Você está na página 1de 2

The TB5000 Gas Turbine

Uprate to 5200/5400 bhp


For TB5000 Gas Turbines (and some later TB4000 models)

Answers for Energy

The TB type gas turbine, renowned for its ruggedness and reliability, numbering
in excess of 840 units operating throughout the world, was originally brought
into service in 1970.
Throughout the production life of the The Uprate
TB turbine, the design and
To increase the nominal ISO power
performance of the engine has been
improved, whilst maintaining its output of a TB5000 from 4900 bhp to
philosophy of reliability and ease of 5200/5400 bhp, the design maximum
maintenance on site. temperature was raised from 877C to
900C, giving an increased exhaust
Since the first TB3000, rated at 3100 temperature of 495C.
bhp*, the TB has undergone three power
enhancement changes; To cater for this increase in temperature,
various design changes were made to the
3990 bhp* - TB4000
turbine gas generator.
4900 bhp* - TB5000
5200/5400 bhp* - TB5000 uprate The combustion system is modified using
sealed chambers, the swirler tubes and
For the latter increase of power 4900 their extensions having special mating
bhp* to 5200/5400 bhp*, we can offer features to improve temperature spread
to uprate your TB5000 gas turbine. This to the compressor turbine.
uprate to 5200/5400 bhp* can also be
offered for some later TB4000 models.
(*Power output figures given based on
ISO conditions.)

www.siemens.com/energy
Limitations
Performance
Whilst the TB5000 can be
Obsolescence Health & The increase in power attained by
Safety uprated to provide up to 5400
uprating from 4900 bhp is 5200 bhp
bhp output, the following
for liquid fuel engines, and 5400 bhp
points should be noted:
Cost for gas fuel engines, subject to gas
Reduction Benefit by fuel analysis.
Reliability
Limitations of the driven unit
Mods & Ups
Dual fuel engines are rated respective Limitations of the gearbox
to the fuel used. and coupling
Performance
Environment

6000
Power Limit

6000
50
ISO Rating 5400 bhp (gas only)
ISO Rating 5200 bhp
ISO Rating 5200 bhp

ISO Power Output (bhp)


5000

5000
48
ISO Rating 4900 bhp
Ba
se
loa
The Parts dr

Ex
46 ati

ha
ng

us
tG

4000
For retrofitting to a 4900 bhp rated

as
44

Te
4000
Altitude sea level

m
TB5000, new swirler cones, flame

pe
Zero Loss Power Output (bhp) Ambient pressure 1.013 bar

r
at
Gearbox loss is not included

52
u

0
Inlet/exhaust ducting losses not included

re
42
tubes and extensions are required for

C
Power turbine speed 7950 rev/min

3000
50
0
--20 -10 0 10 20 30 40 50 C
the combustion system.

48
40

0
Ambient Temperature
3000

46
The cooling air for the first stage CT

0
38

44
lb/s

0
blades is routed through holes in the When requesting details or a

42

0
w 36
s Flo
quotation for a TB5000 uprate,

40
Mas
quadrants, hence the uprate requires Gas

0
st

380
Exhau 34
please quote the turbine serial
2000

the retrofit of new bladed quadrants.


360

number to enable us to check


340

32
320

The abradable seals of the second the engine details.


300
280

30
stage are fitted via a T slot in the
For a quotation of further
1000

stator ring, hence the retrofit of a


details, please contact your
340

360

380
280

300

320

40
new stator ring will be required.
0
local Siemens Industrial
0

-20 -10 0 10 20 30 40 50 C
Compressor Cleaning Ambient Temperature Turbomachinery Ltd
representative.
Early TB5000 gas turbines were fitted
with a dry solids compressor cleaning
system.
1*013 bar 7*30 bar 2*43 psia
14*7 psia 105*8 psia 6*86 bar
Due to the nature of the cooled blades 15 C 271 C 99*5 psia 53*3 ata
663 C
59 F 520 F 900 C 2*43 bar 1225 F
required for the uprate, the cooling 1625 F 53*3 psia
663 C
holes would become blocked with solids, 1225 F
defeating the cooling system. It is
therefore essential that a fluid wash
system is retrofitted.
When requesting a quote for a TB5000
uprate, please advise if a fluid wash
system is already fitted.

Published by and copyright 2013: For more information, please contact Energy Service Division All rights reserved. Trademarks mentioned in
Siemens AG our Customer Support Center. LCN 2013 - F33.19 LN this document are the property of Siemens AG,
Energy Sector Phone: +49 180 524 70 00 its affiliates, or their respective owners.
Printed on elementary chlorine-free
Freyeslebenstrasse 1 Fax: +49 180 524 24 71
bleached paper. Subject to change without prior notice.
91058 Erlangen, Germany (Charges depending on provider)
The information in this document contains
E-mail: support.energy@siemens.com
Siemens Energy, Inc. general descriptions of the technical options
4400 Alafaya Trail available, which may not apply in all cases.
Orlando, FL 32826-2399, USA The required technical options should
therefore be specified in the contract.

www.siemens.com/energy

Você também pode gostar