Você está na página 1de 4

ANDRES P.

VILLARIN

POSITION: Rigger/Foreman Rigger


OBJECTIVES: A career in rigging hook-up, dismantling, structural installation, removal of valve reinstatement
in oil and gas refinery with safety standards (L.S.P). Loler Standard both in onshore and offshore field
assignment.
PERSONAL DATA:
Date of Birth
Place of Birth
Citizenship
Passport No.
Seaman Book No.
Provincial Address
City Address

:
:
:
:
:
:
:

Nov 16, 1961


Maypajo Caloocan City (Philippines)
Filipino
SS0185922
B0321580
Bario-An Tagudin, Ilocos Sur
No.39 A.De Guzman St., Concepcion, Marikina City

WORKING EXPERIENCE
April 27, 2012 - present

Southern highlands EPC camp. Papua New Guinea


(Rigger) Kentz/ Exxon Mobil LNG Extraction Project

Duties Responsibilities
Loading/ unloading of materials
Housing Accommodation module assembly
March 24, 2011-June 19, 2011

Port Moresby Papa New Guinea


(Rigger) BCJV BAM Clough

Duties Responsibilities
Loading/Unloading of Materials such as Precast Girder, Structural Materials.
Involve in Assembly of Cantilever Beams for Pile Driving.
March 16, 2010-Dec 11, 2010

Heerema Marine Cont.LTD


Angola, Porto Amboim (Rigger Foreman)

Duties Responsibilities
Involve in Pipe Assembly
Loading/Unloading from Barge to Fab Plant
Segregation of Pipe to be delivered in Offshore Platform BLK 31 Project.
2008.2009

Grand Isle Shipyard


Gulf of Mexico U.S.A

(Rigger Foreman)
Duties Responsibilities
Responsible in the preparation of Rigging Tools and accessories for rigging lifting and Hook-up
intallationss in offshore platform.
Rigging with in safety standard (LOLER). Lifting Operation and Lifting Equipment Regulation.
June 24, 2007-Oct.20, 2007

Grand Shipyard
Gulf of Mexico U.S.A
(RIGGER)

Duties Responsibilities
Rehabilitation and repair of offshore platform
Deck rigging and material boat transfer
April 04, 2006-May 17, 2006

Grand Isle Shipyard


Gulf of Mexico U.S.A
(RIGGER)

Duties Responsibilities
Rehabilitation of MARS LTP (Tension Leg Platform)
Routine and non-routine complicated rigging techniques.
Sept 08, 2006-Oct.20, 2006

BRITANIA SATELLITES, U.K (NORTH ASIA)


OFFSHORE PLATFORM
RIGGER FOREMAN (CHARGEHAND)

Duties Responsibilities
Structural piping and Mechanical installation
Deck Rigging
July 06, 2006- August 2006

ARMADA HUB SHUTDOWN U.K. (NORTH SEA)


OFFSHORE
(RIGGER)

Duties Responsibilities
Shutdown including hook-up and commissioning
Rigging of flanges to pipeline for testing and pipe spool for installation with in safety standards.
Sept 22, 2005-Dec 16, 2005

BONGA F.P.S.O. (Floating Production Storage Offloading)


OFFSHORE NIGERIA
(RIGGER)

Duties Responsibilities

Hook-up and Commissioning


Structural
Hook- up and Commissioning
Structural Piping and Mechanical Installations
Deck Rigging Using Pedestal Cranes

2002.2005

DOHA PETROLEUM (QATAR GAS PROJECT)


(RIGGER ONSHORE / OFFSHORE

Duties and Responsibilities

Shutdown jobs in train 1, train 2 and 3


Complicated rigging of Heat Exchanges Team Turbines, Gas Turbines Cylinder.
Heavy Lift Rigging De-Bottlenecking
Shutdown jobs in HALUL ISLAND QATAR OFFSHORE

Oct 15, 2000 Oct 14, 2001

ABV ROCK GROUP, ABHA KINGDOM OF SAUDI ARBIA


(RIGGER)

Duties and Responsibilities

Saudi Strategic Storage Program (S.S.S.P.)


Material Handling and module Set0up using Mobile Cranes
Erection in Underground tunnel A to Z.
Fuel stock-up coming from Refineries for Jet Fuel

July 20, 1999- Dec 28, 1999

ABB MULLUS GLOBAL OVERSEAS CORP.COASTAL


ARUBA REFINING CO. SOUTH AMERICA
(REBAR IRON WORKER)

Duties and Responsibilities


Assembly and erection of structural steel components in cokes projects using Grove all terrain 70 tons.
Cranes
Erection of refinery Flare using VAN SEUMEREN HOLLAND 430 TON. all option cranes.
Nov 18, 1995 Nov 18, 1997

ABV ROCK GROUP K.B KINGDOM OD SAUDI ARABIA


RIYADH
(STEEL RECTOR / PLATER

Duties and Responsibilities


Erection of structural steel components inside tunnel A to Z.
Lay-out and interpretation of shop drawing in underground tunnel S.S.S.P. (Saudi Strategic Storage
Program)
April 17, 1991-June 26, 1995

QDC (QANBAR / DYWIDAG CO.K.S.A)


(ERECTOR RIGGER)

Duties and Responsibilities


Erection of Beams, Panels, Trusses, Girder and other pre-cast elements

Project: AL WAHA SHOPPING CENTER, TOYS TOWN, HALF MOON BEACH RESORTS.

1985-1991

PHILTRESS CONCRETE (PHILIPPINES


(ERECTOR / RIGGER

Duties and Responsibilities


Erection of Pres-Cast Elements Project: ROBINSONS SHOPPING CENTER, MUSLIM MOSQUE IN
QUIAPO MANILA.

TRAINING AND SEMINAR ATTENDED


CONDUCTED BY:
Qatar Petroleum
Qatar Gas
Grand Isle Shipyard USA
Grand Isle Shipyard USA
Grand Isle Shipyard USA
Grand Isle Shipyard USA
Grand Isle Shipyard USA
Grand Isle Shipyard USA
Grand Isle Shipyard USA
Grand Isle Shipyard USA
Grand Isle Shipyard USA
Grand Isle Shipyard USA
Grand Isle Shipyard USA
Grand Isle Shipyard USA
ABB (Aruba South America)
ABB (Aruba South America)
Consolidated Training System
ABV Rock Group
Oil and Gas for Britain
TESDA
ACEL
IST

TITLE
H2S /BA Training
H2S/BA Training
Back Safety
Confined Space Entry
Env. Awareness All-up
Fall Protection
H2S Awareness
Haz Comm.
Hazwoper Awareness
Hearing Conservation
Lead Safety
Lock Out /Tag Out
Respiratory
Rigging
Confined Space Entry
Basic Rigging Safety
Basic Offshore Safety
Induction and Emergency
Training Fire Theory
Fire Theory
Offshore Fitness (UKOOA)
HEO (RIGGER)
RIGGER NC-1
BASIC DOGGING
-RIGGING-

DATE TAKEN
March 28, 2005
March 29, 2005
April 03, 2006
April 04, 2006
April 02, 2006
April 03, 2006
April 03, 2006
April 03, 2006
April 03, 2006
April 02, 2006
April 03, 2006
April 03, 2006
April 03, 2006
April 04, 2006
July 27, 1999
July 23, 1999
August 31, 2005

VALIDITY
March 27, 2006
March 28, 2007
April 03, 2009
April 04, 2009
April 02, 2007
April 03, 2009
April 03, 2007
April 03, 2009
April 03, 2007
April 02, 2007
April 03, 2007
April 03, 2009
April 03, 2009
April 04, 2009
July 28, 1999
July 24, 1999
Sept.01, 2009

Nov 28. 1995


May 23, 2006
Jan 13, 2010
Jan 13, 2010
Jan 20, 2011

No Validity
May 23, 2008
January 13, 2015
No Validity
No Validity

Você também pode gostar