MINUTE OF MEETING

Subject : Inspection (Final Acceptance Test) Generator Unit 1 & Unit 2


Date : March, 26'n -29 '2013 Meeting No.:
Hour : 9.00 LocalTime - Finish
Meeting Beetween :

PLN UIP KITRING NUSRA II Location :


PT. TWINK - PERCIE Hang Zhou Hangfa Electrical Equipment Co. Ltd
HCTC

Attachment : Distribution :
t. Test Report for Unit 1 & unit 2 1. PLN UIP KITRING NUSRA II
2. Steam Tubining Generator Program 2. PT. TWINK - PERCIE
3. MaterialCertificate 3. HCTC
4. Attendance List

Minutes Reviewed and Agreed

Hang Zhou
Electrical

PT. TWINK- PERCIE PTN UIP KITRING NUSRA II

lDidik Aeus S)
JE Tekhnik Mechanical
MINUTE OF MEETING
No. Item/Meeting Result Action by Remark
1. Generator Unit 1
(lnspection Factory Acceptance Test)
The Inspection was held dated on March 26,h - 2gil
2013, and following test activities which carried out in
factory during this session. :
1. Insulation Resistance Test
This test intended to determine the insulation
resistance for each phase winding, and
determine whether the condition of insulatior
is good or not according to it class. Test result
is acceptable as attached.

2. Direct Current Resistance Test


Test result is acceptable as attached.

3. Alternating Cu rrent lmpedance


Test result is acceptable as attached.

4. OCC Test
This test is intended to determine the open
circuit characteristic of generator voltage
related to field current.
Test result is acceptable as attached.

5. SCC Test
This test is intended to determine the short
circuits characteristic of generator voltage
related to field current.
Test result is acceptable as attached.

6. Short Circuit ratio Test


Test result is acceptable as attached.

7. Overspeed Test
Overspeed test has been performing on 3600
rpm and duration 2 minute. Generator has
been perform ing succesfully.

--g-6
r,\ t\
2. Generator Unit 2
(lnspection Factory Acceptance Test)
The nspection was held dated on March 26'n -Zg'n
f

2013, and following test activities which carried out in


factory during this session. :
L. Insulation Resistance Test
This test intended to determine the insulation
resistance for each phase winding, and
determine whether the condition of insulation
is good or not according to it class. Test result
is acceptable as attached.

2. Direct Current Resistance Test


Test result is acceptable as attached.

3. Alternating Current lmpedance


Test result is acceptable as attached.

4. OCC Test
This test is intended to determine the open
circuit characteristic of generator voltage
related to field current.
Test result is acceptable as attached.

5. SCC Test
This test is intended to determine the short
circuits characteristic of generator voltage
related to field current.
Test result is acceptable as attached.

6. Short Circuit ratio Test


Test result is acceptable as attached.

7. Overspeed Test
Overspeed test has been performing on 3600
rpm and duration 2 minute. Generator has
been performing succesfully.

3. Generator Unit 1 & 2 will be ready for shipment in the


middle of April 201-3, but consortium will shipment
Generator (Unit L&2)together with Steam Turbine
estimeted in the middle of June 2013.
4. For Voltage withstand test for Coil insulation HCTC
cannot Test in Workshop, and will be tested on site.
5. Original QC Report document will be submit along
with Generator shipment.
6. Conclussion :
Generator Unit 1& 2 has been tested succesfully

A
Day/Date Tuesday - Friday / March Z6th - Z9th,2O!3
Hour 09.00 - Finish (Local time)
Venue Hang Zhou office, China
Agenda Inspection (FAT) Generator unit 1 & 2 PLTU SUMBAWA BARAT 2 X 7 MW.

No. Name Company Phone Email Signature


Number I
1
JUcrutzFN PWUIP& 0D16r+19, -7h__
2.

3.
DrDfK A6US

Llesrz f
t
T?& 6rtrv
UPr Mas

Put F{?-R
m rr
Nfik. qws
009?ltfioUts Qrln. [o.ttl

O0tzCftg\t ,lizratmix
frr
' C nl^-.(dt,
4.
-,+<?ru Lle'v,) t3l,{6ty1 ,n
5. l"qp.n/
f{ar1ano1 l.oirak DBtlrolqg tva.co .d h\
%
'
6.
ntbtbr& ufls,ft@^I@r.
W tWtEU Z'Jkl
7. //

8.

9.

10.

11.

L2.

13.

14.

15.

76.