Notes: 1.
The rates include - (i) Removal of dismantled materials to a distance of 50
m and all lifts.
(ii) Picking, cleaning, sorting out and stacking of serviceable materials and
unserviceable materials separately.
2.
3.
4.
5.
6.
The rates are applicable to all types of structures viz. Roads, Buildings,
Bridges and Floors and all heights.
7.
8.
All the materials obtained from the removal of the structure shall be the
property of Government Serviceable materials shall be stacked neatly in
such a manner as to avoid deterioration and a places directed by
Engineer-in-Charge with in specified lead. Different categories of materials
shall be stacked separately.
Unless otherwise provided, excavated materials shall be used in back
filling the excavation made in removing the structure in levelling ground or
otherwise disposed off as directed with in specified lead.
Non serviceable materials shall be disposed off without causing any
damage or inconvenience.
Item No.
1901
1902
1903
1904
1905
1906
1907
1908
1909
1910
1911
1912
Item
Unit
Rate
cum
41.00
cum
62.00
cum
186.00
cum
232.00
cum
191.00
cum
74.00
cum
92.00
cum
28.00
cum
54.00
sqm
11.00
sqm
6.90
sqm
15.40
Remark
Item No.
1913
1914
1915
1916
1917
1918
1919
1920
1921
1922
1923
1924
1925
Item
Unit
Rate
sqm
10.00
sqm
25.30
cum
191.40
1.50
sqm
4.10
sqm
1.70
sqm
3.20
sqm
sqm
0.80
2.30
each
33.00
each
25.00
cum
168.00
kg.
2.00
Remark
Item No.
1926
1927
1928
1929
1930
1931
1932
1933
Item
Unit
Rate
sqm
1.70
sqm
2.30
sqm
10.00
sqm
8.80
sqm
11.40
5.00
m
m
10.00
15.40
19.80
27.50
34.10
50.60
61.60
m
m
0.60
1.10
Remark
Circumferential
measurement
Item No.
1934
Item
Unit
Rate
sqm
55.00
Remark