DEVELOPMENT OF
NATURAL GAS
PIPING
PT. UNILEVER
OLEOCHEMICAL
INDONESIA
SEI MANGKE,
NORTH of
SUMATERA
: PTUOIDoc
TW2015-PIPINGNo
GJW-PJL
GOLD JOINT
WELDING
(APPROVED)
(COMMENTED)
(ACTION / OTHER)
Date :...
Sign :..
Rev
:A
No
Proj
ect : No
No. Document :
PTUOI-TW2015-PIPING-GJW-PJL
Revision
:A
Date
: 12/03/2016
Page
: 2 dari 6
12/03/2016
REV
DATE
BY
CHK
PJL
APV
CHK
APV
UOI
REVISION TABLE
Rev
Date
12/03/2016
Change Description
Issued For Review
Check by
No. Document :
PTUOI-TW2015-PIPING-GJW-PJL
Revision
:A
Date
: 12/03/2016
Page
: 3 dari 6
TABLE OF CONTENTS
1.
2.
3.
4.
5.
6.
No. Document :
PTUOI-TW2015-PIPING-GJW-PJL
Revision
:A
Date
: 12/03/2016
Page
: 4 dari 6
2. REFERENCE
The applicator shall apply the most recent issue of the applicable codes and standards
by the following associations and approval bodies as part of this procedure.
1. American Society of Mechanical Engineers (ASME), 2010 edition.
ASME B31.3 Process Piping
2. Welding Procedure Specification to be used.
3. GOLDEN WELD APPLICATION
3.1
Preliminary check: DWG no., material, line number, thickness, joint identification, and
3.2
approved WPS.
In-process Examination.
The applicator welding inspector shall inspect and monitor the following task, before,
during and after welding of golden weld.
3.2.1 Joint preparation and cleanliness.
3.2.2 Preheating.
3.2.3 Fit-up, joint clearance and internal alignment prior to joining.
3.2.4 Variables specified by the joining procedure including filler material, electrode.
3.2.5 Condition of the hot passes after cleaning external and internal, where
accessible, aided by liquid penetrant OR magnetic particle examination when
specified in the engineering document.
3.2.6
3.2.7
3.2.8
No. Document :
PTUOI-TW2015-PIPING-GJW-PJL
Revision
:A
Date
: 12/03/2016
Page
: 5 dari 6
No. Document :
PTUOI-TW2015-PIPING-GJW-PJL
Revision
:A
Date
: 12/03/2016
Page
: 6 dari 6
5. QA/QC DOCUMENT
The applicator shall submit the following document to the company QA/QC
engineer/representative for review and approval.
1. ISO and PID drawings related to the concerned golden welds, line numbers, and joint
numbers.
2. Approved WPS to be used.
3. In-process welding checklist endorsed and signed by the applicator and company
welding inspector.
4. Visual and NDT reports.
5. Records of welding parameters
No. Document :
PTUOI-TW2015-PIPING-GJW-PJL
Revision
:A
Date
: 12/03/2016
Page
: 7 dari 6
6. ATTACHMENT
GOLDEN WELDS APPLICATION CHECK LIST
ISO DWG No.
Sheet
Joint No.
WPS No.
Welder ID
No
.
Activity
1.
2.
3.
4.
5.
6.
7.
8.
9.
10
.
11
.
Y/
N
Checked
by
Remar
k
Review by,
______________