SCHEDULE "Q"
QUALITY REQUIREMENTS
TABLE OF CONTENTS
1.
GENERAL
2.
3.
DOCUMENTATION REQUIREMENTS
4.
MANAGEMENT RESPONSIBILITY
5.
RESOURCE MANAGEMENT
6.
PROJECT REALIZATIONIEXECUTION
7.
ATTACHMENT I
&
SUBCONTRACTOR
QUALITY
CONTRACTOR
PERSONNEL QUALIFICATION REQUIREMENTS
ATTACHMENT II
ATTACHMENT Ill
QUALITY
REQUIREMENTS
SUPPLIED MATERIALS
FOR
CONTRACTOR
ATTACHMENT VI
For the purposes of this Schedule "Q", SAUDI ARAMCO shall have the
=I,?.
same meaning as COMP,4NY for contracts \ ~ i t hAramco Services
Company and Aramco Overseas Company.
1.2
-1.3.
1.4.
CONTRACTOR shall inspect, test and accept all parts of the WORK as
defined in Schedule "B", including its subcontractors' work, in conformance
with all drawings, specifications and standards applicable to the WORK.
1.5. CONTRACTOR shall perform Quality Management functions for all parts
of the WORK, including its subcontractors', vendors', manufacturers' and
suppliers' WORK as specified in the CONTRACTOR's Quality Manual and
approved Quality Plan(s).
1.6.
Q-I
1.7.
1.8.
I9
1.10. If CONTRACTOR does not adhere to the Quality requirements ,of this
I
schedule, SAUDl ARAMCO may, after two weeks notification to
CONTRACTOR, supply sufficient inspection and testing services to
assure that the WORK is being done as required by this Contract.
CONTRACTOR shall bear the cost of such inspection and testing.
2.0
DOCUMENTATION REQUIREMENTS
3.1
3.3.
3.4.
3.6.
3.7.
MANAGEMENT RESPONSIBILITY
4.1.
4.2. Within two (2) weeks after the scheduled review date, CONTRACTOR
shall advise the Company Representative in writing of the results and
recommended actions of such reviews. Changes to the Quality System
that result from CONTRACTOR'S Top Management Reviews shall be
incorporated in the project Quality Plans, with the approval of the
Company Representative.
51.
5.2.
shall designate the Quality Assurance Manager for this Contract within
seven calendar days of the effective date of this Contract. The Quality
Assurance Manager shall be assigned to the WORK through'Mechanical
Completion.
5.8.
5.9.
5.10. Planned staffing levels shall comply with SAUDI ARAMCO approved
Quality Plan and Attachment VI of this Schedule "Q"; any reduction from
the required levels must be approved in advance in writing by the
Company Representative.
5.A I. CONTRACTOR shall make quality personnel changes required due to
vacations, illness, temporary assignments, 'emergency leave, resignations
or other reasons as necessary to maintain required Quality coverage.
CONTRACTOR shall advise the Company Representative of such
personnel and quality coverage at least thirty '(30).calendar days in
PROJECT REALIZATIOI\I/EXECUTlON
6
6.2.
6.3.
6.4.
7.1.
Inspection Schedules
CONTRACTOR shall submit each week a two-week look ahead schedule
of all planned quality activities to the Company Representative during the
Procurement, Construction and Precommissioning WORK Phases as
specified in Schedule "A". The
7.2.
Internal Audits
7.2.1. CONTRACTOR shall conduct internal audits covering WORK
Phases with a duration of six months or longer. This shall include
audits of the CONTRACTOR'S quality function and obligations as
described in the Saudi Aramco approved quality plans, this
Contract, and IS0 9001. This program shall also include scheduled
Quality System audits for subcontracts with work scheduled to
exceed six months in duration.
7.2.2. CONTRACTOR shall submit a quality audit schedule to the
Company Representative for review and approval within thirty (30)
calendar days from the effective date of this Contract. As a
minimum, full quality system audits shall be carried out at fifteen
percent (1 5%) and sixty percent (60%) of completion stage for the
Design, Procurement, and Construction WORK Phases.
CONTRACTOR'S audits may be rescheduled only with the approval
of the Company Representative.
7.2.4.
CONTRACTOR shall investigate root causes and initiate corrective
actions for nonconformities identified in each audit. CONTRACTOR
shall verify implementation and closeout of corrective actions prior
to the next scheduled audit.
7.2.5. CONTRACTOR shall submit to the Company Representative a
copy of each audit report within two (2) weeks of its completion.
7.2.6. The Company Representative or his nominee shall be invited to
participate ,in all audits. Audit' n'otifications and agenda shall be
submitted to the Company Representative fourteen (14) calendar
days in advance.
7.3.
Control of Non-Conformance
7.4:
Waivers
7.4.1. CONTRACTOR shall not waive the requirements of any
CONTRACTOR Quality Plan or. ITP previously accepted by the
, Company Representative without the express written consent of the
Company Representative.
7.4.2. The CONTPACTOR shall maintain a log detailing all waivers from
SAUDI ARAMCO or CONTRACTOR Quality and inspection
requirements obtained during all WORK phases. This log must
indicate the status of the waiver, a brief description and details of
the applicable purchase order and equipment or construction
process.
7.4.3. The CONTRACTOR shall also maintain a log detailing all waivers
to SAUDI Armco standards obtained during all phases, including
those initiated by SAUDI ARAMCO (during or prior to the start of
WORK) or CONTRACTOR. This log must indicate the status of the
waiver, a brief description and details of the applicable purchase
order and equipment or construction process.
7.5.
Analysis of Data
CONTRACTOR shall prepare and submit a monthly Quality Management
Report in a format acceptable to SAUDI ARAMCO to demonstrate
effective implementation of the CONTRACTOR'S Quality System. The
report shall include the following items as a minimum:
d)
.'
b)
c)
lmprovement
7.6.1. CONTRACTOR'S procedure(s) for Continual lmprovement shall
ensure measurement, analysis and improvement of the. key.
variables and objectives identified in Attachment Vl 'of this Schedule
"Q".
1.2. Quality System Auditors: Shall have 5 years Quality System experience in
auditing activities in the discipline he is working in. Auditors shall be
qualified as stated in ISO-19011 and competent in the discipline being
audited, familiar with Quality System standards and be able to exercise
judgment against the criteria of the standards. Auditors must be able to
communicate clearly in writing and orally. Auditors shall have satisfactorily
completed a training course and passed the course examination. Auditors
shall have participated in a minimum of four audits for a total of at least 20
days including documentation review, actual audit activities and audit
reporting during the past th.ree years.
2.0
2.1
2.2.8.
Electrical: Inspector shall demonstrate a thorough working
knowledge of the National Electric CodelNFPA 70, IEC or
equivalent standards. Where, inspection of Cathodic Protection
equipment is required, inspector must be able to demonstrate a
thorough knowledge of applicable requirements of NACE or
equivalent corrosion standards.
2.2.9,
lnstrumentation: lnspector shall have three (3) years documented
experience in the field of instrumentation and control systems. He
shall be familiar with the internatiqnal Industry Codes and
Standards related to Intrinsically Safe Systems and Electrical
Systems for lnstrumentation such as; ISA RP12.6, ISA RPI 2.2.02,
ISA TR12., ANSI MC96.1, IEEE 518, IEEE 1100, IEC 60529,
NEMA ICS 6, NEMA 250, NEMA VE I , NEMA VE 2, NFPA 7O/NEC
and UL 94. As, a minimum, he shall be able to inspect complete
loop checking, wiring continuity, color coding, and start up. When
required, he shall be able to evaluate Factory Acceptance Test and
demonstrate a thorough working knowledge of international codes
and standards related to packaged units instrumentation such as,
Distributed Control System (DCS), Supervisory Control and Data
Acquisition (SCADA) Systems, Remote Terminal Unit, and
Emergency Shutdown (ESD) systems.
3.1.
/3.2.
3.3.
Inspector Title
I
3/
V
Sr. Inspector
Inspector
Contract Scope
of Work *
3
3.3.3.
HotlCold Insulation
3.3.4.
3.3.5.
3.3.6.
3.3.7.
3.3.8.
3.3.9.
3.3.15.2. Radiograph
1.
SAEP-122
Project Records
2.
SAEP-124
3.
SAEP-127
4.
SAEP-133
5.
SAEP-302
6.
SAEP-303
7.
SAEP-311
8.
SAEP-316
9.
SAEP-318
10.
SAEP-324
11.
'SAEP-334
12.
SAEP-352
13.
14.
Form 3099A, RV
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
26.
27.
C O N T M C T NO. 6600027360
SCHEDULE "Q";ATTACHMENT - Ill
QLlALlTY REQUIREMENTS FOR CONTR4CTOR SUPPLIED MATERIALS
I .O
PROCUREMENT PROCESS
1.1.
1.2.
1.3.
Supplier Selection
Q-I 11-1
2.0
PROCUREMENT INFORMATION
2.1.
CONTRACTOR shall review and ensure the quality of all requisitions prior
to submittal for Saudi Ararnco review, including all technical and quality
requirements specified in Schedule "G".
2.2. CONTRACTOR shall review its supplier's sub-orders to ensure that all
relevant SAUDl ARAMCO technical and inspection requirements are
passed on to sub-suppliers.
2.3.
2.4.
2.5. SAUDI AFAMCO shall have access to all purchase order inspection report
files
3.0
3.2.
3.3.
3.4.
3.5.
3.9.
3.1 0.1.5.
'each
pre-inspection
meeting
where
3.1 I. CONTRACTOR or its approved third party inspector shall schedule and
perform source inspection at supplier and sub-supplier fabrication sites as
specified in the approved lnspection and Test Plans.
3.1 2. Contractor shall provide Pre-inspection Meeting Reports and subsequent
Vendor lnspection Reports to the Company Representative within 10
calendar days of each shop visit.
3.13. If SAUDI ARAMCO waives a plant inspection visit, CONTRACTOR shall
obtain from suppliers and sib-suppliers such inspection records as may
be required to meet the requirements of Paragraph 3.8, and include the
inspection records in the lnspection Disposition Reports (Paragraph 3.12).
Such waiver shall not release CONTRACTOR from any other obligations
contained in this Schedule "Q".
3.14. CONTPACTOR shall require its Subcontractors I suppliers to submit
manufacturing and test reports as specified on each form SA-175. ,The
CONTRACTOR shall review and indicate its acceptance of these
inspection rgcords prior to issuing the inspection (or shipping) release. A
copy shall be provided to SAUDI ARAMCO with the lnspection Disposition
Report.
3.1 5. Within two weeks of acceptance of material or equipment, CONTRACTOR
shall prepare and issue to the Company Representative a final disposition
report. This report shall be based upon CONTRACTOR'S review of the
inspection file and include as a minimum:
3,15.1. Narrative details of Quality activities pe'rformed during
manufacturing and fabrication of the equipment or material.
approved waivers to
SAUDI
1. I .
1.2.
1.3.
lnspection and Test Plans and related procedures shall include provisions
to ensure that test prerequisites have been met, that adequate calibrated
instrumentation is available and used, and that the necessary inspection is
performed.
1.4.
2.1. The following special processes require SAUDI APJIiIICO's review andlor
approval of work procedures, personnel qualifications, or personnel
qualification procedures. CONTRACTOR shall ensure that these special
processes are accomplished under controlled conditions as specified in all
applicable standards and specifications. All process parameters shall be
identified with acceptance criteria specified and monitored. All Procedures
and Personnel Qualification shall be submitted for review and/or approval
at least thirty (30) calendar days prior to the start O ~ W O R K .
J'
Special Process
LWeldinglBrazing
Nondestructive Testinglexamination
High Voltage Cable
splicing/termination
Alloy verification (PMI)
Coatings
Concrete & Asphalt Mix Design
Cable and Conduit Seal lnstallat~on
Gasket Installation
Concrete Installation
Structural Bolt Tensioning
Gap Control for socket weld and back
welded threaded fittings.
Hydro-testing
Heat Treatment
Hot Tap Procedures (Calculation
Sheets)
Refractory Installation
RTR Pipe work
HVAC Testing & Balancing
Fiber optic cable installation
Work
Procedure
Approval (A)
or Review
(R) Required
A
A
Personnel
Qualification
Procedure
Approval
Required
Yes
Yes"
Personnel
Qualification
Approval
Required
Yes
Yes
A
A
A
Yes
No
No
No
No
No
No
Yes
Yes
I\] o
No
No
No
No
No
No
A
A
No
No
No
No
No
No
A
R
R
A
No
No
No
No
No
Yes
No
No
R
R
R
Yes
Yes
3.0
3I
3.3.
4.0
CUSTOMER PROPERTY
CONTRACTOR shall implement a documented control system for all SAUDI
ARAMCO's supplied material or equipment. The written procedure shall provide
for receiving inspection, proper storage, and maintenance of such material and
equipment. This procedure shall have provisions for dealing with losses, damage
or other problems discovered with such material and equipment. . '
5.0
PRESERVATION
CONTRACTOR shall include procedures for handling, storage, and preservation
of material as specified in all applicable specifications, manufacturer
recommendations and SAUDl AFL4MC01sstandards. The. procedure shall list all
inspection schedules for maintaining the quality of the material or equipment as
well as provide for documentation that the required activities have been
performed. Individuals responsible for special handling, storage and preservation
shall be fully qualified to do so, and supplied with predetermined WORK and
inspection instructions. Data concerning handling, storage and preservation shall
be included on the Monthly Materials Procurement Status Report as specified in
Schedule "G".
7.0
6.2.
6.3.
7.1. CONTRP,CTOR shall visually inspect all incoming equipment for damage
and for conformance to all applicable requirements, including the supplier
inspection releas? with verified Material Test Reports (MTR). If the
equipment does n o t have the required inspection release and MTR,
CONTRACTOR shall verify and document the. compliance of the
equipment with applicable standards and specifications prior to release to
be used as part of the WORK. Data concerning receiving inspections shall
be included on the Monthly Materials Procurement Status Report as
specified in Schedule "G".
7.2. CONTRACTOR shall submit its test reports and its subcontractors test
reports to the Company Representative as specified by the applicable
SAUDI ARAMCO standards. The CONTRACTOR shall review its
subcontractor's test reports prior to submittal.
-
7.3.
Title
Ido
Quality Plan:
Paragraph 3.2 of Schedule
" Q"
Organization Chart(s)
Paragraph 5.2 of Schedule
"Q"
Quality Personnel
Qualifications: Paragraph
5.3 of Schedule "Q"
Quality Audit Schedule:
Paragraph 7.2.2 of
Schedule "Q"
2
3
/
I
Subsequent submittals to
SAUDI ARAMCO
Monthly
Prior to assignment of
personnel on the project
Within
(30)calendar within 7 calendar days of
days of the effective date
revisions
of the Contract
Within fourteen (14)
calendar days of
completion of the audit
and &audit
Fourteen (14) calendar
/ Updated \Weekly
days before the start of
any related activities
within 48 hours of
reporting each nonconformance
Notification of clearance
required
1
'
Title
No
13
15
First Submittal to
SAUDI APAMCO
Ten (1 0) calendar days
after the first inspection
visit for each supplier
Subsequent submittals to
SAUDI APSiMCO
I en
1v
Construction Inspection
1.Iof Attachment IV
1.2.
( Item
2.0
'
Material Description
Inspection Level
Remarks
Position
Quality Assurance1
Quality Control Manager
Quality Control
Supervisor
One (1)
One (I)
Q-VI-I
Subcontractoi(s)
'
CONTRACTOR
Primary Inspector
Supervising
(CONTRACTOR or
Construction Discipline
Inspectors
Subcontractor)
lnspection Discipline: CivillStructural
One ( I ) per thirty
(30) workers,
Earthwork +
Minimum
Foundations + Steel
,Structure
Requirement One
One ( I ) per every
( I ) inspector
five (5) inspectors
One ( I ) per location,
Minimum
Thrust Boring
Requirement One
( I ) inspector
Inspection Discipline: Mechanical/VWelding
Tie-In welding including
One
per crew
temperature tie-ins
Minimum
Welding at (Fabrication
.
Requirement One
Shop)
( I ) inspector
Equipment1
One ( I ) per crew
MechanicalIPiping
.One ( I ) per every
twenty (20) workers,
One (1) per every
Minimum
S:ructural Steel
(5) inspectors
Requirement One
(I
) inspector
One ( I ) per crew
supervisor,
Minimum
Pipeline Welding
Requirem.ent One
( I ) inspector per 5
km radius
One (1) per every
Flange Assembly
fifteen ( 15) workers
One ( I ) lnspector
Pipe Stringing
per site
.One (1) lnspector
One ('1) 'ns~ector
per every ten (10)
Beveling
per crew
personnel
One (1 ) lnspector
per every two (2)
Bending .
crews within a 5 km
radius
One (13 lnspector
Fencing
per site
One (I
) ..,per. crew
Hot tapping
. .
/'
Precommissioning
Jnspectors
Construction Discipline
CONTRACTOR
Supervising
Inspec.lors
Subcontracior)
One ( I ) NDT
coordinator per site
NDT Coordinator
Primary Inspector
(CONTRACTOR or
Padding, lowering,
holiday testing and
backfilling
commissioning
One ( I ) inspector
for each five (5)
subcontractor's
inspector, Minimum
Requirement One
(1)
,
,.A
/'
'
3.0
CONTINUAL IMPROVEMENTS:
NONE
4.0
NONE
5.0
END OF ATTACHMENT
VI TO SCHEDULE "Q"