Você está na página 1de 4

Engr.

Muhammad Awais
House # D-161, WAPDA COLONY, Thermal Power Station,
District Muzaffargarh
Mobile: (+92)-333-6867453
Home: (+92)-66-2512125
Email: mawaistps@gmail.com

Profile

Master of Science in Electrical Engineering with majors in Power.

Career Objective

Seeking a challenging and responsible position in an organization where I can contribute to


the growth of both a prospective employer & myself in an excellent environment providing
opportunities of learning, growth and carrier development.

Personal Information

Date of Birth : 13th July, 1992


Marital Status : Single
Religion : Islam
Domicile : Rahim Yar Khan
CNIC No : 32304-4305128-3
Nationality : Pakistani

Education

M.Sc Electrical Engineering (Power) (2014-2016)


University of Gujrat
CGPA: 2.74/4.00 (Thesis remaining)

B.Sc Electrical Engineering (Power) (2010-2014)


The Islamia University of Bahawalpur Pakistan
CGPA: 3.24/4.00
PEC Reg. No. ELECT/48792

Intermediate (FSc Pre-Engg:) (2008-2010)


Board of Intermediate and Secondary Education Dera Ghazi Khan
Percentage: 80.09%

Matriculation (with Science) (2006-2008)


Board of Intermediate and Secondary Education Dera Ghazi Khan
Percentage: 84.58%
Work Experience

1. I am working as Trainee Engineer with M/s. Al-Bario Engineering Pvt Ltd. at


NPGCL, 425 MW CCPP Nandipur Gujranwala, w.e.f 5th May, 2016 to date.

During this period I have undergone for practical training of different


systems of Operation of Gas Turbine and gained best knowhow and
experience in different sections of the Combined Cycle Power Plant,

o Operation of Gas Turbine (Frame 9E)


o Chemical Plant (WTP)
o Fuel Oil Treatment Plant (FOTP)
o Fuel Oil Forwarding (FOF)
o Auxiliary Boiler

I got practical field experience of Testing and Commissioning of Electrical


Equipments and gained knowledge in :-
o Protection Schemes of Motors (WDZ-430EX Motor Management
Relay) and performed testing by FREJA 300 Relay Test System
o Protection Schemes of medium voltage Transformers 11kV
Switchgear room (WDZ-440EX Transformer Management Relay)
and also performed testing by FREJA 300 Relay Test System.
o Protection schemes of main Power Transformer and Auxiliary
Transformer and performed testing of Nari Relays RCS-985TM and
RCS-985TS respectively by FREJA 300 Relay Test System.
o Breaker Failure Protection RCS-921 Relay is tested of 132 kV Switch
Yard by FREJA 300 Relay Test System.

Testing and Commissioning of Electrical equipments.


Following Tests are performed of Main power Transformer and Auxiliary
Transformer.
o ZGF-120/5 DC High Pot Test
o Transformer winding resistance by Transformer Resistance Meter.
o Capacitance and tan-delta test.
o Megger Test HT 2672.

Switchgear Room and Switchyard Testing


o Circuit Breaker (11kV) Megger Test HT 2672.
o Circuit Breaker (11kV, 132kV) Contacts Resistance Test by MOM
200A.

I feel pleasure to say that I obtained highest percentage i.e 72% in my group,
for the Trainee Engineers Test, conducted by M/s. Al-Bario on weekly basis.
2. Organization Kot Adu Power Company Limited (KAPCO)
Designation Internee Engineer
Tenure 1st July, 2013 to 15th August, 2013
Responsibilities Learned the working of Combined Cycle Power Plant
(getting better understanding of Gas Turbine Control)

3. Organization WAPDA Thermal Power Station, NPGCL GENCO-III, Muzaffargarh


Designation Internee Engineer
Tenure i) 18th July, 2012 to 17th August, 2012
ii) 9th March, 2016 to 3rd May, 2016
Operation of Steam Turbine.
Got better understanding of Generator (Cooling mechanism,
Excitation system).
Learned about different Cycles to convert Water into Steam.
Got knowledge of 220kV Switchyard /500kV Grid Station
Responsibilities Got experience of Transformer Differential Protection,
Transmission lines Distance Relays Protection Scheme
Knowledge in Electrical Control & Protection Section.
Got fully understanding about Relays, Circuit Breaker
Operation, Control and Protection Drawings and Interlocking
of Drawings with other circuits.
Worked by Hand in 6.6 kV & 4.4 kV Switchgear

Semester Project

Speed control of DC motor


Wind Power Generation
RLC parallel circuit on zero board

BSc Final Year Project:

Speed control of three phase induction motor

A Simulation based project in which control the speed of three phase induction motor
by using vector control technique. In vector control technique we control the torque and flux
separately just like that DC motor.

MSc Final Year Project:

Power quality improvement of grid connected renewable energy system using FACTS
devices.
A Simulation based project in which AC Power system (grid) is synchronized with
wind power and improve the quality issues that occur due to fluctuations of the wind by using
Flexible AC Transmission System (FACTS) devices.

Skills:
Personal Skills:
Easily adoptable to any kind of environment.
Always willing to go an extra mile
An efficient team worker.
Hard working and dedicated.
Tools:
MS Office (Word, Excel and Power Point)

Operating System:
Window 7, Window XP, Window 98, Window 2000, Window 8
Hobbies:
Playing badminton
Doing physical exercise.
Football
Gathering knowledge

References/Doc/d///
Will be provided on demand.

Você também pode gostar