Qty Rate
Per Unit (Rs.) Amount (Rs.)
Rate Analysis for 1250 Bricks
Labour
Total 140.00
Sundries 10.00 Percent 14.00
Total 154.00
Item Rates
Page 1
DESCRIPTION OF ITEM NO 2: Loading or unloading bricks into or from Railway
Wagons laid and stacked lead within one chain.
Qty Rate
Per Unit (Rs.) Amount (Rs.)
Rate Analysis for 1250 Bricks
Labour
Total 175.00
Sundries 10.00 Percent 17.50
Total 192.50
Item Rates
Page 2
Item No. 2 Loading or unloading bricks into or from Railway
Wagons laid and stacked lead within one chain.
Qty Rate
Per Unit (Rs.) Amount (Rs.)
Rate Analysis for 1250 Bricks
Labour
Total 140.00
Sundries 10.00 Percent 14.00
Total 154.00
Item Rates
Page 3
DESCRIPTION OF ITEM NO 3: Loading or unloading into or from Railway
Wagons cement in bags (from inside or outside
the go-down) and stacking within one chain.
Qty Rate
Per Unit (Rs.) Amount (Rs.)
Rate Analysis for 125 Bags
Labour
Total 175.00
Sundries 10.00 Percent 17.50
Total 192.50
Item Rates
Page 4
DESCRIPTION OF ITEM NO 4: Loading or unloading into of from Railway
Wagons empty cement bags (from inside or
outside the go-down) and stacking.
Qty Rate
Per Unit (Rs.) Amount (Rs.)
Rate Analysis for 125 Nos.
Labour
Total 16.80
Sundries 10.00 Percent 1.68
Total 18.48
Item Rates
Labour Rate Per 100 Nos Rs. 22.18 17.74 Say 17.75
125
Page 5
DESCRIPTION OF ITEM NO 5: Loading or unloading into or from Railway
Wagons (from inside or outside the go-down) and
stacking white lime in bags.
Qty Rate
Per Unit (Rs.) Amount (Rs.)
Rate Analysis for 125 Mds
Labour
Total 105.00
Sundries 10.00 Percent 10.50
Total 115.50
Item Rates
Page 6
DESCRIPTION OF ITEM NO 6: Loading or unloading into or from Railway
Wagons structural steel, joists, broad, narrow or
meter gauge rail and rail fastening etc.
Qty Rate
Per Unit (Rs.) Amount (Rs.)
Rate Analysis for 125 Ton
Labour
Total 84.00
Sundries 10.00 Percent 8.40
Total 92.40
Item Rates
Page 7
DESCRIPTION OF ITEM NO 7: Loading or unloading 45 gallons drum full into
or from Railway Wagons lead upto one chain.
Qty Rate
Per Unit (Rs.) Amount (Rs.)
Labour
Total 8.40
Sundries 10.00 Percent 0.84
Total 9.24
Item Rates
Page 8
DESCRIPTION OF ITEM NO 8: Loading or unloading packages or stock of all
sorts upto I cwt. except cement in jute or paper
bags.
Qty Rate
Per Unit (Rs.) Amount (Rs.)
Labour
Total 4.20
Sundries 10.00 Percent 0.42
Total 4.62
Item Rates
Page 9
DESCRIPTION OF ITEM NO 9: Loading or unloading sleepers other than wooden
including stacking lead within one chan in.
Qty Rate
Per Unit (Rs.) Amount (Rs.)
Rate Analysis for 125 Nos.
Labour
Total 350.00
Sundries 10.00 Percent 35.00
Total 385.00
Item Rates
Page 10
Item No. 9 Loading or unloading sleepers other than wooden
including stacking load within one chan in.
Qty Rate
Per Unit (Rs.) Amount (Rs.)
Rate Analysis for 125 Nos
Labour
Total 175.00
Sundries 10.00 Percent 17.50
Total 192.50
Item Rates
Page 11
DESCRIPTION OF ITEM NO 10: Loading or unloading timber logs or timber for
shuttering into or from Railway Wagons of any
gauge including stacking, lead within one chain.
Qty Rate
Per Unit (Rs.) Amount (Rs.)
Rate Analysis for 20 Ton
Labour
Total 700.00
Sundries 10.00 Percent 70.00
Total 770.00
Item Rates
Page 12
DESCRIPTION OF ITEM NO 11: Loading or unloading bhoosa in Railway Wagons
lead upto 150 feet.
Qty Rate
Per Unit (Rs.) Amount (Rs.)
Rate Analysis for 125 Mds
Labour
Total 420.00
Sundries 10.00 Percent 42.00
Total 462.00
Item Rates
Page 13
DESCRIPTION OF ITEM NO 12: Loading or unloading timber scrap or wooden
plugs into or from Railway Wagons and stacking
within one chain lead.
Qty Rate
Per Unit (Rs.) Amount (Rs.)
Rate Analysis for 1.25 Ton
Labour
Total 70.00
Sundries 10.00 Percent 7.00
Total 77.00
Item Rates
Page 14
DESCRIPTION OF ITEM NO 13: Loading or unloading pitching stone or spawl
from Railway Wagons of any gauge (including
clearing 5 feet away from the rail)
Qty Rate
Per Unit (Rs.) Amount (Rs.)
Rate Analysis for 125 Cft.
Labour
Total 51.80
Sundries 10.00 Percent 5.18
Total 56.98
Item Rates
Page 15
DESCRIPTION OF ITEM NO 14: Loading or unloading building stone (including
clearing 5 feet away from rails)
Qty Rate
Per Unit (Rs.) Amount (Rs.)
Rate Analysis for 125 Cft.
Labour
Total 67.20
Sundries 10.00 Percent 6.72
Total 73.92
Item Rates
Page 16
DESCRIPTION OF ITEM NO 15: Unloading oil, bitumen tar etc.
Qty Rate
Per Unit (Rs.) Amount (Rs.)
Rate Analysis for 1250 Gallons
Labour
Total 175.00
Sundries 10.00 Percent 17.50
Total 192.50
Item Rates
Page 17
Item No. 15 Unloading oil, bitumen tar etc.
Qty Rate
Per Unit (Rs.) Amount (Rs.)
Rate Analysis for 1250 Gallons
Labour
Total 175.00
Sundries 10.00 Percent 17.50
Total 192.50
Item Rates
Page 18
Item No. 15 Unloading oil, bitumen tar etc.
Qty Rate
Per Unit (Rs.) Amount (Rs.)
Rate Analysis for 125 Cft
Labour
Total 22.40
Sundries 10.00 Percent 2.24
Total 24.64
Item Rates
Page 19
Item No. 15 Unloading oil, bitumen tar etc.
Qty Rate
Per Unit (Rs.) Amount (Rs.)
Rate Analysis for 45 Ton
Labour
Total 2,240.00
Sundries 10.00 Percent 224.00
Total 2,464.00
Item Rates
Page 20
Item No. 15 Unloading oil, bitumen tar etc.
Qty Rate
Per Unit (Rs.) Amount (Rs.)
Rate Analysis for 125 Nos
Labour
Total 88.20
Sundries 10.00 Percent 8.82
Total 97.02
Item Rates
Page 21
Item No. 15 Unloading oil, bitumen tar etc.
Qty Rate
Per Unit (Rs.) Amount (Rs.)
Rate Analysis for 125 Nos
Labour
Total 175.00
Sundries 10.00 Percent 17.50
Total 192.50
Item Rates
Page 22
DESCRIPTION OF ITEM NO 16: Removing and stacking within one chain lead.
Qty Rate
Per Unit (Rs.) Amount (Rs.)
Rate Analysis for 125 Cft
Labour
Total 70.00
Sundries 10.00 Percent 7.00
Total 77.00
Item Rates
Page 23
Item No. 16 Removing and stacking within one chain lead.
b) Bricks
Qty Rate
Per Unit (Rs.) Amount (Rs.)
Rate Analysis for 15,000 Nos
Labour
Total 2,240.00
Sundries 10.00 Percent 224.00
Total 2,464.00
Item Rates
Page 24
Item No. 16 Removing and stacking within one chain lead.
Qty Rate
Per Unit (Rs.) Amount (Rs.)
Rate Analysis for 2,500 Nos
Labour
Total 2,240.00
Sundries 10.00 Percent 224.00
Total 2,464.00
Item Rates
Page 25
Item No. 16 Removing and stacking within one chain lead.
Qty Rate
Per Unit (Rs.) Amount (Rs.)
Rate Analysis for 4,200 Nos
Labour
Total 2,240.00
Sundries 10.00 Percent 224.00
Total 2,464.00
Item Rates
Page 26
Item No. 16 Removing and stacking within one chain lead.
Qty Rate
Per Unit (Rs.) Amount (Rs.)
Rate Analysis for 90 Ton
Labour
Total 2,240.00
Sundries 10.00 Percent 224.00
Total 2,464.00
Item Rates
Page 27
Item No. 16 Removing and stacking within one chain lead.
Qty Rate
Per Unit (Rs.) Amount (Rs.)
Rate Analysis for 750 Nos
Labour
Total 2,240.00
Sundries 10.00 Percent 224.00
Total 2,464.00
Item Rates
Page 28
DESCRIPTION OF ITEM NO 17: Loading into Wagons Girders, Rails, permanent
way material (except wooden sleepers) iron work,
M.S. Bars, Pipes, etc. including lead one chain
and stacking inside Wagons.
Qty Rate
Per Unit (Rs.) Amount (Rs.)
Rate Analysis for 40 Ton
Labour
Total 2,240.00
Sundries 10.00 Percent 224.00
Total 2,464.00
Item Rates
Page 29
DESCRIPTION OF ITEM NO 18: Unloading from Wagons Girders, Rails,
permanent way material (except wooden sleepers)
iron work, M.S. Bars, Pipes, etc. lead upto one
chain but excluding stacking.
Qty Rate
Per Unit (Rs.) Amount (Rs.)
Rate Analysis for 70 Ton
Labour
Total 2,240.00
Sundries 10.00 Percent 224.00
Total 2,464.00
Item Rates
Page 30
DESCRIPTION OF ITEM NO 19: Loading into Wagons, wooden broad gauge
sleepers including one chain lead and stacking.
Qty Rate
Per Unit (Rs.) Amount (Rs.)
Rate Analysis for 1,000 Nos
Labour
Total 2,240.00
Sundries 10.00 Percent 224.00
Total 2,464.00
Item Rates
Page 31
DESCRIPTION OF ITEM NO 20: Unloading wooden broad gauge sleepers from
Wagons including one chain lead and stacking.
Qty Rate
Per Unit (Rs.) Amount (Rs.)
Rate Analysis for 2,100 Nos
Labour
Total 2,240.00
Sundries 10.00 Percent 224.00
Total 2,464.00
Item Rates
Page 32
DESCRIPTION OF ITEM NO 21: Loading metre gauge or narrow gauge wooden
sleepers including one chain lead and stacking
inside Wagons.
Qty Rate
Per Unit (Rs.) Amount (Rs.)
Rate Analysis for 2,000 Nos
Labour
Total 2,240.00
Sundries 10.00 Percent 224.00
Total 2,464.00
Item Rates
Page 33
DESCRIPTION OF ITEM NO 22: Unloading metre gauge or narrow gauge wooden
sleepers including one chain lead but excluding
stacking
Qty Rate
Per Unit (Rs.) Amount (Rs.)
Rate Analysis for 3,800 Nos
Labour
Total 2,240.00
Sundries 10.00 Percent 224.00
Total 2,464.00
Item Rates
Page 34
DESCRIPTION OF ITEM NO 23: Loading Bridge and grossing timber including
one chain lead and stacking.
Qty Rate
Per Unit (Rs.) Amount (Rs.)
Rate Analysis for 125 Nos
Labour
Total 560.00
Sundries 10.00 Percent 56.00
Total 616.00
Item Rates
Page 35
DESCRIPTION OF ITEM NO 24: Unloading Bridge and crossing timber including
one chain lead but excluding stacking.
Qty Rate
Per Unit (Rs.) Amount (Rs.)
Rate Analysis for 125 Nos
Labour
Total 280.00
Sundries 10.00 Percent 28.00
Total 308.00
Item Rates
NOTE :
Rate for loading and unloading for Mobile trucks/ boats, item 1-15 will be 80%
of the rate of Railway Wagons.
Page 36
DESCRIPTION OF ITEM NO 25: Loading or unloading bitumen, asphalt or tar in
drums, into or from Railway Wagons lead upto
one chain.
Qty Rate
Per Unit (Rs.) Amount (Rs.)
Rate Analysis for 25 Ton
Labour
Total 840.00
Sundries 10.00 Percent 84.00
Total 924.00
Item Rates
Page 37