Conducting Surveillance for Construction Activities and Site Inspection for the following
Electrical Activities:
- Preparation of Inspection and Test Plan, Construction Quality Procedure and Method
of Statement
- Preparation and Submittal for RFI.
- Review and Inspection of all Electrical Material, prior to Installation.
- Daily monitoring the Construction Activities.
- Responsible for the over-all implementation of Quality Control related electrical works
accordance with project specifications and Engineering Standards.
- Verify the equipment and devices used in the project meets the required specifications
per project requirements, Standard and tested in accordance with the procedures.
- Monitor the Underground installations; check the required burial depth and spacing
requirements to adjacent installations, prior to backfilling
- Testing of cable meggaring and HI POT test.
- Inspection of Electrical Equipment function test and Illumination level testing of lighting
system.
- Inspection of electrical installation Panels Monitoring control panel wiring, Termination,
cable routing & cable tray installation.
- Verify all required inspection report and test records are systematically generated and
compiled according to the approved QC Procedures.
- Coordinate with Client representatives regarding the implementation and quality of
works.
- Inspection of Switch Gear Panel installation, Cable Termination and Bus bar torque.
- Installation of control panel marshalling panels and termination continuity and Meggar
test.
- Insulation Resistance and Winding Resistance Testing of LV, MV motors.
- Inspection of Ground Rod and Grounding cable, as per Engineering Specification.
- Preparation of Electrical Inspection Reports
- QA/QC Inspection witness for cathodic protection system Underground pipe lines and
Metal Tanks. Installation of Permanent Anodes, Temporary Mg Anodes, LIDA Anode,
Galvanic Anodes, Test station ,AJB,NJB,MJB ASB and Positive Negative cable laying,
and Termination, Installation and termination of Transformer rectifier, Witness of
HMWPE Cable Holiday Test and CP system Pre-Commissioning Activities.
- Inspection of Heat Tracing panel Installation, PT, RTD Junction Box Installation and
Heat tracing cable laying and meggaring.
- Witness for Pre-commissioning of motor Solo Run activities.
- Prepare the Motor Solo Run test Package.
- Witness of Motor Solo Run Test
- Provide sufficient feedback to QA/QC Manager on the day to day quality issues.
- To supervise and carry out effective implementation of work schedule to clear punch
list.
ISA RP12.6:
ISA RP12.2.02:
ISA TR12:
ANSI MC96.1:
IEEE 518:
IEEE 1100:
IEC 60529:
NEMA ICS 6:
NEMA 250:
NEMA VE 1:
NEMA VE 2:
As a minimum.
He shall be able to inspect complete loop checking, wiring continuity, color coding, and
start up. When required, he shall be able to evaluate Factory Acceptance Test and
demonstrate a thorough working knowledge of international codes and standards
related to packaged units instrumentation such as, Distributed Control System (DCS),
Supervisory Control and Data Acquisition (SCADA) Systems, Remote Terminal Unit,
and Emergency Shutdown (ESD) systems.