1 PROYECTO VIVIENDA 0.96 1 mié 18/01/17 mar 17/01/17 S/. 9,760.00

2 FASE 1 0.82 1 jue 05/01/17 vie 06/01/17 S/. 6,960.00

3 COMPRA 1 1 mié 14/12/16 mié 14/12/16 S/. 720.00 CAIN

4 LICENCIA 1 1 mar 20/12/16 mar 20/12/16 S/. 1,600.00 ABEL

5 LIMPIEZA 0.5 1 vie 16/12/16 mar 20/12/16 S/. 480.00 CAIN

6 EXCAVACION 0.83 1 mar 27/12/16 mié 28/12/16 S/. 2,000.00 ABEL

7 ESTRUCTURA 0.6 1 lun 02/01/17 mar 03/01/17 S/. 960.00 ABEL

8 INSTALACION 1 1 1 jue 05/01/17 vie 06/01/17 S/. 1,200.00 ABEL

9 FASE 2 1.67 1 mié 18/01/17 mar 17/01/17 S/. 2,800.00

10 TECHO 1.67 1 lun 09/01/17 mar 10/01/17 S/. 800.00 CAIN

11 INSTALACION 2 1.67 1 mié 11/01/17 jue 12/01/17 S/. 800.00 CAIN

12 ACABADO 3 1 lun 16/01/17 vie 13/01/17 S/. 720.00 CAIN

13 PINTURA 1 1 mar 17/01/17 lun 16/01/17 S/. 240.00 CAIN

14 JARDINES 1 1 mié 18/01/17 mar 17/01/17 S/. 240.00 CAIN

Tarea Resumen del proyecto Tarea manual solo el comienzo Fecha límite Progreso

Proyecto: CAIN ABEL División Tarea inactiva solo duración solo fin Línea base Progreso manual
Fecha: lun 06/02/17 Hito Hito inactivo Informe de resumen manual Tareas externas Hito de línea base

Resumen Resumen inactivo Resumen manual Hito externo Resumen de línea base

Página 1

Você também pode gostar