Você está na página 1de 2

SgTPP Switchyard Schedule Maintenance Programme for E/M - OPH

during Financial06/02/16 to 20/02/17.


1

400 KV Parulia #2
Line.

400KV side bay of ICT


#1.

400 KV
Beharampur-I Line

4.

400 KV
Beharampur-2Line

ST#3 and its bay


tightness checking

400KV Subhashgram
Line & Line Reactor
bay.

ST#4 and its bay


tightness checking

400 KV Farakka Line

400 KV Main Bus 1

Tightness Checking of 400KV


Breaker,CT,CVT ,DS,ES,LA,Wave
Trap ,cleaning & Tightness
checking of above said item`s
Control Panel terminal Block
etc.
Bay Tightness checking.Breaker,
CT,CVT,LA checking etc.

06/02/2017.( From 07.00 hrs to


17.00

Tightness Checking of 400KV


Breaker,CT,CVT,DS,ES,LA,Wa
ve Trap ,cleaning & Tightness
checking of above said
item`s Control Panel
terminal Block etc.
Tightness Checking of 400KV
Breaker,CT,CVT,DS,ES,LA,Wa
ve Trap ,cleaning & Tightness
checking of above said
item`s Control Panel
terminal Block etc.
Transformer checking,
Bushing tightness checking
,Tan Delta Test of 220 KV
side bushing ,ST#2 bay
tightness checking with 6.6
KV incomer

08/02/2017
(From 07.00 hrs to 17.00.)

Tightness Checking of 400KV


Breaker,CT,CVT,DS,ES,LA,Wave
Trap ,cleaning & Tightness
checking of above said item`s
Control Panel terminal Block
etc.
Transformer checking, Bushing
tightness checking ,Tan Delta
Test of 220 KV side bushing
,ST#2 bay tightness checking
with 6.6 KV incomer
Tightness Checking of 400KV
Breaker,CT,CVT,DS,ES,LA,Wave
Trap ,cleaning & Tightness
checking of above said item`s
Control Panel terminal Block
etc.
Bay Tightness checking
DS,ES,CVT,LA checking etc.

11/02/2017 (From 07.00 hrs to


17.00 hrs)

07/02/2017(From 07.00 hrs to


17.00. .

09/02/2017
(From 07.00 hrs to 17.00.)

10/02/17,10/02/17(From 06.00
hrs to 17.00 hrs.)

13/02/17,14/02/17(From 06.00
hrs to 17.00 hrs.)

14/02/2017.(From 07.00 hrs to


17.00)

15/02/2017.(From 07.00 hrs to


17.00

10

400 KV Main Bus2.

Bay Tightness checking


DS,ES,CVT,LA checking etc.

17/02/2017.(From 07.00 hrs to


17.00

11
.

400 KV Parulia #1
Line.

Tightness Checking of 400KV


Breaker,CT,CVT,DS,ES,LA,Wave
Trap ,cleaning & Tightness
checking of above said item`s
Control Panel terminal Block
etc.

20/02/2017 ( From 07.00 hrs to


17.00

Você também pode gostar