REPORT
Inspection Date
Document No.
A+SH_ICC_05214_
20150818
Client Name
GNF
Overall Result
pending
Page 1 of 14
A. GENERAL INFORMATION
To:
Contact:
Email:
Tel:
Fax:
Inspector
GNF
Luis
Ingmecanica@gasnaturalFidg.com
+86 183 0157 8172
From:
Contact:
Email:
Tel:
Fax:
Copy to
Kevin kong
Turbine shaft
Vendor/Supplier:
HARBIN ELECTRIC
COMPANY LIMITED
Factory Address:
Factory Contact/Tel:
UPC (Barcode):
Service Performed:
FAT test
Inspection Dates
Turbine shaft
Product Description:
MACHINERY
Applus SH
Kevin kong
Kevin.kong@applus.com
+86(21)18626060831
+86(21)5208 0556
Item/Style/Product No.:
Yes
N/A
2015-08-18
Product Specs/Drawings
Copy of PO
Packing List
Date: 2015/08/18
Supervisor: Oriol Pla
Date: 2015/08/18
Inspector: Kevin kong
Other
B. SCOPE
1. As per the vendors arrangement and the clients request, Appluss inspector Kevin kong performed the inspection
action for the Minas project in HarBin Electric Machinery Company Limted, The inspector was instructed to
witness the FAT test of the turbine shaft . The inspection activities on Aug14TH ;
2.
INSPECTION
REPORT
Inspection Date
Document No.
A+SH_ICC_05214_
20150818
Client Name
GNF
Overall Result
pending
Page 2 of 14
INSPECTION
REPORT
Inspection Date
Document No.
A+SH_ICC_05214_
20150818
Client Name
GNF
Overall Result
pending
Page 3 of 14
INSPECTION
REPORT
Inspection Date
Document No.
A+SH_ICC_05214_
20150818
Client Name
GNF
Overall Result
pending
Page 4 of 14
INSPECTION
REPORT
Inspection Date
Document No.
A+SH_ICC_05214_
20150818
Client Name
GNF
Overall Result
pending
Page 5 of 14
INSPECTION
REPORT
Inspection Date
Document No.
A+SH_ICC_05214_
20150818
Client Name
GNF
Overall Result
pending
Page 6 of 14
4305+0.06
INSPECTION
REPORT
Inspection Date
Document No.
A+SH_ICC_05214_
20150818
Client Name
GNF
Overall Result
pending
Page 7 of 14
INSPECTION
REPORT
Inspection Date
Document No.
A+SH_ICC_05214_
20150818
Client Name
GNF
Overall Result
pending
Page 8 of 14
INSPECTION
REPORT
Inspection Date
Document No.
A+SH_ICC_05214_
20150818
Client Name
GNF
Overall Result
pending
Page 9 of 14
Pic.37 Using Big steel rule close to the surface of flange,with 0.02
mm feeler gauge measure the gap.but cann't put the feeler inside.
INSPECTION
REPORT
Inspection Date
Document No.
A+SH_ICC_05214_
20150818
Client Name
GNF
Overall Result
pending
Page 10 of 14
meter, and without contrast sample, only compare compare with blue area,smoothness of 5 better
the turbine shaft itself
than it
INSPECTION
REPORT
Inspection Date
Document No.
A+SH_ICC_05214_
20150818
Client Name
GNF
Overall Result
pending
Page 11 of 14
than it
than it
than it
than it
INSPECTION
REPORT
Inspection Date
Document No.
A+SH_ICC_05214_
20150818
Client Name
GNF
Overall Result
pending
Page 12 of 14
DRAWING DESIGN
INSPECTION RESULT
CHECK
POINT
SIZE/ROUGHNESS
GEOMETRIC
DIMENSION
TOLERANCE
TOLERANCE
ROUGHNESS
GEOMETRIC
TOLERANCE
SURVEY TOOLS
Outside
1240 0.05
micrometer1200-
Ra3.2
-0.04
1.09
0.02
1400mm
Qualified
inside micrometer
150-2000mm
Outside
0.05
680 0
micrometer700-
Ra1.6
0.02
1.6
0.03
800mm
Qualified
inside micrometer
150-2000mm
Outside
0.098
1220 0.203
micrometer1200-
Ra1.6
-0.17
1.6
0.02
1400mm
Qualified
inside micrometer
150-2000mm
Outside
1050 0.105
Ra0.8
-0.04
0.54
0.02
0.02
micrometer10001200mm
Qualified
inside micrometer
150-2000mm
Outside
-0.025
700 - 0.074
micrometer700-
Ra1.6
-0.02
0.45
0.02
800mm
Qualified
inside micrometer
150-2000mm
Outside
1220 0.2
micrometer1200m-
Ra3.2
-0.04
0.34
0.03
1400mm
Qualified
inside micrometer
150-2000mm
inside micrometer
150-175mm
H1
43050.1
Ra1.6
+0.06
1.6
0.02
0.02-
inside micrometer
175-200mm
Qualified
inside micrometer
1000-4000mm
INSPECTION
REPORT
Inspection Date
Document No.
A+SH_ICC_05214_
20150818
Client Name
GNF
Overall Result
pending
Page 13 of 14
INSPECTION
REPORT
Inspection Date
Document No.
A+SH_ICC_05214_
20150818
Client Name
GNF
Overall Result
pending
Page 14 of 14
Type
serial No.
Valid date
dial indicator
(0~10)mm
1029612
2015/10/16
Roughness meter
RT100
0800L130005
2015/9/1
(175~200)mm
6940
2015/10/15
(1000~4000)mm
050566405
2015/09/25
(150~175)mm
742553
2015/09/13
(150~2000)mm
020814850
2015/9/24
UT
23145102265UT
2017/12/30
D. CONCLUSION
1.
The factory didn't carried out MT internal checking for turbine shaft,they want finish MT internal
test of turbine shaft together with the generator shaft