Escolar Documentos
Profissional Documentos
Cultura Documentos
For efficient management of your assets, Halliburtons FS fluid loss isolation barrier
valve provides a reliable, interventionless solution for fluid loss control in your well
completion, eliminating potential formation damage.
e FS valve isolates the formation below the uppermost gravel-pack packer before
the upper completion has been installed and can be utilized in frac pack, gravel pack
and standalone screen applications.
Preventing fluid loss to formations aer completing initial gravel pack operations
Isolating formations during up-hole operations throughout the life of the well
Optimum placement of the FS valve is normally below the gravel pack or liner
hanger assembly. Washpipe, located on the bottom of the service tool, is extended
through the valve. A collet shiing tool is attached to the end of the washpipe,
which on retrieval closes the valve, immediately isolating the formation and
allowing inflow or positive pressure-testing above the ball. Remote actuation in
the form of hydraulic pressure cycles is then used to open the valve aer upper
completion installation.
HAL30847
COMPLETION SOLUTIONS
Valve opens on pressure bleed down, minimizing the risk Burst rating up to 12,000 psi (827.4 bar)
of surging the formation. Temperature rating to 350F (176.7C)
Full bore ID maximizes production and allows access to Increased differential opening capability
the formation.
Design incorporates enhanced debris exclusion features.
Mechanical shiing profile incorporated within design.
Sealed actuation mechanism helps prevent control system
contamination.
Cycling mechanism isolated from debris in the well bore.
2015 Halliburton. All rights reserved. Sales of Halliburton products and services will be in accord solely with the terms and conditions contained in the contract
between Halliburton and the customer that is applicable to the sale. H07007 03/15
www.halliburton.com