In this stage of works the location of columns are determined practically in field. It
is done by laying rope according to grids shown in the drawing and then mark the
location of columns related to rope.
It is important that the reinforcement is castles and dalas joined together, to truly be
of confinement. This is accomplished by anchoring properly the rods of an element
within another.
The maximum spacing shall be three castles meters.
rods, go to the bottom of the dala, tied, making a legs to that better hold, in the
case of foundation Specifically go to the bottom of the contratrabe, nalso anchored
folds for making legs.
In construction, the floor height is normally maintained 3 meters, less the extent of
the beam and the slab, to know the height of the column, and this is falsework
timber that is resistant to stress the concrete after him emptied.
The castle will be armed, before lifting the wall: First stop 30-30 cm steel castles,
above the wall, this in order to tie the steel slab or closures.
After the formwork is placed: Place the planks to both sides of the wall, and finally
put yokes.
Wood for formwork going varnished with burnt oil or diesel, the falsework is fixed to
the wall with wire annealing moorings, which are passed from one side to the other
of the wall through small holes made in the joints.