KUMANG CLUSTER DEVELOPMENT

Located 200km offshore Bintulu, Sarawak


Operated by PETRONAS Carigali Sdn. Bhd.
Consists of 10 gas fields located at water depths ranging from 60m to 100m.

1.0 PHASE l

1.1 Involved the development of 3 gas fields:

Kumang
F9
Kanowit

1.2 Included the installation of:

Central Processing Platform (CPP), F9KG-A


Equipped with a condensate/gas separation system
Gas compression system
Gas dehydration system
Telecommunication system
Power generation system
Compact manifolds
Metering system
Helipad
Equipped with minimum basic facilities
KUJT-A wellhead at Kumang.
- compact manifolds
F9JT-A wellhead at F9
- small-scale power generation facilities
KAJT-A wellhead at Kanowit
- Telecommunication
- Helipads

The first gas production from the project was in 2011, and the export facilities are designed
to convey 550 million cubic feet of gas per day and 22,000 barrels per day of condensate.
1.3 Contractor involvement

Project FEED Activities Ranhill-WorleyParson


Conceptual design and engineering services - MMC Oil & Gas Engineering
Topsides and jackets of the platform Sime Darby Engineering
- Ramunia Fabricators
- Oilfab
EPC Contract Subsea Production System ( Kanowit field) - Aker Process Systems
Asia Pacific (APSAP)
2 subsea trees
2 wellheads
Subsea control system
Manifold with high-integrity pressure protection system (HIPPS)
Pipeline-end manifold
Tie-in equipment
Supplied 5,600m of subsea umbilicals for tying back the Kanowit subsea wells to
the CPP.
Installation of subsea umbilicals, riser and flowline Subsea7
Installation of pipeline - Leighton Offshore
Fuel gas-heater control panels - Topaz Integrated Technology
Offshore brownfield and subsea tie-backs for PETRONAS FLNG1- Technip

2.0 PHASE ll
2.1 Involved the development of the other 7 gas fields:

A3

F11
F22
F27
F12
Selar Marine
Bunga Pelaga

F12 GAS FIELD DEVELOPMENT

i.
BACKGROUND
- Located at 180km north-west of Bintulu, Sarawak
- F12 Field were discovered in 1969 in water depth of 101m.
- The expected rate of the gas production from F12 field is 250MMscf/d.
ii.

CONTRACT AWARDS
1) SK TLO
To provide transportation and installation of pipeline, substructure and topside for the
F12 gas development project. The contract is for eight months.

2) MHB
The first contract entails the Engineering, Procurement, Construction and
Commissioning (EPCC) of the WHP topside and jacket, telecommunication and
instrumentation system tie-ins of the new F12 platform and telecommunication and
instrumentation system tie-ins modification of the existing platform. Scheduled for
delivery within 12 months of the signing of the Letter Of Award.

iii.

RESEARCH STUDIES

Reach Integrated, in collaboration with ALTAMiRA INFORMATION (Spain), has submitted its
competitive technical & commercial proposals for the deployment of Continuous Subsidence
Monitoring System or CSMS for PETRONAS' new F12JT-A Wellhead Platform. The F12JT-A
Wellhead Platform is one of the facilities planned to be built within the scope of F12 Gas
Development Project
Reach Integrated has submitted its CSMS proposals through several fabricators of offshore
facilities whom are currently bidding for the project directly from PETRONAS' wholly owned
subsidiary - PETRONAS Carigali Sdn Bhd.
The new and un-manned F12JT-A Wellhead Platform has been designed (and will be
deployed) to extract natural gas from its reservoir which is situated directly beneath it.
Studies have shown that extraction of gas from underground gas reservoirs for a long period
of time may cause the ground layer (or formation) directly above the reservoir to undergo
"subsidence phenomenon" due to reduction of gas volume within the reservoir after been

extracted via the gas production process. What this mean is, over a long period of time, the
ground (in this case the sea floor) where the new F12JT-A Wellhead Platform is to be
designated to / standing on may be subjected to this subsidence phenomenon; and that
subsequently F12JT-A may "sink" relative to the sea level.
Reach Integrated (ALTAMiRA INFORMATION's local support partner for this project) will be
monitoring the occurence as well as the magnitude of this subsidence phenomenon which
might be incurred by F12JT-A Wellhead Platform using the advance InSAR Radar Satellite
Technologies.
GlobalSAR Monitoring System (which is ALTAMiRA INFORMATION's processing chain),
will then analyse this data and provide the measurement of subsidence of F12JT-A (if any)
relative to one (or more if required) onshore reference point. GlobalSAR Monitoring System
has the advantage of providing good measurement points, high resolution, precision,
sufficient coverage with high & comprehensive information gathering frequency that will
allow PETRONAS to quantify the platform motion and monitor infrastructure integrity on a
continuous basis.

Source : http://www.reachintegrated.com/news-events-details.asp?id=50

Below illustrates nearby facilities distances from F12 field