CONSTRUCTION

DEVELOPMENT OF
NATURAL GAS
PIPING
PT. UNILEVER
OLEOCHEMICAL
INDONESIA
SEI MANGKE,
NORTH of
SUMATERA
: PTUOIDoc
TW2015-PIPINGNo
GJW-PJL

GOLD JOINT
WELDING

(APPROVED)

(APPROVED WITH MINOR


COMENTS)

(COMMENTED)

(ACTION / OTHER)

Date :...

Sign :..

Rev
:A
No
Proj
ect : No

GOLD JOINT WELDING


CONSTRUCTION DEVELOPMENT OF
NATURAL GAS PIPING
PT. UNILEVER OLEOCHEMICAL INDONESIA
SEI MANGKE, SUMATERA UTARA

No. Document :
PTUOI-TW2015-PIPING-GJW-PJL
Revision
:A
Date
: 12/03/2016
Page
: 2 dari 6

GOLD JOINT WELDING PROCEDURE


Discipline : Piping
A

12/03/2016

REV

DATE

Type of Document: Procedure


Issued For Review
PURPOSE

BY

CHK
PJL

APV

CHK

APV
UOI

REVISION TABLE
Rev

Date

12/03/2016

Change Description
Issued For Review

Check by

GOLD JOINT WELDING PROCEDURE


Discipline : Piping

Type of Document: Procedure

No. Document :
PTUOI-TW2015-PIPING-GJW-PJL
Revision
:A
Date
: 12/03/2016
Page
: 3 dari 6

TABLE OF CONTENTS

1.
2.
3.
4.
5.
6.

PURPOSE AND SCOPE ...........................................................................................4


REFERENCE............................................................................................................. 4
GOLD WELD APPLICATION.....................................................................................4
NDE EXAMINATION OF GOLDEN JOINT.................................................................5
QAQC DOCUMENT...................................................................................................5
ATTACHMENT........................................................................................................... 6

GOLD JOINT WELDING PROCEDURE


Discipline : Piping

Type of Document: Procedure

No. Document :
PTUOI-TW2015-PIPING-GJW-PJL
Revision
:A
Date
: 12/03/2016
Page
: 4 dari 6

1. PURPOSE AND SCOPE


1.1
Purpose
Provides general guidance for implementation golden welds to construction
development of natural gas piping project PT. Unilever Oleochemical Indonesia,
1.2

Sei Mangke North Sumatera.


Scope
This document describes final butt welds connecting components which have
been successfully tested may not be pressure tested provided it is demonstrated
that pressure test cant be practically performed. This document is general
requirement for golden welds application on hook-up pipe spools with butt weld
connection is only applicable to a connection of a straight length of tube/pipe to
another straight length of tube/pipe, not applicable for connections welds onto
fittings and welds.

2. REFERENCE
The applicator shall apply the most recent issue of the applicable codes and standards
by the following associations and approval bodies as part of this procedure.
1. American Society of Mechanical Engineers (ASME), 2010 edition.
ASME B31.3 Process Piping
2. Welding Procedure Specification to be used.
3. GOLDEN WELD APPLICATION
3.1
Preliminary check: DWG no., material, line number, thickness, joint identification, and
3.2

approved WPS.
In-process Examination.
The applicator welding inspector shall inspect and monitor the following task, before,
during and after welding of golden weld.
3.2.1 Joint preparation and cleanliness.
3.2.2 Preheating.
3.2.3 Fit-up, joint clearance and internal alignment prior to joining.
3.2.4 Variables specified by the joining procedure including filler material, electrode.
3.2.5 Condition of the hot passes after cleaning external and internal, where
accessible, aided by liquid penetrant OR magnetic particle examination when
specified in the engineering document.

3.2.6
3.2.7
3.2.8

Slag removal and weld condition between passes.


Appearance of finished joints (visual examination)
Application PT and RT for finishing reinforcement welding.

4. NDE EXAMINATION OF GOLDEN JOINT


All Visual and NDE examination shall be performed in accordance with the ASME B31.3,
Chapter VI , Table 341.3.2 and Fig 341.3.2 Acceptance criteria for weld and examination
method for evaluating weld imperfections.

GOLD JOINT WELDING PROCEDURE


Discipline : Piping

Type of Document: Procedure

No. Document :
PTUOI-TW2015-PIPING-GJW-PJL
Revision
:A
Date
: 12/03/2016
Page
: 5 dari 6

GOLD JOINT WELDING PROCEDURE


Discipline : Piping

Type of Document: Procedure

No. Document :
PTUOI-TW2015-PIPING-GJW-PJL
Revision
:A
Date
: 12/03/2016
Page
: 6 dari 6

5. QA/QC DOCUMENT
The applicator shall submit the following document to the company QA/QC
engineer/representative for review and approval.
1. ISO and PID drawings related to the concerned golden welds, line numbers, and joint
numbers.
2. Approved WPS to be used.
3. In-process welding checklist endorsed and signed by the applicator and company
welding inspector.
4. Visual and NDT reports.
5. Records of welding parameters

GOLD JOINT WELDING PROCEDURE


Discipline : Piping

Type of Document: Procedure

No. Document :
PTUOI-TW2015-PIPING-GJW-PJL
Revision
:A
Date
: 12/03/2016
Page
: 7 dari 6

6. ATTACHMENT
GOLDEN WELDS APPLICATION CHECK LIST
ISO DWG No.

Sheet

Joint No.

WPS No.

Welder ID

No
.

Activity

1.

Tools & equipment check (welding machine, grinder,


power tools, etc)

2.

Consumable check (electrode, filler rods)

3.

Safety requirement check (protection, firefighting


equipment)

4.

Joint preparation and cleanliness

5.

Fit-up, joint clearance and internal alignment prior to


joining

6.

Welding parameter (voltage/current) monitoring during


welding

7.

Condition of the root passes after cleaning

8.

Slag removal and weld condition between passes

9.

Appearance of finished joint

10
.

NDT Result of the hot pass (PT/MPT)

11
.

NDT result of the finished joint (PT/MPT, RT)


Prepared by,

PT. Primaco Jaya Larasindo

Y/
N

Checked
by

Remar
k

Review by,

______________