Escolar Documentos
Profissional Documentos
Cultura Documentos
CONTRATO N
COMPUTOS METRICOS
OBRA:
EMPRESA:
PARTIDA N
DESCRIPCION
FECHA:
MEDIDAS
LARGO
ANCHO
ELEMET
IGUALES
ALTO
CANT.
TOTAL
UND
OBRAS PRELIMINARES
1
E-113.S/C
CONSTRUCCION DE CERCAS PROVISIONALES DE LAMINA DE ZINC
37.34
3.00
2.00
M2
112.02
30.00
3.00
2.00
M2
180.00
TOTAL
M2
292.02
RELACIONADO
M2
292.00
7.00
PZA
7.00
TOTAL EJECUTADO
PZA
7.00
E-123.200.000
TALA Y DESRAIZAMIENTO DE ARBOLES CON ALTURA ENTRE 5 M Y 12 M. EN CANTIDADES MENORES DE 5 PZA POR HECTAREA.
E-132.721.101
DEMOLICION A MANO DE CERCAS DE MALLA CICLON CON RECUPERACION.
FRENTE PARCELA
34.00
ML.
34.00
TOTAL EJECUTADO
ML.
34.00
E-131.420.006
DEMOLICION A MANO DE PUERTAS METALICAS, AMONTONAMIENTO Y/O BOTE HASTA 200 MTS.
PUERTAS PERIMETRALES
1.00
2.10
2.00
M2
4.20
PUERTAS INTERIORES
0.90
2.10
22.00
M2
41.58
M2
45.78
M2
44.00
M2
44.00
TOTAL EJECUTADO
5
E-131.S/C
DEMOLICION DE CUBIERTA DE TECHO DE LAMINAS METALICAS, INCLUYE AMONTONAMIENTO Y/O BOTE HASTA 200 MTS.
PERGOLA
11.00
4.00
TOTAL EJECUTADO
E-132.800.002
REMOCION A MANO O DESMONTAJE DE MARCOS EN GENERAL, SIN RECUPERACION DE MATERIALES.
PUERTAS PERIMETRALES
4.00
PZA
4.00
PUERTAS INTERIORES
22.00
PZA
22.00
4.00
PZA
4.00
PZA
30.00
VENTANAS
TOTAL EJECUTADO
7
E-111.200.000
CONSTRUCCION PROVISIONAL CONVENCIONAL DE DEPOSITOS. INCLUYE LA ACOMETIDA PROVISIONAL DENTRO DEL AREA DE LA CONSTRUCCION. INCLUYE EL
TRANSPORTE DE LOS MATERIALES HASTA 50 KM.
DEPOSITO
5.00
5.00
TOTAL EJECUTADO
M2
25.00
M2
25.00
E-111.300.000
CONSTRUCCION PROVISIONAL CONVENCIONAL DE VESTUARIOS Y CASETAS. INCLUYE LA ACOMETIDA PROVISIONAL DENTRO DEL AREA DE LA CONSTRUCCION.
INCLUYE TRANS. MATERIALES HASTA 50 KM.
VESTUARIOS
4.00
4.00
TOTAL EJECUTADO
M2
16.00
M2
16.00
E-111.400.000
CONSTRUCCION PROVISIONAL CONVENCIONAL DE SANITARIOS.INCLUYE ACOMETIDA. INCLUYE LA ACOMETIDA PROVISIONAL DENTRO DEL AREA DE LA
CONSTRUCCION. INCLUYE TRANS. MATERIALES HASTA 50 KM.
BAOS
10
2.00
2.00
M2
4.00
TOTAL EJECUTADO
M2
4.00
ML
25.00
TOTAL EJECUTADO
ML
25.00
PZA
50.00
PZA
50.00
E-114.203.S/C
ADUCCION PROVISIONAL DE AGUAS CLARAS CON TUBERIA DE PVC D= 3/4"
25.00
11
DES024
DESMONTAJE DE LAMPARAS FLUORESCENTES.
50.00
TOTAL EJECUTADO
12
E-131.410.006
DEMOLICION DE IMPERMEABILIZACION, SIN RECUPERACION DE MATERIALES, SIN PENDIENTE DE MORTERO. MEDIDOS SEGN EL AREA DE PISO.
AREA EDIFICACION
34.00
10.10
TOTAL EJECUTADO
M2
343.40
M2
343.40
CONTRATO N
COMPUTOS METRICOS
OBRA:
EMPRESA:
PARTIDA N
13
MEDIDAS
DESCRIPCION
ING. RESIDENTE/CONTRATISTA
FECHA:
LARGO
ANCHO
FISCAL
ELEMET
IGUALES
ALTO
UND
CANT.
TOTAL
ING. INSPECTOR
E-131.410.008
DEMOLICION DE PENDIENTES DE MORTERO, SIN RECUPERACION DE MATERIALES, MEDIDOS SEGUN EL AREA DE PISO.
AREA EDIFICACION
14
34.00
10.10
M2
343.40
TOTAL EJECUTADO
M2
343.40
E-132.112.S/C
DEMOLICION DE MIEMBROS HORIZONTALES DE CONCRETO ARMADO CON EQUIPO LIVIANO (COMPRESOR)
VIGAS DE CARGA
34.00
0.30
0.40
3.00
M3
12.24
VIGAS DE CARGA
10.10
0.30
0.40
6.00
M3
7.27
VIGAS DE CARGA
3.00
0.20
0.40
5.00
M3
1.20
ZAPATAS
1.20
1.20
0.30
12.00
M3
5.18
V.RIOSTRA
34.00
0.30
0.40
3.00
M3
12.24
V.RIOSTRA
10.10
0.30
0.40
6.00
M3
7.27
1.20
0.50
0.50
12.00
M3
3.60
ENTREPISO Y TECHO
34.00
10.10
0.20
2.00
M3
137.36
MESON DE COCINA
PEDESTALES
15
10.00
0.60
0.20
1.00
M3
1.20
ESCALERA
3.00
1.50
0.20
2.00
M3
1.80
ESCALERA
3.00
1.50
0.20
1.00
M3
0.90
TOTAL EJECUTADO
M3
190.26
E-132.122.000
DEMOLICION DE MIEMBROS VERTICALES DE CONCRETO ARMADO CON EQUIPO LIVIANO (COMPRESOR)
COLUMNAS
8.00
0.50
0.50
12.00
M3
24.00
PEDESTALES
0.90
0.50
0.50
12.00
M3
2.70
MESON DE COCINA
0.60
0.15
0.90
8.00
M3
0.65
3.00
0.20
2.50
4.00
M3
33.35
TOTAL EJECUTADO
16
6.00
E-132.310.000
DEMOLICION DE PIEZAS SANITARIAS.
LAVAMANOS
8.00
PZA
8.00
POCETAS
8.00
PZA
8.00
FREGADEROS
1.00
PZA
1.00
BATEAS
2.00
PZA
2.00
PZA
19.00
TOTAL EJECUTADO
17
E-132.5.S/C
DEMOLICION A MANO DE REVESTIMIENTO DE CERAMICA, BALDOSAS, MOSAICOS Y SIMILARES, EN PAREDES. INCLUYE AMONTONAMIENTO Y/O BOTE HASTA 200 MTS.-
18
BAOS
5.00
2.40
8.00
M2
BAOS
2.00
2.40
16.00
M2
96.00
76.80
BAOS
-0.80
2.10
8.00
M2
-13.44
COCINA
10.00
2.40
1.00
M2
24.00
TOTAL EJECUTADO
M2
183.36
E-132.500.000
DEMOLICION A MANO DE PAREDES DE BLOQUES
19
PAREDES EXTERIORES
34.00
7.50
2.00
M2.
510.00
PAREDES EXTERIORES
10.10
7.50
2.00
M2.
151.50
PAREDES EXTERIORES
-1.00
2.50
4.00
M2.
-10.00
PAREDES EXTERIORES
-1.00
2.10
2.00
M2.
-4.20
PAREDES INTERIORES
34.00
3.50
2.00
M2.
238.00
PAREDES INTERIORES
-34.50
0.40
M2.
-13.80
PAREDES INTERIORES
5.00
3.50
13.00
M2.
227.50
PAREDES INTERIORES
3.00
3.50
2.00
M2.
21.00
PAREDES INTERIORES
6.00
1.20
M2.
7.20
TOTAL EJECUTADO
M2.
1,127.20
ML
50.00
TOTAL EJECUTADO
ML
50.00
E-132.620.012
DEMOLICION DE TUBERIAS DE CONCRETO DIAMETROS MENORES A 12".
50.00
CONTRATO N
COMPUTOS METRICOS
OBRA:
EMPRESA:
PARTIDA N
MEDIDAS
DESCRIPCION
ING. RESIDENTE/CONTRATISTA
20
FECHA:
LARGO
ANCHO
ELEMET
IGUALES
ALTO
FISCAL
UND
CANT.
TOTAL
ING. INSPECTOR
E-132.711.000
DEMOLICION A MANO DE CERCAS DE ALAMBRE DE PUAS. SIN RECUPERACION DE LOS MATERIALES.
PERIMETRO
21
88.20
ML
88.20
TOTAL EJECUTADO
ML
88.20
34.50
0.40
M2
13.80
2.50
1.00
M2
10.00
TOTAL EJECUTADO
M2
23.80
E-132.801.000
DEMOLICION A MANO DE VENTANAS Y PUERTAS EN GENERAL SIN RECUPERACION DE MATERIALES.
22
4.00
E-132.800.001
DEMOLICION A MANO DE REJAS Y BARANDAS, SIN RECUPERACION DE MATERIAL.
PUERTAS PERIMETRALES
1.00
2.10
2.00
M2
4.20
PUERTAS INTERIORES
0.90
2.10
22.00
M2
41.58
VENTANAS
34.50
0.40
M2
13.80
VENTANAS
2.50
1.00
M2
10.00
M2
69.58
4.00
TOTAL EJECUTADO
23
E-132.S/C.3
REMOCION SIN RECUPERACION DE INSTALACIONES ELECTRICAS, (CABLES, TUBERIAS) INCLUYE CARGA Y BOTE HASTA 200 MTS.
800.00
TOTAL EJECUTADO
24
ML
800.00
ML
800.00
165.33
E-133.110.000
DEMOLICION DE PAVIMENTO DE CONCRETO, CON EQUIPO LIVIANO/COMPRESOR.
25
AREA PARCELA
24.10
34.30
0.20
M3
AREA PARCELA
3.80
1.50
0.20
M3
1.14
BANCADA
80.00
0.96
0.20
M3
15.36
TOTAL EJECUTADO
M3
181.83
123.99
E-133.420.000
DEMOLICION DE PAVIMENTO DE ASFALTO CON EQUIPO LIVIANO (COMPRESOR).
26
AREA PARCELA
24.10
34.30
0.15
M3
AREA PARCELA
3.80
1.50
0.15
M3
0.86
TOTAL EJECUTADO
M3
124.85
M2
680.00
M2
680.00
E-133.710.002
DEMOLICION A MANO DE PISO DE CERAMICA, BALDOSA, MOSAICO Y SIMILAR.
PISOS INTERIORES DE LA VIVIENDA
34.00
10.00
2.00
TOTAL EJECUTADO
27
E-141.02.S/C
DESMONTAJE DE CANAL GALVANIZADO DE AGUAS DE LLUVIA CON RECUPERACION DE LOS MATERIALES Y ALMACENAMIENTO.
CANALES EXISTENTES
34.00
2.00
TOTAL EJECUTADO
28
ML
68.00
ML
68.00
56.00
E-141.901.002
REMOCION A MANO O DESMONTAJE DE BAJANTES DE AGUA DE LLUVIA DE LAMINA GALVANIZADA.
BAJANTES EXISTENTES
7.00
8.00
ML
28.00
2.00
ML
56.00
ML
112.00
TOTAL EJECUTADO
CONTRATO N
COMPUTOS METRICOS
OBRA:
EMPRESA:
PARTIDA N
29
MEDIDAS
DESCRIPCION
ING. RESIDENTE/CONTRATISTA
FECHA:
LARGO
ANCHO
ELEMET
IGUALES
ALTO
FISCAL
UND
CANT.
TOTAL
ING. INSPECTOR
E-134.010.000
CARGA A MANO DEL MATERIAL, PROVENIENTE DE LAS DEMOLICIONES O PREPARACION DEL SITIO.
PUERTAS
45.78
0.05
1.20
M3
50.00
0.04
1.20
M3
2.40
IMPERMEABILIZACION Y MORTERO
343.40
0.05
1.20
M3
20.60
MIEMBROS HORIZONTALES
190.26
1.20
M3
228.31
33.35
1.20
M3
40.02
MIEMBROS VERTICALES
2.75
CERAMICA
183.36
0.01
1.20
M3
2.20
PAREDES
1127.20
0.19
1.20
M3
257.00
PAVIMENTO DE CONCRETO
181.83
1.20
M3
218.20
PAVIMENTO DE ASFALTO
124.85
1.20
M3
149.82
CERAMICA
680.00
0.01
1.20
M3
8.16
7.00
12.00
1.20
M3
316.51
M3
1,245.97
578.64
3.14
TOTAL EJECUTADO
ESTRUCTURAS
30
H-INOS 221.21
RELLENO COMPACTADO CON MATERIAL DE PRESTAMO. INCLUYE EL SUMINISTRO DE MATERIAL DEL SAQUE LAS CABRAS Y EL ROYALTY
CAPA VEGETAL
24.10
34.30
0.70
M3
CAPA VEGETAL
3.80
1.50
0.70
M3
3.99
M2
582.63
TOTAL EJECUTADO
31
E-311.110.150
EXCAVACION EN TIERRA A MANO PARA ASIENTO DE FUNDACIONES, ZANJAS U OTROS, HASTA PROFUNDIDADES COMPRENDIDAS ENTRE 0.00 Y 1.50 M.
FUNDACIONES F-1
1.50
1.50
1.25
8.00
M3
22.50
FUNDACIONES F-2
1.20
1.80
1.25
16.00
M3
43.20
RIOSTRA
33.80
0.30
0.45
4.00
M3
18.25
RIOSTRA
24.10
0.30
0.45
4.00
M3
13.01
BANCADAS
120.00
0.40
0.60
M3
28.80
ADUCCION A.B.
30.00
0.30
0.27
M3
2.43
CONEXIN A.N.
30.00
0.30
1.00
M3
9.00
10.00
10.00
0.36
M3
36.00
ATERRAMIENTO TABLEROS
0.80
0.80
1.87
M3
1.20
TUBERIAS 4"
110.53
0.30
0.40
M3
13.26
TUBERIAS 6"
82.36
0.30
0.50
TOTAL EJECUTADO
32
M3
12.35
M3
200.00
E-311.310.000
EXCAVACION EN TIERRAS CON USO DE EQUIPO DE RETROEXCAVADOR PARA ASIENTO DE FUNDACIONES, ZANJAS U OTROS.(INCLUYE PERFILAMIENTO A MANO)
CAPA VEGETAL
24.10
34.30
0.50
M3
CAPA VEGETAL
3.80
1.50
0.50
M3
2.85
34.30
10.10
1.00
M3
346.43
TANQUE
3.50
3.50
3.10
TOTAL EJECUTADO
33
413.32
M3
37.98
M3
800.58
161.90
E-313.110.000
CARGA A MANO DEL MATERIAL PROVENIENTE DE LAS EXCAVACIONES PARA ASIENTO DE FUNDACIONES, ZANJAS U OTROS.
34
137.20
1.18
M3
800.58
1.18
M3
944.68
TOTAL EJECUTADO
M3
1,106.58
E-317.000.000
COMPACTACION DE RELLENO CON USO DE APISONADORES DE PERCUSION, CORRESPONDIENTES A LOS ASIENTOS DE FUNDACIONES, ZANJAS U OTROS.
CAPA VEGETAL
24.10
34.30
0.70
M3
578.64
CAPA VEGETAL
3.80
1.50
0.70
M3
3.99
CONTRATO N
COMPUTOS METRICOS
OBRA:
EMPRESA:
PARTIDA N
FECHA:
MEDIDAS
DESCRIPCION
LARGO
ANCHO
ALTO
ELEMET
IGUALES
TOTAL EJECUTADO
ING. RESIDENTE/CONTRATISTA
FISCAL
ING. INSPECTOR
UND
M3
CANT.
TOTAL
582.63
CONTRATO N
COMPUTOS METRICOS
OBRA:
EMPRESA:
PARTIDA N
35
DESCRIPCION
FECHA:
MEDIDAS
LARGO
ANCHO
ALTO
ELEMET
IGUALES
UND
E-319.100.000
CONSTRUCCION DE BASE DE PIEDRA PICADA CORRESPONDIENTE A OBRAS PREPARATIVAS. INCLUYE EL SUMINISTRO Y TRANSPORTE DEL MATERIAL HASTA UNA
DISTANCIA DE 50 km.
BASE DE PAV
24.10
34.30
0.05
BASE DE PAV
3.80
1.50
0.05
M3
ZAPATA F-1
1.50
1.50
0.05
8.00
M3
ZAPATA F-2
1.20
1.80
0.05
16.00
M3
TANQUE (PISO)
3.50
3.50
0.05
RIOSTRA
33.80
0.30
0.05
4.00
M3
RIOSTRA
24.10
0.30
0.05
4.00
M3
M3
M3
TOTAL EJECUTADO
36
M3
E-323.000.125
CONCRETO DE Fc 250 Kgf/CM2 A LOS 28 DIAS ACABADO CORRIENTE, PARA LA CONSTRUCCION DE BASES Y ESCALONES. INCLUYE EL TRANSPORTE DEL CEMENTO Y
AGREGADOS HASTA 50 KM Y EXCLUYE EL REFUERZO METALICO Y EL ENCOFRADO.
ZAPATA F-1
1.50
1.50
0.30
8.00
M3
ZAPATA F-2
1.20
1.80
0.30
16.00
M3
TOTAL EJECUTADO
37
M3
E-324.000.125
CONCRETO DE Fc 250 Kgf/CM2 A LOS 28 DIAS ACABADO CORRIENTE, PARA LA CONSTRUCCION DE PEDESTALES. INCLUYE EL TRANSPORTE DEL CEMENTO Y
AGREGADOS HASTA 50 KM Y EXCLUYE EL REFUERZO METALICO Y EL ENCOFRADO.
PEDESTALES
0.90
0.50
0.50
24.00
TOTAL EJECUTADO
38
M3
M3
E-325.000.125
CONCRETO DE Fc 250 Kgf/CM2 A LOS 28 DIAS ACABADO CORRIENTE, PARA LA CONSTRUCCION DE VIGAS RIOSTRA, TIRANTES Y FUNDACIONES DE PARED. INCLUYE
EL TRANSPORTE DEL CEMENTO Y AGREGADOS HASTA 50 KM Y EXCLUYE EL REFUERZO METALICO Y EL ENCOFRADO.
RIOSTRA
33.80
0.30
0.40
4.00
M3
RIOSTRA
24.10
0.30
0.40
4.00
M3
TOTAL EJECUTADO
39
M3
E-328.000.121
CONCRETO DE FC= 210 Kgf/CM2 A LOS 28 DIAS, ACABADO CORRIENTE, PARA LA CONSTRUCCION DE BASE DE PAVIMENTO. INCLUYE TRANSPORTE DEL CEMENTO Y
AGREGADOS HASTA 50 KM. Y EXCLUYE EL REFUERZO METALICO Y EL ENCOFRADO.
BASE DE PAV
24.10
34.30
0.15
M3
BASE DE PAV
3.80
1.50
0.15
M3
2.00
1.05
0.15
M3
BANCADA
80.00
0.96
0.20
M3
1.95
1.45
0.15
M3
TOTAL EJECUTADO
40
M3
E-391.2S/C2
S/T/C DE CUBIERTA DE TECHO CON LAMINA TIPO LUMETEX O SIMILAR COLOR BLANCO LA CARA INTERNA.
TECHO
24.60
34.80
M2
TECHO
3.80
1.50
M2
DESCUENTO CLARABOYA
-20.28
7.67
M2
TOTAL EJECUTADO
41
M2
E-391.2.S/C.4
S/T/C DE CUBIERTA DE TECHO CON LAMINA DE POLICARBONATO E= 10 MM. INCLUYE ELEMENTOS DE SUJECIN.
CLARABOYA
21.78
9.17
LATERALES CLARABOYA
21.78
0.40
M2
2.00
TOTAL EJECUTADO
M2
M2
CONTRATO N
COMPUTOS METRICOS
OBRA:
EMPRESA:
PARTIDA N
42
MEDIDAS
DESCRIPCION
ING. RESIDENTE/CONTRATISTA
FECHA:
LARGO
ANCHO
ALTO
FISCAL
ELEMET
IGUALES
UND
ING. INSPECTOR
E-334.000.121
CONCRETO Fc 210 Kgf/CM2 , ACAB. CORRIENTE PARA LA CONSTRUCCION DE MACHONES Y VIGAS DECORONAS. INCLUYE TRANSPORTE DEL CEMENTO Y
AGREGADOS HASTA 50 KM. Y EXCLUYE EL REFUERZO METALICO Y EL ENCOFRADO.
MACHONES PARED PERIMETRAL (FRENTE)
4.00
0.15
0.20
6.00
M3
4.00
0.15
0.20
20.00
M3
4.00
0.15
0.20
6.00
M3
4.50
0.15
0.20
11.00
M3
13.46
0.15
0.20
M3
16.50
0.15
0.20
M3
12.53
0.15
0.20
M3
8.00
0.15
0.20
DINTEL DE PUERTA
1.20
0.15
0.20
M3
6.00
TOTAL EJECUTADO
43
M3
M3
E-339.000.125
CONCRETO DE FC 250 Kgf/CM2, A LOS 28 DIAS ACABADO CORRIENTE, PARA LA CONSTRUCCION DE MUROS Y PANTALLAS. EXCLUYE EL REFUERZO METALICO Y EL
ENCOFRADO.
TANQUE (PAREDES)
3.50
3.00
0.15
TANQUE (PISO)
3.50
3.50
0.15
M3
TANQUE (TAPA)
3.50
3.50
0.15
M3
TANQUE (TAPA)
-0.70
0.70
0.15
0.70
0.30
0.15
0.60
0.50
1.00
PEDESTAL SIAMESA
4.00
M3
4.00
TOTAL EJECUTADO
44
M3
M3
M3
E-341.010.110
ENCOFRADO DE MADERA, TIPO RECTO, ACABADO CORRIENTE, EN CABEZALES DE PILOTES, BASES Y ESCALONES, PEDESTALES, VIGA DE RIOSTRAS, TIRANTES,
FUNDACIONES DE PARED, VIGAS DE FUNDACION, LOSA DE FUNDACION Y BASES DE PAVIMENTOS.
ZAPATA F-1
1.50
0.30
32.00
M2
ZAPATA F-2
1.20
0.30
32.00
M2
ZAPATA F-2
1.80
0.30
32.00
M2
PEDESTALES
0.90
0.50
96.00
M2
RIOSTRA
33.80
0.30
8.00
M2
RIOSTRA
24.10
0.30
8.00
M2
BASE DE PAV
24.10
0.15
2.00
M2
BASE DE PAV
34.30
0.15
2.00
M2
BASE DE PAV
3.80
0.15
2.00
M2
BASE DE PAV
1.50
0.15
2.00
M2
4.00
0.15
6.80
0.15
M2
M2
TOTAL EJECUTADO
45
M2
E-342.010.114
ENCOFRADO DE MADERA, TIPO RECTO, ACABADO CORRIENTE, EN MACHONES, VIGAS DE CORONA, DINTELES Y ARRIOSTRAMIENTO DE PAREDES.
MACHONES PARED PERIMETRAL (FRENTE)
4.00
0.20
24.00
M2
4.00
0.20
80.00
M2
4.00
0.20
24.00
M2
4.50
0.20
44.00
M2
13.46
0.20
2.00
M2
16.50
0.20
2.00
M2
12.53
0.20
2.00
M2
8.00
0.20
2.00
M2
DINTEL DE PUERTA
1.20
0.20
12.00
M2
TOTAL EJECUTADO
M2
CONTRATO N
COMPUTOS METRICOS
OBRA:
EMPRESA:
PARTIDA N
46
MEDIDAS
DESCRIPCION
ING. RESIDENTE/CONTRATISTA
FECHA:
LARGO
ANCHO
ALTO
FISCAL
ELEMET
IGUALES
UND
ING. INSPECTOR
E-342.010.119
ENCOFRADO DE MADERA, TIPO RECTO, ACABADO CORRIENTE, EN MUROS Y PANTALLAS.
TANQUE (PAREDES)
TANQUE TAPA
3.50
3.00
3.50
3.50
TANQUE (TAPA)
-0.70
0.70
TANQUE (TAPA)
3.50
0.15
4.00
M2
0.85
0.30
8.00
M2
1.00
0.60
1.00
0.50
8.00
M2
M2
M2
2.00
TOTAL EJECUTADO
47
M2
M2
M2
E-351.110.210
SUMINISTRO, TRANSPORTE, PREPARACION Y COLOCACION DE ACERO DE REFUERZO FY= 4200 Kgf/CM2, UTILIZANDO CABILLA MENOR DEL N 3 PARA
INFRAESTRUCTURA.INCLUYE TRANS. MATERIALES HASTA 50 KM.
ESTRIBOS PEDESTAL
1.70
0.559
216.00
KG
ESTRIBOS V.R.
1.10
0.559
1168.00
KG
1.45
0.559
14.00
KG
11.00
0.559
1.95
TOTAL EJECUTADO
48
KG
KG
E-351.120.210
SUMINISTRO, TRANSPORTE, PREPARACION Y COLOCACION DE ACERO DE REFUERZO FY= 4200 Kgf/CM2, UTILIZANDO CABILLAS N 4 A N 7, PARA
INFRAESTRUCTURA. (1/2 A 7/8). INCLUYE TRANS. MATERIALES HASTA 50 KM
ZAPATAS F-1
1.60
1.554
176.00
KG
ZAPATAS F-2
1.90
1.554
208.00
KG
ZAPATAS F-3
1.30
1.554
144.00
KG
PEDESTAL
1.45
1.554
192.00
KG
V.R.
35.30
1.554
16.00
KG
V.R.
25.10
1.554
16.00
KG
TANQUE (REPARTICION)
15.60
1.554
30.00
M3
8.70
1.554
72.00
KG
TANQUE (TAPA)
4.40
1.554
72.00
KG
2.10
1.554
70.00
TOTAL EJECUTADO
49
KG
KG
E-351.200.250
SUMINISTRO, TRANSPORTE, PREPARACION Y COLOCACIN DE MALLA SOLDADA DE ACERO, TIPO TRUCKSON. PARA INFRAESTRUCTURAS. INCLUYE TRANS.
MATERIAL HASTA 50 KM.
PISO (PESO MALLA 1.996 KG/M2)
24.10
34.30
1.996
KG
3.80
1.50
1.996
KG
BANCADA
80.00
0.96
1.996
KG
TOTAL EJECUTADO
50
KG
E-352.110.210
SUMINISTRO, TRANSPORTE, PREPARACION Y COLOCACION DE ACERO DE REFUERZO FY 4200 Kgf/CM2, UTILIZANDO CABILLAS DE DIAMETRO INFERIOR AL N 3 PARA
SUPERESTRUCTURA. INCLUYE TRANS. MATERIALES HASTA 50 KM.
ESTRIBOS MACHONES Y V.CORONA
51
0.60
0.559
1210.00
KG
TOTAL EJECUTADO
KG
E-352.120.210
SUMINISTRO, TRANSPORTE, PREPARACION Y COLOCACION DE ACERO DE REFUERZO FY 4200 kgf/cm2, UTILIZANDO CABILLAS DE DIAMETRO DE 1/2" A 7/8" PARA
SUPERESTRUCTURA. INCLUYE TRANS. MATERIALES HASTA 50 KM.
MACHONES PARED PERIMETRAL (FRENTE)
5.00
1.554
24.00
KG
5.00
1.554
80.00
KG
5.00
1.554
24.00
KG
5.50
1.554
44.00
KG
16.46
1.554
4.00
KG
18.50
1.554
4.00
KG
14.53
1.554
4.00
KG
10.00
1.554
4.00
KG
DINTEL DE PUERTA
1.60
1.554
24.00
KG
CONTRATO N
COMPUTOS METRICOS
OBRA:
EMPRESA:
PARTIDA N
FECHA:
MEDIDAS
DESCRIPCION
LARGO
ANCHO
ELEMET
IGUALES
ALTO
TOTAL EJECUTADO
ING. RESIDENTE/CONTRATISTA
52
FISCAL
UND
KG
ING. INSPECTOR
E-361.124.S/C.3
S/T/C DE ANCLAJES COMPUESTOS POR LAMINAS METALICAS E= 16 MM Y PERNOS 5/8" X 0.75 MTS DE LONGITUD CON TUERCAS (40.00 CMS X 40.00 CMS)
53
24.00
PZA
TOTAL EJECUTADO
PZA
E-362.330.S/C
SUMINISTRO, CONFECCION Y COLOCACION DE TUBOS ESTRUCTURALES CONDUVEN EN CORREAS. INCLUYE GRUA Y EL TRANSPORTE DE LOS ELEMENTOS HASTA
50 KM.
54
6.56
8.89
30.00
KG
7.58
8.89
10.00
KG
1.20
8.89
4.00
KG
2.51
8.89
4.00
KG
3.79
8.89
4.00
KG
5.07
8.89
4.00
KG
6.35
8.89
4.00
KG
5.55
8.89
4.00
KG
4.43
8.89
4.00
KG
3.30
8.89
4.00
KG
2.17
8.89
4.00
KG
1.05
8.89
4.00
KG
TOTAL EJECUTADO
KG
E-362.110.500
SSUMINISTRO, CONFECCION Y COLOCACION EN ESTRUCTURA METALICA DE COLUMNAS SIMPLES CON PERFIL FORMADO EN FRIO (CONDUVEN). INCLUYE GRUA Y EL
TRANSPORTE DE LOS ELEMENTOS HASTA 50 KM.
55
52.36
4.00
12.00
KG
52.36
5.70
12.00
KG
52.36
0.60
12.00
KG
TOTAL EJECUTADO
KG
E-362.120.300
SUMINISTRO, CONFECCION Y COLOCACION EN ESTRUCTURA METALICA DE VIGAS CONDUVEN. INCLUYE GRUA Y EL TRANSPORTE DE LOS ELEMENTOS HASTA 50 KM.
VIGAS 2-AB, 2-CD, 3-AB, 3-BC, 4-AB, 4-BC, 5-AB, 5-BC (ECO 220X90 PESO=
20.72 KG/M)
7.47
20.72
8.00
KG
VIGAS B-56, C-56, B-45, C-45, B-34, C-34, B-23, C-23, B-12, C-12 (ECO 220X90
PESO= 20.72 KG/M)
6.56
20.72
10.00
KG
0.50
20.72
32.00
KG
10.03
28.46
4.00
KG
0.50
28.46
8.00
KG
6.56
14.45
16.00
KG
7.47
14.45
8.00
KG
7.47
14.45
2.00
KG
6.56
20.72
6.00
KG
1.50
20.72
4.00
KG
TOTAL EJECUTADO
KG
VIGAS 6A-5B, 6D-5C, 1A-2B, 1D-2C (ECO 260X90 PESO= 28.46 KG/M)
56
E-361.615.S/C
S/T/C DE ANCLAJES COMPUESTOS POR LAMINAS METALICAS E= 5 MM Y CABILLA DE 3/8" DE (15,00 CMS X 15,00 CMS)
57
E-JUNTA WATER
S/T/C DE JUNTA WATER STOP
PAREDES DE TANQUE
3.50
20.00
PZA
TOTAL EJECUTADO
PZA
8.00
TOTAL EJECUTADO
ML
CONTRATO N
COMPUTOS METRICOS
OBRA:
EMPRESA:
PARTIDA N
ING. RESIDENTE/CONTRATISTA
FECHA:
MEDIDAS
DESCRIPCION
LARGO
FISCAL
ANCHO
ALTO
ELEMET
IGUALES
ING. INSPECTOR
UND
CONTRATO N
A ECONOMIA INFORMAL.
CANT.
TOTAL
5.40
10.37
15.77
856.08
5.70
-155.55
706.23
199.72
17.42
217.14
CONTRATO N
A ECONOMIA INFORMAL.
CANT.
TOTAL
ING. INSPECTOR
RRIOSTRAMIENTO DE PAREDES.
19.20
64.00
19.20
39.60
5.38
6.60
5.01
3.20
2.88
165.07
CONTRATO N
A ECONOMIA INFORMAL.
CANT.
TOTAL
ING. INSPECTOR
84.00
12.25
-0.49
2.10
2.04
0.60
1.00
101.50
DO CABILLAS N 4 A N 7, PARA
437.61
614.14
290.91
432.63
877.70
624.09
727.27
973.43
492.31
228.44
5,698.53
CONTRATO N
A ECONOMIA INFORMAL.
CANT.
TOTAL
1,800.10
ING. INSPECTOR
S)
20.00
20.00
28.00
28.00
CONTRATO N
A ECONOMIA INFORMAL.
CANT.
TOTAL
ING. INSPECTOR
CONTRATO N
COMPUTOS METRICOS
OBRA:
EMPRESA:
PARTIDA N
DESCRIPCION
FECHA:
MEDIDAS
LARGO
ANCHO
ALTO
ELEMET
IGUALES
UND
CANT.
TOTAL
ARQUITECTURA
58
E-411.042.015
CONSTRUCCION DE PAREDES DE BLOQUE DE CONCRETO, ACABADO OBRA LIMPIA POR UNA CARA, E=15 CM. NO INCLUYE MACHONES, DINTELES, BROCALES.
INCLUYE TRANSPORTE DE LOS MATERIALES HASTA 50 KM.
PERIMETRAL
24.10
4.00
M2
96.40
PERIMETRAL
25.60
4.00
M2
102.40
PERIMETRAL
34.30
4.00
M2
274.40
PERIMETRAL
1.50
4.00
PERIMETRAL
-1.20
2.10
PERIMETRAL (DCTO.)
-5.00
2.80
PERIMETRAL (DCTO.)
-4.00
2.80
BAO
9.00
BAO
2.00
M2
6.00
M2
-5.04
M2
-14.00
M2
-22.40
4.70
M2
42.30
3.60
4.70
M2
16.92
BAO
2.50
4.70
M2
23.50
-2.00
2.10
M2
-4.20
4.25
2.70
M2
11.48
2.20
4.70
M2
20.68
-0.80
2.10
M2
-1.68
-1.20
2.10
M2
-2.52
CUARTO DE CAVAS
13.20
4.00
M2
52.80
CUARTO DE CAVAS
3.35
4.70
M2
15.75
CUARTO DE CAVAS
-1.20
2.10
M2
-2.52
M2
610.27
2.00
2.00
2.00
2.00
TOTAL EJECUTADO
59
E-412.202.003
CONSTRUCCION DE REVESTIMIENTO INTERIOR EN PAREDES, CON MORTERO A BASE DE CAL, ACABADO LISO. INCLUYE FRISO BASE DE 0 A 3 NIVELES.
60
PERIMETRAL
24.10
4.00
-1.20
2.10
M2
-5.00
2.80
-4.00
2.80
PERIMETRAL TRASERA
22.00
4.00
M2
88.00
27.23
4.00
M2
108.92
1.50
4.00
M2
6.00
7.07
4.70
2.00
M2
66.46
2.05
4.70
4.00
M2
38.54
-0.90
2.10
4.00
M2
-7.56
34.30
4.00
M2
137.20
BAO (FRENTE)
3.21
4.70
2.00
M2
30.17
BAO
3.21
2.20
4.00
M2
28.25
BAO
3.53
2.20
4.00
M2
31.06
BAO
2.20
2.20
4.00
M2
19.36
BAO
2.20
4.70
1.00
M2
10.34
CUARTO DE CAVAS
13.12
4.70
2.00
M2
123.33
CUARTO DE CAVAS
3.35
4.70
2.00
M2
31.49
CUARTO DE CAVAS
-1.20
2.10
2.00
M2
-5.04
TOTAL EJECUTADO
M2
761.48
2.00
2.00
96.40
M2
-5.04
M2
-14.00
M2
-22.40
E-412.202.001
CONSTRUCCION DE REVESTIMIENTO EXTERIOR EN PAREDES CON MORTERO A BASE DE CAL, ACABADO RUSTICO. INCLUYE FRISO BASE DE 0 A 3 NIVELES CON
ALTURA SUPERIOR A 3 MTS.
61
PERIMETRAL
24.10
4.00
PERIMETRAL
-1.20
2.10
PERIMETRAL
-5.00
2.80
PERIMETRAL
-4.00
2.80
PERIMETRAL TRASERA
24.10
1.20
PERIMETRAL LATERAL
34.30
1.20
M2
2.00
2.00
96.40
M2
-5.04
M2
-14.00
M2
-22.40
M2
28.92
2.00
M2
82.32
TOTAL EJECUTADO
M2
166.20
M2
42.00
M2
12.25
M2
54.25
E-412.103.003
CONSTRUCCION DE REVESTIMIENTO INTERIOR EN PAREDES, CON MORTERO HIDROFUGO, ACABADO LISO. INCLUYE FRISO BASE.
TANQUE (PAREDES)
3.50
3.00
TANQUE PISO
3.50
3.50
4.00
TOTAL EJECUTADO
CONTRATO N
COMPUTOS METRICOS
OBRA:
EMPRESA:
PARTIDA N
MEDIDAS
DESCRIPCION
ING. RESIDENTE/CONTRATISTA
62
FECHA:
LARGO
ANCHO
FISCAL
ALTO
ELEMET
IGUALES
UND
CANT.
TOTAL
ING. INSPECTOR
E-412.111.006
CONSTRUCCION DE REVESTIMIENTO INTERIOR EN PAREDES CON BALDOSA DE CERAMICAS NACIONAL, ACABADO NATURAL. INCLUYE FRISO BASE.
63
BAOS
3.60
2.50
2.00
M2
18.00
BAOS
2.80
2.50
2.00
M2
14.00
BAOS
2.50
2.50
1.00
M2
6.25
BAOS
9.00
2.50
1.00
M2
22.50
BAOS
3.25
2.50
2.00
M2
16.25
AREAS DE SERVICIO
3.60
2.50
2.00
M2
18.00
TOTAL EJECUTADO
M2
95.00
E-415.S/C
SUMINISTRO, TRANSPORTE E INSTALACION DE TOPE DE GRANITO NATURAL O SIMILAR, ACABADO PULIDO, SIN JUNTAS. INCLUYE MORTERO BASE.
BAOS
64
1.80
2.00
ML
3.60
TOTAL EJECUTADO
ML
3.60
E-X-EMBONADO
EMBONADO DE VIGAS Y COLUMNAS METALICAS INCLUYE EL EMPLEO DE MALLA GALLINERO.
65
COLUMNAS CENTRALES
2.00
1.20
6.00
M2
14.40
EMBONADO DE BAJANTES
1.00
6.00
2.00
M2
12.00
TOTAL EJECUTADO
M2
26.40
E-414.094.050
CONSTRUCCION DE REVESTIMIENTO INTERIOR EN PISOS CON CERAMICAS NACIONAL, ACABADO NATURAL. INCLUYE FRISO BASE.TRANS. MATERIAL HASTA 50 KM.
BAOS
9.00
3.60
TOTAL EJECUTADO
66
M2
32.40
M2
32.40
826.63
E-SIKAFLOOR 3 QUARTZ
SUMINISTRO, TRANSPORTE Y APLICACION DE ADITIVO SIKAFLOOR QUARTZ.
AREA TOTAL PISO
24.10
34.30
M2
3.80
1.50
M2
5.70
-9.00
3.60
M2
-32.40
M2
799.93
826.63
DCTO BAOS
TOTAL EJECUTADO
67
E-SIKACURE
SUMINISTRO, TRANSPORTE Y APLICACION DE ADITIVO SIKACURE.
AREA TOTAL PISO
24.10
34.30
M2
3.80
1.50
M2
5.70
-9.00
3.60
M2
-32.40
M2
799.93
DCTO BAOS
TOTAL EJECUTADO
68
E-437.011.S/C.01
SUMINISTRO, TRANSPORTE Y COLOCACION DE PUERTAS DE SEGURIDAD BATIENTES DE LAMINA ENTAMBORADAS DE HIERRO Y VISOR 40x13 CM. INCLUYE ACRILICO
TRANSPARENTE CON PAO FIJO Y TRANS. MATERIALES HASTA 50 KM.
ACCESOS
69
1.20
2.00
M2
5.04
TOTAL EJECUTADO
2.10
M2
5.04
2.00
PZA
2.00
TOTAL EJECUTADO
PZA
2.00
E-474.522.S/C
SUMINISTRO E INSTALACION DE CERRADURA PARA PUERTA DE SEGURIDAD (MULTILOCK).
ACCESOS
70
E-437.011.S/C.02
SUMINISTRO, TRANSPORTE Y COLOCACION DE PUERTAS BATIENTES DE LAMINA ENTAMBORADA DE HIERRO Y VISOR LATERAL DE 1.45x22 CM, INCLUYE VIDRIO
CON PAO FIJO Y TRANS. MATERIALES HASTA 50 KM.
BAOS
0.90
2.00
M2
3.78
TOTAL EJECUTADO
2.10
M2
3.78
CONTRATO N
COMPUTOS METRICOS
OBRA:
EMPRESA:
PARTIDA N
ONTRATISTA
MEDIDAS
DESCRIPCION
ING. RESIDENTE/CONTRATISTA
E-437.011.S/C
FISCAL
FECHA:
LARGO
ANCHO
ALTO
FISCAL
ELEMET
IGUALES
UND
CANT.
TOTAL
ING. INSPECTOR
ING. INSPECTOR
S/T/C DE PUERTAS ENTAMBORADAS DE HIERRO Y ROMANILLA, INCLUYE TRANSPORTE DE MATERIAL HASTA 50 KM.
CUARTO DE BOMBA
0.90
2.10
M2
1.89
CUARTO DE BASURA
1.20
2.10
M2
2.52
M2
4.41
TOTAL EJECUTADO
72
E-437.015.S/C
SUMINISTRO, TRANSPORTE Y COLOCACION DE PUERTA METALICA ARROLLABLE MICROPERFORADO.
73
4.00
2.80
2.00
M2
22.40
5.00
2.80
1.00
M2
14.00
TOTAL EJECUTADO
M2
36.40
E-437.037.S/C
SUMINISTRO, TRANSPORTE Y COLOCACION DE TABIQUES METALICOS DE LAMINA SENCILLA. MEDIDO SEGUN AREA EFECTIVA DEL TABIQUE. INCLUYE PUERTAS Y
TRANS. MATERIALES HASTA 50 KM.
74
2.50
2.00
2.00
M2
10.00
1.18
2.00
4.00
M2
9.44
0.90
2.00
2.00
M2
3.60
TOTAL EJECUTADO
M2
23.04
M2
2.52
M2
2.52
E-437-1-S/C4
S/T/C DE PUERTA CON PANEL PREFABRICADO INYECTADO EN POLIURETANO (DENS=40 KG/M3), CON CARAS EN FIBRA.
CAVAS
1.20
2.10
TOTAL EJECUTADO
75
E-473.632.253
CERRADURA DE EMBUTIR, ACABADO DE ACERO NIQUELADO, CILINDRO MOVIL, CERROJO SIMPLE, PESTILLO SIMPLE. AMBOS LADOS CON LLAVE. DISTANCIA DEL
CILINDRO AL BORDE 35 MM. (MOD: YALE 52111 35 MM)
76
7.00
PZA
7.00
TOTAL EJECUTADO
PZA
7.00
E-437.028.S/C
SUMINISTRO, TRANSPORTE Y COLOCACION DE VENTANAS DE ROMANILLA PARA INCLUYE MARCO DE TUBO DE 2x1. INCLUYE TRANS. MATERIALES HASTA 50 KM.
77
0.30
0.70
8.00
M2
1.68
0.30
0.75
2.00
M2
0.45
0.30
0.70
2.00
M2
0.42
0.30
0.90
2.00
M2
0.54
0.30
0.20
2.00
M2
0.12
0.50
0.70
12.00
M2
4.20
1.00
0.70
2.00
M2
1.40
TOTAL EJECUTADO
M2
8.81
E-437.024.S/C
SUMINISTRO, TRANSPORTE Y COLOCACION DE VENTANAS EN LAMINA METALICA PERFORADA. INCLUYE TRANS. MATERIALES HASTA 50 KM.
78
1.20
0.70
4.00
M2
3.36
1.20
0.90
2.00
M2
2.16
1.20
0.60
2.00
M2
1.44
2.74
0.70
4.00
M2
7.67
2.60
0.70
8.00
M2
14.56
TOTAL EJECUTADO
M2
29.19
E-PANTALLA
SUMINISTRO, TRANSPORTE, CONFECCION Y COLOCACION DE PANTALLA ELABORADA CON LAMINA METALICA. INCLUYE TRANSPORTE DE LOS MATERIALES HASTA
50 KM.
25.00
0.90
TOTAL EJECUTADO
79
M2
22.50
M2
22.50
E-394.022.062
SUMINISTRO, TRANSPORTE Y COLOCACION DE CANAL DE AGUAS DE LLUVIAS CON LAMINA GALVANIZADA, CAL. 22; CON 62 CM. DE DESARROLLO. INCLUYE TRANS.
HASTA 50 KM.
LATERALES
32.40
2.00
ML
64.80
FRENTE Y POSTERIOR
24.10
2.00
ML
48.20
CONTRATO N
COMPUTOS METRICOS
OBRA:
EMPRESA:
PARTIDA N
MEDIDAS
DESCRIPCION
ING. RESIDENTE/CONTRATISTA
80
FECHA:
LARGO
ANCHO
ELEMET
IGUALES
UND
CANT.
TOTAL
TOTAL EJECUTADO
ML
113.00
ALTO
FISCAL
ING. INSPECTOR
E-437.071.015
MARCO DE HIERRO, CAL. 18 PARA PARED, E= 15 CMS CON BISAGRA 3". INCLUYE TRANS. MATERIALES HASTA 50 KM.
81
5.40
4.00
M2
21.60
5.10
3.00
M2
15.30
TOTAL EJECUTADO
M2
36.90
E-362.000.S/C.01
S/T/P/C DE ANGULOS METALICOS DE 50 X 5 MM.
82
ANGULO EN COLUMNAS
4.00
3.77
64.00
KG
965.12
ANGULO EN VIGAS
24.00
3.77
2.00
KG
180.96
ANGULO EN VIGAS
34.00
3.77
2.00
KG
256.36
TOTAL EJECUTADO
KG
1,402.44
E-437.057.S/C3
S/T/C DE TUBO DE HIERRO DE 2 x 1 1/2". INCLUYE FONDO ANTICORROSIVO.
83
PERFIL 2 X 1 1/2"
21.78
4.00
ML
87.12
PERFIL 2 X 1 1/2"
9.17
4.00
ML
36.68
PERFIL 2 X 1 1/2"
0.60
4.00
ML
2.40
TOTAL EJECUTADO
ML
126.20
E-665.150.020
SUMINISTRO, TRANSPORTE Y COLOCACION DE ESPEJO PARA BAO. INCLUYE TRANS. MATERIAL HASTA 50 KM.
84
2.00
PZA
2.00
TOTAL EJECUTADO
PZA
2.00
E-412.119.007
RODAPIE DE VINYL.
PERIMETRAL
34.30
2.00
ML
68.60
PERIMETRAL
24.10
2.00
ML
48.20
3.21
3.00
ML
9.63
CTO CAVAS
13.12
2.00
ML
26.24
CTO CAVAS
3.35
2.00
ML
6.70
CTO BOMBAS
7.07
2.00
ML
14.14
CTO BOMBAS
2.05
BAO
85
4.00
ML
8.20
TOTAL EJECUTADO
ML
181.71
E-461.000.101
ESMALTE EN COLUMNAS METALICAS. INCLUYE TRANS. MATERIAL HASTA 50 KM.
86
4.00
0.80
12.00
M2
38.40
5.70
0.80
12.00
M2
54.72
0.60
0.80
12.00
M2
5.76
TOTAL EJECUTADO
M2
98.88
E-461.000.101
ESMALTE EN VIGAS METALICAS DE ALMA LLENA. INCLUYE TRANS. MATERIAL HASTA 50 KM.
VIGAS 2-AB, 2-CD, 3-AB, 3-BC, 4-AB, 4-BC, 5-AB, 5-BC (ECO 220X90)
7.47
0.62
8.00
M2
37.05
VIGAS B-56, C-56, B-45, C-45, B-34, C-34, B-23, C-23, B-12, C-12 (ECO
220X90)
6.56
0.62
10.00
M2
40.67
0.50
0.62
32.00
M2
9.92
10.03
0.70
4.00
M2
28.08
0.50
0.70
8.00
M2
2.80
6.56
0.50
16.00
M2
52.48
4.47
0.50
8.00
M2
17.88
7.47
0.50
2.00
M2
7.47
CONTRATO N
COMPUTOS METRICOS
OBRA:
EMPRESA:
PARTIDA N
FECHA:
MEDIDAS
DESCRIPCION
LARGO
ALTO
ELEMET
IGUALES
UND
CANT.
TOTAL
24.40
6.56
0.62
6.00
M2
6.56
0.40
30.00
M2
78.72
VAN
299.47
ING. RESIDENTE/CONTRATISTA
FISCAL
ING. INSPECTOR
VIENEN
299.47
7.58
0.40
10.00
M2
30.32
1.20
0.40
4.00
M2
1.92
2.51
0.40
4.00
M2
4.02
3.79
0.40
4.00
M2
6.06
5.07
0.40
4.00
M2
8.11
6.35
0.40
4.00
M2
10.16
5.55
0.40
4.00
M2
8.88
4.43
0.40
4.00
M2
7.09
3.30
0.40
4.00
M2
5.28
2.17
0.40
4.00
M2
3.47
1.05
0.40
4.00
M2
1.68
8.87
0.16
12.00
M2
17.03
20.28
0.24
2.00
M2
9.73
TOTAL EJECUTADO
M2
413.22
ANCHO
E-461.000.701
ESMALTE EN PUERTA METALICA. INCLUYE TRANS. MATERIAL HASTA 50 KM.
88
1.20
2.10
6.00
M2
15.12
1.25
2.10
2.00
M2
5.25
0.80
2.10
2.00
M2
3.36
0.90
2.10
4.00
M2
7.56
TOTAL EJECUTADO
M2
31.29
5.40
3.00
ML
16.20
5.45
1.00
ML
5.45
5.00
1.00
ML
5.00
5.10
2.00
ML
10.20
21.78
4.00
ML
87.12
9.17
4.00
ML
36.68
0.60
4.00
ML
2.40
TOTAL EJECUTADO
ML
163.05
E-461.000.801
ESMALTE EN MARCOS METALICOS . INCLUYE TRANS. MATERIAL HASTA 50 KM.
89
E-461.000.601
ESMALTE EN TABIQUES METALICOS. INCLUYE TRANS. MATERIAL HASTA 50 KM.
90
2.60
2.00
4.00
M2
20.80
1.18
2.00
8.00
M2
18.88
0.90
2.00
4.00
M2
7.20
TOTAL EJECUTADO
M2
46.88
E-461.000.701
ESMALTE EN VENTANAS DE LAMINAS METALICAS. INCLUYE TRANS. MATERIAL HASTA 50 KM.
0.30
0.70
16.00
M2
3.36
0.30
0.75
4.00
M2
0.90
0.30
0.70
4.00
M2
0.84
0.30
0.90
4.00
M2
1.08
0.30
0.20
4.00
M2
0.24
0.50
0.70
24.00
M2
8.40
1.00
0.70
4.00
M2
2.80
1.20
0.70
8.00
M2
6.72
1.20
0.90
4.00
M2
4.32
1.20
0.60
4.00
M2
2.88
2.74
0.70
8.00
M2
15.34
0.70
16.00
M2
29.12
TOTAL EJECUTADO
M2
76.00
2.60
CONTRATO N
COMPUTOS METRICOS
OBRA:
EMPRESA:
PARTIDA N
91
FECHA:
MEDIDAS
DESCRIPCION
LARGO
ALTO
ELEMET
IGUALES
UND
CANT.
TOTAL
0.95
2.00
M2
47.50
TOTAL EJECUTADO
M2
47.50
M2
96.40
ANCHO
E-461.S/C
ESMALTE EN LAMINAS METALICAS (TIPO 1 MARCA MONTANA O SHERWIN WILLIAMS)
25.00
ING. RESIDENTE/CONTRATISTA
92
FISCAL
ING. INSPECTOR
E-461.100.S/C
HIDROESMALTE EN PAREDES INTERIORES. INCLUYENDO FONDO ANTIALCALINO. TRANS. MATERIAL HASTA 50 KM.
93
PERIMETRAL
24.10
4.00
-1.20
2.10
-5.00
2.80
-4.00
2.80
PERIMETRAL TRASERA
22.00
4.00
M2
88.00
27.23
4.00
M2
108.92
1.50
4.00
M2
6.00
7.07
4.70
2.00
M2
66.46
2.05
4.70
4.00
M2
38.54
-0.90
2.10
4.00
M2
-7.56
34.30
4.00
M2
137.20
BAO (FRENTE)
3.21
4.70
2.00
M2
30.17
BAO
3.21
2.20
4.00
M2
28.25
BAO
3.53
2.20
4.00
M2
31.06
BAO
2.20
2.20
4.00
M2
19.36
BAO
2.20
4.70
1.00
M2
10.34
CUARTO DE CAVAS
13.12
4.70
2.00
M2
123.33
CUARTO DE CAVAS
3.35
4.70
2.00
M2
31.49
CUARTO DE CAVAS
-1.20
2.10
2.00
M2
-5.04
TOTAL EJECUTADO
M2
761.48
2.00
2.00
M2
-5.04
M2
-14.00
M2
-22.40
E-461.200.S/C
HIDROESMALTE EN PAREDES EXTERIORES. INCLUYENDO FONDO ANTIALCALINO. TRANS. MATERIAL HASTA 50 KM.
94
PERIMETRAL
24.10
4.00
1.00
M2
96.40
PERIMETRAL
25.60
1.20
1.00
M2
30.72
PERIMETRAL
34.30
1.20
2.00
M2
82.32
PERIMETRAL
1.50
4.00
1.00
M2
6.00
PERIMETRAL
-5.00
2.20
1.00
M2
-11.00
PERIMETRAL
-4.00
2.20
2.00
M2
-17.60
TOTAL EJECUTADO
M2
186.84
M2
96.40
E-46.S/C-EP
ENCAMISADO (MACILLADO) Y LIJADO DE PAREDES, ALTURA MAXIMA 5 MTS.
PERIMETRAL
24.10
4.00
-1.20
2.10
-5.00
2.80
-4.00
2.80
PERIMETRAL TRASERA
22.00
4.00
M2
88.00
27.23
4.00
M2
108.92
1.50
4.00
M2
6.00
7.07
4.70
2.00
M2
66.46
2.05
4.70
4.00
M2
38.54
-0.90
2.10
4.00
M2
-7.56
34.30
4.00
M2
137.20
BAO (FRENTE)
3.21
4.70
2.00
M2
30.17
BAO
3.21
2.20
4.00
M2
28.25
BAO
3.53
2.20
4.00
M2
31.06
BAO
2.20
2.20
4.00
M2
19.36
BAO
2.20
4.70
1.00
M2
10.34
CUARTO DE CAVAS
13.12
4.70
2.00
M2
123.33
CUARTO DE CAVAS
3.35
4.70
2.00
M2
31.49
2.00
2.00
M2
-5.04
M2
-14.00
M2
-22.40
CONTRATO N
COMPUTOS METRICOS
OBRA:
EMPRESA:
PARTIDA N
MEDIDAS
DESCRIPCION
LARGO
ANCHO
ALTO
ELEMET
IGUALES
UND
CANT.
TOTAL
CUARTO DE CAVAS
-1.20
2.10
2.00
M2
-5.04
PERIMETRAL EXT
24.10
4.00
1.00
M2
96.40
PERIMETRAL EXT
25.60
1.20
1.00
M2
30.72
PERIMETRAL EXT
34.30
1.20
2.00
M2
82.32
PERIMETRAL EXT
1.50
4.00
1.00
M2
6.00
PERIMETRAL EXT
-5.00
2.20
1.00
M2
-11.00
PERIMETRAL EXT
-4.00
2.20
2.00
M2
-17.60
TOTAL EJECUTADO
M2
948.32
ING. RESIDENTE/CONTRATISTA
95
FECHA:
FISCAL
ING. INSPECTOR
E-463.100.513
CAUCHO CLORADO EN PAREDES. INCLUYE TRANS. MATERIAL HASTA 50 KM.
TANQUE (PAREDES)
3.50
3.00
4.00
M2
42.00
3.50
3.50
2.00
M2
24.50
TANQUE (TAPA)
-0.70
0.70
TOTAL EJECUTADO
96
M2
-0.49
M2
66.01
E-411.051.S/C
CONSTRUCCION DE PAREDES DE BLOQUE DE VENTILACION DE CONCRETO, ACABADO CORRIENTE, E=15 CM NO INCLUYE MACHONES, DINTELES Y BROCALES.
DEPOSITO BASURA+CUARTO DE BOMBA
4.25
2.00
M2
8.50
2.20
2.00
M2
4.40
CUARTO DE CAVAS
13.20
0.70
M2
9.24
22.14
CONTRATO N
COMPUTOS METRICOS
OBRA:
EMPRESA:
PARTIDA N
ING. RESIDENTE/CONTRATISTA
FECHA:
MEDIDAS
DESCRIPCION
LARGO
FISCAL
ANCHO
ALTO
ELEMET
IGUALES
ING. INSPECTOR
UND
CANT.
TOTAL
CONTRATO N
COMPUTOS METRICOS
OBRA:
EMPRESA:
PARTIDA N
DESCRIPCION
FECHA:
MEDIDAS
LARGO
ANCHO
ALTO
ELEMET
IGUALES
UND
CANT.
TOTAL
ELECTRICIDAD
97
E-512.211.051
I.E. TUBERIA DE HIERRO GALVANIZADO, SIN ROSCA TIPO EMT, EMBUTIDA, DIAMETRO 2" (51mm). INCLUYE TRANS. MATERIAL HASTA 50 KM.
CIRCUITOS DE ILUMINACION
25.00
TOTAL EJECUTADO
98
ML
25.00
ML
25.00
E-512.211.019
I.E. TUBERIA DE HIERRO GALVANIZADO, SIN ROSCA, TIPO EMT, EMBUTIDA. D= 3/4" (19 MM). INCLUYE TRANS. MATERIAL HASTA 50 KM.
CIRCUITOS DE ILUMINICION Y TOMACORRIENTES
600.00
TOTAL EJECUTADO
99
ML
600.00
ML
600.00
E-512.211.076
I.E. TUBERIA DE HIERRO GALVANIZADO, SIN ROSCA, TIPO EMT, EMBUTIDA. D= 3 " (76 MM). INCLUYE TRANS. MATERIAL HASTA 50 KM.
ACOMETIDA PRINCIPAL
15.00
ML
15.00
TABLEROS
10.00
ML
10.00
ML
25.00
TOTAL EJECUTADO
100
E-512.211.038
I.E. TUBERIA DE HIERRO GALVANIZADO, SIN ROSCA, TIPO EMT, EMBUTIDA. D= 1 1/2" (38 MM). INCLUYE TRANS. MATERIAL HASTA 50 KM.
CIRCUITOS DE ILUMINICION Y TOMACORRIENTES
100.00
TOTAL EJECUTADO
101
ML
100.00
ML
100.00
E-512.211.025
I.E. TUBERIA DE HIERRO GALVANIZADO, SIN ROSCA, TIPO EMT, EMBUTIDA. D= 1" (25 MM). INCLUYE TRANS. MATERIAL HASTA 50 KM.
CIRCUITOS DE ILUMINICION Y TOMACORRIENTES
170.00
TOTAL EJECUTADO
102
ML
170.00
ML
170.00
E-512.211.019
I.E. TUBERIA DE HIERRO GALVANIZADO, SIN ROSCA, TIPO EMT, EMBUTIDA. D= 3/4" (19 MM). INCLUYE TRANS. MATERIAL HASTA 50 KM.
CIRCUITOS DE ILUMINICION Y TOMACORRIENTES
103
65.00
ML
65.00
TOTAL EJECUTADO
ML
65.00
ML
1,350.00
TOTAL EJECUTADO
ML
1,350.00
ML
30.00
TOTAL EJECUTADO
ML
30.00
ML
2,100.00
TOTAL EJECUTADO
ML
2,100.00
ML
850.00
TOTAL EJECUTADO
ML
850.00
ML
15.00
TOTAL EJECUTADO
ML
15.00
ML
180.00
TOTAL EJECUTADO
ML
180.00
E-521.223.023
I.E CABLE DE COBRE, TRENSADO, REVESTIDO, THW, CALIBRE 12 AWG (2.32 MM).
1350.00
104
E-521.223.095
I.E CABLE DE COBRE, TRENSADO, REVESTIDO, THW, CALIBRE 1/0 AWG (9.47 MM).
30.00
105
E-521.223.030
I.E CABLE DE COBRE, TRENSADO, REVESTIDO, THW, CALIBRE 10 AWG (2.95 MM).
2100.00
106
E-521.223.037
I.E CABLE DE COBRE, TRENSADO, REVESTIDO, THW, CALIBRE 8 AWG (3.71 MM).
850.00
107
E-521.223.074
I.E CABLE DE COBRE, TRENSADO, REVESTIDO, THW, CALIBRE 2 AWG (7.42 MM)
15.00
108
E-521.224.095
I.E CABLE DE COBRE, TRENSADO, REVESTIDO, TTU, CALIBRE 1/0 AWG (9.47 MM)
180.00
CONTRATO N
COMPUTOS METRICOS
OBRA:
EMPRESA:
PARTIDA N
109
MEDIDAS
DESCRIPCION
ING. RESIDENTE/CONTRATISTA
FECHA:
LARGO
ANCHO
ALTO
FISCAL
ELEMET
IGUALES
UND
CANT.
TOTAL
ING. INSPECTOR
E-521.224.106
I.E CABLE DE COBRE, TRENSADO, REVESTIDO, TTU, CALIBRE 2/0 AWG (10.64 MM)
540.00
TOTAL EJECUTADO
110
ML
540.00
ML
540.00
PZA
80.00
PZA
80.00
E-531.210.010
I.E. CAJETINES METALICOS, SALIDA DE 1/2", PROFUNDIDAD 1 1/2". OCTOGONALES 4" (10.2 CM).
80.00
TOTAL EJECUTADO
111
E-531.210.510
I.E. CAJETINES METALICOS, SALIDA DE 1/2" - 3/4" PLG PROFUNDIDAD 1 1/2". RECTANGULARES DE 2" X 4" (5.1 CM X 10.2 CMS) PARA TOMAS E INTERRUPTORES.
112
100.00
PZA
100.00
TOTAL EJECUTADO
PZA
100.00
PZA
20.00
PZA
20.00
UNIDAD
12.00
UNIDAD
12.00
PZA
9.00
PZA
9.00
PZA
73.00
PZA
73.00
E-538.080.S/C
I.E. CAJA METALICA DE (10X10X4) CM. INCLUYE TRANS. MATERIAL.
20.00
TOTAL EJECUTADO
113
E-531.231.010
I.E. CAJETIN METALICO, SALIDA 1/2" - 3/4" PROFUNDIDAD 2 1/8" CUADRADO 4X4". (10.2 X 10.2 CM).
12.00
TOTAL EJECUTADO
114
E-541.111.120
I.E. INTERRUPTORES COMBINABLES SIMPLES, CON TAPA METALICA, PUENTE Y TORNILLOS, 20 A.
9.00
TOTAL EJECUTADO
115
E-542.121.120
I.E. TOMACORRIENTES CON TAPA METALICA, PUENTE Y TORNILLOS. DOBLE, UNA (1) FASE, 15 A.
73.00
TOTAL EJECUTADO
116
E-551.120.412
I.E. TABLERO METALICO CONVERTIBLE, EMBUTIDO, CON PUERTA 2 FASE+ NEUTRO, 4 CIRCUITOS, BARRAS DE 125 A. NO INCLUYE BREAKER. INCLUYE TRANS.
MATERIAL.
CAVAS DE REFRIGERACION
4.00
TOTAL EJECUTADO
117
PZA
4.00
PZA
4.00
E-551.121.212
I.E. TABLERO METALICO CONVERTIBLE, EMBUTIDO, CON PUERTA 2 FASES+ NEUTRO, 12 CIRCUITOS, BARRAS DE 125 A. NO INCLUYE BREAKER. INCLUYE TRANS.
MATERIAL.
1.00
TOTAL EJECUTADO
118
PZA
1.00
PZA
1.00
E-552.131.S/C
I.E. TABLERO METALICO SUPERFICIAL SIN BREAKER, CON PUERTA, 3 FASES + NEUTRO, DE 4 HILOS, 18 CIRCUITOS BARRAS 150 A. INCLUYE TRANS. MATERIAL.
1.00
TOTAL EJECUTADO
119
PZA
1.00
PZA
1.00
E-551.131.S/C
I.E. TABLERO METALICO CONVERTIBLE, EMBUTIDO, CON PUERTA 3 FASES+ NEUTRO, 12 CIRCUITOS, BARRAS DE 225 A. NO INCLUYE BREAKER.
1.00
TOTAL EJECUTADO
120
PZA
1.00
PZA
1.00
E-551.131.S/C.01
I.E. TABLERO METALICO CONVERTIBLE EMBUTIDO, CON PUERTA 3 FASES+ NEUTRO , 12 CIRCUITOS, BARRAS DE 350 AMP. NO INCLUYE BREAKERS.
1.00
TOTAL EJECUTADO
121
PZA
1.00
PZA
1.00
E-563.110.020
I.E. INTERRUPTOR TERMOMAGNETICO (BREAKER), CON TORNILLOS, 1 POLO, 10 KA ICC, 120/240 V, CAP 20 AMP. (HQC).
CAVAS DE REFRIGERACION
4.00
PZA
4.00
2.00
PZA
2.00
2.00
PZA
2.00
17.00
PZA
17.00
PZA
25.00
TOTAL EJECUTADO
CONTRATO N
COMPUTOS METRICOS
OBRA:
EMPRESA:
PARTIDA N
123
MEDIDAS
DESCRIPCION
ING. RESIDENTE/CONTRATISTA
FECHA:
LARGO
ANCHO
ELEMET
IGUALES
ALTO
FISCAL
UND
CANT.
TOTAL
ING. INSPECTOR
E-563.210.060
I.E. INTERRUPTOR TERMOMAGNETICO (BREAKER), CON TORNILLOS, 2 POLOS, 10 KA ICC, 120/240 V, CAPACIDAD 60 AMP.
6.00
TOTAL EJECUTADO
124
PZA
6.00
PZA
6.00
PZA
1.00
PZA
1.00
PZA
1.00
PZA
1.00
PZA
2.00
PZA
2.00
PZA
1.00
PZA
1.00
PZA
10.00
PZA
10.00
PZA
21.00
PZA
21.00
PZA
49.00
PZA
49.00
E-563.318.S/C
I.E. INTERRUPTOR TERMOMAGNETICO (BREAKER) CON TORNILLOS, 3 POLOS, 42/30/22 KA ICC, 248/480 V, CAP. 40 A.
1.00
TOTAL EJECUTADO
125
E-563.318.S/C.01
I.E. INTERRUPTOR TERMOMAGNETICO (BREAKER) CON TORNILLOS, 3 POLOS, 42/30/22 KA ICC, 248/480 V, CAP. 150 A.
1.00
TOTAL EJECUTADO
126
E-563.310.070
I.E. INTERRUPTOR TERMOMAGNETICO (BREAKER), CON TORNILLOS, 3 POLOS, 10 KA ICC, 120/240 V, CAP. 70 A. (HQC)
2.00
TOTAL EJECUTADO
127
E-564.210.350
I.E. INTERRUPTOR TERMOMAGNETICO BREAKER 208/120 V, 3 P X 350 AMP.
1.00
TOTAL EJECUTADO
128
E-581.S/C.02
I.E. SUMINISTRO, TRANSPORTE E INSTALACION DE LUMINARIA TIPO ESPECULAR DE 40 W. DE 3 X 40 W X 0.60 M. INCLUYE TUBOS.
10.00
TOTAL EJECUTADO
129
E-581.S/C.01
I.E. SUMINISTRO, TRANSPORTE E INSTALACION DE LUMINARIA TIPO ESPECULAR DE 40 W. DE 2 X 40 W X 1.20 M. INCLUYE TUBOS.
21.00
TOTAL EJECUTADO
130
E-581.S/C
I.E. SUMINISTRO E INSTALACION DE LAMPARA FLUORESCENTE CON REFLECTOR PARABOLICO Y BOMBILLO 2 X 32 W.
49.00
TOTAL EJECUTADO
131
E-EXTRACTOR 24"
SUMINISTRO, TRANSPORTE Y COLOCACION DE EXTRACTORES DE 24" CAPACIDAD 5000 M3/HORA. INCLUYE TRANS. MATERIAL HASTA 50 KM.
12.00
TOTAL EJECUTADO
132
PZA
12.00
PZA
12.00
E-EXTRACTOR 16"
SUMINISTRO, TRANSPORTE Y COLOCACION DE EXTRACTORES DE 16" CAPACIDAD 2400 M3/HORA. INCLUYE TRANS. MATERIAL HASTA 50 KM.
5.00
TOTAL EJECUTADO
133
PZA
5.00
PZA
5.00
E-VENTILADOR
SUMINISTRO, TRANSPORTE Y COLOCACION DE VENTILADOR PARA INYECCION DE AIRE 24 PLG POTENCIA 1.5 HP. INCLUYE DUCTO DE ENTRADA.
2.00
TOTAL EJECUTADO
134
PZA
2.00
PZA
2.00
PZA
19.00
PZA
19.00
E-DUCTO DE TRANSICION
SUMINISTRO Y COLOCACION DE DUCTO DE TRANSICION PARA COLOCACION DE VENTILADOR.
19.00
TOTAL EJECUTADO
135
RAB307
BANCADA DE DOS TUBOS DE PVC 4"0 EN CTO. (RCC 100 KG/CM2) PARA B.T. (B2C-4"0)
80.00
TOTAL EJECUTADO
136
ML
80.00
ML
80.00
ML
50.00
RAB305
BANCADA DE DOS TUBOS DE PVC 2"0 EN CTO. (RCC 100 KG/CM2) PARA B.T. (B2C-2"0)
50.00
CONTRATO N
COMPUTOS METRICOS
OBRA:
EMPRESA:
PARTIDA N
FECHA:
MEDIDAS
DESCRIPCION
LARGO
ANCHO
ALTO
ELEMET
IGUALES
TOTAL EJECUTADO
ING. RESIDENTE/CONTRATISTA
FISCAL
ING. INSPECTOR
UND
ML
CANT.
TOTAL
50.00
CONTRATO N
COMPUTOS METRICOS
OBRA:
EMPRESA:
PARTIDA N
DESCRIPCION
FECHA:
MEDIDAS
LARGO
ANCHO
ALTO
ELEMET
IGUALES
UND
PLOMERIA
137
E-394.100.004
SUMINISTRO Y COLOCACION DE BAJANTE PARA A.LL. EN PVC 4 ". INCLUYE TRANS. MATERIALES HASTA 50 KM.
BAJANTES
1.50
10.00
TOTAL EJECUTADO
138
ML
ML
E-600.S/C
SUMINISTRO, Y COLOCACION DE BAJANTE PARA A.LL. EN PVC 6". INCLUYE TRANS. MATERIALES HASTA 50 KM.
LATERALES
34.00
2.00
ML
TRASERAS
6.00
2.00
ML
BAJANTE
4.50
2.00
TOTAL EJECUTADO
139
ML
ML
E-611.132.051
SUMINISTRO, TRANSPORTE E INSTALACION DE TUBERIA AGUAS CLARAS, P.V.C., ASTM, D= 2" AMBIENTE EXTERIOR AL RECINTO SANITARIO.
61.75
ML
52.70
ML
TOTAL EJECUTADO
140
ML
E-611.132.064
SUMINISTRO, TRANSPORTE E INSTALACION DE TUBERIA AGUAS CLARAS, P.V.C., ASTM, D=2 1/2" (E= 3.0 MM), AMBIENTE EXTERIOR AL RECINTO SANITARIO. INCLUYE
CONEXIONES DE H.G.
45.36
ML
TOTAL EJECUTADO
141
ML
E-611.142.019
SUMINISTRO, TRANSPORTE E INSTALACION DE TUBERIA AGUAS CLARAS, P.V.C., ASTM, D= 3/4". AMBIENTE EXTERIOR AL RECINTO SANITARIO.
100.62
ML
TOTAL EJECUTADO
142
ML
E-621.122.038
SUMINISTRO, TRANSPORTE E INSTALACION DE TUBERIA AGUAS CLARAS, P.V.C., ASTM, D= 1". AMBIENTE EXTERIOR AL RECINTO SANITARIO.
22.95
ML
TOTAL EJECUTADO
143
ML
E-612.142.051
SUMINISTRO, TRANSPORTE E INSTALACION DE TUBERIA AGUA RESIDUALES, P.V.C., ASTM, D= 2". AMBIENTE EXTERIOR AL RECINTO SANITARIO.
36.60
ML
TOTAL EJECUTADO
144
ML
E-612.144.102
SUMINISTRO, TRANSPORTE E INSTALACION TUBERIA AGUAS RESIDUALES, P.V.C., ASTM, D= 4". AMBIENTE EXTERIOR AL RECINTO SANITARIO.
75.53
ACOMETIDA PROVISIONAL
ML
35.00
ML
TOTAL EJECUTADO
145
ML
E-612.144.152
SUMINISTRO, TRANSPORTE E INSTALACION TUBERIA AGUAS RESIDUALES, P.V.C., ASTM, D= 6". (152 MM) E=3.3 MM. AMBIENTE EXTERIOR AL RECINTO SANITARIO.
INCLUYE CONEXIONES.
82.36
ML
TOTAL EJECUTADO
146
ML
E-611.142.025
SUMINISTRO, TRANSPORTE E INSTALACION TUBERIA AGUAS RESIDUALES, P.V.C., D= 3". (76 MM) E=1.8 MM. AMBIENTE EXTERIOR AL RECINTO SANITARIO. INCLUYE
CONEXIONES. TRANS. MATERIAL HASTA 50 KM.
61.88
ML
TOTAL EJECUTADO
ML
CONTRATO N
COMPUTOS METRICOS
OBRA:
EMPRESA:
PARTIDA N
147
MEDIDAS
DESCRIPCION
ING. RESIDENTE/CONTRATISTA
FECHA:
LARGO
ANCHO
ALTO
ELEMET
IGUALES
FISCAL
UND
ING. INSPECTOR
E-621.132.038
SUMINISTRO, TRANSPORTE E INSTALACION PUNTOS AGUAS CLARAS, DE P.V.C., ASTM, D= 1 1/2". AMBIENTE INTERIOR AL RECINTO SANITARIO.
W.C.
6.00
PTO
LAVAMANOS
4.00
PTO
URINARIOS
2.00
PTO
TOTAL EJECUTADO
148
PTO
E-621.132.013
SUMINISTRO, TRANSPORTE E INSTALACION PUNTOS AGUAS CLARAS, DE P.V.C., ASTM, D= 1/2". AMBIENTE INTERIOR AL RECINTO SANITARIO.
FREGADERO
15.00
PTO
LLAVES DE CHORRO
7.00
PTO
CAVAS
3.00
PTO
TOTAL EJECUTADO
149
PTO
E-622.131.051
SUMINISTRO, TRANSPORTE E INSTALACION PUNTOS DE AGUAS NEGRAS, DE P.V.C., D= 2". (E=1.8 MM). AMBIENTE INTERIOR AL RECINTO SANITARIO.
FREGADERO
15.00
PTO
LAVAMANOS
4.00
PTO
URINARIOS
2.00
PTO
C.P. 2"
4.00
PTO
TOTAL EJECUTADO
150
PTO
E-622.131.076
SUMINISTRO, TRANSPORTE E INSTALACION PUNTOS DE AGUAS NEGRAS, DE P.V.C., D= 3". (E=1.8 MM). AMBIENTE INTERIOR AL RECINTO SANITARIO.
CAVAS
6.00
PTO
CENTRO PISO
6.00
PTO
BASURA
1.00
PTO
GALPON
4.00
PTO
TOTAL EJECUTADO
151
PTO
E-622.132.102
SUMINISTRO, TRANSPORTE E INSTALACION PUNTOS AGUAS RESIDUALES, DE P.V.C., ASTM, D= 4". AMBIENTE INTERIOR AL RECINTO SANITARIO.
W.C.
6.00
PTO
T.R.
7.00
PTO
TOTAL EJECUTADO
152
PTO
E-631.001.013
SUMINISTRO Y TRANSPORTE DE LLAVE DE PASO TIPO COMPUERTA, DE BRONCE, D= 1/2" (13 MM). (150 PSI).
FREGADEROS
15.00
TOTAL EJECUTADO
153
PZA
PZA
E-631.001.051
SUMINISTRO Y TRANSPORTE DE LLAVE DE PASO TIPO COMPUERTA, DE BRONCE, D= 2" (51 MM). (150 PSI).
3.00
TOTAL EJECUTADO
154
PZA
PZA
E-632.002.S/C
SUMINISTRO Y TRANSPORTE DE LLAVE DE PASO TIPO ESFERICA O DE BOLA DE ALEACION DE METALES, D= 2 1/2" .
2.00
TOTAL EJECUTADO
155
PZA
PZA
E-631.001.038
SUMINISTRO Y TRANSPORTE DE LLAVE DE PASO TIPO COMPUERTA, DE BRONCE, D= 1 1/2" (38 MM). (150 PSI).
12.00
TOTAL EJECUTADO
PZA
PZA
CONTRATO N
COMPUTOS METRICOS
OBRA:
EMPRESA:
PARTIDA N
156
MEDIDAS
DESCRIPCION
ING. RESIDENTE/CONTRATISTA
FECHA:
LARGO
ANCHO
ELEMET
IGUALES
ALTO
FISCAL
UND
ING. INSPECTOR
E-631.001.019
SUMINISTRO Y TRANSPORTE DE LLAVE DE PASO TIPO COMPUERTA, DE BRONCE, DIAMETRO 3/4" (19 MM). (150 PSI).
2.00
TOTAL EJECUTADO
157
PZA
PZA
E-661.110.121
SUMINISTRO, TRANSPORTE E INSTALACION DE LAVAMANOS PARA EMPOTRAR, DE UNA LLAVE, BLANCO O COLOR CLARO. INCLUYE GRIFERIA. TRANS. MATERIAL
HASTA 50 KM.
ONTRATISTA
FISCAL
ING. INSPECTOR
4.00
TOTAL EJECUTADO
158
PZA
PZA
E-662.141.111
I.S. SUMINISTRO, TRANSPORTE E INSTALACION DE W.C. DE ASIENTO, CON FLUXOMETRO INCLUIDO, DESCARGA AL PISO, BLANCO O COLOR CLARO. INCLUYE
GRIFERIA. TRANS. MATERIAL HASTA 50 KM.
6.00
TOTAL EJECUTADO
159
PZA
PZA
E-666.222.111
I.S. SUMINISTRO, TRANSPORTE E INSTALACION DE URINARIOS, CON SIFON INTEGRADO, ALIMENTADO CON FLUXOMETRO/INCLUIDO/DESCARGA A LA PARED, BLANCO
O COLOR CLARO, LINEA ECONOMICA/INCLUYE GRIFERIA.
2.00
TOTAL EJECUTADO
160
PZA
PZA
E-665.101.S/C
SUMINISTRO, TRANSPORTE Y COLOCACION DE PORTARROLLO DE PAPEL TIPO INDUSTRIAL.
BAO DAMAS Y CABALLEROS
2.00
TOTAL EJECUTADO
161
PZA
PZA
E-665.S/C
S/T/C DE DISPENSADOR DE JABON. INCLUYE ELEMENTOS DE FIJACION.
2.00
TOTAL EJECUTADO
162
PZA
PZA
E-678.112.S/C
SUMINISTRO, TRANSPORTE E INSTALACION DE FREGADERO AUTOPORTANTE DE UNA (1) PONCHERA Y MESA DE TRABAJO TOTALMENTE EN ACERO INOXIDABLE.
INCLUIYE GRIFERIA.
11.00
TOTAL EJECUTADO
163
PZA
PZA
E-678.112.S/C.01
SUMINISTRO, TRANSPORTE Y COLOCACION DE FREGADERO DE ACERO INOXIDABLE. DE 2 PONCHERA Y MESA DE TRABAJO. INCLUIYE GRIFERIA.
2.00
TOTAL EJECUTADO
164
PZA
PZA
E-666.311.051
I.S. SUMINISTRO, TRANSPORTE E INSTALACION DE CENTRO PISO CIRCULAR STANDAR, DE BRONCE, PARA TUBO DE DESCARGA DE 2PGDS. DE DIAMETRO 51 MM.
4.00
TOTAL EJECUTADO
165
PZA
PZA
E-666.311.076
I.S. SUMINISTRO, TRANSPORTE E INSTALACION DE CENTRO PISO CIRCULAR STANDAR, DE BRONCE, PARA TUBO DE DESCARGA DE 3 PGDS. DE DIAMETRO 76 MM.
16.00
TOTAL EJECUTADO
166
PZA
PZA
E-666.371.076
I/S. SUMINISTRO, TRANSPORTE E INSTALACION DE TAPON DE REGISTRO CIRCULAR, DE BRONCE, PARA TUBO DE DESCARGA DE 3 PGDS. DE DIAMETRO (76 MM)
1.00
TOTAL EJECUTADO
167
PZA
PZA
E-666.371.102
I/S. SUMINISTRO, TRANSPORTE E INSTALACION DE TAPON DE REGISTRO CIRCULAR, DE BRONCE, PARA TUBO DE DECARGA DE 4 PGDS. DE DIAMETRO (102 MM)
7.00
TOTAL EJECUTADO
PZA
PZA
CONTRATO N
COMPUTOS METRICOS
OBRA:
EMPRESA:
PARTIDA N
ING. RESIDENTE/CONTRATISTA
FECHA:
MEDIDAS
DESCRIPCION
LARGO
FISCAL
ANCHO
ALTO
ELEMET
IGUALES
UND
ING. INSPECTOR
CONTRATO N
DE LA ECONOMIA INFORMAL.
CANT.
TOTAL
.
15.00
15.00
.
68.00
12.00
9.00
89.00
CONTRATO N
DE LA ECONOMIA INFORMAL.
CANT.
TOTAL
ING. INSPECTOR
15.00
15.00
3.00
3.00
1/2" .
2.00
2.00
12.00
12.00
CONTRATO N
DE LA ECONOMIA INFORMAL.
CANT.
TOTAL
ING. INSPECTOR
0 PSI).
2.00
2.00
2.00
2.00
2.00
2.00
CONTRATO N
DE LA ECONOMIA INFORMAL.
CANT.
TOTAL
ING. INSPECTOR
CONTRATO N
COMPUTOS METRICOS
OBRA:
EMPRESA:
PARTIDA N
FECHA:
MEDIDAS
DESCRIPCION
LARGO
ANCHO
ALTO
ELEMET
IGUALES
UND
CANT.
TOTAL
E-700.S/C
I/E. DETECTOR TERMICO
169
21.00
PZA
21.00
TOTAL EJECUTADO
PZA
21.00
E-700.CID001
I/E. DIFUSOR DE SONIDO DE 8 OHMNIOS Y 5 W.
170
4.00
PZA
4.00
TOTAL EJECUTADO
PZA
4.00
4.00
PZA
4.00
TOTAL EJECUTADO
PZA
4.00
PZA
4.00
PZA
4.00
PZA
4.00
PZA
4.00
PZA
4.00
PZA
4.00
UND
1.00
UND
1.00
PZA
1.00
PZA
1.00
PZA
1.00
PZA
1.00
E-700.CID002
I/E DETECTOR OPTICO DE HUMO.
171
E-700.CIE000
SUMINISTRO Y COLOCACION DE EXTINTORES DE POLVO QUIMICO. TIPO ABC. 10 LBS.
4.00
TOTAL EJECUTADO
172
E-700.CIG001
SUMINISTRO, TRANSPORTE E INSTALACION DE CAJAS PARA EXTINTORES. (EMPOTRABLE)
4.00
TOTAL EJECUTADO
173
E-700.CII001
I/E. SUMINISTRO E INSTALACION DE ESTACIONES MANUALES DE DOBLE ACCION.
4.00
TOTAL EJECUTADO
174
E-700.S/C.01
SUMINISTRO E INSTALACION DE CENTRAL DE INCENDIOS DE 8 ZONAS HASTA 4 DIFUSORES DE SONIDOS DE 10 W. INCLUYE BATERIA.
1.00
TOTAL EJECUTADO
175
E-700.S/C.02
SUMINISTRO, TRANSPORTE E INSTALACION DE CONEXION SIAMESA TIPO "Y" 2 1/2" X 4"
1.00
TOTAL EJECUTADO
176
E-643.002.039
SUMINISTRO, TRANSPORTE DE VALVULA DE RETENCION VERTICAL (MARACA - CHECK VALVE), DE BRONCE, D= 2" (38 MM) (150 PSI)
1.00
TOTAL EJECUTADO
177
E-700.CIG002-A
SUMINISTRO, TRANSPORTE E INSTALACION DE CAJAS CON MANGUERAS DE EXTINCION DE INCENDIO. INCLUYE PITON DE BRONCE DE 1 1/2".
2.00
TOTAL EJECUTADO
178
PZA
2.00
PZA
2.00
E-521.S/C
I.E CABLE DE COBRE, TRENSADO, REVESTIDO, TF CALIBRE 18
179
1700.00
ML
1,700.00
TOTAL EJECUTADO
ML
1,700.00
PZA
25.00
PZA
25.00
E-531.210.010
I.E. CAJETINES METALICOS, SALIDA DE 1/2", PROFUNDIDAD 1 1/2". OCTOGONAL 4" (10.2 CM).
25.00
TOTAL EJECUTADO
ING. RESIDENTE/CONTRATISTA
FISCAL
ING. INSPECTOR
CONTRATO N
COMPUTOS METRICOS
OBRA:
EMPRESA:
PARTIDA N
180
DESCRIPCION
FECHA:
MEDIDAS
LARGO
ANCHO
ALTO
ELEMET
IGUALES
UND
CANT.
TOTAL
E-531.210.510
I.E. CAJETINES METALICOS, SALIDA 1/2 - 3/4 PLG PROFUNDIDAD 1 1/2 PLG. RECTANGULARES 4X2 PLG (10.2 CM X 5.1 CM). PARA TOMAS E INTERRUPTORES
40.00
PZA
40.00
PZA
40.00
260.00
ML
260.00
TOTAL EJECUTADO
ML
260.00
TOTAL EJECUTADO
181
E-512.211.019
I.E. TUBERIA DE HIERRO GALVANIZADO, SIN ROSCA, TIPO EMT, EMBUTIDA. D= 3/4" (19 MM). INCLUYE TRANS. MATERIAL HASTA 50 KM.
182
E-611.111.051
SUMINISTRO, TRANSPORTE E INSTALACION TUBERIA AGUA CLARA, H.G., 2" ISO II, 150 PSI. AMBIENTE EXTERIOR AL RECINTO SANITARIO. INCLUYE CONEXIONES.
TRANS. MATERIAL HASTA 50 KM
52.70
ML
52.70
TOTAL EJECUTADO
ML
52.70
OBRAS DE SERVICIO
183
E-802.305.S/C.01
CONSTRUCCION DE TANQUILLAS DE AGUAS SERVIDAS DE CONCRETO FCC=180 KG/CM2 A LOS 28 DIAS, DE 0.80 X 0.80 X 0.80, CORRESPONDIENTE A O.S. INCLUYE
ENCOFRADO, ACERO DE REFUERZO, Y TAPA DEL MISMO MATERIAL Y EXCAVACION.
2.00
TOTAL EJECUTADO
184
PZA
2.00
PZA
2.00
E-802.305.S/C.02
CONSTRUCCION DE TANQUILLAS DE AGUAS SERVIDAS DE CONCRETO FCC=180 KG/CM2 A LOS 28 DIAS, DE 0.40 X 0.40 X 0.40, CORRESPONDIENTE A O.S. INCLUYE
ENCOFRADO, ACERO DE REFUERZO, Y TAPA DEL MISMO MATERIAL Y EXCAVACION.
4.00
TOTAL EJECUTADO
185
PZA
4.00
PZA
4.00
E-8-D-S/C.
PINTURA EN FRANJA DE ANCHO 10 CMS. PARA DEMARCACION.
27.00
4.00
ML
108.00
7.00
2.00
ML
14.00
5.50
2.00
ML
11.00
11.50
1.00
ML
11.50
0.50
1.00
ML
0.50
16.50
1.00
ML
16.50
23.00
1.00
ML
23.00
3.00
2.00
ML
6.00
ML
190.50
UND
12.00
UND
12.00
TOTAL EJECUTADO
186
E-SEALIZACION
SEALIZACIONES VARIAS EN ACRILICO.
12.00
TOTAL EJECUTADO
TRANSPORTES
187
E-903.142.020
TRANSPORTE URBANO EN CAMIONES DE CUALQUIER TIPO DE MATERIAL, PROVENIENTE DE LA PREPARACION DEL SITIO, MEDIDO EN ESTADO SUELTO, DISTANCIA
MAYOR QUE 15 KM. MENOR O IGUAL A 20 KM.
1245.97
20.00
M3.KM
24,919.40
1200.70
20.00
M3.KM
24,014.00
M3.KM
48,933.40
TOTAL EJECUTADO
188
E-904.242.025
TRANSPORTE URBANO EN CAMIONES DE MATERIALES PROVENIENTES DE MOVIMIENTO DE TIERRA, MEDIDO POR SECCIONES, A DISTANCIA MAYOR DE 20 KM.
1019.60
20.00
TOTAL EJECUTADO
M3.KM
20,392.00
M3.KM
20,392.00
CONTRATO N
COMPUTOS METRICOS
OBRA:
EMPRESA:
PARTIDA N
ING. RESIDENTE/CONTRATISTA
FECHA:
MEDIDAS
DESCRIPCION
LARGO
FISCAL
ANCHO
ALTO
ELEMET
IGUALES
ING. INSPECTOR
UND
CANT.
TOTAL
CONTRATO N
COMPUTOS METRICOS
OBRA:
EMPRESA:
PARTIDA N
DESCRIPCION
FECHA:
MEDIDAS
LARGO
ANCHO
ALTO
ELEMET
IGUALES
UND
CANT.
TOTAL
ALTA TENSION
189
E-807.137.211
SUMINISTRO, TRANSPORTE Y COLOCACION DE POSTE DE 37 211 KG D=6" - 5"- 4". INCLUYE EXCAVACION Y BASE DE CONCRETO.
2.00
TOTAL EJECUTADO
190
PZA
2.00
PZA
2.00
PZA
2.00
PZA
2.00
PZA
2.00
PZA
2.00
PZA
1.00
PZA
1.00
PZA
1.00
PZA
1.00
RAB106
CRUCETA DOBLE DE 1.80 MTS EN TERMINAL LINEA TRIFASICA DE 13.8 KV.
2.00
TOTAL EJECUTADO
191
RAB127
TRES AISLADORES DE ESPIGA 15 KV.
2.00
TOTAL EJECUTADO
192
RAB166
TRES PARARRAYOS PARA 15 KV EN CRUCETA EXISTENTE.
1.00
TOTAL EJECUTADO
193
RAB169
TRES CORTACORRIENTES 15 KV EN CRUCETA EXISTENTE.
1.00
TOTAL EJECUTADO
194
RAB202
CONDUCTOR ARVIDAL N 1/0
50.00
TOTAL EJECUTADO
195
ML
50.00
ML
50.00
PZA
2.00
PZA
2.00
PZA
2.00
PZA
2.00
PZA
2.00
PZA
2.00
RAB231
CONEXION A TIERRA POSTE DE ALTA TENSION.
2.00
TOTAL EJECUTADO
196
RAB243
BAJANTE DE H.G. (CONDUIT) DE 6 MTS X 4".
2.00
TOTAL EJECUTADO
197
RAB273
PINTURA DE UN POSTE DE ALTA TENSION.
2.00
TOTAL EJECUTADO
198
RAB338-1
TANQUILLA TIPO T-3- INCLUYE MARCO Y TAPA H.F. PESADA (120 X 120 X 140 CMS) Y BASE DE PIEDRA PICADA.
3.00
199
PZA
3.00
TOTAL EJECUTADO
PZA
3.00
ML
320.00
TOTAL EJECUTADO
ML
320.00
ML
320.00
TOTAL EJECUTADO
ML
320.00
ML
60.00
TOTAL EJECUTADO
ML
60.00
ML
20.00
ML
20.00
E-CABLE MONOPOLAR N2
I.E CABLE DE COBRE, MONOPOLAR CON AISLAMIENTO XLPE 15 KV N 2
320.00
200
201
E-521.224.207
I.E CABLE DE COBRE, TRENSADO, REVESTIDO, TTU, CALIBRE 500 MCM (20.65 MM)
60.00
202
E-521.224.173
I.E CABLE DE COBRE, TRENSADO, REVESTIDO, TTU, CALIBRE 350 MCM (17.30 MM)
20.00
TOTAL EJECUTADO
CONTRATO N
COMPUTOS METRICOS
OBRA:
EMPRESA:
PARTIDA N
203
MEDIDAS
DESCRIPCION
ING. RESIDENTE/CONTRATISTA
FECHA:
LARGO
FISCAL
ANCHO
ALTO
ELEMET
IGUALES
UND
CANT.
TOTAL
ING. INSPECTOR
RAB313
BANCADA DE DOS TUBOS DE PVC 4"0 EN CTO. (RCC 100 KG/CM2) PARA A.T. (A2C-4"0)
80.00
TOTAL EJECUTADO
204
ML
80.00
ML
80.00
PZA
1.00
PZA
1.00
PZA
1.00
PZA
1.00
E-561.110.
I.E. INTERRUPTOR DE POTENCIA DE 700 AMP.
1.00
TOTAL EJECUTADO
205
E-PAD-MOUNTED 75KVA
TRANSFORMADOR TRIFASICO TIPO PAD-MOUNTED, CAPACIDAD 75 KVA
1.00
TOTAL EJECUTADO
206
E-COPAS
S.I. DE COPAS TERMINALES TERMOCONTRAIDAS DE USO EXTERIOR PARA CONDUCTORES 15 KV.
2.00
TOTAL EJECUTADO
207
JGO
2.00
JGO
2.00
E-EMPALME 15K
I.E. EMPALME CONTRACTIL DE 15 KV
3.00
TOTAL EJECUTADO
208
JGO
3.00
JGO
3.00
PZA
1.00
PZA
1.00
PZA
8.00
PZA
8.00
RAB074
PERCHA DE CINCO AISLADORES PARA ALINEACION.
1.00
TOTAL EJECUTADO
209
E-BARRAS
S/T/C DE BARRAS COOPERWELD DE 5/8" X 2.40 MTS.
8.00
TOTAL EJECUTADO
210
E-521.010.000
I.E CABLE DE COBRE, DESNUDO, SOLIDO O TRENZADO PARA DIFERENTES CALIBRES. INCLUYE TRANS. MATERIAL HASTA 50 KM.
20.00
TOTAL EJECUTADO
211
KG
20.00
KG
20.00
E-ACOPLES
SUMINISTRO Y COLOCACION DE TERMINAL DE ACOPLE DE A.T. 15 KV
1.00
TOTAL EJECUTADO
JGO
1.00
JGO
1.00
PZA
12.00
PZA
12.00
MOBILIARIO
212
E-BALANZA
SUMINISTRO Y TRANSPORTE DE BALANZA MECANICA COLGANTE
12.00
TOTAL EJECUTADO
213
214
PZA
40.00
PZA
40.00
215
PZA
54.00
PZA
54.00
PZA
188.00
TOTAL EJECUTADO
PZA
188.00
CONTRATO N
COMPUTOS METRICOS
OBRA:
EMPRESA:
PARTIDA N
216
MEDIDAS
DESCRIPCION
ING. RESIDENTE/CONTRATISTA
FECHA:
LARGO
FISCAL
ANCHO
ALTO
ELEMET
IGUALES
UND
CANT.
TOTAL
ING. INSPECTOR
E-PASAMANO
S/C DE PASAMANOS DE ACERO INOXIDABLE FIJADA EN PARED.
2.00
217
ML
2.00
UND
3.00
UND
3.00
UND
1.00
UND
1.00
218
219
E-667.121.000
S/T/I DE SISTEMA HIDRONEUMATICO DE CAPACIDAD DE TANQUE DE 600 GALONES. INCLUYE 2 BOMBA DE 5 HP. TABLERO DE CONTROL Y COMPRESOR.
1.00
TOTAL EJECUTADO
UND
1.00
UND
1.00
CONTRATO N
COMPUTOS METRICOS
OBRA:
EMPRESA:
PARTIDA N
ING. RESIDENTE/CONTRATISTA
FECHA:
MEDIDAS
DESCRIPCION
LARGO
FISCAL
ANCHO
ING. INSPECTOR
ALTO
ELEMET
IGUALES
UND
CANT.
TOTAL