BIM EXECUTION PLAN TEMPLATE

Notes

The applicants must establish, implement and document the processes and
procedures required to achieve BIM objectives in the BIM Execution Plan
(BEP), including the following:

1. BIM workflows and delivery methodologies

2. Individual discipline modelling


2.1 Revision management
2.2 Model orientation and site configuration
2.3 Model division and structure
2.4 Modelling guidelines

3. Inter-discipline collaboration
3.1 Data sharing process, framework and protocol, including the
data information and models to be shared, file formats and
frequency of data sharing
3.2 Coordination review process and plan, including use of BIM in
coordination meetings
3.3 Clash detection procedure, methodology and plan

Besides Items 1 3 above, BIM Fund applicants must fill up Items 4 9 below,
which will be reviewed for BIM Fund assessment purposes. Applicants may
use other templates, as long as the equivalent content of all Items 1 9 are
included and any other relevant information.

4. Project Information Page 2

5. Project Members Page 2

6. Key Performance Indicators Page 3

7. Model Checklist for BIM Collaboration Page 4

8. BIM Objective and Responsibility Matrix Page 6

9. Model Elements for each Deliverable Page 6

1
4. PROJECT INFORMATION

Project Owner

Project Reference Number

Project Title

Project Description

Contract Type

Estimated Project Size (GFA)

Estimated Project Value

5. PROJECT MEMBERS

Title Name Company Discipline Remarks

2
6. KEY PERFORMANCE INDICATORS

Key Performance Indicators are used to quantify the productive performance of the BIM project delivery.

Leading Indicators (see example below)

Time taken to resolve RFIs (latency)

No of RFIs trending over time

3
7. MODEL CHECKLIST FOR BIM COLLABORATION

Notes
Applicants must fulfil at minimum the list below, in at least one of the following stages:
- Design stage before tender
- Before substructure construction
- Before superstructure construction.

7.1 All Control Elements


7.2 Any 3 clash-free pair of elements in each of the Architectural-Structural, Structural-MEP and Architectural-MEP matrix
(Applicant to submit a total of 9 pairs)
7.3 Any 3 elements in each of the 3 disciplines to meet intra-discipline quality standards 1 4
(Applicant to submit a total of 9 elements)
7.4 Sample images

7.1 CONTROL ELEMENTS


LOCATION AND ORIENTATION Link models by "Origin to origin". All models must align.
GRIDS Check in any floor plan if grids align in all models
Check if levels align in all models. (Note: it is acceptable for SFL to be different from FFL
LEVELS provided the difference in drops between both is logical and consistent, and there is a
corresponding SFL for every FFL.)

4
7.2 INTER-DISCIPLINE 7.3 INTRA-DISCIPLINE

5
COORDINATION CLASHES: 1. OVERLAPS AND DUPLICATES:
Perform interference checks for all coloured boxes below Perform automated interference checks for the same element.
- The GREEN boxes are compulsory to be checked, if applicable. There must be zero interferences
There must be zero interferences 2. USE OF CORRECT OBJECTS:
Turn off visibility of all categories except for category to check.
There must be no instance of any model element not belonging to this category.
3. INFORMATION
Open prepared schedule
There must be no instance of any model type using "Generic", Typical,
"Default", or any ambiguous type
4. NAMING CONSISTENCY
In same schedule, all model types must be named consistently
ARCHITECTURAL STRUCTURAL

FoundationStructural

Structural Framing
ColumnStructural

Structural Wall
NAMING
Window
1 2 3 4

(others)

(others)
REMARKS
Ceiling
Floor

Door

Slab
Wall

CONVENTION
STRUCTURAL LARCHITECTURA

Floor 00

Wall
Ceiling
Door
Window
Generic Models
Structural Column
Structural
Foundation
Structural Framing
Structural Wall
Slab
Generic Models
MEP

Mechanical
Equipment
Ducts
Air Terminals
Pipe

6
Plumbing Fixtures
Cable Tray
Generic Models

7.4 SAMPLE IMAGES


Control Elements Intra-Discipline Inter-Discipline
Correct Incorrect Correct Incorrect Correct Incorrect
2
Models
located in Models not
the same located in
coordinates the same
coordinates
2 floor elements do not floor elements overlap Slab openings for ducts No slab opening, thus ducts
overlap penetrate slabs

Grids are aligned No clashes for pile cap Pipe clashing with pile cap
Grids are not aligned Single plumbing fixture Duplicate plumbing fixture

Levels are not aligned


Levels are aligned Floor category consists of Beam and ceiling free of Beam clashing with ceiling
Louvers modelled as floors
floors only clashes

8. BIM Objective and Responsibility Matrix (Refer to Singapore BIM Guide Appendix B)

9. Model elements within each deliverable (Refer to Singapore BIM Guide Appendix A)