Subject: Abi samra Site

Dear Sir

At the request of Touch, we (Senmar office) have


visited Abi Samra site located in Tripoli- Lebanon, to
check the safety of an existing site.

Site surveillance

First of all we should mention that the site is


ancient back to 1993 more or less.

The site is formed from a shelter where Mtc


equipments are installed, the shelter is supported on a
steel structure that is connected to the structural
system of the building body at the roof top, and some
Antennas that are fixed directly to roof without any
concrete foundation.

Apparently at the top of the roof a number of water


tanks and solar system is installed recently.

Also, we should mention that generators are located at


the ground floor level.
Reason of the visit

Mainly, we visited the site because some


complains from the residents in the building, from the
generator vibration, and some water leakage.

Overview of the site and solutions

Once we arrived to the building, we have seen


the following :

1- the building didn't get any maintenance since ever

2-the building is full of cracks all over its faade


specially on the balconies caused by the sea wind
(steel rust)

3-the roof is subjected to water leakage

4-the equipments of MTC also didnt get any


maintenance where the neoprene pads seems to be
very old.

5-Some equipments are installed directly and


randomly on the roof

Solutions

1-the faade should be treated against corrosion with


anti-rust materials.
2-the protection of the roof with water-proofing
materials to avoid leakage.

3-the neoprene pads should be replaced by new ones


to avoid the transmission of the vibration.

4-remove the equipments of MTC that are installed


randomly, and place it on concrete foundation
supported by existing columns or walls

Finally, we should mention that the structure of


the building not threatened ,and no matter of
insecurity appears to be, since the equipments loads
are subjected directly to the vertical concrete
members, and they are not supported directly on the
roof top.
Ground level of the building
Faade of building
Water tanks
Mtc Equipments need new neoprene pads
Equipments installed Randomly
The building needs maintenance

Done By: Eng. Bahiya al-


Rifaii

31/03/2016

(Head of structural
department)

Approved By: Dr. Soubra