761.05

724,761.05

724,761.05

349,540.80

349,540.80

349,540.80

349,540.80

48,782.13

48,782.13

48,782.13

48,782.13

62,464.49

2,589,915.54
501,999.83
258,991.55
3,350,906.93
636,672.32
3,987,579.24
8.04%
39.57%

2,652,380.03
514,107.23
265,238.00
3,431,725.27
652,027.80
4,083,753.07
8.24%
47.80%

62,464.49

2,589,915.54
501,999.83
258,991.55
3,350,906.93
636,672.32
3,987,579.24
8.04%
55.85%

2,652,380.03
514,107.23
265,238.00
3,431,725.27
652,027.80
4,083,753.07
8.24%
64.08%

10

11

12

13

383,003.37
1,083,828.19

1,083,828.19

1,083,828.19

1,083,828.19

724,761.05

724,761.05

724,761.05

724,761.05

349,540.80

349,540.80

349,540.80

349,540.80
139,237.69

48,782.13

48,782.13

48,782.13

62,464.49

2,589,915.54
501,999.83
258,991.55
3,350,906.93
636,672.32
3,987,579.24
8.04%
72.12%

2,269,376.66
439,870.21
226,937.67
2,936,184.53
557,875.06
3,494,059.59
7.05%
79.17%

48,782.13
62,464.49

2,206,912.17
427,762.80
220,691.22
2,855,366.19
542,519.58
3,397,885.76
6.85%
86.02%

2,408,614.34
466,858.46
240,861.43
3,116,334.24
592,103.50
3,708,437.74
7.48%
93.50%

14

15
588,914.08 1,226,833.72
48.00%
3,638,532.02

541,914.10

###
8,334,752.08

349,540.80

174,770.40 4,893,571.20

139,237.69

139,237.69

417,713.07

48,782.13

48,782.13

731,731.95

62,464.49

499,715.92

1,079,474.71
209,233.12
107,947.47
1,396,655.30
265,364.51
1,662,019.81
3.35%
96.85%

1,014,168.78
###
196,574.96 6,242,614.84
101,416.88 3,220,687.38
1,312,160.62
###
249,310.52 7,917,333.53
1,561,471.14
###
3.15%
100.00%
100.00%

ITEM.

1.00
1.01
1.02
1.03
2.00
2.01
02.01.01
02.01.02
02.01.03
2.02
2.03
2.04
2.05
02.05.01
02.05.02
02.05.03
2.06
3.00
3.01
3.02
3.03
3.04
3.05
3.06
3.07
4.00
4.01
4.02
4.03
4.04
4.05
4.06
4.07
4.08
4.09
4.10
4.11
4.12
4.13

DESCRIPCION DE PARTIDA

OBRAS PRELIMINARES
MOVILIZACION Y DESMOVILIZACION DE EQUIPOS
TRAZO Y REPLANTEO
CARTEL DE OBRA 3.60 x 7.20
MOVIMIENTO DE TIERRAS
EXCAVACION PARA EXPLANACIONES
CORTE EN MATERIAL SUELTO
CORTE EN ROCA SUELTA
CORTE EN ROCA FIJA
PERFILADO, NIVELACION Y COMPACTACION DE SUBRASANTE EN ZONAS D
MEJORAMIENTO DE SUB RASANTE
LIMPIEZA DE TERRENO PARA RECIBIR RELLENO
TERRAPLEN
RELLENO CON MATERIAL PROPIO
RELLENO CON MATERIAL EXCEDENTE DE CORTE
RELLENO CON MATERIAL DE CANTERA (MATERIAL CONSIDERADO EN TRAN
REMOCION DE DERRUMBES (SOLO REFINE Y LIMPIEZA)
PAVIMENTO
SUB BASE GRANULAR
BASE GRANULAR
IMPRIMACION BITUMINOSA
CARPETA ASFALTICA EN CALIENTE (e=0.075 m.)
ASFALTO DILUIDO MC-30
CEMENTO ASFALTICO PEN 120 -150
ADITIVO MEJORADOR DE ADHERENCIA
OBRAS DE ARTE Y DRENAJE
EXCAVACION PARA ESTRUCTURAS
EXCAVACION PARA ESTRUCTURAS BAJO AGUA
DEMOLICION DE CONCRETO CICLOPEO
DEMOLICION DE MAMPOSTERIA DE PIEDRA
ENCOFRADO Y DESENCOFRADO
ENCOFRADO Y DESENCOFRADO CARA VISTA
ENCOFRADO Y DESENCOFRADO BAJO AGUA
ACERO DE REFUERZO FY=4,200 KG/CM2
CONCRETO CICLOPEO f'c = 175 KG/CM2 + 30 % PIEDRA MEDIANA
CONCRETO SIMPLE f'c = 100 KG/CM2
CONCRETO SIMPLE f'c = 210 KG/CM2 EN SECO
CONCRETO SIMPLE f'c = 210 KG/CM2 BAJO AGUA
CONCRETO SIMPLE f'c = 280 KG/CM2

4.14
4.15
4.16
4.17
4.18
4.19
4.20
4.21
4.22
4.23
4.24
4.25
4.26
4.27
4.28
4.29
4.3
4.31
4.32
4.33
4.34
4.35
4.36
4.37
4.38
5.00
5.01
5.02
5.03
5.04
5.05
5.06
6.00
6.01
6.02
6.03
06.03.01
06.03.02
06.03.03
6.04
6.05
6.06
6.07
6.08
6.09

RELLENO DE ESTRUCTURAS
ALCANTARILLA TMC 0 36"
ALCANTARILLA TMC 0 48"
ALCANTARILLA TMC 0 60"
ALIVIADERO DE EMBOQUILLADO DE PIEDRA (E=0.15 M)
CUNETAS TRIANGULARES REVESTIDAS 1.00X0.40
CUNETAS TRIANGULARES REVESTIDAS 0.75X0.35
CUNETAS TRIANGULARES REVESTIDAS 0.50X0.30
CUNETAS RECTANGULARES REVESTIDAS
ZANJAS REVESTIDAS
JUNTA PARA MUROS
FILTRO
MATERIAL IMPERMEABLE
GEOTEXTIL
DREN PVC D=3"
SUBDRENAJE
POLIESTILENO EXPANDIDO
BARANDAS METALICAS
BRUA ROMPE AGUA EN LOSA
ACABADO DE VEREDAS
JUNTA DE DILATACION EXPANDIBLES
APOYO DE NEOPRENO
TUBOS DE DRENAJE PVC D = 3" X 0.50 M.
FALSO PUENTE
LOSA DE APROXIMACION
TRANSPORTES
TRANSPORTE DE ESCOMBROS PARA D<=1.00 KM
TRANSPORTE DE ESCOMBROS PARA D>1.00 KM
TRANSPORTE DE MATERIALES GRANULARES PARA D<=1.00 KM
TRANSPORTE DE MATERIALES GRANULARES PARA D>1.00 KM
TRANSPORTE DE MEZCLA ASFALTICA PARA D<=1.00 KM
TRANSPORTE DE MEZCLA ASFALTICA PARA D>1.00 KM
SEALIZACION
SEAL PREVENTIVA (0.75 m. x 0.75 m.)
SEAL REGLAMENTARIA
SEAL INFORMATIVA
PANEL INFORMATIVO
ESTRUCTURA DE SOPORTE
CIMENTACION Y MONTAJE
POSTES KILOMETRICOS
DEMARCACION EN EL PAVIMENTO
GUARDAVIAS (Incluye Terminal)
POSTES DELINEADORES
TACHAS REFLECTIVAS BIDIRECCIONALES
PINTADO DE MUROS Y PARAPETOS

7.00
7.01
7.02
8.00
8.01
8.02
8.03
8.04
8.05
8.06
8.07
8.08
8.09
8.10
8.11

VARIOS
MANTENIMIENTO DE TRANSITO TEMPORAL Y SEGURIDAD VIAL
CONSTRUCCION DE PASE PROVISIONAL
MEDIO AMBIENTE
ACONDICIONAMIENTO DE DEPOSITOS DE MATERIAL EXCEDENTE
RESTAURACION DE AREA AFECTADA POR CAMPAMENTO
RESTAURACION DE CANTERAS
REVEGETALIZACION
RESTAURACION DE AREA AFECTADA POR PLANTA DE ASFALTO Y CHANCAD
RESTAURACION DE AREA AFECTADA POR PATIO DE MAQUINAS
SELLADO DE LETRINAS
PROGRAMA DE EDUCACION AMBIENTAL
PROGRAMA DE SEALIZACION AMBIENTAL
PROGRAMA DE CONTINGENCIAS
PROGRAMA DE SEGUIMIENTO Y VIGILANCIA
COSTO DIRECTO
UTILIDAD (10%)
GASTOS GENRALES (19.38%)
SUBTOTAL
IGV (19%)
PRSUPUESTO TOTAL

ON DE PARTIDA

UBRASANTE EN ZONAS DE CORTE

CONSIDERADO EN TRANSP.)
EZA)

IEDRA MEDIANA

UNIDAD

METRADO

GLB
KM
und

1.00
31.76
2.00

m3
m3
m3
m2
m3
m2

65,986.17
92,573.52
8,715.76
69,540.19
17,384.36
75,179.04

m3
m3
m3
m3

55,428.55
66,078.76
22,553.71
2,905.32

m3
m3
m2
m3
gln
gln
kg

53,128.45
49,316.77
240,667.14
17,511.09
72,200.00
638,629.41
24,172.00

m3
m3
m3
m3
m2
m2
m2
kg
m3
m3
m3
m3
m3

14,755.92
1,423.33
98.00
3,448.44
6,462.80
1,513.36
475.11
89,713.11
1,325.05
64.42
484.43
789.56
115.66

15 M)

D<=1.00 KM
D>1.00 KM
00 KM
KM

m3
m
m
m
m2
m
m
m
m
m
m2
m3
m3
m2
m
m
m2
m
m
m
m
CM3
und
m
m

8,958.89
1,010.20
296.50
94.90
742.26
26,742.10
2,950.00
2,233.00
1,062.00
1,087.50
48.88
148.07
31.56
638.60
278.45
4,793.00
1.80
30.00
30.00
30.00
18.00
29,120.00
4.00
32.50
21.00

m3K
m3K
m3K
m3K
M3K
M3K

67,453.98
770,042.15
142,383.29
809,732.73
17,511.09
153,922.50

und
und

110.00
22.00

m2
m
und
und
m2
m
und
und
m2

20.53
106.60
11.00
31.00
8,822.22
440.00
361.00
261.00
157.80

URIDAD VIAL

GLB
m

1.00
60.00

AL EXCEDENTE
ENTO

m3
m2
m2
HA
m2
m2
und
mes
und
GLB
mes

74,972.94
1,500.00
30,000.00
10.00
15,000.00
4,000.00
15.00
15.00
15.00
1.00
15.00

DE ASFALTO Y CHANCADORA
E MAQUINAS

PRIMER MES
PRECIO
S/.

PARCIAL
S/.

1,177,828.16
1,379.95
2,589.17

4.70
14.43
23.99
0.90
13.58
1.26
5.22
12.50
11.85
2.58
28.73
48.67
0.75
211.70
7.53
5.81
16.37
11.43
21.45
34.71
36.50
32.81
54.19
55.92
4.18
250.27
247.08
344.37
367.40
394.92

1,226,833.71
1,177,828.16
43,827.21
5,178.34
3,638,532.07
2,248,453.35
310,135.00
1,335,835.89
209,091.08
62,586.17
236,079.61
94,725.59
1,390,078.72
289,337.03
825,984.50
267,261.46
7,495.73
12,464,024.18
1,526,380.37
2,400,247.20
180,500.36
3,707,097.75
543,666.00
3,710,436.87
395,695.64
8,334,752.05
168,660.17
30,530.43
3,401.58
125,868.06
212,044.47
82,008.98
26,568.15
375,000.80
331,620.26
15,916.89
166,823.16
290,084.34
45,676.45

RENDIMIENTO

PROGRAMADO
METRADO

0.50
15.95
1.00

3,472.96
4,872.29
458.72
3,660.01
914.97
3,956.79
2,917.29
3,477.83
1,187.04
152.91

42.31
356.75
527.95
786.32
51.45
120.08
99.07
78.75
121.39
106.33
8.61
99.11
41.50
6.45
16.27
279.25
15.77
466.78
13.68
5.46
15.77
0.12
46.85
3,459.98
1,590.12
18.26
1.29
8.70
1.18
13.90
1.50
695.25
820.95
584.52
168.62
566.86
92.70
18.52
188.01
89.83
14.97
10.41

379,050.64
360,388.85
156,537.18
74,621.77
38,189.28
3,211,191.37
292,256.50
175,848.75
128,916.18
115,633.88
420.86
14,675.22
1,309.74
4,118.97
4,530.38
1,338,445.25
28.39
14,003.40
410.40
163.80
283.86
3,494.40
187.40
112,449.35
33,392.52
4,893,571.19
1,231,709.67
993,354.37
1,238,734.62
955,484.62
243,404.15
230,883.75
417,713.06
76,477.50
18,060.90
323,174.66
12,000.20
17,974.89
6,235.46
2,873.70
163,387.51
82,724.40
32,428.63
3,907.17
1,642.70

2,409.07
27,501.51
5,085.12
28,919.03
625.40
5,497.23

638,524.36
1,553.46
2.87
2.77
2.25
1,211.84
2.77
2.77
397.54
3,500.00
410.47
8,520.00
5,000.00

731,731.96
638,524.36
93,207.60
499,715.89
215,172.34
4,155.00
67,500.00
12,118.40
41,550.00
11,080.00
5,963.10
52,500.00
6,157.05
8,520.00
75,000.00
32,206,874.11
3,220,687.41
6,241,692.20
41,669,253.73
7,917,158.21
49,586,411.94

0.07
4.00
9,371.62
187.50
3,750.00
1.25
1,875.00
500.00
1.88
1.88
1.88
0.13
1.88

PRIMER MES

100.00%

PROGRAMADO
S/.

616,006.03
591,399.83
22,006.10
2,600.10
191,501.69
118,339.65
16,322.89
70,307.15
11,004.79
3,294.01
12,425.24
4,985.56
73,162.04
15,228.26
43,472.87
14,066.39
394.51

VALOR. ACUMUL. ANTERIOR


METRADO
S/.

VALORIZACION ACTUAL
METRADO

0.50
15.95
1.00

3,472.96
4,872.29
458.72
3,660.01
914.97
3,956.79
2,917.29
3,477.83
1,187.04
152.91

174,770.40
43,989.63
35,476.94
44,240.52
34,124.45
8,693.01
8,245.85

2,409.07
27,501.51
5,085.12
28,919.03
625.40
5,497.23

48,782.13
42,568.29
6,213.84
62,464.49
26,896.54
519.38
8,437.50
1,514.80
5,193.75
1,385.00
745.39
6,562.50
769.63
1,065.00
9,375.00
1,093,524.74
109,352.47
211,925.09
1,414,802.31
268,812.44
1,683,614.75

0.07
4.00
9,371.62
187.50
3,750.00
1.25
1,875.00
500.00
1.88
1.88
1.88
0.13
1.88

RIZACION ACTUAL
S/.

616,006.03
591,399.83
22,006.10
2,600.10
191,501.69
118,339.65
16,322.89
70,307.15
11,004.79
3,294.01
12,425.24
4,985.56
73,162.04
15,228.26
43,472.87
14,066.39
394.51

VALORIZACION ACUMULADO
METRADO
S/.

0.50
15.95
1.00

3,472.96
4,872.29
458.72
3,660.01
914.97
3,956.79
2,917.29
3,477.83
1,187.04
152.91

616,006.03
591,399.83
22,006.10
2,600.10
191,501.69
118,339.65
16,322.89
70,307.15
11,004.79
3,294.01
12,425.24
4,985.56
73,162.04
15,228.26
43,472.87
14,066.39
394.51

ACTUAL
%

SALDO POR VALORIZ


METRADO

50.21%
50.21%
50.21%

0.00
0.00
0.00

5.26%
5.26%
5.26%
5.26%
5.26%
5.26%

0.00
0.00
0.00
0.00
0.00
0.00

5.26%
5.26%
5.26%
5.26%

0.00
0.00
0.00
0.00

174,770.40
43,989.63
35,476.94
44,240.52
34,124.45
8,693.01
8,245.85

2,409.07
27,501.51
5,085.12
28,919.03
625.40
5,497.23

174,770.40
43,989.63
35,476.94
44,240.52
34,124.45
8,693.01
8,245.85

3.57%
3.57%
3.57%
3.57%
3.57%
3.57%

0.00
0.00
0.00
0.00
0.00
0.00

48,782.13
42,568.29
6,213.84
62,464.49
26,896.54
519.38
8,437.50
1,514.80
5,193.75
1,385.00
745.39
6,562.50
769.63
1,065.00
9,375.00
1,093,524.74
109,352.47
211,925.09

0.07
4.00
9,371.62
187.50
3,750.00
1.25
1,875.00
500.00
1.88
1.88
1.88
0.13
1.88

48,782.13
42,568.29
6,213.84
62,464.49
26,896.54
519.38
8,437.50
1,514.80
5,193.75
1,385.00
745.39
6,562.50
769.63
1,065.00
9,375.00
1,093,524.74
109,352.47
211,925.09

1,414,802.31
268,812.44

1,414,802.31
268,812.44

1,683,614.75

1,683,614.75

6.67%
6.67%

0.00
0.00

12.50%
12.50%
12.50%
12.50%
12.50%
12.50%
12.50%
12.50%
12.50%
12.50%
12.50%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

SALDO POR VALORIZAR


S/.

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

49.79%
49.79%
49.79%

94.74%
94.74%
94.74%
94.74%
94.74%
94.74%
94.74%
94.74%
94.74%
94.74%

0.00
0.00
0.00
0.00
0.00
0.00
0.00

96.43%
96.43%
96.43%
96.43%
96.43%
96.43%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

93.33%
93.33%
87.50%
87.50%
87.50%
87.50%
87.50%
87.50%
87.50%
87.50%
87.50%
87.50%
87.50%

ITEM.

1.00
1.01
1.02
1.03
2.00
2.01
02.01.01
02.01.02
02.01.03
2.02
2.03
2.04
2.05
02.05.01
02.05.02
02.05.03
2.06
3.00
3.01
3.02
3.03
3.04
3.05
3.06
3.07
4.00
4.01
4.02
4.03
4.04
4.05
4.06
4.07
4.08
4.09
4.10
4.11
4.12
4.13
4.14

DESCRIPCION DE PARTIDA

OBRAS PRELIMINARES
MOVILIZACION Y DESMOVILIZACION DE EQUIPOS
TRAZO Y REPLANTEO
CARTEL DE OBRA 3.60 x 7.20
MOVIMIENTO DE TIERRAS
EXCAVACION PARA EXPLANACIONES
CORTE EN MATERIAL SUELTO
CORTE EN ROCA SUELTA
CORTE EN ROCA FIJA
PERFILADO, NIVELACION Y COMPACTACION DE SUBRASANTE EN ZONAS D
MEJORAMIENTO DE SUB RASANTE
LIMPIEZA DE TERRENO PARA RECIBIR RELLENO
TERRAPLEN
RELLENO CON MATERIAL PROPIO
RELLENO CON MATERIAL EXCEDENTE DE CORTE
RELLENO CON MATERIAL DE CANTERA (MATERIAL CONSIDERADO EN TRAN
REMOCION DE DERRUMBES (SOLO REFINE Y LIMPIEZA)
PAVIMENTO
SUB BASE GRANULAR
BASE GRANULAR
IMPRIMACION BITUMINOSA
CARPETA ASFALTICA EN CALIENTE (e=0.075 m.)
ASFALTO DILUIDO MC-30
CEMENTO ASFALTICO PEN 120 -150
ADITIVO MEJORADOR DE ADHERENCIA
OBRAS DE ARTE Y DRENAJE
EXCAVACION PARA ESTRUCTURAS
EXCAVACION PARA ESTRUCTURAS BAJO AGUA
DEMOLICION DE CONCRETO CICLOPEO
DEMOLICION DE MAMPOSTERIA DE PIEDRA
ENCOFRADO Y DESENCOFRADO
ENCOFRADO Y DESENCOFRADO CARA VISTA
ENCOFRADO Y DESENCOFRADO BAJO AGUA
ACERO DE REFUERZO FY=4,200 KG/CM2
CONCRETO CICLOPEO f'c = 175 KG/CM2 + 30 % PIEDRA MEDIANA
CONCRETO SIMPLE f'c = 100 KG/CM2
CONCRETO SIMPLE f'c = 210 KG/CM2 EN SECO
CONCRETO SIMPLE f'c = 210 KG/CM2 BAJO AGUA
CONCRETO SIMPLE f'c = 280 KG/CM2
RELLENO DE ESTRUCTURAS

4.15
4.16
4.17
4.18
4.19
4.20
4.21
4.22
4.23
4.24
4.25
4.26
4.27
4.28
4.29
4.3
4.31
4.32
4.33
4.34
4.35
4.36
4.37
4.38
5.00
5.01
5.02
5.03
5.04
5.05
5.06
6.00
6.01
6.02
6.03
06.03.01
06.03.02
06.03.03
6.04
6.05
6.06
6.07
6.08
6.09
7.00

ALCANTARILLA TMC 0 36"


ALCANTARILLA TMC 0 48"
ALCANTARILLA TMC 0 60"
ALIVIADERO DE EMBOQUILLADO DE PIEDRA (E=0.15 M)
CUNETAS TRIANGULARES REVESTIDAS 1.00X0.40
CUNETAS TRIANGULARES REVESTIDAS 0.75X0.35
CUNETAS TRIANGULARES REVESTIDAS 0.50X0.30
CUNETAS RECTANGULARES REVESTIDAS
ZANJAS REVESTIDAS
JUNTA PARA MUROS
FILTRO
MATERIAL IMPERMEABLE
GEOTEXTIL
DREN PVC D=3"
SUBDRENAJE
POLIESTILENO EXPANDIDO
BARANDAS METALICAS
BRUA ROMPE AGUA EN LOSA
ACABADO DE VEREDAS
JUNTA DE DILATACION EXPANDIBLES
APOYO DE NEOPRENO
TUBOS DE DRENAJE PVC D = 3" X 0.50 M.
FALSO PUENTE
LOSA DE APROXIMACION
TRANSPORTES
TRANSPORTE DE ESCOMBROS PARA D<=1.00 KM
TRANSPORTE DE ESCOMBROS PARA D>1.00 KM
TRANSPORTE DE MATERIALES GRANULARES PARA D<=1.00 KM
TRANSPORTE DE MATERIALES GRANULARES PARA D>1.00 KM
TRANSPORTE DE MEZCLA ASFALTICA PARA D<=1.00 KM
TRANSPORTE DE MEZCLA ASFALTICA PARA D>1.00 KM
SEALIZACION
SEAL PREVENTIVA (0.75 m. x 0.75 m.)
SEAL REGLAMENTARIA
SEAL INFORMATIVA
PANEL INFORMATIVO
ESTRUCTURA DE SOPORTE
CIMENTACION Y MONTAJE
POSTES KILOMETRICOS
DEMARCACION EN EL PAVIMENTO
GUARDAVIAS (Incluye Terminal)
POSTES DELINEADORES
TACHAS REFLECTIVAS BIDIRECCIONALES
PINTADO DE MUROS Y PARAPETOS
VARIOS

7.01
7.02
8.00
8.01
8.02
8.03
8.04
8.05
8.06
8.07
8.08
8.09
8.10
8.11

MANTENIMIENTO DE TRANSITO TEMPORAL Y SEGURIDAD VIAL


CONSTRUCCION DE PASE PROVISIONAL
MEDIO AMBIENTE
ACONDICIONAMIENTO DE DEPOSITOS DE MATERIAL EXCEDENTE
RESTAURACION DE AREA AFECTADA POR CAMPAMENTO
RESTAURACION DE CANTERAS
REVEGETALIZACION
RESTAURACION DE AREA AFECTADA POR PLANTA DE ASFALTO Y CHANCAD
RESTAURACION DE AREA AFECTADA POR PATIO DE MAQUINAS
SELLADO DE LETRINAS
PROGRAMA DE EDUCACION AMBIENTAL
PROGRAMA DE SEALIZACION AMBIENTAL
PROGRAMA DE CONTINGENCIAS
PROGRAMA DE SEGUIMIENTO Y VIGILANCIA
COSTO DIRECTO
UTILIDAD (10%)
GASTOS GENRALES (19.38%)
SUBTOTAL
IGV (19%)
PRSUPUESTO TOTAL

ON DE PARTIDA

UBRASANTE EN ZONAS DE CORTE

CONSIDERADO EN TRANSP.)
EZA)

IEDRA MEDIANA

UNIDAD

METRADO

GLB
KM
und

1.00
31.76
2.00

m3
m3
m3
m2
m3
m2

65,986.17
92,573.52
8,715.76
69,540.19
17,384.36
75,179.04

m3
m3
m3
m3

55,428.55
66,078.76
22,553.71
2,905.32

m3
m3
m2
m3
gln
gln
kg

53,128.45
49,316.77
240,667.14
17,511.09
72,200.00
638,629.41
24,172.00

m3
m3
m3
m3
m2
m2
m2
kg
m3
m3
m3
m3
m3
m3

14,755.92
1,423.33
98.00
3,448.44
6,462.80
1,513.36
475.11
89,713.11
1,325.05
64.42
484.43
789.56
115.66
8,958.89

15 M)

D<=1.00 KM
D>1.00 KM
00 KM
KM

m
m
m
m2
m
m
m
m
m
m2
m3
m3
m2
m
m
m2
m
m
m
m
CM3
und
m
m

1,010.20
296.50
94.90
742.26
26,742.10
2,950.00
2,233.00
1,062.00
1,087.50
48.88
148.07
31.56
638.60
278.45
4,793.00
1.80
30.00
30.00
30.00
18.00
29,120.00
4.00
32.50
21.00

m3K
m3K
m3K
m3K
M3K
M3K

67,453.98
770,042.15
142,383.29
809,732.73
17,511.09
153,922.50

und
und

110.00
22.00

m2
m
und
und
m2
m
und
und
m2

20.53
106.60
11.00
31.00
8,822.22
440.00
361.00
261.00
157.80

URIDAD VIAL

GLB
m

1.00
60.00

AL EXCEDENTE
ENTO

m3
m2
m2
HA
m2
m2
und
mes
und
GLB
mes

74,972.94
1,500.00
30,000.00
10.00
15,000.00
4,000.00
15.00
15.00
15.00
1.00
15.00

DE ASFALTO Y CHANCADORA
E MAQUINAS

PRIMER MES
PRECIO
S/.

PARCIAL
S/.

1,177,828.16
1,379.95
2,589.17

4.70
14.43
23.99
0.90
13.58
1.26
5.22
12.50
11.85
2.58
28.73
48.67
0.75
211.70
7.53
5.81
16.37
11.43
21.45
34.71
36.50
32.81
54.19
55.92
4.18
250.27
247.08
344.37
367.40
394.92
42.31

1,226,833.71
1,177,828.16
43,827.21
5,178.34
3,638,532.07
2,248,453.35
310,135.00
1,335,835.89
209,091.08
62,586.17
236,079.61
94,725.59
1,390,078.72
289,337.03
825,984.50
267,261.46
7,495.73
12,464,024.18
1,526,380.37
2,400,247.20
180,500.36
3,707,097.75
543,666.00
3,710,436.87
395,695.64
8,334,752.05
168,660.17
30,530.43
3,401.58
125,868.06
212,044.47
82,008.98
26,568.15
375,000.80
331,620.26
15,916.89
166,823.16
290,084.34
45,676.45
379,050.64

RENDIMIENTO

PROGRAMADO
METRADO

0.02
0.57
0.04

6,945.91
9,744.58
917.45
7,320.02
1,829.93
7,913.58
5,834.58
6,955.66
2,374.07
305.82

641.56
61.88
4.26
149.93
280.99
65.80
20.66
3,900.57
57.61
2.80
21.06
34.33
5.03
389.52

356.75
527.95
786.32
51.45
120.08
99.07
78.75
121.39
106.33
8.61
99.11
41.50
6.45
16.27
279.25
15.77
466.78
13.68
5.46
15.77
0.12
46.85
3,459.98
1,590.12
18.26
1.29
8.70
1.18
13.90
1.50
695.25
820.95
584.52
168.62
566.86
92.70
18.52
188.01
89.83
14.97
10.41

360,388.85
156,537.18
74,621.77
38,189.28
3,211,191.37
292,256.50
175,848.75
128,916.18
115,633.88
420.86
14,675.22
1,309.74
4,118.97
4,530.38
1,338,445.25
28.39
14,003.40
410.40
163.80
283.86
3,494.40
187.40
112,449.35
33,392.52
4,893,571.19
1,231,709.67
993,354.37
1,238,734.62
955,484.62
243,404.15
230,883.75
417,713.06
76,477.50
18,060.90
323,174.66
12,000.20
17,974.89
6,235.46
2,873.70
163,387.51
82,724.40
32,428.63
3,907.17
1,642.70
731,731.96

43.92
12.89
4.13
32.27
1,162.70
128.26
97.09
46.17
47.28
2.13
6.44
1.37
27.77
12.11
208.39
0.08
1.30
1.30
1.30
0.78
1,266.09
0.17
1.41
0.91
4,818.14
55,003.01
10,170.24
57,838.05
1,250.79
10,994.46
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

638,524.36
1,553.46
2.87
2.77
2.25
1,211.84
2.77
2.77
397.54
3,500.00
410.47
8,520.00
5,000.00

638,524.36
93,207.60
499,715.89
215,172.34
4,155.00
67,500.00
12,118.40
41,550.00
11,080.00
5,963.10
52,500.00
6,157.05
8,520.00
75,000.00
32,206,874.11
3,220,687.41
6,241,692.20
41,669,253.73
7,917,158.21
49,586,411.94

0.07
4.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

PRIMER MES

100.00%

PROGRAMADO
S/.

21,913.61
21,038.28
782.84
92.50
383,003.37
236,679.30
32,645.79
140,614.30
22,009.59
6,588.02
24,850.48
9,971.11
146,324.07
30,456.53
86,945.74
28,132.79
789.02

VALOR. ACUMUL. ANTERIOR


METRADO
S/.

0.50
15.95
1.00

3,472.96
4,872.29
458.72
3,660.01
914.97
3,956.79
2,917.29
3,477.83
1,187.04
152.91
0.00
0.00
0.00
0.00
0.00
0.00
0.00

362,380.53
7,333.05
1,327.41
147.89
5,472.52
9,219.32
3,565.61
1,155.14
16,304.38
14,418.27
692.04
7,253.18
12,612.36
1,985.93
16,480.46

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

616,006.03
591,399.83
22,006.10
2,600.10
191,501.69
118,339.65
16,322.89
70,307.15
11,004.79
3,294.01
12,425.24
4,985.56
73,162.04
15,228.26
43,472.87
14,066.39
394.51
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

VALORIZACION ACTUAL
METRADO

0.02
0.57
0.04

6,945.91
9,744.58
917.45
7,320.02
1,829.93
7,913.58
5,834.58
6,955.66
2,374.07
305.82
0.00
0.00
0.00
0.00
0.00
0.00
0.00
641.56
61.88
4.26
149.93
280.99
65.80
20.66
3,900.57
57.61
2.80
21.06
34.33
5.03
389.52

15,669.08
6,805.96
3,244.42
1,660.40
139,617.02
12,706.80
7,645.60
5,605.05
5,027.56
18.30
638.05
56.95
179.09
196.97
58,193.27
1.23
608.84
17.84
7.12
12.34
151.93
8.15
4,889.10
1,451.85
349,540.80
87,979.26
70,953.88
88,481.04
68,248.90
17,386.01
16,491.70

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2,409.07
27,501.51
5,085.12
28,919.03
625.40
5,497.23
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

48,782.13

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
174,770.40
43,989.63
35,476.94
44,240.52
34,124.45
8,693.01
8,245.85
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
48,782.13

43.92
12.89
4.13
32.27
1,162.70
128.26
97.09
46.17
47.28
2.13
6.44
1.37
27.77
12.11
208.39
0.08
1.30
1.30
1.30
0.78
1,266.09
0.17
1.41
0.91
4,818.14
55,003.01
10,170.24
57,838.05
1,250.79
10,994.46
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

42,568.29
6,213.84

0.07
4.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1,165,620.44
116,562.04
225,897.24

9,371.62
187.50
3,750.00
1.25
1,875.00
500.00
1.88
1.88
1.88
0.13
1.88

1,508,079.73
286,535.15
1,794,614.87

42,568.29
6,213.84
62,464.49
26,896.54
519.38
8,437.50
1,514.80
5,193.75
1,385.00
745.39
6,562.50
769.63
1,065.00
9,375.00

0.07
4.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

VALORIZACION ACTUAL
S/.

21,913.61
21,038.28
782.84
92.50
383,003.37
236,679.30
32,645.79
140,614.30
22,009.59
6,588.02
24,850.48
9,971.11
146,324.07
30,456.53
86,945.74
28,132.79
789.02
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
362,380.53
7,333.05
1,327.41
147.89
5,472.52
9,219.32
3,565.61
1,155.14
16,304.38
14,418.27
692.04
7,253.18
12,612.36
1,985.93
16,480.46

100.00%
100.00%
100.00%

VALORIZACION ACUMULADO
METRADO
S/.

0.52
16.51
1.04

10,418.87
14,616.87
1,376.17
10,980.03
2,744.90
11,870.37
8,751.88
10,433.49
3,561.11
458.73
0.00
0.00
0.00
0.00
0.00
0.00
0.00
641.56
61.88
4.26
149.93
280.99
65.80
20.66
3,900.57
57.61
2.80
21.06
34.33
5.03
389.52

637,919.64
612,438.11
22,788.94
2,692.59
574,505.06
355,018.95
48,968.68
210,921.46
33,014.38
9,882.03
37,275.73
14,956.67
219,486.11
45,684.79
130,418.60
42,199.18
1,183.54
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
362,380.53
7,333.05
1,327.41
147.89
5,472.52
9,219.32
3,565.61
1,155.14
16,304.38
14,418.27
692.04
7,253.18
12,612.36
1,985.93
16,480.46

ACTUAL
%

52.00%
52.00%
52.00%

15.79%
15.79%
15.79%
15.79%
15.79%
15.79%
15.79%
15.79%
15.79%
15.79%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
4.35%
4.35%
4.35%
4.35%
4.35%
4.35%
4.35%
4.35%
4.35%
4.35%
4.35%
4.35%
4.35%
4.35%

15,669.08
6,805.96
3,244.42
1,660.40
139,617.02
12,706.80
7,645.60
5,605.05
5,027.56
18.30
638.05
56.95
179.09
196.97
58,193.27
1.23
608.84
17.84
7.12
12.34
151.93
8.15
4,889.10
1,451.85
349,540.80
87,979.26
70,953.88
88,481.04
68,248.90
17,386.01
16,491.70
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
48,782.13

43.92
12.89
4.13
32.27
1,162.70
128.26
97.09
46.17
47.28
2.13
6.44
1.37
27.77
12.11
208.39
0.08
1.30
1.30
1.30
0.78
1,266.09
0.17
1.41
0.91
7,227.21
82,504.52
15,255.35
86,757.08
1,876.19
16,491.70
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

15,669.08
6,805.96
3,244.42
1,660.40
139,617.02
12,706.80
7,645.60
5,605.05
5,027.56
18.30
638.05
56.95
179.09
196.97
58,193.27
1.23
608.84
17.84
7.12
12.34
151.93
8.15
4,889.10
1,451.85
524,311.20
131,968.89
106,430.83
132,721.57
102,373.35
26,079.02
24,737.54
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
97,564.26

4.35%
4.35%
4.35%
4.35%
4.35%
4.35%
4.35%
4.35%
4.35%
4.35%
4.35%
4.35%
4.35%
4.35%
4.35%
4.35%
4.35%
4.35%
4.35%
4.35%
4.35%
4.35%
4.35%
4.35%
10.71%
10.71%
10.71%
10.71%
10.71%
10.71%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

42,568.29
6,213.84
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1,165,620.44
116,562.04
225,897.24

0.13
8.00
9,371.62
187.50
3,750.00
1.25
1,875.00
500.00
1.88
1.88
1.88
0.13
1.88

85,136.58
12,427.68
62,464.49
26,896.54
519.38
8,437.50
1,514.80
5,193.75
1,385.00
745.39
6,562.50
769.63
1,065.00
9,375.00
2,259,145.18
225,914.52
437,822.34

1,508,079.73
286,535.15

2,922,882.03
555,347.59

1,794,614.87

3,478,229.62

13.33%
13.33%
12.50%
12.50%
12.50%
12.50%
12.50%
12.50%
12.50%
12.50%
12.50%
12.50%
12.50%

SALDO POR VALORIZAR


METRADO
S/.

0.48
15.25
0.96

55,567.30
77,956.65
7,339.59
58,560.16
14,639.46
63,308.67
46,676.67
55,645.27
18,992.60
2,446.59
0.00
0.00
0.00
0.00
0.00
0.00
0.00
14,114.36
1,361.45
93.74
3,298.51
6,181.81
1,447.56
454.45
85,812.54
1,267.44
61.62
463.37
755.23
110.63
8,569.37

588,914.07
565,390.05
21,038.27
2,485.75
3,064,027.01
1,893,434.40
261,166.32
1,124,914.44
176,076.70
52,704.14
198,803.88
79,768.92
1,170,592.61
243,652.24
695,565.90
225,062.29
6,312.19
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
7,972,371.52
161,327.11
29,203.02
3,253.69
120,395.54
202,825.14
78,443.37
25,413.01
358,696.42
317,201.99
15,224.85
159,569.98
277,471.98
43,690.51
362,570.17

48.00%
48.00%
48.00%

84.21%
84.21%
84.21%
84.21%
84.21%
84.21%
84.21%
84.21%
84.21%
84.21%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
95.65%
95.65%
95.65%
95.65%
95.65%
95.65%
95.65%
95.65%
95.65%
95.65%
95.65%
95.65%
95.65%
95.65%

966.28
283.61
90.77
709.99
25,579.40
2,821.74
2,135.91
1,015.83
1,040.22
46.75
141.63
30.19
610.83
266.34
4,584.61
1.72
28.70
28.70
28.70
17.22
27,853.91
3.83
31.09
20.09
60,226.77
687,537.63
127,127.94
722,975.65
15,634.90
137,430.80
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

344,719.77
149,731.21
71,377.34
36,528.87
3,071,574.35
279,549.70
168,203.15
123,311.13
110,606.32
402.56
14,037.16
1,252.79
3,939.88
4,333.41
1,280,251.98
27.15
13,394.56
392.56
156.68
271.52
3,342.47
179.25
107,560.25
31,940.67
4,369,259.99
1,099,740.78
886,923.55
1,106,013.06
853,111.27
217,325.13
206,146.21

95.65%
95.65%
95.65%
95.65%
95.65%
95.65%
95.65%
95.65%
95.65%
95.65%
95.65%
95.65%
95.65%
95.65%
95.65%
95.65%
95.65%
95.65%
95.65%
95.65%
95.65%
95.65%
95.65%
95.65%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
634,167.70

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

89.29%
89.29%
89.29%
89.29%
89.29%
89.29%

0.87
52.00
65,601.32
1,312.50
26,250.00
8.75
13,125.00
3,500.00
13.12
13.12
13.12
0.87
13.12

553,387.78
80,779.92
437,251.40
188,275.79
3,635.62
59,062.50
10,603.60
36,356.25
9,695.00
5,217.71
45,937.50
5,387.42
7,455.00
65,625.00
17,065,991.69
1,706,599.17
3,307,389.19
22,079,980.05
4,195,196.21
26,275,176.26

86.67%
86.67%
87.50%
87.50%
87.50%
87.50%
87.50%
87.50%
87.50%
87.50%
87.50%
87.50%
87.50%

ITEM.

1.00
1.01
1.02
1.03
2.00
2.01
02.01.01
02.01.02
02.01.03
2.02
2.03
2.04
2.05
02.05.01
02.05.02
02.05.03
2.06
3.00
3.01
3.02
3.03
3.04
3.05
3.06
3.07
4.00
4.01
4.02
4.03
4.04
4.05
4.06
4.07
4.08
4.09
4.10
4.11
4.12
4.13
4.14

DESCRIPCION DE PARTIDA

OBRAS PRELIMINARES
MOVILIZACION Y DESMOVILIZACION DE EQUIPOS
TRAZO Y REPLANTEO
CARTEL DE OBRA 3.60 x 7.20
MOVIMIENTO DE TIERRAS
EXCAVACION PARA EXPLANACIONES
CORTE EN MATERIAL SUELTO
CORTE EN ROCA SUELTA
CORTE EN ROCA FIJA
PERFILADO, NIVELACION Y COMPACTACION DE SUBRASANTE EN ZONAS D
MEJORAMIENTO DE SUB RASANTE
LIMPIEZA DE TERRENO PARA RECIBIR RELLENO
TERRAPLEN
RELLENO CON MATERIAL PROPIO
RELLENO CON MATERIAL EXCEDENTE DE CORTE
RELLENO CON MATERIAL DE CANTERA (MATERIAL CONSIDERADO EN TRAN
REMOCION DE DERRUMBES (SOLO REFINE Y LIMPIEZA)
PAVIMENTO
SUB BASE GRANULAR
BASE GRANULAR
IMPRIMACION BITUMINOSA
CARPETA ASFALTICA EN CALIENTE (e=0.075 m.)
ASFALTO DILUIDO MC-30
CEMENTO ASFALTICO PEN 120 -150
ADITIVO MEJORADOR DE ADHERENCIA
OBRAS DE ARTE Y DRENAJE
EXCAVACION PARA ESTRUCTURAS
EXCAVACION PARA ESTRUCTURAS BAJO AGUA
DEMOLICION DE CONCRETO CICLOPEO
DEMOLICION DE MAMPOSTERIA DE PIEDRA
ENCOFRADO Y DESENCOFRADO
ENCOFRADO Y DESENCOFRADO CARA VISTA
ENCOFRADO Y DESENCOFRADO BAJO AGUA
ACERO DE REFUERZO FY=4,200 KG/CM2
CONCRETO CICLOPEO f'c = 175 KG/CM2 + 30 % PIEDRA MEDIANA
CONCRETO SIMPLE f'c = 100 KG/CM2
CONCRETO SIMPLE f'c = 210 KG/CM2 EN SECO
CONCRETO SIMPLE f'c = 210 KG/CM2 BAJO AGUA
CONCRETO SIMPLE f'c = 280 KG/CM2
RELLENO DE ESTRUCTURAS

4.15
4.16
4.17
4.18
4.19
4.20
4.21
4.22
4.23
4.24
4.25
4.26
4.27
4.28
4.29
4.3
4.31
4.32
4.33
4.34
4.35
4.36
4.37
4.38
5.00
5.01
5.02
5.03
5.04
5.05
5.06
6.00
6.01
6.02
6.03
06.03.01
06.03.02
06.03.03
6.04
6.05
6.06
6.07
6.08
6.09
7.00

ALCANTARILLA TMC 0 36"


ALCANTARILLA TMC 0 48"
ALCANTARILLA TMC 0 60"
ALIVIADERO DE EMBOQUILLADO DE PIEDRA (E=0.15 M)
CUNETAS TRIANGULARES REVESTIDAS 1.00X0.40
CUNETAS TRIANGULARES REVESTIDAS 0.75X0.35
CUNETAS TRIANGULARES REVESTIDAS 0.50X0.30
CUNETAS RECTANGULARES REVESTIDAS
ZANJAS REVESTIDAS
JUNTA PARA MUROS
FILTRO
MATERIAL IMPERMEABLE
GEOTEXTIL
DREN PVC D=3"
SUBDRENAJE
POLIESTILENO EXPANDIDO
BARANDAS METALICAS
BRUA ROMPE AGUA EN LOSA
ACABADO DE VEREDAS
JUNTA DE DILATACION EXPANDIBLES
APOYO DE NEOPRENO
TUBOS DE DRENAJE PVC D = 3" X 0.50 M.
FALSO PUENTE
LOSA DE APROXIMACION
TRANSPORTES
TRANSPORTE DE ESCOMBROS PARA D<=1.00 KM
TRANSPORTE DE ESCOMBROS PARA D>1.00 KM
TRANSPORTE DE MATERIALES GRANULARES PARA D<=1.00 KM
TRANSPORTE DE MATERIALES GRANULARES PARA D>1.00 KM
TRANSPORTE DE MEZCLA ASFALTICA PARA D<=1.00 KM
TRANSPORTE DE MEZCLA ASFALTICA PARA D>1.00 KM
SEALIZACION
SEAL PREVENTIVA (0.75 m. x 0.75 m.)
SEAL REGLAMENTARIA
SEAL INFORMATIVA
PANEL INFORMATIVO
ESTRUCTURA DE SOPORTE
CIMENTACION Y MONTAJE
POSTES KILOMETRICOS
DEMARCACION EN EL PAVIMENTO
GUARDAVIAS (Incluye Terminal)
POSTES DELINEADORES
TACHAS REFLECTIVAS BIDIRECCIONALES
PINTADO DE MUROS Y PARAPETOS
VARIOS

7.01
7.02
8.00
8.01
8.02
8.03
8.04
8.05
8.06
8.07
8.08
8.09
8.10
8.11

MANTENIMIENTO DE TRANSITO TEMPORAL Y SEGURIDAD VIAL


CONSTRUCCION DE PASE PROVISIONAL
MEDIO AMBIENTE
ACONDICIONAMIENTO DE DEPOSITOS DE MATERIAL EXCEDENTE
RESTAURACION DE AREA AFECTADA POR CAMPAMENTO
RESTAURACION DE CANTERAS
REVEGETALIZACION
RESTAURACION DE AREA AFECTADA POR PLANTA DE ASFALTO Y CHANCAD
RESTAURACION DE AREA AFECTADA POR PATIO DE MAQUINAS
SELLADO DE LETRINAS
PROGRAMA DE EDUCACION AMBIENTAL
PROGRAMA DE SEALIZACION AMBIENTAL
PROGRAMA DE CONTINGENCIAS
PROGRAMA DE SEGUIMIENTO Y VIGILANCIA
COSTO DIRECTO
UTILIDAD (10%)
GASTOS GENRALES (19.38%)
SUBTOTAL
IGV (19%)
PRSUPUESTO TOTAL

ON DE PARTIDA

UBRASANTE EN ZONAS DE CORTE

CONSIDERADO EN TRANSP.)
EZA)

IEDRA MEDIANA

UNIDAD

METRADO

GLB
KM
und

1.00
31.76
2.00

m3
m3
m3
m2
m3
m2

65,986.17
92,573.52
8,715.76
69,540.19
17,384.36
75,179.04

m3
m3
m3
m3

55,428.55
66,078.76
22,553.71
2,905.32

m3
m3
m2
m3
gln
gln
kg

53,128.45
49,316.77
240,667.14
17,511.09
72,200.00
638,629.41
24,172.00

m3
m3
m3
m3
m2
m2
m2
kg
m3
m3
m3
m3
m3
m3

14,755.92
1,423.33
98.00
3,448.44
6,462.80
1,513.36
475.11
89,713.11
1,325.05
64.42
484.43
789.56
115.66
8,958.89

15 M)

D<=1.00 KM
D>1.00 KM
00 KM
KM

m
m
m
m2
m
m
m
m
m
m2
m3
m3
m2
m
m
m2
m
m
m
m
CM3
und
m
m

1,010.20
296.50
94.90
742.26
26,742.10
2,950.00
2,233.00
1,062.00
1,087.50
48.88
148.07
31.56
638.60
278.45
4,793.00
1.80
30.00
30.00
30.00
18.00
29,120.00
4.00
32.50
21.00

m3K
m3K
m3K
m3K
M3K
M3K

67,453.98
770,042.15
142,383.29
809,732.73
17,511.09
153,922.50

und
und

110.00
22.00

m2
m
und
und
m2
m
und
und
m2

20.53
106.60
11.00
31.00
8,822.22
440.00
361.00
261.00
157.80

URIDAD VIAL

GLB
m

1.00
60.00

AL EXCEDENTE
ENTO

m3
m2
m2
HA
m2
m2
und
mes
und
GLB
mes

74,972.94
1,500.00
30,000.00
10.00
15,000.00
4,000.00
15.00
15.00
15.00
1.00
15.00

DE ASFALTO Y CHANCADORA
E MAQUINAS

PRIMER MES
PRECIO
S/.

PARCIAL
S/.

1,177,828.16
1,379.95
2,589.17

4.70
14.43
23.99
0.90
13.58
1.26
5.22
12.50
11.85
2.58
28.73
48.67
0.75
211.70
7.53
5.81
16.37
11.43
21.45
34.71
36.50
32.81
54.19
55.92
4.18
250.27
247.08
344.37
367.40
394.92
42.31

1,226,833.71
1,177,828.16
43,827.21
5,178.34
3,638,532.07
2,248,453.35
310,135.00
1,335,835.89
209,091.08
62,586.17
236,079.61
94,725.59
1,390,078.72
289,337.03
825,984.50
267,261.46
7,495.73
12,464,024.18
1,526,380.37
2,400,247.20
180,500.36
3,707,097.75
543,666.00
3,710,436.87
395,695.64
8,334,752.05
168,660.17
30,530.43
3,401.58
125,868.06
212,044.47
82,008.98
26,568.15
375,000.80
331,620.26
15,916.89
166,823.16
290,084.34
45,676.45
379,050.64

RENDIMIENTO

PROGRAMADO
METRADO

0.00
0.00
0.00

6,945.91
9,744.58
917.45
7,320.02
1,829.93
7,913.58
5,834.58
6,955.66
2,374.07
305.82
4,619.87
4,288.41
20,927.58
1,522.70
6,278.26
55,532.99
2,101.91
1,283.12
123.77
8.52
299.86
561.98
131.60
41.31
7,801.14
115.22
5.60
42.12
68.66
10.06
779.03

356.75
527.95
786.32
51.45
120.08
99.07
78.75
121.39
106.33
8.61
99.11
41.50
6.45
16.27
279.25
15.77
466.78
13.68
5.46
15.77
0.12
46.85
3,459.98
1,590.12
18.26
1.29
8.70
1.18
13.90
1.50
695.25
820.95
584.52
168.62
566.86
92.70
18.52
188.01
89.83
14.97
10.41

360,388.85
156,537.18
74,621.77
38,189.28
3,211,191.37
292,256.50
175,848.75
128,916.18
115,633.88
420.86
14,675.22
1,309.74
4,118.97
4,530.38
1,338,445.25
28.39
14,003.40
410.40
163.80
283.86
3,494.40
187.40
112,449.35
33,392.52
4,893,571.19
1,231,709.67
993,354.37
1,238,734.62
955,484.62
243,404.15
230,883.75
417,713.06
76,477.50
18,060.90
323,174.66
12,000.20
17,974.89
6,235.46
2,873.70
163,387.51
82,724.40
32,428.63
3,907.17
1,642.70
731,731.96

87.84
25.78
8.25
64.54
2,325.40
256.52
194.17
92.35
94.57
4.25
12.88
2.74
55.53
24.21
416.78
0.16
2.61
2.61
2.61
1.57
2,532.17
0.35
2.83
1.83
4,818.14
55,003.01
10,170.24
57,838.05
1,250.79
10,994.46
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

638,524.36
1,553.46
2.87
2.77
2.25
1,211.84
2.77
2.77
397.54
3,500.00
410.47
8,520.00
5,000.00

638,524.36
93,207.60
499,715.89
215,172.34
4,155.00
67,500.00
12,118.40
41,550.00
11,080.00
5,963.10
52,500.00
6,157.05
8,520.00
75,000.00
32,206,874.11
3,220,687.41
6,241,692.20
41,669,253.73
7,917,158.21
49,586,411.94

0.07
4.00
9,371.62
187.50
3,750.00
1.25
1,875.00
500.00
1.88
1.88
1.88
0.13
1.88

PRIMER MES

100.00%

PROGRAMADO
S/.

0.00
0.00
0.00
0.00
383,003.37
236,679.30
32,645.79
140,614.30
22,009.59
6,588.02
24,850.48
9,971.11
146,324.07
30,456.53
86,945.74
28,132.79
789.02
1,083,828.19
132,728.73
208,717.15
15,695.68
322,356.33
47,275.30
322,646.68
34,408.32
724,761.05
14,666.10
2,654.82
295.79
10,945.05
18,438.65
7,131.22
2,310.27
32,608.77
28,836.54
1,384.08
14,506.36
25,224.73
3,971.86
32,960.92

VALOR. ACUMUL. ANTERIOR


METRADO
S/.

0.52
16.51
1.04

10,418.87
14,616.87
1,376.17
10,980.03
2,744.90
11,870.37
0.00
8,751.88
10,433.49
3,561.11
458.73
0.00
0.00
0.00
0.00
0.00
0.00
0.00
641.56
61.88
4.26
149.93
280.99
65.80
20.66
3,900.57
57.61
2.80
21.06
34.33
5.03
389.52

637,919.64
612,438.11
22,788.94
2,692.59
574,505.06
355,018.95
48,968.68
210,921.46
33,014.38
9,882.03
37,275.73
14,956.67
219,486.11
45,684.79
130,418.60
42,199.18
1,183.54
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
362,380.53
7,333.05
1,327.41
147.89
5,472.52
9,219.32
3,565.61
1,155.14
16,304.38
14,418.27
692.04
7,253.18
12,612.36
1,985.93
16,480.46

VALORIZACION ACTUAL
METRADO

0.00
0.00
0.00

6,945.91
9,744.58
917.45
7,320.02
1,829.93
7,913.58
5,834.58
6,955.66
2,374.07
305.82
4,619.87
4,288.41
20,927.58
1,522.70
6,278.26
55,532.99
2,101.91
1,283.12
123.77
8.52
299.86
561.98
131.60
41.31
7,801.14
115.22
5.60
42.12
68.66
10.06
779.03

31,338.16
13,611.93
6,488.85
3,320.81
279,234.03
25,413.61
15,291.20
11,210.10
10,055.12
36.60
1,276.11
113.89
358.17
393.95
116,386.54
2.47
1,217.69
35.69
14.24
24.68
303.86
16.30
9,778.20
2,903.70
349,540.80
87,979.26
70,953.88
88,481.04
68,248.90
17,386.01
16,491.70

43.92
12.89
4.13
32.27
1,162.70
128.26
97.09
46.17
47.28
2.13
6.44
1.37
27.77
12.11
208.39
0.08
1.30
1.30
1.30
0.78
1,266.09
0.17
1.41
0.91
7,227.21
82,504.52
15,255.35
86,757.08
1,876.19
16,491.70
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

48,782.13

15,669.08
6,805.96
3,244.42
1,660.40
139,617.02
12,706.80
7,645.60
5,605.05
5,027.56
18.30
638.05
56.95
179.09
196.97
58,193.27
1.23
608.84
17.84
7.12
12.34
151.93
8.15
4,889.10
1,451.85
524,311.20
131,968.89
106,430.83
132,721.57
102,373.35
26,079.02
24,737.54
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
97,564.26

87.84
25.78
8.25
64.54
2,325.40
256.52
194.17
92.35
94.57
4.25
12.88
2.74
55.53
24.21
416.78
0.16
2.61
2.61
2.61
1.57
2,532.17
0.35
2.83
1.83
4,818.14
55,003.01
10,170.24
57,838.05
1,250.79
10,994.46
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

42,568.29
6,213.84
62,464.49
26,896.54
519.38
8,437.50
1,514.80
5,193.75
1,385.00
745.39
6,562.50
769.63
1,065.00
9,375.00
2,652,380.03
265,238.00
514,031.25
3,431,649.28
652,013.36
4,083,662.65

0.13
8.00
9,371.62
187.50
3,750.00
1.25
1,875.00
500.00
1.88
1.88
1.88
0.13
1.88

85,136.58
12,427.68
62,464.49
26,896.54
519.38
8,437.50
1,514.80
5,193.75
1,385.00
745.39
6,562.50
769.63
1,065.00
9,375.00

0.07
4.00
9,371.62
187.50
3,750.00
1.25
1,875.00
500.00
1.88
1.88
1.88
0.13
1.88

VALORIZACION ACTUAL
S/.

0.00
0.00
0.00
0.00
383,003.37
236,679.30
32,645.79
140,614.30
22,009.59
6,588.02
24,850.48
9,971.11
146,324.07
30,456.53
86,945.74
28,132.79
789.02
1,083,828.19
132,728.73
208,717.15
15,695.68
322,356.33
47,275.30
322,646.68
34,408.32
724,761.05
14,666.10
2,654.82
295.79
10,945.05
18,438.65
7,131.22
2,310.27
32,608.77
28,836.54
1,384.08
14,506.36
25,224.73
3,971.86
32,960.92

#DIV/0!
#DIV/0!
#DIV/0!

VALORIZACION ACUMULADO
METRADO
S/.

0.52
16.51
1.04

17,364.78
24,361.45
2,293.62
18,300.05
4,574.83
19,783.96
14,586.46
17,389.15
5,935.19
764.56
4,619.87
4,288.41
20,927.58
1,522.70
6,278.26
55,532.99
2,101.91
1,924.69
185.65
12.78
449.80
842.97
197.39
61.97
11,701.71
172.83
8.40
63.19
102.99
15.09
1,168.55

637,919.64
612,438.11
22,788.94
2,692.59
957,508.43
591,698.24
81,614.47
351,535.76
55,023.97
16,470.04
62,126.21
24,927.79
365,810.19
76,141.32
217,364.34
70,331.96
1,972.56
1,083,828.19
132,728.73
208,717.15
15,695.68
322,356.33
47,275.30
322,646.68
34,408.32
1,087,141.58
21,999.15
3,982.23
443.68
16,417.57
27,657.97
10,696.82
3,465.41
48,913.15
43,254.82
2,076.12
21,759.54
37,837.09
5,957.80
49,441.39

ACTUAL
%

52.00%
52.00%
52.00%

26.32%
26.32%
26.32%
26.32%
26.32%
26.32%
26.32%
26.32%
26.32%
26.32%
8.70%
8.70%
8.70%
8.70%
8.70%
8.70%
8.70%
13.04%
13.04%
13.04%
13.04%
13.04%
13.04%
13.04%
13.04%
13.04%
13.04%
13.04%
13.04%
13.04%
13.04%

31,338.16
13,611.93
6,488.85
3,320.81
279,234.03
25,413.61
15,291.20
11,210.10
10,055.12
36.60
1,276.11
113.89
358.17
393.95
116,386.54
2.47
1,217.69
35.69
14.24
24.68
303.86
16.30
9,778.20
2,903.70
349,540.80
87,979.26
70,953.88
88,481.04
68,248.90
17,386.01
16,491.70
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
48,782.13

131.77
38.67
12.38
96.82
3,488.10
384.78
291.26
138.52
141.85
6.38
19.31
4.12
83.30
36.32
625.17
0.23
3.91
3.91
3.91
2.35
3,798.26
0.52
4.24
2.74
12,045.35
137,507.53
25,425.59
144,595.13
3,126.98
27,486.16
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

47,007.24
20,417.89
9,733.27
4,981.21
418,851.05
38,120.41
22,936.79
16,815.15
15,082.68
54.89
1,914.16
170.84
537.26
590.92
174,579.82
3.70
1,826.53
53.53
21.37
37.03
455.79
24.44
14,667.31
4,355.55
873,852.00
219,948.16
177,384.71
221,202.61
170,622.25
43,465.03
41,229.24

13.04%
13.04%
13.04%
13.04%
13.04%
13.04%
13.04%
13.04%
13.04%
13.04%
13.04%
13.04%
13.04%
13.04%
13.04%
13.04%
13.04%
13.04%
13.04%
13.04%
13.04%
13.04%
13.04%
13.04%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
146,346.39

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

17.86%
17.86%
17.86%
17.86%
17.86%
17.86%

42,568.29
6,213.84
62,464.49
26,896.54
519.38
8,437.50
1,514.80
5,193.75
1,385.00
745.39
6,562.50
769.63
1,065.00
9,375.00
2,652,380.03
265,238.00
514,031.25

0.20
12.00
18,743.24
375.00
7,500.00
2.50
3,750.00
1,000.00
3.75
3.75
3.75
0.25
3.75

127,704.87
18,641.52
124,928.98
53,793.09
1,038.75
16,875.00
3,029.60
10,387.50
2,770.00
1,490.78
13,125.00
1,539.26
2,130.00
18,750.00
4,273,605.57
427,360.56
828,224.76

3,431,649.28
652,013.36

5,529,190.89
1,050,546.27

4,083,662.65

6,579,737.15

44,558,357.04

20.00%
20.00%
25.00%
25.00%
25.00%
25.00%
25.00%
25.00%
25.00%
25.00%
25.00%
25.00%
25.00%

SALDO POR VALORIZAR


METRADO
S/.

0.48
15.25
0.96

48,621.39
68,212.07
6,422.14
51,240.14
12,809.53
55,395.08
40,842.09
48,689.61
16,618.52
2,140.76
48,508.58
45,028.36
219,739.56
15,988.39
65,921.74
583,096.42
22,070.09
12,831.23
1,237.68
85.22
2,998.64
5,619.83
1,315.97
413.14
78,011.40
1,152.22
56.02
421.24
686.57
100.57
7,790.34

588,914.07
565,390.05
21,038.27
2,485.75
2,681,023.64
1,656,755.10
228,520.53
984,300.14
154,067.11
46,116.13
173,953.40
69,797.80
1,024,268.53
213,195.71
608,620.16
196,929.50
5,523.17
11,380,195.99
1,393,651.64
2,191,530.05
164,804.67
3,384,741.43
496,390.70
3,387,790.19
361,287.32
7,247,610.47
146,661.01
26,548.20
2,957.90
109,450.49
184,386.49
71,312.16
23,102.74
326,087.65
288,365.45
13,840.78
145,063.62
252,247.26
39,718.65
329,609.25

48.00%
48.00%
48.00%

73.68%
73.68%
73.68%
73.68%
73.68%
73.68%
73.68%
73.68%
73.68%
73.68%
91.30%
91.30%
91.30%
91.30%
91.30%
91.30%
91.30%
86.96%
86.96%
86.96%
86.96%
86.96%
86.96%
86.96%
86.96%
86.96%
86.96%
86.96%
86.96%
86.96%
86.96%

878.43
257.83
82.52
645.44
23,254.00
2,565.22
1,941.74
923.48
945.65
42.50
128.76
27.44
555.30
242.13
4,167.83
1.57
26.09
26.09
26.09
15.65
25,321.74
3.48
28.26
18.26
55,408.63
632,534.62
116,957.70
665,137.60
14,384.11
126,436.34
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

313,381.61
136,119.28
64,888.49
33,208.07
2,792,340.32
254,136.09
152,911.96
112,101.03
100,551.20
365.96
12,761.06
1,138.90
3,581.71
3,939.46
1,163,865.43
24.68
12,176.87
356.87
142.43
246.83
3,038.61
162.96
97,782.04
29,036.97
4,019,719.19
1,011,761.52
815,969.66
1,017,532.01
784,862.37
199,939.12
189,654.51

86.96%
86.96%
86.96%
86.96%
86.96%
86.96%
86.96%
86.96%
86.96%
86.96%
86.96%
86.96%
86.96%
86.96%
86.96%
86.96%
86.96%
86.96%
86.96%
86.96%
86.96%
86.96%
86.96%
86.96%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
585,385.57

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

82.14%
82.14%
82.14%
82.14%
82.14%
82.14%

0.80
48.00
56,229.70
1,125.00
22,500.00
7.50
11,250.00
3,000.00
11.25
11.25
11.25
0.75
11.25

510,819.49
74,566.08
374,786.91
161,379.25
3,116.25
50,625.00
9,088.80
31,162.50
8,310.00
4,472.32
39,375.00
4,617.79
6,390.00
56,250.00
26,288,721.77
2,628,872.18
5,094,754.28
34,012,348.23
6,462,346.16
40,474,694.39

80.00%
80.00%
75.00%
75.00%
75.00%
75.00%
75.00%
75.00%
75.00%
75.00%
75.00%
75.00%
75.00%

ITEM.

1.00
1.01
1.02
1.03
2.00
2.01
02.01.01
02.01.02
02.01.03
2.02
2.03
2.04
2.05
02.05.01
02.05.02
02.05.03
2.06
3.00
3.01
3.02
3.03
3.04
3.05
3.06
3.07
4.00
4.01
4.02
4.03
4.04
4.05
4.06
4.07
4.08
4.09
4.10
4.11
4.12
4.13
4.14

DESCRIPCION DE PARTIDA

OBRAS PRELIMINARES
MOVILIZACION Y DESMOVILIZACION DE EQUIPOS
TRAZO Y REPLANTEO
CARTEL DE OBRA 3.60 x 7.20
MOVIMIENTO DE TIERRAS
EXCAVACION PARA EXPLANACIONES
CORTE EN MATERIAL SUELTO
CORTE EN ROCA SUELTA
CORTE EN ROCA FIJA
PERFILADO, NIVELACION Y COMPACTACION DE SUBRASANTE EN ZONAS D
MEJORAMIENTO DE SUB RASANTE
LIMPIEZA DE TERRENO PARA RECIBIR RELLENO
TERRAPLEN
RELLENO CON MATERIAL PROPIO
RELLENO CON MATERIAL EXCEDENTE DE CORTE
RELLENO CON MATERIAL DE CANTERA (MATERIAL CONSIDERADO EN TRAN
REMOCION DE DERRUMBES (SOLO REFINE Y LIMPIEZA)
PAVIMENTO
SUB BASE GRANULAR
BASE GRANULAR
IMPRIMACION BITUMINOSA
CARPETA ASFALTICA EN CALIENTE (e=0.075 m.)
ASFALTO DILUIDO MC-30
CEMENTO ASFALTICO PEN 120 -150
ADITIVO MEJORADOR DE ADHERENCIA
OBRAS DE ARTE Y DRENAJE
EXCAVACION PARA ESTRUCTURAS
EXCAVACION PARA ESTRUCTURAS BAJO AGUA
DEMOLICION DE CONCRETO CICLOPEO
DEMOLICION DE MAMPOSTERIA DE PIEDRA
ENCOFRADO Y DESENCOFRADO
ENCOFRADO Y DESENCOFRADO CARA VISTA
ENCOFRADO Y DESENCOFRADO BAJO AGUA
ACERO DE REFUERZO FY=4,200 KG/CM2
CONCRETO CICLOPEO f'c = 175 KG/CM2 + 30 % PIEDRA MEDIANA
CONCRETO SIMPLE f'c = 100 KG/CM2
CONCRETO SIMPLE f'c = 210 KG/CM2 EN SECO
CONCRETO SIMPLE f'c = 210 KG/CM2 BAJO AGUA
CONCRETO SIMPLE f'c = 280 KG/CM2
RELLENO DE ESTRUCTURAS

4.15
4.16
4.17
4.18
4.19
4.20
4.21
4.22
4.23
4.24
4.25
4.26
4.27
4.28
4.29
4.3
4.31
4.32
4.33
4.34
4.35
4.36
4.37
4.38
5.00
5.01
5.02
5.03
5.04
5.05
5.06
6.00
6.01
6.02
6.03
06.03.01
06.03.02
06.03.03
6.04
6.05
6.06
6.07
6.08
6.09
7.00

ALCANTARILLA TMC 0 36"


ALCANTARILLA TMC 0 48"
ALCANTARILLA TMC 0 60"
ALIVIADERO DE EMBOQUILLADO DE PIEDRA (E=0.15 M)
CUNETAS TRIANGULARES REVESTIDAS 1.00X0.40
CUNETAS TRIANGULARES REVESTIDAS 0.75X0.35
CUNETAS TRIANGULARES REVESTIDAS 0.50X0.30
CUNETAS RECTANGULARES REVESTIDAS
ZANJAS REVESTIDAS
JUNTA PARA MUROS
FILTRO
MATERIAL IMPERMEABLE
GEOTEXTIL
DREN PVC D=3"
SUBDRENAJE
POLIESTILENO EXPANDIDO
BARANDAS METALICAS
BRUA ROMPE AGUA EN LOSA
ACABADO DE VEREDAS
JUNTA DE DILATACION EXPANDIBLES
APOYO DE NEOPRENO
TUBOS DE DRENAJE PVC D = 3" X 0.50 M.
FALSO PUENTE
LOSA DE APROXIMACION
TRANSPORTES
TRANSPORTE DE ESCOMBROS PARA D<=1.00 KM
TRANSPORTE DE ESCOMBROS PARA D>1.00 KM
TRANSPORTE DE MATERIALES GRANULARES PARA D<=1.00 KM
TRANSPORTE DE MATERIALES GRANULARES PARA D>1.00 KM
TRANSPORTE DE MEZCLA ASFALTICA PARA D<=1.00 KM
TRANSPORTE DE MEZCLA ASFALTICA PARA D>1.00 KM
SEALIZACION
SEAL PREVENTIVA (0.75 m. x 0.75 m.)
SEAL REGLAMENTARIA
SEAL INFORMATIVA
PANEL INFORMATIVO
ESTRUCTURA DE SOPORTE
CIMENTACION Y MONTAJE
POSTES KILOMETRICOS
DEMARCACION EN EL PAVIMENTO
GUARDAVIAS (Incluye Terminal)
POSTES DELINEADORES
TACHAS REFLECTIVAS BIDIRECCIONALES
PINTADO DE MUROS Y PARAPETOS
VARIOS

7.01
7.02
8.00
8.01
8.02
8.03
8.04
8.05
8.06
8.07
8.08
8.09
8.10
8.11

MANTENIMIENTO DE TRANSITO TEMPORAL Y SEGURIDAD VIAL


CONSTRUCCION DE PASE PROVISIONAL
MEDIO AMBIENTE
ACONDICIONAMIENTO DE DEPOSITOS DE MATERIAL EXCEDENTE
RESTAURACION DE AREA AFECTADA POR CAMPAMENTO
RESTAURACION DE CANTERAS
REVEGETALIZACION
RESTAURACION DE AREA AFECTADA POR PLANTA DE ASFALTO Y CHANCAD
RESTAURACION DE AREA AFECTADA POR PATIO DE MAQUINAS
SELLADO DE LETRINAS
PROGRAMA DE EDUCACION AMBIENTAL
PROGRAMA DE SEALIZACION AMBIENTAL
PROGRAMA DE CONTINGENCIAS
PROGRAMA DE SEGUIMIENTO Y VIGILANCIA
COSTO DIRECTO
UTILIDAD (10%)
GASTOS GENRALES (19.38%)
SUBTOTAL
IGV (19%)
PRSUPUESTO TOTAL

ON DE PARTIDA

UBRASANTE EN ZONAS DE CORTE

CONSIDERADO EN TRANSP.)
EZA)

IEDRA MEDIANA

UNIDAD

METRADO

GLB
KM
und

1.00
31.76
2.00

m3
m3
m3
m2
m3
m2

65,986.17
92,573.52
8,715.76
69,540.19
17,384.36
75,179.04

m3
m3
m3
m3

55,428.55
66,078.76
22,553.71
2,905.32

m3
m3
m2
m3
gln
gln
kg

53,128.45
49,316.77
240,667.14
17,511.09
72,200.00
638,629.41
24,172.00

m3
m3
m3
m3
m2
m2
m2
kg
m3
m3
m3
m3
m3
m3

14,755.92
1,423.33
98.00
3,448.44
6,462.80
1,513.36
475.11
89,713.11
1,325.05
64.42
484.43
789.56
115.66
8,958.89

15 M)

D<=1.00 KM
D>1.00 KM
00 KM
KM

m
m
m
m2
m
m
m
m
m
m2
m3
m3
m2
m
m
m2
m
m
m
m
CM3
und
m
m

1,010.20
296.50
94.90
742.26
26,742.10
2,950.00
2,233.00
1,062.00
1,087.50
48.88
148.07
31.56
638.60
278.45
4,793.00
1.80
30.00
30.00
30.00
18.00
29,120.00
4.00
32.50
21.00

m3K
m3K
m3K
m3K
M3K
M3K

67,453.98
770,042.15
142,383.29
809,732.73
17,511.09
153,922.50

und
und

110.00
22.00

m2
m
und
und
m2
m
und
und
m2

20.53
106.60
11.00
31.00
8,822.22
440.00
361.00
261.00
157.80

URIDAD VIAL

GLB
m

1.00
60.00

AL EXCEDENTE
ENTO

m3
m2
m2
HA
m2
m2
und
mes
und
GLB
mes

74,972.94
1,500.00
30,000.00
10.00
15,000.00
4,000.00
15.00
15.00
15.00
1.00
15.00

DE ASFALTO Y CHANCADORA
E MAQUINAS

PRIMER MES
PRECIO
S/.

PARCIAL
S/.

1,177,828.16
1,379.95
2,589.17

4.70
14.43
23.99
0.90
13.58
1.26
5.22
12.50
11.85
2.58
28.73
48.67
0.75
211.70
7.53
5.81
16.37
11.43
21.45
34.71
36.50
32.81
54.19
55.92
4.18
250.27
247.08
344.37
367.40
394.92
42.31

1,226,833.71
1,177,828.16
43,827.21
5,178.34
3,638,532.07
2,248,453.35
310,135.00
1,335,835.89
209,091.08
62,586.17
236,079.61
94,725.59
1,390,078.72
289,337.03
825,984.50
267,261.46
7,495.73
12,464,024.18
1,526,380.37
2,400,247.20
180,500.36
3,707,097.75
543,666.00
3,710,436.87
395,695.64
8,334,752.05
168,660.17
30,530.43
3,401.58
125,868.06
212,044.47
82,008.98
26,568.15
375,000.80
331,620.26
15,916.89
166,823.16
290,084.34
45,676.45
379,050.64

RENDIMIENTO

PROGRAMADO
METRADO

0.00
0.00
0.00

6,945.91
9,744.58
917.45
7,320.02
1,829.93
7,913.58
5,834.58
6,955.66
2,374.07
305.82
4,619.87
4,288.41
20,927.58
1,522.70
6,278.26
55,532.99
2,101.91
1,283.12
123.77
8.52
299.86
561.98
131.60
41.31
7,801.14
115.22
5.60
42.12
68.66
10.06
779.03

356.75
527.95
786.32
51.45
120.08
99.07
78.75
121.39
106.33
8.61
99.11
41.50
6.45
16.27
279.25
15.77
466.78
13.68
5.46
15.77
0.12
46.85
3,459.98
1,590.12
18.26
1.29
8.70
1.18
13.90
1.50
695.25
820.95
584.52
168.62
566.86
92.70
18.52
188.01
89.83
14.97
10.41

360,388.85
156,537.18
74,621.77
38,189.28
3,211,191.37
292,256.50
175,848.75
128,916.18
115,633.88
420.86
14,675.22
1,309.74
4,118.97
4,530.38
1,338,445.25
28.39
14,003.40
410.40
163.80
283.86
3,494.40
187.40
112,449.35
33,392.52
4,893,571.19
1,231,709.67
993,354.37
1,238,734.62
955,484.62
243,404.15
230,883.75
417,713.06
76,477.50
18,060.90
323,174.66
12,000.20
17,974.89
6,235.46
2,873.70
163,387.51
82,724.40
32,428.63
3,907.17
1,642.70
731,731.96

87.84
25.78
8.25
64.54
2,325.40
256.52
194.17
92.35
94.57
4.25
12.88
2.74
55.53
24.21
416.78
0.16
2.61
2.61
2.61
1.57
2,532.17
0.35
2.83
1.83
4,818.14
55,003.01
10,170.24
57,838.05
1,250.79
10,994.46
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

638,524.36
1,553.46
2.87
2.77
2.25
1,211.84
2.77
2.77
397.54
3,500.00
410.47
8,520.00
5,000.00

638,524.36
93,207.60
499,715.89
215,172.34
4,155.00
67,500.00
12,118.40
41,550.00
11,080.00
5,963.10
52,500.00
6,157.05
8,520.00
75,000.00
32,206,874.11
3,220,687.41
6,241,692.20
41,669,253.73
7,917,158.21
49,586,411.94

0.07
4.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

PRIMER MES

100.00%

PROGRAMADO
S/.

0.00
0.00
0.00
0.00
383,003.37
236,679.30
32,645.79
140,614.30
22,009.59
6,588.02
24,850.48
9,971.11
146,324.07
30,456.53
86,945.74
28,132.79
789.02
1,083,828.19
132,728.73
208,717.15
15,695.68
322,356.33
47,275.30
322,646.68
34,408.32
724,761.05
14,666.10
2,654.82
295.79
10,945.05
18,438.65
7,131.22
2,310.27
32,608.77
28,836.54
1,384.08
14,506.36
25,224.73
3,971.86
32,960.92

VALOR. ACUMUL. ANTERIOR


METRADO
S/.

0.52
16.51
1.04

17,364.78
24,361.45
2,293.62
18,300.05
4,574.83
19,783.96
14,586.46
17,389.15
5,935.19
764.56
4,619.87
4,288.41
20,927.58
1,522.70
6,278.26
55,532.99
2,101.91
1,924.69
185.65
12.78
449.80
842.97
197.39
61.97
11,701.71
172.83
8.40
63.19
102.99
15.09
1,168.55

637,919.64
612,438.11
22,788.94
2,692.59
957,508.43
591,698.24
81,614.47
351,535.76
55,023.97
16,470.04
62,126.21
24,927.79
365,810.19
76,141.32
217,364.34
70,331.96
1,972.56
1,083,828.19
132,728.73
208,717.15
15,695.68
322,356.33
47,275.30
322,646.68
34,408.32
1,087,141.58
21,999.15
3,982.23
443.68
16,417.57
27,657.97
10,696.82
3,465.41
48,913.15
43,254.82
2,076.12
21,759.54
37,837.09
5,957.80
49,441.39

VALORIZACION ACTUAL
METRADO

0.00
0.00
0.00

6,945.91
9,744.58
917.45
7,320.02
1,829.93
7,913.58
5,834.58
6,955.66
2,374.07
305.82
4,619.87
4,288.41
20,927.58
1,522.70
6,278.26
55,532.99
2,101.91
1,283.12
123.77
8.52
299.86
561.98
131.60
41.31
7,801.14
115.22
5.60
42.12
68.66
10.06
779.03

31,338.16
13,611.93
6,488.85
3,320.81
279,234.03
25,413.61
15,291.20
11,210.10
10,055.12
36.60
1,276.11
113.89
358.17
393.95
116,386.54
2.47
1,217.69
35.69
14.24
24.68
303.86
16.30
9,778.20
2,903.70
349,540.80
87,979.26
70,953.88
88,481.04
68,248.90
17,386.01
16,491.70

131.77
38.67
12.38
96.82
3,488.10
384.78
291.26
138.52
141.85
6.38
19.31
4.12
83.30
36.32
625.17
0.23
3.91
3.91
3.91
2.35
3,798.26
0.52
4.24
2.74
12,045.35
137,507.53
25,425.59
144,595.13
3,126.98
27,486.16
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

48,782.13

47,007.24
20,417.89
9,733.27
4,981.21
418,851.05
38,120.41
22,936.79
16,815.15
15,082.68
54.89
1,914.16
170.84
537.26
590.92
174,579.82
3.70
1,826.53
53.53
21.37
37.03
455.79
24.44
14,667.31
4,355.55
873,852.00
219,948.16
177,384.71
221,202.61
170,622.25
43,465.03
41,229.24
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
146,346.39

87.84
25.78
8.25
64.54
2,325.40
256.52
194.17
92.35
94.57
4.25
12.88
2.74
55.53
24.21
416.78
0.16
2.61
2.61
2.61
1.57
2,532.17
0.35
2.83
1.83
4,818.14
55,003.01
10,170.24
57,838.05
1,250.79
10,994.46
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

42,568.29
6,213.84
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2,589,915.54
258,991.55
501,925.63
3,350,832.73
636,658.22
3,987,490.94

0.20
12.00
18,743.24
375.00
7,500.00
2.50
3,750.00
1,000.00
3.75
3.75
3.75
0.25
3.75

127,704.87
18,641.52
124,928.98
53,793.09
1,038.75
16,875.00
3,029.60
10,387.50
2,770.00
1,490.78
13,125.00
1,539.26
2,130.00
18,750.00

0.07
4.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

VALORIZACION ACTUAL
S/.

0.00
0.00
0.00
0.00
383,003.37
236,679.30
32,645.79
140,614.30
22,009.59
6,588.02
24,850.48
9,971.11
146,324.07
30,456.53
86,945.74
28,132.79
789.02
1,083,828.19
132,728.73
208,717.15
15,695.68
322,356.33
47,275.30
322,646.68
34,408.32
724,761.05
14,666.10
2,654.82
295.79
10,945.05
18,438.65
7,131.22
2,310.27
32,608.77
28,836.54
1,384.08
14,506.36
25,224.73
3,971.86
32,960.92

#DIV/0!
#DIV/0!
#DIV/0!

VALORIZACION ACUMULADO
METRADO
S/.

0.52
16.51
1.04

24,310.69
34,106.03
3,211.07
25,620.07
6,404.76
27,697.54
20,421.04
24,344.81
8,309.26
1,070.38
9,239.73
8,576.83
41,855.15
3,045.41
12,556.52
111,065.98
4,203.83
3,207.81
309.42
21.30
749.66
1,404.96
328.99
103.28
19,502.85
288.05
14.00
105.31
171.64
25.14
1,947.58

637,919.64
612,438.11
22,788.94
2,692.59
1,340,511.80
828,377.54
114,260.26
492,150.06
77,033.56
23,058.06
86,976.70
34,898.90
512,134.26
106,597.85
304,310.08
98,464.75
2,761.58
2,167,656.38
265,457.46
417,434.29
31,391.37
644,712.65
94,550.61
645,293.37
68,816.63
1,811,902.63
36,665.25
6,637.05
739.47
27,362.62
46,096.62
17,828.04
5,775.69
81,521.91
72,091.36
3,460.19
36,265.90
63,061.81
9,929.66
82,402.31

ACTUAL
%

52.00%
52.00%
52.00%

36.84%
36.84%
36.84%
36.84%
36.84%
36.84%
36.84%
36.84%
36.84%
36.84%
17.39%
17.39%
17.39%
17.39%
17.39%
17.39%
17.39%
21.74%
21.74%
21.74%
21.74%
21.74%
21.74%
21.74%
21.74%
21.74%
21.74%
21.74%
21.74%
21.74%
21.74%

31,338.16
13,611.93
6,488.85
3,320.81
279,234.03
25,413.61
15,291.20
11,210.10
10,055.12
36.60
1,276.11
113.89
358.17
393.95
116,386.54
2.47
1,217.69
35.69
14.24
24.68
303.86
16.30
9,778.20
2,903.70
349,540.80
87,979.26
70,953.88
88,481.04
68,248.90
17,386.01
16,491.70
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
48,782.13

219.61
64.46
20.63
161.36
5,813.50
641.30
485.43
230.87
236.41
10.63
32.19
6.86
138.83
60.53
1,041.96
0.39
6.52
6.52
6.52
3.91
6,330.43
0.87
7.07
4.57
16,863.50
192,510.54
35,595.82
202,433.18
4,377.77
38,480.63
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

78,345.40
34,029.82
16,222.12
8,302.02
698,085.08
63,534.02
38,227.99
28,025.26
25,137.80
91.49
3,190.26
284.73
895.43
984.87
290,966.36
6.17
3,044.22
89.22
35.61
61.71
759.65
40.74
24,445.51
7,259.24
1,223,392.80
307,927.42
248,338.59
309,683.66
238,871.16
60,851.04
57,720.94

21.74%
21.74%
21.74%
21.74%
21.74%
21.74%
21.74%
21.74%
21.74%
21.74%
21.74%
21.74%
21.74%
21.74%
21.74%
21.74%
21.74%
21.74%
21.74%
21.74%
21.74%
21.74%
21.74%
21.74%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
195,128.52

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

25.00%
25.00%
25.00%
25.00%
25.00%
25.00%

42,568.29
6,213.84
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2,589,915.54
258,991.55
501,925.63

0.27
16.00
18,743.24
375.00
7,500.00
2.50
3,750.00
1,000.00
3.75
3.75
3.75
0.25
3.75

170,273.16
24,855.36
124,928.98
53,793.09
1,038.75
16,875.00
3,029.60
10,387.50
2,770.00
1,490.78
13,125.00
1,539.26
2,130.00
18,750.00
6,738,592.13
673,859.21
1,305,939.15

3,350,832.73
636,658.22

8,718,390.50
1,656,494.19

3,987,490.94

10,374,884.69

39,897,664.22

26.67%
26.67%
25.00%
25.00%
25.00%
25.00%
25.00%
25.00%
25.00%
25.00%
25.00%
25.00%
25.00%

SALDO POR VALORIZAR


METRADO
S/.

0.48
15.25
0.96

41,675.48
58,467.49
5,504.69
43,920.12
10,979.60
47,481.50
35,007.51
41,733.95
14,244.45
1,834.94
43,888.72
40,739.94
198,811.99
14,465.68
59,643.48
527,563.43
19,968.17
11,548.11
1,113.91
76.70
2,698.78
5,057.84
1,184.37
371.83
70,210.26
1,037.00
50.42
379.12
617.92
90.52
7,011.31

588,914.07
565,390.05
21,038.27
2,485.75
2,298,020.27
1,420,075.81
195,874.74
843,685.83
132,057.53
39,528.11
149,102.91
59,826.69
877,944.46
182,739.18
521,674.42
168,796.71
4,734.14
10,296,367.80
1,260,922.91
1,982,812.90
149,108.99
3,062,385.10
449,115.39
3,065,143.50
326,879.01
6,522,849.42
131,994.91
23,893.38
2,662.11
98,505.44
165,947.84
64,180.94
20,792.47
293,478.89
259,528.90
12,456.70
130,557.25
227,022.53
35,746.78
296,648.32

48.00%
48.00%
48.00%

63.16%
63.16%
63.16%
63.16%
63.16%
63.16%
63.16%
63.16%
63.16%
63.16%
82.61%
82.61%
82.61%
82.61%
82.61%
82.61%
82.61%
78.26%
78.26%
78.26%
78.26%
78.26%
78.26%
78.26%
78.26%
78.26%
78.26%
78.26%
78.26%
78.26%
78.26%

790.59
232.04
74.27
580.90
20,928.60
2,308.70
1,747.57
831.13
851.09
38.25
115.88
24.70
499.77
217.92
3,751.04
1.41
23.48
23.48
23.48
14.09
22,789.57
3.13
25.43
16.43
50,590.48
577,531.61
106,787.47
607,299.55
13,133.32
115,441.87
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

282,043.45
122,507.35
58,399.64
29,887.26
2,513,106.28
228,722.48
137,620.76
100,890.92
90,496.08
329.37
11,484.95
1,025.01
3,223.54
3,545.52
1,047,478.89
22.22
10,959.18
321.18
128.19
222.15
2,734.75
146.66
88,003.84
26,133.28
3,670,178.39
923,782.26
745,015.78
929,050.97
716,613.47
182,553.11
173,162.81

78.26%
78.26%
78.26%
78.26%
78.26%
78.26%
78.26%
78.26%
78.26%
78.26%
78.26%
78.26%
78.26%
78.26%
78.26%
78.26%
78.26%
78.26%
78.26%
78.26%
78.26%
78.26%
78.26%
78.26%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
536,603.44

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

75.00%
75.00%
75.00%
75.00%
75.00%
75.00%

0.73
44.00
56,229.70
1,125.00
22,500.00
7.50
11,250.00
3,000.00
11.25
11.25
11.25
0.75
11.25

468,251.20
68,352.24
374,786.91
161,379.25
3,116.25
50,625.00
9,088.80
31,162.50
8,310.00
4,472.32
39,375.00
4,617.79
6,390.00
56,250.00
23,324,019.32
2,332,401.93
4,520,194.94
30,176,616.20
5,733,557.08
35,910,173.28

73.33%
73.33%
75.00%
75.00%
75.00%
75.00%
75.00%
75.00%
75.00%
75.00%
75.00%
75.00%
75.00%

ITEM.

1.00
1.01
1.02
1.03
2.00
2.01
02.01.01
02.01.02
02.01.03
2.02
2.03
2.04
2.05
02.05.01
02.05.02
02.05.03
2.06
3.00
3.01
3.02
3.03
3.04
3.05
3.06
3.07
4.00
4.01
4.02
4.03
4.04
4.05
4.06
4.07
4.08
4.09
4.10
4.11
4.12
4.13
4.14

DESCRIPCION DE PARTIDA

OBRAS PRELIMINARES
MOVILIZACION Y DESMOVILIZACION DE EQUIPOS
TRAZO Y REPLANTEO
CARTEL DE OBRA 3.60 x 7.20
MOVIMIENTO DE TIERRAS
EXCAVACION PARA EXPLANACIONES
CORTE EN MATERIAL SUELTO
CORTE EN ROCA SUELTA
CORTE EN ROCA FIJA
PERFILADO, NIVELACION Y COMPACTACION DE SUBRASANTE EN ZONAS D
MEJORAMIENTO DE SUB RASANTE
LIMPIEZA DE TERRENO PARA RECIBIR RELLENO
TERRAPLEN
RELLENO CON MATERIAL PROPIO
RELLENO CON MATERIAL EXCEDENTE DE CORTE
RELLENO CON MATERIAL DE CANTERA (MATERIAL CONSIDERADO EN TRAN
REMOCION DE DERRUMBES (SOLO REFINE Y LIMPIEZA)
PAVIMENTO
SUB BASE GRANULAR
BASE GRANULAR
IMPRIMACION BITUMINOSA
CARPETA ASFALTICA EN CALIENTE (e=0.075 m.)
ASFALTO DILUIDO MC-30
CEMENTO ASFALTICO PEN 120 -150
ADITIVO MEJORADOR DE ADHERENCIA
OBRAS DE ARTE Y DRENAJE
EXCAVACION PARA ESTRUCTURAS
EXCAVACION PARA ESTRUCTURAS BAJO AGUA
DEMOLICION DE CONCRETO CICLOPEO
DEMOLICION DE MAMPOSTERIA DE PIEDRA
ENCOFRADO Y DESENCOFRADO
ENCOFRADO Y DESENCOFRADO CARA VISTA
ENCOFRADO Y DESENCOFRADO BAJO AGUA
ACERO DE REFUERZO FY=4,200 KG/CM2
CONCRETO CICLOPEO f'c = 175 KG/CM2 + 30 % PIEDRA MEDIANA
CONCRETO SIMPLE f'c = 100 KG/CM2
CONCRETO SIMPLE f'c = 210 KG/CM2 EN SECO
CONCRETO SIMPLE f'c = 210 KG/CM2 BAJO AGUA
CONCRETO SIMPLE f'c = 280 KG/CM2
RELLENO DE ESTRUCTURAS

4.15
4.16
4.17
4.18
4.19
4.20
4.21
4.22
4.23
4.24
4.25
4.26
4.27
4.28
4.29
4.3
4.31
4.32
4.33
4.34
4.35
4.36
4.37
4.38
5.00
5.01
5.02
5.03
5.04
5.05
5.06
6.00
6.01
6.02
6.03
06.03.01
06.03.02
06.03.03
6.04
6.05
6.06
6.07
6.08
6.09
7.00

ALCANTARILLA TMC 0 36"


ALCANTARILLA TMC 0 48"
ALCANTARILLA TMC 0 60"
ALIVIADERO DE EMBOQUILLADO DE PIEDRA (E=0.15 M)
CUNETAS TRIANGULARES REVESTIDAS 1.00X0.40
CUNETAS TRIANGULARES REVESTIDAS 0.75X0.35
CUNETAS TRIANGULARES REVESTIDAS 0.50X0.30
CUNETAS RECTANGULARES REVESTIDAS
ZANJAS REVESTIDAS
JUNTA PARA MUROS
FILTRO
MATERIAL IMPERMEABLE
GEOTEXTIL
DREN PVC D=3"
SUBDRENAJE
POLIESTILENO EXPANDIDO
BARANDAS METALICAS
BRUA ROMPE AGUA EN LOSA
ACABADO DE VEREDAS
JUNTA DE DILATACION EXPANDIBLES
APOYO DE NEOPRENO
TUBOS DE DRENAJE PVC D = 3" X 0.50 M.
FALSO PUENTE
LOSA DE APROXIMACION
TRANSPORTES
TRANSPORTE DE ESCOMBROS PARA D<=1.00 KM
TRANSPORTE DE ESCOMBROS PARA D>1.00 KM
TRANSPORTE DE MATERIALES GRANULARES PARA D<=1.00 KM
TRANSPORTE DE MATERIALES GRANULARES PARA D>1.00 KM
TRANSPORTE DE MEZCLA ASFALTICA PARA D<=1.00 KM
TRANSPORTE DE MEZCLA ASFALTICA PARA D>1.00 KM
SEALIZACION
SEAL PREVENTIVA (0.75 m. x 0.75 m.)
SEAL REGLAMENTARIA
SEAL INFORMATIVA
PANEL INFORMATIVO
ESTRUCTURA DE SOPORTE
CIMENTACION Y MONTAJE
POSTES KILOMETRICOS
DEMARCACION EN EL PAVIMENTO
GUARDAVIAS (Incluye Terminal)
POSTES DELINEADORES
TACHAS REFLECTIVAS BIDIRECCIONALES
PINTADO DE MUROS Y PARAPETOS
VARIOS

7.01
7.02
8.00
8.01
8.02
8.03
8.04
8.05
8.06
8.07
8.08
8.09
8.10
8.11

MANTENIMIENTO DE TRANSITO TEMPORAL Y SEGURIDAD VIAL


CONSTRUCCION DE PASE PROVISIONAL
MEDIO AMBIENTE
ACONDICIONAMIENTO DE DEPOSITOS DE MATERIAL EXCEDENTE
RESTAURACION DE AREA AFECTADA POR CAMPAMENTO
RESTAURACION DE CANTERAS
REVEGETALIZACION
RESTAURACION DE AREA AFECTADA POR PLANTA DE ASFALTO Y CHANCAD
RESTAURACION DE AREA AFECTADA POR PATIO DE MAQUINAS
SELLADO DE LETRINAS
PROGRAMA DE EDUCACION AMBIENTAL
PROGRAMA DE SEALIZACION AMBIENTAL
PROGRAMA DE CONTINGENCIAS
PROGRAMA DE SEGUIMIENTO Y VIGILANCIA
COSTO DIRECTO
UTILIDAD (10%)
GASTOS GENRALES (19.38%)
SUBTOTAL
IGV (19%)
PRSUPUESTO TOTAL

ON DE PARTIDA

UBRASANTE EN ZONAS DE CORTE

CONSIDERADO EN TRANSP.)
EZA)

IEDRA MEDIANA

UNIDAD

METRADO

GLB
KM
und

1.00
31.76
2.00

m3
m3
m3
m2
m3
m2

65,986.17
92,573.52
8,715.76
69,540.19
17,384.36
75,179.04

m3
m3
m3
m3

55,428.55
66,078.76
22,553.71
2,905.32

m3
m3
m2
m3
gln
gln
kg

53,128.45
49,316.77
240,667.14
17,511.09
72,200.00
638,629.41
24,172.00

m3
m3
m3
m3
m2
m2
m2
kg
m3
m3
m3
m3
m3
m3

14,755.92
1,423.33
98.00
3,448.44
6,462.80
1,513.36
475.11
89,713.11
1,325.05
64.42
484.43
789.56
115.66
8,958.89

15 M)

D<=1.00 KM
D>1.00 KM
00 KM
KM

m
m
m
m2
m
m
m
m
m
m2
m3
m3
m2
m
m
m2
m
m
m
m
CM3
und
m
m

1,010.20
296.50
94.90
742.26
26,742.10
2,950.00
2,233.00
1,062.00
1,087.50
48.88
148.07
31.56
638.60
278.45
4,793.00
1.80
30.00
30.00
30.00
18.00
29,120.00
4.00
32.50
21.00

m3K
m3K
m3K
m3K
M3K
M3K

67,453.98
770,042.15
142,383.29
809,732.73
17,511.09
153,922.50

und
und

110.00
22.00

m2
m
und
und
m2
m
und
und
m2

20.53
106.60
11.00
31.00
8,822.22
440.00
361.00
261.00
157.80

URIDAD VIAL

GLB
m

1.00
60.00

AL EXCEDENTE
ENTO

m3
m2
m2
HA
m2
m2
und
mes
und
GLB
mes

74,972.94
1,500.00
30,000.00
10.00
15,000.00
4,000.00
15.00
15.00
15.00
1.00
15.00

DE ASFALTO Y CHANCADORA
E MAQUINAS

PRIMER MES
PRECIO
S/.

PARCIAL
S/.

1,177,828.16
1,379.95
2,589.17

4.70
14.43
23.99
0.90
13.58
1.26
5.22
12.50
11.85
2.58
28.73
48.67
0.75
211.70
7.53
5.81
16.37
11.43
21.45
34.71
36.50
32.81
54.19
55.92
4.18
250.27
247.08
344.37
367.40
394.92
42.31

1,226,833.71
1,177,828.16
43,827.21
5,178.34
3,638,532.07
2,248,453.35
310,135.00
1,335,835.89
209,091.08
62,586.17
236,079.61
94,725.59
1,390,078.72
289,337.03
825,984.50
267,261.46
7,495.73
12,464,024.18
1,526,380.37
2,400,247.20
180,500.36
3,707,097.75
543,666.00
3,710,436.87
395,695.64
8,334,752.05
168,660.17
30,530.43
3,401.58
125,868.06
212,044.47
82,008.98
26,568.15
375,000.80
331,620.26
15,916.89
166,823.16
290,084.34
45,676.45
379,050.64

RENDIMIENTO

PROGRAMADO
METRADO

0.00
0.00
0.00

6,945.91
9,744.58
917.45
7,320.02
1,829.93
7,913.58
5,834.58
6,955.66
2,374.07
305.82
4,619.87
4,288.41
20,927.58
1,522.70
6,278.26
55,532.99
2,101.91
1,283.12
123.77
8.52
299.86
561.98
131.60
41.31
7,801.14
115.22
5.60
42.12
68.66
10.06
779.03

356.75
527.95
786.32
51.45
120.08
99.07
78.75
121.39
106.33
8.61
99.11
41.50
6.45
16.27
279.25
15.77
466.78
13.68
5.46
15.77
0.12
46.85
3,459.98
1,590.12
18.26
1.29
8.70
1.18
13.90
1.50
695.25
820.95
584.52
168.62
566.86
92.70
18.52
188.01
89.83
14.97
10.41

360,388.85
156,537.18
74,621.77
38,189.28
3,211,191.37
292,256.50
175,848.75
128,916.18
115,633.88
420.86
14,675.22
1,309.74
4,118.97
4,530.38
1,338,445.25
28.39
14,003.40
410.40
163.80
283.86
3,494.40
187.40
112,449.35
33,392.52
4,893,571.19
1,231,709.67
993,354.37
1,238,734.62
955,484.62
243,404.15
230,883.75
417,713.06
76,477.50
18,060.90
323,174.66
12,000.20
17,974.89
6,235.46
2,873.70
163,387.51
82,724.40
32,428.63
3,907.17
1,642.70
731,731.96

87.84
25.78
8.25
64.54
2,325.40
256.52
194.17
92.35
94.57
4.25
12.88
2.74
55.53
24.21
416.78
0.16
2.61
2.61
2.61
1.57
2,532.17
0.35
2.83
1.83
4,818.14
55,003.01
10,170.24
57,838.05
1,250.79
10,994.46
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

638,524.36
1,553.46
2.87
2.77
2.25
1,211.84
2.77
2.77
397.54
3,500.00
410.47
8,520.00
5,000.00

638,524.36
93,207.60
499,715.89
215,172.34
4,155.00
67,500.00
12,118.40
41,550.00
11,080.00
5,963.10
52,500.00
6,157.05
8,520.00
75,000.00
32,206,874.11
3,220,687.41
6,241,692.20
41,669,253.73
7,917,158.21
49,586,411.94

0.07
4.00
9,371.62
187.50
3,750.00
1.25
1,875.00
500.00
1.88
1.88
1.88
0.13
1.88

PRIMER MES

100.00%

PROGRAMADO
S/.

0.00
0.00
0.00
0.00
383,003.37
236,679.30
32,645.79
140,614.30
22,009.59
6,588.02
24,850.48
9,971.11
146,324.07
30,456.53
86,945.74
28,132.79
789.02
1,083,828.19
132,728.73
208,717.15
15,695.68
322,356.33
47,275.30
322,646.68
34,408.32
724,761.05
14,666.10
2,654.82
295.79
10,945.05
18,438.65
7,131.22
2,310.27
32,608.77
28,836.54
1,384.08
14,506.36
25,224.73
3,971.86
32,960.92

VALOR. ACUMUL. ANTERIOR


METRADO
S/.

0.52
16.51
1.04

24,310.69
34,106.03
3,211.07
25,620.07
6,404.76
27,697.54
20,421.04
24,344.81
8,309.26
1,070.38
9,239.73
8,576.83
41,855.15
3,045.41
12,556.52
111,065.98
4,203.83
3,207.81
309.42
21.30
749.66
1,404.96
328.99
103.28
19,502.85
288.05
14.00
105.31
171.64
25.14
1,947.58

637,919.64
612,438.11
22,788.94
2,692.59
1,340,511.80
828,377.54
114,260.26
492,150.06
77,033.56
23,058.06
86,976.70
34,898.90
512,134.26
106,597.85
304,310.08
98,464.75
2,761.58
2,167,656.38
265,457.46
417,434.29
31,391.37
644,712.65
94,550.61
645,293.37
68,816.63
1,811,902.63
36,665.25
6,637.05
739.47
27,362.62
46,096.62
17,828.04
5,775.69
81,521.91
72,091.36
3,460.19
36,265.90
63,061.81
9,929.66
82,402.31

VALORIZACION ACTUAL
METRADO

0.00
0.00
0.00

6,945.91
9,744.58
917.45
7,320.02
1,829.93
7,913.58
5,834.58
6,955.66
2,374.07
305.82
4,619.87
4,288.41
20,927.58
1,522.70
6,278.26
55,532.99
2,101.91
1,283.12
123.77
8.52
299.86
561.98
131.60
41.31
7,801.14
115.22
5.60
42.12
68.66
10.06
779.03

31,338.16
13,611.93
6,488.85
3,320.81
279,234.03
25,413.61
15,291.20
11,210.10
10,055.12
36.60
1,276.11
113.89
358.17
393.95
116,386.54
2.47
1,217.69
35.69
14.24
24.68
303.86
16.30
9,778.20
2,903.70
349,540.80
87,979.26
70,953.88
88,481.04
68,248.90
17,386.01
16,491.70

219.61
64.46
20.63
161.36
5,813.50
641.30
485.43
230.87
236.41
10.63
32.19
6.86
138.83
60.53
1,041.96
0.39
6.52
6.52
6.52
3.91
6,330.43
0.87
7.07
4.57
16,863.50
192,510.54
35,595.82
202,433.18
4,377.77
38,480.63
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

48,782.13

78,345.40
34,029.82
16,222.12
8,302.02
698,085.08
63,534.02
38,227.99
28,025.26
25,137.80
91.49
3,190.26
284.73
895.43
984.87
290,966.36
6.17
3,044.22
89.22
35.61
61.71
759.65
40.74
24,445.51
7,259.24
1,223,392.80
307,927.42
248,338.59
309,683.66
238,871.16
60,851.04
57,720.94
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
195,128.52

87.84
25.78
8.25
64.54
2,325.40
256.52
194.17
92.35
94.57
4.25
12.88
2.74
55.53
24.21
416.78
0.16
2.61
2.61
2.61
1.57
2,532.17
0.35
2.83
1.83
4,818.14
55,003.01
10,170.24
57,838.05
1,250.79
10,994.46
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

42,568.29
6,213.84
62,464.49
26,896.54
519.38
8,437.50
1,514.80
5,193.75
1,385.00
745.39
6,562.50
769.63
1,065.00
9,375.00
2,652,380.03
265,238.00
514,031.25
3,431,649.28
652,013.36
4,083,662.65

0.27
16.00
18,743.24
375.00
7,500.00
2.50
3,750.00
1,000.00
3.75
3.75
3.75
0.25
3.75

170,273.16
24,855.36
124,928.98
53,793.09
1,038.75
16,875.00
3,029.60
10,387.50
2,770.00
1,490.78
13,125.00
1,539.26
2,130.00
18,750.00

0.07
4.00
9,371.62
187.50
3,750.00
1.25
1,875.00
500.00
1.88
1.88
1.88
0.13
1.88

VALORIZACION ACTUAL
S/.

0.00
0.00
0.00
0.00
383,003.37
236,679.30
32,645.79
140,614.30
22,009.59
6,588.02
24,850.48
9,971.11
146,324.07
30,456.53
86,945.74
28,132.79
789.02
1,083,828.19
132,728.73
208,717.15
15,695.68
322,356.33
47,275.30
322,646.68
34,408.32
724,761.05
14,666.10
2,654.82
295.79
10,945.05
18,438.65
7,131.22
2,310.27
32,608.77
28,836.54
1,384.08
14,506.36
25,224.73
3,971.86
32,960.92

#DIV/0!
#DIV/0!
#DIV/0!

VALORIZACION ACUMULADO
METRADO
S/.

0.52
16.51
1.04

31,256.61
43,850.61
4,128.52
32,940.09
8,234.70
35,611.12
26,255.63
31,300.46
10,683.34
1,376.20
13,859.60
12,865.24
62,782.73
4,568.11
18,834.78
166,598.98
6,305.74
4,490.93
433.19
29.83
1,049.53
1,966.94
460.59
144.60
27,303.99
403.28
19.61
147.44
240.30
35.20
2,726.62

637,919.64
612,438.11
22,788.94
2,692.59
1,723,515.17
1,065,056.84
146,906.05
632,764.36
99,043.14
29,646.08
111,827.18
44,870.02
658,458.33
137,054.38
391,255.81
126,597.53
3,550.61
3,251,484.57
398,186.18
626,151.44
47,087.05
967,068.98
141,825.91
967,940.05
103,224.95
2,536,663.68
51,331.36
9,291.87
1,035.26
38,307.67
64,535.27
24,959.25
8,085.96
114,130.68
100,927.91
4,844.27
50,772.27
88,286.54
13,901.53
115,363.24

ACTUAL
%

52.00%
52.00%
52.00%

47.37%
47.37%
47.37%
47.37%
47.37%
47.37%
47.37%
47.37%
47.37%
47.37%
26.09%
26.09%
26.09%
26.09%
26.09%
26.09%
26.09%
30.43%
30.43%
30.43%
30.43%
30.43%
30.43%
30.43%
30.43%
30.43%
30.43%
30.43%
30.43%
30.43%
30.43%

31,338.16
13,611.93
6,488.85
3,320.81
279,234.03
25,413.61
15,291.20
11,210.10
10,055.12
36.60
1,276.11
113.89
358.17
393.95
116,386.54
2.47
1,217.69
35.69
14.24
24.68
303.86
16.30
9,778.20
2,903.70
349,540.80
87,979.26
70,953.88
88,481.04
68,248.90
17,386.01
16,491.70
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
48,782.13

307.45
90.24
28.88
225.91
8,138.90
897.83
679.61
323.22
330.98
14.88
45.06
9.61
194.36
84.75
1,458.74
0.55
9.13
9.13
9.13
5.48
8,862.61
1.22
9.89
6.39
21,681.64
247,513.55
45,766.06
260,271.23
5,628.56
49,475.09
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

109,683.56
47,641.75
22,710.97
11,622.82
977,319.12
88,947.63
53,519.19
39,235.36
35,192.92
128.09
4,466.37
398.62
1,253.60
1,378.81
407,352.90
8.64
4,261.90
124.90
49.85
86.39
1,063.51
57.03
34,223.72
10,162.94
1,572,933.60
395,906.68
319,292.48
398,164.70
307,120.06
78,237.05
74,212.63

30.43%
30.43%
30.43%
30.43%
30.43%
30.43%
30.43%
30.43%
30.43%
30.43%
30.43%
30.43%
30.43%
30.43%
30.43%
30.43%
30.43%
30.43%
30.43%
30.43%
30.43%
30.43%
30.43%
30.43%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
243,910.65

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

32.14%
32.14%
32.14%
32.14%
32.14%
32.14%

42,568.29
6,213.84
62,464.49
26,896.54
519.38
8,437.50
1,514.80
5,193.75
1,385.00
745.39
6,562.50
769.63
1,065.00
9,375.00
2,652,380.03
265,238.00
514,031.25

0.33
20.00
28,114.85
562.50
11,250.00
3.75
5,625.00
1,500.00
5.63
5.63
5.63
0.38
5.63

212,841.45
31,069.20
187,393.47
80,689.63
1,558.13
25,312.50
4,544.40
15,581.25
4,155.00
2,236.16
19,687.50
2,308.89
3,195.00
28,125.00
9,515,901.14
951,590.11
1,844,181.64

3,431,649.28
652,013.36

12,311,672.89
2,339,217.85

4,083,662.65

14,650,890.74

36,487,203.45

33.33%
33.33%
37.50%
37.50%
37.50%
37.50%
37.50%
37.50%
37.50%
37.50%
37.50%
37.50%
37.50%

SALDO POR VALORIZAR


METRADO
S/.

0.48
15.25
0.96

34,729.56
48,722.91
4,587.24
36,600.10
9,149.66
39,567.92
29,172.92
34,778.30
11,870.37
1,529.12
39,268.85
36,451.53
177,884.41
12,942.98
53,365.22
472,030.43
17,866.26
10,264.99
990.14
68.17
2,398.91
4,495.86
1,052.77
330.51
62,409.12
921.77
44.81
336.99
549.26
80.46
6,232.27

588,914.07
565,390.05
21,038.27
2,485.75
1,915,016.90
1,183,396.51
163,228.95
703,071.53
110,047.94
32,940.09
124,252.43
49,855.57
731,620.39
152,282.65
434,728.69
140,663.93
3,945.12
9,212,539.61
1,128,194.19
1,774,095.75
133,413.31
2,740,028.77
401,840.09
2,742,496.82
292,470.69
5,798,088.37
117,328.81
21,238.56
2,366.32
87,560.39
147,509.19
57,049.72
18,482.19
260,870.12
230,692.36
11,072.62
116,050.89
201,797.80
31,774.92
263,687.40

48.00%
48.00%
48.00%

52.63%
52.63%
52.63%
52.63%
52.63%
52.63%
52.63%
52.63%
52.63%
52.63%
73.91%
73.91%
73.91%
73.91%
73.91%
73.91%
73.91%
69.57%
69.57%
69.57%
69.57%
69.57%
69.57%
69.57%
69.57%
69.57%
69.57%
69.57%
69.57%
69.57%
69.57%

702.75
206.26
66.02
516.35
18,603.20
2,052.17
1,553.39
738.78
756.52
34.00
103.01
21.95
444.24
193.70
3,334.26
1.25
20.87
20.87
20.87
12.52
20,257.39
2.78
22.61
14.61
45,772.34
522,528.60
96,617.23
549,461.50
11,882.53
104,447.41
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

250,705.29
108,895.43
51,910.80
26,566.45
2,233,872.25
203,308.87
122,329.56
89,680.82
80,440.96
292.77
10,208.85
911.12
2,865.37
3,151.57
931,092.35
19.75
9,741.50
285.50
113.95
197.47
2,430.89
130.37
78,225.63
23,229.58
3,320,637.59
835,802.99
674,061.90
840,569.92
648,364.56
165,167.10
156,671.12

69.57%
69.57%
69.57%
69.57%
69.57%
69.57%
69.57%
69.57%
69.57%
69.57%
69.57%
69.57%
69.57%
69.57%
69.57%
69.57%
69.57%
69.57%
69.57%
69.57%
69.57%
69.57%
69.57%
69.57%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
487,821.31

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

67.86%
67.86%
67.86%
67.86%
67.86%
67.86%

0.67
40.00
46,858.09
937.50
18,750.00
6.25
9,375.00
2,500.00
9.37
9.37
9.37
0.62
9.37

425,682.91
62,138.40
312,322.42
134,482.71
2,596.87
42,187.50
7,574.00
25,968.75
6,925.00
3,726.94
32,812.50
3,848.16
5,325.00
46,875.00
21,046,426.20
2,104,642.62
4,078,797.40
27,229,866.22
5,173,674.58
32,403,540.80

66.67%
66.67%
62.50%
62.50%
62.50%
62.50%
62.50%
62.50%
62.50%
62.50%
62.50%
62.50%
62.50%

ITEM.

1.00
1.01
1.02
1.03
2.00
2.01
02.01.01
02.01.02
02.01.03
2.02
2.03
2.04
2.05
02.05.01
02.05.02
02.05.03
2.06
3.00
3.01
3.02
3.03
3.04
3.05
3.06
3.07
4.00
4.01
4.02
4.03
4.04
4.05
4.06
4.07
4.08
4.09
4.10
4.11
4.12
4.13
4.14

DESCRIPCION DE PARTIDA

OBRAS PRELIMINARES
MOVILIZACION Y DESMOVILIZACION DE EQUIPOS
TRAZO Y REPLANTEO
CARTEL DE OBRA 3.60 x 7.20
MOVIMIENTO DE TIERRAS
EXCAVACION PARA EXPLANACIONES
CORTE EN MATERIAL SUELTO
CORTE EN ROCA SUELTA
CORTE EN ROCA FIJA
PERFILADO, NIVELACION Y COMPACTACION DE SUBRASANTE EN ZONAS D
MEJORAMIENTO DE SUB RASANTE
LIMPIEZA DE TERRENO PARA RECIBIR RELLENO
TERRAPLEN
RELLENO CON MATERIAL PROPIO
RELLENO CON MATERIAL EXCEDENTE DE CORTE
RELLENO CON MATERIAL DE CANTERA (MATERIAL CONSIDERADO EN TRAN
REMOCION DE DERRUMBES (SOLO REFINE Y LIMPIEZA)
PAVIMENTO
SUB BASE GRANULAR
BASE GRANULAR
IMPRIMACION BITUMINOSA
CARPETA ASFALTICA EN CALIENTE (e=0.075 m.)
ASFALTO DILUIDO MC-30
CEMENTO ASFALTICO PEN 120 -150
ADITIVO MEJORADOR DE ADHERENCIA
OBRAS DE ARTE Y DRENAJE
EXCAVACION PARA ESTRUCTURAS
EXCAVACION PARA ESTRUCTURAS BAJO AGUA
DEMOLICION DE CONCRETO CICLOPEO
DEMOLICION DE MAMPOSTERIA DE PIEDRA
ENCOFRADO Y DESENCOFRADO
ENCOFRADO Y DESENCOFRADO CARA VISTA
ENCOFRADO Y DESENCOFRADO BAJO AGUA
ACERO DE REFUERZO FY=4,200 KG/CM2
CONCRETO CICLOPEO f'c = 175 KG/CM2 + 30 % PIEDRA MEDIANA
CONCRETO SIMPLE f'c = 100 KG/CM2
CONCRETO SIMPLE f'c = 210 KG/CM2 EN SECO
CONCRETO SIMPLE f'c = 210 KG/CM2 BAJO AGUA
CONCRETO SIMPLE f'c = 280 KG/CM2
RELLENO DE ESTRUCTURAS

4.15
4.16
4.17
4.18
4.19
4.20
4.21
4.22
4.23
4.24
4.25
4.26
4.27
4.28
4.29
4.3
4.31
4.32
4.33
4.34
4.35
4.36
4.37
4.38
5.00
5.01
5.02
5.03
5.04
5.05
5.06
6.00
6.01
6.02
6.03
06.03.01
06.03.02
06.03.03
6.04
6.05
6.06
6.07
6.08
6.09
7.00

ALCANTARILLA TMC 0 36"


ALCANTARILLA TMC 0 48"
ALCANTARILLA TMC 0 60"
ALIVIADERO DE EMBOQUILLADO DE PIEDRA (E=0.15 M)
CUNETAS TRIANGULARES REVESTIDAS 1.00X0.40
CUNETAS TRIANGULARES REVESTIDAS 0.75X0.35
CUNETAS TRIANGULARES REVESTIDAS 0.50X0.30
CUNETAS RECTANGULARES REVESTIDAS
ZANJAS REVESTIDAS
JUNTA PARA MUROS
FILTRO
MATERIAL IMPERMEABLE
GEOTEXTIL
DREN PVC D=3"
SUBDRENAJE
POLIESTILENO EXPANDIDO
BARANDAS METALICAS
BRUA ROMPE AGUA EN LOSA
ACABADO DE VEREDAS
JUNTA DE DILATACION EXPANDIBLES
APOYO DE NEOPRENO
TUBOS DE DRENAJE PVC D = 3" X 0.50 M.
FALSO PUENTE
LOSA DE APROXIMACION
TRANSPORTES
TRANSPORTE DE ESCOMBROS PARA D<=1.00 KM
TRANSPORTE DE ESCOMBROS PARA D>1.00 KM
TRANSPORTE DE MATERIALES GRANULARES PARA D<=1.00 KM
TRANSPORTE DE MATERIALES GRANULARES PARA D>1.00 KM
TRANSPORTE DE MEZCLA ASFALTICA PARA D<=1.00 KM
TRANSPORTE DE MEZCLA ASFALTICA PARA D>1.00 KM
SEALIZACION
SEAL PREVENTIVA (0.75 m. x 0.75 m.)
SEAL REGLAMENTARIA
SEAL INFORMATIVA
PANEL INFORMATIVO
ESTRUCTURA DE SOPORTE
CIMENTACION Y MONTAJE
POSTES KILOMETRICOS
DEMARCACION EN EL PAVIMENTO
GUARDAVIAS (Incluye Terminal)
POSTES DELINEADORES
TACHAS REFLECTIVAS BIDIRECCIONALES
PINTADO DE MUROS Y PARAPETOS
VARIOS

7.01
7.02
8.00
8.01
8.02
8.03
8.04
8.05
8.06
8.07
8.08
8.09
8.10
8.11

MANTENIMIENTO DE TRANSITO TEMPORAL Y SEGURIDAD VIAL


CONSTRUCCION DE PASE PROVISIONAL
MEDIO AMBIENTE
ACONDICIONAMIENTO DE DEPOSITOS DE MATERIAL EXCEDENTE
RESTAURACION DE AREA AFECTADA POR CAMPAMENTO
RESTAURACION DE CANTERAS
REVEGETALIZACION
RESTAURACION DE AREA AFECTADA POR PLANTA DE ASFALTO Y CHANCAD
RESTAURACION DE AREA AFECTADA POR PATIO DE MAQUINAS
SELLADO DE LETRINAS
PROGRAMA DE EDUCACION AMBIENTAL
PROGRAMA DE SEALIZACION AMBIENTAL
PROGRAMA DE CONTINGENCIAS
PROGRAMA DE SEGUIMIENTO Y VIGILANCIA
COSTO DIRECTO
UTILIDAD (10%)
GASTOS GENRALES (19.38%)
SUBTOTAL
IGV (19%)
PRSUPUESTO TOTAL

ON DE PARTIDA

UBRASANTE EN ZONAS DE CORTE

CONSIDERADO EN TRANSP.)
EZA)

IEDRA MEDIANA

UNIDAD

METRADO

GLB
KM
und

1.00
31.76
2.00

m3
m3
m3
m2
m3
m2

65,986.17
92,573.52
8,715.76
69,540.19
17,384.36
75,179.04

m3
m3
m3
m3

55,428.55
66,078.76
22,553.71
2,905.32

m3
m3
m2
m3
gln
gln
kg

53,128.45
49,316.77
240,667.14
17,511.09
72,200.00
638,629.41
24,172.00

m3
m3
m3
m3
m2
m2
m2
kg
m3
m3
m3
m3
m3
m3

14,755.92
1,423.33
98.00
3,448.44
6,462.80
1,513.36
475.11
89,713.11
1,325.05
64.42
484.43
789.56
115.66
8,958.89

15 M)

D<=1.00 KM
D>1.00 KM
00 KM
KM

m
m
m
m2
m
m
m
m
m
m2
m3
m3
m2
m
m
m2
m
m
m
m
CM3
und
m
m

1,010.20
296.50
94.90
742.26
26,742.10
2,950.00
2,233.00
1,062.00
1,087.50
48.88
148.07
31.56
638.60
278.45
4,793.00
1.80
30.00
30.00
30.00
18.00
29,120.00
4.00
32.50
21.00

m3K
m3K
m3K
m3K
M3K
M3K

67,453.98
770,042.15
142,383.29
809,732.73
17,511.09
153,922.50

und
und

110.00
22.00

m2
m
und
und
m2
m
und
und
m2

20.53
106.60
11.00
31.00
8,822.22
440.00
361.00
261.00
157.80

URIDAD VIAL

GLB
m

1.00
60.00

AL EXCEDENTE
ENTO

m3
m2
m2
HA
m2
m2
und
mes
und
GLB
mes

74,972.94
1,500.00
30,000.00
10.00
15,000.00
4,000.00
15.00
15.00
15.00
1.00
15.00

DE ASFALTO Y CHANCADORA
E MAQUINAS

PRIMER MES
PRECIO
S/.

PARCIAL
S/.

1,177,828.16
1,379.95
2,589.17

4.70
14.43
23.99
0.90
13.58
1.26
5.22
12.50
11.85
2.58
28.73
48.67
0.75
211.70
7.53
5.81
16.37
11.43
21.45
34.71
36.50
32.81
54.19
55.92
4.18
250.27
247.08
344.37
367.40
394.92
42.31

1,226,833.71
1,177,828.16
43,827.21
5,178.34
3,638,532.07
2,248,453.35
310,135.00
1,335,835.89
209,091.08
62,586.17
236,079.61
94,725.59
1,390,078.72
289,337.03
825,984.50
267,261.46
7,495.73
12,464,024.18
1,526,380.37
2,400,247.20
180,500.36
3,707,097.75
543,666.00
3,710,436.87
395,695.64
8,334,752.05
168,660.17
30,530.43
3,401.58
125,868.06
212,044.47
82,008.98
26,568.15
375,000.80
331,620.26
15,916.89
166,823.16
290,084.34
45,676.45
379,050.64

RENDIMIENTO

PROGRAMADO
METRADO

0.00
0.00
0.00

6,945.91
9,744.58
917.45
7,320.02
1,829.93
7,913.58
5,834.58
6,955.66
2,374.07
305.82
4,619.87
4,288.41
20,927.58
1,522.70
6,278.26
55,532.99
2,101.91
1,283.12
123.77
8.52
299.86
561.98
131.60
41.31
7,801.14
115.22
5.60
42.12
68.66
10.06
779.03

356.75
527.95
786.32
51.45
120.08
99.07
78.75
121.39
106.33
8.61
99.11
41.50
6.45
16.27
279.25
15.77
466.78
13.68
5.46
15.77
0.12
46.85
3,459.98
1,590.12
18.26
1.29
8.70
1.18
13.90
1.50
695.25
820.95
584.52
168.62
566.86
92.70
18.52
188.01
89.83
14.97
10.41

360,388.85
156,537.18
74,621.77
38,189.28
3,211,191.37
292,256.50
175,848.75
128,916.18
115,633.88
420.86
14,675.22
1,309.74
4,118.97
4,530.38
1,338,445.25
28.39
14,003.40
410.40
163.80
283.86
3,494.40
187.40
112,449.35
33,392.52
4,893,571.19
1,231,709.67
993,354.37
1,238,734.62
955,484.62
243,404.15
230,883.75
417,713.06
76,477.50
18,060.90
323,174.66
12,000.20
17,974.89
6,235.46
2,873.70
163,387.51
82,724.40
32,428.63
3,907.17
1,642.70
731,731.96

87.84
25.78
8.25
64.54
2,325.40
256.52
194.17
92.35
94.57
4.25
12.88
2.74
55.53
24.21
416.78
0.16
2.61
2.61
2.61
1.57
2,532.17
0.35
2.83
1.83
4,818.14
55,003.01
10,170.24
57,838.05
1,250.79
10,994.46
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

638,524.36
1,553.46
2.87
2.77
2.25
1,211.84
2.77
2.77
397.54
3,500.00
410.47
8,520.00
5,000.00

638,524.36
93,207.60
499,715.89
215,172.34
4,155.00
67,500.00
12,118.40
41,550.00
11,080.00
5,963.10
52,500.00
6,157.05
8,520.00
75,000.00
32,206,874.11
3,220,687.41
6,241,692.20
41,669,253.73
7,917,158.21
49,586,411.94

0.07
4.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

PRIMER MES

100.00%

PROGRAMADO
S/.

0.00
0.00
0.00
0.00
383,003.37
236,679.30
32,645.79
140,614.30
22,009.59
6,588.02
24,850.48
9,971.11
146,324.07
30,456.53
86,945.74
28,132.79
789.02
1,083,828.19
132,728.73
208,717.15
15,695.68
322,356.33
47,275.30
322,646.68
34,408.32
724,761.05
14,666.10
2,654.82
295.79
10,945.05
18,438.65
7,131.22
2,310.27
32,608.77
28,836.54
1,384.08
14,506.36
25,224.73
3,971.86
32,960.92

VALOR. ACUMUL. ANTERIOR


METRADO
S/.

0.52
16.51
1.04

31,256.61
43,850.61
4,128.52
32,940.09
8,234.70
35,611.12
26,255.63
31,300.46
10,683.34
1,376.20
13,859.60
12,865.24
62,782.73
4,568.11
18,834.78
166,598.98
6,305.74
4,490.93
433.19
29.83
1,049.53
1,966.94
460.59
144.60
27,303.99
403.28
19.61
147.44
240.30
35.20
2,726.62

637,919.64
612,438.11
22,788.94
2,692.59
1,723,515.17
1,065,056.84
146,906.05
632,764.36
99,043.14
29,646.08
111,827.18
44,870.02
658,458.33
137,054.38
391,255.81
126,597.53
3,550.61
3,251,484.57
398,186.18
626,151.44
47,087.05
967,068.98
141,825.91
967,940.05
103,224.95
2,536,663.68
51,331.36
9,291.87
1,035.26
38,307.67
64,535.27
24,959.25
8,085.96
114,130.68
100,927.91
4,844.27
50,772.27
88,286.54
13,901.53
115,363.24

VALORIZACION ACTUAL
METRADO

0.00
0.00
0.00

6,945.91
9,744.58
917.45
7,320.02
1,829.93
7,913.58
5,834.58
6,955.66
2,374.07
305.82
4,619.87
4,288.41
20,927.58
1,522.70
6,278.26
55,532.99
2,101.91
1,283.12
123.77
8.52
299.86
561.98
131.60
41.31
7,801.14
115.22
5.60
42.12
68.66
10.06
779.03

31,338.16
13,611.93
6,488.85
3,320.81
279,234.03
25,413.61
15,291.20
11,210.10
10,055.12
36.60
1,276.11
113.89
358.17
393.95
116,386.54
2.47
1,217.69
35.69
14.24
24.68
303.86
16.30
9,778.20
2,903.70
349,540.80
87,979.26
70,953.88
88,481.04
68,248.90
17,386.01
16,491.70

307.45
90.24
28.88
225.91
8,138.90
897.83
679.61
323.22
330.98
14.88
45.06
9.61
194.36
84.75
1,458.74
0.55
9.13
9.13
9.13
5.48
8,862.61
1.22
9.89
6.39
21,681.64
247,513.55
45,766.06
260,271.23
5,628.56
49,475.09
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

48,782.13

109,683.56
47,641.75
22,710.97
11,622.82
977,319.12
88,947.63
53,519.19
39,235.36
35,192.92
128.09
4,466.37
398.62
1,253.60
1,378.81
407,352.90
8.64
4,261.90
124.90
49.85
86.39
1,063.51
57.03
34,223.72
10,162.94
1,572,933.60
395,906.68
319,292.48
398,164.70
307,120.06
78,237.05
74,212.63
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
243,910.65

87.84
25.78
8.25
64.54
2,325.40
256.52
194.17
92.35
94.57
4.25
12.88
2.74
55.53
24.21
416.78
0.16
2.61
2.61
2.61
1.57
2,532.17
0.35
2.83
1.83
4,818.14
55,003.01
10,170.24
57,838.05
1,250.79
10,994.46
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

42,568.29
6,213.84
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2,589,915.54
258,991.55
501,925.63
3,350,832.73
636,658.22
3,987,490.94

0.33
20.00
28,114.85
562.50
11,250.00
3.75
5,625.00
1,500.00
5.63
5.63
5.63
0.38
5.63

212,841.45
31,069.20
187,393.47
80,689.63
1,558.13
25,312.50
4,544.40
15,581.25
4,155.00
2,236.16
19,687.50
2,308.89
3,195.00
28,125.00

0.07
4.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

VALORIZACION ACTUAL
S/.

0.00
0.00
0.00
0.00
383,003.37
236,679.30
32,645.79
140,614.30
22,009.59
6,588.02
24,850.48
9,971.11
146,324.07
30,456.53
86,945.74
28,132.79
789.02
1,083,828.19
132,728.73
208,717.15
15,695.68
322,356.33
47,275.30
322,646.68
34,408.32
724,761.05
14,666.10
2,654.82
295.79
10,945.05
18,438.65
7,131.22
2,310.27
32,608.77
28,836.54
1,384.08
14,506.36
25,224.73
3,971.86
32,960.92

#DIV/0!
#DIV/0!
#DIV/0!

VALORIZACION ACUMULADO
METRADO
S/.

0.52
16.51
1.04

38,202.52
53,595.20
5,045.97
40,260.11
10,064.63
43,524.71
32,090.21
38,256.12
13,057.41
1,682.03
18,479.46
17,153.66
83,710.31
6,090.81
25,113.04
222,131.97
8,407.65
5,774.06
556.96
38.35
1,349.39
2,528.92
592.18
185.91
35,105.13
518.50
25.21
189.56
308.96
45.26
3,505.65

637,919.64
612,438.11
22,788.94
2,692.59
2,106,518.54
1,301,736.13
179,551.84
773,378.67
121,052.73
36,234.10
136,677.67
54,841.13
804,782.41
167,510.91
478,201.55
154,730.32
4,339.63
4,335,312.76
530,914.91
834,868.59
62,782.73
1,289,425.31
189,101.22
1,290,586.74
137,633.27
3,261,424.73
65,997.46
11,946.69
1,331.05
49,252.72
82,973.92
32,090.47
10,396.23
146,739.44
129,764.45
6,228.35
65,278.63
113,511.27
17,873.39
148,324.16

ACTUAL
%

52.00%
52.00%
52.00%

57.89%
57.89%
57.89%
57.89%
57.89%
57.89%
57.89%
57.89%
57.89%
57.89%
34.78%
34.78%
34.78%
34.78%
34.78%
34.78%
34.78%
39.13%
39.13%
39.13%
39.13%
39.13%
39.13%
39.13%
39.13%
39.13%
39.13%
39.13%
39.13%
39.13%
39.13%

31,338.16
13,611.93
6,488.85
3,320.81
279,234.03
25,413.61
15,291.20
11,210.10
10,055.12
36.60
1,276.11
113.89
358.17
393.95
116,386.54
2.47
1,217.69
35.69
14.24
24.68
303.86
16.30
9,778.20
2,903.70
349,540.80
87,979.26
70,953.88
88,481.04
68,248.90
17,386.01
16,491.70
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
48,782.13

395.30
116.02
37.13
290.45
10,464.30
1,154.35
873.78
415.57
425.54
19.13
57.94
12.35
249.89
108.96
1,875.52
0.70
11.74
11.74
11.74
7.04
11,394.78
1.57
12.72
8.22
26,499.78
302,516.56
55,936.29
318,109.29
6,879.36
60,469.55
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

141,021.72
61,253.68
29,199.82
14,943.63
1,256,553.15
114,361.24
68,810.38
50,445.46
45,248.04
164.68
5,742.48
512.51
1,611.77
1,772.76
523,739.45
11.11
5,479.59
160.59
64.10
111.08
1,367.37
73.33
44,001.92
13,066.64
1,922,474.40
483,885.94
390,246.36
486,645.75
375,368.96
95,623.06
90,704.33

39.13%
39.13%
39.13%
39.13%
39.13%
39.13%
39.13%
39.13%
39.13%
39.13%
39.13%
39.13%
39.13%
39.13%
39.13%
39.13%
39.13%
39.13%
39.13%
39.13%
39.13%
39.13%
39.13%
39.13%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
292,692.78

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

39.29%
39.29%
39.29%
39.29%
39.29%
39.29%

42,568.29
6,213.84
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2,589,915.54
258,991.55
501,925.63

0.40
24.00
28,114.85
562.50
11,250.00
3.75
5,625.00
1,500.00
5.63
5.63
5.63
0.38
5.63

255,409.74
37,283.04
187,393.47
80,689.63
1,558.13
25,312.50
4,544.40
15,581.25
4,155.00
2,236.16
19,687.50
2,308.89
3,195.00
28,125.00
11,918,423.21
1,191,842.32
2,309,790.42

3,350,832.73
636,658.22

15,420,055.95
2,929,810.63

3,987,490.94

18,349,866.58

31,922,682.34

40.00%
40.00%
37.50%
37.50%
37.50%
37.50%
37.50%
37.50%
37.50%
37.50%
37.50%
37.50%
37.50%

SALDO POR VALORIZAR


METRADO
S/.

0.48
15.25
0.96

27,783.65
38,978.32
3,669.79
29,280.08
7,319.73
31,654.33
23,338.34
27,822.64
9,496.30
1,223.29
34,648.99
32,163.11
156,956.83
11,420.28
47,086.96
416,497.44
15,764.35
8,981.86
866.37
59.65
2,099.05
3,933.88
921.18
289.20
54,607.98
806.55
39.21
294.87
480.60
70.40
5,453.24

588,914.07
565,390.05
21,038.27
2,485.75
1,532,013.53
946,717.21
130,583.16
562,457.23
88,038.35
26,352.07
99,401.94
39,884.46
585,296.31
121,826.12
347,782.95
112,531.14
3,156.10
8,128,711.42
995,465.46
1,565,378.61
117,717.62
2,417,672.45
354,564.78
2,419,850.13
258,062.37
5,073,327.32
102,662.71
18,583.74
2,070.53
76,615.34
129,070.55
49,918.51
16,171.92
228,261.36
201,855.81
9,688.54
101,544.53
176,573.08
27,803.05
230,726.47

48.00%
48.00%
48.00%

42.11%
42.11%
42.11%
42.11%
42.11%
42.11%
42.11%
42.11%
42.11%
42.11%
65.22%
65.22%
65.22%
65.22%
65.22%
65.22%
65.22%
60.87%
60.87%
60.87%
60.87%
60.87%
60.87%
60.87%
60.87%
60.87%
60.87%
60.87%
60.87%
60.87%
60.87%

614.90
180.48
57.77
451.81
16,277.80
1,795.65
1,359.22
646.43
661.96
29.75
90.13
19.21
388.71
169.49
2,917.48
1.10
18.26
18.26
18.26
10.96
17,725.22
2.43
19.78
12.78
40,954.20
467,525.59
86,447.00
491,623.44
10,631.73
93,452.95
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

219,367.13
95,283.50
45,421.95
23,245.65
1,954,638.22
177,895.26
107,038.37
78,470.72
70,385.84
256.17
8,932.74
797.23
2,507.20
2,757.62
814,705.80
17.28
8,523.81
249.81
99.70
172.78
2,127.03
114.07
68,447.43
20,325.88
2,971,096.79
747,823.73
603,108.01
752,088.88
580,115.66
147,781.09
140,179.42

60.87%
60.87%
60.87%
60.87%
60.87%
60.87%
60.87%
60.87%
60.87%
60.87%
60.87%
60.87%
60.87%
60.87%
60.87%
60.87%
60.87%
60.87%
60.87%
60.87%
60.87%
60.87%
60.87%
60.87%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
439,039.18

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

60.71%
60.71%
60.71%
60.71%
60.71%
60.71%

0.60
36.00
46,858.09
937.50
18,750.00
6.25
9,375.00
2,500.00
9.37
9.37
9.37
0.62
9.37

383,114.62
55,924.56
312,322.42
134,482.71
2,596.87
42,187.50
7,574.00
25,968.75
6,925.00
3,726.94
32,812.50
3,848.16
5,325.00
46,875.00
18,144,188.24
1,814,418.82
3,516,343.68
23,474,950.75
4,460,240.64
27,935,191.39

60.00%
60.00%
62.50%
62.50%
62.50%
62.50%
62.50%
62.50%
62.50%
62.50%
62.50%
62.50%
62.50%

ITEM.

1.00
1.01
1.02
1.03
2.00
2.01
02.01.01
02.01.02
02.01.03
2.02
2.03
2.04
2.05
02.05.01
02.05.02
02.05.03
2.06
3.00
3.01
3.02
3.03
3.04
3.05
3.06
3.07
4.00
4.01
4.02
4.03
4.04
4.05
4.06
4.07
4.08
4.09
4.10
4.11
4.12
4.13
4.14

DESCRIPCION DE PARTIDA

OBRAS PRELIMINARES
MOVILIZACION Y DESMOVILIZACION DE EQUIPOS
TRAZO Y REPLANTEO
CARTEL DE OBRA 3.60 x 7.20
MOVIMIENTO DE TIERRAS
EXCAVACION PARA EXPLANACIONES
CORTE EN MATERIAL SUELTO
CORTE EN ROCA SUELTA
CORTE EN ROCA FIJA
PERFILADO, NIVELACION Y COMPACTACION DE SUBRASANTE EN ZONAS D
MEJORAMIENTO DE SUB RASANTE
LIMPIEZA DE TERRENO PARA RECIBIR RELLENO
TERRAPLEN
RELLENO CON MATERIAL PROPIO
RELLENO CON MATERIAL EXCEDENTE DE CORTE
RELLENO CON MATERIAL DE CANTERA (MATERIAL CONSIDERADO EN TRAN
REMOCION DE DERRUMBES (SOLO REFINE Y LIMPIEZA)
PAVIMENTO
SUB BASE GRANULAR
BASE GRANULAR
IMPRIMACION BITUMINOSA
CARPETA ASFALTICA EN CALIENTE (e=0.075 m.)
ASFALTO DILUIDO MC-30
CEMENTO ASFALTICO PEN 120 -150
ADITIVO MEJORADOR DE ADHERENCIA
OBRAS DE ARTE Y DRENAJE
EXCAVACION PARA ESTRUCTURAS
EXCAVACION PARA ESTRUCTURAS BAJO AGUA
DEMOLICION DE CONCRETO CICLOPEO
DEMOLICION DE MAMPOSTERIA DE PIEDRA
ENCOFRADO Y DESENCOFRADO
ENCOFRADO Y DESENCOFRADO CARA VISTA
ENCOFRADO Y DESENCOFRADO BAJO AGUA
ACERO DE REFUERZO FY=4,200 KG/CM2
CONCRETO CICLOPEO f'c = 175 KG/CM2 + 30 % PIEDRA MEDIANA
CONCRETO SIMPLE f'c = 100 KG/CM2
CONCRETO SIMPLE f'c = 210 KG/CM2 EN SECO
CONCRETO SIMPLE f'c = 210 KG/CM2 BAJO AGUA
CONCRETO SIMPLE f'c = 280 KG/CM2
RELLENO DE ESTRUCTURAS

4.15
4.16
4.17
4.18
4.19
4.20
4.21
4.22
4.23
4.24
4.25
4.26
4.27
4.28
4.29
4.3
4.31
4.32
4.33
4.34
4.35
4.36
4.37
4.38
5.00
5.01
5.02
5.03
5.04
5.05
5.06
6.00
6.01
6.02
6.03
06.03.01
06.03.02
06.03.03
6.04
6.05
6.06
6.07
6.08
6.09
7.00

ALCANTARILLA TMC 0 36"


ALCANTARILLA TMC 0 48"
ALCANTARILLA TMC 0 60"
ALIVIADERO DE EMBOQUILLADO DE PIEDRA (E=0.15 M)
CUNETAS TRIANGULARES REVESTIDAS 1.00X0.40
CUNETAS TRIANGULARES REVESTIDAS 0.75X0.35
CUNETAS TRIANGULARES REVESTIDAS 0.50X0.30
CUNETAS RECTANGULARES REVESTIDAS
ZANJAS REVESTIDAS
JUNTA PARA MUROS
FILTRO
MATERIAL IMPERMEABLE
GEOTEXTIL
DREN PVC D=3"
SUBDRENAJE
POLIESTILENO EXPANDIDO
BARANDAS METALICAS
BRUA ROMPE AGUA EN LOSA
ACABADO DE VEREDAS
JUNTA DE DILATACION EXPANDIBLES
APOYO DE NEOPRENO
TUBOS DE DRENAJE PVC D = 3" X 0.50 M.
FALSO PUENTE
LOSA DE APROXIMACION
TRANSPORTES
TRANSPORTE DE ESCOMBROS PARA D<=1.00 KM
TRANSPORTE DE ESCOMBROS PARA D>1.00 KM
TRANSPORTE DE MATERIALES GRANULARES PARA D<=1.00 KM
TRANSPORTE DE MATERIALES GRANULARES PARA D>1.00 KM
TRANSPORTE DE MEZCLA ASFALTICA PARA D<=1.00 KM
TRANSPORTE DE MEZCLA ASFALTICA PARA D>1.00 KM
SEALIZACION
SEAL PREVENTIVA (0.75 m. x 0.75 m.)
SEAL REGLAMENTARIA
SEAL INFORMATIVA
PANEL INFORMATIVO
ESTRUCTURA DE SOPORTE
CIMENTACION Y MONTAJE
POSTES KILOMETRICOS
DEMARCACION EN EL PAVIMENTO
GUARDAVIAS (Incluye Terminal)
POSTES DELINEADORES
TACHAS REFLECTIVAS BIDIRECCIONALES
PINTADO DE MUROS Y PARAPETOS
VARIOS

7.01
7.02
8.00
8.01
8.02
8.03
8.04
8.05
8.06
8.07
8.08
8.09
8.10
8.11

MANTENIMIENTO DE TRANSITO TEMPORAL Y SEGURIDAD VIAL


CONSTRUCCION DE PASE PROVISIONAL
MEDIO AMBIENTE
ACONDICIONAMIENTO DE DEPOSITOS DE MATERIAL EXCEDENTE
RESTAURACION DE AREA AFECTADA POR CAMPAMENTO
RESTAURACION DE CANTERAS
REVEGETALIZACION
RESTAURACION DE AREA AFECTADA POR PLANTA DE ASFALTO Y CHANCAD
RESTAURACION DE AREA AFECTADA POR PATIO DE MAQUINAS
SELLADO DE LETRINAS
PROGRAMA DE EDUCACION AMBIENTAL
PROGRAMA DE SEALIZACION AMBIENTAL
PROGRAMA DE CONTINGENCIAS
PROGRAMA DE SEGUIMIENTO Y VIGILANCIA
COSTO DIRECTO
UTILIDAD (10%)
GASTOS GENRALES (19.38%)
SUBTOTAL
IGV (19%)
PRSUPUESTO TOTAL

ON DE PARTIDA

UBRASANTE EN ZONAS DE CORTE

CONSIDERADO EN TRANSP.)
EZA)

IEDRA MEDIANA

UNIDAD

METRADO

GLB
KM
und

1.00
31.76
2.00

m3
m3
m3
m2
m3
m2

65,986.17
92,573.52
8,715.76
69,540.19
17,384.36
75,179.04

m3
m3
m3
m3

55,428.55
66,078.76
22,553.71
2,905.32

m3
m3
m2
m3
gln
gln
kg

53,128.45
49,316.77
240,667.14
17,511.09
72,200.00
638,629.41
24,172.00

m3
m3
m3
m3
m2
m2
m2
kg
m3
m3
m3
m3
m3
m3

14,755.92
1,423.33
98.00
3,448.44
6,462.80
1,513.36
475.11
89,713.11
1,325.05
64.42
484.43
789.56
115.66
8,958.89

15 M)

D<=1.00 KM
D>1.00 KM
00 KM
KM

m
m
m
m2
m
m
m
m
m
m2
m3
m3
m2
m
m
m2
m
m
m
m
CM3
und
m
m

1,010.20
296.50
94.90
742.26
26,742.10
2,950.00
2,233.00
1,062.00
1,087.50
48.88
148.07
31.56
638.60
278.45
4,793.00
1.80
30.00
30.00
30.00
18.00
29,120.00
4.00
32.50
21.00

m3K
m3K
m3K
m3K
M3K
M3K

67,453.98
770,042.15
142,383.29
809,732.73
17,511.09
153,922.50

und
und

110.00
22.00

m2
m
und
und
m2
m
und
und
m2

20.53
106.60
11.00
31.00
8,822.22
440.00
361.00
261.00
157.80

URIDAD VIAL

GLB
m

1.00
60.00

AL EXCEDENTE
ENTO

m3
m2
m2
HA
m2
m2
und
mes
und
GLB
mes

74,972.94
1,500.00
30,000.00
10.00
15,000.00
4,000.00
15.00
15.00
15.00
1.00
15.00

DE ASFALTO Y CHANCADORA
E MAQUINAS

SEPTIMO MES
PRECIO
S/.

PARCIAL
S/.

1,177,828.16
1,379.95
2,589.17

4.70
14.43
23.99
0.90
13.58
1.26
5.22
12.50
11.85
2.58
28.73
48.67
0.75
211.70
7.53
5.81
16.37
11.43
21.45
34.71
36.50
32.81
54.19
55.92
4.18
250.27
247.08
344.37
367.40
394.92
42.31

1,226,833.71
1,177,828.16
43,827.21
5,178.34
3,638,532.07
2,248,453.35
310,135.00
1,335,835.89
209,091.08
62,586.17
236,079.61
94,725.59
1,390,078.72
289,337.03
825,984.50
267,261.46
7,495.73
12,464,024.18
1,526,380.37
2,400,247.20
180,500.36
3,707,097.75
543,666.00
3,710,436.87
395,695.64
8,334,752.05
168,660.17
30,530.43
3,401.58
125,868.06
212,044.47
82,008.98
26,568.15
375,000.80
331,620.26
15,916.89
166,823.16
290,084.34
45,676.45
379,050.64

RENDIMIENTO

PROGRAMADO
METRADO

0.00
0.00
0.00

6,945.91
9,744.58
917.45
7,320.02
1,829.93
7,913.58
5,834.58
6,955.66
2,374.07
305.82
4,619.87
4,288.41
20,927.58
1,522.70
6,278.26
55,532.99
2,101.91
1,283.12
123.77
8.52
299.86
561.98
131.60
41.31
7,801.14
115.22
5.60
42.12
68.66
10.06
779.03

356.75
527.95
786.32
51.45
120.08
99.07
78.75
121.39
106.33
8.61
99.11
41.50
6.45
16.27
279.25
15.77
466.78
13.68
5.46
15.77
0.12
46.85
3,459.98
1,590.12
18.26
1.29
8.70
1.18
13.90
1.50
695.25
820.95
584.52
168.62
566.86
92.70
18.52
188.01
89.83
14.97
10.41

360,388.85
156,537.18
74,621.77
38,189.28
3,211,191.37
292,256.50
175,848.75
128,916.18
115,633.88
420.86
14,675.22
1,309.74
4,118.97
4,530.38
1,338,445.25
28.39
14,003.40
410.40
163.80
283.86
3,494.40
187.40
112,449.35
33,392.52
4,893,571.19
1,231,709.67
993,354.37
1,238,734.62
955,484.62
243,404.15
230,883.75
417,713.06
76,477.50
18,060.90
323,174.66
12,000.20
17,974.89
6,235.46
2,873.70
163,387.51
82,724.40
32,428.63
3,907.17
1,642.70
731,731.96

87.84
25.78
8.25
64.54
2,325.40
256.52
194.17
92.35
94.57
4.25
12.88
2.74
55.53
24.21
416.78
0.16
2.61
2.61
2.61
1.57
2,532.17
0.35
2.83
1.83
4,818.14
55,003.01
10,170.24
57,838.05
1,250.79
10,994.46
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

638,524.36
1,553.46
2.87
2.77
2.25
1,211.84
2.77
2.77
397.54
3,500.00
410.47
8,520.00
5,000.00

638,524.36
93,207.60
499,715.89
215,172.34
4,155.00
67,500.00
12,118.40
41,550.00
11,080.00
5,963.10
52,500.00
6,157.05
8,520.00
75,000.00
32,206,874.11
3,220,687.41
6,241,692.20
41,669,253.73
7,917,158.21
49,586,411.94

0.07
4.00
9,371.62
187.50
3,750.00
1.25
1,875.00
500.00
1.88
1.88
1.88
0.13
1.88

SEPTIMO MES

100.00%

PROGRAMADO
S/.

0.00
0.00
0.00
0.00
383,003.37
236,679.30
32,645.79
140,614.30
22,009.59
6,588.02
24,850.48
9,971.11
146,324.07
30,456.53
86,945.74
28,132.79
789.02
1,083,828.19
132,728.73
208,717.15
15,695.68
322,356.33
47,275.30
322,646.68
34,408.32
724,761.05
14,666.10
2,654.82
295.79
10,945.05
18,438.65
7,131.22
2,310.27
32,608.77
28,836.54
1,384.08
14,506.36
25,224.73
3,971.86
32,960.92

VALOR. ACUMUL. ANTERIOR


METRADO
S/.

0.52
16.51
1.04

38,202.52
53,595.20
5,045.97
40,260.11
10,064.63
43,524.71
32,090.21
38,256.12
13,057.41
1,682.03
18,479.46
17,153.66
83,710.31
6,090.81
25,113.04
222,131.97
8,407.65
5,774.06
556.96
38.35
1,349.39
2,528.92
592.18
185.91
35,105.13
518.50
25.21
189.56
308.96
45.26
3,505.65

637,919.64
612,438.11
22,788.94
2,692.59
2,106,518.54
1,301,736.13
179,551.84
773,378.67
121,052.73
36,234.10
136,677.67
54,841.13
804,782.41
167,510.91
478,201.55
154,730.32
4,339.63
4,335,312.76
530,914.91
834,868.59
62,782.73
1,289,425.31
189,101.22
1,290,586.74
137,633.27
3,261,424.73
65,997.46
11,946.69
1,331.05
49,252.72
82,973.92
32,090.47
10,396.23
146,739.44
129,764.45
6,228.35
65,278.63
113,511.27
17,873.39
148,324.16

VALORIZACION ACTUAL
METRADO

0.00
0.00
0.00

6,945.91
9,744.58
917.45
7,320.02
1,829.93
7,913.58
5,834.58
6,955.66
2,374.07
305.82
4,619.87
4,288.41
20,927.58
1,522.70
6,278.26
55,532.99
2,101.91
1,283.12
123.77
8.52
299.86
561.98
131.60
41.31
7,801.14
115.22
5.60
42.12
68.66
10.06
779.03

31,338.16
13,611.93
6,488.85
3,320.81
279,234.03
25,413.61
15,291.20
11,210.10
10,055.12
36.60
1,276.11
113.89
358.17
393.95
116,386.54
2.47
1,217.69
35.69
14.24
24.68
303.86
16.30
9,778.20
2,903.70
349,540.80
87,979.26
70,953.88
88,481.04
68,248.90
17,386.01
16,491.70

395.30
116.02
37.13
290.45
10,464.30
1,154.35
873.78
415.57
425.54
19.13
57.94
12.35
249.89
108.96
1,875.52
0.70
11.74
11.74
11.74
7.04
11,394.78
1.57
12.72
8.22
26,499.78
302,516.56
55,936.29
318,109.29
6,879.36
60,469.55
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

48,782.13

141,021.72
61,253.68
29,199.82
14,943.63
1,256,553.15
114,361.24
68,810.38
50,445.46
45,248.04
164.68
5,742.48
512.51
1,611.77
1,772.76
523,739.45
11.11
5,479.59
160.59
64.10
111.08
1,367.37
73.33
44,001.92
13,066.64
1,922,474.40
483,885.94
390,246.36
486,645.75
375,368.96
95,623.06
90,704.33
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
292,692.78

87.84
25.78
8.25
64.54
2,325.40
256.52
194.17
92.35
94.57
4.25
12.88
2.74
55.53
24.21
416.78
0.16
2.61
2.61
2.61
1.57
2,532.17
0.35
2.83
1.83
4,818.14
55,003.01
10,170.24
57,838.05
1,250.79
10,994.46
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

42,568.29
6,213.84
62,464.49
26,896.54
519.38
8,437.50
1,514.80
5,193.75
1,385.00
745.39
6,562.50
769.63
1,065.00
9,375.00
2,652,380.03
265,238.00
514,031.25
3,431,649.28
652,013.36
4,083,662.65

0.40
24.00
28,114.85
562.50
11,250.00
3.75
5,625.00
1,500.00
5.63
5.63
5.63
0.38
5.63

255,409.74
37,283.04
187,393.47
80,689.63
1,558.13
25,312.50
4,544.40
15,581.25
4,155.00
2,236.16
19,687.50
2,308.89
3,195.00
28,125.00

0.07
4.00
9,371.62
187.50
3,750.00
1.25
1,875.00
500.00
1.88
1.88
1.88
0.13
1.88

VALORIZACION ACTUAL
S/.

0.00
0.00
0.00
0.00
383,003.37
236,679.30
32,645.79
140,614.30
22,009.59
6,588.02
24,850.48
9,971.11
146,324.07
30,456.53
86,945.74
28,132.79
789.02
1,083,828.19
132,728.73
208,717.15
15,695.68
322,356.33
47,275.30
322,646.68
34,408.32
724,761.05
14,666.10
2,654.82
295.79
10,945.05
18,438.65
7,131.22
2,310.27
32,608.77
28,836.54
1,384.08
14,506.36
25,224.73
3,971.86
32,960.92

#DIV/0!
#DIV/0!
#DIV/0!

VALORIZACION ACUMULADO
METRADO
S/.

0.52
16.51
1.04

45,148.43
63,339.78
5,963.41
47,580.13
11,894.56
51,438.29
37,924.80
45,211.78
15,431.49
1,987.85
23,099.33
21,442.07
104,637.89
7,613.52
31,391.30
277,664.96
10,509.57
7,057.18
680.72
46.87
1,649.25
3,090.90
723.78
227.23
42,906.27
633.72
30.81
231.68
377.62
55.32
4,284.69

637,919.64
612,438.11
22,788.94
2,692.59
2,489,521.91
1,538,415.43
212,197.63
913,992.97
143,062.32
42,822.12
161,528.15
64,812.25
951,106.48
197,967.44
565,147.28
182,863.10
5,128.65
5,419,140.95
663,643.64
1,043,585.74
78,478.42
1,611,781.63
236,376.52
1,613,233.42
172,041.58
3,986,185.78
80,663.56
14,601.51
1,626.84
60,197.77
101,412.57
39,221.69
12,706.51
179,348.21
158,601.00
7,612.43
79,784.99
138,735.99
21,845.26
181,285.09

ACTUAL
%

52.00%
52.00%
52.00%

68.42%
68.42%
68.42%
68.42%
68.42%
68.42%
68.42%
68.42%
68.42%
68.42%
43.48%
43.48%
43.48%
43.48%
43.48%
43.48%
43.48%
47.83%
47.83%
47.83%
47.83%
47.83%
47.83%
47.83%
47.83%
47.83%
47.83%
47.83%
47.83%
47.83%
47.83%

31,338.16
13,611.93
6,488.85
3,320.81
279,234.03
25,413.61
15,291.20
11,210.10
10,055.12
36.60
1,276.11
113.89
358.17
393.95
116,386.54
2.47
1,217.69
35.69
14.24
24.68
303.86
16.30
9,778.20
2,903.70
349,540.80
87,979.26
70,953.88
88,481.04
68,248.90
17,386.01
16,491.70
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
48,782.13

483.14
141.80
45.39
354.99
12,789.70
1,410.87
1,067.96
507.91
520.11
23.38
70.82
15.09
305.42
133.17
2,292.30
0.86
14.35
14.35
14.35
8.61
13,926.96
1.91
15.54
10.04
31,317.92
357,519.57
66,106.53
375,947.34
8,130.15
71,464.02
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

172,359.89
74,865.61
35,688.67
18,264.44
1,535,787.18
139,774.85
84,101.58
61,655.56
55,303.16
201.28
7,018.58
626.40
1,969.94
2,166.70
640,125.99
13.58
6,697.28
196.28
78.34
135.76
1,671.23
89.63
53,780.12
15,970.34
2,272,015.20
571,865.21
461,200.25
575,126.79
443,617.86
113,009.07
107,196.03

47.83%
47.83%
47.83%
47.83%
47.83%
47.83%
47.83%
47.83%
47.83%
47.83%
47.83%
47.83%
47.83%
47.83%
47.83%
47.83%
47.83%
47.83%
47.83%
47.83%
47.83%
47.83%
47.83%
47.83%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
341,474.91

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

46.43%
46.43%
46.43%
46.43%
46.43%
46.43%

42,568.29
6,213.84
62,464.49
26,896.54
519.38
8,437.50
1,514.80
5,193.75
1,385.00
745.39
6,562.50
769.63
1,065.00
9,375.00
2,652,380.03
265,238.00
514,031.25

0.47
28.00
37,486.47
750.00
15,000.00
5.00
7,500.00
2,000.00
7.50
7.50
7.50
0.50
7.50

297,978.03
43,496.88
249,857.96
107,586.18
2,077.50
33,750.00
6,059.20
20,775.00
5,540.00
2,981.55
26,250.00
3,078.53
4,260.00
37,500.00
14,758,196.71
1,475,819.67
2,860,138.52

3,431,649.28
652,013.36

19,094,154.90
3,627,889.43

4,083,662.65

22,722,044.34

28,416,049.86

46.67%
46.67%
50.00%
50.00%
50.00%
50.00%
50.00%
50.00%
50.00%
50.00%
50.00%
50.00%
50.00%

SALDO POR VALORIZAR


METRADO
S/.

0.48
15.25
0.96

20,837.74
29,233.74
2,752.35
21,960.06
5,489.80
23,740.75
17,503.75
20,866.98
7,122.22
917.47
30,029.12
27,874.70
136,029.25
9,897.57
40,808.70
360,964.45
13,662.43
7,698.74
742.61
51.13
1,799.19
3,371.90
789.58
247.88
46,806.84
691.33
33.61
252.75
411.94
60.34
4,674.20

588,914.07
565,390.05
21,038.27
2,485.75
1,149,010.16
710,037.92
97,937.37
421,842.92
66,028.76
19,764.05
74,551.46
29,913.35
438,972.24
91,369.59
260,837.22
84,398.36
2,367.07
7,044,883.23
862,736.73
1,356,661.46
102,021.94
2,095,316.12
307,289.48
2,097,203.45
223,654.06
4,348,566.27
87,996.61
15,928.92
1,774.74
65,670.29
110,631.90
42,787.29
13,861.64
195,652.59
173,019.27
8,304.47
87,038.17
151,348.35
23,831.19
197,765.55

48.00%
48.00%
48.00%

31.58%
31.58%
31.58%
31.58%
31.58%
31.58%
31.58%
31.58%
31.58%
31.58%
56.52%
56.52%
56.52%
56.52%
56.52%
56.52%
56.52%
52.17%
52.17%
52.17%
52.17%
52.17%
52.17%
52.17%
52.17%
52.17%
52.17%
52.17%
52.17%
52.17%
52.17%

527.06
154.70
49.51
387.27
13,952.40
1,539.13
1,165.04
554.09
567.39
25.50
77.25
16.47
333.18
145.28
2,500.70
0.94
15.65
15.65
15.65
9.39
15,193.04
2.09
16.96
10.96
36,136.06
412,522.58
76,276.76
433,785.39
9,380.94
82,458.48
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

188,028.96
81,671.57
38,933.10
19,924.84
1,675,404.19
152,481.65
91,747.17
67,260.62
60,330.72
219.58
7,656.64
683.34
2,149.03
2,363.68
698,319.26
14.81
7,306.12
214.12
85.46
148.10
1,823.17
97.77
58,669.23
17,422.18
2,621,555.99
659,844.47
532,154.13
663,607.83
511,866.76
130,395.08
123,687.72

52.17%
52.17%
52.17%
52.17%
52.17%
52.17%
52.17%
52.17%
52.17%
52.17%
52.17%
52.17%
52.17%
52.17%
52.17%
52.17%
52.17%
52.17%
52.17%
52.17%
52.17%
52.17%
52.17%
52.17%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
390,257.05

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

53.57%
53.57%
53.57%
53.57%
53.57%
53.57%

0.53
32.00
37,486.47
750.00
15,000.00
5.00
7,500.00
2,000.00
7.50
7.50
7.50
0.50
7.50

340,546.33
49,710.72
249,857.93
107,586.16
2,077.50
33,750.00
6,059.20
20,775.00
5,540.00
2,981.55
26,250.00
3,078.52
4,260.00
37,500.00
15,804,130.63
1,580,413.06
3,062,840.52
20,447,384.21
3,885,003.00
24,332,387.21

53.33%
53.33%
50.00%
50.00%
50.00%
50.00%
50.00%
50.00%
50.00%
50.00%
50.00%
50.00%
50.00%

ITEM.

1.00
1.01
1.02
1.03
2.00
2.01
02.01.01
02.01.02
02.01.03
2.02
2.03
2.04
2.05
02.05.01
02.05.02
02.05.03
2.06
3.00
3.01
3.02
3.03
3.04
3.05
3.06
3.07
4.00
4.01
4.02
4.03
4.04
4.05
4.06
4.07
4.08
4.09
4.10
4.11
4.12
4.13
4.14

DESCRIPCION DE PARTIDA

OBRAS PRELIMINARES
MOVILIZACION Y DESMOVILIZACION DE EQUIPOS
TRAZO Y REPLANTEO
CARTEL DE OBRA 3.60 x 7.20
MOVIMIENTO DE TIERRAS
EXCAVACION PARA EXPLANACIONES
CORTE EN MATERIAL SUELTO
CORTE EN ROCA SUELTA
CORTE EN ROCA FIJA
PERFILADO, NIVELACION Y COMPACTACION DE SUBRASANTE EN ZONAS D
MEJORAMIENTO DE SUB RASANTE
LIMPIEZA DE TERRENO PARA RECIBIR RELLENO
TERRAPLEN
RELLENO CON MATERIAL PROPIO
RELLENO CON MATERIAL EXCEDENTE DE CORTE
RELLENO CON MATERIAL DE CANTERA (MATERIAL CONSIDERADO EN TRAN
REMOCION DE DERRUMBES (SOLO REFINE Y LIMPIEZA)
PAVIMENTO
SUB BASE GRANULAR
BASE GRANULAR
IMPRIMACION BITUMINOSA
CARPETA ASFALTICA EN CALIENTE (e=0.075 m.)
ASFALTO DILUIDO MC-30
CEMENTO ASFALTICO PEN 120 -150
ADITIVO MEJORADOR DE ADHERENCIA
OBRAS DE ARTE Y DRENAJE
EXCAVACION PARA ESTRUCTURAS
EXCAVACION PARA ESTRUCTURAS BAJO AGUA
DEMOLICION DE CONCRETO CICLOPEO
DEMOLICION DE MAMPOSTERIA DE PIEDRA
ENCOFRADO Y DESENCOFRADO
ENCOFRADO Y DESENCOFRADO CARA VISTA
ENCOFRADO Y DESENCOFRADO BAJO AGUA
ACERO DE REFUERZO FY=4,200 KG/CM2
CONCRETO CICLOPEO f'c = 175 KG/CM2 + 30 % PIEDRA MEDIANA
CONCRETO SIMPLE f'c = 100 KG/CM2
CONCRETO SIMPLE f'c = 210 KG/CM2 EN SECO
CONCRETO SIMPLE f'c = 210 KG/CM2 BAJO AGUA
CONCRETO SIMPLE f'c = 280 KG/CM2
RELLENO DE ESTRUCTURAS

4.15
4.16
4.17
4.18
4.19
4.20
4.21
4.22
4.23
4.24
4.25
4.26
4.27
4.28
4.29
4.3
4.31
4.32
4.33
4.34
4.35
4.36
4.37
4.38
5.00
5.01
5.02
5.03
5.04
5.05
5.06
6.00
6.01
6.02
6.03
06.03.01
06.03.02
06.03.03
6.04
6.05
6.06
6.07
6.08
6.09
7.00

ALCANTARILLA TMC 0 36"


ALCANTARILLA TMC 0 48"
ALCANTARILLA TMC 0 60"
ALIVIADERO DE EMBOQUILLADO DE PIEDRA (E=0.15 M)
CUNETAS TRIANGULARES REVESTIDAS 1.00X0.40
CUNETAS TRIANGULARES REVESTIDAS 0.75X0.35
CUNETAS TRIANGULARES REVESTIDAS 0.50X0.30
CUNETAS RECTANGULARES REVESTIDAS
ZANJAS REVESTIDAS
JUNTA PARA MUROS
FILTRO
MATERIAL IMPERMEABLE
GEOTEXTIL
DREN PVC D=3"
SUBDRENAJE
POLIESTILENO EXPANDIDO
BARANDAS METALICAS
BRUA ROMPE AGUA EN LOSA
ACABADO DE VEREDAS
JUNTA DE DILATACION EXPANDIBLES
APOYO DE NEOPRENO
TUBOS DE DRENAJE PVC D = 3" X 0.50 M.
FALSO PUENTE
LOSA DE APROXIMACION
TRANSPORTES
TRANSPORTE DE ESCOMBROS PARA D<=1.00 KM
TRANSPORTE DE ESCOMBROS PARA D>1.00 KM
TRANSPORTE DE MATERIALES GRANULARES PARA D<=1.00 KM
TRANSPORTE DE MATERIALES GRANULARES PARA D>1.00 KM
TRANSPORTE DE MEZCLA ASFALTICA PARA D<=1.00 KM
TRANSPORTE DE MEZCLA ASFALTICA PARA D>1.00 KM
SEALIZACION
SEAL PREVENTIVA (0.75 m. x 0.75 m.)
SEAL REGLAMENTARIA
SEAL INFORMATIVA
PANEL INFORMATIVO
ESTRUCTURA DE SOPORTE
CIMENTACION Y MONTAJE
POSTES KILOMETRICOS
DEMARCACION EN EL PAVIMENTO
GUARDAVIAS (Incluye Terminal)
POSTES DELINEADORES
TACHAS REFLECTIVAS BIDIRECCIONALES
PINTADO DE MUROS Y PARAPETOS
VARIOS

7.01
7.02
8.00
8.01
8.02
8.03
8.04
8.05
8.06
8.07
8.08
8.09
8.10
8.11

MANTENIMIENTO DE TRANSITO TEMPORAL Y SEGURIDAD VIAL


CONSTRUCCION DE PASE PROVISIONAL
MEDIO AMBIENTE
ACONDICIONAMIENTO DE DEPOSITOS DE MATERIAL EXCEDENTE
RESTAURACION DE AREA AFECTADA POR CAMPAMENTO
RESTAURACION DE CANTERAS
REVEGETALIZACION
RESTAURACION DE AREA AFECTADA POR PLANTA DE ASFALTO Y CHANCAD
RESTAURACION DE AREA AFECTADA POR PATIO DE MAQUINAS
SELLADO DE LETRINAS
PROGRAMA DE EDUCACION AMBIENTAL
PROGRAMA DE SEALIZACION AMBIENTAL
PROGRAMA DE CONTINGENCIAS
PROGRAMA DE SEGUIMIENTO Y VIGILANCIA
COSTO DIRECTO
UTILIDAD (10%)
GASTOS GENRALES (19.38%)
SUBTOTAL
IGV (19%)
PRSUPUESTO TOTAL

ON DE PARTIDA

UBRASANTE EN ZONAS DE CORTE

CONSIDERADO EN TRANSP.)
EZA)

IEDRA MEDIANA

UNIDAD

METRADO

GLB
KM
und

1.00
31.76
2.00

m3
m3
m3
m2
m3
m2

65,986.17
92,573.52
8,715.76
69,540.19
17,384.36
75,179.04

m3
m3
m3
m3

55,428.55
66,078.76
22,553.71
2,905.32

m3
m3
m2
m3
gln
gln
kg

53,128.45
49,316.77
240,667.14
17,511.09
72,200.00
638,629.41
24,172.00

m3
m3
m3
m3
m2
m2
m2
kg
m3
m3
m3
m3
m3
m3

14,755.92
1,423.33
98.00
3,448.44
6,462.80
1,513.36
475.11
89,713.11
1,325.05
64.42
484.43
789.56
115.66
8,958.89

15 M)

D<=1.00 KM
D>1.00 KM
00 KM
KM

m
m
m
m2
m
m
m
m
m
m2
m3
m3
m2
m
m
m2
m
m
m
m
CM3
und
m
m

1,010.20
296.50
94.90
742.26
26,742.10
2,950.00
2,233.00
1,062.00
1,087.50
48.88
148.07
31.56
638.60
278.45
4,793.00
1.80
30.00
30.00
30.00
18.00
29,120.00
4.00
32.50
21.00

m3K
m3K
m3K
m3K
M3K
M3K

67,453.98
770,042.15
142,383.29
809,732.73
17,511.09
153,922.50

und
und

110.00
22.00

m2
m
und
und
m2
m
und
und
m2

20.53
106.60
11.00
31.00
8,822.22
440.00
361.00
261.00
157.80

URIDAD VIAL

GLB
m

1.00
60.00

AL EXCEDENTE
ENTO

m3
m2
m2
HA
m2
m2
und
mes
und
GLB
mes

74,972.94
1,500.00
30,000.00
10.00
15,000.00
4,000.00
15.00
15.00
15.00
1.00
15.00

DE ASFALTO Y CHANCADORA
E MAQUINAS

SEPTIMO MES
PRECIO
S/.

PARCIAL
S/.

1,177,828.16
1,379.95
2,589.17

4.70
14.43
23.99
0.90
13.58
1.26
5.22
12.50
11.85
2.58
28.73
48.67
0.75
211.70
7.53
5.81
16.37
11.43
21.45
34.71
36.50
32.81
54.19
55.92
4.18
250.27
247.08
344.37
367.40
394.92
42.31

1,226,833.71
1,177,828.16
43,827.21
5,178.34
3,638,532.07
2,248,453.35
310,135.00
1,335,835.89
209,091.08
62,586.17
236,079.61
94,725.59
1,390,078.72
289,337.03
825,984.50
267,261.46
7,495.73
12,464,024.18
1,526,380.37
2,400,247.20
180,500.36
3,707,097.75
543,666.00
3,710,436.87
395,695.64
8,334,752.05
168,660.17
30,530.43
3,401.58
125,868.06
212,044.47
82,008.98
26,568.15
375,000.80
331,620.26
15,916.89
166,823.16
290,084.34
45,676.45
379,050.64

RENDIMIENTO

PROGRAMADO
METRADO

0.00
0.00
0.00

6,945.91
9,744.58
917.45
7,320.02
1,829.93
7,913.58
5,834.58
6,955.66
2,374.07
305.82
4,619.87
4,288.41
20,927.58
1,522.70
6,278.26
55,532.99
2,101.91
1,283.12
123.77
8.52
299.86
561.98
131.60
41.31
7,801.14
115.22
5.60
42.12
68.66
10.06
779.03

356.75
527.95
786.32
51.45
120.08
99.07
78.75
121.39
106.33
8.61
99.11
41.50
6.45
16.27
279.25
15.77
466.78
13.68
5.46
15.77
0.12
46.85
3,459.98
1,590.12
18.26
1.29
8.70
1.18
13.90
1.50
695.25
820.95
584.52
168.62
566.86
92.70
18.52
188.01
89.83
14.97
10.41

360,388.85
156,537.18
74,621.77
38,189.28
3,211,191.37
292,256.50
175,848.75
128,916.18
115,633.88
420.86
14,675.22
1,309.74
4,118.97
4,530.38
1,338,445.25
28.39
14,003.40
410.40
163.80
283.86
3,494.40
187.40
112,449.35
33,392.52
4,893,571.19
1,231,709.67
993,354.37
1,238,734.62
955,484.62
243,404.15
230,883.75
417,713.06
76,477.50
18,060.90
323,174.66
12,000.20
17,974.89
6,235.46
2,873.70
163,387.51
82,724.40
32,428.63
3,907.17
1,642.70
731,731.96

87.84
25.78
8.25
64.54
2,325.40
256.52
194.17
92.35
94.57
4.25
12.88
2.74
55.53
24.21
416.78
0.16
2.61
2.61
2.61
1.57
2,532.17
0.35
2.83
1.83
4,818.14
55,003.01
10,170.24
57,838.05
1,250.79
10,994.46
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

638,524.36
1,553.46
2.87
2.77
2.25
1,211.84
2.77
2.77
397.54
3,500.00
410.47
8,520.00
5,000.00

638,524.36
93,207.60
499,715.89
215,172.34
4,155.00
67,500.00
12,118.40
41,550.00
11,080.00
5,963.10
52,500.00
6,157.05
8,520.00
75,000.00
32,206,874.11
3,220,687.41
6,241,692.20
41,669,253.73
7,917,158.21
49,586,411.94

0.07
4.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

SEPTIMO MES

100.00%

PROGRAMADO
S/.

0.00
0.00
0.00
0.00
383,003.37
236,679.30
32,645.79
140,614.30
22,009.59
6,588.02
24,850.48
9,971.11
146,324.07
30,456.53
86,945.74
28,132.79
789.02
1,083,828.19
132,728.73
208,717.15
15,695.68
322,356.33
47,275.30
322,646.68
34,408.32
724,761.05
14,666.10
2,654.82
295.79
10,945.05
18,438.65
7,131.22
2,310.27
32,608.77
28,836.54
1,384.08
14,506.36
25,224.73
3,971.86
32,960.92

VALOR. ACUMUL. ANTERIOR


METRADO
S/.

0.52
16.51
1.04

45,148.43
63,339.78
5,963.41
47,580.13
11,894.56
51,438.29
0.00
37,924.80
45,211.78
15,431.49
1,987.85
23,099.33
21,442.07
104,637.89
7,613.52
31,391.30
277,664.96
10,509.57
7,057.18
680.72
46.87
1,649.25
3,090.90
723.78
227.23
42,906.27
633.72
30.81
231.68
377.62
55.32
4,284.69

637,919.64
612,438.11
22,788.94
2,692.59
2,489,521.91
1,538,415.43
212,197.63
913,992.97
143,062.32
42,822.12
161,528.15
64,812.25
951,106.48
197,967.44
565,147.28
182,863.10
5,128.65
5,419,140.95
663,643.64
1,043,585.74
78,478.42
1,611,781.63
236,376.52
1,613,233.42
172,041.58
3,986,185.78
80,663.56
14,601.51
1,626.84
60,197.77
101,412.57
39,221.69
12,706.51
179,348.21
158,601.00
7,612.43
79,784.99
138,735.99
21,845.26
181,285.09

VALORIZACION ACTUAL
METRADO

0.00
0.00
0.00

6,945.91
9,744.58
917.45
7,320.02
1,829.93
7,913.58
5,834.58
6,955.66
2,374.07
305.82
4,619.87
4,288.41
20,927.58
1,522.70
6,278.26
55,532.99
2,101.91
1,283.12
123.77
8.52
299.86
561.98
131.60
41.31
7,801.14
115.22
5.60
42.12
68.66
10.06
779.03

31,338.16
13,611.93
6,488.85
3,320.81
279,234.03
25,413.61
15,291.20
11,210.10
10,055.12
36.60
1,276.11
113.89
358.17
393.95
116,386.54
2.47
1,217.69
35.69
14.24
24.68
303.86
16.30
9,778.20
2,903.70
349,540.80
87,979.26
70,953.88
88,481.04
68,248.90
17,386.01
16,491.70

483.14
141.80
45.39
354.99
12,789.70
1,410.87
1,067.96
507.91
520.11
23.38
70.82
15.09
305.42
133.17
2,292.30
0.86
14.35
14.35
14.35
8.61
13,926.96
1.91
15.54
10.04
31,317.92
357,519.57
66,106.53
375,947.34
8,130.15
71,464.02
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

48,782.13

172,359.89
74,865.61
35,688.67
18,264.44
1,535,787.18
139,774.85
84,101.58
61,655.56
55,303.16
201.28
7,018.58
626.40
1,969.94
2,166.70
640,125.99
13.58
6,697.28
196.28
78.34
135.76
1,671.23
89.63
53,780.12
15,970.34
2,272,015.20
571,865.21
461,200.25
575,126.79
443,617.86
113,009.07
107,196.03
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
341,474.91

87.84
25.78
8.25
64.54
2,325.40
256.52
194.17
92.35
94.57
4.25
12.88
2.74
55.53
24.21
416.78
0.16
2.61
2.61
2.61
1.57
2,532.17
0.35
2.83
1.83
4,818.14
55,003.01
10,170.24
57,838.05
1,250.79
10,994.46
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

42,568.29
6,213.84
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2,589,915.54
258,991.55
501,925.63
3,350,832.73
636,658.22
3,987,490.94

0.47
28.00
37,486.47
750.00
15,000.00
5.00
7,500.00
2,000.00
7.50
7.50
7.50
0.50
7.50

297,978.03
43,496.88
249,857.96
107,586.18
2,077.50
33,750.00
6,059.20
20,775.00
5,540.00
2,981.55
26,250.00
3,078.53
4,260.00
37,500.00

0.07
4.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

VALORIZACION ACTUAL
S/.

0.00
0.00
0.00
0.00
383,003.37
236,679.30
32,645.79
140,614.30
22,009.59
6,588.02
24,850.48
9,971.11
146,324.07
30,456.53
86,945.74
28,132.79
789.02
1,083,828.19
132,728.73
208,717.15
15,695.68
322,356.33
47,275.30
322,646.68
34,408.32
724,761.05
14,666.10
2,654.82
295.79
10,945.05
18,438.65
7,131.22
2,310.27
32,608.77
28,836.54
1,384.08
14,506.36
25,224.73
3,971.86
32,960.92

#DIV/0!
#DIV/0!
#DIV/0!

VALORIZACION ACUMULADO
METRADO
S/.

0.52
16.51
1.04

52,094.34
73,084.36
6,880.86
54,900.15
13,724.49
59,351.87
43,759.38
52,167.44
17,805.56
2,293.67
27,719.19
25,730.49
125,565.46
9,136.22
37,669.57
333,197.95
12,611.48
8,340.30
804.49
55.39
1,949.12
3,652.89
855.38
268.54
50,707.41
748.94
36.41
273.81
446.27
65.37
5,063.72

637,919.64
612,438.11
22,788.94
2,692.59
2,872,525.28
1,775,094.72
244,843.42
1,054,607.27
165,071.91
49,410.13
186,378.64
74,783.36
1,097,430.56
228,423.97
652,093.02
210,995.89
5,917.68
6,502,969.14
796,372.37
1,252,302.88
94,174.10
1,934,137.96
283,651.83
1,935,880.11
206,449.90
4,710,946.83
95,329.66
17,256.33
1,922.63
71,142.82
119,851.22
46,352.90
15,016.78
211,956.97
187,437.54
8,996.51
94,291.35
163,960.72
25,817.12
214,246.01

ACTUAL
%

52.00%
52.00%
52.00%

78.95%
78.95%
78.95%
78.95%
78.95%
78.95%
78.95%
78.95%
78.95%
78.95%
52.17%
52.17%
52.17%
52.17%
52.17%
52.17%
52.17%
56.52%
56.52%
56.52%
56.52%
56.52%
56.52%
56.52%
56.52%
56.52%
56.52%
56.52%
56.52%
56.52%
56.52%

31,338.16
13,611.93
6,488.85
3,320.81
279,234.03
25,413.61
15,291.20
11,210.10
10,055.12
36.60
1,276.11
113.89
358.17
393.95
116,386.54
2.47
1,217.69
35.69
14.24
24.68
303.86
16.30
9,778.20
2,903.70
349,540.80
87,979.26
70,953.88
88,481.04
68,248.90
17,386.01
16,491.70
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
48,782.13

570.98
167.59
53.64
419.54
15,115.10
1,667.39
1,262.13
600.26
614.67
27.63
83.69
17.84
360.95
157.38
2,709.09
1.02
16.96
16.96
16.96
10.17
16,459.13
2.26
18.37
11.87
36,136.06
412,522.58
76,276.76
433,785.39
9,380.94
82,458.48
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

203,698.05
88,477.53
42,177.52
21,585.24
1,815,021.22
165,188.46
99,392.77
72,865.67
65,358.28
237.88
8,294.69
740.29
2,328.11
2,560.65
756,512.54
16.04
7,914.97
231.97
92.58
160.44
1,975.10
105.92
63,558.33
18,874.03
2,621,556.00
659,844.47
532,154.13
663,607.83
511,866.76
130,395.08
123,687.72

56.52%
56.52%
56.52%
56.52%
56.52%
56.52%
56.52%
56.52%
56.52%
56.52%
56.52%
56.52%
56.52%
56.52%
56.52%
56.52%
56.52%
56.52%
56.52%
56.52%
56.52%
56.52%
56.52%
56.52%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
390,257.04

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

53.57%
53.57%
53.57%
53.57%
53.57%
53.57%

42,568.29
6,213.84
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2,589,915.54
258,991.55
501,925.63

0.53
32.00
37,486.47
750.00
15,000.00
5.00
7,500.00
2,000.00
7.50
7.50
7.50
0.50
7.50

340,546.32
49,710.72
249,857.96
107,586.18
2,077.50
33,750.00
6,059.20
20,775.00
5,540.00
2,981.55
26,250.00
3,078.53
4,260.00
37,500.00
17,098,254.29
1,709,825.43
3,313,641.68

3,350,832.73
636,658.22

22,121,721.40
4,203,127.07

3,987,490.94

26,324,848.47

23,947,700.45

53.33%
53.33%
50.00%
50.00%
50.00%
50.00%
50.00%
50.00%
50.00%
50.00%
50.00%
50.00%
50.00%

SALDO POR VALORIZAR


METRADO
S/.

0.48
15.25
0.96

13,891.83
19,489.16
1,834.90
14,640.04
3,659.87
15,827.17
11,669.17
13,911.32
4,748.15
611.65
25,409.26
23,586.28
115,101.68
8,374.87
34,530.43
305,431.46
11,560.52
6,415.62
618.84
42.61
1,499.32
2,809.91
657.98
206.57
39,005.70
576.11
28.01
210.62
343.29
50.29
3,895.17

588,914.07
565,390.05
21,038.27
2,485.75
766,006.79
473,358.62
65,291.58
281,228.62
44,019.18
13,176.04
49,700.97
19,942.23
292,648.16
60,913.06
173,891.48
56,265.57
1,578.05
5,961,055.04
730,008.00
1,147,944.31
86,326.26
1,772,959.79
260,014.17
1,774,556.76
189,245.74
3,623,805.22
73,330.51
13,274.10
1,478.95
54,725.24
92,193.25
35,656.08
11,551.37
163,043.83
144,182.72
6,920.39
72,531.81
126,123.63
19,859.32
164,804.62

48.00%
48.00%
48.00%

21.05%
21.05%
21.05%
21.05%
21.05%
21.05%
21.05%
21.05%
21.05%
21.05%
47.83%
47.83%
47.83%
47.83%
47.83%
47.83%
47.83%
43.48%
43.48%
43.48%
43.48%
43.48%
43.48%
43.48%
43.48%
43.48%
43.48%
43.48%
43.48%
43.48%
43.48%

439.22
128.91
41.26
322.72
11,627.00
1,282.61
970.87
461.74
472.83
21.25
64.38
13.72
277.65
121.07
2,083.91
0.78
13.04
13.04
13.04
7.83
12,660.87
1.74
14.13
9.13
31,317.92
357,519.57
66,106.53
375,947.34
8,130.15
71,464.02
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

156,690.80
68,059.64
32,444.25
16,604.03
1,396,170.15
127,068.04
76,455.98
56,050.51
50,275.60
182.98
6,380.53
569.45
1,790.86
1,969.73
581,932.71
12.34
6,088.43
178.43
71.22
123.42
1,519.30
81.48
48,891.02
14,518.49
2,272,015.19
571,865.21
461,200.24
575,126.79
443,617.86
113,009.07
107,196.03

43.48%
43.48%
43.48%
43.48%
43.48%
43.48%
43.48%
43.48%
43.48%
43.48%
43.48%
43.48%
43.48%
43.48%
43.48%
43.48%
43.48%
43.48%
43.48%
43.48%
43.48%
43.48%
43.48%
43.48%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
341,474.92

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

46.43%
46.43%
46.43%
46.43%
46.43%
46.43%

0.47
28.00
37,486.47
750.00
15,000.00
5.00
7,500.00
2,000.00
7.50
7.50
7.50
0.50
7.50

297,978.04
43,496.88
249,857.93
107,586.16
2,077.50
33,750.00
6,059.20
20,775.00
5,540.00
2,981.55
26,250.00
3,078.52
4,260.00
37,500.00
12,964,357.16
1,296,435.72
2,512,492.42
16,773,285.30
3,186,924.21
19,960,209.50

46.67%
46.67%
50.00%
50.00%
50.00%
50.00%
50.00%
50.00%
50.00%
50.00%
50.00%
50.00%
50.00%

ITEM.

1.00
1.01
1.02
1.03
2.00
2.01
02.01.01
02.01.02
02.01.03
2.02
2.03
2.04
2.05
02.05.01
02.05.02
02.05.03
2.06
3.00
3.01
3.02
3.03
3.04
3.05
3.06
3.07
4.00
4.01
4.02
4.03
4.04
4.05
4.06
4.07
4.08
4.09
4.10
4.11
4.12
4.13
4.14

DESCRIPCION DE PARTIDA

OBRAS PRELIMINARES
MOVILIZACION Y DESMOVILIZACION DE EQUIPOS
TRAZO Y REPLANTEO
CARTEL DE OBRA 3.60 x 7.20
MOVIMIENTO DE TIERRAS
EXCAVACION PARA EXPLANACIONES
CORTE EN MATERIAL SUELTO
CORTE EN ROCA SUELTA
CORTE EN ROCA FIJA
PERFILADO, NIVELACION Y COMPACTACION DE SUBRASANTE EN ZONAS D
MEJORAMIENTO DE SUB RASANTE
LIMPIEZA DE TERRENO PARA RECIBIR RELLENO
TERRAPLEN
RELLENO CON MATERIAL PROPIO
RELLENO CON MATERIAL EXCEDENTE DE CORTE
RELLENO CON MATERIAL DE CANTERA (MATERIAL CONSIDERADO EN TRAN
REMOCION DE DERRUMBES (SOLO REFINE Y LIMPIEZA)
PAVIMENTO
SUB BASE GRANULAR
BASE GRANULAR
IMPRIMACION BITUMINOSA
CARPETA ASFALTICA EN CALIENTE (e=0.075 m.)
ASFALTO DILUIDO MC-30
CEMENTO ASFALTICO PEN 120 -150
ADITIVO MEJORADOR DE ADHERENCIA
OBRAS DE ARTE Y DRENAJE
EXCAVACION PARA ESTRUCTURAS
EXCAVACION PARA ESTRUCTURAS BAJO AGUA
DEMOLICION DE CONCRETO CICLOPEO
DEMOLICION DE MAMPOSTERIA DE PIEDRA
ENCOFRADO Y DESENCOFRADO
ENCOFRADO Y DESENCOFRADO CARA VISTA
ENCOFRADO Y DESENCOFRADO BAJO AGUA
ACERO DE REFUERZO FY=4,200 KG/CM2
CONCRETO CICLOPEO f'c = 175 KG/CM2 + 30 % PIEDRA MEDIANA
CONCRETO SIMPLE f'c = 100 KG/CM2
CONCRETO SIMPLE f'c = 210 KG/CM2 EN SECO
CONCRETO SIMPLE f'c = 210 KG/CM2 BAJO AGUA
CONCRETO SIMPLE f'c = 280 KG/CM2
RELLENO DE ESTRUCTURAS

4.15
4.16
4.17
4.18
4.19
4.20
4.21
4.22
4.23
4.24
4.25
4.26
4.27
4.28
4.29
4.3
4.31
4.32
4.33
4.34
4.35
4.36
4.37
4.38
5.00
5.01
5.02
5.03
5.04
5.05
5.06
6.00
6.01
6.02
6.03
06.03.01
06.03.02
06.03.03
6.04
6.05
6.06
6.07
6.08
6.09
7.00

ALCANTARILLA TMC 0 36"


ALCANTARILLA TMC 0 48"
ALCANTARILLA TMC 0 60"
ALIVIADERO DE EMBOQUILLADO DE PIEDRA (E=0.15 M)
CUNETAS TRIANGULARES REVESTIDAS 1.00X0.40
CUNETAS TRIANGULARES REVESTIDAS 0.75X0.35
CUNETAS TRIANGULARES REVESTIDAS 0.50X0.30
CUNETAS RECTANGULARES REVESTIDAS
ZANJAS REVESTIDAS
JUNTA PARA MUROS
FILTRO
MATERIAL IMPERMEABLE
GEOTEXTIL
DREN PVC D=3"
SUBDRENAJE
POLIESTILENO EXPANDIDO
BARANDAS METALICAS
BRUA ROMPE AGUA EN LOSA
ACABADO DE VEREDAS
JUNTA DE DILATACION EXPANDIBLES
APOYO DE NEOPRENO
TUBOS DE DRENAJE PVC D = 3" X 0.50 M.
FALSO PUENTE
LOSA DE APROXIMACION
TRANSPORTES
TRANSPORTE DE ESCOMBROS PARA D<=1.00 KM
TRANSPORTE DE ESCOMBROS PARA D>1.00 KM
TRANSPORTE DE MATERIALES GRANULARES PARA D<=1.00 KM
TRANSPORTE DE MATERIALES GRANULARES PARA D>1.00 KM
TRANSPORTE DE MEZCLA ASFALTICA PARA D<=1.00 KM
TRANSPORTE DE MEZCLA ASFALTICA PARA D>1.00 KM
SEALIZACION
SEAL PREVENTIVA (0.75 m. x 0.75 m.)
SEAL REGLAMENTARIA
SEAL INFORMATIVA
PANEL INFORMATIVO
ESTRUCTURA DE SOPORTE
CIMENTACION Y MONTAJE
POSTES KILOMETRICOS
DEMARCACION EN EL PAVIMENTO
GUARDAVIAS (Incluye Terminal)
POSTES DELINEADORES
TACHAS REFLECTIVAS BIDIRECCIONALES
PINTADO DE MUROS Y PARAPETOS
VARIOS

7.01
7.02
8.00
8.01
8.02
8.03
8.04
8.05
8.06
8.07
8.08
8.09
8.10
8.11

MANTENIMIENTO DE TRANSITO TEMPORAL Y SEGURIDAD VIAL


CONSTRUCCION DE PASE PROVISIONAL
MEDIO AMBIENTE
ACONDICIONAMIENTO DE DEPOSITOS DE MATERIAL EXCEDENTE
RESTAURACION DE AREA AFECTADA POR CAMPAMENTO
RESTAURACION DE CANTERAS
REVEGETALIZACION
RESTAURACION DE AREA AFECTADA POR PLANTA DE ASFALTO Y CHANCAD
RESTAURACION DE AREA AFECTADA POR PATIO DE MAQUINAS
SELLADO DE LETRINAS
PROGRAMA DE EDUCACION AMBIENTAL
PROGRAMA DE SEALIZACION AMBIENTAL
PROGRAMA DE CONTINGENCIAS
PROGRAMA DE SEGUIMIENTO Y VIGILANCIA
COSTO DIRECTO
UTILIDAD (10%)
GASTOS GENRALES (19.38%)
SUBTOTAL
IGV (19%)
PRSUPUESTO TOTAL

ON DE PARTIDA

UBRASANTE EN ZONAS DE CORTE

CONSIDERADO EN TRANSP.)
EZA)

IEDRA MEDIANA

UNIDAD

METRADO

GLB
KM
und

1.00
31.76
2.00

m3
m3
m3
m2
m3
m2

65,986.17
92,573.52
8,715.76
69,540.19
17,384.36
75,179.04

m3
m3
m3
m3

55,428.55
66,078.76
22,553.71
2,905.32

m3
m3
m2
m3
gln
gln
kg

53,128.45
49,316.77
240,667.14
17,511.09
72,200.00
638,629.41
24,172.00

m3
m3
m3
m3
m2
m2
m2
kg
m3
m3
m3
m3
m3
m3

14,755.92
1,423.33
98.00
3,448.44
6,462.80
1,513.36
475.11
89,713.11
1,325.05
64.42
484.43
789.56
115.66
8,958.89

15 M)

D<=1.00 KM
D>1.00 KM
00 KM
KM

m
m
m
m2
m
m
m
m
m
m2
m3
m3
m2
m
m
m2
m
m
m
m
CM3
und
m
m

1,010.20
296.50
94.90
742.26
26,742.10
2,950.00
2,233.00
1,062.00
1,087.50
48.88
148.07
31.56
638.60
278.45
4,793.00
1.80
30.00
30.00
30.00
18.00
29,120.00
4.00
32.50
21.00

m3K
m3K
m3K
m3K
M3K
M3K

67,453.98
770,042.15
142,383.29
809,732.73
17,511.09
153,922.50

und
und

110.00
22.00

m2
m
und
und
m2
m
und
und
m2

20.53
106.60
11.00
31.00
8,822.22
440.00
361.00
261.00
157.80

URIDAD VIAL

GLB
m

1.00
60.00

AL EXCEDENTE
ENTO

m3
m2
m2
HA
m2
m2
und
mes
und
GLB
mes

74,972.94
1,500.00
30,000.00
10.00
15,000.00
4,000.00
15.00
15.00
15.00
1.00
15.00

DE ASFALTO Y CHANCADORA
E MAQUINAS

SEPTIMO MES
PRECIO
S/.

PARCIAL
S/.

1,177,828.16
1,379.95
2,589.17

4.70
14.43
23.99
0.90
13.58
1.26
5.22
12.50
11.85
2.58
28.73
48.67
0.75
211.70
7.53
5.81
16.37
11.43
21.45
34.71
36.50
32.81
54.19
55.92
4.18
250.27
247.08
344.37
367.40
394.92
42.31

1,226,833.71
1,177,828.16
43,827.21
5,178.34
3,638,532.07
2,248,453.35
310,135.00
1,335,835.89
209,091.08
62,586.17
236,079.61
94,725.59
1,390,078.72
289,337.03
825,984.50
267,261.46
7,495.73
12,464,024.18
1,526,380.37
2,400,247.20
180,500.36
3,707,097.75
543,666.00
3,710,436.87
395,695.64
8,334,752.05
168,660.17
30,530.43
3,401.58
125,868.06
212,044.47
82,008.98
26,568.15
375,000.80
331,620.26
15,916.89
166,823.16
290,084.34
45,676.45
379,050.64

RENDIMIENTO

PROGRAMADO
METRADO

0.00
0.00
0.00

6,945.91
9,744.58
917.45
7,320.02
1,829.93
7,913.58
5,834.58
6,955.66
2,374.07
305.82
4,619.87
4,288.41
20,927.58
1,522.70
6,278.26
55,532.99
2,101.91
1,283.12
123.77
8.52
299.86
561.98
131.60
41.31
7,801.14
115.22
5.60
42.12
68.66
10.06
779.03

356.75
527.95
786.32
51.45
120.08
99.07
78.75
121.39
106.33
8.61
99.11
41.50
6.45
16.27
279.25
15.77
466.78
13.68
5.46
15.77
0.12
46.85
3,459.98
1,590.12
18.26
1.29
8.70
1.18
13.90
1.50
695.25
820.95
584.52
168.62
566.86
92.70
18.52
188.01
89.83
14.97
10.41

360,388.85
156,537.18
74,621.77
38,189.28
3,211,191.37
292,256.50
175,848.75
128,916.18
115,633.88
420.86
14,675.22
1,309.74
4,118.97
4,530.38
1,338,445.25
28.39
14,003.40
410.40
163.80
283.86
3,494.40
187.40
112,449.35
33,392.52
4,893,571.19
1,231,709.67
993,354.37
1,238,734.62
955,484.62
243,404.15
230,883.75
417,713.06
76,477.50
18,060.90
323,174.66
12,000.20
17,974.89
6,235.46
2,873.70
163,387.51
82,724.40
32,428.63
3,907.17
1,642.70
731,731.96

87.84
25.78
8.25
64.54
2,325.40
256.52
194.17
92.35
94.57
4.25
12.88
2.74
55.53
24.21
416.78
0.16
2.61
2.61
2.61
1.57
2,532.17
0.35
2.83
1.83
4,818.14
55,003.01
10,170.24
57,838.05
1,250.79
10,994.46
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

638,524.36
1,553.46
2.87
2.77
2.25
1,211.84
2.77
2.77
397.54
3,500.00
410.47
8,520.00
5,000.00

638,524.36
93,207.60
499,715.89
215,172.34
4,155.00
67,500.00
12,118.40
41,550.00
11,080.00
5,963.10
52,500.00
6,157.05
8,520.00
75,000.00
32,206,874.11
3,220,687.41
6,241,692.20
41,669,253.73
7,917,158.21
49,586,411.94

0.07
4.00
9,371.62
187.50
3,750.00
1.25
1,875.00
500.00
1.88
1.88
1.88
0.13
1.88

SEPTIMO MES

100.00%

PROGRAMADO
S/.

0.00
0.00
0.00
0.00
383,003.37
236,679.30
32,645.79
140,614.30
22,009.59
6,588.02
24,850.48
9,971.11
146,324.07
30,456.53
86,945.74
28,132.79
789.02
1,083,828.19
132,728.73
208,717.15
15,695.68
322,356.33
47,275.30
322,646.68
34,408.32
724,761.05
14,666.10
2,654.82
295.79
10,945.05
18,438.65
7,131.22
2,310.27
32,608.77
28,836.54
1,384.08
14,506.36
25,224.73
3,971.86
32,960.92

VALOR. ACUMUL. ANTERIOR


METRADO
S/.

0.52
16.51
1.04

52,094.34
73,084.36
6,880.86
54,900.15
13,724.49
59,351.87
43,759.38
52,167.44
17,805.56
2,293.67
27,719.19
25,730.49
125,565.46
9,136.22
37,669.57
333,197.95
12,611.48
8,340.30
804.49
55.39
1,949.12
3,652.89
855.38
268.54
50,707.41
748.94
36.41
273.81
446.27
65.37
5,063.72

637,919.64
612,438.11
22,788.94
2,692.59
2,872,525.28
1,775,094.72
244,843.42
1,054,607.27
165,071.91
49,410.13
186,378.64
74,783.36
1,097,430.56
228,423.97
652,093.02
210,995.89
5,917.68
6,502,969.14
796,372.37
1,252,302.88
94,174.10
1,934,137.96
283,651.83
1,935,880.11
206,449.90
4,710,946.83
95,329.66
17,256.33
1,922.63
71,142.82
119,851.22
46,352.90
15,016.78
211,956.97
187,437.54
8,996.51
94,291.35
163,960.72
25,817.12
214,246.01

VALORIZACION ACTUAL
METRADO

0.00
0.00
0.00

6,945.91
9,744.58
917.45
7,320.02
1,829.93
7,913.58
5,834.58
6,955.66
2,374.07
305.82
4,619.87
4,288.41
20,927.58
1,522.70
6,278.26
55,532.99
2,101.91
1,283.12
123.77
8.52
299.86
561.98
131.60
41.31
7,801.14
115.22
5.60
42.12
68.66
10.06
779.03

31,338.16
13,611.93
6,488.85
3,320.81
279,234.03
25,413.61
15,291.20
11,210.10
10,055.12
36.60
1,276.11
113.89
358.17
393.95
116,386.54
2.47
1,217.69
35.69
14.24
24.68
303.86
16.30
9,778.20
2,903.70
349,540.80
87,979.26
70,953.88
88,481.04
68,248.90
17,386.01
16,491.70

570.98
167.59
53.64
419.54
15,115.10
1,667.39
1,262.13
600.26
614.67
27.63
83.69
17.84
360.95
157.38
2,709.09
1.02
16.96
16.96
16.96
10.17
16,459.13
2.26
18.37
11.87
36,136.06
412,522.58
76,276.76
433,785.39
9,380.94
82,458.48
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

48,782.13

203,698.05
88,477.53
42,177.52
21,585.24
1,815,021.22
165,188.46
99,392.77
72,865.67
65,358.28
237.88
8,294.69
740.29
2,328.11
2,560.65
756,512.54
16.04
7,914.97
231.97
92.58
160.44
1,975.10
105.92
63,558.33
18,874.03
2,621,556.00
659,844.47
532,154.13
663,607.83
511,866.76
130,395.08
123,687.72
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
390,257.04

87.84
25.78
8.25
64.54
2,325.40
256.52
194.17
92.35
94.57
4.25
12.88
2.74
55.53
24.21
416.78
0.16
2.61
2.61
2.61
1.57
2,532.17
0.35
2.83
1.83
4,818.14
55,003.01
10,170.24
57,838.05
1,250.79
10,994.46
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

42,568.29
6,213.84
62,464.49
26,896.54
519.38
8,437.50
1,514.80
5,193.75
1,385.00
745.39
6,562.50
769.63
1,065.00
9,375.00
2,652,380.03
265,238.00
514,031.25
3,431,649.28
652,013.36
4,083,662.65

0.53
32.00
37,486.47
750.00
15,000.00
5.00
7,500.00
2,000.00
7.50
7.50
7.50
0.50
7.50

340,546.32
49,710.72
249,857.96
107,586.18
2,077.50
33,750.00
6,059.20
20,775.00
5,540.00
2,981.55
26,250.00
3,078.53
4,260.00
37,500.00

0.07
4.00
9,371.62
187.50
3,750.00
1.25
1,875.00
500.00
1.88
1.88
1.88
0.13
1.88

VALORIZACION ACTUAL
S/.

0.00
0.00
0.00
0.00
383,003.37
236,679.30
32,645.79
140,614.30
22,009.59
6,588.02
24,850.48
9,971.11
146,324.07
30,456.53
86,945.74
28,132.79
789.02
1,083,828.19
132,728.73
208,717.15
15,695.68
322,356.33
47,275.30
322,646.68
34,408.32
724,761.05
14,666.10
2,654.82
295.79
10,945.05
18,438.65
7,131.22
2,310.27
32,608.77
28,836.54
1,384.08
14,506.36
25,224.73
3,971.86
32,960.92

#DIV/0!
#DIV/0!
#DIV/0!

VALORIZACION ACUMULADO
METRADO
S/.

0.52
16.51
1.04

59,040.26
82,828.94
7,798.31
62,220.17
15,554.43
67,265.46
49,593.97
59,123.10
20,179.64
2,599.50
32,339.06
30,018.90
146,493.04
10,658.92
43,947.83
388,730.95
14,713.39
9,623.43
928.26
63.91
2,248.98
4,214.87
986.97
309.85
58,508.55
864.16
42.01
315.93
514.93
75.43
5,842.75

637,919.64
612,438.11
22,788.94
2,692.59
3,255,528.65
2,011,774.02
277,489.21
1,195,221.57
187,081.49
55,998.15
211,229.12
84,754.47
1,243,754.63
258,880.50
739,038.75
239,128.67
6,706.70
7,586,797.33
929,101.09
1,461,020.03
109,869.78
2,256,494.28
330,927.13
2,258,526.79
240,858.22
5,435,707.88
109,995.76
19,911.15
2,218.42
82,087.87
138,289.87
53,484.12
17,327.06
244,565.74
216,274.09
10,380.58
108,797.71
189,185.44
29,788.99
247,206.94

ACTUAL
%

52.00%
52.00%
52.00%

89.47%
89.47%
89.47%
89.47%
89.47%
89.47%
89.47%
89.47%
89.47%
89.47%
60.87%
60.87%
60.87%
60.87%
60.87%
60.87%
60.87%
65.22%
65.22%
65.22%
65.22%
65.22%
65.22%
65.22%
65.22%
65.22%
65.22%
65.22%
65.22%
65.22%
65.22%

31,338.16
13,611.93
6,488.85
3,320.81
279,234.03
25,413.61
15,291.20
11,210.10
10,055.12
36.60
1,276.11
113.89
358.17
393.95
116,386.54
2.47
1,217.69
35.69
14.24
24.68
303.86
16.30
9,778.20
2,903.70
349,540.80
87,979.26
70,953.88
88,481.04
68,248.90
17,386.01
16,491.70
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
48,782.13

658.83
193.37
61.89
484.08
17,440.50
1,923.91
1,456.30
692.61
709.24
31.88
96.57
20.58
416.48
181.60
3,125.87
1.17
19.57
19.57
19.57
11.74
18,991.30
2.61
21.20
13.70
40,954.20
467,525.59
86,447.00
491,623.44
10,631.73
93,452.95
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

235,036.21
102,089.46
48,666.37
24,906.05
2,094,255.25
190,602.07
114,683.97
84,075.77
75,413.40
274.47
9,570.79
854.18
2,686.28
2,954.60
872,899.08
18.51
9,132.65
267.65
106.83
185.13
2,278.96
122.22
73,336.53
21,777.73
2,971,096.80
747,823.73
603,108.01
752,088.88
580,115.66
147,781.09
140,179.42

65.22%
65.22%
65.22%
65.22%
65.22%
65.22%
65.22%
65.22%
65.22%
65.22%
65.22%
65.22%
65.22%
65.22%
65.22%
65.22%
65.22%
65.22%
65.22%
65.22%
65.22%
65.22%
65.22%
65.22%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
439,039.17

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

60.71%
60.71%
60.71%
60.71%
60.71%
60.71%

42,568.29
6,213.84
62,464.49
26,896.54
519.38
8,437.50
1,514.80
5,193.75
1,385.00
745.39
6,562.50
769.63
1,065.00
9,375.00
2,652,380.03
265,238.00
514,031.25

0.60
36.00
46,858.09
937.50
18,750.00
6.25
9,375.00
2,500.00
9.38
9.38
9.38
0.63
9.38

383,114.61
55,924.56
312,322.45
134,482.72
2,596.88
42,187.50
7,574.00
25,968.75
6,925.00
3,726.94
32,812.50
3,848.16
5,325.00
46,875.00
20,000,492.28
2,000,049.23
3,876,095.40

3,431,649.28
652,013.36

25,876,636.91
4,916,561.01

4,083,662.65

30,793,197.93

20,344,896.27

60.00%
60.00%
62.50%
62.50%
62.50%
62.50%
62.50%
62.50%
62.50%
62.50%
62.50%
62.50%
62.50%

SALDO POR VALORIZAR


METRADO
S/.

0.48
15.25
0.96

6,945.91
9,744.58
917.45
7,320.02
1,829.93
7,913.58
5,834.58
6,955.66
2,374.07
305.82
20,789.39
19,297.87
94,174.10
6,852.17
28,252.17
249,898.46
9,458.61
5,132.49
495.07
34.09
1,199.46
2,247.93
526.39
165.26
31,204.56
460.89
22.41
168.50
274.63
40.23
3,116.14

588,914.07
565,390.05
21,038.27
2,485.75
383,003.42
236,679.32
32,645.79
140,614.32
22,009.59
6,588.02
24,850.49
9,971.12
146,324.09
30,456.53
86,945.75
28,132.79
789.02
4,877,226.85
597,279.27
939,227.16
70,630.57
1,450,603.47
212,738.87
1,451,910.08
154,837.42
2,899,044.17
58,664.40
10,619.28
1,183.16
43,780.19
73,754.60
28,524.86
9,241.10
130,435.06
115,346.18
5,536.31
58,025.45
100,898.90
15,887.46
131,843.70

48.00%
48.00%
48.00%

10.53%
10.53%
10.53%
10.53%
10.53%
10.53%
10.53%
10.53%
10.53%
10.53%
39.13%
39.13%
39.13%
39.13%
39.13%
39.13%
39.13%
34.78%
34.78%
34.78%
34.78%
34.78%
34.78%
34.78%
34.78%
34.78%
34.78%
34.78%
34.78%
34.78%
34.78%

351.37
103.13
33.01
258.18
9,301.60
1,026.09
776.70
369.39
378.26
17.00
51.50
10.98
222.12
96.85
1,667.13
0.63
10.43
10.43
10.43
6.26
10,128.70
1.39
11.30
7.30
26,499.78
302,516.56
55,936.29
318,109.29
6,879.36
60,469.55
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

125,352.64
54,447.71
25,955.40
13,283.23
1,116,936.12
101,654.43
61,164.78
44,840.41
40,220.48
146.38
5,104.42
455.56
1,432.69
1,575.78
465,546.17
9.87
4,870.75
142.75
56.97
98.73
1,215.44
65.18
39,112.82
11,614.79
1,922,474.39
483,885.94
390,246.36
486,645.74
375,368.96
95,623.06
90,704.33

34.78%
34.78%
34.78%
34.78%
34.78%
34.78%
34.78%
34.78%
34.78%
34.78%
34.78%
34.78%
34.78%
34.78%
34.78%
34.78%
34.78%
34.78%
34.78%
34.78%
34.78%
34.78%
34.78%
34.78%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
292,692.79

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

39.29%
39.29%
39.29%
39.29%
39.29%
39.29%

0.40
24.00
28,114.85
562.50
11,250.00
3.75
5,625.00
1,500.00
5.62
5.62
5.62
0.37
5.62

255,409.75
37,283.04
187,393.44
80,689.62
1,558.12
25,312.50
4,544.40
15,581.25
4,155.00
2,236.16
19,687.50
2,308.89
3,195.00
28,125.00
10,561,835.06
1,056,183.51
2,046,883.63
13,664,902.20
2,596,331.42
16,261,233.62

40.00%
40.00%
37.50%
37.50%
37.50%
37.50%
37.50%
37.50%
37.50%
37.50%
37.50%
37.50%
37.50%

ITEM.

1.00
1.01
1.02
1.03
2.00
2.01
02.01.01
02.01.02
02.01.03
2.02
2.03
2.04
2.05
02.05.01
02.05.02
02.05.03
2.06
3.00
3.01
3.02
3.03
3.04
3.05
3.06
3.07
4.00
4.01
4.02
4.03
4.04
4.05
4.06
4.07
4.08
4.09
4.10
4.11
4.12
4.13
4.14

DESCRIPCION DE PARTIDA

OBRAS PRELIMINARES
MOVILIZACION Y DESMOVILIZACION DE EQUIPOS
TRAZO Y REPLANTEO
CARTEL DE OBRA 3.60 x 7.20
MOVIMIENTO DE TIERRAS
EXCAVACION PARA EXPLANACIONES
CORTE EN MATERIAL SUELTO
CORTE EN ROCA SUELTA
CORTE EN ROCA FIJA
PERFILADO, NIVELACION Y COMPACTACION DE SUBRASANTE EN ZONAS D
MEJORAMIENTO DE SUB RASANTE
LIMPIEZA DE TERRENO PARA RECIBIR RELLENO
TERRAPLEN
RELLENO CON MATERIAL PROPIO
RELLENO CON MATERIAL EXCEDENTE DE CORTE
RELLENO CON MATERIAL DE CANTERA (MATERIAL CONSIDERADO EN TRAN
REMOCION DE DERRUMBES (SOLO REFINE Y LIMPIEZA)
PAVIMENTO
SUB BASE GRANULAR
BASE GRANULAR
IMPRIMACION BITUMINOSA
CARPETA ASFALTICA EN CALIENTE (e=0.075 m.)
ASFALTO DILUIDO MC-30
CEMENTO ASFALTICO PEN 120 -150
ADITIVO MEJORADOR DE ADHERENCIA
OBRAS DE ARTE Y DRENAJE
EXCAVACION PARA ESTRUCTURAS
EXCAVACION PARA ESTRUCTURAS BAJO AGUA
DEMOLICION DE CONCRETO CICLOPEO
DEMOLICION DE MAMPOSTERIA DE PIEDRA
ENCOFRADO Y DESENCOFRADO
ENCOFRADO Y DESENCOFRADO CARA VISTA
ENCOFRADO Y DESENCOFRADO BAJO AGUA
ACERO DE REFUERZO FY=4,200 KG/CM2
CONCRETO CICLOPEO f'c = 175 KG/CM2 + 30 % PIEDRA MEDIANA
CONCRETO SIMPLE f'c = 100 KG/CM2
CONCRETO SIMPLE f'c = 210 KG/CM2 EN SECO
CONCRETO SIMPLE f'c = 210 KG/CM2 BAJO AGUA
CONCRETO SIMPLE f'c = 280 KG/CM2
RELLENO DE ESTRUCTURAS

4.15
4.16
4.17
4.18
4.19
4.20
4.21
4.22
4.23
4.24
4.25
4.26
4.27
4.28
4.29
4.3
4.31
4.32
4.33
4.34
4.35
4.36
4.37
4.38
5.00
5.01
5.02
5.03
5.04
5.05
5.06
6.00
6.01
6.02
6.03
06.03.01
06.03.02
06.03.03
6.04
6.05
6.06
6.07
6.08
6.09
7.00

ALCANTARILLA TMC 0 36"


ALCANTARILLA TMC 0 48"
ALCANTARILLA TMC 0 60"
ALIVIADERO DE EMBOQUILLADO DE PIEDRA (E=0.15 M)
CUNETAS TRIANGULARES REVESTIDAS 1.00X0.40
CUNETAS TRIANGULARES REVESTIDAS 0.75X0.35
CUNETAS TRIANGULARES REVESTIDAS 0.50X0.30
CUNETAS RECTANGULARES REVESTIDAS
ZANJAS REVESTIDAS
JUNTA PARA MUROS
FILTRO
MATERIAL IMPERMEABLE
GEOTEXTIL
DREN PVC D=3"
SUBDRENAJE
POLIESTILENO EXPANDIDO
BARANDAS METALICAS
BRUA ROMPE AGUA EN LOSA
ACABADO DE VEREDAS
JUNTA DE DILATACION EXPANDIBLES
APOYO DE NEOPRENO
TUBOS DE DRENAJE PVC D = 3" X 0.50 M.
FALSO PUENTE
LOSA DE APROXIMACION
TRANSPORTES
TRANSPORTE DE ESCOMBROS PARA D<=1.00 KM
TRANSPORTE DE ESCOMBROS PARA D>1.00 KM
TRANSPORTE DE MATERIALES GRANULARES PARA D<=1.00 KM
TRANSPORTE DE MATERIALES GRANULARES PARA D>1.00 KM
TRANSPORTE DE MEZCLA ASFALTICA PARA D<=1.00 KM
TRANSPORTE DE MEZCLA ASFALTICA PARA D>1.00 KM
SEALIZACION
SEAL PREVENTIVA (0.75 m. x 0.75 m.)
SEAL REGLAMENTARIA
SEAL INFORMATIVA
PANEL INFORMATIVO
ESTRUCTURA DE SOPORTE
CIMENTACION Y MONTAJE
POSTES KILOMETRICOS
DEMARCACION EN EL PAVIMENTO
GUARDAVIAS (Incluye Terminal)
POSTES DELINEADORES
TACHAS REFLECTIVAS BIDIRECCIONALES
PINTADO DE MUROS Y PARAPETOS
VARIOS

7.01
7.02
8.00
8.01
8.02
8.03
8.04
8.05
8.06
8.07
8.08
8.09
8.10
8.11

MANTENIMIENTO DE TRANSITO TEMPORAL Y SEGURIDAD VIAL


CONSTRUCCION DE PASE PROVISIONAL
MEDIO AMBIENTE
ACONDICIONAMIENTO DE DEPOSITOS DE MATERIAL EXCEDENTE
RESTAURACION DE AREA AFECTADA POR CAMPAMENTO
RESTAURACION DE CANTERAS
REVEGETALIZACION
RESTAURACION DE AREA AFECTADA POR PLANTA DE ASFALTO Y CHANCAD
RESTAURACION DE AREA AFECTADA POR PATIO DE MAQUINAS
SELLADO DE LETRINAS
PROGRAMA DE EDUCACION AMBIENTAL
PROGRAMA DE SEALIZACION AMBIENTAL
PROGRAMA DE CONTINGENCIAS
PROGRAMA DE SEGUIMIENTO Y VIGILANCIA
COSTO DIRECTO
UTILIDAD (10%)
GASTOS GENRALES (19.38%)
SUBTOTAL
IGV (19%)
PRSUPUESTO TOTAL

ON DE PARTIDA

UBRASANTE EN ZONAS DE CORTE

CONSIDERADO EN TRANSP.)
EZA)

IEDRA MEDIANA

UNIDAD

METRADO

GLB
KM
und

1.00
31.76
2.00

m3
m3
m3
m2
m3
m2

65,986.17
92,573.52
8,715.76
69,540.19
17,384.36
75,179.04

m3
m3
m3
m3

55,428.55
66,078.76
22,553.71
2,905.32

m3
m3
m2
m3
gln
gln
kg

53,128.45
49,316.77
240,667.14
17,511.09
72,200.00
638,629.41
24,172.00

m3
m3
m3
m3
m2
m2
m2
kg
m3
m3
m3
m3
m3
m3

14,755.92
1,423.33
98.00
3,448.44
6,462.80
1,513.36
475.11
89,713.11
1,325.05
64.42
484.43
789.56
115.66
8,958.89

15 M)

D<=1.00 KM
D>1.00 KM
00 KM
KM

m
m
m
m2
m
m
m
m
m
m2
m3
m3
m2
m
m
m2
m
m
m
m
CM3
und
m
m

1,010.20
296.50
94.90
742.26
26,742.10
2,950.00
2,233.00
1,062.00
1,087.50
48.88
148.07
31.56
638.60
278.45
4,793.00
1.80
30.00
30.00
30.00
18.00
29,120.00
4.00
32.50
21.00

m3K
m3K
m3K
m3K
M3K
M3K

67,453.98
770,042.15
142,383.29
809,732.73
17,511.09
153,922.50

und
und

110.00
22.00

m2
m
und
und
m2
m
und
und
m2

20.53
106.60
11.00
31.00
8,822.22
440.00
361.00
261.00
157.80

URIDAD VIAL

GLB
m

1.00
60.00

AL EXCEDENTE
ENTO

m3
m2
m2
HA
m2
m2
und
mes
und
GLB
mes

74,972.94
1,500.00
30,000.00
10.00
15,000.00
4,000.00
15.00
15.00
15.00
1.00
15.00

DE ASFALTO Y CHANCADORA
E MAQUINAS

SEPTIMO MES
PRECIO
S/.

PARCIAL
S/.

1,177,828.16
1,379.95
2,589.17

4.70
14.43
23.99
0.90
13.58
1.26
5.22
12.50
11.85
2.58
28.73
48.67
0.75
211.70
7.53
5.81
16.37
11.43
21.45
34.71
36.50
32.81
54.19
55.92
4.18
250.27
247.08
344.37
367.40
394.92
42.31

1,226,833.71
1,177,828.16
43,827.21
5,178.34
3,638,532.07
2,248,453.35
310,135.00
1,335,835.89
209,091.08
62,586.17
236,079.61
94,725.59
1,390,078.72
289,337.03
825,984.50
267,261.46
7,495.73
12,464,024.18
1,526,380.37
2,400,247.20
180,500.36
3,707,097.75
543,666.00
3,710,436.87
395,695.64
8,334,752.05
168,660.17
30,530.43
3,401.58
125,868.06
212,044.47
82,008.98
26,568.15
375,000.80
331,620.26
15,916.89
166,823.16
290,084.34
45,676.45
379,050.64

RENDIMIENTO

PROGRAMADO
METRADO

0.00
0.00
0.00

6,945.91
9,744.58
917.45
7,320.02
1,829.93
7,913.58
5,834.58
6,955.66
2,374.07
305.82
4,619.87
4,288.41
20,927.58
1,522.70
6,278.26
55,532.99
2,101.91
1,283.12
123.77
8.52
299.86
561.98
131.60
41.31
7,801.14
115.22
5.60
42.12
68.66
10.06
779.03

356.75
527.95
786.32
51.45
120.08
99.07
78.75
121.39
106.33
8.61
99.11
41.50
6.45
16.27
279.25
15.77
466.78
13.68
5.46
15.77
0.12
46.85
3,459.98
1,590.12
18.26
1.29
8.70
1.18
13.90
1.50
695.25
820.95
584.52
168.62
566.86
92.70
18.52
188.01
89.83
14.97
10.41

360,388.85
156,537.18
74,621.77
38,189.28
3,211,191.37
292,256.50
175,848.75
128,916.18
115,633.88
420.86
14,675.22
1,309.74
4,118.97
4,530.38
1,338,445.25
28.39
14,003.40
410.40
163.80
283.86
3,494.40
187.40
112,449.35
33,392.52
4,893,571.19
1,231,709.67
993,354.37
1,238,734.62
955,484.62
243,404.15
230,883.75
417,713.06
76,477.50
18,060.90
323,174.66
12,000.20
17,974.89
6,235.46
2,873.70
163,387.51
82,724.40
32,428.63
3,907.17
1,642.70
731,731.96

87.84
25.78
8.25
64.54
2,325.40
256.52
194.17
92.35
94.57
4.25
12.88
2.74
55.53
24.21
416.78
0.16
2.61
2.61
2.61
1.57
2,532.17
0.35
2.83
1.83
4,818.14
55,003.01
10,170.24
57,838.05
1,250.79
10,994.46
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

638,524.36
1,553.46
2.87
2.77
2.25
1,211.84
2.77
2.77
397.54
3,500.00
410.47
8,520.00
5,000.00

638,524.36
93,207.60
499,715.89
215,172.34
4,155.00
67,500.00
12,118.40
41,550.00
11,080.00
5,963.10
52,500.00
6,157.05
8,520.00
75,000.00
32,206,874.11
3,220,687.41
6,241,692.20
41,669,253.73
7,917,158.21
49,586,411.94

0.07
4.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

SEPTIMO MES

100.00%

PROGRAMADO
S/.

0.00
0.00
0.00
0.00
383,003.37
236,679.30
32,645.79
140,614.30
22,009.59
6,588.02
24,850.48
9,971.11
146,324.07
30,456.53
86,945.74
28,132.79
789.02
1,083,828.19
132,728.73
208,717.15
15,695.68
322,356.33
47,275.30
322,646.68
34,408.32
724,761.05
14,666.10
2,654.82
295.79
10,945.05
18,438.65
7,131.22
2,310.27
32,608.77
28,836.54
1,384.08
14,506.36
25,224.73
3,971.86
32,960.92

VALOR. ACUMUL. ANTERIOR


METRADO
S/.

0.52
16.51
1.04

59,040.26
82,828.94
7,798.31
62,220.17
15,554.43
67,265.46
49,593.97
59,123.10
20,179.64
2,599.50
32,339.06
30,018.90
146,493.04
10,658.92
43,947.83
388,730.95
14,713.39
9,623.43
928.26
63.91
2,248.98
4,214.87
986.97
309.85
58,508.55
864.16
42.01
315.93
514.93
75.43
5,842.75

637,919.64
612,438.11
22,788.94
2,692.59
3,255,528.65
2,011,774.02
277,489.21
1,195,221.57
187,081.49
55,998.15
211,229.12
84,754.47
1,243,754.63
258,880.50
739,038.75
239,128.67
6,706.70
7,586,797.33
929,101.09
1,461,020.03
109,869.78
2,256,494.28
330,927.13
2,258,526.79
240,858.22
5,435,707.88
109,995.76
19,911.15
2,218.42
82,087.87
138,289.87
53,484.12
17,327.06
244,565.74
216,274.09
10,380.58
108,797.71
189,185.44
29,788.99
247,206.94

VALORIZACION ACTUAL
METRADO

0.00
0.00
0.00

6,945.91
9,744.58
917.45
7,320.02
1,829.93
7,913.58
5,834.58
6,955.66
2,374.07
305.82
4,619.87
4,288.41
20,927.58
1,522.70
6,278.26
55,532.99
2,101.91
1,283.12
123.77
8.52
299.86
561.98
131.60
41.31
7,801.14
115.22
5.60
42.12
68.66
10.06
779.03

31,338.16
13,611.93
6,488.85
3,320.81
279,234.03
25,413.61
15,291.20
11,210.10
10,055.12
36.60
1,276.11
113.89
358.17
393.95
116,386.54
2.47
1,217.69
35.69
14.24
24.68
303.86
16.30
9,778.20
2,903.70
349,540.80
87,979.26
70,953.88
88,481.04
68,248.90
17,386.01
16,491.70

658.83
193.37
61.89
484.08
17,440.50
1,923.91
1,456.30
692.61
709.24
31.88
96.57
20.58
416.48
181.60
3,125.87
1.17
19.57
19.57
19.57
11.74
18,991.30
2.61
21.20
13.70
40,954.20
467,525.59
86,447.00
491,623.44
10,631.73
93,452.95
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

48,782.13

235,036.21
102,089.46
48,666.37
24,906.05
2,094,255.25
190,602.07
114,683.97
84,075.77
75,413.40
274.47
9,570.79
854.18
2,686.28
2,954.60
872,899.08
18.51
9,132.65
267.65
106.83
185.13
2,278.96
122.22
73,336.53
21,777.73
2,971,096.80
747,823.73
603,108.01
752,088.88
580,115.66
147,781.09
140,179.42
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
439,039.17

87.84
25.78
8.25
64.54
2,325.40
256.52
194.17
92.35
94.57
4.25
12.88
2.74
55.53
24.21
416.78
0.16
2.61
2.61
2.61
1.57
2,532.17
0.35
2.83
1.83
4,818.14
55,003.01
10,170.24
57,838.05
1,250.79
10,994.46
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

42,568.29
6,213.84
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2,589,915.54
258,991.55
501,925.63
3,350,832.73
636,658.22
3,987,490.94

0.60
36.00
46,858.09
937.50
18,750.00
6.25
9,375.00
2,500.00
9.38
9.38
9.38
0.63
9.38

383,114.61
55,924.56
312,322.45
134,482.72
2,596.88
42,187.50
7,574.00
25,968.75
6,925.00
3,726.94
32,812.50
3,848.16
5,325.00
46,875.00

0.07
4.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

RIZACION ACTUAL
S/.

0.00
0.00
0.00
0.00
383,003.37
236,679.30
32,645.79
140,614.30
22,009.59
6,588.02
24,850.48
9,971.11
146,324.07
30,456.53
86,945.74
28,132.79
789.02
1,083,828.19
132,728.73
208,717.15
15,695.68
322,356.33
47,275.30
322,646.68
34,408.32
724,761.05
14,666.10
2,654.82
295.79
10,945.05
18,438.65
7,131.22
2,310.27
32,608.77
28,836.54
1,384.08
14,506.36
25,224.73
3,971.86
32,960.92

VALORIZACION ACUMULADO
METRADO
S/.

0.52
16.51
1.04

65,986.17
92,573.52
8,715.76
69,540.19
17,384.36
75,179.04
55,428.55
66,078.76
22,553.71
2,905.32
36,958.92
34,307.32
167,420.62
12,181.63
50,226.09
444,263.94
16,815.30
10,906.55
1,052.03
72.43
2,548.85
4,776.85
1,118.57
351.17
66,309.69
979.38
47.61
358.06
583.59
85.49
6,621.79

637,919.64
612,438.11
22,788.94
2,692.59
3,638,532.02
2,248,453.32
310,135.00
1,335,835.88
209,091.08
62,586.17
236,079.61
94,725.59
1,390,078.70
289,337.03
825,984.49
267,261.46
7,495.73
8,670,625.52
1,061,829.82
1,669,737.18
125,565.46
2,578,850.61
378,202.43
2,581,173.48
275,266.53
6,160,468.93
124,661.86
22,565.97
2,514.21
93,032.91
156,728.52
60,615.33
19,637.33
277,174.51
245,110.63
11,764.66
123,304.07
214,410.17
33,760.85
280,167.86

ACTUAL
%

SALDO POR VALOR


METRADO

52.00%
52.00%
52.00%

0.48
15.25
0.96

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

0.00
0.00
0.00
0.00
0.00
0.00

100.00%
100.00%
100.00%
100.00%

0.00
0.00
0.00
0.00

69.57%
69.57%
69.57%
69.57%
69.57%
69.57%
69.57%

16,169.53
15,009.45
73,246.52
5,329.46
21,973.91
194,365.47
7,356.70

73.91%
73.91%
73.91%
73.91%
73.91%
73.91%
73.91%
73.91%
73.91%
73.91%
73.91%
73.91%
73.91%
73.91%

3,849.37
371.30
25.57
899.59
1,685.95
394.79
123.94
23,403.42
345.67
16.81
126.37
205.97
30.17
2,337.10

31,338.16
13,611.93
6,488.85
3,320.81
279,234.03
25,413.61
15,291.20
11,210.10
10,055.12
36.60
1,276.11
113.89
358.17
393.95
116,386.54
2.47
1,217.69
35.69
14.24
24.68
303.86
16.30
9,778.20
2,903.70
349,540.80
87,979.26
70,953.88
88,481.04
68,248.90
17,386.01
16,491.70
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
48,782.13

746.67
219.15
70.14
548.63
19,765.90
2,180.43
1,650.48
784.96
803.80
36.13
109.44
23.33
472.01
205.81
3,542.65
1.33
22.17
22.17
22.17
13.30
21,523.48
2.96
24.02
15.52
45,772.34
522,528.60
96,617.23
549,461.50
11,882.53
104,447.41
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

266,374.37
115,701.39
55,155.22
28,226.86
2,373,489.28
216,015.67
129,975.16
95,285.87
85,468.52
311.07
10,846.90
968.07
3,044.46
3,348.54
989,285.62
20.98
10,350.34
303.34
121.07
209.81
2,582.82
138.51
83,114.74
24,681.43
3,320,637.60
835,802.99
674,061.90
840,569.92
648,364.57
165,167.10
156,671.12

73.91%
73.91%
73.91%
73.91%
73.91%
73.91%
73.91%
73.91%
73.91%
73.91%
73.91%
73.91%
73.91%
73.91%
73.91%
73.91%
73.91%
73.91%
73.91%
73.91%
73.91%
73.91%
73.91%
73.91%

263.53
77.35
24.76
193.63
6,976.20
769.57
582.52
277.04
283.70
12.75
38.63
8.23
166.59
72.64
1,250.35
0.47
7.83
7.83
7.83
4.70
7,596.52
1.04
8.48
5.48

67.86%
67.86%
67.86%
67.86%
67.86%
67.86%

21,681.64
247,513.55
45,766.06
260,271.23
5,628.56
49,475.09

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
487,821.30

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

42,568.29
6,213.84
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2,589,915.54
258,991.55
501,925.63

0.67
40.00
46,858.09
937.50
18,750.00
6.25
9,375.00
2,500.00
9.38
9.38
9.38
0.63
9.38

425,682.90
62,138.40
312,322.45
134,482.72
2,596.88
42,187.50
7,574.00
25,968.75
6,925.00
3,726.94
32,812.50
3,848.16
5,325.00
46,875.00
22,278,085.37
2,227,808.54
4,317,492.94

3,350,832.73
636,658.22

28,823,386.85
5,476,443.50

3,987,490.94

34,299,830.35

15,972,718.56

66.67%
66.67%

0.33
20.00

62.50%
62.50%
62.50%
62.50%
62.50%
62.50%
62.50%
62.50%
62.50%
62.50%
62.50%

28,114.85
562.50
11,250.00
3.75
5,625.00
1,500.00
5.62
5.62
5.62
0.37
5.62

SALDO POR VALORIZAR


S/.

588,914.07
565,390.05
21,038.27
2,485.75
0.05
0.03
0.00
0.02
0.00
0.00
0.00
0.00
0.02
0.00
0.01
0.00
0.00
3,793,398.66
464,550.55
730,510.02
54,934.89
1,128,247.14
165,463.57
1,129,263.40
120,429.11
2,174,283.12
43,998.30
7,964.46
887.37
32,835.15
55,315.95
21,393.65
6,930.82
97,826.29
86,509.63
4,152.23
43,519.08
75,674.18
11,915.59
98,882.77

48.00%
48.00%
48.00%

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
30.43%
30.43%
30.43%
30.43%
30.43%
30.43%
30.43%
26.09%
26.09%
26.09%
26.09%
26.09%
26.09%
26.09%
26.09%
26.09%
26.09%
26.09%
26.09%
26.09%
26.09%

94,014.48
40,835.78
19,466.55
9,962.42
837,702.09
76,240.83
45,873.59
33,630.31
30,165.36
109.79
3,828.32
341.67
1,074.51
1,181.84
349,159.63
7.41
3,653.06
107.06
42.73
74.05
911.58
48.89
29,334.61
8,711.09
1,572,933.59
395,906.68
319,292.48
398,164.70
307,120.06
78,237.05
74,212.63

26.09%
26.09%
26.09%
26.09%
26.09%
26.09%
26.09%
26.09%
26.09%
26.09%
26.09%
26.09%
26.09%
26.09%
26.09%
26.09%
26.09%
26.09%
26.09%
26.09%
26.09%
26.09%
26.09%
26.09%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
243,910.66

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

32.14%
32.14%
32.14%
32.14%
32.14%
32.14%

212,841.46
31,069.20
187,393.44
80,689.62
1,558.12
25,312.50
4,544.40
15,581.25
4,155.00
2,236.16
19,687.50
2,308.89
3,195.00
28,125.00
7,784,526.08
778,452.61
1,508,641.15
10,071,619.85
1,913,607.77
11,985,227.62

33.33%
33.33%
37.50%
37.50%
37.50%
37.50%
37.50%
37.50%
37.50%
37.50%
37.50%
37.50%
37.50%

ITEM.

1.00
1.01
1.02
1.03
2.00
2.01
02.01.01
02.01.02
02.01.03
2.02
2.03
2.04
2.05
02.05.01
02.05.02
02.05.03
2.06
3.00
3.01
3.02
3.03
3.04
3.05
3.06
3.07
4.00
4.01
4.02
4.03
4.04
4.05
4.06
4.07
4.08
4.09
4.10
4.11
4.12
4.13
4.14

DESCRIPCION DE PARTIDA

OBRAS PRELIMINARES
MOVILIZACION Y DESMOVILIZACION DE EQUIPOS
TRAZO Y REPLANTEO
CARTEL DE OBRA 3.60 x 7.20
MOVIMIENTO DE TIERRAS
EXCAVACION PARA EXPLANACIONES
CORTE EN MATERIAL SUELTO
CORTE EN ROCA SUELTA
CORTE EN ROCA FIJA
PERFILADO, NIVELACION Y COMPACTACION DE SUBRASANTE EN ZONAS D
MEJORAMIENTO DE SUB RASANTE
LIMPIEZA DE TERRENO PARA RECIBIR RELLENO
TERRAPLEN
RELLENO CON MATERIAL PROPIO
RELLENO CON MATERIAL EXCEDENTE DE CORTE
RELLENO CON MATERIAL DE CANTERA (MATERIAL CONSIDERADO EN TRAN
REMOCION DE DERRUMBES (SOLO REFINE Y LIMPIEZA)
PAVIMENTO
SUB BASE GRANULAR
BASE GRANULAR
IMPRIMACION BITUMINOSA
CARPETA ASFALTICA EN CALIENTE (e=0.075 m.)
ASFALTO DILUIDO MC-30
CEMENTO ASFALTICO PEN 120 -150
ADITIVO MEJORADOR DE ADHERENCIA
OBRAS DE ARTE Y DRENAJE
EXCAVACION PARA ESTRUCTURAS
EXCAVACION PARA ESTRUCTURAS BAJO AGUA
DEMOLICION DE CONCRETO CICLOPEO
DEMOLICION DE MAMPOSTERIA DE PIEDRA
ENCOFRADO Y DESENCOFRADO
ENCOFRADO Y DESENCOFRADO CARA VISTA
ENCOFRADO Y DESENCOFRADO BAJO AGUA
ACERO DE REFUERZO FY=4,200 KG/CM2
CONCRETO CICLOPEO f'c = 175 KG/CM2 + 30 % PIEDRA MEDIANA
CONCRETO SIMPLE f'c = 100 KG/CM2
CONCRETO SIMPLE f'c = 210 KG/CM2 EN SECO
CONCRETO SIMPLE f'c = 210 KG/CM2 BAJO AGUA
CONCRETO SIMPLE f'c = 280 KG/CM2
RELLENO DE ESTRUCTURAS

4.15
4.16
4.17
4.18
4.19
4.20
4.21
4.22
4.23
4.24
4.25
4.26
4.27
4.28
4.29
4.3
4.31
4.32
4.33
4.34
4.35
4.36
4.37
4.38
5.00
5.01
5.02
5.03
5.04
5.05
5.06
6.00
6.01
6.02
6.03
06.03.01
06.03.02
06.03.03
6.04
6.05
6.06
6.07
6.08
6.09
7.00

ALCANTARILLA TMC 0 36"


ALCANTARILLA TMC 0 48"
ALCANTARILLA TMC 0 60"
ALIVIADERO DE EMBOQUILLADO DE PIEDRA (E=0.15 M)
CUNETAS TRIANGULARES REVESTIDAS 1.00X0.40
CUNETAS TRIANGULARES REVESTIDAS 0.75X0.35
CUNETAS TRIANGULARES REVESTIDAS 0.50X0.30
CUNETAS RECTANGULARES REVESTIDAS
ZANJAS REVESTIDAS
JUNTA PARA MUROS
FILTRO
MATERIAL IMPERMEABLE
GEOTEXTIL
DREN PVC D=3"
SUBDRENAJE
POLIESTILENO EXPANDIDO
BARANDAS METALICAS
BRUA ROMPE AGUA EN LOSA
ACABADO DE VEREDAS
JUNTA DE DILATACION EXPANDIBLES
APOYO DE NEOPRENO
TUBOS DE DRENAJE PVC D = 3" X 0.50 M.
FALSO PUENTE
LOSA DE APROXIMACION
TRANSPORTES
TRANSPORTE DE ESCOMBROS PARA D<=1.00 KM
TRANSPORTE DE ESCOMBROS PARA D>1.00 KM
TRANSPORTE DE MATERIALES GRANULARES PARA D<=1.00 KM
TRANSPORTE DE MATERIALES GRANULARES PARA D>1.00 KM
TRANSPORTE DE MEZCLA ASFALTICA PARA D<=1.00 KM
TRANSPORTE DE MEZCLA ASFALTICA PARA D>1.00 KM
SEALIZACION
SEAL PREVENTIVA (0.75 m. x 0.75 m.)
SEAL REGLAMENTARIA
SEAL INFORMATIVA
PANEL INFORMATIVO
ESTRUCTURA DE SOPORTE
CIMENTACION Y MONTAJE
POSTES KILOMETRICOS
DEMARCACION EN EL PAVIMENTO
GUARDAVIAS (Incluye Terminal)
POSTES DELINEADORES
TACHAS REFLECTIVAS BIDIRECCIONALES
PINTADO DE MUROS Y PARAPETOS
VARIOS

7.01
7.02
8.00
8.01
8.02
8.03
8.04
8.05
8.06
8.07
8.08
8.09
8.10
8.11

MANTENIMIENTO DE TRANSITO TEMPORAL Y SEGURIDAD VIAL


CONSTRUCCION DE PASE PROVISIONAL
MEDIO AMBIENTE
ACONDICIONAMIENTO DE DEPOSITOS DE MATERIAL EXCEDENTE
RESTAURACION DE AREA AFECTADA POR CAMPAMENTO
RESTAURACION DE CANTERAS
REVEGETALIZACION
RESTAURACION DE AREA AFECTADA POR PLANTA DE ASFALTO Y CHANCAD
RESTAURACION DE AREA AFECTADA POR PATIO DE MAQUINAS
SELLADO DE LETRINAS
PROGRAMA DE EDUCACION AMBIENTAL
PROGRAMA DE SEALIZACION AMBIENTAL
PROGRAMA DE CONTINGENCIAS
PROGRAMA DE SEGUIMIENTO Y VIGILANCIA
COSTO DIRECTO
UTILIDAD (10%)
GASTOS GENRALES (19.38%)
SUBTOTAL
IGV (19%)
PRSUPUESTO TOTAL

ON DE PARTIDA

UBRASANTE EN ZONAS DE CORTE

CONSIDERADO EN TRANSP.)
EZA)

IEDRA MEDIANA

UNIDAD

METRADO

GLB
KM
und

1.00
31.76
2.00

m3
m3
m3
m2
m3
m2

65,986.17
92,573.52
8,715.76
69,540.19
17,384.36
75,179.04

m3
m3
m3
m3

55,428.55
66,078.76
22,553.71
2,905.32

m3
m3
m2
m3
gln
gln
kg

53,128.45
49,316.77
240,667.14
17,511.09
72,200.00
638,629.41
24,172.00

m3
m3
m3
m3
m2
m2
m2
kg
m3
m3
m3
m3
m3
m3

14,755.92
1,423.33
98.00
3,448.44
6,462.80
1,513.36
475.11
89,713.11
1,325.05
64.42
484.43
789.56
115.66
8,958.89

15 M)

D<=1.00 KM
D>1.00 KM
00 KM
KM

m
m
m
m2
m
m
m
m
m
m2
m3
m3
m2
m
m
m2
m
m
m
m
CM3
und
m
m

1,010.20
296.50
94.90
742.26
26,742.10
2,950.00
2,233.00
1,062.00
1,087.50
48.88
148.07
31.56
638.60
278.45
4,793.00
1.80
30.00
30.00
30.00
18.00
29,120.00
4.00
32.50
21.00

m3K
m3K
m3K
m3K
M3K
M3K

67,453.98
770,042.15
142,383.29
809,732.73
17,511.09
153,922.50

und
und

110.00
22.00

m2
m
und
und
m2
m
und
und
m2

20.53
106.60
11.00
31.00
8,822.22
440.00
361.00
261.00
157.80

URIDAD VIAL

GLB
m

1.00
60.00

AL EXCEDENTE
ENTO

m3
m2
m2
HA
m2
m2
und
mes
und
GLB
mes

74,972.94
1,500.00
30,000.00
10.00
15,000.00
4,000.00
15.00
15.00
15.00
1.00
15.00

DE ASFALTO Y CHANCADORA
E MAQUINAS

SEPTIMO MES
PRECIO
S/.

PARCIAL
S/.

1,177,828.16
1,379.95
2,589.17

4.70
14.43
23.99
0.90
13.58
1.26
5.22
12.50
11.85
2.58
28.73
48.67
0.75
211.70
7.53
5.81
16.37
11.43
21.45
34.71
36.50
32.81
54.19
55.92
4.18
250.27
247.08
344.37
367.40
394.92
42.31

1,226,833.71
1,177,828.16
43,827.21
5,178.34
3,638,532.07
2,248,453.35
310,135.00
1,335,835.89
209,091.08
62,586.17
236,079.61
94,725.59
1,390,078.72
289,337.03
825,984.50
267,261.46
7,495.73
12,464,024.18
1,526,380.37
2,400,247.20
180,500.36
3,707,097.75
543,666.00
3,710,436.87
395,695.64
8,334,752.05
168,660.17
30,530.43
3,401.58
125,868.06
212,044.47
82,008.98
26,568.15
375,000.80
331,620.26
15,916.89
166,823.16
290,084.34
45,676.45
379,050.64

RENDIMIENTO

PROGRAMADO
METRADO

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
4,619.87
4,288.41
20,927.58
1,522.70
6,278.26
55,532.99
2,101.91
1,283.12
123.77
8.52
299.86
561.98
131.60
41.31
7,801.14
115.22
5.60
42.12
68.66
10.06
779.03

356.75
527.95
786.32
51.45
120.08
99.07
78.75
121.39
106.33
8.61
99.11
41.50
6.45
16.27
279.25
15.77
466.78
13.68
5.46
15.77
0.12
46.85
3,459.98
1,590.12
18.26
1.29
8.70
1.18
13.90
1.50
695.25
820.95
584.52
168.62
566.86
92.70
18.52
188.01
89.83
14.97
10.41

360,388.85
156,537.18
74,621.77
38,189.28
3,211,191.37
292,256.50
175,848.75
128,916.18
115,633.88
420.86
14,675.22
1,309.74
4,118.97
4,530.38
1,338,445.25
28.39
14,003.40
410.40
163.80
283.86
3,494.40
187.40
112,449.35
33,392.52
4,893,571.19
1,231,709.67
993,354.37
1,238,734.62
955,484.62
243,404.15
230,883.75
417,713.06
76,477.50
18,060.90
323,174.66
12,000.20
17,974.89
6,235.46
2,873.70
163,387.51
82,724.40
32,428.63
3,907.17
1,642.70
731,731.96

87.84
25.78
8.25
64.54
2,325.40
256.52
194.17
92.35
94.57
4.25
12.88
2.74
55.53
24.21
416.78
0.16
2.61
2.61
2.61
1.57
2,532.17
0.35
2.83
1.83
4,818.14
55,003.01
10,170.24
57,838.05
1,250.79
10,994.46
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

638,524.36
1,553.46
2.87
2.77
2.25
1,211.84
2.77
2.77
397.54
3,500.00
410.47
8,520.00
5,000.00

638,524.36
93,207.60
499,715.89
215,172.34
4,155.00
67,500.00
12,118.40
41,550.00
11,080.00
5,963.10
52,500.00
6,157.05
8,520.00
75,000.00
32,206,874.11
3,220,687.41
6,241,692.20
41,669,253.73
7,917,158.21
49,586,411.94

0.07
4.00
9,371.62
187.50
3,750.00
1.25
1,875.00
500.00
1.88
1.88
1.88
0.13
1.88

SEPTIMO MES

100.00%

PROGRAMADO
S/.

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1,083,828.19
132,728.73
208,717.15
15,695.68
322,356.33
47,275.30
322,646.68
34,408.32
724,761.05
14,666.10
2,654.82
295.79
10,945.05
18,438.65
7,131.22
2,310.27
32,608.77
28,836.54
1,384.08
14,506.36
25,224.73
3,971.86
32,960.92

VALOR. ACUMUL. ANTERIOR


METRADO
S/.

0.52
16.51
1.04

59,040.26
82,828.94
7,798.31
62,220.17
15,554.43
67,265.46
49,593.97
59,123.10
20,179.64
2,599.50
36,958.92
34,307.32
167,420.62
12,181.63
50,226.09
444,263.94
16,815.30
10,906.55
1,052.03
72.43
2,548.85
4,776.85
1,118.57
351.17
66,309.69
979.38
47.61
358.06
583.59
85.49
6,621.79

637,919.64
612,438.11
22,788.94
2,692.59
3,255,528.65
2,011,774.02
277,489.21
1,195,221.57
187,081.49
55,998.15
211,229.12
84,754.47
1,243,754.63
258,880.50
739,038.75
239,128.67
6,706.70
8,670,625.52
1,061,829.82
1,669,737.18
125,565.46
2,578,850.61
378,202.43
2,581,173.48
275,266.53
6,160,468.93
124,661.86
22,565.97
2,514.21
93,032.91
156,728.52
60,615.33
19,637.33
277,174.51
245,110.63
11,764.66
123,304.07
214,410.17
33,760.85
280,167.86

VALORIZACION ACTUAL
METRADO

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
4,619.87
4,288.41
20,927.58
1,522.70
6,278.26
55,532.99
2,101.91
1,283.12
123.77
8.52
299.86
561.98
131.60
41.31
7,801.14
115.22
5.60
42.12
68.66
10.06
779.03

31,338.16
13,611.93
6,488.85
3,320.81
279,234.03
25,413.61
15,291.20
11,210.10
10,055.12
36.60
1,276.11
113.89
358.17
393.95
116,386.54
2.47
1,217.69
35.69
14.24
24.68
303.86
16.30
9,778.20
2,903.70
349,540.80
87,979.26
70,953.88
88,481.04
68,248.90
17,386.01
16,491.70

746.67
219.15
70.14
548.63
19,765.90
2,180.43
1,650.48
784.96
803.80
36.13
109.44
23.33
472.01
205.81
3,542.65
1.33
22.17
22.17
22.17
13.30
21,523.48
2.96
24.02
15.52
45,772.34
522,528.60
96,617.23
549,461.50
11,882.53
104,447.41
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

48,782.13

266,374.37
115,701.39
55,155.22
28,226.86
2,373,489.28
216,015.67
129,975.16
95,285.87
85,468.52
311.07
10,846.90
968.07
3,044.46
3,348.54
989,285.62
20.98
10,350.34
303.34
121.07
209.81
2,582.82
138.51
83,114.74
24,681.43
3,320,637.60
835,802.99
674,061.90
840,569.92
648,364.57
165,167.10
156,671.12
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
487,821.30

87.84
25.78
8.25
64.54
2,325.40
256.52
194.17
92.35
94.57
4.25
12.88
2.74
55.53
24.21
416.78
0.16
2.61
2.61
2.61
1.57
2,532.17
0.35
2.83
1.83
4,818.14
55,003.01
10,170.24
57,838.05
1,250.79
10,994.46
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

42,568.29
6,213.84
62,464.49
26,896.54
519.38
8,437.50
1,514.80
5,193.75
1,385.00
745.39
6,562.50
769.63
1,065.00
9,375.00
2,269,376.66
226,937.67
439,805.20
2,936,119.52
557,862.71
3,493,982.23

0.67
40.00
46,858.09
937.50
18,750.00
6.25
9,375.00
2,500.00
9.38
9.38
9.38
0.63
9.38

425,682.90
62,138.40
312,322.45
134,482.72
2,596.88
42,187.50
7,574.00
25,968.75
6,925.00
3,726.94
32,812.50
3,848.16
5,325.00
46,875.00

0.07
4.00
9,371.62
187.50
3,750.00
1.25
1,875.00
500.00
1.88
1.88
1.88
0.13
1.88

VALORIZACION ACTUAL
S/.

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1,083,828.19
132,728.73
208,717.15
15,695.68
322,356.33
47,275.30
322,646.68
34,408.32
724,761.05
14,666.10
2,654.82
295.79
10,945.05
18,438.65
7,131.22
2,310.27
32,608.77
28,836.54
1,384.08
14,506.36
25,224.73
3,971.86
32,960.92

#DIV/0!
#DIV/0!
#DIV/0!

VALORIZACION ACUMULADO
METRADO
S/.

0.52
16.51
1.04

59,040.26
82,828.94
7,798.31
62,220.17
15,554.43
67,265.46
49,593.97
59,123.10
20,179.64
2,599.50
41,578.79
38,595.73
188,348.20
13,704.33
56,504.35
499,796.93
18,917.22
12,189.67
1,175.79
80.96
2,848.71
5,338.83
1,250.17
392.48
74,110.83
1,094.61
53.22
400.18
652.25
95.55
7,400.82

637,919.64
612,438.11
22,788.94
2,692.59
3,255,528.65
2,011,774.02
277,489.21
1,195,221.57
187,081.49
55,998.15
211,229.12
84,754.47
1,243,754.63
258,880.50
739,038.75
239,128.67
6,706.70
9,754,453.71
1,194,558.55
1,878,454.33
141,261.15
2,901,206.94
425,477.74
2,903,820.16
309,674.85
6,885,229.98
139,327.96
25,220.79
2,810.00
103,977.96
175,167.17
67,746.55
21,947.60
309,783.27
273,947.18
13,148.74
137,810.44
239,634.89
37,732.72
313,128.79

ACTUAL
%

52.00%
52.00%
52.00%

89.47%
89.47%
89.47%
89.47%
89.47%
89.47%
89.47%
89.47%
89.47%
89.47%
78.26%
78.26%
78.26%
78.26%
78.26%
78.26%
78.26%
82.61%
82.61%
82.61%
82.61%
82.61%
82.61%
82.61%
82.61%
82.61%
82.61%
82.61%
82.61%
82.61%
82.61%

31,338.16
13,611.93
6,488.85
3,320.81
279,234.03
25,413.61
15,291.20
11,210.10
10,055.12
36.60
1,276.11
113.89
358.17
393.95
116,386.54
2.47
1,217.69
35.69
14.24
24.68
303.86
16.30
9,778.20
2,903.70
349,540.80
87,979.26
70,953.88
88,481.04
68,248.90
17,386.01
16,491.70
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
48,782.13

834.51
244.93
78.40
613.17
22,091.30
2,436.96
1,844.65
877.30
898.37
40.38
122.32
26.07
527.54
230.02
3,959.43
1.49
24.78
24.78
24.78
14.87
24,055.65
3.30
26.85
17.35
50,590.49
577,531.61
106,787.47
607,299.55
13,133.32
115,441.88
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

297,712.53
129,313.32
61,644.07
31,547.66
2,652,723.31
241,429.28
145,266.36
106,495.98
95,523.64
347.66
12,123.01
1,081.96
3,402.63
3,742.49
1,105,672.17
23.45
11,568.03
339.03
135.31
234.49
2,886.68
154.81
92,892.94
27,585.13
3,670,178.40
923,782.26
745,015.78
929,050.97
716,613.47
182,553.11
173,162.81

82.61%
82.61%
82.61%
82.61%
82.61%
82.61%
82.61%
82.61%
82.61%
82.61%
82.61%
82.61%
82.61%
82.61%
82.61%
82.61%
82.61%
82.61%
82.61%
82.61%
82.61%
82.61%
82.61%
82.61%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
536,603.43

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

75.00%
75.00%
75.00%
75.00%
75.00%
75.00%

42,568.29
6,213.84
62,464.49
26,896.54
519.38
8,437.50
1,514.80
5,193.75
1,385.00
745.39
6,562.50
769.63
1,065.00
9,375.00
2,269,376.66
226,937.67
439,805.20

0.73
44.00
56,229.71
1,125.00
22,500.00
7.50
11,250.00
3,000.00
11.25
11.25
11.25
0.75
11.25

468,251.19
68,352.24
374,786.94
161,379.26
3,116.25
50,625.00
9,088.80
31,162.50
8,310.00
4,472.33
39,375.00
4,617.79
6,390.00
56,250.00
21,221,252.46
2,122,125.25
4,112,678.73

2,936,119.52
557,862.71

27,456,056.43
5,216,650.72

3,493,982.23

32,672,707.15

12,273,742.61

73.33%
73.33%
75.00%
75.00%
75.00%
75.00%
75.00%
75.00%
75.00%
75.00%
75.00%
75.00%
75.00%

SALDO POR VALORIZAR


METRADO
S/.

0.48
15.25
0.96

6,945.91
9,744.58
917.45
7,320.02
1,829.93
7,913.58
5,834.58
6,955.66
2,374.07
305.82
11,549.66
10,721.04
52,318.94
3,806.76
15,695.65
138,832.48
5,254.78
2,566.25
247.54
17.04
599.73
1,123.97
263.19
82.63
15,602.28
230.44
11.20
84.25
137.31
20.11
1,558.07

588,914.07
565,390.05
21,038.27
2,485.75
383,003.42
236,679.32
32,645.79
140,614.32
22,009.59
6,588.02
24,850.49
9,971.12
146,324.09
30,456.53
86,945.75
28,132.79
789.02
2,709,570.47
331,821.82
521,792.87
39,239.21
805,890.82
118,188.26
806,616.71
86,020.79
1,449,522.07
29,332.20
5,309.64
591.58
21,890.10
36,877.30
14,262.43
4,620.55
65,217.53
57,673.09
2,768.16
29,012.72
50,449.45
7,943.73
65,921.85

48.00%
48.00%
48.00%

10.53%
10.53%
10.53%
10.53%
10.53%
10.53%
10.53%
10.53%
10.53%
10.53%
21.74%
21.74%
21.74%
21.74%
21.74%
21.74%
21.74%
17.39%
17.39%
17.39%
17.39%
17.39%
17.39%
17.39%
17.39%
17.39%
17.39%
17.39%
17.39%
17.39%
17.39%

175.69
51.57
16.50
129.09
4,650.80
513.04
388.35
184.70
189.13
8.50
25.75
5.49
111.06
48.43
833.57
0.31
5.22
5.22
5.22
3.13
5,064.35
0.70
5.65
3.65
16,863.49
192,510.54
35,595.82
202,433.18
4,377.77
38,480.62
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

62,676.32
27,223.86
12,977.70
6,641.61
558,468.05
50,827.22
30,582.39
22,420.20
20,110.24
73.19
2,552.21
227.78
716.34
787.89
232,773.08
4.94
2,435.37
71.37
28.49
49.37
607.72
32.59
19,556.41
5,807.39
1,223,392.79
307,927.42
248,338.59
309,683.65
238,871.15
60,851.04
57,720.94

17.39%
17.39%
17.39%
17.39%
17.39%
17.39%
17.39%
17.39%
17.39%
17.39%
17.39%
17.39%
17.39%
17.39%
17.39%
17.39%
17.39%
17.39%
17.39%
17.39%
17.39%
17.39%
17.39%
17.39%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
195,128.53

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

25.00%
25.00%
25.00%
25.00%
25.00%
25.00%

0.27
16.00
18,743.23
375.00
7,500.00
2.50
3,750.00
1,000.00
3.75
3.75
3.75
0.25
3.75

170,273.17
24,855.36
124,928.95
53,793.07
1,038.75
16,875.00
3,029.60
10,387.50
2,770.00
1,490.77
13,125.00
1,539.26
2,130.00
18,750.00
5,702,542.82
570,254.28
1,105,152.80
7,377,949.90
1,401,810.48
8,779,760.38

26.67%
26.67%
25.00%
25.00%
25.00%
25.00%
25.00%
25.00%
25.00%
25.00%
25.00%
25.00%
25.00%

ITEM.

1.00
1.01
1.02
1.03
2.00
2.01
02.01.01
02.01.02
02.01.03
2.02
2.03
2.04
2.05
02.05.01
02.05.02
02.05.03
2.06
3.00
3.01
3.02
3.03
3.04
3.05
3.06
3.07
4.00
4.01
4.02
4.03
4.04
4.05
4.06
4.07
4.08
4.09
4.10
4.11
4.12
4.13
4.14

DESCRIPCION DE PARTIDA

OBRAS PRELIMINARES
MOVILIZACION Y DESMOVILIZACION DE EQUIPOS
TRAZO Y REPLANTEO
CARTEL DE OBRA 3.60 x 7.20
MOVIMIENTO DE TIERRAS
EXCAVACION PARA EXPLANACIONES
CORTE EN MATERIAL SUELTO
CORTE EN ROCA SUELTA
CORTE EN ROCA FIJA
PERFILADO, NIVELACION Y COMPACTACION DE SUBRASANTE EN ZONAS D
MEJORAMIENTO DE SUB RASANTE
LIMPIEZA DE TERRENO PARA RECIBIR RELLENO
TERRAPLEN
RELLENO CON MATERIAL PROPIO
RELLENO CON MATERIAL EXCEDENTE DE CORTE
RELLENO CON MATERIAL DE CANTERA (MATERIAL CONSIDERADO EN TRAN
REMOCION DE DERRUMBES (SOLO REFINE Y LIMPIEZA)
PAVIMENTO
SUB BASE GRANULAR
BASE GRANULAR
IMPRIMACION BITUMINOSA
CARPETA ASFALTICA EN CALIENTE (e=0.075 m.)
ASFALTO DILUIDO MC-30
CEMENTO ASFALTICO PEN 120 -150
ADITIVO MEJORADOR DE ADHERENCIA
OBRAS DE ARTE Y DRENAJE
EXCAVACION PARA ESTRUCTURAS
EXCAVACION PARA ESTRUCTURAS BAJO AGUA
DEMOLICION DE CONCRETO CICLOPEO
DEMOLICION DE MAMPOSTERIA DE PIEDRA
ENCOFRADO Y DESENCOFRADO
ENCOFRADO Y DESENCOFRADO CARA VISTA
ENCOFRADO Y DESENCOFRADO BAJO AGUA
ACERO DE REFUERZO FY=4,200 KG/CM2
CONCRETO CICLOPEO f'c = 175 KG/CM2 + 30 % PIEDRA MEDIANA
CONCRETO SIMPLE f'c = 100 KG/CM2
CONCRETO SIMPLE f'c = 210 KG/CM2 EN SECO
CONCRETO SIMPLE f'c = 210 KG/CM2 BAJO AGUA
CONCRETO SIMPLE f'c = 280 KG/CM2
RELLENO DE ESTRUCTURAS

4.15
4.16
4.17
4.18
4.19
4.20
4.21
4.22
4.23
4.24
4.25
4.26
4.27
4.28
4.29
4.3
4.31
4.32
4.33
4.34
4.35
4.36
4.37
4.38
5.00
5.01
5.02
5.03
5.04
5.05
5.06
6.00
6.01
6.02
6.03
06.03.01
06.03.02
06.03.03
6.04
6.05
6.06
6.07
6.08
6.09
7.00

ALCANTARILLA TMC 0 36"


ALCANTARILLA TMC 0 48"
ALCANTARILLA TMC 0 60"
ALIVIADERO DE EMBOQUILLADO DE PIEDRA (E=0.15 M)
CUNETAS TRIANGULARES REVESTIDAS 1.00X0.40
CUNETAS TRIANGULARES REVESTIDAS 0.75X0.35
CUNETAS TRIANGULARES REVESTIDAS 0.50X0.30
CUNETAS RECTANGULARES REVESTIDAS
ZANJAS REVESTIDAS
JUNTA PARA MUROS
FILTRO
MATERIAL IMPERMEABLE
GEOTEXTIL
DREN PVC D=3"
SUBDRENAJE
POLIESTILENO EXPANDIDO
BARANDAS METALICAS
BRUA ROMPE AGUA EN LOSA
ACABADO DE VEREDAS
JUNTA DE DILATACION EXPANDIBLES
APOYO DE NEOPRENO
TUBOS DE DRENAJE PVC D = 3" X 0.50 M.
FALSO PUENTE
LOSA DE APROXIMACION
TRANSPORTES
TRANSPORTE DE ESCOMBROS PARA D<=1.00 KM
TRANSPORTE DE ESCOMBROS PARA D>1.00 KM
TRANSPORTE DE MATERIALES GRANULARES PARA D<=1.00 KM
TRANSPORTE DE MATERIALES GRANULARES PARA D>1.00 KM
TRANSPORTE DE MEZCLA ASFALTICA PARA D<=1.00 KM
TRANSPORTE DE MEZCLA ASFALTICA PARA D>1.00 KM
SEALIZACION
SEAL PREVENTIVA (0.75 m. x 0.75 m.)
SEAL REGLAMENTARIA
SEAL INFORMATIVA
PANEL INFORMATIVO
ESTRUCTURA DE SOPORTE
CIMENTACION Y MONTAJE
POSTES KILOMETRICOS
DEMARCACION EN EL PAVIMENTO
GUARDAVIAS (Incluye Terminal)
POSTES DELINEADORES
TACHAS REFLECTIVAS BIDIRECCIONALES
PINTADO DE MUROS Y PARAPETOS
VARIOS

7.01
7.02
8.00
8.01
8.02
8.03
8.04
8.05
8.06
8.07
8.08
8.09
8.10
8.11

MANTENIMIENTO DE TRANSITO TEMPORAL Y SEGURIDAD VIAL


CONSTRUCCION DE PASE PROVISIONAL
MEDIO AMBIENTE
ACONDICIONAMIENTO DE DEPOSITOS DE MATERIAL EXCEDENTE
RESTAURACION DE AREA AFECTADA POR CAMPAMENTO
RESTAURACION DE CANTERAS
REVEGETALIZACION
RESTAURACION DE AREA AFECTADA POR PLANTA DE ASFALTO Y CHANCAD
RESTAURACION DE AREA AFECTADA POR PATIO DE MAQUINAS
SELLADO DE LETRINAS
PROGRAMA DE EDUCACION AMBIENTAL
PROGRAMA DE SEALIZACION AMBIENTAL
PROGRAMA DE CONTINGENCIAS
PROGRAMA DE SEGUIMIENTO Y VIGILANCIA
COSTO DIRECTO
UTILIDAD (10%)
GASTOS GENRALES (19.38%)
SUBTOTAL
IGV (19%)
PRSUPUESTO TOTAL

ON DE PARTIDA

UBRASANTE EN ZONAS DE CORTE

CONSIDERADO EN TRANSP.)
EZA)

IEDRA MEDIANA

UNIDAD

METRADO

GLB
KM
und

1.00
31.76
2.00

m3
m3
m3
m2
m3
m2

65,986.17
92,573.52
8,715.76
69,540.19
17,384.36
75,179.04

m3
m3
m3
m3

55,428.55
66,078.76
22,553.71
2,905.32

m3
m3
m2
m3
gln
gln
kg

53,128.45
49,316.77
240,667.14
17,511.09
72,200.00
638,629.41
24,172.00

m3
m3
m3
m3
m2
m2
m2
kg
m3
m3
m3
m3
m3
m3

14,755.92
1,423.33
98.00
3,448.44
6,462.80
1,513.36
475.11
89,713.11
1,325.05
64.42
484.43
789.56
115.66
8,958.89

15 M)

D<=1.00 KM
D>1.00 KM
00 KM
KM

m
m
m
m2
m
m
m
m
m
m2
m3
m3
m2
m
m
m2
m
m
m
m
CM3
und
m
m

1,010.20
296.50
94.90
742.26
26,742.10
2,950.00
2,233.00
1,062.00
1,087.50
48.88
148.07
31.56
638.60
278.45
4,793.00
1.80
30.00
30.00
30.00
18.00
29,120.00
4.00
32.50
21.00

m3K
m3K
m3K
m3K
M3K
M3K

67,453.98
770,042.15
142,383.29
809,732.73
17,511.09
153,922.50

und
und

110.00
22.00

m2
m
und
und
m2
m
und
und
m2

20.53
106.60
11.00
31.00
8,822.22
440.00
361.00
261.00
157.80

URIDAD VIAL

GLB
m

1.00
60.00

AL EXCEDENTE
ENTO

m3
m2
m2
HA
m2
m2
und
mes
und
GLB
mes

74,972.94
1,500.00
30,000.00
10.00
15,000.00
4,000.00
15.00
15.00
15.00
1.00
15.00

DE ASFALTO Y CHANCADORA
E MAQUINAS

SEPTIMO MES
PRECIO
S/.

PARCIAL
S/.

1,177,828.16
1,379.95
2,589.17

4.70
14.43
23.99
0.90
13.58
1.26
5.22
12.50
11.85
2.58
28.73
48.67
0.75
211.70
7.53
5.81
16.37
11.43
21.45
34.71
36.50
32.81
54.19
55.92
4.18
250.27
247.08
344.37
367.40
394.92
42.31

1,226,833.71
1,177,828.16
43,827.21
5,178.34
3,638,532.07
2,248,453.35
310,135.00
1,335,835.89
209,091.08
62,586.17
236,079.61
94,725.59
1,390,078.72
289,337.03
825,984.50
267,261.46
7,495.73
12,464,024.18
1,526,380.37
2,400,247.20
180,500.36
3,707,097.75
543,666.00
3,710,436.87
395,695.64
8,334,752.05
168,660.17
30,530.43
3,401.58
125,868.06
212,044.47
82,008.98
26,568.15
375,000.80
331,620.26
15,916.89
166,823.16
290,084.34
45,676.45
379,050.64

RENDIMIENTO

PROGRAMADO
METRADO

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
4,619.87
4,288.41
20,927.58
1,522.70
6,278.26
55,532.99
2,101.91
1,283.12
123.77
8.52
299.86
561.98
131.60
41.31
7,801.14
115.22
5.60
42.12
68.66
10.06
779.03

356.75
527.95
786.32
51.45
120.08
99.07
78.75
121.39
106.33
8.61
99.11
41.50
6.45
16.27
279.25
15.77
466.78
13.68
5.46
15.77
0.12
46.85
3,459.98
1,590.12
18.26
1.29
8.70
1.18
13.90
1.50
695.25
820.95
584.52
168.62
566.86
92.70
18.52
188.01
89.83
14.97
10.41

360,388.85
156,537.18
74,621.77
38,189.28
3,211,191.37
292,256.50
175,848.75
128,916.18
115,633.88
420.86
14,675.22
1,309.74
4,118.97
4,530.38
1,338,445.25
28.39
14,003.40
410.40
163.80
283.86
3,494.40
187.40
112,449.35
33,392.52
4,893,571.19
1,231,709.67
993,354.37
1,238,734.62
955,484.62
243,404.15
230,883.75
417,713.06
76,477.50
18,060.90
323,174.66
12,000.20
17,974.89
6,235.46
2,873.70
163,387.51
82,724.40
32,428.63
3,907.17
1,642.70
731,731.96

87.84
25.78
8.25
64.54
2,325.40
256.52
194.17
92.35
94.57
4.25
12.88
2.74
55.53
24.21
416.78
0.16
2.61
2.61
2.61
1.57
2,532.17
0.35
2.83
1.83
4,818.14
55,003.01
10,170.24
57,838.05
1,250.79
10,994.46
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

638,524.36
1,553.46
2.87
2.77
2.25
1,211.84
2.77
2.77
397.54
3,500.00
410.47
8,520.00
5,000.00

638,524.36
93,207.60
499,715.89
215,172.34
4,155.00
67,500.00
12,118.40
41,550.00
11,080.00
5,963.10
52,500.00
6,157.05
8,520.00
75,000.00
32,206,874.11
3,220,687.41
6,241,692.20
41,669,253.73
7,917,158.21
49,586,411.94

0.07
4.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

SEPTIMO MES

100.00%

PROGRAMADO
S/.

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1,083,828.19
132,728.73
208,717.15
15,695.68
322,356.33
47,275.30
322,646.68
34,408.32
724,761.05
14,666.10
2,654.82
295.79
10,945.05
18,438.65
7,131.22
2,310.27
32,608.77
28,836.54
1,384.08
14,506.36
25,224.73
3,971.86
32,960.92

VALOR. ACUMUL. ANTERIOR


METRADO
S/.

0.52
16.51
1.04

59,040.26
82,828.94
7,798.31
62,220.17
15,554.43
67,265.46
49,593.97
59,123.10
20,179.64
2,599.50
41,578.79
38,595.73
188,348.20
13,704.33
56,504.35
499,796.93
18,917.22
12,189.67
1,175.79
80.96
2,848.71
5,338.83
1,250.17
392.48
74,110.83
1,094.61
53.22
400.18
652.25
95.55
7,400.82

637,919.64
612,438.11
22,788.94
2,692.59
3,255,528.65
2,011,774.02
277,489.21
1,195,221.57
187,081.49
55,998.15
211,229.12
84,754.47
1,243,754.63
258,880.50
739,038.75
239,128.67
6,706.70
9,754,453.71
1,194,558.55
1,878,454.33
141,261.15
2,901,206.94
425,477.74
2,903,820.16
309,674.85
6,885,229.98
139,327.96
25,220.79
2,810.00
103,977.96
175,167.17
67,746.55
21,947.60
309,783.27
273,947.18
13,148.74
137,810.44
239,634.89
37,732.72
313,128.79

VALORIZACION ACTUAL
METRADO

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
4,619.87
4,288.41
20,927.58
1,522.70
6,278.26
55,532.99
2,101.91
1,283.12
123.77
8.52
299.86
561.98
131.60
41.31
7,801.14
115.22
5.60
42.12
68.66
10.06
779.03

31,338.16
13,611.93
6,488.85
3,320.81
279,234.03
25,413.61
15,291.20
11,210.10
10,055.12
36.60
1,276.11
113.89
358.17
393.95
116,386.54
2.47
1,217.69
35.69
14.24
24.68
303.86
16.30
9,778.20
2,903.70
349,540.80
87,979.26
70,953.88
88,481.04
68,248.90
17,386.01
16,491.70

834.51
244.93
78.40
613.17
22,091.30
2,436.96
1,844.65
877.30
898.37
40.38
122.32
26.07
527.54
230.02
3,959.43
1.49
24.78
24.78
24.78
14.87
24,055.65
3.30
26.85
17.35
50,590.49
577,531.61
106,787.47
607,299.55
13,133.32
115,441.88
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

48,782.13

297,712.53
129,313.32
61,644.07
31,547.66
2,652,723.31
241,429.28
145,266.36
106,495.98
95,523.64
347.66
12,123.01
1,081.96
3,402.63
3,742.49
1,105,672.17
23.45
11,568.03
339.03
135.31
234.49
2,886.68
154.81
92,892.94
27,585.13
3,670,178.40
923,782.26
745,015.78
929,050.97
716,613.47
182,553.11
173,162.81
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
536,603.43

87.84
25.78
8.25
64.54
2,325.40
256.52
194.17
92.35
94.57
4.25
12.88
2.74
55.53
24.21
416.78
0.16
2.61
2.61
2.61
1.57
2,532.17
0.35
2.83
1.83
4,818.14
55,003.01
10,170.24
57,838.05
1,250.79
10,994.46
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

42,568.29
6,213.84
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2,206,912.17
220,691.22
427,699.58
2,855,302.97
542,507.56
3,397,810.53

0.73
44.00
56,229.71
1,125.00
22,500.00
7.50
11,250.00
3,000.00
11.25
11.25
11.25
0.75
11.25

468,251.19
68,352.24
374,786.94
161,379.26
3,116.25
50,625.00
9,088.80
31,162.50
8,310.00
4,472.33
39,375.00
4,617.79
6,390.00
56,250.00

0.07
4.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

VALORIZACION ACTUAL
S/.

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1,083,828.19
132,728.73
208,717.15
15,695.68
322,356.33
47,275.30
322,646.68
34,408.32
724,761.05
14,666.10
2,654.82
295.79
10,945.05
18,438.65
7,131.22
2,310.27
32,608.77
28,836.54
1,384.08
14,506.36
25,224.73
3,971.86
32,960.92

#DIV/0!
#DIV/0!
#DIV/0!

VALORIZACION ACUMULADO
METRADO
S/.

0.52
16.51
1.04

59,040.26
82,828.94
7,798.31
62,220.17
15,554.43
67,265.46
49,593.97
59,123.10
20,179.64
2,599.50
46,198.65
42,884.15
209,275.77
15,227.03
62,782.61
555,329.92
21,019.13
13,472.80
1,299.56
89.48
3,148.58
5,900.82
1,381.76
433.80
81,911.97
1,209.83
58.82
442.31
720.90
105.60
8,179.86

637,919.64
612,438.11
22,788.94
2,692.59
3,255,528.65
2,011,774.02
277,489.21
1,195,221.57
187,081.49
55,998.15
211,229.12
84,754.47
1,243,754.63
258,880.50
739,038.75
239,128.67
6,706.70
10,838,281.90
1,327,287.28
2,087,171.47
156,956.83
3,223,563.26
472,753.04
3,226,466.85
344,083.17
7,609,991.03
153,994.06
27,875.61
3,105.79
114,923.01
193,605.82
74,877.76
24,257.88
342,392.04
302,783.72
14,532.82
152,316.80
264,859.62
41,704.58
346,089.71

ACTUAL
%

52.00%
52.00%
52.00%

89.47%
89.47%
89.47%
89.47%
89.47%
89.47%
89.47%
89.47%
89.47%
89.47%
86.96%
86.96%
86.96%
86.96%
86.96%
86.96%
86.96%
91.30%
91.30%
91.30%
91.30%
91.30%
91.30%
91.30%
91.30%
91.30%
91.30%
91.30%
91.30%
91.30%
91.30%

31,338.16
13,611.93
6,488.85
3,320.81
279,234.03
25,413.61
15,291.20
11,210.10
10,055.12
36.60
1,276.11
113.89
358.17
393.95
116,386.54
2.47
1,217.69
35.69
14.24
24.68
303.86
16.30
9,778.20
2,903.70
349,540.80
87,979.26
70,953.88
88,481.04
68,248.90
17,386.01
16,491.70
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
48,782.13

922.36
270.72
86.65
677.72
24,416.70
2,693.48
2,038.83
969.65
992.93
44.63
135.19
28.82
583.07
254.24
4,376.22
1.64
27.39
27.39
27.39
16.43
26,587.83
3.65
29.67
19.17
55,408.63
632,534.62
116,957.70
665,137.60
14,384.11
126,436.34
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

329,050.69
142,925.25
68,132.92
34,868.47
2,931,957.35
266,842.89
160,557.55
117,706.08
105,578.76
384.26
13,399.11
1,195.85
3,760.80
4,136.44
1,222,058.71
25.92
12,785.71
374.71
149.56
259.18
3,190.54
171.10
102,671.15
30,488.82
4,019,719.20
1,011,761.52
815,969.66
1,017,532.01
784,862.37
199,939.12
189,654.51

91.30%
91.30%
91.30%
91.30%
91.30%
91.30%
91.30%
91.30%
91.30%
91.30%
91.30%
91.30%
91.30%
91.30%
91.30%
91.30%
91.30%
91.30%
91.30%
91.30%
91.30%
91.30%
91.30%
91.30%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
585,385.56

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

82.14%
82.14%
82.14%
82.14%
82.14%
82.14%

42,568.29
6,213.84
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2,206,912.17
220,691.22
427,699.58

0.80
48.00
56,229.71
1,125.00
22,500.00
7.50
11,250.00
3,000.00
11.25
11.25
11.25
0.75
11.25

510,819.48
74,566.08
374,786.94
161,379.26
3,116.25
50,625.00
9,088.80
31,162.50
8,310.00
4,472.33
39,375.00
4,617.79
6,390.00
56,250.00
23,053,377.69
2,305,337.77
4,467,744.60

2,855,302.97
542,507.56

29,826,460.06
5,667,027.41

3,397,810.53

35,493,487.47

8,587,417.02

80.00%
80.00%
75.00%
75.00%
75.00%
75.00%
75.00%
75.00%
75.00%
75.00%
75.00%
75.00%
75.00%

SALDO POR VALORIZAR


METRADO
S/.

0.48
15.25
0.96

6,945.91
9,744.58
917.45
7,320.02
1,829.93
7,913.58
5,834.58
6,955.66
2,374.07
305.82
6,929.80
6,432.62
31,391.37
2,284.06
9,417.39
83,299.49
3,152.87
1,283.12
123.77
8.52
299.86
561.98
131.60
41.31
7,801.14
115.22
5.60
42.12
68.66
10.06
779.03

588,914.07
565,390.05
21,038.27
2,485.75
383,003.42
236,679.32
32,645.79
140,614.32
22,009.59
6,588.02
24,850.49
9,971.12
146,324.09
30,456.53
86,945.75
28,132.79
789.02
1,625,742.28
199,093.09
313,075.72
23,543.52
483,534.49
70,912.96
483,970.03
51,612.47
724,761.02
14,666.10
2,654.82
295.79
10,945.05
18,438.65
7,131.22
2,310.27
32,608.76
28,836.54
1,384.08
14,506.36
25,224.72
3,971.86
32,960.92

48.00%
48.00%
48.00%

10.53%
10.53%
10.53%
10.53%
10.53%
10.53%
10.53%
10.53%
10.53%
10.53%
13.04%
13.04%
13.04%
13.04%
13.04%
13.04%
13.04%
8.70%
8.70%
8.70%
8.70%
8.70%
8.70%
8.70%
8.70%
8.70%
8.70%
8.70%
8.70%
8.70%
8.70%

87.84
25.78
8.25
64.54
2,325.40
256.52
194.17
92.35
94.57
4.25
12.88
2.74
55.53
24.21
416.78
0.16
2.61
2.61
2.61
1.57
2,532.17
0.35
2.83
1.83
12,045.35
137,507.53
25,425.59
144,595.13
3,126.98
27,486.16
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

31,338.16
13,611.93
6,488.85
3,320.81
279,234.02
25,413.61
15,291.20
11,210.10
10,055.12
36.60
1,276.11
113.89
358.17
393.95
116,386.54
2.47
1,217.69
35.69
14.24
24.68
303.86
16.30
9,778.20
2,903.70
873,851.99
219,948.15
177,384.71
221,202.61
170,622.25
43,465.03
41,229.24
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
146,346.40

8.70%
8.70%
8.70%
8.70%
8.70%
8.70%
8.70%
8.70%
8.70%
8.70%
8.70%
8.70%
8.70%
8.70%
8.70%
8.70%
8.70%
8.70%
8.70%
8.70%
8.70%
8.70%
8.70%
8.70%
17.86%
17.86%
17.86%
17.86%
17.86%
17.86%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

0.20
12.00
18,743.23
375.00
7,500.00
2.50
3,750.00
1,000.00
3.75
3.75
3.75
0.25
3.75

127,704.88
18,641.52
124,928.95
53,793.07
1,038.75
16,875.00
3,029.60
10,387.50
2,770.00
1,490.77
13,125.00
1,539.26
2,130.00
18,750.00
3,370,701.70
337,070.17
653,241.99
4,361,013.86
828,592.63
5,189,606.49

20.00%
20.00%
25.00%
25.00%
25.00%
25.00%
25.00%
25.00%
25.00%
25.00%
25.00%
25.00%
25.00%

ITEM.

1.00
1.01
1.02
1.03
2.00
2.01
02.01.01
02.01.02
02.01.03
2.02
2.03
2.04
2.05
02.05.01
02.05.02
02.05.03
2.06
3.00
3.01
3.02
3.03
3.04
3.05
3.06
3.07
4.00
4.01
4.02
4.03
4.04
4.05
4.06
4.07
4.08
4.09
4.10
4.11
4.12
4.13
4.14

DESCRIPCION DE PARTIDA

OBRAS PRELIMINARES
MOVILIZACION Y DESMOVILIZACION DE EQUIPOS
TRAZO Y REPLANTEO
CARTEL DE OBRA 3.60 x 7.20
MOVIMIENTO DE TIERRAS
EXCAVACION PARA EXPLANACIONES
CORTE EN MATERIAL SUELTO
CORTE EN ROCA SUELTA
CORTE EN ROCA FIJA
PERFILADO, NIVELACION Y COMPACTACION DE SUBRASANTE EN ZONAS D
MEJORAMIENTO DE SUB RASANTE
LIMPIEZA DE TERRENO PARA RECIBIR RELLENO
TERRAPLEN
RELLENO CON MATERIAL PROPIO
RELLENO CON MATERIAL EXCEDENTE DE CORTE
RELLENO CON MATERIAL DE CANTERA (MATERIAL CONSIDERADO EN TRAN
REMOCION DE DERRUMBES (SOLO REFINE Y LIMPIEZA)
PAVIMENTO
SUB BASE GRANULAR
BASE GRANULAR
IMPRIMACION BITUMINOSA
CARPETA ASFALTICA EN CALIENTE (e=0.075 m.)
ASFALTO DILUIDO MC-30
CEMENTO ASFALTICO PEN 120 -150
ADITIVO MEJORADOR DE ADHERENCIA
OBRAS DE ARTE Y DRENAJE
EXCAVACION PARA ESTRUCTURAS
EXCAVACION PARA ESTRUCTURAS BAJO AGUA
DEMOLICION DE CONCRETO CICLOPEO
DEMOLICION DE MAMPOSTERIA DE PIEDRA
ENCOFRADO Y DESENCOFRADO
ENCOFRADO Y DESENCOFRADO CARA VISTA
ENCOFRADO Y DESENCOFRADO BAJO AGUA
ACERO DE REFUERZO FY=4,200 KG/CM2
CONCRETO CICLOPEO f'c = 175 KG/CM2 + 30 % PIEDRA MEDIANA
CONCRETO SIMPLE f'c = 100 KG/CM2
CONCRETO SIMPLE f'c = 210 KG/CM2 EN SECO
CONCRETO SIMPLE f'c = 210 KG/CM2 BAJO AGUA
CONCRETO SIMPLE f'c = 280 KG/CM2
RELLENO DE ESTRUCTURAS

4.15
4.16
4.17
4.18
4.19
4.20
4.21
4.22
4.23
4.24
4.25
4.26
4.27
4.28
4.29
4.3
4.31
4.32
4.33
4.34
4.35
4.36
4.37
4.38
5.00
5.01
5.02
5.03
5.04
5.05
5.06
6.00
6.01
6.02
6.03
06.03.01
06.03.02
06.03.03
6.04
6.05
6.06
6.07
6.08
6.09
7.00

ALCANTARILLA TMC 0 36"


ALCANTARILLA TMC 0 48"
ALCANTARILLA TMC 0 60"
ALIVIADERO DE EMBOQUILLADO DE PIEDRA (E=0.15 M)
CUNETAS TRIANGULARES REVESTIDAS 1.00X0.40
CUNETAS TRIANGULARES REVESTIDAS 0.75X0.35
CUNETAS TRIANGULARES REVESTIDAS 0.50X0.30
CUNETAS RECTANGULARES REVESTIDAS
ZANJAS REVESTIDAS
JUNTA PARA MUROS
FILTRO
MATERIAL IMPERMEABLE
GEOTEXTIL
DREN PVC D=3"
SUBDRENAJE
POLIESTILENO EXPANDIDO
BARANDAS METALICAS
BRUA ROMPE AGUA EN LOSA
ACABADO DE VEREDAS
JUNTA DE DILATACION EXPANDIBLES
APOYO DE NEOPRENO
TUBOS DE DRENAJE PVC D = 3" X 0.50 M.
FALSO PUENTE
LOSA DE APROXIMACION
TRANSPORTES
TRANSPORTE DE ESCOMBROS PARA D<=1.00 KM
TRANSPORTE DE ESCOMBROS PARA D>1.00 KM
TRANSPORTE DE MATERIALES GRANULARES PARA D<=1.00 KM
TRANSPORTE DE MATERIALES GRANULARES PARA D>1.00 KM
TRANSPORTE DE MEZCLA ASFALTICA PARA D<=1.00 KM
TRANSPORTE DE MEZCLA ASFALTICA PARA D>1.00 KM
SEALIZACION
SEAL PREVENTIVA (0.75 m. x 0.75 m.)
SEAL REGLAMENTARIA
SEAL INFORMATIVA
PANEL INFORMATIVO
ESTRUCTURA DE SOPORTE
CIMENTACION Y MONTAJE
POSTES KILOMETRICOS
DEMARCACION EN EL PAVIMENTO
GUARDAVIAS (Incluye Terminal)
POSTES DELINEADORES
TACHAS REFLECTIVAS BIDIRECCIONALES
PINTADO DE MUROS Y PARAPETOS
VARIOS

7.01
7.02
8.00
8.01
8.02
8.03
8.04
8.05
8.06
8.07
8.08
8.09
8.10
8.11

MANTENIMIENTO DE TRANSITO TEMPORAL Y SEGURIDAD VIAL


CONSTRUCCION DE PASE PROVISIONAL
MEDIO AMBIENTE
ACONDICIONAMIENTO DE DEPOSITOS DE MATERIAL EXCEDENTE
RESTAURACION DE AREA AFECTADA POR CAMPAMENTO
RESTAURACION DE CANTERAS
REVEGETALIZACION
RESTAURACION DE AREA AFECTADA POR PLANTA DE ASFALTO Y CHANCAD
RESTAURACION DE AREA AFECTADA POR PATIO DE MAQUINAS
SELLADO DE LETRINAS
PROGRAMA DE EDUCACION AMBIENTAL
PROGRAMA DE SEALIZACION AMBIENTAL
PROGRAMA DE CONTINGENCIAS
PROGRAMA DE SEGUIMIENTO Y VIGILANCIA
COSTO DIRECTO
UTILIDAD (10%)
GASTOS GENRALES (19.38%)
SUBTOTAL
IGV (19%)
PRSUPUESTO TOTAL

ON DE PARTIDA

UBRASANTE EN ZONAS DE CORTE

CONSIDERADO EN TRANSP.)
EZA)

IEDRA MEDIANA

UNIDAD

METRADO

GLB
KM
und

1.00
31.76
2.00

m3
m3
m3
m2
m3
m2

65,986.17
92,573.52
8,715.76
69,540.19
17,384.36
75,179.04

m3
m3
m3
m3

55,428.55
66,078.76
22,553.71
2,905.32

m3
m3
m2
m3
gln
gln
kg

53,128.45
49,316.77
240,667.14
17,511.09
72,200.00
638,629.41
24,172.00

m3
m3
m3
m3
m2
m2
m2
kg
m3
m3
m3
m3
m3
m3

14,755.92
1,423.33
98.00
3,448.44
6,462.80
1,513.36
475.11
89,713.11
1,325.05
64.42
484.43
789.56
115.66
8,958.89

15 M)

D<=1.00 KM
D>1.00 KM
00 KM
KM

m
m
m
m2
m
m
m
m
m
m2
m3
m3
m2
m
m
m2
m
m
m
m
CM3
und
m
m

1,010.20
296.50
94.90
742.26
26,742.10
2,950.00
2,233.00
1,062.00
1,087.50
48.88
148.07
31.56
638.60
278.45
4,793.00
1.80
30.00
30.00
30.00
18.00
29,120.00
4.00
32.50
21.00

m3K
m3K
m3K
m3K
M3K
M3K

67,453.98
770,042.15
142,383.29
809,732.73
17,511.09
153,922.50

und
und

110.00
22.00

m2
m
und
und
m2
m
und
und
m2

20.53
106.60
11.00
31.00
8,822.22
440.00
361.00
261.00
157.80

URIDAD VIAL

GLB
m

1.00
60.00

AL EXCEDENTE
ENTO

m3
m2
m2
HA
m2
m2
und
mes
und
GLB
mes

74,972.94
1,500.00
30,000.00
10.00
15,000.00
4,000.00
15.00
15.00
15.00
1.00
15.00

DE ASFALTO Y CHANCADORA
E MAQUINAS

SEPTIMO MES
PRECIO
S/.

PARCIAL
S/.

1,177,828.16
1,379.95
2,589.17

4.70
14.43
23.99
0.90
13.58
1.26
5.22
12.50
11.85
2.58
28.73
48.67
0.75
211.70
7.53
5.81
16.37
11.43
21.45
34.71
36.50
32.81
54.19
55.92
4.18
250.27
247.08
344.37
367.40
394.92
42.31

1,226,833.71
1,177,828.16
43,827.21
5,178.34
3,638,532.07
2,248,453.35
310,135.00
1,335,835.89
209,091.08
62,586.17
236,079.61
94,725.59
1,390,078.72
289,337.03
825,984.50
267,261.46
7,495.73
12,464,024.18
1,526,380.37
2,400,247.20
180,500.36
3,707,097.75
543,666.00
3,710,436.87
395,695.64
8,334,752.05
168,660.17
30,530.43
3,401.58
125,868.06
212,044.47
82,008.98
26,568.15
375,000.80
331,620.26
15,916.89
166,823.16
290,084.34
45,676.45
379,050.64

RENDIMIENTO

PROGRAMADO
METRADO

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
4,619.87
4,288.41
20,927.58
1,522.70
6,278.26
55,532.99
2,101.91
1,283.12
123.77
8.52
299.86
561.98
131.60
41.31
7,801.14
115.22
5.60
42.12
68.66
10.06
779.03

356.75
527.95
786.32
51.45
120.08
99.07
78.75
121.39
106.33
8.61
99.11
41.50
6.45
16.27
279.25
15.77
466.78
13.68
5.46
15.77
0.12
46.85
3,459.98
1,590.12
18.26
1.29
8.70
1.18
13.90
1.50
695.25
820.95
584.52
168.62
566.86
92.70
18.52
188.01
89.83
14.97
10.41

360,388.85
156,537.18
74,621.77
38,189.28
3,211,191.37
292,256.50
175,848.75
128,916.18
115,633.88
420.86
14,675.22
1,309.74
4,118.97
4,530.38
1,338,445.25
28.39
14,003.40
410.40
163.80
283.86
3,494.40
187.40
112,449.35
33,392.52
4,893,571.19
1,231,709.67
993,354.37
1,238,734.62
955,484.62
243,404.15
230,883.75
417,713.06
76,477.50
18,060.90
323,174.66
12,000.20
17,974.89
6,235.46
2,873.70
163,387.51
82,724.40
32,428.63
3,907.17
1,642.70
731,731.96

87.84
25.78
8.25
64.54
2,325.40
256.52
194.17
92.35
94.57
4.25
12.88
2.74
55.53
24.21
416.78
0.16
2.61
2.61
2.61
1.57
2,532.17
0.35
2.83
1.83
4,818.14
55,003.01
10,170.24
57,838.05
1,250.79
10,994.46
36.67
7.33
6.84
35.53
3.67
10.33
2,940.74
146.67
120.33
87.00
52.60

638,524.36
1,553.46
2.87
2.77
2.25
1,211.84
2.77
2.77
397.54
3,500.00
410.47
8,520.00
5,000.00

638,524.36
93,207.60
499,715.89
215,172.34
4,155.00
67,500.00
12,118.40
41,550.00
11,080.00
5,963.10
52,500.00
6,157.05
8,520.00
75,000.00
32,206,874.11
3,220,687.41
6,241,692.20
41,669,253.73
7,917,158.21
49,586,411.94

0.07
4.00
9,371.62
187.50
3,750.00
1.25
1,875.00
500.00
1.88
1.88
1.88
0.13
1.88

SEPTIMO MES

100.00%

PROGRAMADO
S/.

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1,083,828.19
132,728.73
208,717.15
15,695.68
322,356.33
47,275.30
322,646.68
34,408.32
724,761.05
14,666.10
2,654.82
295.79
10,945.05
18,438.65
7,131.22
2,310.27
32,608.77
28,836.54
1,384.08
14,506.36
25,224.73
3,971.86
32,960.92

VALOR. ACUMUL. ANTERIOR


METRADO
S/.

0.52
16.51
1.04

59,040.26
82,828.94
7,798.31
62,220.17
15,554.43
67,265.46
49,593.97
59,123.10
20,179.64
2,599.50
46,198.65
42,884.15
209,275.77
15,227.03
62,782.61
555,329.92
21,019.13
13,472.80
1,299.56
89.48
3,148.58
5,900.82
1,381.76
433.80
81,911.97
1,209.83
58.82
442.31
720.90
105.60
8,179.86

637,919.64
612,438.11
22,788.94
2,692.59
3,255,528.65
2,011,774.02
277,489.21
1,195,221.57
187,081.49
55,998.15
211,229.12
84,754.47
1,243,754.63
258,880.50
739,038.75
239,128.67
6,706.70
10,838,281.90
1,327,287.28
2,087,171.47
156,956.83
3,223,563.26
472,753.04
3,226,466.85
344,083.17
7,609,991.03
153,994.06
27,875.61
3,105.79
114,923.01
193,605.82
74,877.76
24,257.88
342,392.04
302,783.72
14,532.82
152,316.80
264,859.62
41,704.58
346,089.71

VALORIZACION ACTUAL
METRADO

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
4,619.87
4,288.41
20,927.58
1,522.70
6,278.26
55,532.99
2,101.91
1,283.12
123.77
8.52
299.86
561.98
131.60
41.31
7,801.14
115.22
5.60
42.12
68.66
10.06
779.03

31,338.16
13,611.93
6,488.85
3,320.81
279,234.03
25,413.61
15,291.20
11,210.10
10,055.12
36.60
1,276.11
113.89
358.17
393.95
116,386.54
2.47
1,217.69
35.69
14.24
24.68
303.86
16.30
9,778.20
2,903.70
349,540.80
87,979.26
70,953.88
88,481.04
68,248.90
17,386.01
16,491.70
139,237.69
25,492.50
6,020.30
107,724.89
4,000.07
5,991.63
2,078.49
957.90
54,462.51
27,574.80
10,809.54
1,302.39
547.57
48,782.13

922.36
270.72
86.65
677.72
24,416.70
2,693.48
2,038.83
969.65
992.93
44.63
135.19
28.82
583.07
254.24
4,376.22
1.64
27.39
27.39
27.39
16.43
26,587.83
3.65
29.67
19.17
55,408.63
632,534.62
116,957.70
665,137.60
14,384.11
126,436.34
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

329,050.69
142,925.25
68,132.92
34,868.47
2,931,957.35
266,842.89
160,557.55
117,706.08
105,578.76
384.26
13,399.11
1,195.85
3,760.80
4,136.44
1,222,058.71
25.92
12,785.71
374.71
149.56
259.18
3,190.54
171.10
102,671.15
30,488.82
4,019,719.20
1,011,761.52
815,969.66
1,017,532.01
784,862.37
199,939.12
189,654.51
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
585,385.56

87.84
25.78
8.25
64.54
2,325.40
256.52
194.17
92.35
94.57
4.25
12.88
2.74
55.53
24.21
416.78
0.16
2.61
2.61
2.61
1.57
2,532.17
0.35
2.83
1.83
4,818.14
55,003.01
10,170.24
57,838.05
1,250.79
10,994.46
36.67
7.33
6.84
35.53
3.67
10.33
2,940.74
146.67
120.33
87.00
52.60

42,568.29
6,213.84
62,464.49
26,896.54
519.38
8,437.50
1,514.80
5,193.75
1,385.00
745.39
6,562.50
769.63
1,065.00
9,375.00
2,408,614.35
240,861.44
466,789.46
3,116,265.25
592,090.40
3,708,355.64

0.80
48.00
56,229.71
1,125.00
22,500.00
7.50
11,250.00
3,000.00
11.25
11.25
11.25
0.75
11.25

510,819.48
74,566.08
374,786.94
161,379.26
3,116.25
50,625.00
9,088.80
31,162.50
8,310.00
4,472.33
39,375.00
4,617.79
6,390.00
56,250.00

0.07
4.00
9,371.62
187.50
3,750.00
1.25
1,875.00
500.00
1.88
1.88
1.88
0.13
1.88

VALORIZACION ACTUAL
S/.

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1,083,828.19
132,728.73
208,717.15
15,695.68
322,356.33
47,275.30
322,646.68
34,408.32
724,761.05
14,666.10
2,654.82
295.79
10,945.05
18,438.65
7,131.22
2,310.27
32,608.77
28,836.54
1,384.08
14,506.36
25,224.73
3,971.86
32,960.92

#DIV/0!
#DIV/0!
#DIV/0!

VALORIZACION ACUMULADO
METRADO
S/.

0.52
16.51
1.04

59,040.26
82,828.94
7,798.31
62,220.17
15,554.43
67,265.46
49,593.97
59,123.10
20,179.64
2,599.50
50,818.52
47,172.56
230,203.35
16,749.74
69,060.87
610,862.91
23,121.04
14,755.92
1,423.33
98.00
3,448.44
6,462.80
1,513.36
475.11
89,713.11
1,325.05
64.42
484.43
789.56
115.66
8,958.89

637,919.64
612,438.11
22,788.94
2,692.59
3,255,528.65
2,011,774.02
277,489.21
1,195,221.57
187,081.49
55,998.15
211,229.12
84,754.47
1,243,754.63
258,880.50
739,038.75
239,128.67
6,706.70
11,922,110.09
1,460,016.00
2,295,888.62
172,652.51
3,545,919.59
520,028.35
3,549,113.53
378,491.48
8,334,752.08
168,660.17
30,530.43
3,401.58
125,868.06
212,044.47
82,008.98
26,568.15
375,000.80
331,620.26
15,916.89
166,823.16
290,084.35
45,676.45
379,050.64

ACTUAL
%

52.00%
52.00%
52.00%

89.47%
89.47%
89.47%
89.47%
89.47%
89.47%
89.47%
89.47%
89.47%
89.47%
95.65%
95.65%
95.65%
95.65%
95.65%
95.65%
95.65%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

31,338.16
13,611.93
6,488.85
3,320.81
279,234.03
25,413.61
15,291.20
11,210.10
10,055.12
36.60
1,276.11
113.89
358.17
393.95
116,386.54
2.47
1,217.69
35.69
14.24
24.68
303.86
16.30
9,778.20
2,903.70
349,540.80
87,979.26
70,953.88
88,481.04
68,248.90
17,386.01
16,491.70
139,237.69
25,492.50
6,020.30
107,724.89
4,000.07
5,991.63
2,078.49
957.90
54,462.51
27,574.80
10,809.54
1,302.39
547.57
48,782.13

1,010.20
296.50
94.90
742.26
26,742.10
2,950.00
2,233.00
1,062.00
1,087.50
48.88
148.07
31.56
638.60
278.45
4,793.00
1.80
30.00
30.00
30.00
18.00
29,120.00
4.00
32.50
21.00
60,226.77
687,537.63
127,127.94
722,975.65
15,634.90
137,430.80
36.67
7.33
6.84
35.53
3.67
10.33
2,940.74
146.67
120.33
87.00
52.60

360,388.85
156,537.18
74,621.77
38,189.28
3,211,191.38
292,256.50
175,848.75
128,916.18
115,633.88
420.86
14,675.22
1,309.74
4,118.97
4,530.38
1,338,445.25
28.39
14,003.40
410.40
163.80
283.86
3,494.40
187.40
112,449.35
33,392.52
4,369,260.00
1,099,740.78
886,923.55
1,106,013.06
853,111.27
217,325.14
206,146.21
139,237.69
25,492.50
6,020.30
107,724.89
4,000.07
5,991.63
2,078.49
957.90
54,462.51
27,574.80
10,809.54
1,302.39
547.57
634,167.69

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
89.29%
89.29%
89.29%
89.29%
89.29%
89.29%
33.33%
33.33%
33.33%
33.33%
33.33%
33.33%
33.33%
33.33%
33.33%
33.33%
33.33%
33.33%

42,568.29
6,213.84
62,464.49
26,896.54
519.38
8,437.50
1,514.80
5,193.75
1,385.00
745.39
6,562.50
769.63
1,065.00
9,375.00
2,408,614.35
240,861.44
466,789.46

0.87
52.00
65,601.33
1,312.50
26,250.00
8.75
13,125.00
3,500.00
13.13
13.13
13.13
0.88
13.13

553,387.77
80,779.92
437,251.43
188,275.81
3,635.63
59,062.50
10,603.60
36,356.25
9,695.00
5,217.71
45,937.50
5,387.42
7,455.00
65,625.00
25,836,778.98
2,583,677.90
5,007,167.77

3,116,265.25
592,090.40

33,427,624.64
6,351,248.68

3,708,355.64

39,778,873.33

6,025,070.06

86.67%
86.67%
87.50%
87.50%
87.50%
87.50%
87.50%
87.50%
87.50%
87.50%
87.50%
87.50%
87.50%

SALDO POR VALORIZAR


METRADO
S/.

0.48
15.25
0.96

6,945.91
9,744.58
917.45
7,320.02
1,829.93
7,913.58
5,834.58
6,955.66
2,374.07
305.82
2,309.93
2,144.21
10,463.79
761.35
3,139.13
27,766.50
1,050.96
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

588,914.07
565,390.05
21,038.27
2,485.75
383,003.42
236,679.32
32,645.79
140,614.32
22,009.59
6,588.02
24,850.49
9,971.12
146,324.09
30,456.53
86,945.75
28,132.79
789.02
541,914.09
66,364.36
104,358.57
7,847.84
161,178.16
23,637.65
161,323.34
17,204.16
-0.03
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

48.00%
48.00%
48.00%

10.53%
10.53%
10.53%
10.53%
10.53%
10.53%
10.53%
10.53%
10.53%
10.53%
4.35%
4.35%
4.35%
4.35%
4.35%
4.35%
4.35%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
7,227.21
82,504.52
15,255.35
86,757.08
1,876.19
16,491.70
73.33
14.67
0.00
13.69
71.07
7.33
20.67
5,881.48
293.33
240.67
174.00
105.20

0.00
0.00
0.00
0.00
-0.01
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
524,311.19
131,968.89
106,430.82
132,721.57
102,373.35
26,079.02
24,737.54
278,475.37
50,985.00
12,040.60
215,449.77
8,000.13
11,983.26
4,156.97
1,915.80
108,925.01
55,149.60
21,619.09
2,604.78
1,095.13
97,564.27

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
10.71%
10.71%
10.71%
10.71%
10.71%
10.71%
66.67%
66.67%
66.67%
66.67%
66.67%
66.67%
66.67%
66.67%
66.67%
66.67%
66.67%
66.67%

0.13
8.00
9,371.61
187.50
3,750.00
1.25
1,875.00
500.00
1.87
1.87
1.87
0.12
1.87

85,136.59
12,427.68
62,464.46
26,896.53
519.37
8,437.50
1,514.80
5,193.75
1,385.00
745.39
6,562.50
769.63
1,065.00
9,375.00
1,504,729.36
150,472.94
291,616.55
1,946,818.84
369,895.58
2,316,714.42

13.33%
13.33%
12.50%
12.50%
12.50%
12.50%
12.50%
12.50%
12.50%
12.50%
12.50%
12.50%
12.50%

ITEM.

1.00
1.01
1.02
1.03
2.00
2.01
02.01.01
02.01.02
02.01.03
2.02
2.03
2.04
2.05
02.05.01
02.05.02
02.05.03
2.06
3.00
3.01
3.02
3.03
3.04
3.05
3.06
3.07
4.00
4.01
4.02
4.03
4.04
4.05
4.06
4.07
4.08
4.09
4.10
4.11
4.12
4.13
4.14

DESCRIPCION DE PARTIDA

OBRAS PRELIMINARES
MOVILIZACION Y DESMOVILIZACION DE EQUIPOS
TRAZO Y REPLANTEO
CARTEL DE OBRA 3.60 x 7.20
MOVIMIENTO DE TIERRAS
EXCAVACION PARA EXPLANACIONES
CORTE EN MATERIAL SUELTO
CORTE EN ROCA SUELTA
CORTE EN ROCA FIJA
PERFILADO, NIVELACION Y COMPACTACION DE SUBRASANTE EN ZONAS D
MEJORAMIENTO DE SUB RASANTE
LIMPIEZA DE TERRENO PARA RECIBIR RELLENO
TERRAPLEN
RELLENO CON MATERIAL PROPIO
RELLENO CON MATERIAL EXCEDENTE DE CORTE
RELLENO CON MATERIAL DE CANTERA (MATERIAL CONSIDERADO EN TRAN
REMOCION DE DERRUMBES (SOLO REFINE Y LIMPIEZA)
PAVIMENTO
SUB BASE GRANULAR
BASE GRANULAR
IMPRIMACION BITUMINOSA
CARPETA ASFALTICA EN CALIENTE (e=0.075 m.)
ASFALTO DILUIDO MC-30
CEMENTO ASFALTICO PEN 120 -150
ADITIVO MEJORADOR DE ADHERENCIA
OBRAS DE ARTE Y DRENAJE
EXCAVACION PARA ESTRUCTURAS
EXCAVACION PARA ESTRUCTURAS BAJO AGUA
DEMOLICION DE CONCRETO CICLOPEO
DEMOLICION DE MAMPOSTERIA DE PIEDRA
ENCOFRADO Y DESENCOFRADO
ENCOFRADO Y DESENCOFRADO CARA VISTA
ENCOFRADO Y DESENCOFRADO BAJO AGUA
ACERO DE REFUERZO FY=4,200 KG/CM2
CONCRETO CICLOPEO f'c = 175 KG/CM2 + 30 % PIEDRA MEDIANA
CONCRETO SIMPLE f'c = 100 KG/CM2
CONCRETO SIMPLE f'c = 210 KG/CM2 EN SECO
CONCRETO SIMPLE f'c = 210 KG/CM2 BAJO AGUA
CONCRETO SIMPLE f'c = 280 KG/CM2
RELLENO DE ESTRUCTURAS

4.15
4.16
4.17
4.18
4.19
4.20
4.21
4.22
4.23
4.24
4.25
4.26
4.27
4.28
4.29
4.3
4.31
4.32
4.33
4.34
4.35
4.36
4.37
4.38
5.00
5.01
5.02
5.03
5.04
5.05
5.06
6.00
6.01
6.02
6.03
06.03.01
06.03.02
06.03.03
6.04
6.05
6.06
6.07
6.08
6.09
7.00

ALCANTARILLA TMC 0 36"


ALCANTARILLA TMC 0 48"
ALCANTARILLA TMC 0 60"
ALIVIADERO DE EMBOQUILLADO DE PIEDRA (E=0.15 M)
CUNETAS TRIANGULARES REVESTIDAS 1.00X0.40
CUNETAS TRIANGULARES REVESTIDAS 0.75X0.35
CUNETAS TRIANGULARES REVESTIDAS 0.50X0.30
CUNETAS RECTANGULARES REVESTIDAS
ZANJAS REVESTIDAS
JUNTA PARA MUROS
FILTRO
MATERIAL IMPERMEABLE
GEOTEXTIL
DREN PVC D=3"
SUBDRENAJE
POLIESTILENO EXPANDIDO
BARANDAS METALICAS
BRUA ROMPE AGUA EN LOSA
ACABADO DE VEREDAS
JUNTA DE DILATACION EXPANDIBLES
APOYO DE NEOPRENO
TUBOS DE DRENAJE PVC D = 3" X 0.50 M.
FALSO PUENTE
LOSA DE APROXIMACION
TRANSPORTES
TRANSPORTE DE ESCOMBROS PARA D<=1.00 KM
TRANSPORTE DE ESCOMBROS PARA D>1.00 KM
TRANSPORTE DE MATERIALES GRANULARES PARA D<=1.00 KM
TRANSPORTE DE MATERIALES GRANULARES PARA D>1.00 KM
TRANSPORTE DE MEZCLA ASFALTICA PARA D<=1.00 KM
TRANSPORTE DE MEZCLA ASFALTICA PARA D>1.00 KM
SEALIZACION
SEAL PREVENTIVA (0.75 m. x 0.75 m.)
SEAL REGLAMENTARIA
SEAL INFORMATIVA
PANEL INFORMATIVO
ESTRUCTURA DE SOPORTE
CIMENTACION Y MONTAJE
POSTES KILOMETRICOS
DEMARCACION EN EL PAVIMENTO
GUARDAVIAS (Incluye Terminal)
POSTES DELINEADORES
TACHAS REFLECTIVAS BIDIRECCIONALES
PINTADO DE MUROS Y PARAPETOS
VARIOS

7.01
7.02
8.00
8.01
8.02
8.03
8.04
8.05
8.06
8.07
8.08
8.09
8.10
8.11

MANTENIMIENTO DE TRANSITO TEMPORAL Y SEGURIDAD VIAL


CONSTRUCCION DE PASE PROVISIONAL
MEDIO AMBIENTE
ACONDICIONAMIENTO DE DEPOSITOS DE MATERIAL EXCEDENTE
RESTAURACION DE AREA AFECTADA POR CAMPAMENTO
RESTAURACION DE CANTERAS
REVEGETALIZACION
RESTAURACION DE AREA AFECTADA POR PLANTA DE ASFALTO Y CHANCAD
RESTAURACION DE AREA AFECTADA POR PATIO DE MAQUINAS
SELLADO DE LETRINAS
PROGRAMA DE EDUCACION AMBIENTAL
PROGRAMA DE SEALIZACION AMBIENTAL
PROGRAMA DE CONTINGENCIAS
PROGRAMA DE SEGUIMIENTO Y VIGILANCIA
COSTO DIRECTO
UTILIDAD (10%)
GASTOS GENRALES (19.38%)
SUBTOTAL
IGV (19%)
PRSUPUESTO TOTAL

ON DE PARTIDA

UBRASANTE EN ZONAS DE CORTE

CONSIDERADO EN TRANSP.)
EZA)

IEDRA MEDIANA

UNIDAD

METRADO

GLB
KM
und

1.00
31.76
2.00

m3
m3
m3
m2
m3
m2

65,986.17
92,573.52
8,715.76
69,540.19
17,384.36
75,179.04

m3
m3
m3
m3

55,428.55
66,078.76
22,553.71
2,905.32

m3
m3
m2
m3
gln
gln
kg

53,128.45
49,316.77
240,667.14
17,511.09
72,200.00
638,629.41
24,172.00

m3
m3
m3
m3
m2
m2
m2
kg
m3
m3
m3
m3
m3
m3

14,755.92
1,423.33
98.00
3,448.44
6,462.80
1,513.36
475.11
89,713.11
1,325.05
64.42
484.43
789.56
115.66
8,958.89

15 M)

D<=1.00 KM
D>1.00 KM
00 KM
KM

m
m
m
m2
m
m
m
m
m
m2
m3
m3
m2
m
m
m2
m
m
m
m
CM3
und
m
m

1,010.20
296.50
94.90
742.26
26,742.10
2,950.00
2,233.00
1,062.00
1,087.50
48.88
148.07
31.56
638.60
278.45
4,793.00
1.80
30.00
30.00
30.00
18.00
29,120.00
4.00
32.50
21.00

m3K
m3K
m3K
m3K
M3K
M3K

67,453.98
770,042.15
142,383.29
809,732.73
17,511.09
153,922.50

und
und

110.00
22.00

m2
m
und
und
m2
m
und
und
m2

20.53
106.60
11.00
31.00
8,822.22
440.00
361.00
261.00
157.80

URIDAD VIAL

GLB
m

1.00
60.00

AL EXCEDENTE
ENTO

m3
m2
m2
HA
m2
m2
und
mes
und
GLB
mes

74,972.94
1,500.00
30,000.00
10.00
15,000.00
4,000.00
15.00
15.00
15.00
1.00
15.00

DE ASFALTO Y CHANCADORA
E MAQUINAS

SEPTIMO MES
PRECIO
S/.

PARCIAL
S/.

1,177,828.16
1,379.95
2,589.17

4.70
14.43
23.99
0.90
13.58
1.26
5.22
12.50
11.85
2.58
28.73
48.67
0.75
211.70
7.53
5.81
16.37
11.43
21.45
34.71
36.50
32.81
54.19
55.92
4.18
250.27
247.08
344.37
367.40
394.92
42.31

1,226,833.71
1,177,828.16
43,827.21
5,178.34
3,638,532.07
2,248,453.35
310,135.00
1,335,835.89
209,091.08
62,586.17
236,079.61
94,725.59
1,390,078.72
289,337.03
825,984.50
267,261.46
7,495.73
12,464,024.18
1,526,380.37
2,400,247.20
180,500.36
3,707,097.75
543,666.00
3,710,436.87
395,695.64
8,334,752.05
168,660.17
30,530.43
3,401.58
125,868.06
212,044.47
82,008.98
26,568.15
375,000.80
331,620.26
15,916.89
166,823.16
290,084.34
45,676.45
379,050.64

RENDIMIENTO

PROGRAMADO
METRADO

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2,309.93
2,144.21
10,463.79
761.35
3,139.13
27,766.50
1,050.96
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

356.75
527.95
786.32
51.45
120.08
99.07
78.75
121.39
106.33
8.61
99.11
41.50
6.45
16.27
279.25
15.77
466.78
13.68
5.46
15.77
0.12
46.85
3,459.98
1,590.12
18.26
1.29
8.70
1.18
13.90
1.50
695.25
820.95
584.52
168.62
566.86
92.70
18.52
188.01
89.83
14.97
10.41

360,388.85
156,537.18
74,621.77
38,189.28
3,211,191.37
292,256.50
175,848.75
128,916.18
115,633.88
420.86
14,675.22
1,309.74
4,118.97
4,530.38
1,338,445.25
28.39
14,003.40
410.40
163.80
283.86
3,494.40
187.40
112,449.35
33,392.52
4,893,571.19
1,231,709.67
993,354.37
1,238,734.62
955,484.62
243,404.15
230,883.75
417,713.06
76,477.50
18,060.90
323,174.66
12,000.20
17,974.89
6,235.46
2,873.70
163,387.51
82,724.40
32,428.63
3,907.17
1,642.70
731,731.96

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
4,818.14
55,003.01
10,170.24
57,838.05
1,250.79
10,994.46
36.67
7.33
6.84
35.53
3.67
10.33
2,940.74
146.67
120.33
87.00
52.60

638,524.36
1,553.46
2.87
2.77
2.25
1,211.84
2.77
2.77
397.54
3,500.00
410.47
8,520.00
5,000.00

638,524.36
93,207.60
499,715.89
215,172.34
4,155.00
67,500.00
12,118.40
41,550.00
11,080.00
5,963.10
52,500.00
6,157.05
8,520.00
75,000.00
32,206,874.11
3,220,687.41
6,241,692.20
41,669,253.73
7,917,158.21
49,586,411.94

0.07
4.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

SEPTIMO MES

100.00%

PROGRAMADO
S/.

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
541,914.10
66,364.36
104,358.57
7,847.84
161,178.16
23,637.65
161,323.34
17,204.16
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

VALOR. ACUMUL. ANTERIOR


METRADO
S/.

0.52
16.51
1.04

59,040.26
82,828.94
7,798.31
62,220.17
15,554.43
67,265.46
49,593.97
59,123.10
20,179.64
2,599.50
50,818.52
47,172.56
230,203.35
16,749.74
69,060.87
610,862.91
23,121.04
13,472.80
1,299.56
89.48
3,148.58
5,900.82
1,381.76
433.80
81,911.97
1,209.83
58.82
442.31
720.90
105.60
8,179.86

637,919.64
612,438.11
22,788.94
2,692.59
3,255,528.65
2,011,774.02
277,489.21
1,195,221.57
187,081.49
55,998.15
211,229.12
84,754.47
1,243,754.63
258,880.50
739,038.75
239,128.67
6,706.70
11,922,110.09
1,460,016.00
2,295,888.62
172,652.51
3,545,919.59
520,028.35
3,549,113.53
378,491.48
7,609,991.03
153,994.06
27,875.61
3,105.79
114,923.01
193,605.82
74,877.76
24,257.88
342,392.04
302,783.72
14,532.82
152,316.80
264,859.62
41,704.58
346,089.71

VALORIZACION ACTUAL
METRADO

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2,309.93
2,144.21
10,463.79
761.35
3,139.13
27,766.50
1,050.96
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
349,540.80
87,979.26
70,953.88
88,481.04
68,248.90
17,386.01
16,491.70
139,237.69
25,492.50
6,020.30
107,724.89
4,000.07
5,991.63
2,078.49
957.90
54,462.51
27,574.80
10,809.54
1,302.39
547.57
48,782.13

922.36
270.72
86.65
677.72
24,416.70
2,693.48
2,038.83
969.65
992.93
44.63
135.19
28.82
583.07
254.24
4,376.22
1.64
27.39
27.39
27.39
16.43
26,587.83
3.65
29.67
19.17
60,226.77
687,537.63
127,127.94
722,975.65
15,634.90
137,430.80
36.67
7.33
6.84
35.53
3.67
10.33
2,940.74
146.67
120.33
87.00
52.60

329,050.69
142,925.25
68,132.92
34,868.47
2,931,957.35
266,842.89
160,557.55
117,706.08
105,578.76
384.26
13,399.11
1,195.85
3,760.80
4,136.44
1,222,058.71
25.92
12,785.71
374.71
149.56
259.18
3,190.54
171.10
102,671.15
30,488.82
4,369,260.00
1,099,740.78
886,923.55
1,106,013.06
853,111.27
217,325.14
206,146.21
139,237.69
25,492.50
6,020.30
107,724.89
4,000.07
5,991.63
2,078.49
957.90
54,462.51
27,574.80
10,809.54
1,302.39
547.57
634,167.69

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
4,818.14
55,003.01
10,170.24
57,838.05
1,250.79
10,994.46
36.67
7.33
6.84
35.53
3.67
10.33
2,940.74
146.67
120.33
87.00
52.60

42,568.29
6,213.84
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1,079,474.72
107,947.47
209,202.20
1,396,624.39
265,358.63
1,661,983.03

0.87
52.00
65,601.33
1,312.50
26,250.00
8.75
13,125.00
3,500.00
13.13
13.13
13.13
0.88
13.13

553,387.77
80,779.92
437,251.43
188,275.81
3,635.63
59,062.50
10,603.60
36,356.25
9,695.00
5,217.71
45,937.50
5,387.42
7,455.00
65,625.00

0.07
4.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

RIZACION ACTUAL
S/.

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
541,914.10
66,364.36
104,358.57
7,847.84
161,178.16
23,637.65
161,323.34
17,204.16
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

VALORIZACION ACUMULADO
METRADO
S/.

0.52
16.51
1.04

59,040.26
82,828.94
7,798.31
62,220.17
15,554.43
67,265.46
49,593.97
59,123.10
20,179.64
2,599.50
53,128.45
49,316.77
240,667.14
17,511.09
72,200.00
638,629.41
24,172.00
13,472.80
1,299.56
89.48
3,148.58
5,900.82
1,381.76
433.80
81,911.97
1,209.83
58.82
442.31
720.90
105.60
8,179.86

637,919.64
612,438.11
22,788.94
2,692.59
3,255,528.65
2,011,774.02
277,489.21
1,195,221.57
187,081.49
55,998.15
211,229.12
84,754.47
1,243,754.63
258,880.50
739,038.75
239,128.67
6,706.70
12,464,024.19
1,526,380.37
2,400,247.20
180,500.36
3,707,097.75
543,666.00
3,710,436.87
395,695.64
7,609,991.03
153,994.06
27,875.61
3,105.79
114,923.01
193,605.82
74,877.76
24,257.88
342,392.04
302,783.72
14,532.82
152,316.80
264,859.62
41,704.58
346,089.71

ACTUAL
%

SALDO POR VALOR


METRADO

52.00%
52.00%
52.00%

0.48
15.25
0.96

89.47%
89.47%
89.47%
89.47%
89.47%
89.47%

6,945.91
9,744.58
917.45
7,320.02
1,829.93
7,913.58

89.47%
89.47%
89.47%
89.47%

5,834.58
6,955.66
2,374.07
305.82

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

0.00
0.00
0.00
0.00
0.00
0.00
0.00

91.30%
91.30%
91.30%
91.30%
91.30%
91.30%
91.30%
91.30%
91.30%
91.30%
91.30%
91.30%
91.30%
91.30%

1,283.12
123.77
8.52
299.86
561.98
131.60
41.31
7,801.14
115.22
5.60
42.12
68.66
10.06
779.03

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
349,540.80
87,979.26
70,953.88
88,481.04
68,248.90
17,386.01
16,491.70
139,237.69
25,492.50
6,020.30
107,724.89
4,000.07
5,991.63
2,078.49
957.90
54,462.51
27,574.80
10,809.54
1,302.39
547.57
48,782.13

922.36
270.72
86.65
677.72
24,416.70
2,693.48
2,038.83
969.65
992.93
44.63
135.19
28.82
583.07
254.24
4,376.22
1.64
27.39
27.39
27.39
16.43
26,587.83
3.65
29.67
19.17
65,044.91
742,540.65
137,298.17
780,813.70
16,885.69
148,425.27
73.33
14.67
13.69
71.07
7.33
20.67
5,881.48
293.33
240.67
174.00
105.20

329,050.69
142,925.25
68,132.92
34,868.47
2,931,957.35
266,842.89
160,557.55
117,706.08
105,578.76
384.26
13,399.11
1,195.85
3,760.80
4,136.44
1,222,058.71
25.92
12,785.71
374.71
149.56
259.18
3,190.54
171.10
102,671.15
30,488.82
4,718,800.80
1,187,720.05
957,877.43
1,194,494.10
921,360.17
234,711.15
222,637.90
278,475.38
50,985.00
12,040.60
215,449.78
8,000.13
11,983.26
4,156.97
1,915.80
108,925.01
55,149.60
21,619.09
2,604.78
1,095.13
682,949.82

91.30%
91.30%
91.30%
91.30%
91.30%
91.30%
91.30%
91.30%
91.30%
91.30%
91.30%
91.30%
91.30%
91.30%
91.30%
91.30%
91.30%
91.30%
91.30%
91.30%
91.30%
91.30%
91.30%
91.30%

87.84
25.78
8.25
64.54
2,325.40
256.52
194.17
92.35
94.57
4.25
12.88
2.74
55.53
24.21
416.78
0.16
2.61
2.61
2.61
1.57
2,532.17
0.35
2.83
1.83

96.43%
96.43%
96.43%
96.43%
96.43%
96.43%

2,409.07
27,501.50
5,085.12
28,919.03
625.40
5,497.23

0.67
66.67%
66.67%
66.67%
66.67%
66.67%
66.67%
66.67%
66.67%
66.67%
66.67%
66.67%
66.67%

36.67
7.33
6.84
35.53
3.67
10.33
2,940.74
146.67
120.33
87.00
52.60

42,568.29
6,213.84
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1,079,474.72
107,947.47
209,202.20

0.93
56.00
65,601.33
1,312.50
26,250.00
8.75
13,125.00
3,500.00
13.13
13.13
13.13
0.88
13.13

595,956.06
86,993.76
437,251.43
188,275.81
3,635.63
59,062.50
10,603.60
36,356.25
9,695.00
5,217.71
45,937.50
5,387.42
7,455.00
65,625.00
18,144,250.19
1,814,425.02
3,516,355.69

1,396,624.39
265,358.63

23,475,030.90
4,460,255.87

1,661,983.03

27,935,286.77

2,220,542.81

93.33%
93.33%

0.07
4.00

87.50%
87.50%
87.50%
87.50%
87.50%
87.50%
87.50%
87.50%
87.50%
87.50%
87.50%

9,371.61
187.50
3,750.00
1.25
1,875.00
500.00
1.87
1.87
1.87
0.12
1.87

SALDO POR VALORIZAR


S/.

588,914.07
565,390.05
21,038.27
2,485.75
383,003.42
236,679.32
32,645.79
140,614.32
22,009.59
6,588.02
24,850.49
9,971.12
146,324.09
30,456.53
86,945.75
28,132.79
789.02
(0.01)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
724,761.02
14,666.10
2,654.82
295.79
10,945.05
18,438.65
7,131.22
2,310.27
32,608.76
28,836.54
1,384.08
14,506.36
25,224.72
3,971.86
32,960.92

48.00%
48.00%
48.00%

10.53%
10.53%
10.53%
10.53%
10.53%
10.53%
10.53%
10.53%
10.53%
10.53%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
8.70%
8.70%
8.70%
8.70%
8.70%
8.70%
8.70%
8.70%
8.70%
8.70%
8.70%
8.70%
8.70%
8.70%

31,338.16
13,611.93
6,488.85
3,320.81
279,234.02
25,413.61
15,291.20
11,210.10
10,055.12
36.60
1,276.11
113.89
358.17
393.95
116,386.54
2.47
1,217.69
35.69
14.24
24.68
303.86
16.30
9,778.20
2,903.70
174,770.39
43,989.63
35,476.94
44,240.52
34,124.45
8,693.01
8,245.85
139,237.68
25,492.50
6,020.30
107,724.88
4,000.07
5,991.63
2,078.49
957.90
54,462.50
27,574.80
10,809.54
1,302.39
547.57
48,782.14

8.70%
8.70%
8.70%
8.70%
8.70%
8.70%
8.70%
8.70%
8.70%
8.70%
8.70%
8.70%
8.70%
8.70%
8.70%
8.70%
8.70%
8.70%
8.70%
8.70%
8.70%
8.70%
8.70%
8.70%
3.57%
3.57%
3.57%
3.57%
3.57%
3.57%

0.33
33.33%
33.33%
33.33%
33.33%
33.33%
33.33%
33.33%
33.33%
33.33%
33.33%
33.33%
33.33%

42,568.30
6,213.84
62,464.46
26,896.53
519.37
8,437.50
1,514.80
5,193.75
1,385.00
745.39
6,562.50
769.63
1,065.00
9,375.00
362,790.21
36,279.02
70,308.74
469,377.97
89,181.81
558,559.79

6.67%
6.67%
12.50%
12.50%
12.50%
12.50%
12.50%
12.50%
12.50%
12.50%
12.50%
12.50%
12.50%

ITEM.

1.00
1.01
1.02
1.03
2.00
2.01
02.01.01
02.01.02
02.01.03
2.02
2.03
2.04
2.05
02.05.01
02.05.02
02.05.03
2.06
3.00
3.01
3.02
3.03
3.04
3.05
3.06
3.07
4.00
4.01
4.02
4.03
4.04
4.05
4.06
4.07
4.08
4.09
4.10
4.11
4.12
4.13
4.14

DESCRIPCION DE PARTIDA

OBRAS PRELIMINARES
MOVILIZACION Y DESMOVILIZACION DE EQUIPOS
TRAZO Y REPLANTEO
CARTEL DE OBRA 3.60 x 7.20
MOVIMIENTO DE TIERRAS
EXCAVACION PARA EXPLANACIONES
CORTE EN MATERIAL SUELTO
CORTE EN ROCA SUELTA
CORTE EN ROCA FIJA
PERFILADO, NIVELACION Y COMPACTACION DE SUBRASANTE EN ZONAS D
MEJORAMIENTO DE SUB RASANTE
LIMPIEZA DE TERRENO PARA RECIBIR RELLENO
TERRAPLEN
RELLENO CON MATERIAL PROPIO
RELLENO CON MATERIAL EXCEDENTE DE CORTE
RELLENO CON MATERIAL DE CANTERA (MATERIAL CONSIDERADO EN TRAN
REMOCION DE DERRUMBES (SOLO REFINE Y LIMPIEZA)
PAVIMENTO
SUB BASE GRANULAR
BASE GRANULAR
IMPRIMACION BITUMINOSA
CARPETA ASFALTICA EN CALIENTE (e=0.075 m.)
ASFALTO DILUIDO MC-30
CEMENTO ASFALTICO PEN 120 -150
ADITIVO MEJORADOR DE ADHERENCIA
OBRAS DE ARTE Y DRENAJE
EXCAVACION PARA ESTRUCTURAS
EXCAVACION PARA ESTRUCTURAS BAJO AGUA
DEMOLICION DE CONCRETO CICLOPEO
DEMOLICION DE MAMPOSTERIA DE PIEDRA
ENCOFRADO Y DESENCOFRADO
ENCOFRADO Y DESENCOFRADO CARA VISTA
ENCOFRADO Y DESENCOFRADO BAJO AGUA
ACERO DE REFUERZO FY=4,200 KG/CM2
CONCRETO CICLOPEO f'c = 175 KG/CM2 + 30 % PIEDRA MEDIANA
CONCRETO SIMPLE f'c = 100 KG/CM2
CONCRETO SIMPLE f'c = 210 KG/CM2 EN SECO
CONCRETO SIMPLE f'c = 210 KG/CM2 BAJO AGUA
CONCRETO SIMPLE f'c = 280 KG/CM2
RELLENO DE ESTRUCTURAS

4.15
4.16
4.17
4.18
4.19
4.20
4.21
4.22
4.23
4.24
4.25
4.26
4.27
4.28
4.29
4.3
4.31
4.32
4.33
4.34
4.35
4.36
4.37
4.38
5.00
5.01
5.02
5.03
5.04
5.05
5.06
6.00
6.01
6.02
6.03
06.03.01
06.03.02
06.03.03
6.04
6.05
6.06
6.07
6.08
6.09
7.00

ALCANTARILLA TMC 0 36"


ALCANTARILLA TMC 0 48"
ALCANTARILLA TMC 0 60"
ALIVIADERO DE EMBOQUILLADO DE PIEDRA (E=0.15 M)
CUNETAS TRIANGULARES REVESTIDAS 1.00X0.40
CUNETAS TRIANGULARES REVESTIDAS 0.75X0.35
CUNETAS TRIANGULARES REVESTIDAS 0.50X0.30
CUNETAS RECTANGULARES REVESTIDAS
ZANJAS REVESTIDAS
JUNTA PARA MUROS
FILTRO
MATERIAL IMPERMEABLE
GEOTEXTIL
DREN PVC D=3"
SUBDRENAJE
POLIESTILENO EXPANDIDO
BARANDAS METALICAS
BRUA ROMPE AGUA EN LOSA
ACABADO DE VEREDAS
JUNTA DE DILATACION EXPANDIBLES
APOYO DE NEOPRENO
TUBOS DE DRENAJE PVC D = 3" X 0.50 M.
FALSO PUENTE
LOSA DE APROXIMACION
TRANSPORTES
TRANSPORTE DE ESCOMBROS PARA D<=1.00 KM
TRANSPORTE DE ESCOMBROS PARA D>1.00 KM
TRANSPORTE DE MATERIALES GRANULARES PARA D<=1.00 KM
TRANSPORTE DE MATERIALES GRANULARES PARA D>1.00 KM
TRANSPORTE DE MEZCLA ASFALTICA PARA D<=1.00 KM
TRANSPORTE DE MEZCLA ASFALTICA PARA D>1.00 KM
SEALIZACION
SEAL PREVENTIVA (0.75 m. x 0.75 m.)
SEAL REGLAMENTARIA
SEAL INFORMATIVA
PANEL INFORMATIVO
ESTRUCTURA DE SOPORTE
CIMENTACION Y MONTAJE
POSTES KILOMETRICOS
DEMARCACION EN EL PAVIMENTO
GUARDAVIAS (Incluye Terminal)
POSTES DELINEADORES
TACHAS REFLECTIVAS BIDIRECCIONALES
PINTADO DE MUROS Y PARAPETOS
VARIOS

7.01
7.02
8.00
8.01
8.02
8.03
8.04
8.05
8.06
8.07
8.08
8.09
8.10
8.11

MANTENIMIENTO DE TRANSITO TEMPORAL Y SEGURIDAD VIAL


CONSTRUCCION DE PASE PROVISIONAL
MEDIO AMBIENTE
ACONDICIONAMIENTO DE DEPOSITOS DE MATERIAL EXCEDENTE
RESTAURACION DE AREA AFECTADA POR CAMPAMENTO
RESTAURACION DE CANTERAS
REVEGETALIZACION
RESTAURACION DE AREA AFECTADA POR PLANTA DE ASFALTO Y CHANCAD
RESTAURACION DE AREA AFECTADA POR PATIO DE MAQUINAS
SELLADO DE LETRINAS
PROGRAMA DE EDUCACION AMBIENTAL
PROGRAMA DE SEALIZACION AMBIENTAL
PROGRAMA DE CONTINGENCIAS
PROGRAMA DE SEGUIMIENTO Y VIGILANCIA
COSTO DIRECTO
UTILIDAD (10%)
GASTOS GENRALES (19.38%)
SUBTOTAL
IGV (19%)
PRSUPUESTO TOTAL

ON DE PARTIDA

UBRASANTE EN ZONAS DE CORTE

CONSIDERADO EN TRANSP.)
EZA)

IEDRA MEDIANA

UNIDAD

METRADO

GLB
KM
und

1.00
31.76
2.00

m3
m3
m3
m2
m3
m2

65,986.17
92,573.52
8,715.76
69,540.19
17,384.36
75,179.04

m3
m3
m3
m3

55,428.55
66,078.76
22,553.71
2,905.32

m3
m3
m2
m3
gln
gln
kg

53,128.45
49,316.77
240,667.14
17,511.09
72,200.00
638,629.41
24,172.00

m3
m3
m3
m3
m2
m2
m2
kg
m3
m3
m3
m3
m3
m3

14,755.92
1,423.33
98.00
3,448.44
6,462.80
1,513.36
475.11
89,713.11
1,325.05
64.42
484.43
789.56
115.66
8,958.89

15 M)

D<=1.00 KM
D>1.00 KM
00 KM
KM

m
m
m
m2
m
m
m
m
m
m2
m3
m3
m2
m
m
m2
m
m
m
m
CM3
und
m
m

1,010.20
296.50
94.90
742.26
26,742.10
2,950.00
2,233.00
1,062.00
1,087.50
48.88
148.07
31.56
638.60
278.45
4,793.00
1.80
30.00
30.00
30.00
18.00
29,120.00
4.00
32.50
21.00

m3K
m3K
m3K
m3K
M3K
M3K

67,453.98
770,042.15
142,383.29
809,732.73
17,511.09
153,922.50

und
und

110.00
22.00

m2
m
und
und
m2
m
und
und
m2

20.53
106.60
11.00
31.00
8,822.22
440.00
361.00
261.00
157.80

URIDAD VIAL

GLB
m

1.00
60.00

AL EXCEDENTE
ENTO

m3
m2
m2
HA
m2
m2
und
mes
und
GLB
mes

74,972.94
1,500.00
30,000.00
10.00
15,000.00
4,000.00
15.00
15.00
15.00
1.00
15.00

DE ASFALTO Y CHANCADORA
E MAQUINAS

SEPTIMO MES
PRECIO
S/.

PARCIAL
S/.

1,177,828.16
1,379.95
2,589.17

4.70
14.43
23.99
0.90
13.58
1.26
5.22
12.50
11.85
2.58
28.73
48.67
0.75
211.70
7.53
5.81
16.37
11.43
21.45
34.71
36.50
32.81
54.19
55.92
4.18
250.27
247.08
344.37
367.40
394.92
42.31

1,226,833.71
1,177,828.16
43,827.21
5,178.34
3,638,532.07
2,248,453.35
310,135.00
1,335,835.89
209,091.08
62,586.17
236,079.61
94,725.59
1,390,078.72
289,337.03
825,984.50
267,261.46
7,495.73
12,464,024.18
1,526,380.37
2,400,247.20
180,500.36
3,707,097.75
543,666.00
3,710,436.87
395,695.64
8,334,752.05
168,660.17
30,530.43
3,401.58
125,868.06
212,044.47
82,008.98
26,568.15
375,000.80
331,620.26
15,916.89
166,823.16
290,084.34
45,676.45
379,050.64

RENDIMIENTO

PROGRAMADO
METRADO

0.48
15.25
0.96

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

356.75
527.95
786.32
51.45
120.08
99.07
78.75
121.39
106.33
8.61
99.11
41.50
6.45
16.27
279.25
15.77
466.78
13.68
5.46
15.77
0.12
46.85
3,459.98
1,590.12
18.26
1.29
8.70
1.18
13.90
1.50
695.25
820.95
584.52
168.62
566.86
92.70
18.52
188.01
89.83
14.97
10.41

360,388.85
156,537.18
74,621.77
38,189.28
3,211,191.37
292,256.50
175,848.75
128,916.18
115,633.88
420.86
14,675.22
1,309.74
4,118.97
4,530.38
1,338,445.25
28.39
14,003.40
410.40
163.80
283.86
3,494.40
187.40
112,449.35
33,392.52
4,893,571.19
1,231,709.67
993,354.37
1,238,734.62
955,484.62
243,404.15
230,883.75
417,713.06
76,477.50
18,060.90
323,174.66
12,000.20
17,974.89
6,235.46
2,873.70
163,387.51
82,724.40
32,428.63
3,907.17
1,642.70
731,731.96

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2,409.07
27,501.51
5,085.12
28,919.03
625.40
5,497.23
36.67
7.33
6.84
35.53
3.67
10.33
2,940.74
146.67
120.33
87.00
52.60

638,524.36
1,553.46
2.87
2.77
2.25
1,211.84
2.77
2.77
397.54
3,500.00
410.47
8,520.00
5,000.00

638,524.36
93,207.60
499,715.89
215,172.34
4,155.00
67,500.00
12,118.40
41,550.00
11,080.00
5,963.10
52,500.00
6,157.05
8,520.00
75,000.00
32,206,874.11
3,220,687.41
6,241,692.20
41,669,253.73
7,917,158.21
49,586,411.94

0.07
4.00
9,371.62
187.50
3,750.00
1.25
1,875.00
500.00
1.88
1.88
1.88
0.13
1.88

SEPTIMO MES

100.00%

PROGRAMADO
S/.

588,914.08
565,390.06
21,038.27
2,485.75
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

VALOR. ACUMUL. ANTERIOR


METRADO
S/.

0.52
16.51
1.04

59,040.26
82,828.94
7,798.31
62,220.17
15,554.43
67,265.46
49,593.97
59,123.10
20,179.64
2,599.50
50,818.52
47,172.56
230,203.35
16,749.74
69,060.87
610,862.91
23,121.04
14,755.92
1,423.33
98.00
3,448.44
6,462.80
1,513.36
475.11
89,713.11
1,325.05
64.42
484.43
789.56
115.66
8,958.89

637,919.64
612,438.11
22,788.94
2,692.59
3,255,528.65
2,011,774.02
277,489.21
1,195,221.57
187,081.49
55,998.15
211,229.12
84,754.47
1,243,754.63
258,880.50
739,038.75
239,128.67
6,706.70
11,922,110.09
1,460,016.00
2,295,888.62
172,652.51
3,545,919.59
520,028.35
3,549,113.53
378,491.48
8,334,752.08
168,660.17
30,530.43
3,401.58
125,868.06
212,044.47
82,008.98
26,568.15
375,000.80
331,620.26
15,916.89
166,823.16
290,084.35
45,676.45
379,050.64

VALORIZACION ACTUAL
METRADO

0.48
15.25
0.96

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
174,770.40
43,989.63
35,476.94
44,240.52
34,124.45
8,693.01
8,245.85
139,237.69
25,492.50
6,020.30
107,724.89
4,000.07
5,991.63
2,078.49
957.90
54,462.51
27,574.80
10,809.54
1,302.39
547.57
48,782.13

1,010.20
296.50
94.90
742.26
26,742.10
2,950.00
2,233.00
1,062.00
1,087.50
48.88
148.07
31.56
638.60
278.45
4,793.00
1.80
30.00
30.00
30.00
18.00
29,120.00
4.00
32.50
21.00
60,226.77
687,537.63
127,127.94
722,975.65
15,634.90
137,430.80
73.33
14.67
13.69
71.07
7.33
20.67
5,881.48
293.33
240.67
174.00
105.20

360,388.85
156,537.18
74,621.77
38,189.28
3,211,191.38
292,256.50
175,848.75
128,916.18
115,633.88
420.86
14,675.22
1,309.74
4,118.97
4,530.38
1,338,445.25
28.39
14,003.40
410.40
163.80
283.86
3,494.40
187.40
112,449.35
33,392.52
4,369,260.00
1,099,740.78
886,923.55
1,106,013.06
853,111.27
217,325.14
206,146.21
278,475.38
50,985.00
12,040.60
215,449.78
8,000.13
11,983.26
4,156.97
1,915.80
108,925.01
55,149.60
21,619.09
2,604.78
1,095.13
634,167.69

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2,409.07
27,501.51
5,085.12
28,919.03
625.40
5,497.23
36.67
7.33
6.84
35.53
3.67
10.33
2,940.74
146.67
120.33
87.00
52.60

42,568.29
6,213.84
62,464.49
26,896.54
519.38
8,437.50
1,514.80
5,193.75
1,385.00
745.39
6,562.50
769.63
1,065.00
9,375.00
1,014,168.79
101,416.88
196,545.91
1,312,131.58
249,305.00
1,561,436.58

0.87
52.00
65,601.33
1,312.50
26,250.00
8.75
13,125.00
3,500.00
13.13
13.13
13.13
0.88
13.13

553,387.77
80,779.92
437,251.43
188,275.81
3,635.63
59,062.50
10,603.60
36,356.25
9,695.00
5,217.71
45,937.50
5,387.42
7,455.00
65,625.00

0.07
4.00
9,371.62
187.50
3,750.00
1.25
1,875.00
500.00
1.88
1.88
1.88
0.13
1.88

RIZACION ACTUAL
S/.

588,914.08
565,390.06
21,038.27
2,485.75
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

VALORIZACION ACUMULADO
METRADO
S/.

1.00
31.76
2.00

59,040.26
82,828.94
7,798.31
62,220.17
15,554.43
67,265.46
49,593.97
59,123.10
20,179.64
2,599.50
50,818.52
47,172.56
230,203.35
16,749.74
69,060.87
610,862.91
23,121.04
14,755.92
1,423.33
98.00
3,448.44
6,462.80
1,513.36
475.11
89,713.11
1,325.05
64.42
484.43
789.56
115.66
8,958.89

1,226,833.72
1,177,828.17
43,827.21
5,178.34
3,255,528.65
2,011,774.02
277,489.21
1,195,221.57
187,081.49
55,998.15
211,229.12
84,754.47
1,243,754.63
258,880.50
739,038.75
239,128.67
6,706.70
11,922,110.09
1,460,016.00
2,295,888.62
172,652.51
3,545,919.59
520,028.35
3,549,113.53
378,491.48
8,334,752.08
168,660.17
30,530.43
3,401.58
125,868.06
212,044.47
82,008.98
26,568.15
375,000.80
331,620.26
15,916.89
166,823.16
290,084.35
45,676.45
379,050.64

ACTUAL
%

SALDO POR VALOR


METRADO

100.00%
0.00
0.00
0.00
89.47%
6,945.91
9,744.58
917.45
7,320.02
1,829.93
7,913.58
5,834.58
6,955.66
2,374.07
305.82
95.65%
2,309.93
2,144.21
10,463.79
761.35
3,139.13
27,766.50
1,050.96
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
174,770.40
43,989.63
35,476.94
44,240.52
34,124.45
8,693.01
8,245.85
139,237.69
25,492.50
6,020.30
107,724.89
4,000.07
5,991.63
2,078.49
957.90
54,462.51
27,574.80
10,809.54
1,302.39
547.57
48,782.13

1,010.20
296.50
94.90
742.26
26,742.10
2,950.00
2,233.00
1,062.00
1,087.50
48.88
148.07
31.56
638.60
278.45
4,793.00
1.80
30.00
30.00
30.00
18.00
29,120.00
4.00
32.50
21.00
62,635.84
715,039.14
132,213.06
751,894.68
16,260.30
142,928.04
110.00
22.00
20.53
106.60
11.00
31.00
8,822.22
440.00
361.00
261.00
157.80

360,388.85
156,537.18
74,621.77
38,189.28
3,211,191.38
292,256.50
175,848.75
128,916.18
115,633.88
420.86
14,675.22
1,309.74
4,118.97
4,530.38
1,338,445.25
28.39
14,003.40
410.40
163.80
283.86
3,494.40
187.40
112,449.35
33,392.52
4,544,030.40
1,143,730.41
922,400.49
1,150,253.58
887,235.72
226,018.14
214,392.05
417,713.07
76,477.50
18,060.90
323,174.67
12,000.20
17,974.89
6,235.46
2,873.70
163,387.52
82,724.40
32,428.63
3,907.17
1,642.70
682,949.82

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
92.86%
4,818.14
55,003.01
10,170.23
57,838.05
1,250.79
10,994.46
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
93.33%

42,568.29
6,213.84
62,464.49
26,896.54
519.38
8,437.50
1,514.80
5,193.75
1,385.00
745.39
6,562.50
769.63
1,065.00
9,375.00
1,014,168.79
101,416.88
196,545.91

0.93
56.00
74,972.94
1,500.00
30,000.00
10.00
15,000.00
4,000.00
15.00
15.00
15.00
1.00
15.00

595,956.06
86,993.76
499,715.92
215,172.35
4,155.00
67,500.00
12,118.40
41,550.00
11,080.00
5,963.10
52,500.00
6,157.05
8,520.00
75,000.00
30,883,633.75
3,088,363.38
5,985,248.22

1,312,131.58
249,305.00

39,957,245.35
7,591,876.62

1,561,436.58

47,549,121.96

0.07
4.00
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
95.89%

95.89%

SALDO POR VALORIZAR


S/.

-0.01
-0.01
0.00
0.00
383,003.42
236,679.32
32,645.79
140,614.32
22,009.59
6,588.02
24,850.49
9,971.12
146,324.09
30,456.53
86,945.75
28,132.79
789.02
541,914.09
66,364.36
104,358.57
7,847.84
161,178.16
23,637.65
161,323.34
17,204.16
-0.03
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%

10.53%

4.35%

0.00%

0.00
0.00
0.00
0.00
-0.01
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
349,540.79
87,979.26
70,953.88
88,481.04
68,248.90
17,386.01
16,491.70
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
48,782.14

7.14%

0.00%

6.67%

42,568.30
6,213.84
-0.03
-0.01
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1,323,240.37
132,324.04
256,443.98

0.00%

4.11%

1,712,008.39
325,281.59
2,037,289.99

4.11%

Você também pode gostar

  • Resumen Presupuesto
    Resumen Presupuesto
    Documento3 páginas
    Resumen Presupuesto
    Ciro Quispe Alvinagorta
    Ainda não há avaliações
  • Formación de Lagunas
    Formación de Lagunas
    Documento8 páginas
    Formación de Lagunas
    Ciro Quispe Alvinagorta
    Ainda não há avaliações
  • Consumo de Agua
    Consumo de Agua
    Documento2 páginas
    Consumo de Agua
    Ciro Quispe Alvinagorta
    Ainda não há avaliações
  • Resultados Con El Programa Hec
    Resultados Con El Programa Hec
    Documento6 páginas
    Resultados Con El Programa Hec
    Ciro Quispe Alvinagorta
    Ainda não há avaliações
  • Acta de Constitución Del Proyecto
    Acta de Constitución Del Proyecto
    Documento5 páginas
    Acta de Constitución Del Proyecto
    Ciro Quispe Alvinagorta
    Ainda não há avaliações
  • Precio de Agua Por M3
    Precio de Agua Por M3
    Documento2 páginas
    Precio de Agua Por M3
    Ciro Quispe Alvinagorta
    Ainda não há avaliações
  • Tuneleria
    Tuneleria
    Documento13 páginas
    Tuneleria
    Ciro Quispe Alvinagorta
    Ainda não há avaliações
  • Drenaje
    Drenaje
    Documento1 página
    Drenaje
    Ciro Quispe Alvinagorta
    Ainda não há avaliações
  • AFORADOR
    AFORADOR
    Documento20 páginas
    AFORADOR
    Ciro Quispe Alvinagorta
    Ainda não há avaliações
  • Lagos y Lagunas en México
    Lagos y Lagunas en México
    Documento8 páginas
    Lagos y Lagunas en México
    Ciro Quispe Alvinagorta
    Ainda não há avaliações
  • Filtro Suavisador
    Filtro Suavisador
    Documento2 páginas
    Filtro Suavisador
    Erick Ismael Zacarias
    Ainda não há avaliações
  • Project Charter Ejemplo Tesis
    Project Charter Ejemplo Tesis
    Documento6 páginas
    Project Charter Ejemplo Tesis
    Carlos Alberto Espinoza Henríquez
    100% (1)
  • Conductividad Hidráulica
    Conductividad Hidráulica
    Documento3 páginas
    Conductividad Hidráulica
    Ciro Quispe Alvinagorta
    Ainda não há avaliações
  • Alcantarillado Condominial
    Alcantarillado Condominial
    Documento1 página
    Alcantarillado Condominial
    Ciro Quispe Alvinagorta
    Ainda não há avaliações
  • Capitulo Iv
    Capitulo Iv
    Documento2 páginas
    Capitulo Iv
    Ciro Quispe Alvinagorta
    Ainda não há avaliações
  • Geoceldas
    Geoceldas
    Documento23 páginas
    Geoceldas
    Ciro Quispe Alvinagorta
    100% (1)
  • Tratamiento de Agua
    Tratamiento de Agua
    Documento4 páginas
    Tratamiento de Agua
    Ciro Quispe Alvinagorta
    Ainda não há avaliações
  • Capitulo I
    Capitulo I
    Documento2 páginas
    Capitulo I
    Ciro Quispe Alvinagorta
    Ainda não há avaliações
  • Formacion de Las Lagunas
    Formacion de Las Lagunas
    Documento2 páginas
    Formacion de Las Lagunas
    Ciro Quispe Alvinagorta
    Ainda não há avaliações
  • Formacion de Los Glaciares
    Formacion de Los Glaciares
    Documento2 páginas
    Formacion de Los Glaciares
    Ciro Quispe Alvinagorta
    Ainda não há avaliações
  • Movimiento de Tierras
    Movimiento de Tierras
    Documento14 páginas
    Movimiento de Tierras
    Ciro Quispe Alvinagorta
    Ainda não há avaliações
  • 6 - Presupuesto
    6 - Presupuesto
    Documento3 páginas
    6 - Presupuesto
    Kikin Sanchez
    Ainda não há avaliações
  • Capitulo V
    Capitulo V
    Documento2 páginas
    Capitulo V
    Ciro Quispe Alvinagorta
    Ainda não há avaliações
  • Tratamiento de Aguas Residuales
    Tratamiento de Aguas Residuales
    Documento5 páginas
    Tratamiento de Aguas Residuales
    Ciro Quispe Alvinagorta
    Ainda não há avaliações
  • Duracion de Partidas
    Duracion de Partidas
    Documento12 páginas
    Duracion de Partidas
    Ciro Quispe Alvinagorta
    Ainda não há avaliações
  • Project Charter
    Project Charter
    Documento8 páginas
    Project Charter
    Ciro Quispe Alvinagorta
    Ainda não há avaliações
  • SOlucionario Del Libro de Linsley
    SOlucionario Del Libro de Linsley
    Documento8 páginas
    SOlucionario Del Libro de Linsley
    Ciro Quispe Alvinagorta
    Ainda não há avaliações
  • Analisis Estrutural
    Analisis Estrutural
    Documento4 páginas
    Analisis Estrutural
    Ciro Quispe Alvinagorta
    Ainda não há avaliações
  • Problemas Propuestos Del Libro de Mario Paz
    Problemas Propuestos Del Libro de Mario Paz
    Documento3 páginas
    Problemas Propuestos Del Libro de Mario Paz
    Ciro Quispe Alvinagorta
    Ainda não há avaliações