TOTAL BIAYA
23.9652
A 2250
B 1500
C 1900
JMLH J 5650
MOBILISASI 1 LS
DAMIJA 3750 M'
PENYIAPAN BADAN JALAN 15200 M2
CUTING & FILL (C) 8,400 M3
LAND CLEARING 15,000 m2
GALIAN BIASA (B) 36,000 M3
50,020,000 50,020,000
25,535 66,391,390
1,357,571 0
637,409 0
776,526 0
1,291,290 0
2,210,296 0
- 0
17,430,068 0
227,323 0
634,607 0
33,165 0
79,514 0
93,946 629,440,210
136,589 0
688,104 0
601,473 0
- 0
183,891 0
775,651 0
16,802 0
179,744 0
126,815 0
293,201 0
109,692 0
5,191 71,117,239
69,858,056 83,829,668
1,022,638 0
828,058 0
2,378,134 0
113,898 0
13,529 0
8,073 0
7,673 0
1,016,247 0
820,547 0
590,569 0
2,429,819 0
86,009 0
- 0
- 0
10,263 0
- 0
- 0
- 0
- 0
- 0
76,966 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
3,369,797 0
3,123,157 0
2,647,630 0
2,556,696 0
2,073,388 0
1,843,733 0
1,942,553 0
32,105,385 0
35,681,957 0
36,715,387 0
37,705,387 0
38,695,387 0
39,355,387 0
42,589,387 0
41,005,387 0
303,912 0
46,291,390 0
2,823,162 0
34,945 0
13,681 0
45,453 0
13,002 0
14,132 0
42,460 0
50,370 0
50,645 0
50,370 0
911 0
741 0
50,370 0
- 0
4,500,669 0
28,886 0
- 0
4,511,206 0
67,637 0
177,452 0
6,498,021 0
1,285,802 0
210,190 0
70,338 0
70,063 0
70,063 0
73,730 0
73,730 0
73,730 0
1,146,721 0
2,028,915 0
3,161,386 0
4,544,135 0
7,087,530 0
- 0
- 0
- 0
- 0
- 0
- 0
6,686,970 0
8,066,858 0
9,505,794 0
11,994,727 0
379,175 0
492,113 0
585,214 0
875,662 0
838 0
1,494,438 0
744,986 0
1,599,301 0
87,083 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
32,560 0
286,000 0
- 0
559,343 0
- 0
- 0
327,970 0
254,571 0
- 0
- 0
- 0
2,396,400 0
- 0
- 0
941,240 0
926,632 0
544,719 0
815,437 0
2,694,228 0
- 0
1,984,026 0
1,755,092 0
8,150 0
107,485 0
26,798 0
200,773 0
304,555 0
626,218 0
10,835 0
10,175 0
9,790 0
131,747 0
121,022 0
443,113 0
638,015 0
487,663 0
725,813 0
148,721 0
526,639 0
234,618 0
755,783 0
208,567 0
249,973 0
252,864 0
- 0
23,413 0
102,960 0
- 0
- 0
1,001,830 0
23,959,391 0
2,731,515 0
2,711,814 0
2,731,515 0
2,711,814 0
2,731,515 0
536,621 0
719,881 0
18,857 0
11,000 0
15,714 0
220,042 0
359,155 0
205,587 0
742,208 0
373,104 0
364,489 0
249,256 0
524,721 0
564,090 0
420,108 0
352,701 0
45,061 0
374,753 0
133,545 0
59,373 0
38,400 0
36,555 0
50,684,979 0
25,271,716 25,271,716
47,154,236 0
11,326,027 0
60,606,125 0
926,070,223
50,020,000 Rp 50,020,000
Rp 25,272 Rp 94,768,935
Rp 5,191 Rp 78,903,798
Rp 93,946 Rp 789,148,920
Rp 6,986 Rp 104,787,084
Rp 60,207 Rp 2,167,443,337
Rp 234,779 Rp 669,119,665
Rp 3,954,191,739
Rp 395,419,174
Rp 4,349,610,913
No. Mata Perkiraan
Uraian Satuan
Pembayaran Kuantitas
a b c d
23.96519 926,070,223
REKAPITULASI
Nama Paket : PENINGKATAN JALAN TPA WAIBRON
Prop / Kab / Ko : KECAMATAN WAIBRON - KABUPATEN SENTANI
1 Umum
2 Drainase
3 Pekerjaan Tanah
4 Pelebaran Perkerasan dan Bahu Jalan
5 Pekerasan Non Aspal
6 Perkerasan Aspal
7 Struktur
8 Pengembalian Kondisi dan Pekerjaan Minor
9 Pekerjaan Harian
10 Pekerjaan Pemeliharaan Rutin
Jumlah Harga
Pekerjaan
(Rupiah)
50,020,000.00
66,391,390.00
3,722,548,225.17
-
-
-
-
-
-
25,271,716.00
3,864,231,331.17
386,423,133.12
4,250,654,464.29
###
ATUS LIMA PULUH JUTA ENAM RATUS LIMA PULUH RIBU RUPIAH "
INFORMASI UMUM
No. U RAIAN I N F O R MAS I
2. Nama Paket
: PENINGKATAN JALAN TPA WAIBRON
11. Jarak rata-rata Base Camp ke lokasi pekerjaan ---> L= 1.876 Kilometer
2.50 Km = a C 4.40 Km = b
A B
0.020 Km = c
Base Camp ---------> D
20 ....................................
21 ....................................
22 ....................................
F O R MAS I
WAIBRON
ABUPATEN SENTANI
...............
( Leff = a + b )
meter
meter
eriode Pelaksanaan)
..........
ITEM PEMBAYARAN NO. : 1.2
JENIS PEKERJAAN : MOBILISASI
B. PERALATAN
Periksa lembar 1.2-2 18,000,000.00
C. FASILITAS KONTRAKTOR
1 Base Camp M2 72.00 85,000.00 6,120,000.00
2 Kantor M2 - 350,000.00 -
3 Barak M2 - 350,000.00 -
4 Bengkel M2 -
5 Gudang, dan lain-lain M2
6 ...................... ....
D. FASILITAS LABORATORIUM
1 Ruang Laboratorium (sesuai Gambar) M2 25.00
E. MOBILISASI LAINNYA
E.I. PEKERJAAN DARURAT
1 Perkuatan Jembatan Lama LS - -
2 Pemeliharaan Jalan Kerja / Samping LS - -
3 Erection Stone Crusher LS - ### -
4 ...................... .... -
5 ...................... .... -
6 ...................... .... -
E.II. LAIN-LAIN
1 Komunikasi Lapangan Lengkap Set 1.00 -
2 Dokumentasi dan Pendukungnya Ls 1.00 2,500,000.00 2,500,000.00
3 Sewa Kendaraan Roda Empat Bln - 4,500,000.00 -
4 As Built Drawing Ls 1.00 4,000,000.00 4,000,000.00
5 Survey dan Pengukuran Ls 1.00 4,000,000.00 4,000,000.00
B. PERALATAN
4 Bulldozer E04
9.7 7 175 7 1225 jam
6 Concrete Vibrator
7.1(5) 4 100 7 700 m3
7.1(6) 4 100 7 700 m3
7.1(8) 4 100 7 700 m3
7 Compressor E05
6.1(1) 9 225 7 1575 liter
9.17 7 175 7 1225 jam
8 Crane E07
9.12 7 175 7 1225 jam
10 Excavator E10
2.1 7 175 7 1225 m3
3.1(1) 6 150 7 1050 m3
9.11 7 175 7 1225 jam
DIVISI 1. UMUM
Jumlah Harga Pekerjaan DIVISI 1 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)
DIVISI 2. DRAINASE
2.1 Galian untuk Selokan Drainase dan Saluran Air M3 2,600.00 25,535.15
Jumlah Harga Pekerjaan DIVISI 2 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)
3.2 (1) Timbunan Biasa dari selain galian sumber bahan M3 5,500.00 118,687.02
Jumlah Harga Pekerjaan DIVISI 3 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)
DIVISI 10. PEKERJAAN PEMELIHARAAN RUTIN
Jumlah Harga Pekerjaan DIVISI 10 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)
NTITAS DAN HARGA
Jumlah
Harga-Harga
(Rupiah)
f = (d x e)
50,020,000.00
50,020,000.00
66,391,390.00
66,391,390.00
1,721,913,317.64
629,440,210.00
652,778,599.52
563,469,191.47
71,117,239.03
83,829,667.51
3,722,548,225.17
25,271,716.00
25,271,716.00
3,864,231,331.17
A B C D E F G H
1PERHITUNGAN VOLUME PASANGAN BATU DENGAN MORTAR (PLAT DACK)
2
3 KEGIATAN : PERENCANAAN TEKNIS PENINGKATAN JALAN TPA WAIBRON
4 PEKERJAAN : PASANGAN BATU DENGAN MORTAR (PLAT DACK)
5 ITEM NO : 3.2. (1)
6 VOLUME 65.34 M3
7 LOKASI : KECAMATAN WAIBRON - KABUPATEN SENTANI
8 TAHUN : 2012
9
10 LEBAR LEBAR
BAGIAN TINGGI PANJANG JUMLAH VOLUME (M3)
11 ATAS BAWAH
12
13 DINDING 0.4 1.5 1.3 8 2 19.76
14 ABUTMT PONDASI 1.6 1.6 0.4 8 2 10.24
15 LANTAI 1 1 0.4 8 1 3.20
16 TUMIT 0.3 0.3 0.4 4.2 2 1.01
17
18 SAYAP DINDING 0.3 0.75 1.6 8 4 26.88
19 PONDASI 0.85 0.85 0.5 2.5 4 4.25
20 TOTAL 65.34
21 Untuk STA 3+500 dan 3+810 130.68
A B C D E F G H
23 PERHITUNGAN VOLUME BETON K-250 (PLAT DACK)
24
25 KEGIATAN : PERENCANAAN TEKNIS PENINGKATAN JALAN TPA WAIBRON
26 PEKERJAAN : BETON K-250 (PLAT DACK)
27 ITEM NO : 7.1. (5)
28 VOLUME 11.20 M3
29 LOKASI : KECAMATAN WAIBRON - KABUPATEN SENTANI
30 TAHUN : 2012
31
32 LEBAR LEBAR
BAGIAN TINGGI PANJANG JUMLAH VOLUME (M3)
33 ATAS BAWAH
34
35 PLAT 1.4 1.4 0.3 8 1 3.36
36 TUMPUAN 0.4 0.4 0.2 8 2 1.28
37 BACK WALL 0.2 0.2 0.3 8 2 0.96
38 TOTAL 5.60
39 Untuk STA 3+500 dan 3+810 11.20
A B C D E F G H
41 PERHITUNGAN VOLUME BETON K-175 (PLAT DACK)
42
43 KEGIATAN : PERENCANAAN TEKNIS PENINGKATAN JALAN TPA WAIBRON
44 PEKERJAAN : BETON K-175 (PLAT DACK)
45 ITEM NO : 7.1. (5)
46 VOLUME 2.88 M3
47 LOKASI : KECAMATAN WAIBRON - KABUPATEN SENTANI
48 TAHUN : 2012
49
50 LEBAR LEBAR
BAGIAN TINGGI PANJANG JUMLAH VOLUME (M3)
51 ATAS BAWAH
52
53 LENINGAN 0.5 0.5 0.8 1.8 2 1.44
54 Untuk STA 3+500 dan 3+810 2.88
A B C D E F G H
56 PERHITUNGAN VOLUME BAJA TULANGAN (PLAT DACK)
57
58 KEGIATAN : PERENCANAAN TEKNIS PENINGKATAN JALAN TPA WAIBRON
59 PEKERJAAN : BAJA TULANGAN U32 POLOS (PLAT DACK)
60 ITEM NO : 7.3. (2)
61 VOLUME ### KG
62 LOKASI : KECAMATAN WAIBRON - KABUPATEN SENTANI
63 TAHUN : 2012
64
65 berat
BAGIAN sketsa dia a b
66 satuan
67
68 Tul. Utama
69 12 0.888 1134 24
70 PELAT
71 Tul pembagi
72 12 0.888 794
73
74
75
76 LENINGAN 12 0.888 44 104
77
78 12 0.888 174
79
DOWEL
80 12 0.888 50
81
82 Untuk STA 3+500 dan 3+810
I J K L
N VOLUME BAJA TULANGAN (PLAT
56 DACK)
57
NIS PENINGKATAN JALAN TPA WAIBRON
58
59
60
61
62
63
64
65 panjang
c Jumlah Jumlah (Kg)
66 pot
67
68
69 6 1194 55 583.15
70
71
72 17 828 20 147.05
73
74
75
76 6 264 12 28.13
77
78 6 186 12 19.82
79
80 6 62 132 72.67
81 TOTAL 850.83
uk STA 3+500 dan 3+810 82 1,701.66
PERHITUNGAN VOLUME GALIAN
LUAS
PANJANG (M) VOLUME (M3)
RATA-RATA
3 + 225 3 + 250
7.24 20.03
3 + 250 3 + 275
20.03 26.18
3 + 275 3 + 300
26.18 24.20
3 + 300 3 + 325
24.20 15.26
3 + 325 3 + 350
15.26 10.12
3 + 350 3 + 375
10.12 5.25
3 + 375 3 + 400
5.25 7.12
3 + 400 3 + 425
7.12 11.44
3 + 425 3 + 450
11.44 13.98
3 + 450 3 + 475
13.98 13.31
3 + 475 3 + 500
13.31 16.55
3 + 500 3 + 525
16.55 16.60
3 + 525 3 + 550
16.60 7.55
3 + 550 3 + 575
7.55 1.67
3 + 575 3 + 600
1.67 1.69
3 + 600 3 + 625
1.69 2.86
3 + 625 3 + 650
2.86 2.11
3 + 650 3 + 675
2.11 5.50
3 + 675 3 + 700
5.50 5.34
3 + 700 3 + 725
5.34 4.28
3 + 725 3 + 750
4.28 -
TOTAL VOLUME GALIAN (M)
LUAS
PANJANG (M) VOLUME (M3)
RATA-RATA
700 14,907.44
6 + 625 6 + 650
- 4.19
6 + 650 6 + 675
4.19 5.94
6 + 675 6 + 700
5.94 29.12
6 + 700 6 + 725
29.12 40.56
6 + 725 6 + 750
40.56 87.58
6 + 750 6 + 775
87.58 67.02
6 + 775 6 + 800
67.02 51.25
6 + 800 6 + 825
51.25 38.35
6 + 825 6 + 850
38.35 19.75
6 + 850 6 + 875
19.75 4.28
6 + 875 6 + 900
4.28 -
TOTAL VOLUME GALIAN (M)
LUAS
PANJANG (M) VOLUME (M3)
RATA-RATA
1,225 20,274.10
5 + 525 5 + 550
- 7.18
5 + 550 5 + 575
7.18 6.43
5 + 575 5 + 600
6.43 -
5 + 625 5 + 650
- 1.35
5 + 650 5 + 675
1.35 5.97
5 + 675 5 + 700
5.97 14.62
5 + 700 5 + 725
14.62 11.83
5 + 725 5 + 750
11.83 11.08
5 + 750 5 + 775
11.08 4.21
5 + 775 5 + 800
4.21 -
6 + 250 6 + 275
- 3.73
6 + 275 6 + 300
3.73 22.40
6 + 300 6 + 325
22.40 53.28
6 + 325 6 + 350
53.28 22.04
6 + 350 6 + 375
22.04 24.49
6 + 375 6 + 400
24.49 26.90
6 + 400 6 + 425
26.90 25.43
6 + 425 6 + 450
25.43 24.05
6 + 450 6 + 475
24.05 5.98
6 + 475 6 + 500
5.98 6.06
6 + 500 6 + 525
6.06 -
LUAS
PANJANG (M) VOLUME (M3)
RATA-RATA
STA
NO LEBAR PANJANG (M)
AWAL AKHIR
VOLUME (M2)
9,600.00
600.00
1,400.00
2,200.00
13,800.00
PERHITUNGAN VOLUME LAND CLEARING
STA
NO LEBAR PANJANG
AWAL AKHIR
12,000.00 1.20
TAL VOLUME LAND CLEARING (HA) 1.20
PERHITUNGAN VOLUME TIMBUNAN
VOLUME (M3)
9.14
9.14
57.42
109.15
115.68
117.95
90.23
66.78
82.85
132.09
103.39
68.89
80.69
78.18
91.84
99.28
103.75
109.50
107.02
125.14
141.38
128.85
131.93
158.56
162.32
150.15
121.91
181.29
2,934.47
STA LUAS TIMBUNAN LUAS
NO PANJANG (M)
AWAL AKHIR AWAL AKHIR RATA-RATA
700
3 + 225 3 + 250
10.83 6.01 8.42 25.00
3 + 250 3 + 275
6.01 7.95 6.98 25.00
3 + 275 3 + 300
7.95 6.55 7.25 25.00
3 + 300 3 + 325
6.55 5.92 6.23 25.00
3 + 325 3 + 350
5.92 5.35 5.63 25.00
3 + 350 3 + 375
5.35 4.03 4.69 25.00
3 + 375 3 + 400
4.03 5.78 4.90 25.00
3 + 400 3 + 425
5.78 7.32 6.55 25.00
3 + 425 3 + 450
7.32 6.68 7.00 25.00
3 + 450 3 + 475
6.68 5.65 6.16 25.00
3 + 475 3 + 500
5.65 6.39 6.02 25.00
3 + 500 3 + 525
6.39 9.42 7.90 25.00
3 + 525 3 + 550
9.42 5.73 7.57 25.00
3 + 550 3 + 575
5.73 4.37 5.05 25.00
3 + 575 3 + 600
4.37 3.93 4.15 25.00
3 + 600 3 + 625
3.93 3.81 3.87 25.00
3 + 625 3 + 650
3.81 2.00 2.90 25.00
3 + 650 3 + 675
2.00 2.74 2.37 25.00
3 + 675 3 + 700
2.74 6.17 4.46 25.00
3 + 700 3 + 725
6.17 3.38 4.77 25.00
3 + 725 3 + 750
3.38 - 1.69 25.00
TOTAL VOLUME TIMBUNAN (M) 1,225
VOLUME (M3)
2,934.47
210.48
174.42
181.21
155.86
140.84
117.19
122.53
163.67
174.91
154.10
150.51
197.56
189.35
126.24
103.73
96.81
72.62
59.22
111.40
119.35
42.23
5,798.67
PERHITUNGAN VOLUME GALIAN SALURAN (KANAN/KIR
15.00 -
30.00 -
-
30.00 -
30.00 -
30.00 -
30.00 -
30.00 -
30.00 -
30.00 -
30.00 -
30.00 -
30.00 -
30.00 -
30.00 -
30.00 -
30.00 -
30.00 -
30.00 -
30.00 -
30.00 -
30.00 -
30.00 -
30.00 -
30.00 -
30.00 -
30.00 -
30.00 -
30.00 -
- 825.00 -
STA LUAS GALIAN LUAS PANJANG (M)
NO
AWAL AKHIR AWAL AKHIR RATA-RATA KANAN
700
3 + 275 3 + 300
1.20 1.20 1.20 25.00
3 + 300 3 + 325
1.20 1.20 1.20 25.00
3 + 325 3 + 350
1.20 1.20 1.20 25.00
3 + 350 3 + 375
1.20 1.20 1.20 25.00
3 + 375 3 + 400
1.20 1.20 1.20 25.00
3 + 400 3 + 425
1.20 1.20 1.20 25.00
3 + 425 3 + 450
1.20 1.20 1.20 25.00
3 + 450 3 + 475
1.20 1.20 1.20 25.00
3 + 475 3 + 500
1.20 1.20 1.20 25.00
3 + 500 3 + 525
1.20 1.20 1.20 25.00
3 + 525 3 + 550
1.20 1.20 1.20 25.00
3 + 550 3 + 575
1.20 1.20 1.20 25.00
3 + 575 3 + 600
1.20 1.20 1.20 25.00
3 + 600 3 + 625
1.20 1.20 1.20 25.00
3 + 625 3 + 650
1.20 1.20 1.20 25.00
3 + 650 3 + 675
1.20 1.20 1.20 25.00
3 + 675 3 + 700
1.20 1.20 1.20 25.00
3 + 700 3 + 725
1.20 1.20 1.20 25.00
3 + 725 3 + 750
1.20 1.20 1.20 25.00
3 + 750 3 + 775
1.20 1.20 1.20 25.00
3 + 775 3 + 800
1.20 1.20 1.20 25.00
TOTAL VOLUME GALIAN SALURAN (M) 1,225.00
PANJANG (M) VOLUME (M3)
KIRI KANAN KIRI
825.00 -
30.00 -
30.00 -
30.00 -
30.00 -
30.00 -
30.00 -
30.00 -
30.00 -
30.00 -
30.00 -
30.00 -
30.00 -
30.00 -
30.00 -
30.00 -
30.00 -
30.00 -
30.00 -
30.00 -
30.00 -
30.00 -
- 1,455.00 -
STA LUAS GALIAN LUAS PANJANG (M)
NO
AWAL AKHIR AWAL AKHIR RATA-RATA KANAN
1,225
5 + 525 5 + 550
1.20 1.20 1.20 25.00
5 + 550 5 + 575
1.20 1.20 1.20 25.00
5 + 575 5 + 600
1.20 1.20 1.20 25.00
5 + 600 5 + 625
1.20 1.20 1.20 25.00
5 + 625 5 + 650
1.20 1.20 1.20 25.00
5 + 650 5 + 675
1.20 1.20 1.20 25.00
5 + 675 5 + 700
1.20 1.20 1.20 25.00
5 + 700 5 + 725
1.20 1.20 1.20 25.00
5 + 725 5 + 750
1.20 1.20 1.20 25.00
5 + 750 5 + 775
1.20 1.20 1.20 25.00
5 + 775 5 + 800
1.20 1.20 1.20 25.00
5 + 800 5 + 825
1.20 1.20 1.20 25.00
5 + 825 5 + 850
1.20 - 0.60 25.00
6 + 250 6 + 275
- 1.20 0.60
6 + 275 6 + 300
1.20 1.20 1.20
6 + 300 6 + 325
1.20 1.20 1.20
6 + 325 6 + 350
1.20 1.20 1.20
6 + 350 6 + 375
1.20 1.20 1.20
6 + 375 6 + 400
1.20 1.20 1.20
6 + 400 6 + 425
1.20 - 0.60
6 + 425 6 + 450
- - -
30.00 -
30.00 -
30.00 -
30.00 -
30.00 -
30.00 -
30.00 -
30.00 -
30.00 -
30.00 -
15.00 -
25.00 - 15.00
25.00 - 30.00
25.00 - 30.00
25.00 - 30.00
25.00 - 30.00
25.00 - 30.00
25.00 - 15.00
25.00 - -
6 + 575 6 + 600
- 1.20 0.60
6 + 600 6 + 625
1.20 1.20 1.20
6 + 625 6 + 650
1.20 1.20 1.20
6 + 650 6 + 675
1.20 1.20 1.20
6 + 675 6 + 700
1.20 - 0.60 25.00
6 + 700 6 + 725
1.20 1.20 1.20 25.00
6 + 725 6 + 750
1.20 1.20 1.20 25.00
6 + 750 6 + 775
1.20 1.20 1.20 25.00
6 + 775 6 + 800
1.20 1.20 1.20 25.00
6 + 800 6 + 825
1.20 1.20 1.20 25.00
6 + 825 6 + 850
1.20 1.20 1.20 25.00
6 + 850 6 + 875
1.20 1.20 1.20 25.00
6 + 875 6 + 900
1.20 - 0.60 25.00
TOTAL VOLUME GALIAN SALURAN (M) 1,775
PANJANG (M) VOLUME (M3)
KIRI KANAN KIRI
250 1,830.00 240.00
25.00 - 30.00
25.00 - 30.00
25.00 - 15.00
25.00 - 15.00
25.00 - 30.00
25.00 - 30.00
25.00 - 30.00
STA
NO TEBAL (M) LEBAR (M) PANJANG (M)
AWAL AKHIR
2 + 575 2 + 600
0.20 6.00 25.00
2 + 600 2 + 625
0.20 6.00 25.00
2 + 625 2 + 650
0.20 6.00 25.00
2 + 650 2 + 675
0.20 6.00 25.00
2 + 675 2 + 700
0.20 6.00 25.00
2 + 700 2 + 725
0.20 6.00 25.00
2 + 725 2 + 750
0.20 6.00 25.00
2 + 750 2 + 775
0.20 6.00 25.00
2 + 775 2 + 800
0.20 6.00 25.00
2 + 800 2 + 825
0.20 6.00 25.00
2 + 825 2 + 850
0.20 6.00 25.00
2 + 850 2 + 875
0.20 6.00 25.00
2 + 875 2 + 900
0.20 6.00 25.00
2 + 900 2 + 925
0.20 6.00 25.00
2 + 925 2 + 950
0.20 6.00 25.00
2 + 950 2 + 975
0.20 6.00 25.00
2 + 975 3 + 000
0.20 6.00 25.00
3 + 000 3 + 025
0.20 6.00 25.00
3 + 025 3 + 050
0.20 6.00 25.00
3 + 050 3 + 075
0.20 6.00 25.00
3 + 075 3 + 100
0.20 6.00 25.00
3 + 100 3 + 125
0.20 6.00 25.00
3 + 125 3 + 150
0.20 6.00 25.00
3 + 150 3 + 175
0.20 6.00 25.00
3 + 175 3 + 200
0.20 6.00 25.00
3 + 200 3 + 225
0.20 6.00 25.00
3 + 225 3 + 250
0.20 6.00 25.00
3 + 250 3 + 275
0.20 6.00 25.00
TOTAL VOLUME TIMBUNAN PILIHAN (M3) 700
HITUNGAN VOLUME TIMBUNAN PILIHAN
VOLUME (M3)
30.00
30.00
30.00
30.00
30.00
30.00
30.00
30.00
30.00
30.00
30.00
30.00
30.00
30.00
30.00
30.00
30.00
30.00
30.00
30.00
30.00
30.00
30.00
30.00
30.00
30.00
30.00
30.00
840.00
STA
NO TEBAL (M) LEBAR (M) PANJANG (M)
AWAL AKHIR
700.00
3 + 275 3 + 300
0.20 6.00 25.00
3 + 300 3 + 325
0.20 6.00 25.00
3 + 325 3 + 350
0.20 6.00 25.00
3 + 350 3 + 375
0.20 6.00 25.00
3 + 375 3 + 400
0.20 6.00 25.00
3 + 400 3 + 425
0.20 6.00 25.00
3 + 425 3 + 450
0.20 6.00 25.00
3 + 450 3 + 475
0.20 6.00 25.00
3 + 475 3 + 500
0.20 6.00 25.00
3 + 500 3 + 525
0.20 6.00 25.00
3 + 525 3 + 550
0.20 6.00 25.00
3 + 550 3 + 575
0.20 6.00 25.00
3 + 575 3 + 600
0.20 6.00 25.00
3 + 600 3 + 625
0.20 6.00 25.00
3 + 625 3 + 650
0.20 6.00 25.00
3 + 650 3 + 675
0.20 6.00 25.00
3 + 675 3 + 700
0.20 6.00 25.00
3 + 700 3 + 725
0.20 6.00 25.00
3 + 725 3 + 750
0.20 6.00 25.00
3 + 750 3 + 775
0.20 6.00 25.00
3 + 775 3 + 800
0.20 6.00 25.00
3 + 800 3 + 825
0.20 6.00 25.00
3 + 825 3 + 850
0.20 6.00 25.00
3 + 850 3 + 875
0.20 6.00 25.00
840.00
30.00
30.00
30.00
30.00
30.00
30.00
30.00
30.00
30.00
30.00
30.00
30.00
30.00
30.00
30.00
30.00
30.00
30.00
30.00
30.00
30.00
30.00
30.00
30.00
1,560.00
STA
NO TEBAL (M) LEBAR (M) PANJANG (M)
AWAL AKHIR
1,300.00
5 + 425 5 + 450
0.20 6.00 25.00
5 + 450 5 + 475
0.20 6.00 25.00
5 + 475 5 + 500
0.20 6.00 25.00
5 + 500 5 + 525
0.20 6.00 25.00
5 + 525 5 + 550
0.20 6.00 25.00
5 + 625 5 + 650
0.20 6.00 25.00
5 + 650 5 + 675
0.20 6.00 25.00
5 + 825 5 + 850
0.20 6.00 25.00
5 + 850 5 + 875
0.20 6.00 25.00
5 + 875 5 + 900
0.20 6.00 25.00
5 + 900 5 + 925
0.20 6.00 25.00
5 + 925 5 + 950
0.20 6.00 25.00
5 + 950 5 + 975
0.20 6.00 25.00
5 + 975 6 + 000
0.20 6.00 25.00
6 + 000 6 + 025
0.20 6.00 25.00
6 + 025 6 + 050
0.20 6.00 25.00
6 + 050 6 + 075
0.20 6.00 25.00
6 + 075 6 + 100
0.20 6.00 25.00
6 + 100 6 + 125
0.20 6.00 25.00
6 + 125 6 + 150
0.20 6.00 25.00
6 + 150 6 + 175
0.20 6.00 25.00
6 + 175 6 + 200
0.20 6.00 25.00
6 + 200 6 + 225
0.20 6.00 25.00
6 + 225 6 + 250
0.20 6.00 25.00
6 + 250 6 + 275
0.20 6.00 25.00
1,560.00
30.00
30.00
30.00
30.00
30.00
30.00
30.00
30.00
30.00
30.00
30.00
30.00
30.00
30.00
30.00
30.00
30.00
30.00
30.00
30.00
30.00
30.00
30.00
30.00
30.00
2,310.00
STA
NO TEBAL (M) LEBAR (M) PANJANG (M)
AWAL AKHIR
1,925.00
6 + 525 6 + 550
0.20 6.00 25.00
6 + 550 6 + 575
0.20 6.00 25.00
6 + 575 6 + 600
0.20 6.00 25.00
TOTAL VOLUME TIMBUNAN PILIHAN (M3) 2,000
VOLUME (M3)
2,310.00
30.00
30.00
30.00
2,400.00
ITEM PEMBAYARAN NO. : 2.1
JENIS PEKERJAAN : Galian Utk Drainase, Saluran dan Saluran Air
SATUAN PEMBAYARAN : M3 URAIAN ANALISA
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi Jalan : baik
4 Jam kerja efektif per-hari Tk 7.00
5 Faktor pengembangan bahan Fk 1.20
6 Berat volume bahan D 1.60
1. BAHAN
Tidak ada bahan yang diperlukan
2. ALAT
2.a. EXCAVATOR (E10)
Kapasitas Bucket V 0.93
Faktor Bucket Fb 1.00
Faktor Efisiensi alat Fa 0.75
Faktor Konversi (<40 %) Fv 0.9
Waktu siklus = T1 x Fv Ts1 0.29
- Menggali, memuat dan berputar T1 0.3
3. TENAGA
Produksi menentukan : EXCAVATOR Q1 121.09
Produksi Galian / hari = Tk x Q1 Qt 847.66
Kebutuhan tenaga :
- Pekerja P 4.00
- Mandor M 1.00
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 0.0330
- Mandor = (Tk x M) : Qt (L03) 0.0083
Rp. 25,535.15 / M3
SATUAN KETERANGAN
jam
-
Ton/M3
Km
M3
-
-
menit
menit
M3
Jam
ton
-
Km/Jam
Km/Jam
menit
menit
menit
menit
menit
M3
Jam
SATUAN KETERANGAN
M3/Jam
M3
orang
orang
Jam
Jam
ITEM PEMBAYARAN NO. : 2.2
JENIS PEKERJAAN : Pasangan Batu Dengan Mortar untuk Saluran
SATUAN PEMBAYARAN : M3 URAIAN ANALISA
I. ASUMSI
1 Menggunakan alat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (batu, pasir dan semen) diterima
seluruhnya di lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 1.9
5 Jam kerja efektif per-hari Tk 7.00
6 Perbandingan Pasir & Semen : - Volume Semen Sm 25
: - Volume Pasir Ps 75
7 Perbandingan Batu & Mortar :
- Batu Bt 60
- Mortar (campuran semen & pasir) Mr 40
8 Berat Jenis Bahan :
- Pasangan Batu Dengan Mortar D1 2.40
- Batu D2 1.60
- Adukan (mortar) D3 1.80
- Pasir D4 1.67
- Semen Portland D5 1.44
1. BAHAN
1.a. Batu -----> {(Bt x D1 x 1 M3) : D2} x 1.20 (M02) 1.0800
1.b. Semen ----> Sm x {(Mr x D1 x 1 M3} : D3} x 1.05 0.1400
x {D5 x (1000)} (M12) 202.0000
1.c. Pasir -----> Ps x {(Mr x D1 x 1 M3) : D4} x 1.05 (M01) 0.4527
2. ALAT
2.a. CONCRETE MIXER (E06)
Kapasitas Alat V 500.00
Faktor Efisiensi Alat Fa 0.75
Waktu siklus : (T1 + T2 + T3 + T4)
- Memuat T1 1.00
- Mengaduk T2 1.00
- Menuang T3 1.00
- Menunggu, dll. T4 1.00
Ts1 4.00
SATUAN KETERANGAN
KM
jam
% Kuat Tekan min.
% 50 kg/cm2
%
%
ton/M3
ton/M3
ton/M3
ton/M3
ton/M3
M3 Lepas
Kg
M3
Liter
-
menit
menit
menit
menit
menit
M3
jam
Lump Sum
3. TENAGA
Produksi Pas. Batu yang menentukan ( Prod. C. Mixer ) Q1 5.63
Produksi Pasangan Batu dalam 1 hari = Tk x Q1 Qt 39.38
Koefisien Tenaga / M3 :
- Mandor = (Tk x M) : Qt (L03) 1.2444
- Tukang = (Tk x Tb) : Qt (L02) 3.7333
- Pekerja = (Tk x P) : Qt (L01) 12.4444
Rp. 1,357,571.06 / M3
SATUAN KETERANGAN
M3/Jam
M3
orang
orang
orang
jam
jam
jam
ANALISA HARGA SATUAN PEKERJAAN
PERKIRAAN
NO. KOMPONEN SATUAN KUANTITAS
A. TENAGA
B. BAHAN
C. PERALATAN
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
10,000.00 330.32
17,142.86 141.57
544,258.12 4,494.52
250,593.96 18,247.37
0.00 0.00
23,213.77
2,321.38
25,535.15
erja dan Peralatan, volume dan/atau ukuran
PERKIRAAN
NO. KOMPONEN SATUAN KUANTITAS
A. TENAGA
B. BAHAN
C. PERALATAN
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
10,000.00 124,444.44
14,285.71 53,333.33
17,142.86 21,333.33
443,900.00 479,412.00
1,967.00 397,334.00
322,304.00 145,905.28
64,086.25 11,393.11
1,000.00 1,000.00
1,234,155.51
123,415.55
1,357,571.06
erja dan Peralatan, volume dan/atau ukuran
I. ASUMSI
1 Pekerjaan (secara mekanis) dilakukan pada tempat tertentu
2 Pohon dipotong 4 bagian untuk memudahkan transportasi
3 Lokasi pekerjaan : tempat tertentu / sepanjang jalan
4 Kondisi Jalan : jelek / belum padat
5 Jam kerja efektif per-hari Tk 7.00
6 Diasumsikan dalam 1Ha jumlah pohon besar Dia.>0.5 M Ph 60.00
2. ALAT
2.a. BULLDOZER (E04)
Panjang operasi bulldozer sekali jalan Lh 20.00
Lebar Efektif kerja Blade b 3.72
Faktor Efisiensi Alat Fa 0.83
Kecepatan rata-rata alat v 2.00
Jumlah lintasan n 8.00
Waktu siklus Ts1
- Pembersohan 1 kali lintasan = Lh : (v x 1000) x 60 T1 0.60
- Lain-lain T2 3.00
[DIV3.XLS]
Ts1 3.60
[DIV3.XLS]
ITEM PEMBAYARAN NO. : 3.4
JENIS PEKERJAAN : LAND CLEARING
SATUAN PEMBAYARAN : HEKTAR (Ha) URAIAN ANA
Koefisien tenaga / Ha
- Pekerja = (Tk x Ph x P) : Qt (L01) 180.723
- Mandor = (Tk x Ph x M) : Qt (L02) 18.0723
[DIV3.XLS]
5. ANALISA HARGA SATUAN PEKERJAAN
Lihat perhitungan dalam FORMULIR STANDAR UNTUK
PEREKEMAN ANALISA MASING-MASING HARGA
SATUAN.
Didapat Harga Satuan Pekerjaan :
Rp. 69,858,056.26 / Ha
[DIV3.XLS]
URAIAN ANALISA HARGA SATUAN
SATUAN KETERANGAN
Jam
Pohon
M
M
-
Km / Jam
lintasan
menit
menit
[DIV3.XLS]
menit
M2
Jam
Pohon / jam
-
Pohon
Jam
Pohon / jam
-
Pohon
Bersambung
[DIV3.XLS]
URAIAN ANALISA HARGA SATUAN
Lanjutan
SATUAN KETERANGAN
Jam
Pohon
-
Km
Menit
Menit
Menit
Menit
Pohon
Jam
Lump Sum
Pohon/Jam
M2
orang
orang
Jam
Jam
[DIV3.XLS]
[DIV3.XLS]
ANALISA HARGA SATUAN PEKERJAAN
A. TENAGA
B. BAHAN
C. PERALATAN
1. Bulldozer (E04) jam 77.7303 778,096.68
2. Chain Saw (E53) jam 18.0723 50,000.00
3. Crane (E07) jam 9.0361 0.00
4. Flat Bed Truck (E11) jam 36.8675 0.00
5. Alat Bantu Ls 1.0000 5,000.00
[DIV3.XLS]
D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )
E. OVERHEAD & PROFIT 10.0 % x D
F. HARGA SATUAN PEKERJAAN ( D + E )
Note : 1 Satuan dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau u
untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas setiap komponen untuk menyelesaikan satu satuan pekerjaan
mata pembayaran.
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termas
dibayar dari kontrak) dan biaya-biaya lainnya.
[DIV3.XLS]
Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termas
dibayar dari kontrak) dan biaya-biaya lainnya.
[DIV3.XLS]
57.50
4,166,038,093.85
6.43
JUMLAH
HARGA
(Rp.)
1,807,228.92
309,810.67
2,117,039.59
0.00
60,481,669.83
903,614.46
0.00
0.00
5,000.00
61,390,284.28
[DIV3.XLS]
63,507,323.87
6,350,732.39
69,858,056.26
operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat
[DIV3.XLS]
[DIV3.XLS]
ITEM PEMBAYARAN NO. : 3.1 (1)
JENIS PEKERJAAN : Galian Biasa
SATUAN PEMBAYARAN : M3 URAIA
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi Jalan : baik
4 Jam kerja efektif per-hari Tk 7.00
5 Faktor pengembangan bahan Fk 1.20
6 Berat volume tanah (lepas) D 1.60
1. BAHAN
Tidak ada bahan yang diperlukan
2. ALAT
2.a. EXCAVATOR (E10)
Kapasitas Bucket V 0.93
Faktor Bucket Fb 0.75
Faktor Efisiensi alat Fa 0.75
Faktor konversi , kedalaman < 40 % Fv 0.75
Waktu siklus Ts1
- Menggali / memuat (standar) T1 3.000
SATUAN KETERANGAN
Jam
-
ton/m3 1.40 - 1.80
Km
M3
-
lihat panduan
menit
menit
menit
M3/Jam
Jam
ton
-
KM/Jam
KM/Jam
menit
menit
menit
menit
menit
menit
M3/Jam
Jam
Lump Sump
3. TENAGA
Produksi menentukan : EXCAVATOR Q1 11.63
Produksi Galian / hari = Tk x Q1 Qt 81.38
Kebutuhan tenaga :
- Pekerja P 4.00
- Mandor M 1.00
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 0.3441
- Mandor = (Tk x M) : Qt (L03) 0.0860
Rp. 60,206.76 / M3
SATUAN KETERANGAN
M3/Jam
M3
orang
orang
Jam
Jam
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
A. TENAGA
B. BAHAN
C. PERALATAN
28,600.00
###
40.51
JUMLAH
HARGA
(Rp.)
3,440.86
1,474.65
4,915.51
0.00
46,817.90
0.00
3,000.00
49,817.90
54,733.42
5,473.34
60,206.76
m operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
I. ASUMSI
1 Pekerjaan dilakukan secara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi Jalan : baik
4 Jam kerja efektif per-hari Tk 7.00
5 Faktor pengembangan bahan Fk 1.20
6 Berat volume tanah (lepas) D 1.80
1. BAHAN
Tidak ada bahan yang diperlukan
2. ALAT
2.a. COMPRESSOR, EXCAVATOR, JACK HAMMER & LOADER
Produksi per jam Q1 20.00
3. TENAGA
Produksi menentukan : JACK HAMMER Q1 20.00
Produksi Galian / hari = Tk x Q1 Qt 140.00
Kebutuhan tenaga :
- Pekerja P 4.00
- Mandor M 1.00
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 0.2000
- Mandor = (Tk x M) : Qt (L03) 0.0500
URAIAN ANALISA HARGA SATUAN
SATUAN KETERANGAN
Jam
-
ton/m3
Km
(E05/26/10/15)
M3 / Jam
Jam
M3
-
KM/Jam
KM/Jam
menit
menit
menit
menit
menit
menit
M3 / Jam
Jam
Lump Sump
M3/Jam
M3
orang
orang
Jam
Jam
Rp. 93,946.30 / M3
SATUAN KETERANGAN
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
A. TENAGA
B. BAHAN
C. PERALATAN
1. Compressor (E05) Jam 0.0500 151,738.46
2. Jack Hammer (E26) Jam 0.0500 33,231.70
3. Wheel Loader (E15) Jam 0.0500 379,887.70
4. Excavator (E10) Jam 0.0500 544,258.12
5 Dump Truck (E08) Jam 0.1081 250,593.96
Alat bantu Ls 1.0000 0.00
6,700.00
629,440,210.00
14.81
JUMLAH
HARGA
(Rp.)
2,000.00
857.14
2,857.14
0.00
7,586.92
1,661.59
18,994.39
27,212.91
27,092.79
0.00
82,548.59
85,405.73
8,540.57
93,946.30
m operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
I. ASUMSI
1 Pekerjaan dilakukan secara mekanis
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi Jalan : baik
4 Jam kerja efektif per-hari Tk 7.00
5 Faktor pengembangan bahan Fk 1.20
6 Tebal hamparan padat t 0.15
7 Berat volume bahan (lepas) D 1.60
2. ALAT
2.a. EXCAVATOR (E15)
Kapasitas Bucket V 0.93
Faktor Bucket Fb 0.90
Faktor Efisiensi Alat Fa 0.75
Faktor Konversi Fv 0.90
Waktu sklus Ts1
- Muat T1 0.32
Waktu Siklus = T1 x Fv Ts1 0.29
SATUAN KETERANGAN
Jam
-
M
Ton/M3
Km
M3
M3
-
-
Lihat panduan
menit
menit
M3
Jam
Ton
-
KM/Jam
KM/Jam
menit
menit
menit
menit
menit
M3
Jam
A. TENAGA
B. BAHAN
C. PERALATAN
1. Excavator (E15) Jam 0.0092 379,887.70
2. Dump Truck (E08) Jam 0.1278 250,593.96
3. Motor Grader (E13) Jam 0.1190 407,436.23
4 Vibro Roller (E19) Jam 0.0120 362,093.21
5. Alat Bantu Ls 1.0000 1,000.00
0.00
0.00
JUMLAH
HARGA
(Rp.)
367.03
157.30
524.32
18,000.00
18,000.00
3,485.71
32,033.48
48,504.31
4,349.47
1,000.00
89,372.97
107,897.29
10,789.73
118,687.02
erasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
aan setiap komponen untuk menyelesaikan satu satuan pekerjaan
tuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
eskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
masuk bahan bakar, bahan habis dipakai dan operator.
an untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
ITEM PEMBAYARAN NO. : 3.2 (1)
JENIS PEKERJAAN : Timbunan Biasa dari selain Sumber Galian
SATUAN PEMBAYARAN : M3 URAIA
3. TENAGA
Produksi menentukan : EXCAVATOR Q1 108.98
Produksi Timbunan / hari = Tk x Q1 Qt 762.89
Kebutuhan tenaga :
- Pekerja P 4.00
- Mandor M 1.00
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 0.0367
- Mandor = (Tk x M) : Qt (L02) 0.0092
Rp. 118,687.02 / M3
I. ASUMSI
1 Pekerjaan dilakukan secara mekanis
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi Jalan : baik
4 Jam kerja efektif per-hari Tk 7.00
5 Faktor pengembangan bahan Fk 1.20
6 Tebal hamparan padat t 0.15
7 Berat volume bahan (lepas) D 1.60
2. ALAT
2.a. WHELL LOADER (E15)
Kapasitas Bucket V 1.50
Faktor Bucket Fb 0.75
Faktor Efisiensi Alat Fa 0.75
Waktu sklus Ts1
- Muat T1 0.45
Ts1 0.45
SATUAN KETERANGAN
M
M
-
Km / Jam
lintasan
M
menit
menit
menit
M3
Jam
Km / Jam
M
lintasan
-
M3
Jam
Lump Sump
M3/Jam
M3
orang
orang
Jam
Jam
SATUAN KETERANGAN
URAIAN ANALISA HARGA SATUAN
SATUAN KETERANGAN
Jam
-
M
Ton/M3
Km
M3
M3
-
-
menit
menit
M3
Jam
M3
-
Km / Jam
Km / Jam
menit
menit
menit
menit
menit
M3
Jam
3. TENAGA
Produksi menentukan : DUMP TRUCK Q1 23.22
Produksi Timbunan / hari = Tk x Q1 Qt 162.51
Kebutuhan tenaga :
- Pekerja P 4.00
- Mandor M 1.00
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 0.1723
- Mandor = (Tk x M) : Qt (L03) 0.0431
SATUAN KETERANGAN
m
m
m Panduan
-
Km / Jam
lintasan
menit
menit
menit
M3
Jam
Km / jam
M
lintasan
-
M3
Jam
M3
M3
liter/menit
-
M3
Jam
Lump Sump
M3/Jam
M3
orang
orang
Jam
Jam
SATUAN KETERANGAN
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
A. TENAGA
B. BAHAN
C. PERALATAN
1. Wheel Loader (E15) Jam 0.0171 379,887.70
2. Dump Truck (E08) Jam 0.0431 250,593.96
3. Motor Grader (E13) Jam 0.0020 407,436.23
3. Tandem (E17) Jam 0.0320 423,371.96
4. Water Tanker (E23) Jam 0.0078 237,453.58
5. Alat Bantu Ls 1.0000 0.00
2,400.00
563,469,191.47
13.26
JUMLAH
HARGA
(Rp.)
1,722.92
738.39
2,461.32
177,480.00
177,480.00
6,483.42
10,793.84
808.41
13,561.46
1,846.86
0.00
33,493.98
213,435.30
21,343.53
234,778.83
m operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
I. ASUMSI
1 Pekerjaan dilaksanakan hanya pada tanah galian
2 Pekerjaan dilakukan secara mekanis
3 Lokasi pekerjaan : sepanjang jalan
4 Kondisi Jalan : jelek / belum padat
5 Jam kerja efektif per-hari Tk 7.00
2. ALAT
2.a. MOTOR GRADER (E13)
Panjang operasi grader sekali jalan Lh 50.00
Lebar Efektif kerja Blade b 2.40
3. TENAGA
Produksi menentukan : VIBRO ROLLER Q2 142.86
Produksi Pekerjaan / hari = Tk x Q2 Qt 1,000.00
Kebutuhan tenaga :
- Pekerja P 4.00
- Mandor M 1.00
Koefisien tenaga / M2
- Pekerja = (Tk x P) : Qt (L01) 0.0280
- Mandor = (Tk x M) : Qt (L02) 0.0070
URAIAN ANALISA HARGA SATUAN
SATUAN KETERANGAN
Jam
M
M
-
Km / Jam
lintasan
menit
menit
menit
M2
Jam
M
M
-
Km / Jam
lintasan
menit
menit
menit
M2
Jam
Lump Sum
M2/Jam
M2
orang
orang
Jam
Jam
Rp. 5,191.04 / M2
SATUAN KETERANGAN
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
A. TENAGA
B. BAHAN
C. PERALATAN
1. Motor Grader (E13) jam 0.0039 407,436.23
2. Vibro Roller (E19) jam 0.0070 362,093.21
3 Alat Bantu Ls 1.0000 200.00
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukur
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerja
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecu
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lel
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PP
yang dibayar dari kontrak) dan biaya-biaya lainnya.
ORMULIR STANDAR UNTUK
NALISA MASING-MASING HARGA SATUAN
13,700.00
71,117,239.03
0.00
JUMLAH
HARGA
(Rp.)
280.00
120.00
400.00
0.00
1,584.47
2,534.65
200.00
4,319.13
4,719.13
471.91
5,191.04
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : sedang
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 1.88 KM
5 Tebal lapis Agregat padat t 0.15 M
6 Berat isi padat Bip 1.81 -
7 Jam kerja efektif per-hari Tk 7.00 Jam
8 Lebar bahu jalan Lb 1.00 M
9 Proporsi Campuran : - Agregat Pecah Mesin 20 - 30 mm 20-30 28.00 % Gradasi harus
- Agregat Pecah Mesin 5 - 10 & 10 - 20 mm 5-10&10-20 42.00 % memenuhi Spec.
- Pasir Urug PU 30.00 %
10 Berat Isi Agregat (lepas) Bil 1.51 ton/m3
Faktor kehilangan - Agregat A Fh 1.05
1. BAHAN
- Agregat A = 1 M3 x (Bip/Bil) x Fh (M26) 1.25861 M3
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V 1.50 M3 (lepas)
Faktor bucket Fb 0.85 - kondisi sedang
Faktor Efisiensi alat Fa 0.75 -
Waktu Siklus :
- Memuat dan lain-lain T1 0.45 menit panduan
A. TENAGA
B. BAHAN
C. PERALATAN
A. TENAGA
B. BAHAN
C. PERALATAN
1. Wheel Loader (E15) Jam 0.0009 379,887.70 331.50
2. AMP (E01) Jam 0.0000 0.00 0.00
3. Genset (E12) Jam 0.0000 0.00 0.00
4. Dump Truck (E09) Jam 0.0056 250,593.96 1,391.71
5. Asphalt Finisher (E02) (E02) Jam 0.0000 0.00 0.00
6. Tandem Roller (E17) Jam 0.0017 423,371.96 728.70
7 P. Tyre Roller (E18) Jam 0.0000 0.00 0.00
8 Alat Bantu Ls 1.0000 14,200.00 14,200.00
I. ASUMSI
1 Menggunakan cara mekanik
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : sedang
4 Pek. ini tdk. termasuk Bitumen Asbuton & Peremaja
5 Jarak rata-rata Base Camp ke lokasi pekerjaan L 1.88 Km
6 Jam kerja efektif per-hari Tk 7.00 Jam
7 Faktor pemadatan material Fp 1.15 -
8 Tebal LASBUTAG t 3.00 Cm
9 Lasbutag terdiri dari (spesifikasi) :
- Agregat Kasar CA 30.00 %
- Pasir Ps 49.50 %
- Asbuton Asb 16.00 %
- Peremaja, terdiri atas : Md 4.50 %
- Bunker Oil (BO) Bo 47.00 %
- Aspal Semen Asp 38.00 %
- Minyak Tanah Mt 15.00 %
- Bahan Anti Stripping (jarang digunakan) As 0.00 %
10 Penyiapan campuran dilaksanakan di Base Camp
11 Berat Isi bahan : - Agregat Kasar D1 1.80 T/m3
- Pasir D2 1.80 T/m3
- Asbuton D3 1.05 T/m3
- Modifier D4 0.99 T/m3
- Bunker Oil (BO) D5 0.97 T/m3
- Aspal Semen D6 1.03 T/m3
- Minyak Tanah D7 0.80 T/m3
- Lasbutag D8 2.20 T/m3
II. URUTAN KERJA
1. BAHAN
2 ALAT
Berlanjut ke hal. be
3. TENAGA
Produksi menentukan : ASPHALT FINISHER Q5 3,213.00 M2
Produksi / hari = Tk x Q5 Qt 22,491.00 M2
Kebutuhan tenaga :
- Pekerja P 20.00 orang
- Mandor M 1.00 orang
Koefisien Tenaga / M2 :
- Pekerja = (Tk x P) / Qt (L01) 0.0062 Jam
- Mandor = (Tk x M) / Qt (L02) 0.0003 Jam
I. ASUMSI
1 Menggunakan cara mekanik
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : sedang
4 Dalam pek. ini tdk. termasuk Asbuton & Peremaja
5 Jarak rata-rata Base Camp ke lokasi pekerjaan L 1.88 Km
6 Jam kerja efektif per-hari Tk 7.00 Jam
7 Faktor pemadatan material Fp 1.15 -
8 Tebal Latasbusir t 1.50 Cm
9 Latasbusir terdiri dari (spesifikasi) :
- Agregat Kasar (umumnya tidak digunakan) CA 0.00 %
- Pasir Ps 73.00 %
- Asbuton Asb 21.00 %
- Peremaja, terdiri atas : Md 6.00 %
- Bunker Oil (BO) Bo 44.00 %
- Aspal Semen Asp 38.00 %
- Minyak Tanah Mt 18.00 %
- Bahan Anti Stripping As 0.00 %
10 Penyiapan campuran dilaksanakan di Base Camp
11 Berat Isi bahan : - Agregat Kasar D1 1.80 T/m3
- Pasir D2 1.80 T/m3
- Asbuton D3 1.05 T/m3
- Modifier D4 0.99 T/m3
- Bunker Oil (BO) D5 0.97 T/m3
- Aspal Semen D6 1.03 T/m3
- Minyak Tanah D7 0.80 T/m3
- Latasbusir D8 2.20 T/m3
II. URUTAN KERJA
1. BAHAN
2 ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V 1.50 M3
Faktor bucket Fb 0.90 -
Faktor Efisiensi alat Fa 0.85 -
Waktu Siklus : Ts1 0.45 menit
Berlanjut ke hal. be
Berlanjut ke hal. be
3. TENAGA
Produksi menentukan : Asphal Finisher Q5 2,835.00 M2
Produksi / hari = Tk x Q5 Qt 19,845.00 M2
Kebutuhan tenaga :
- Pekerja P 20.00 orang
- Mandor M 1.00 orang
Koefisien Tenaga / M2 :
- Pekerja = (Tk x P) / Qt (L01) 0.0071 Jam
- Mandor = (Tk x M) / Qt (L02) 0.0004 Jam
I. ASUMSI
1 Menggunakan cara mekanik
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : sedang
4 Dalam pek. ini tdk. termasuk Asbuton & Peremaja
5 Jarak rata-rata Base Camp ke lokasi pekerjaan L 1.88 Km
6 Jam kerja efektif per-hari Tk 7.00 Jam
7 Faktor pemadatan material Fp 1.15 -
8 Tebal Latasbusir t 2.00 Cm
9 Latasbusir terdiri dari (spesifikasi) :
- Agregat Kasar CA 14.00 %
- Pasir Ps 63.00 %
- Asbuton Asb 18.00 %
- Peremaja, terdiri atas : Md 5.00 %
- Bunker Oil (BO) Bo 44.00 %
- Aspal Semen Asp 38.00 %
- Minyak Tanah Mt 18.00 %
- Bahan Anti Stripping As 0.00 %
10 Penyiapan campuran dilaksanakan di Base Camp
11 Berat Isi bahan : - Agregat Kasar D1 1.80 T/m3
- Pasir D2 1.80 T/m3
- Asbuton D3 1.05 T/m3
- Modifier D4 0.99 T/m3
- Bunker Oil (BO) D5 0.97 T/m3
- Aspal Semen D6 1.03 T/m3
- Minyak Tanah D7 0.80 T/m3
- Latasbusir D8 2.20 T/m3
II. URUTAN KERJA
1. BAHAN
2 ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V 1.50 M3
Faktor bucket Fb 0.90 -
Faktor Efisiensi alat Fa 0.75 -
Waktu Siklus : Ts1 0.45 menit
Berlanjut ke hal. be
Berlanjut ke hal. be
3. TENAGA
Produksi menentukan : Asphalt Finisher Q5 2,835.00 M2
Produksi / hari = Tk x Q5 Qt 19,845.00 M2
Kebutuhan tenaga :
- Pekerja P 20.00 orang
- Mandor M 1.00 orang
Koefisien Tenaga / M2 :
- Pekerja = (Tk x P) / Qt (L01) 0.0071 Jam
- Mandor = (Tk x M) / Qt (L02) 0.0004 Jam
I. ASUMSI
1. BAHAN
2 ALAT
3. TENAGA
I. ASUMSI
1 Jarak rata-rata Base Camp ke lokasi pekerjaan L 1.88 Km
2 Jam kerja efektif per-hari Tk 7.00 Jam
3 Kandungan Bitumen dalam Bunker Oil (BO) Bbo 80.00 %
4 Kandungan Bitumen dalam Aspal Semen Bas 100.00 %
5 Kandungan Bitumen dalam Kerosene Bk 0.00 %
6 Proporsi Peremaja (modifier Lasbutag) :
- Bunker Oil (BO) Bo 47.00 %
- Aspal Semen Asp 38.00 %
- Minyak Tanah Mt 15.00 %
- Bahan Anti Stripping (umumnya tidak digunakan) As 0.00 %
7 Berat Isi bahan : - Modifier D1 0.99 T/m3
- Bunker Oil (BO) D2 0.97 T/m3
- Aspal Semen D3 1.03 T/m3
- Minyak Tanah D4 0.80 T/m3
8 Penyiapan Peremaja dilaksanakan di Base Camp
1.a Bunker Oil (BO) = (1000:Bit) x Bp1 x 1.01 : D2 (M54) 647.3300 Liter
1.b Aspal Semen = (1000:Bit) x Bp2 x 1.01 (M10) 507.6720 Kg
1.c Minyak Tanah = (1000:Bit) x Bp3 x 1.01 : D3 (M11) 250.4960 Liter
2 ALAT
Berlanjut ke hal. be
3. TENAGA
Produksi menentukan : Liquid Asphalt Mixer Q1 1.14 Ton
Produksi / hari = Tk x Q1 Qt 8.00 Ton
Kebutuhan tenaga :
- Pekerja P 10.00 orang
- Mandor M 1.00 orang
KETERANGAN
Total Campuran
Total Campuran
Total Campuran
Total Campuran
Total Modifier
Total Modifier
Total Modifier
Total Modifier
Berlanjut ke hal. berikut.
Analisa EI-641
KETERANGAN
lihat tabel
V - loading
Berlanjut ke hal. berikut.
Analisa EI-641
KETERANGAN
Lump Sum
Analisa EI-642
KETERANGAN
Total Campuran
Total Campuran
Total Campuran
Total Campuran
Total Modifier
Total Modifier
Total Modifier
Total Modifier
lihat tabel
V - loading
Analisa EI-642
KETERANGAN
Berlanjut ke hal. berikut.
Analisa EI-642
KETERANGAN
Lump Sum
Analisa EI-642
KETERANGAN
Analisa EI-643
KETERANGAN
Total Campuran
Total Campuran
Total Campuran
Total Campuran
Total Modifier
Total Modifier
Total Modifier
Total Modifier
lihat tabel
V - loading
Analisa EI-643
KETERANGAN
Berlanjut ke hal. berikut.
Analisa EI-643
URAIAN ANALISA HARGA SATUAN
Lanjutan
KETERANGAN
Lump Sum
Analisa EI-644
KETERANGAN
Analisa EI-645
KETERANGAN
Total Modifier
Total Modifier
Total Modifier
Total Modifier
Berlanjut ke hal. berikut.
Analisa EI-645
KETERANGAN
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
PERKIRAAN
NO. KOMPONEN SATUAN KUANTITAS
A. TENAGA
B. BAHAN
C. PERALATAN
PERKIRAAN
NO. KOMPONEN SATUAN KUANTITAS
A. TENAGA
B. BAHAN
C. PERALATAN
PERKIRAAN
NO. KOMPONEN SATUAN KUANTITAS
A. TENAGA
1. Pekerja (L01) Jam 0.0071
2. Mandor (L02) Jam 0.0004
B. BAHAN
C. PERALATAN
PERKIRAAN
NO. KOMPONEN SATUAN KUANTITAS
A. TENAGA
B. BAHAN
C. PERALATAN
JUMLAH HARGA PERALATAN
PERKIRAAN
NO. KOMPONEN SATUAN KUANTITAS
A. TENAGA
B. BAHAN
NTUK
NG HARGA SATUAN
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
10,000.00 62.25
17,142.86 5.34
639,705.49 7,212.68
322,304.00 5,996.06
379,887.70 97.08
250,593.96 2,480.10
391,493.70 341.92
423,371.96 384.01
906,520.67 282.14
64,086.25 150.79
0.00 0.00
17,012.37
1,701.24
18,713.61
a dan Peralatan, volume dan/atau ukuran
NTUK
NG HARGA SATUAN
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
10,000.00 70.55
17,142.86 6.05
322,304.00 4,421.34
JUMLAH HARGA BAHAN 4,421.34
379,887.70 42.83
250,593.96 1,246.09
391,493.70 341.92
423,371.96 384.01
906,520.67 319.76
64,086.25 85.45
0.00 0.00
6,917.99
691.80
7,609.79
a dan Peralatan, volume dan/atau ukuran
NTUK
NG HARGA SATUAN
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
10,000.00 70.55
17,142.86 6.05
639,705.49 2,243.94
322,304.00 5,087.57
379,887.70 64.72
250,593.96 1,692.85
391,493.70 341.92
423,371.96 384.01
906,520.67 319.76
64,086.25 113.93
0.00 0.00
10,325.29
1,032.53
11,357.82
a dan Peralatan, volume dan/atau ukuran
NTUK
NG HARGA SATUAN
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
325,000.00 1,665,625.00
1,665,625.00
166,562.50
1,832,187.50
a dan Peralatan, volume dan/atau ukuran
Analisa EI-645
NTUK
NG HARGA SATUAN
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
10,000.00 87,542.09
17,142.86 15,007.22
3,000.00 1,941,989.85
6,400.00 3,249,100.53
5,750.42 1,440,457.39
JUMLAH HARGA BAHAN 6,631,547.77
37,464.66 32,797.35
6,766,894.42
676,689.44
7,443,583.87
a dan Peralatan, volume dan/atau ukuran
PERKIRAAN HARGA J
NO. KOMPONEN SATUAN KUANTITAS SATUAN
(Rp.)
A. TENAGA
B. BAHAN
C. PERALATAN
: 0.00
: 0.00
: 0.00
JUMLAH
HARGA
(Rp.)
8,000.00
1,904.76
2,285.71
12,190.48
1,038,330.13
245,305.04
475,940.88
250,000.00
59,772.80
2,069,348.85
76,567.23
144,269.06
16,712.77
4,931.13
250.00
242,730.19
2,324,269.51
232,426.95
2,556,696.00
ITEM PEMBAYARAN NO. : 7.1 (5)
JENIS PEKERJAAN : Beton K-250
SATUAN PEMBAYARAN : M3 URAIAN
I. ASUMSI
1 Menggunakan alat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (batu, pasir dan semen) diterima
seluruhnya di lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 188%
5 Jam kerja efektif per-hari Tk 700%
6 Kadar Semen Minimum (Spesifikasi) Ks 34000%
7 Ukuran Agregat Maksimum Ag 1900%
8 Perbandingan Air/Semen Maksimum (Spesifikasi) Wcr 50%
9 Perbandingan Camp. : Semen Sm 41000%
: Pasir Ps 67000%
: Agregat Kasar Kr 99200%
10 Berat Isi :
- Beton D1 240%
- Semen D2 125%
- Pasir D3 130%
- Agregat Kasar D4 140%
1. BAHAN
1.a. Semen (PC) = Sm x 1.03 (M12) 42230%
1.b. Pasir Beton = (Ps/1000 : D3) x 1.05 (M01a) 54%
1.c. Agregat Kasar = (Kr/1000 : D4) x 1.05 (M03) 74%
1.d. Kayu Perancah dan/atau Bekisting (M19) 20%
1.e. Paku (M18) 160%
2. ALAT
2.a. BATCHING PLANT (E43)
Kapasitas Alat V 50000%
Faktor Efisiensi Alat Fa 75%
Waktu siklus : (T1 + T2 + T3 + T4) Ts
- Memuat T1 100%
- Mengaduk T2 100%
- Menuang T3 50%
- Tunggu, dll. T4 50%
Ts 300%
3. TENAGA
Produksi Beton dalam 1 hari = Tk x Q1 Qt 5250%
Koefisien Tenaga / M3 :
- Mandor = (Tk x M) : Qt (L03) 13%
- Tukang = (Tk x Tb) : Qt (L02) 13%
- Pekerja = (Tk x P) : Qt (L01) 80%
Rp. 255669600% / M3
I. ASUMSI
1 Menggunakan alat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (batu, pasir dan semen) diterima
seluruhnya di lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 1.88
5 Jam kerja efektif per-hari Tk 7.00
6 Kadar Semen Minimum (Spesifikasi) Ks 300
1. BAHAN
1.a. Semen (PC) = Sm x 1.03 (M12) 327.540
1.b. Pasir Beton = (Ps/1000 : D3) x 1.05 (M01a) 0.5024
1.c. Agregat Kasar = (Kr/1000 : D4) x 1.05 (M03) 0.9053
1.d. Kayu Perancah dan/atau Bekisting (M19) 0.1000
1.e. Paku (M18) 0.8000
2. ALAT
2.a. CONCRETE MIXER (E06)
Kapasitas Alat V 500.00
Faktor Efisiensi Alat Fa 0.75
Waktu siklus : (T1 + T2 + T3 + T4) Ts
- Memuat T1 8.00
- Mengaduk T2 4.00
- Menuang T3 2.00
- Tunggu, dll. T4 3.00
Ts 17.00
SATUAN KETERANGAN
KM
jam
Kg/M3
mm
-
Kg/M3 Berdasarkan
Kg/M3 JMF & sesuai
Kg/M3 dgn Spesifikasi
T/M3
T/M3
T/M3
T/M3
Kg
M3
M3
M3
Kg
liter
-
menit
menit
menit
menit
menit
M3
jam
M3
km/jam
km/jam
menit
menit
menit
menit
menit
SATUAN KETERANGAN
M3
jam
M3
M3
-
kali
M3
jam
M3
jam
M3
orang
orang
1 Tk = 20 m3 btn
1 Tk = 2 m3 kayu
orang
jam
jam
jam
URAIAN ANALISA HARGA SATUAN
SATUAN KETERANGAN
KM
jam
Kg/M3
-
Kg/M3 Berdasarkan
Kg/M3 JMF & sesuai
Kg/M3 dgn Spesifikasi
T/M3
T/M3
T/M3
T/M3
Kg
M3 653.10
M3 1,267.35
M3
Kg
liter
-
menit
menit
menit
menit
menit
M3/jam
jam
M3
M3
-
kali
M3
jam
3. TENAGA
Produksi Beton dalam 1 hari = Tk x Q1 Qt 9.26
Koefisien Tenaga / M3 :
- Mandor = (Tk x M) : Qt (L03) 0.7556
- Tukang = (Tk x Tb) : Qt (L02) 1.5111
- Pekerja = (Tk x P) : Qt (L01) 1.5111
Rp. 2,073,388.4 / M3
SATUAN KETERANGAN
M3
orang
orang
1 Tk = 20 m3 btn
1 Tk = 2 m3 kayu
orang
jam
jam
jam
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
PERKIRAAN HARGA J
NO. KOMPONEN SATUAN KUANTITAS SATUAN H
(Rp.)
A. TENAGA
B. BAHAN
C. PERALATAN
: 0.00
: 0.00
: 0.00
JUMLAH
HARGA
(Rp.)
15,111.11
21,587.30
12,952.38
49,650.79
805,338.98
227,730.95
579,093.39
125,000.00
29,886.40
1,767,049.71
48,420.72
14,777.35
5,000.00
68,198.08
1,884,898.58
188,489.86
2,073,388.44
si untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
I. ASUMSI
1 Pekerjaan dilakukan secara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (besi dan kawat) diterima seluruhnya
di lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 1.88
5 Jam kerja efektif per-hari Tk 7.00
6 Faktor Kehilangan Besi Tulangan Fh 1.10
1. BAHAN
1.a. Baja Tulangan (Polos) U24 (M39a) 1.1000
1.b. Kawat beton (M14) 0.0025
2. ALAT
2.a. ALAT BANTU
Diperlukan :
- Gunting Potong Baja = 2 buah
- Kunci Pembengkok Tulangan = 2 buah
- Alat lainnya
3. TENAGA
Produksi kerja satu hari Qt 200.00
dibutuhkan tenaga : - Mandor M 1.00
- Tukang Tb 1.00
- Pekerja P 3.00
Koefisien Tenaga / Kg :
- Mandor = ( M x Tk ) : Qt (L03) 0.0350
- Tukang = ( Tb x Tk ) : Qt (L02) 0.0350
- Pekerja = ( P x Tk ) : Qt (L01) 0.1050
Rp. 34,945.00 / Kg
SATUAN KETERANGAN
KM
jam
-
Kg
Kg
Ls
Kg
orang
orang
orang
jam
jam
jam
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
PERKIRAAN HARGA J
NO. KOMPONEN SATUAN KUANTITAS SATUAN
(Rp.)
A. TENAGA
B. BAHAN
C. PERALATAN
: 0.00
: 0.00
: 0.00
JUMLAH
HARGA
(Rp.)
1,050.00
500.00
600.00
2,150.00
29,268.80
99.65
29,368.45
250.00
250.00
31,768.45
3,176.84
34,945.00
ITEM PEMBAYARAN NO. : 7.10 (3)
JENIS PEKERJAAN : Bronjong
SATUAN PEMBAYARAN : M3 URAIAN ANALISA HARGA
I. ASUMSI
1 Pekerjaan dilakukan secara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (besi, anyaman kawat dan batu) diterima
seluruhnya di lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 1.88 KM
5 Jam kerja efektif per-hari Tk 7.00 jam
6 Faktor Kehilangan Material Fh 1.10 -
1. BAHAN
1.a. Kawat Bronjong (M15) 15.0000 Kg
1.b. Batu (M02) 1.1000 M3
2. ALAT
2.a. ALAT BANTU
Diperlukan :
- Tang = 2 buah
- Pemotong kawat = 2 buah
- Palu pemecah batu = 2 buah
3. TENAGA
Produksi pekerjaan per hari Qt 8.00 M3
dibutuhkan tenaga : - Mandor M 1.00 orang
- Tukang Tb 3.00 orang
- Pekerja P 6.00 orang
Koefisien Tenaga / Kg :
- Mandor = ( M x Tk ) : Qt (L03) 0.8750 jam
- Tukang = ( Tb x Tk ) : Qt (L02) 2.6250 jam
- Pekerja = ( P x Tk ) : Qt (L01) 5.2500 jam
Rp. 1,599,301.00 / M3
KETERANGAN
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
PERKIRAAN HARGA JU
NO. KOMPONEN SATUAN KUANTITAS SATUAN H
(Rp.)
A. TENAGA
B. BAHAN
C. PERALATAN
: 0.00
: 0.00
: 0.00
JUMLAH
HARGA
(Rp.)
52,500.00
37,500.00
15,000.00
105,000.00
860,370.00
488,290.00
1,348,660.00
250.00
250.00
1,453,910.00
145,391.00
1,599,301.00
ITEM PEMBAYARAN NO. : 7.7 (1)
JENIS PEKERJAAN : Penyediaan Dinding Sumuran Silinder, Diameter 250 cm
SATUAN PEMBAYARAN : M1 URAIAN ANALISA HARGA
I. ASUMSI
1 Pekerjaan dilakukan secara mekanik/manual
2 Lokasi pekerjaan : sekitar jembatan
3 Diameter bagian luar Caison d 2.50 M
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 1.88 Km
5 Jam kerja efektif per-hari Tk 7.00 Jam
6 Tebal Caison t 0.40 M
7 Kebutuhan baja tulangan Mb 150 Kg/M3
2. ALAT
ALAT BANTU
Diperlukan alat-alat bantu kecil
- Sekop = 2 buah
- Alat-alat kecil lain
3. TENAGA
Produksi Caison / hari Qt 6.00 M'
Kebutuhan tenaga tambahan :
- Pekerja P 9.00 orang
- Tukang T 3.00 orang
- Mandor M 1.00 orang
I. ASUMSI
1 Pekerjaan dilakukan secara mekanik/manual
2 Lokasi pekerjaan : sekitar jembatan
3 Diameter bagian luar Caison d 3.00 M
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 1.88 Km
5 Jam kerja efektif per-hari Tk 7.00 Jam
6 Tebal Caison t 0.40 M
7 Kebutuhan baja tulangan Mb 150 Kg/M3
2. ALAT
ALAT BANTU
Diperlukan alat-alat bantu kecil
- Sekop = 2 buah
- Alat-alat kecil lain
3. TENAGA
Produksi Caison / hari Qt 6.00 M'
Kebutuhan tenaga tambahan :
- Pekerja P 9.00 orang
- Tukang T 3.00 orang
- Mandor M 1.00 orang
Koefisien tenaga / M' :
- Pekerja = (Tk x P) : Qt (L01) 10.500 jam
- Tukang = (Tk x T) : Qt (L02) 3.500 jam
- Mandor = (Tk x M) : Qt (L03) 1.167 jam
I. ASUMSI
1 Pekerjaan dilakukan secara mekanik/manual
2 Lokasi pekerjaan : sekitar jembatan
3 Diameter bagian luar Caison d 3.50 M
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 1.88 Km
5 Jam kerja efektif per-hari Tk 7.00 Jam
6 Tebal Caison t 0.40 M
7 Kebutuhan baja tulangan Mb 150 Kg/M3
2. ALAT
ALAT BANTU
Diperlukan alat-alat bantu kecil
- Sekop = 2 buah
- Alat-alat kecil lain
3. TENAGA
Produksi Caison / hari Qt 5.00 M'
Kebutuhan tenaga tambahan :
- Pekerja P 9.00 orang
- Tukang T 3.00 orang
- Mandor M 1.00 orang
I. ASUMSI
1 Pekerjaan dilakukan secara mekanik/manual
2 Lokasi pekerjaan : sekitar jembatan
3 Diameter bagian luar Caison d 4.00 M
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 1.9 Km
5 Jam kerja efektif per-hari Tk 7.00 Jam
6 Tebal Caison t 0.45 M
7 Kebutuhan baja tulangan Mb 150 Kg/M3
II. URUTAN KERJA
1 Caison dicetak di Lokasi
2 Pengecoran dengan Beton K 250 berdasarkan
analisa item pekerjaan ybs
3 Sekelompok pekerja akan mengerjakan pekerjaan
dengan cara manual dengan menggunakan alat bantu
2. ALAT
ALAT BANTU
Diperlukan alat-alat bantu kecil
- Sekop = 2 buah
- Alat-alat kecil lain
3. TENAGA
Produksi Caison / hari Qt 5.00 M'
Kebutuhan tenaga tambahan :
- Pekerja P 9.00 orang
- Tukang T 3.00 orang
- Mandor M 1.00 orang
I. ASUMSI
1 Pekerjaan dilakukan secara mekanik/manual
2 Lokasi pekerjaan : sekitar jembatan
3 Diameter bagian luar Caison d 2.50 M
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 1.9 Km
5 Jam kerja efektif per-hari Tk 7.00 Jam
6 Tebal Caison t 0.40 M
7 Banyak Galian pada Caison / M' Vt 4.91 M3
8 Faktor pengembangan bahan Fk 1.20 -
2. ALAT
2.a. EXCAVATOR (E10)
Kapasitas Bucket V 0.93 M3
Faktor Bucket Fb 0.90 -
Faktor Efisiensi alat Fa 0.75 -
0 : 7.7 (5)
JENIS PEKERJAAN : Penurunan Dinding Sumuran Silinder, Diameter 250 cm
SATUAN PEMBAYARAN : M1 URAIAN ANALISA HARGA
3. TENAGA
Produksi menentukan : EXCAVATOR Q1 5.12 M'/Jam
Produksi Galian / hari = Tk x Q1 x Vt Qt 175.77 M3
Kebutuhan tenaga untuk 20% galian :
- Pekerja P 8.00 orang
- Mandor M 1.00 orang
I. ASUMSI
1 Pekerjaan dilakukan secara mekanik/manual
2 Lokasi pekerjaan : sekitar jembatan
3 Diameter bagian luar Caison d 3.00 M
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 1.9 Km
5 Jam kerja efektif per-hari Tk 7.00 Jam
6 Tebal Caison t 0.45 M
7 Banyak Galian pada Caison / M' Vt 7.07 M3
8 Faktor pengembangan bahan Fk 1.20 -
2. ALAT
2.a. EXCAVATOR (E10)
Kapasitas Bucket V 0.93 M3
Faktor Bucket Fb 0.90 -
Faktor Efisiensi alat Fa 0.75 -
3. TENAGA
Produksi menentukan : EXCAVATOR Q1 3.55 M'/Jam
Produksi Galian / hari = Tk x Q1 x Vt Qt 175.77 M3
Kebutuhan tenaga untuk 20% galian :
- Pekerja P 8.00 orang
- Mandor M 1.00 orang
I. ASUMSI
1 Pekerjaan dilakukan secara mekanik/manual
2 Lokasi pekerjaan : sekitar jembatan
3 Diameter bagian luar Caison d 3.50 M
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 1.9 Km
5 Jam kerja efektif per-hari Tk 7.00 Jam
6 Tebal Caison t 0.45 M
7 Banyak Galian pada Caison / M' Vt 9.62 M3
8 Faktor pengembangan bahan Fk 1.20 -
2. ALAT
2.a. EXCAVATOR (E10)
Kapasitas Bucket V 0.93 M3
Faktor Bucket Fb 0.90 -
Faktor Efisiensi alat Fa 0.75 -
3. TENAGA
Produksi menentukan : EXCAVATOR Q1 3.26 M'/Jam
Produksi Galian / hari = Tk x Q1 x Vt Qt 219.71 M3
Kebutuhan tenaga untuk 20% galian :
- Pekerja P 12.00 orang
- Mandor M 1.00 orang
I. ASUMSI
1 Pekerjaan dilakukan secara mekanik/manual
2 Lokasi pekerjaan : sekitar jembatan
3 Diameter bagian luar Caison d 4.00 M
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 1.9 Km
5 Jam kerja efektif per-hari Tk 7.00 Jam
6 Tebal Caison t 0.45 M
7 Banyak Galian pada Caison / M' Vt 12.57 M3
8 Faktor pengembangan bahan Fk 1.20 -
2. ALAT
2.a. EXCAVATOR (E10)
Kapasitas Bucket V 0.93 M3
Faktor Bucket Fb 0.75 -
Faktor Efisiensi alat Fa 0.75 -
Waktu siklus Ts1 menit
- Menggali / memuat T1 0.50 menit
- Lain-lain T2 0.50 menit
Ts1 1.00 menit
3. TENAGA
Produksi menentukan : EXCAVATOR Q1 2.08 M'/Jam
Produksi Galian / hari = Tk x Q1 x Vt Qt 183.09 M3
Kebutuhan tenaga untuk 20% galian :
- Pekerja P 14.00 orang
- Mandor M 1.00 orang
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V 1.50 M3
Faktor bucket Fb 0.85 -
Faktor efisiensi alat Fa 0.75 -
Waktu Siklus Ts1
- Muat T1 0.55 menit
- Lain lain T2 1.00 menit
Ts1 1.55 menit
3. TENAGA
Produksi Beton dalam 1 hari = Tk x Q2 Qt 126.00 M3
Koefisien Tenaga / M3 :
- Mandor = (Tk x M) : Qt (L03) 0.1667 jam
- Tukang = (Tk x Tb) : Qt (L02) 0.7778 jam
- Pekerja = (Tk x P) : Qt (L01) 1.5556 jam
Rp. 0.00 / M2
KETERANGAN
PERKIRAAN
NO. KOMPONEN SATUAN KUANTITAS
Spec.
A. TENAGA
B. BAHAN
Tambahan
Tambahan 1. Beton K-250 (EI-715) M3 1.4451
2. Baja Tulangan (EI-73) Kg 216.7699
3. Kayu Perancah (M19) M3 0.5890
4. Paku (M18) Kg 2.0000
C. PERALATAN
Analisa EI-772
KETERANGAN
PERKIRAAN
NO. KOMPONEN SATUAN KUANTITAS
Spec.
A. TENAGA
B. BAHAN
Tambahan
Tambahan 1. Beton K-250 (EI-715) M3 1.7593
2. Baja Tulangan (EI-73) Kg 263.8938
3. Kayu Perancah (M19) M3 0.7069
4. Paku (M18) Kg 2.0000
C. PERALATAN
Analisa EI-773
KETERANGAN
PERKIRAAN
NO. KOMPONEN SATUAN KUANTITAS
Spec.
A. TENAGA
B. BAHAN
Tambahan
Tambahan 1. Beton K-250 (EI-715) M3 2.0735
2. Baja Tulangan (EI-73) Kg 311.0177
3. Kayu Perancah (M19) M3 0.8247
4. Paku (M18) Kg 2.5000
C. PERALATAN
Analisa EI-774
KETERANGAN
PERKIRAAN
NO. KOMPONEN SATUAN KUANTITAS
Spec.
A. TENAGA
B. BAHAN
Tambahan
Tambahan 1. Beton K-250 (EI-715) M3 2.6684
2. Baja Tulangan (EI-73) Kg 400.2585
3. Kayu Perancah (M19) M3 0.9425
4. Paku (M18) Kg 3.0000
C. PERALATAN
Analisa EI-775
KETERANGAN
PERKIRAAN
NO. KOMPONEN SATUAN KUANTITAS
A. TENAGA
B. BAHAN
C. PERALATAN
Lump Sump
KETERANGAN
Analisa EI-776
KETERANGAN
PERKIRAAN
NO. KOMPONEN SATUAN KUANTITAS
A. TENAGA
B. BAHAN
JUMLAH HARGA BAH
C. PERALATAN
Lump Sump
KETERANGAN
Analisa EI-777
PERKIRAAN
NO. KOMPONEN SATUAN KUANTITAS
A. TENAGA
B. BAHAN
C. PERALATAN
KETERANGAN
Analisa EI-778
KETERANGAN
PERKIRAAN
NO. KOMPONEN SATUAN KUANTITAS
A. TENAGA
B. BAHAN
JUMLAH HARGA BAH
C. PERALATAN
Lump Sump
KETERANGAN
Analisa EI-7.16.1
FORMULIR STANDAR UNTUK
URAIAN ANALISA HARGA SATUAN PEREKAMAN ANALISA MASING-MASING HARGA SATUA
KETERANGAN
ITEM PEMBAYARAN NO. : 7.16.1
JENIS PEKERJAAN : Perkerasan Jalan Beton
SATUAN PEMBAYARAN : M3
PERKIRAAN
NO. KOMPONEN SATUAN KUANTITAS
A. TENAGA
Berdasarkan 1. Pekerja (L01) jam 1.5556
JMF & sesuai 2. Tukang (L02) jam 0.7778
dgn Spesifikasi 3. Mandor (L03) jam 0.1667
B. BAHAN
1. Semen (M12) Kg 410.0000
2 Pasir (M01a) M3 0.6237
3 Agregat Kasar (M03) M3 0.7885
4 Baja Tulangan Polos (M39a) Kg 15.8750
5 Joint Sealent (M94) Kg 0.9900
6 Cat Anti Karat (M95) Kg 0.0200
7 Expansion Cap (M96) M2 0.1700
8 Polytene 125 mikron (M97) Kg 0.4375
9 Curing Compound (M98) Ltr 0.8700
10 Multiplex 12 mm (M73) Lbr 0.1600
11 Kayu Acuan (M99) M3 0.0960
12 Paku (M18) Kg 1.0240
13 Additive (M67a) Ltr 0.9139
JUMLAH HARGA BAH
C. PERALATAN
1 Wheel Loader E15 jam 0.0270
2 Batching Plant E43 jam 0.0556
3 Truck Mixer E49 jam 0.1246
4 Con. Vibrator E20 jam 0.0556
5 Water Tank Truck E23 jam 0.0233
6 Conc. Paver E42 jam 0.0082
7 Alat Bantu Ls 1.0000
8
KETERANGAN
945
KETERANGAN
Analisa EI-771
NDAR UNTUK
G-MASING HARGA SATUAN
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
10,000.00 105,000.00
14,285.71 50,000.00
17,142.86 20,000.00
2,324,269.51 3,358,877.69
8,000.00 1,734,159.14
1,250,000.00 736,310.78
37,358.00 74,716.00
0.00 0.00
AN ( A + B + C ) 6,079,063.62
607,906.36
6,686,969.98
Tenaga Kerja dan Peralatan, volume dan/atau ukuran
Analisa EI-772
NDAR UNTUK
G-MASING HARGA SATUAN
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
10,000.00 105,000.00
14,285.71 50,000.00
17,142.86 20,000.00
2,324,269.51 4,089,068.49
8,000.00 2,111,150.26
1,250,000.00 883,572.93
37,358.00 74,716.00
0.00 0.00
JUMLAH HARGA PERALATAN 0.00
AN ( A + B + C ) 7,333,507.69
733,350.77
8,066,858.46
Tenaga Kerja dan Peralatan, volume dan/atau ukuran
Analisa EI-773
NDAR UNTUK
G-MASING HARGA SATUAN
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
10,000.00 126,000.00
14,285.71 60,000.00
17,142.86 24,000.00
0.00 0.00
AN ( A + B + C ) 8,641,630.77
864,163.08
9,505,793.85
Tenaga Kerja dan Peralatan, volume dan/atau ukuran
Analisa EI-774
NDAR UNTUK
G-MASING HARGA SATUAN
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
10,000.00 126,000.00
14,285.71 60,000.00
17,142.86 24,000.00
2,324,269.51 6,202,058.13
8,000.00 3,202,068.31
1,250,000.00 1,178,097.25
37,358.00 112,074.00
0.00 0.00
AN ( A + B + C ) 10,904,297.69
1,090,429.77
11,994,727.46
Tenaga Kerja dan Peralatan, volume dan/atau ukuran
Analisa EI-775
NDAR UNTUK
G-MASING HARGA SATUAN
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
10,000.00 15,929.91
17,142.86 3,413.55
544,258.12 106,396.69
250,593.96 218,964.41
0.00 0.00
AN ( A + B + C ) 344,704.56
34,470.46
379,175.02
Tenaga Kerja dan Peralatan, volume dan/atau ukuran
NDAR UNTUK
G-MASING HARGA SATUAN
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
10,000.00 15,929.91
17,142.86 3,413.55
544,258.12 153,211.23
250,593.96 274,820.89
0.00 0.00
AN ( A + B + C ) 447,375.58
44,737.56
492,113.14
Tenaga Kerja dan Peralatan, volume dan/atau ukuran
NDAR UNTUK
G-MASING HARGA SATUAN
PERKIRAAN VOL. PEK. : 0.00
TOTAL HARGA (Rp.) : 0.00
% THD. BIAYA PROYEK : 0.00
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
10,000.00 19,115.89
17,142.86 2,730.84
544,258.12 166,830.01
250,593.96 343,336.20
0.00 0.00
AN ( A + B + C ) 532,012.94
53,201.29
585,214.23
Tenaga Kerja dan Peralatan, volume dan/atau ukuran
NDAR UNTUK
G-MASING HARGA SATUAN
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
10,000.00 26,762.25
17,142.86 3,277.01
544,258.12 261,480.50
250,593.96 504,537.01
0.00 0.00
AN ( A + B + C ) 796,056.76
79,605.68
875,662.44
Tenaga Kerja dan Peralatan, volume dan/atau ukuran
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
10,000.00 15,555.56
14,285.71 11,111.11
17,142.86 2,857.14
1,967.00 806,470.00
453,300.00 282,711.01
639,705.49 504,419.20
8,000.00 127,000.00
34,100.00 33,759.00
35,750.00 715.00
6,050.00 1,028.50
19,250.00 8,421.88
38,500.00 33,495.00
181,500.00 29,040.00
1,250,000.00 120,000.00
37,358.00 38,254.59
38,500.00 35,185.92
JUMLAH HARGA BAHAN 2,020,500.09
379,887.70 10,262.76
574,254.24 31,903.01
596,931.66 74,405.95
36,983.45 2,054.64
237,453.58 5,540.58
529,137.42 4,355.04
0.00 0.00
0.025
ITEM PEMBAYARAN NO. : 8.1 (1)
JENIS PEKERJAAN : Pondasi Agregat Kls. A Untuk Pek. Minor
SATUAN PEMBAYARAN : M3 URAIAN
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : setempat2 di sepanjang jalan
3 Kondisi existing jalan : sedang
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 1.9
5 Tebal lapis agregat padat t 0.15
6 Berat isi padat Bip 1.81
7 Jam kerja efektif per-hari Tk 7.00
8 Proporsi Campuran : - Agregat Pecah Mesin 20 - 30 mm 20-30 28.00
- Agregat Pecah Mesin 5 - 10 & 10 - 20 mm 5-10&10-20 42.00
- Pasir Urug PU 30.00
9 Berat Isi Agregat (lepas) Bil 1.51
Faktor kehilangan - Agregat A Fh 1.05
1. BAHAN
- Agregat A = 1 M3 x (Bip/Bil) x Fh (M26) ###
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V 1.50
Faktor bucket Fb 0.85
Faktor Efisiensi alat Fa 0.75
Waktu Siklus :
- Memuat dan lain-lain Ts1 0.45
TENAGA
Produksi menentukan : WHEEL LOADER Q1 106.37
Produksi agregat / hari = Tk x Q1 Qt 744.57
Kebutuhan tenaga :
- Pekerja P 25.00
- Mandor M 1.00
3. Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 0.2350
- Mandor = (Tk x M) : Qt (L03) 0.0094
4. HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT
Lihat lampiran.
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : setempat2 di sepanjang jalan
3 Kondisi existing jalan : sedang
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 1.9
5 Tebal lapis agregat padat t 0.15
6 Berat isi padat Bip 1.81
7 Jam kerja efektif per-hari Tk 7.00
8 Proporsi Campuran : - Agregat Pecah Mesin 20 - 30 mm 20-30 18.00
- Agregat Pecah Mesin 5 - 10 & 10 - 20 mm 5-10&10-20 18.00
- Sirtu St 64.00
9 Berat volume agregat (lepas) Bil 1.51
- Agregat B Fh 1.05
Ts1 0.45
3. TENAGA
Produksi menentukan : WHEEL LOADER Q1 106.37
Produksi agregat / hari = Tk x Q1 Qt 744.57
Kebutuhan tenaga :
- Pekerja P 15.00
- Mandor M 1.00
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 0.1410
- Mandor = (Tk x M) : Qt (L03) 0.0094
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : sedang
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 1.9
5 Tebal lapis Agregat padat t 0.15
6 Berat isi padat Bip 1.81
7 Jam kerja efektif per-hari Tk 7.00
8 Berat volume agregat (lepas) Bil 1.51
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V 1.50
Faktor bucket Fb 0.85
Faktor Efisiensi alat Fa 0.75
Waktu siklus Ts1
- Muat T1 0.45
Ts1 0.45
3. TENAGA
Produksi menentukan : WHEEL LOADER Q1 106.37
Produksi Agregat / hari = Tk x Q1 Qt 744.57
Kebutuhan tenaga :
- Pekerja P 15.00
- Mandor M 1.00
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 0.1410
- Mandor = (Tk x M) : Qt (L03) 0.0094
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : sedang
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 1.9
5 Jam kerja efektif per-hari Tk 7.00
6 Faktor kehilangan material Agregat Fh 1.10
7 Komposisi campuran (taksiran) :
- Agregat Kasar Ak 85.00
- Agregat Halus Ah 15.00
8 Berat jenis bahan :
- Agregat D1 1.80
9 Berat isi padat Bip 1.81
10 Berat volume agregat (lepas) Bil 1.51
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V 1.50
Faktor bucket Fb 0.85
Faktor efisiensi alat Fa 0.75
Waktu Siklus Ts1
- Menunggu, dan lain lain T1 0.45
Ts1 0.45
Kap. Prod. / jam = V x Fb x Fa x 60 Q1 88.64
Ts1 x (Bip/Bil)
3. TENAGA
Produksi menentukan (Produksi Wheel Loader) Q1 88.64
Produksi Lapen / hari = Q1 x Tk Qt 620.48
Kebutuhan tenaga :
- Pekerja P 16.00
- Mandor M 1.00
Koefisien Tenaga / M3 :
- Pekerja = (Tk x P) / Qt (L01) 0.1805
- Mandor = (Tk x M) / Qt (L03) 0.0113
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : sedang
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 1.9
5 Tebal Lapis Hotmix padat untuk patching t 0.04
6 Jam kerja efektif per-hari Tk 7.00
7 Faktor kehilangan material : - Agregat Fh1 1.10
- Aspal Fh2 1.05
8 Komposisi campuran ATB :
- Coarse Agregat CA 55.00
- Fine Agregat FA 37.50
- Fraksi Filler FF 1.00
- Asphalt minimum 6 % As 6.50
9 Berat jenis bahan :
- ATB D1 2.30
- Coarse Agregat & Fine Agregat D2 1.80
- Fraksi Filler D3 2.00
- Asphalt D4 1.03
10 Jarak stock pile ke cold bin l 100.00
11 Faktor kembang Fk 1.20
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V 1.50
Faktor bucket Fb 0.85
Faktor efisiensi alat Fa 0.75
Kecepatan maju (ke bin) Vf 15.00
Kecepatan kembali (ke stock pile) Vr 20.00
Waktu Siklus Ts1
- Muat = l x 60 + l x 60 T1 0.70
- Lain lain 1000 x Vf 1000 x Vr T2 0.75
Ts1 1.45
3. TENAGA
Produksi menentukan : AMP Q6 16.30
Produksi ATB / hari = Tk x Q6 Qt 114.13
Kebutuhan tenaga :
- Pekerja P 20.00
- Mandor M 2.00
Koefisien Tenaga / M3 :
- Pekerja = (Tk x P) / Qt (L01) 1.2267
- Mandor = (Tk x M) / Qt (L03) 0.1227
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : sedang
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 1.88
5 Tebal rata2 Lapen t 0.055
6 Jam kerja efektif per-hari Tk 7.00
7 Faktor kehilanganmaterial : - Agregat Fh1 1.10
- Aspal Fh2 1.05
8 Komposisi campuran Lapen (spesifikasi) :
- Agregat Pokok Ak 133.00
- Agregat Pengunci Ap 25.00
- Aspal : - Paska Agregat Pokok As1 5.20
As2 94.55
9 Berat jenis bahan :
- Agregat D1 1.80
- Aspal D2 1.01
1. BAHAN
1.a. Agregat Kasar = {(Ak/1000 : t M3) x Fh1} : D1 (M03) 1.4778
1.b. Agregat Pengunci = {(Ap/1000 : t M3) x Fh1} : D1 (M04) 0.2778
1.c. Aspal = {(As : t M3) x Fh2} (M10) 99.2727
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V 1.50
Faktor bucket Fb 0.85
Faktor efisiensi alat Fa 0.75
Waktu Siklus Ts1
- Memuat, menuang, kembali T1 0.45
Ts1 0.45
3. TENAGA
Produksi menentukan (Produksi Wheel Loader) Q1 106.25
Produksi Lapen / hari = Q1 x Tk Qt 743.75
Kebutuhan tenaga :
- Pekerja P 20.00
- Mandor M 2.00
Koefisien Tenaga / M3 :
- Pekerja = (Tk x P) / Qt (L01) 0.1882
- Mandor = (Tk x M) / Qt (L03) 0.0188
1. BAHAN
1.a. Agregat Halus = {(100% - As) x 1M3 x D1} : D3 (M04) 1.1683
1.b. Aspal Emulsi = {As x 1M3 x D1} x 1000 (M31) 140.700
2. ALAT
2.a. CONCRETE MIXER (E06)
Kapasitas Alat V 500.00
Faktor Efisiensi Alat Fa 0.75
Waktu siklus : Ts1
- Memuat T1 0.50
- Mengaduk T2 1.00
- Menuang T3 0.30
- Tunggu, dll. T4 0.20
Ts1 2.00
3. TENAGA
Produksi menentukan (Produksi Concrete Mixer) Q1 9.375
Produksi Campuran dalam 1 hari = Tk x Q1 Qt 65.63
Kebutuhan tenaga : - Mandor M 2.00
- Pekerja P 12.00
Koefisien Tenaga / M3 :
- Mandor = (Tk x M) : Qt (L03) 0.2133
- Pekerja = (Tk x P) : Qt (L01) 1.2800
Rp. 1,755,092.09 / M3
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Jarak rata-rata Base Camp ke lokasi pekerjaan L 1.9
4 Jam kerja efektif per-hari Tk 7.00
5 Faktor kehilangan bahan Fh 1.10
6 Komposisi campuran :
- Aspal AC - 10 atau AC - 20 As 87.00
- Minyak Fluk / Pencair K 13.00
7 Berat jenis bahan :
- Aspal AC - 10 atau AC - 20 D1 1.03
- Minyak Fluk / Minyak Tanah (Kerosene) D2 0.80
8 Bahan dasar (aspal & minyak pencair) semuanya
diterima dilokasi pekerjaan
1. BAHAN
Untuk mendapatkan 1 liter Lapis resap Pengikat
diperlukan : (1 liter x Fh) Pc 1.10
Aspal = As x Pc x D1 : 100 (M10) 0.99
Kerosene = K x Pc : 100 (M11) 0.14
2. ALAT
2.a. APHALT SPRAYER (E03)
Kapasitas alat V 850.00
Faktor Efisiensi Alat Fa 0.75
Kapasitas pompa aspal pas 55.00
3. TENAGA
Produksi menentukan : ASPHALT SPRAYER Q1 2,722.50
Produksi / hari = Tk x Q1 Qt 19,057.50
Kebutuhan tenaga :
- Pekerja P 10.00
- Mandor M 1.00
I. ASUMSI
1 Menggunakan tenaga pekerja
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi Jalan : sedang / baik
4 Jam kerja efektif per-hari Tk 7.00
5 Faktor pengembangan bahan Fk 1.20
6 Berat jenis bahan (lepas) D 1.60
II. URUTAN KERJA
1 Tanah yang dipotong umumnya berada disisi jalan
2 Penggalian dilakukan dengan menggunakan pekerja
3 Selanjutnya pekerja memuat material hasil
galian kedalam Dump Truck
4 Dump Truck membuang material hasil galian keluar
lokasi jalan sejauh L 2.00
1. BAHAN
Tidak ada bahan yang diperlukan
2. ALAT
2.a. DUMP TRUCK (E09)
Kapasitas bak V 10.0
Faktor efisiensi alat Fa 0.75
Kecepatan rata-rata bermuatan v1 20.00
Kecepatan rata-rata kosong v2 30.00
Waktu siklus Ts2
- Muat T1 35.00
- Waktu tempuh isi = (L : v1) x 60 T2 6.00
- Waktu tempuh kosong = (L : v2) x 60 T3 4.00
- Lain-lain T4 2.00
Ts2 47.00
3. TENAGA
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 1.0000
- Mandor = (Tk x M) : Qt (L03) 0.1000
Rp. 107,484.75 / M3
I. ASUMSI
1 Menggunakan alat (cara mekanik)
2 Lokasi pekerjaan : setempat2 di sepanjang jalan
3 Kondisi existing jalan : sedang/baik
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 1.9
5 Jam kerja efektif per-hari Tk 7.00
6 Faktor pengembangan bahan Fk 1.20
7 Tebal hamparan padat t 0.15
8 Hasil bongkaran per M2 luas area d 0.50
1. BAHAN
1a Bahan timbunan = 1 x Fk (M08) 1.20
2. ALAT
2.a DUMP TRUCK (E09)
Kapasitas bak V 10.00
Faktor Efisiensi alat Fa 0.75
Kecepatan rata-rata bermuatan v1 20.00
Kecepatan rata-rata kosong v2 30.00
Waktu Siklus :
- Waktu tempuh isi = (L : v1) x 60 menit T1 5.63
- Waktu tempuh kosong = (L : v2) x 60 menit T2 3.75
- Lain-lain (termasuk dumping setempat-setempat) T3 2.00
Ts2 11.38
Kap. Prod. / jam = V x Fa x 60 Q2 79.09
Ts2 x d
Koefisien Alat / M3 = 1 : Q2 (E09) 0.0126
TENAGA
Produksi pembersihan dan pembongkaran/hari Qt 500.00
Kebutuhan tenaga :
- Pekerja P 5.00
- Mandor M 1.00
3. Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 0.0700
- Mandor = (Tk x M) : Qt (L03) 0.0140
I. ASUMSI
1 Menggunakan tenaga pekerja/peralatan
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi Jalan : sedang / baik
4 Jam kerja efektif per-hari Tk 7.00
5 1 Pohon diameter 30-50 cm setara dengan volume Vp 3.00
6 Berat Jenis Kayu BjK 0.90
1. BAHAN
Tidak ada bahan yang diperlukan
2. ALAT
2.a. DUMP TRUCK (E09)
Kapasitas bak V 10.0
Faktor efisiensi alat Fa 0.75
Kecepatan rata-rata bermuatan v1 20.00
Kecepatan rata-rata kosong v2 30.00
Waktu siklus Ts2
- Muat T1 35.00
- Waktu tempuh isi = (L : v1) x 60 T2 6.00
- Waktu tempuh kosong = (L : v2) x 60 T3 4.00
- Lain-lain T4 10.00
Ts 55.00
3. TENAGA
I. ASUMSI
1 Menggunakan tenaga pekerja/peralatan
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi Jalan : sedang / baik
4 Jam kerja efektif per-hari Tk 7.00
5 1 Pohon diameter 50 - 75 cm setara dengan volume Vp 5.00
6 Berat jenis kayu Bjk 0.90
1. BAHAN
Tidak ada bahan yang diperlukan
2. ALAT
2.a. DUMP TRUCK (E09)
Kapasitas bak V 10.0
Faktor efisiensi alat Fa 0.75
Kecepatan rata-rata bermuatan v1 20.00
Kecepatan rata-rata kosong v2 30.00
Waktu siklus Ts2
- Muat T1 35.00
- Waktu tempuh isi = (L : v1) x 60 T2 6.00
- Waktu tempuh kosong = (L : v2) x 60 T3 4.00
- Lain-lain T4 10.00
Ts2 55.00
3. TENAGA
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 3.5000
- Mandor = (Tk x M) : Qt (L03) 0.3500
I. ASUMSI
1 Menggunakan tenaga pekerja/peralatan
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi Jalan : sedang / baik
4 Jam kerja efektif per-hari Tk 7.00
5 1 Pohon diameter > 75 cm setara dengan volume Vp 10.00
6 Berat jenis kayu Bjk 0.90
2. ALAT
2.a. DUMP TRUCK (E09)
Kapasitas bak V 10.0
Faktor efisiensi alat Fa 0.75
Kecepatan rata-rata bermuatan v1 20.00
Kecepatan rata-rata kosong v2 30.00
Waktu siklus Ts2
- Muat T1 35.00
- Waktu tempuh isi = (L : v1) x 60 T2 6.00
- Waktu tempuh kosong = (L : v2) x 60 T3 4.00
- Lain-lain T4 15.00
Ts 60.00
3. TENAGA
I. ASUMSI
1 Menggunakan tenaga pekerja
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (gebalan rumput) diterima seluruhnya
di lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 0.00
5 Jam kerja efektif per-hari Tk 7.00
6 Faktor kehilangan bahan Fh 1.10
1. BAHAN
1.a. Gebalan Rumput = 1 M2 x Fh (M32) 1.1000
2. ALAT
2.a. ALAT BANTU
- Gerobak Dorong = 2 buah
- Tusuk Bambu = 5 buah / M2
- Pagar Tali = sesuai kebutuhan
3. TENAGA
Produksi penanaman rumput dalam 1 hari Qt 100.00
Kebutuhan tenaga : - Mandor M 1.00
- Tukang Tb 2.00
- Pekerja P 4.00
Koefisien Tenaga / M2 :
- Mandor = (Tk x M) : Qt (L03) 0.0700
- Tukang = (Tk x Tb) : Qt (L02) 0.1400
- Pekerja = (Tk x P) : Qt (L01) 0.2800
Rp. 10,835.00 / M2
I. ASUMSI
1 Menggunakan tenaga pekerja
2 Lokasi pekerjaan : di sepanjang jalan
3 Bahan dasar (semak/perdu) diterima seluruhnya di lokasi pekerjaan
1. BAHAN
1.a. - Semak/perdu (M32) 1.10
1.b. - Tanah humus setebal 20 cm mxx 0.22
1.c. - Pupuk mxx 0.25
2. ALAT
2.a. ALAT BANTU
- Pacul/sekop = 4 buah
- Gerobak Dorong = 1 buah
- Pagar Bambu/kayu = sesuai kebutuhan
3. TENAGA
Produksi penanaman rumput dalam 1 hari Qt 100.00
Kebutuhan tenaga : - Mandor M 1.00
- Tukang Tb 0.00
- Pekerja P 6.00
Koefisien Tenaga / M2 :
- Mandor = (Tk x M) : Qt (L03) 0.0700
- Tukang = (Tk x Tb) : Qt (L02) 0.0000
- Pekerja = (Tk x P) : Qt (L01) 0.4200
Rp. 10,175.00 / M2
I. ASUMSI
1 Menggunakan tenaga pekerja
2 Lokasi pekerjaan : di sepanjang jalan
3 Bahan dasar pohon dan bahan lainnya diterima di lokasi pekerjaan
4 ukuran lubang 0,5 x 0,5 x 0,5 m
1. BAHAN
1.a. - pohon (M32) 1.00
1.b. - Tanah humus setebal 20 cm mxx 0.22
1.c. - Pupuk mxx 0.50
2. ALAT
2.a. ALAT BANTU
- Pacul/sekop = 4 buah
- Gerobak Dorong = 1 buah
- Pagar Bambu/kayu = sesuai kebutuhan
3. TENAGA
Produksi penanaman rumput dalam 1 hari Qt 100.00
Kebutuhan tenaga : - Mandor M 1.00
- Tukang Tb 0.00
- Pekerja P 6.00
Koefisien Tenaga / M2 :
- Mandor = (Tk x M) : Qt (L03) 0.0700
- Tukang = (Tk x Tb) : Qt (L02) 0.0000
- Pekerja = (Tk x P) : Qt (L01) 0.4200
Rp. 9,790.00 / bh
I. ASUMSI
1 Pekerjaan dilakukan secara manual/mekanis
2 Lokasi pekerjaan : di lokasi jembatan
3 Kondisi Jalan : sedang / baik
4 Jam kerja efektif per-hari Tk 7.00
5 Faktor kehilangan bahan Fk 1.10
6 Tebal plat jembatan 0.20
1. BAHAN
- Beton K300 0.22
- Baja tulangan (bila diperlukan)
2. ALAT
2.a. COMPRESSOR, JACK HAMMER & LOADER
Produksi per jam Q1 7.50
3. TENAGA
Produksi menentukan : JACK HAMMER Q1 7.50
Produksi Galian / hari = Tk x Q1 Qt 52.50
Kebutuhan tenaga :
- Pekerja P 12.00
- Mandor M 1.00
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 1.6000
- Mandor = (Tk x M) : Qt (L03) 0.1333
Rp. 102,960.11 / M3
I. ASUMSI
1 Pekerjaan dilakukan secara manual/mekanis
2 Lokasi pekerjaan : di lokasi jembatan
3 Kondisi Jalan : sedang / baik
4 Jam kerja efektif per-hari Tk 7.00
5 Faktor kehilangan bahan Fk 1.10
6 Tebal plat jembatan kayu 0.20
1. BAHAN
- Kayu 0.22
- Baja tulangan (bila diperlukan)
2. ALAT
2.a. COMPRESSOR, JACK HAMMER & LOADER
Produksi per jam Q1 7.50
3. TENAGA
Produksi menentukan : JACK HAMMER Q1 7.50
Produksi Galian / hari = Tk x Q1 Qt 52.50
Kebutuhan tenaga :
- Pekerja P 12.00
- Mandor M 1.00
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 1.6000
- Mandor = (Tk x M) : Qt (L03) 0.1333
SATUAN KETERANGAN
KM
M
-
jam
% Gradasi harus
% memenuhi Spec.
%
ton/m3
M3
M3
-
-
menit panduan
M3
jam
ton
-
KM/jam
KM/jam
menit
menit
menit
menit
menit
M3
jam
SATUAN KETERANGAN
KM/jam
M
lintasan
-
M3
jam
M3
M3
liter/menit
-
M3
jam
Lump Sum
M3/jam
M3
orang
orang
jam
jam
Analisa EI-812
SATUAN KETERANGAN
KM
M
-
jam
% Gradasi harus
% memenuhi
% Spesifikasi
M3
M3
-
-
menit
menit
M3
jam
ton
-
KM/jam
KM/jam
menit
menit
menit
menit
menit
M3
jam
SATUAN KETERANGAN
KM/jam
M
lintasan
-
M3
jam
M3
M3
liter/menit
-
M3
jam
Lump Sum
M3/jam
M3
orang
orang
jam
jam
Analisa EI-813
SATUAN KETERANGAN
KM
M
-
Jam
M3 Agregat lepas
M3
-
-
menit
menit
M3
Jam
ton
-
KM / Jam
KM / Jam
menit
menit
menit
menit
menit
M3
Jam
Berlanjut ke halaman berikut
Analisa EI-813
SATUAN KETERANGAN
KM/jam
M
lintasan
-
M3
jam
M3
M3
liter/menit
-
M3
jam
Lump Sum
M3 / Jam
M3
orang
orang
Jam
Jam
Analisa EI-814
SATUAN KETERANGAN
KM
Jam
-
%
%
ton / M3
M3
M3
M3
-
-
menit
menit
M3
Jam
ton
-
KM / Jam
KM / Jam
menit
menit
menit
menit
menit
M3
Jam
SATUAN KETERANGAN
Km / Jam
M
M
lintasan
-
M3
Jam
Lump Sum
M3/Jam
M3
orang
orang
Jam
Jam
Analisa EI-815
SATUAN KETERANGAN
KM
M Rata-rata
Jam
-
-
% Gradasi harus -
% memenuhi -
% Spesifikasi
%
ton / M3
ton / M3
ton / M3
ton / M3
m
M3
M3
Kg
Kg
M3
-
-
km/jam
km/jam
menit
menit
menit
M3
Jam
SATUAN KETERANGAN
ton / Jam
-
M3
Jam
M3
Jam
Ton
-
KM / Jam
KM / Jam
Ton
menit
menit
menit
menit
menit
menit
M3
Jam
Km / Jam
M
lintasan
-
M3
Jam
Lump Sum
M3 / Jam
M3
orang
orang
Jam
Jam
Berlanjut ke halaman berikut
Analisa EI-815
SATUAN KETERANGAN
Analisa EI-817
SATUAN KETERANGAN
KM
M
Jam
-
-
Kg/M2
Kg/M2
Kg/M2
Kg/M3 (As1 : t)
ton / M3
ton / M3
M3
M3
Kg
M3
-
-
menit
menit
M3
Jam
ton
-
KM / Jam
KM / Jam
SATUAN KETERANGAN
menit
menit
menit
menit
menit
M3
Jam
Km / Jam
M
lintasan
-
M3
Jam
liter
-
liter/menit
kg/m3
m3
Jam
Lump Sum
M3/Jam
M3
orang
orang
Jam
Jam
SATUAN KETERANGAN
Analisa EI-818
SATUAN KETERANGAN
KM
jam
MM
%
M Rata-rata
Ton/M3
Ton/M3
Ton/M3
diambil
M3
Kg
liter
-
menit
menit
menit
menit
menit
M3
jam
KM/jam
M
lintasan
-
M3
jam
Berlanjut ke halaman berikut
Analisa EI-818
SATUAN KETERANGAN
ton
-
KM / Jam
KM / Jam
M3
menit
menit
menit
menit
menit
menit
M3 Melayani 1 buah
molen
Jam
M3/Jam
M3
orang
orang
jam
jam
Analisa EI-819
SATUAN KETERANGAN
KM
Jam
-
% 100 bagian
% 15 bagian
Kg / Ltr
Kg / Ltr
liter campuran
Kg
liter
liter
-
liter/menit
liter
Jam
liter
Jam
liter
Jam
SATUAN KETERANGAN
liter
liter
orang
orang
Jam
Jam
Analisa EI-821
SATUAN KETERANGAN
Jam
-
ton/m3
Km
ton
Km/Jam
Km/Jam
menit
menit
menit
menit
menit
menit
M3 / Jam
jam
Lump Sum
M3
orang
orang
jam
jam
SATUAN KETERANGAN
KM
jam
-
M
ton
km
M3 Borrow Pit
ton
-
KM/jam
KM/jam
menit
menit
menit
menit
M2
jam
Lump Sum
M2 asumsi
orang
orang
jam
jam
SATUAN KETERANGAN
Analisa EI-821
SATUAN KETERANGAN
Jam
M3
ton/M3
Km
TON
Km/Jam
Km/Jam
menit
menit
menit
menit
menit
Buah / Jam
jam
buah
Buah / Jam
jam
Lump Sum
SATUAN KETERANGAN
buah
orang
orang
jam
jam
Analisa EI-821
SATUAN KETERANGAN
Jam
M3
ton/m3
Km
ton
Km/Jam
Km/Jam
menit
menit
menit
menit
menit
Buah / Jam
jam
Buah / Jam
jam
Lump Sum
SATUAN KETERANGAN
M2
orang
orang
jam
jam
Analisa EI-825
SATUAN KETERANGAN
Jam
M3
ton/m3
Km
ton
Km/Jam
Km/Jam
menit
menit
menit
menit
menit
menit
Buah
jam
Buah
jam
Lump Sum
SATUAN KETERANGAN
buah
orang
orang
jam
jam
Analisa LI-831
URAIAN ANALISA HARGA SATUAN
SATUAN KETERANGAN
KM
jam
-
M2
M2
orang
orang
orang
jam
jam
jam
Analisa LI-832
SATUAN KETERANGAN
jam
-
M2
m3
kg
M2
orang
orang
orang
jam
jam
jam
Analisa LI-833
SATUAN KETERANGAN
jam
-
bh
m3
kg
M2
orang
orang
orang
jam
jam
jam
Analisa EI-851
SATUAN KETERANGAN
Jam
-
cm
m3
kg
(E05/26/10/15)
M3 / Jam
Jam
Lump Sump
M3/Jam
M3
orang
orang
Jam
Jam
Analisa EI-852
Jam
-
cm
m3
kg
(E05/26/10/15)
M3 / Jam
Jam
Lump Sump
M3/Jam
M3
orang
orang
Jam
Jam
Analis
A. TENAGA
B. BAHAN
C. PERALATAN
A. TENAGA
B. BAHAN
1. Agregat Kasar (M03) M3 1.2586 639,705.49
2. Agregat Halus (M04) M3 0.0000 639,705.49
3. Sirtu (M16) M3 0.0000 147,900.00
JUMLAH HARGA BAHAN
C. PERALATAN
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK 0
NAMA PAKET : PENINGKATAN JALAN TPA WAIBRON
PROP / KAB / KODYA : KECAMATAN WAIBRON - KABUPATEN SENTANI
ITEM PEMBAYARAN NO. : 8.1 (4) PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Waterbound Macadam Utk. Pek. - TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : M3 Minor % THD. BIAYA PROYEK :
A. TENAGA
B. BAHAN
C. PERALATAN
1. Wheel Loader E15 Jam 0.0113 379,887.70
2. Dump Truck E09 Jam 0.0596 428,852.02
3. 3-Wheel Roller E16 Jam 0.0296 194,859.34
4. Alat BAntu Ls 1.0000 0.00
JUMLAH HARGA PERALATAN
PROYEK :
No. PAKET KONTRAK 0
NAMA PAKET : PENINGKATAN JALAN TPA WAIBRON
PROP / KAB / KODYA : KECAMATAN WAIBRON - KABUPATEN SENTANI
ITEM PEMBAYARAN NO. : 8.1 (5) PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Camp. Aspal Panas Utk.Pek.Minor TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK :
B. BAHAN
C. PERALATAN
1. Wheel Loader E15 Jam 0.0334 379,887.70
2. AMP E01 Jam 0.0613 6,993,168.83
3. Genset E12 Jam 0.0613 398,751.95
4. Dump Truck E09 Jam 0.2722 428,852.02
5. Pedestrian Roller E24 Jam 0.2186 72,429.59
6. Alat Bantu Ls 1.0000 0.00
PROYEK :
No. PAKET KONTRAK 0
NAMA PAKET : PENINGKATAN JALAN TPA WAIBRON
PROP / KAB / KODYA : KECAMATAN WAIBRON - KABUPATEN SENTANI
ITEM PEMBAYARAN NO. : 8.1 (7) PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Penetrasi Macadam Utk.Pek.Minor TOTAL HARGA :
SATUAN PEMBAYARAN : M3 (Perata) % THD. BIAYA PROYEK :
A. TENAGA
B. BAHAN
C. PERALATAN
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK 0
NAMA PAKET : PENINGKATAN JALAN TPA WAIBRON
PROP / KAB / KODYA : KECAMATAN WAIBRON - KABUPATEN SENTANI
ITEM PEMBAYARAN NO. : 8.1 (9) PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Residu Bitumen Untuk Pek.Minor TOTAL HARGA :
SATUAN PEMBAYARAN : LITER % THD. BIAYA PROYEK :
A. TENAGA
B. BAHAN
PROYEK :
No. PAKET KONTRAK 0
NAMA PAKET : PENINGKATAN JALAN TPA WAIBRON
PROP / KAB / KODYA : KECAMATAN WAIBRON - KABUPATEN SENTANI
ITEM PEMBAYARAN NO. : 8.2 (1) PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Galian untuk Bahu Jalan & Pek. Minor Lain TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK :
PERKIRAAN HARGA JUM
NO. KOMPONEN SATUAN KUANTITAS SATUAN HAR
(Rp.) (R
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK 0
NAMA PAKET : PENINGKATAN JALAN TPA WAIBRON
PROP / KAB / KODYA : KECAMATAN WAIBRON - KABUPATEN SENTANI
MATA PEMBAYARAN NO. : 8.2 (2) PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Pembersihan dan Pembongkaran Tanaman TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : M2 (diameter < 30 cm) % THD. BIAYA PROYEK :
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK 0
NAMA PAKET : PENINGKATAN JALAN TPA WAIBRON
PROP / KAB / KODYA : KECAMATAN WAIBRON - KABUPATEN SENTANI
ITEM PEMBAYARAN NO. : 8.2 (3) PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Penebangan Pohon, diameter 30 - 50 CM TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : Buah % THD. BIAYA PROYEK :
(Rp.) (R
A. TENAGA
1. Pekerja Biasa (L01) Jam 3.5000 10,000.00
2. Mandor (L03) Jam 0.3500 17,142.86
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK 0
NAMA PAKET : PENINGKATAN JALAN TPA WAIBRON
PROP / KAB / KODYA : KECAMATAN WAIBRON - KABUPATEN SENTANI
ITEM PEMBAYARAN NO. : 8.2 (4) PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Penebangan Pohon, diameter 50 - 75 CM TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : Buah % THD. BIAYA PROYEK :
(Rp.) (R
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK 0
NAMA PAKET : PENINGKATAN JALAN TPA WAIBRON
PROP / KAB / KODYA : KECAMATAN WAIBRON - KABUPATEN SENTANI
ITEM PEMBAYARAN NO. : 8.2 (5) PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Penebangan Pohon, diameter > 75 CM TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : Buah % THD. BIAYA PROYEK :
(Rp.) (R
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK 0
NAMA PAKET : PENINGKATAN JALAN TPA WAIBRON
PROP / KAB / KODYA : KECAMATAN WAIBRON - KABUPATEN SENTANI
ITEM PEMBAYARAN NO. : 8.3.(1) PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Stabilisasi Dengan Tanaman TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : M2 % THD. BIAYA PROYEK :
A. TENAGA
B. BAHAN
C. PERALATAN
Analis
PROYEK :
No. PAKET KONTRAK 0
NAMA PAKET : PENINGKATAN JALAN TPA WAIBRON
PROP / KAB / KODYA : KECAMATAN WAIBRON - KABUPATEN SENTANI
ITEM PEMBAYARAN NO. : 8.3.(2) PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Semak/perdu TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : M2 % THD. BIAYA PROYEK :
A. TENAGA
B. BAHAN
Analis
PROYEK :
No. PAKET KONTRAK 0
NAMA PAKET : PENINGKATAN JALAN TPA WAIBRON
PROP / KAB / KODYA : KECAMATAN WAIBRON - KABUPATEN SENTANI
ITEM PEMBAYARAN NO. : 8.3.(3) PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Pohon TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : Buah % THD. BIAYA PROYEK :
A. TENAGA
B. BAHAN
C. PERALATAN
Analisa
PROYEK
No. PAKET KONTRAK 0
NAMA PAKET : PENINGKATAN JALAN TPA WAIBRON
PROP / KAB / KODYA : KECAMATAN WAIBRON - KABUPATEN SENTANI
ITEM PEMBAYARAN NO. : 8.5.(1) PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Pengembalian kondisi lantai jembatan beton TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : M2 % THD. BIAYA PROYEK :
(Rp.) (R
A. TENAGA
B. BAHAN
C. PERALATAN
1. Compressor E05 Jam 0.1333 151,738.46
2. Jack Hammer E26 Jam 0.1333 33,231.70
3. Wheel Loader E15 Jam 0.1333 379,887.70
4. Alat bantu Ls 1.0000 0.00
Analisa
PROYEK
No. PAKET KONTRAK 0
NAMA PAKET : PENINGKATAN JALAN TPA WAIBRON
PROP / KAB / KODYA : KECAMATAN WAIBRON - KABUPATEN SENTANI
ITEM PEMBAYARAN NO. : 8.5.(2) PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Pengembalian kondisi lantai jembatan kayu TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : M2 % THD. BIAYA PROYEK :
(Rp.) (R
A. TENAGA
B. BAHAN
C. PERALATAN
1. Compressor E05 Jam 0.1333 151,738.46
2. Jack Hammer E26 Jam 0.1333 33,231.70
3. Wheel Loader E15 Jam 0.1333 379,887.70
4. Alat bantu Ls 1.0000 0.00
0.00
0.00
0.00
JUMLAH
HARGA
(Rp.)
2,350.34
161.17
2,511.51
805,139.26
0.00
805,139.26
3,571.47
36,535.00
4,221.76
3,693.72
0.00
48,021.95
855,672.72
85,567.27
941,239.99
e dan/atau ukuran
u satuan pekerjaan
pat diubah kecuali
ada Peserta Lelang
dak termasuk PPN
Analisa EI-812
0.00
0.00
0.00
JUMLAH
HARGA
(Rp.)
1,410.21
161.17
1,571.37
805,139.26
0.00
0.00
805,139.26
3,571.47
24,195.36
4,221.76
3,693.72
0.00
35,682.32
842,392.95
84,239.29
926,632.24
e dan/atau ukuran
u satuan pekerjaan
pat diubah kecuali
ada Peserta Lelang
JUMLAH
HARGA
(Rp.)
1,410.21
161.17
1,571.37
455,735.77
455,735.77
3,571.47
26,404.84
4,221.76
3,693.72
0.00
37,891.79
495,198.93
49,519.89
544,718.82
e dan/atau ukuran
u satuan pekerjaan
pat diubah kecuali
ada Peserta Lelang
0.00
0.00
0.00
JUMLAH
HARGA
(Rp.)
1,805.06
193.40
1,998.46
598,124.63
105,551.41
703,676.04
4,285.76
25,572.58
5,773.61
0.00
35,631.95
741,306.45
74,130.65
815,437.10
e dan/atau ukuran
u satuan pekerjaan
pat diubah kecuali
ada Peserta Lelang
0.00
0.00
0.00
JUMLAH
HARGA
(Rp.)
12,266.67
2,102.86
14,369.52
494,527.88
337,178.10
12,650.00
1,004,640.00
1,848,995.98
12,672.86
428,914.35
24,456.79
116,729.71
15,831.60
0.00
585,932.45
2,449,297.96
244,929.80
2,694,227.75
e dan/atau ukuran
u satuan pekerjaan
pat diubah kecuali
ada Peserta Lelang
0.00
0.00
0.00
JUMLAH
HARGA
(Rp.)
1,882.35
322.69
2,205.04
1,123,038.52
0.00
635,345.45
1,758,383.98
3,575.41
28,805.20
8,336.23
2,353.85
0.00
43,070.69
1,803,659.70
180,365.97
1,984,025.67
e dan/atau ukuran
u satuan pekerjaan
pat diubah kecuali
ada Peserta Lelang
JUMLAH
HARGA
(Rp.)
12,800.00
3,657.14
16,457.14
747,375.92
703,500.00
1,450,875.92
6,835.87
15,831.60
105,537.73
0.00
128,205.20
1,595,538.26
159,553.83
1,755,092.09
e dan/atau ukuran
u satuan pekerjaan
pat diubah kecuali
ada Peserta Lelang
0.00
0.00
0.00
JUMLAH
HARGA
(Rp.)
36.73
6.30
43.03
6,308.54
822.31
7,130.85
21.77
55.73
157.52
235.03
7,408.91
740.89
8,149.80
e dan/atau ukuran
u satuan pekerjaan
pat diubah kecuali
ada Peserta Lelang
0.00
0.00
0.00
JUMLAH
HARGA
(Rp.)
10,000.00
1,714.29
11,714.29
0.00
85,999.12
0.00
85,999.12
97,713.41
9,771.34
107,484.75
e dan/atau ukuran
u satuan pekerjaan
pat diubah kecuali
ada Peserta Lelang
0.00
0.00
0.00
JUMLAH
HARGA
(Rp.)
700.00
240.00
940.00
18,000.00
18,000.00
5,422.11
0.00
5,422.11
24,362.11
2,436.21
26,798.32
e dan/atau ukuran
u satuan pekerjaan
pat diubah kecuali
ada Peserta Lelang
0.00
0.00
0.00
JUMLAH
HARGA
(Rp.)
35,000.00
6,000.00
41,000.00
0.00
141,521.17
0.00
0.00
141,521.17
182,521.17
18,252.12
200,773.28
e dan/atau ukuran
u satuan pekerjaan
pat diubah kecuali
ada Peserta Lelang
0.00
0.00
0.00
JUMLAH
HARGA
(Rp.)
35,000.00
6,000.00
41,000.00
0.00
235,868.61
0.00
0.00
235,868.61
276,868.61
27,686.86
304,555.47
e dan/atau ukuran
u satuan pekerjaan
pat diubah kecuali
ada Peserta Lelang
0.00
0.00
0.00
JUMLAH
HARGA
(Rp.)
46,666.67
8,000.00
54,666.67
0.00
514,622.42
0.00
0.00
514,622.42
569,289.09
56,928.91
626,218.00
e dan/atau ukuran
u satuan pekerjaan
pat diubah kecuali
ada Peserta Lelang
JUMLAH
HARGA
(Rp.)
2,800.00
2,000.00
1,200.00
6,000.00
3,850.00
3,850.00
0.00
0.00
9,850.00
985.00
10,835.00
e dan/atau ukuran
u satuan pekerjaan
pat diubah kecuali
ada Peserta Lelang
dak termasuk PPN
Analisa LI-832
0.00
0.00
0.00
JUMLAH
HARGA
(Rp.)
4,200.00
0.00
1,200.00
5,400.00
3,850.00
3,850.00
0.00
0.00
9,250.00
925.00
10,175.00
e dan/atau ukuran
u satuan pekerjaan
pat diubah kecuali
ada Peserta Lelang
Analisa LI-833
0.00
0.00
0.00
JUMLAH
HARGA
(Rp.)
4,200.00
0.00
1,200.00
5,400.00
3,500.00
3,500.00
0.00
0.00
8,900.00
890.00
9,790.00
e dan/atau ukuran
u satuan pekerjaan
pat diubah kecuali
ada Peserta Lelang
Analisa EI-851
0.00
0.00
0.00
JUMLAH
HARGA
(Rp.)
16,000.00
2,285.71
18,285.71
0.00
20,231.79
4,430.89
50,651.69
0.00
75,314.38
93,600.10
9,360.01
102,960.11
e dan/atau ukuran
u satuan pekerjaan
pat diubah kecuali
ada Peserta Lelang
Analisa EI-852
0.00
0.00
0.00
JUMLAH
HARGA
(Rp.)
16,000.00
2,285.71
18,285.71
0.00
20,231.79
4,430.89
50,651.69
0.00
75,314.38
93,600.10
9,360.01
102,960.11
e dan/atau ukuran
u satuan pekerjaan
pat diubah kecuali
ada Peserta Lelang
dak termasuk PPN
ITEM PEMBAYARAN NO. : 8.4.(1)
JENIS PEKERJAAN : Marka Jalan Termoplastik
SATUAN PEMBAYARAN : M2 URAIAN ANALISA HARGA S
I. ASUMSI
1 Pekerjaan dilakukan secara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (besi dan kawat) diterima seluruhnya
di lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 1.9 KM
5 Jam kerja efektif per-hari Tk 7.00 jam
6 Faktor Kehilangan Material Fh 1.05 -
7 Tebal lapisan cat secara manual t 0.015 M
8 Berat Jenis Bahan Cat BJ.Cat 1.00 Kg/Liter
9 Perbandingan pemakaian bahan : - Cat C 65 %
- Thinner T 35 %
II. URUTAN KERJA
1 Permukaan jalan dibersihkan dari debu/kotoran
2 Cat disemprotkan dengan Compressor di atas maal
tripleks yang dipasang di permukaan jalan
3 Glass Bit diberikan segera setelah cat marka selesai
disemprotkan
1. BAHAN
1.a. Cat Marka Thermoplastic = C x R x (BJ.Cat) (M17b) 1.9500 Kg
1.b. Minyak Pencair (Thinner) = TxR (M33) 1.0500 Liter
1.c. Blass Bead (M34) 0.4500 Kg
2. ALAT
2.a. COMPRESSOR (E05)
Kapasitas penyemprotan V 40.00 Ltr/Jam
Jumlah cat cair = (1 M x 1 M) x t x 1000 R 3.00 Ltr/M2
Koefisien Tenaga / M2 :
- Mandor = ( M x Tk ) : Qt (L03) 0.0750 jam
- Tukang = ( Tb x Tk ) : Qt (L02) 0.2250 jam
- Pekerja = ( P x Tk ) : Qt (L01) 0.6000 jam
Berlanjut ke hal.
ITEM PEMBAYARAN NO. : 8.4.(1)
JENIS PEKERJAAN : Marka Jalan Termoplastik
SATUAN PEMBAYARAN : M2 URAIAN ANALISA HARGA S
Rp. 131,746.92 / M2
I. ASUMSI
1 Pekerjaan dilakukan secara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (besi dan kawat) diterima seluruhnya
di lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 1.9 KM
5 Jam kerja efektif per-hari Tk 7.00 jam
6 Faktor Kehilangan Material Fh 1.05 -
7 Tebal lapisan cat secara manual t 0.0038 M
8 Berat Jenis Bahan Cat BJ.Cat 1.00 Kg/Liter
9 Perbandingan pemakaian bahan : - Cat C 65 %
- Thinner T 35 %
II. URUTAN KERJA
1 Permukaan jalan dibersihkan dari debu/kotoran
2 Cat disemprotkan dengan Compressor di atas maal
tripleks yang dipasang di permukaan jalan
3 Glass Bit diberikan segera setelah cat marka selesai
disemprotkan
1. BAHAN
1.a. Cat Marka Non Thermoplastic = C x R x (BJ.Cat) (M17a) 1.9500 Kg
1.b. Minyak Pencair (Thinner) = TxR (M33) 1.0500 Liter
1.c. Blass Bead (M34) 0.4500 Kg
2. ALAT
2.a. COMPRESSOR (E05)
Kapasitas penyemprotan V 40.00 Ltr/Jam
Jumlah cat cair = (1 M x 1 M) x t x 1000 R 3.00 Ltr/M2
3. TENAGA
Produksi pekerjaan per hari = Q1 x Tk Qt 93.33 M2
dibutuhkan tenaga : - Mandor M 1.00 orang
- Tukang Cat Tb 3.00 orang
- Pekerja P 8.00 orang
Koefisien Tenaga / M2 :
- Mandor = ( M x Tk ) : Qt (L03) 0.0750 jam
- Tukang = ( Tb x Tk ) : Qt (L02) 0.2250 jam
- Pekerja = ( P x Tk ) : Qt (L01) 0.6000 jam
Berlanjut ke hal.
ITEM PEMBAYARAN NO. : 8.4.(2)
JENIS PEKERJAAN : Marka Jalan Bukan Termoplastic
SATUAN PEMBAYARAN : M2 URAIAN ANALISA HARGA S
I. ASUMSI
1 Menggunakan cara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (plat rambu jadi, pipa dan beton cetak)
diangkut dengan Truk ke lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 1.9 KM
5 Jam kerja efektif per-hari Tk 7.00 jam
1. BAHAN
1.a. Pelat Rambu Jadi (Engineering Grade) (M35a) 1.00 BH
1.b. Pipa Galvanis Dia.1,6" (M24) 1.00 Batang
1.c. Beton K-175 (M60) 0.016 M3
1.d. Cat, dan bahan lainnya - 1.0000 Ls
2. ALAT
2.a. DUMP TRUCK (E08)
Kapasitas 1 kali Angkut Cp 15.0 Buah
Waktu Siklus : Ts
- Memuat = atur, ikat, dll. T1 30.0 menit
- Angkut = (2 x L : 25 Km/Jam) x 60 menit T2 9.0 menit
- Menurunkan = Rata-rata 2.5 menit / buah T3 37.5 menit
- Lain-lain = geser, atur, tunggu, dll. T4 30.0 menit
Ts 106.5 menit
3. TENAGA
Produksi pemasangan rambu dalam 1 hari = Tk x Q1 Qt 59.15 Buah
Kebutuhan tenaga : - Mandor M 1.00 orang
- Tukang Tb 3.00 orang
- Pekerja P 5.00 orang
Koefisien Tenaga / Bh :
- Mandor = (Tk x M) : Qt (L03) 0.1183 jam
- Tukang = (Tk x Tb) : Qt (L02) 0.3550 jam
- Pekerja = (Tk x P) : Qt (L01) 0.5917 jam
I. ASUMSI
1 Menggunakan cara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (plat rambu jadi, pipa dan beton cetak)
diangkut dengan Truk ke lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 1.9 KM
5 Jam kerja efektif per-hari Tk 7.00 jam
1. BAHAN
1.a. Pelat Rambu Jadi (Engineering Grade) (M35a) 2.00 BH
1.b. Pipa Galvanis Dia.1,6" (M24) 1.00 Batang
1.c. Beton K-175 (M60) 0.016 M3
1.d. Cat, dan bahan lainnya - 1.0000 Ls
2. ALAT
2.a. DUMP TRUCK (E08)
Kapasitas 1 kali Angkut Cp 15.0 Buah
Waktu Siklus : Ts
- Memuat = atur, ikat, dll. T1 30.0 menit
- Angkut = (2 x L : 25 Km/Jam) x 60 menit T2 9.0 menit
- Menurunkan = Rata-rata 2.5 menit / buah T3 37.5 menit
- Lain-lain = geser, atur, tunggu, dll. T4 30.0 menit
Ts 106.5 menit
3. TENAGA
Produksi pemasangan rambu dalam 1 hari = Tk x Q1 Qt 59.15 Buah
Kebutuhan tenaga : - Mandor M 1.00 orang
- Tukang Tb 3.00 orang
- Pekerja P 6.00 orang
Koefisien Tenaga / Bh :
- Mandor = (Tk x M) : Qt (L03) 0.1183 jam
- Tukang = (Tk x Tb) : Qt (L02) 0.3550 jam
- Pekerja = (Tk x P) : Qt (L01) 0.7100 jam
Berlanjut ke hal.
ITEM PEMBAYARAN NO. : 8.4.(3) .(b)
JENIS PEKERJAAN : Rambu Jalan Ganda dengan Permukaan Pemantul Engineering Grade
SATUAN PEMBAYARAN : BH URAIAN ANALISA HARGA S
I. ASUMSI
1 Menggunakan cara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (plat rambu jadi, pipa dan beton cetak)
diangkut dengan Truk ke lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 1.9 KM
5 Jam kerja efektif per-hari Tk 7.00 jam
1. BAHAN
1.a. Pelat Rambu Jadi (High Intensity Grade) (M35b) 1.00 BH
1.b. Pipa Galvanis Dia.1,6" (M24) 1.00 Batang
1.c. Beton K-175 (M60) 0.016 M3
1.d. Cat, dan bahan lainnya - 1.0000 Ls
2. ALAT
2.a. DUMP TRUCK (E08)
Kapasitas 1 kali Angkut Cp 15.0 Buah
Waktu Siklus : Ts
- Memuat = atur, ikat, dll. T1 30.0 menit
- Angkut = (2 x L : 25 Km/Jam) x 60 menit T2 9.0 menit
- Menurunkan = Rata-rata 2.5 menit / buah T3 37.5 menit
- Lain-lain = geser, atur, tunggu, dll. T4 30.0 menit
Ts 106.5 menit
3. TENAGA
Produksi pemasangan rambu dalam 1 hari = Tk x Q1 Qt 59.15 Buah
Kebutuhan tenaga : - Mandor M 1.00 orang
- Tukang Tb 3.00 orang
- Pekerja P 5.00 orang
Koefisien Tenaga / Bh :
- Mandor = (Tk x M) : Qt (L03) 0.1183 jam
- Tukang = (Tk x Tb) : Qt (L02) 0.3550 jam
- Pekerja = (Tk x P) : Qt (L01) 0.5917 jam
Berlanjut ke hal.
ITEM PEMBAYARAN NO. : 8.4.(4) .(a)
JENIS PEKERJAAN : Rambu Jalan Tunggal dengan Permukaan Pemantul High Intensity Grade
SATUAN PEMBAYARAN : BH URAIAN ANALISA HARGA S
I. ASUMSI
1 Menggunakan cara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (plat rambu jadi, pipa dan beton cetak)
diangkut dengan Truk ke lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 1.9 KM
5 Jam kerja efektif per-hari Tk 7.00 jam
3. TENAGA
Produksi pemasangan rambu dalam 1 hari = Tk x Q1 Qt 59.15 Buah
Kebutuhan tenaga : - Mandor M 1.00 orang
- Tukang Tb 3.00 orang
- Pekerja P 5.00 orang
Koefisien Tenaga / Bh :
- Mandor = (Tk x M) : Qt (L03) 0.1183 jam
- Tukang = (Tk x Tb) : Qt (L02) 0.3550 jam
- Pekerja = (Tk x P) : Qt (L01) 0.5917 jam
4. HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT
Lihat lampiran.
I. ASUMSI
1 Menggunakan cara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (patok beton cetak, dll) diangkut dengan
Truk ke lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 1.9 KM
5 Jam kerja efektif per-hari Tk 7.00 jam
6 Faktor kehilangan bahan Fh 1.05 -
7 Tulangan praktis Rc 125.00 Kg/M3
2. ALAT
2.a. DUMP TRUCK (E08)
Kapasitas 1 kali Angkut Cp 20.0 Buah
Faktor Efisiensi Alat Fa 0.75 -
Waktu Siklus : Ts
- Memuat = atur, ikat, dll. T1 20.0 menit
- Angkut = (2 x L : 25 Km/Jam) x 60 menit T2 9.0 menit
- Menurunkan = Rata-rata 1 menit / buah T3 20.0 menit
- Lain-lain = geser, atur, tunggu, dll. T4 10.0 menit
Ts 59.0 menit
3. TENAGA
Produksi pasang patok pengarah / hari = Tk x Q1 Qt 106.77 Buah
Kebutuhan tenaga : - Mandor M 1.00 orang
- Tukang Tb 4.00 orang
- Pekerja P 8.00 orang
Koefisien Tenaga / Bh :
- Mandor = (Tk x M) : Qt (L03) 0.0656 jam
- Tukang = (Tk x Tb) : Qt (L02) 0.2622 jam
- Pekerja = (Tk x P) : Qt (L01) 0.5245 jam
Berlanjut ke hal.
ITEM PEMBAYARAN NO. : 8.4.(5)
JENIS PEKERJAAN : Patok Pengarah
SATUAN PEMBAYARAN : BH URAIAN ANALISA HARGA S
I. ASUMSI
1 Menggunakan cara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (patok kilometer beton cetak)
diangkut dengan Truk ke lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 1.9 KM
5 Jam kerja efektif per-hari Tk 7.00 jam
6 Faktor kehilangan bahan Fh 1.05 -
7 Tulangan praktis Rc 125.00 Kg/M3
2. ALAT
2.a. DUMP TRUCK (E08)
Kapasitas 1 kali Angkut Cp 15.0 Buah
Waktu Siklus : Ts
- Memuat = muat, atur, ikat, dll T1 20.0 menit
- Angkut = (2 x L : 25 Km/Jam) x 60 T2 9.00 menit
- Menurunkan = Rata-rata 1.5 menit / buah T3 22.5 menit
- Lain-lain = geser, tunggu, dll T4 10.0 menit
Ts 61.5 menit
3. TENAGA
Produksi pasang patok kilometer / hari = Tk x Q1 Qt 102.43 Buah
Kebutuhan tenaga : - Mandor M 1.00 orang
- Tukang Tb 2.00 orang
- Pekerja P 5.00 orang
Koefisien Tenaga / Bh :
- Mandor = (Tk x M) : Qt (L03) 0.0683 jam
- Tukang = (Tk x Tb) : Qt (L02) 0.1367 jam
- Pekerja = (Tk x P) : Qt (L01) 0.3417 jam
Berlanjut ke hal.
ITEM PEMBAYARAN NO. : 8.4.(6) .(a)
JENIS PEKERJAAN : Patok Kilometer
SATUAN PEMBAYARAN : BH URAIAN ANALISA HARGA S
I. ASUMSI
1 Menggunakan cara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (patok kilometer beton cetak)
diangkut dengan Truk ke lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 1.9 KM
5 Jam kerja efektif per-hari Tk 7.00 jam
6 Faktor kehilangan bahan Fh 1.05 -
7 Tulangan praktis Rc 125.00 Kg/M3
2. ALAT
2.a. DUMP TRUCK (E08)
Kapasitas 1 kali Angkut Cp 15.0 Buah
Waktu Siklus : Ts
- Memuat = muat, atur, ikat, dll T1 20.0 menit
- Angkut = (2 x L : 25 Km/Jam) x 60 T2 9.00 menit
- Menurunkan = Rata-rata 1.5 menit / buah T3 22.5 menit
- Lain-lain = geser, tunggu, dll T4 10.0 menit
Ts 61.5 menit
3. TENAGA
Produksi pasang patok kilometer / hari = Tk x Q1 Qt ### Buah
Kebutuhan tenaga : - Mandor M 1.00 orang
- Tukang Tb 2.00 orang
- Pekerja P 5.00 orang
Koefisien Tenaga / Bh :
- Mandor = (Tk x M) : Qt (L03) 0.0683 jam
- Tukang = (Tk x Tb) : Qt (L02) 0.1367 jam
- Pekerja = (Tk x P) : Qt (L01) 0.3417 jam
Berlanjut ke hal.
ITEM PEMBAYARAN NO. : 8.4.(6) .(b)
JENIS PEKERJAAN : Patok Hektometer
SATUAN PEMBAYARAN : BH URAIAN ANALISA HARGA S
I. ASUMSI
1 Menggunakan cara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar rel pengaman diterima di lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 1.9 Km
5 Jam kerja efektif per-hari Tk 7.00 jam
6 Faktor kehilangan bahan Fh 1.00 -
7 Tulangan praktis Rc 50.00 Kg/Cu.m
2. ALAT
2,a DUMP TRUCK (E08) (E08)
Kapasitas 1 kali Angkut Cp 15.0 M'
Waktu Siklus : Ts
- Memuat T1 50.0 menit
- Angkut = (2 x L : 25 Km/Jam) x 60 T2 9.00 menit
- Menurunkan T3 60.0 menit
- Lain-lain T4 30.0 menit
Ts 149.0 menit
3. TENAGA
Produksi pasang pagar pengaman / hari = Tk x Q1 Qt 42.28 M'
Kebutuhan tenaga : - Mandor M 1.00 orang
- Tukang Tb 2.00 orang
- Pekerja P 8.00 orang
Koefisien Tenaga / M' :
- Mandor = (Tk x M) : Qt (L03) 0.1656 jam
- Tukang = (Tk x Tb) : Qt (L02) 0.3311 jam
- Pekerja = (Tk x P) : Qt (L01) 1.3245 jam
Berlanjut ke hal.
ITEM PEMBAYARAN NO. : 8.4.(7)
JENIS PEKERJAAN : Rel Pengaman
SATUAN PEMBAYARAN : M' URAIAN ANALISA HARGA S
I. ASUMSI
1 Menggunakan cara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar paku jalan diterima di lokasi pekerjaan
4 Jam kerja efektif per-hari Tk 7.00 jam
5 Faktor kehilangan bahan Fh 1.05 -
3. TENAGA
Produksi pasang paku jalan/ hari = Tk x Q1 Qt 20.00 Buah
Kebutuhan tenaga : - Mandor M 1.00 orang
- Tukang Tb 2.00 orang
- Pekerja P 5.00 orang
Koefisien Tenaga / Bh :
- Mandor = (Tk x M) : Qt (L03) 0.3500 jam
- Tukang = (Tk x Tb) : Qt (L02) 0.7000 jam
- Pekerja = (Tk x P) : Qt (L01) 1.7500 jam
I. ASUMSI
1 Menggunakan cara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar mata kucing diterima di lokasi pekerjaan
4 Jam kerja efektif per-hari Tk 7.00 jam
5 Faktor kehilangan bahan Fh 1.05 -
2. ALAT
3. TENAGA
Produksi pasang mata kucing/ hari = Tk x Q1 Qt 20.00 Buah
Kebutuhan tenaga : - Mandor M 1.00 orang
- Tukang Tb 2.00 orang
- Pekerja P 5.00 orang
Koefisien Tenaga / Bh :
- Mandor = (Tk x M) : Qt (L03) 0.3500 jam
- Tukang = (Tk x Tb) : Qt (L02) 0.7000 jam
- Pekerja = (Tk x P) : Qt (L01) 1.7500 jam
I. ASUMSI
1 Menggunakan cara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (kerb pracetak) dicetak di base camp dan
diangkut dengan Truk ke lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 1.9 KM
5 Jam kerja efektif per-hari Tk 7.00 jam
6 Faktor kehilangan bahan Fh 1.05 -
7 Tulangan praktis Rc 125.00 Kg/M3
2. ALAT
2.a. FLAT BED TRUCK
Kapasitas 1 kali Angkut Cp 20.0 Buah
Waktu Siklus : Ts
- Memuat = muat, atur, ikat, dll T1 20.0 menit
- Angkut = (2 x L : 25 Km/Jam) x 60 T2 33.38 menit
- Menurunkan = Rata-rata 1.5 menit / buah T3 30.0 menit
- Lain-lain = geser, tunggu, dll T4 10.0 menit
Ts 93.4 menit
3. TENAGA
Produksi pasang kerb pracetak / hari = Tk x Q1 Qt 89.96 Buah
Kebutuhan tenaga : - Mandor M 1.00 orang
- Tukang Tb 2.00 orang
- Pekerja P 5.00 orang
Koefisien Tenaga / Bh :
- Mandor = (Tk x M) : Qt (L03) 0.0778 jam
- Tukang = (Tk x Tb) : Qt (L02) 0.1556 jam
- Pekerja = (Tk x P) : Qt (L01) 0.3891 jam
Berlanjut ke hal.
ITEM PEMBAYARAN NO. : 8.4.(10)
JENIS PEKERJAAN : Kerb Pracetak
SATUAN PEMBAYARAN : M URAIAN ANALISA HARGA S
I. ASUMSI
1 Menggunakan cara manual
2 Lokasi pekerjaan : sepanjang jalan frontage
3 Bahan dasar ( blok beton ) telah berada di lokasi
pekerjaan / proyek
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 1.9 KM
5 Jam kerja efektif per-hari Tk 7.00 jam
6 Faktor kehilangan bahan Fh 1.05 -
3. TENAGA
Produksi paving block / hari = Tk x Q1 Qt 315.00 M2
Kebutuhan tenaga : - Mandor M 1.00 orang
- Tukang Tb 4.00 orang
- Pekerja P 6.00 orang
Koefisien Tenaga / Bh :
- Mandor = (Tk x M) : Qt (L03) 0.0222 jam
- Tukang = (Tk x Tb) : Qt (L02) 0.0889 jam
- Pekerja = (Tk x P) : Qt (L01) 0.1333 jam
Berlanjut ke hal.
ITEM PEMBAYARAN NO. : 8.4.(12)
JENIS PEKERJAAN : Perkerasan Blok Beton pada Trotoar dan Median
SATUAN PEMBAYARAN : M2 URAIAN ANALISA HARGA S
I. ASUMSI
1 Menggunakan cara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (kerb pemisah jalan)
diangkut dengan Truk ke lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 1.9 KM
5 Jam kerja efektif per-hari Tk 7.00 jam
6 Faktor kehilangan bahan Fh 1.05 -
7 Tulangan praktis Rc 100.00 Kg/M3
2. ALAT
2.a. DUMP TRUK (E08)
Kapasitas 1 kali Angkut Cp 10.0 Buah
Waktu Siklus : Ts
- Memuat = muat, atur, ikat, dll T1 20.0 menit
- Angkut = (2 x L : 25 Km/Jam) x 60 T2 9.00 menit
- Menurunkan = Rata-rata 1.5 menit / buah T3 15.0 menit
- Lain-lain = geser, tunggu, dll T4 10.0 menit
Ts 54.0 menit
3. TENAGA
Produksi pasang kerb pemisah jalan / hari = Tk x Q1 Qt 77.77 Buah
Kebutuhan tenaga : - Mandor M 1.00 orang
- Tukang Tb 2.00 orang
- Pekerja P 8.00 orang
Koefisien Tenaga / Bh :
- Mandor = (Tk x M) : Qt (L03) 0.0900 jam
- Tukang = (Tk x Tb) : Qt (L02) 0.1800 jam
- Pekerja = (Tk x P) : Qt (L01) 0.7201 jam
Berlanjut ke hal.
ITEM PEMBAYARAN NO. : 8.6(1)
JENIS PEKERJAAN : Kerb Pracetak Pemisah Jalan (Concrete Barrier)
SATUAN PEMBAYARAN : M URAIAN ANALISA HARGA S
I. ASUMSI
1 Menggunakan cara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar diterima di base camp
diangkut dengan Truk ke lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 1.9 KM
5 Jam kerja efektif per-hari Tk 7.00 jam
6 Faktor kehilangan bahan Fh 1.10 -
Instalasi jaringan induk telah tersedia
2. ALAT
2.a. FLAT BED TRUCK (E08)
Kapasitas 1 kali Angkut Cp 10.0 buah
Waktu Siklus : Ts
- Memuat = muat, atur, ikat, dll T1 20.0 menit
- Angkut = (2 x L : 25 Km/Jam) x 60 T2 9.00 menit
- Menurunkan = Rata-rata 1.5 menit / buah T3 15.0 menit
- Lain-lain = geser, tunggu, dll T4 10.0 menit
Ts 54.0 menit
3. TENAGA
Produksi pasang unit lampu jalan / hari = Tk x Q1 Qt 77.77 Buah
Kebutuhan tenaga : - Mandor M 1.00 orang
- Tukang Tb 2.00 orang
- Pekerja P 8.00 orang
Koefisien Tenaga / Bh :
- Mandor = (Tk x M) : Qt (L03) 0.0900 jam
- Tukang = (Tk x Tb) : Qt (L02) 0.1800 jam
- Pekerja = (Tk x P) : Qt (L01) 0.7201 jam
Berlanjut ke hal.
ITEM PEMBAYARAN NO. : 8.7(1)
JENIS PEKERJAAN : Unit lampu penerangan jalan tunggal
Type sodium 250 watt
SATUAN PEMBAYARAN : Buah URAIAN ANALISA HARGA S
I. ASUMSI
1 Menggunakan cara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar diterima di base camp
diangkut dengan Truk ke lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 1.9 KM
5 Jam kerja efektif per-hari Tk 7.00 jam
6 Faktor kehilangan bahan Fh 1.10 -
Instalasi jaringan induk telah tersedia
2. ALAT
2.a. FLAT BED TRUCK (E08)
Kapasitas 1 kali Angkut Cp 8.0 Buah
Waktu Siklus : Ts
- Memuat = muat, atur, ikat, dll T1 20.0 menit
- Angkut = (2 x L : 25 Km/Jam) x 60 T2 9.00 menit
- Menurunkan = Rata-rata 1.5 menit / buah T3 12.0 menit
- Lain-lain = geser, tunggu, dll T4 10.0 menit
Ts 51.0 menit
3. TENAGA
Produksi pasang unit lampu jalan / hari = Tk x Q1 Qt 65.88 Buah
Kebutuhan tenaga : - Mandor M 1.00 orang
- Tukang Tb 2.00 orang
- Pekerja P 8.00 orang
Koefisien Tenaga / Bh :
- Mandor = (Tk x M) : Qt (L03) 0.1063 jam
- Tukang = (Tk x Tb) : Qt (L02) 0.2125 jam
- Pekerja = (Tk x P) : Qt (L01) 0.8501 jam
Berlanjut ke hal.
ITEM PEMBAYARAN NO. : 8.7(2)
JENIS PEKERJAAN : Unit lampu penerangan jalan ganda
Type sodium 250 watt
SATUAN PEMBAYARAN : Buah URAIAN ANALISA HARGA S
I. ASUMSI
1 Menggunakan cara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar diterima di base camp
diangkut dengan Truk ke lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 1.9 KM
5 Jam kerja efektif per-hari Tk 7.00 jam
6 Faktor kehilangan bahan Fh 1.10 -
Instalasi jaringan induk telah tersedia
2. ALAT
2.a. FLAT BED TRUCK (E08)
Kapasitas 1 kali Angkut Cp 10.0 Buah
Waktu Siklus : Ts
- Memuat = muat, atur, ikat, dll T1 20.0 menit
- Angkut = (2 x L : 25 Km/Jam) x 60 T2 9.00 menit
- Menurunkan = Rata-rata 1.5 menit / buah T3 15.0 menit
- Lain-lain = geser, tunggu, dll T4 10.0 menit
Ts 54.0 menit
3. TENAGA
Produksi pasang unit lampu jalan / hari = Tk x Q1 Qt 77.77 Buah
Kebutuhan tenaga : - Mandor M 1.00 orang
- Tukang Tb 2.00 orang
- Pekerja P 8.00 orang
Koefisien Tenaga / Bh :
- Mandor = (Tk x M) : Qt (L03) 0.0900 jam
- Tukang = (Tk x Tb) : Qt (L02) 0.1800 jam
- Pekerja = (Tk x P) : Qt (L01) 0.7201 jam
Berlanjut ke hal.
ITEM PEMBAYARAN NO. : 8.7(3)
JENIS PEKERJAAN : Unit lampu penerangan jalan tunggal
Type merkuri 250 watt
SATUAN PEMBAYARAN : Buah URAIAN ANALISA HARGA S
2. ALAT
2.a. FLAT BED TRUCK (E08)
Kapasitas 1 kali Angkut Cp 8.0 Buah
Waktu Siklus : Ts
- Memuat = muat, atur, ikat, dll T1 20.0 menit
- Angkut = (2 x L : 25 Km/Jam) x 60 T2 9.00 menit
- Menurunkan = Rata-rata 1.5 menit / buah T3 12.0 menit
- Lain-lain = geser, tunggu, dll T4 10.0 menit
Ts 51.0 menit
3. TENAGA
Produksi pasang unit lampu jalan / hari = Tk x Q1 Qt 65.88 Buah
Kebutuhan tenaga : - Mandor M 1.00 orang
- Tukang Tb 2.00 orang
- Pekerja P 8.00 orang
Koefisien Tenaga / Bh :
- Mandor = (Tk x M) : Qt (L03) 0.1063 jam
- Tukang = (Tk x Tb) : Qt (L02) 0.2125 jam
- Pekerja = (Tk x P) : Qt (L01) 0.8501 jam
Berlanjut ke hal.
ITEM PEMBAYARAN NO. : 8.7(4)
JENIS PEKERJAAN : Unit lampu penerangan jalan ganda
Type merkuri 250 watt
SATUAN PEMBAYARAN : Buah URAIAN ANALISA HARGA S
I. ASUMSI
1 Menggunakan cara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar diterima di base camp
diangkut dengan Truk ke lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 1.9 KM
5 Jam kerja efektif per-hari Tk 7.00 jam
6 Faktor kehilangan bahan Fh 1.10 -
Instalasi jaringan induk telah tersedia
2. ALAT
2.a. FLAT BED TRUCK (E08)
Kapasitas 1 kali Angkut Cp 10.0 Buah
Waktu Siklus : Ts
- Memuat = muat, atur, ikat, dll T1 20.0 menit
- Angkut = (2 x L : 25 Km/Jam) x 60 T2 9.00 menit
- Menurunkan = Rata-rata 1.5 menit / buah T3 15.0 menit
- Lain-lain = geser, tunggu, dll T4 10.0 menit
Ts 54.0 menit
3. TENAGA
Produksi pasang unit lampu jalan / hari = Tk x Q1 Qt 77.77 Buah
Kebutuhan tenaga : - Mandor M 1.00 orang
- Tukang Tb 2.00 orang
- Pekerja P 8.00 orang
Koefisien Tenaga / Bh :
- Mandor = (Tk x M) : Qt (L03) 0.0900 jam
- Tukang = (Tk x Tb) : Qt (L02) 0.1800 jam
- Pekerja = (Tk x P) : Qt (L01) 0.7201 jam
Berlanjut ke hal.
ITEM PEMBAYARAN NO. : 8.7(5)
JENIS PEKERJAAN : Unit lampu penerangan jalan tunggal
Type merkuri 400 watt
SATUAN PEMBAYARAN : Buah URAIAN ANALISA HARGA S
2. ALAT
2.a. FLAT BED TRUCK (E08)
Kapasitas 1 kali Angkut Cp 8.0 Buah
Waktu Siklus : Ts
- Memuat = muat, atur, ikat, dll T1 20.0 menit
- Angkut = (2 x L : 25 Km/Jam) x 60 T2 9.00 menit
- Menurunkan = Rata-rata 1.5 menit / buah T3 12.0 menit
- Lain-lain = geser, tunggu, dll T4 10.0 menit
Ts 51.0 menit
3. TENAGA
Produksi pasang unit lampu jalan / hari = Tk x Q1 Qt 65.88 Buah
Kebutuhan tenaga : - Mandor M 1.00 orang
- Tukang Tb 2.00 orang
- Pekerja P 8.00 orang
Koefisien Tenaga / Bh :
- Mandor = (Tk x M) : Qt (L03) 0.1063 jam
- Tukang = (Tk x Tb) : Qt (L02) 0.2125 jam
- Pekerja = (Tk x P) : Qt (L01) 0.8501 jam
Berlanjut ke hal.
ITEM PEMBAYARAN NO. : 8.7(6)
JENIS PEKERJAAN : Unit lampu penerangan jalan ganda
Type merkuri 400 watt
SATUAN PEMBAYARAN : Buah URAIAN ANALISA HARGA S
I. ASUMSI
1 Menggunakan cara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar pagar pemisah pedestrian corbon steel
seluruhnya diterima di base camp
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 1.9 KM
5 Jam kerja efektif per-hari Tk 7.00 jam
6 Faktor kehilangan bahan Fh 1.05 -
7 Pipa Carbon Steel Dia 3" = (3x2)+(1.4x2) m / 3 M V1 2.93 M
8 Pipa Carbon Steel Dia 1,5" = (1.0 x 20) / 3 M V2 6.67 M
2. ALAT
2.a. Flat Bed Truck (E11)
Kapsitas Bak Cp 30.00 M
Waktu Siklus : Ts
- Memuat = atur, ikat dll rata-rata 5 menit/m T1 50.00 menit
- Angkut V=40 Km/jam = (L : V) x 60 T2 2.81 menit
- Kembali V=60 Km/jam = (L : V) x 60 T3 1.88 menit
- Menurunkan = Rata-rata 2.5 menit/m T4 25.00 menit
- Lain-lain = geser, atur, tunggu dll T5 5.00 menit
Ts 84.69 menit
3. TENAGA
Produksi penanaman rumput / hari = Tk x Q1 Qt 148.78 M2
Kebutuhan tenaga : - Mandor M 1.00 orang
- Tukang Las Tb 2.00 orang
- Pekerja P 4.00 orang
Berlanjut ke hal.
ITEM PEMBAYARAN NO. : 8.8(1)
JENIS PEKERJAAN : Pagar Pemisah Pedestrian Carbon Steel
SATUAN PEMBAYARAN : M1 URAIAN ANALISA HARGA S
Koefisien Tenaga / M2 :
- Mandor = (Tk x M) : Qt (L03) 0.0470 jam
- Tukang = (Tk x Tb) : Qt (L02) 0.0941 jam
- Pekerja = (Tk x P) : Qt (L01) 0.1882 jam
I. ASUMSI
1 Menggunakan cara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar pagar pemisah pedestrian galvanised
seluruhnya diterima di base camp
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 1.9 KM
5 Jam kerja efektif per-hari Tk 7.00 jam
6 Faktor kehilangan bahan Fh 1.05 -
7 Pipa Galvanis Dia 3" = (3x2)+(1.4x2) m / 3 M V1 2.93 M
8 Pipa Galvanis Dia 1,5" = (1.0 x 20) / 3 M V2 6.67 M
2. ALAT
2.a. Flat Bed Truck (E11)
Kapsitas Bak Cp 30.00 M
Waktu Siklus : Ts
- Memuat = atur, ikat dll rata-rata 5 menit/m T1 50.00 menit
- Angkut V=40 Km/jam = Lef x V x 60 T2 2.81 menit
- Kembali V=60 Km/jam = Lef x V x 60 T3 1.88 menit
- Menurunkan = Rata-rata 2.5 menit/m T4 25.00 menit
- Lain-lain = geser, atur, tunggu dll T5 5.00 menit
Ts 84.69 menit
3. TENAGA
Produksi penanaman rumput / hari = Tk x Q1 Qt 148.78 M2
Kebutuhan tenaga : - Mandor M 1.00 orang
- Tukang Las Tb 2.00 orang
- Pekerja P 4.00 orang
Berlanjut ke hal.
ITEM PEMBAYARAN NO. : 8.8(2)
JENIS PEKERJAAN : Pagar Pemisah Pedestrian Galvanised
SATUAN PEMBAYARAN : M1 URAIAN ANALISA HARGA S
Koefisien Tenaga / M2 :
- Mandor = (Tk x M) : Qt (L03) 0.0470 jam
- Tukang = (Tk x Tb) : Qt (L02) 0.0941 jam
- Pekerja = (Tk x P) : Qt (L01) 0.1882 jam
KETERANGAN
PROYEK :
No. PAKET KONTRAK 0
NAMA PAKET : PENINGKATAN JALAN TPA WAIBRON
PROP / KAB / KODYA : KECAMATAN WAIBRON - KABUPATEN SENTANI
ITEM PEMBAYARAN NO. : 8.4.(1)
JENIS PEKERJAAN : Marka Jalan Termoplastik
SATUAN PEMBAYARAN : M2
Spec.10.4.3(2)(d) PERKIRAAN
NO. KOMPONEN SATUAN KUANTITAS
A. TENAGA
B. BAHAN
C. PERALATAN
KETERANGAN
Analisa EI-842
PROYEK :
No. PAKET KONTRAK 0
NAMA PAKET : PENINGKATAN JALAN TPA WAIBRON
PROP / KAB / KODYA : KECAMATAN WAIBRON - KABUPATEN SENTANI
ITEM PEMBAYARAN NO. : 8.4.(2)
JENIS PEKERJAAN : Marka Jalan Bukan Termoplastic
SATUAN PEMBAYARAN : M2
Spec.10.4.3(2)(d)
PERKIRAAN
NO. KOMPONEN SATUAN KUANTITAS
A. TENAGA
B. BAHAN
Spec.10.4.3(2)(e) 1. Cat Marka (M17a) Kg 1.9500
2. Thinner (M33) Liter 1.0500
3. Blass Bit (M34) Kg 0.4500
C. PERALATAN
KETERANGAN
Analisa LI-843a
Engineering Grade
URAIAN ANALISA HARGA SATUAN FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
KETERANGAN
PROYEK :
No. PAKET KONTRAK 0
NAMA PAKET : PENINGKATAN JALAN TPA WAIBRON
PROP / KAB / KODYA : KECAMATAN WAIBRON - KABUPATEN SENTANI
ITEM PEMBAYARAN NO. : 8.4.(3) .(a)
JENIS PEKERJAAN : Rambu Jalan Tunggal dengan Permuka
SATUAN PEMBAYARAN : BH
PERKIRAAN
NO. KOMPONEN SATUAN KUANTITAS
A. TENAGA
B. BAHAN
C. PERALATAN
KETERANGAN
Analisa LI-843b
ngineering Grade
URAIAN ANALISA HARGA SATUAN FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
KETERANGAN
PROYEK :
No. PAKET KONTRAK 0
NAMA PAKET : PENINGKATAN JALAN TPA WAIBRON
PROP / KAB / KODYA : KECAMATAN WAIBRON - KABUPATEN SENTANI
ITEM PEMBAYARAN NO. : 8.4.(3) .(b)
JENIS PEKERJAAN : Rambu Jalan Ganda dengan Permukaa
SATUAN PEMBAYARAN : BH
PERKIRAAN
NO. KOMPONEN SATUAN KUANTITAS
A. TENAGA
B. BAHAN
C. PERALATAN
KETERANGAN
Analisa LI-844a
High Intensity Grade
URAIAN ANALISA HARGA SATUAN FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
KETERANGAN
PROYEK :
No. PAKET KONTRAK 0
NAMA PAKET : PENINGKATAN JALAN TPA WAIBRON
PROP / KAB / KODYA : KECAMATAN WAIBRON - KABUPATEN SENTANI
ITEM PEMBAYARAN NO. : 8.4.(4) .(a)
JENIS PEKERJAAN : Rambu Jalan Tunggal dengan Permukaa
SATUAN PEMBAYARAN : BH
PERKIRAAN
NO. KOMPONEN SATUAN KUANTITAS
A. TENAGA
B. BAHAN
C. PERALATAN
KETERANGAN
Analisa LI-844b
gh Intensity Grade
URAIAN ANALISA HARGA SATUAN FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
KETERANGAN
PROYEK :
No. PAKET KONTRAK 0
NAMA PAKET : PENINGKATAN JALAN TPA WAIBRON
PROP / KAB / KODYA : KECAMATAN WAIBRON - KABUPATEN SENTANI
ITEM PEMBAYARAN NO. : 8.4.(4) .(b)
JENIS PEKERJAAN : Rambu Jalan Ganda dengan Permukaan
SATUAN PEMBAYARAN : BH
PERKIRAAN
NO. KOMPONEN SATUAN KUANTITAS
A. TENAGA
B. BAHAN
C. PERALATAN
Analisa EI-845
KETERANGAN
PROYEK :
No. PAKET KONTRAK 0
NAMA PAKET : PENINGKATAN JALAN TPA WAIBRON
PROP / KAB / KODYA : KECAMATAN WAIBRON - KABUPATEN SENTANI
ITEM PEMBAYARAN NO. : 8.4.(5)
JENIS PEKERJAAN : Patok Pengarah
SATUAN PEMBAYARAN : BH
PERKIRAAN
NO. KOMPONEN SATUAN KUANTITAS
A. TENAGA
B. BAHAN
C. PERALATAN
KETERANGAN
Analisa EI-846a
KETERANGAN
PROYEK :
No. PAKET KONTRAK 0
NAMA PAKET : PENINGKATAN JALAN TPA WAIBRON
PROP / KAB / KODYA : KECAMATAN WAIBRON - KABUPATEN SENTANI
ITEM PEMBAYARAN NO. : 8.4.(6) .(a)
JENIS PEKERJAAN : Patok Kilometer
SATUAN PEMBAYARAN : BH
PERKIRAAN
NO. KOMPONEN SATUAN KUANTITAS
A. TENAGA
B. BAHAN
C. PERALATAN
KETERANGAN
Analisa EI-846b
KETERANGAN
PROYEK :
No. PAKET KONTRAK 0
NAMA PAKET : PENINGKATAN JALAN TPA WAIBRON
PROP / KAB / KODYA : KECAMATAN WAIBRON - KABUPATEN SENTANI
ITEM PEMBAYARAN NO. : 8.4.(6) .(b)
JENIS PEKERJAAN : Patok Hektometer
SATUAN PEMBAYARAN : BH
PERKIRAAN
NO. KOMPONEN SATUAN KUANTITAS
A. TENAGA
B. BAHAN
C. PERALATAN
KETERANGAN
Analisa EI-847
KETERANGAN
PROYEK :
No. PAKET KONTRAK 0
NAMA PAKET : PENINGKATAN JALAN TPA WAIBRON
PROP / KAB / KODYA : KECAMATAN WAIBRON - KABUPATEN SENTANI
ITEM PEMBAYARAN NO. : 8.4.(7)
ukuran JENIS PEKERJAAN : Rel Pengaman
sesuai SATUAN PEMBAYARAN : M'
drawing
PERKIRAAN
NO. KOMPONEN SATUAN KUANTITAS
A. PEKERJA
B. BAHAN
C. PERALATAN
KETERANGAN
Analisa EI-848
KETERANGAN
PROYEK :
No. PAKET KONTRAK 0
NAMA PAKET : PENINGKATAN JALAN TPA WAIBRON
PROP / KAB / KODYA : KECAMATAN WAIBRON - KABUPATEN SENTANI
ITEM PEMBAYARAN NO. : 8.4.(8)
JENIS PEKERJAAN : Paku Jalan
SATUAN PEMBAYARAN : BH
PERKIRAAN
NO. KOMPONEN SATUAN KUANTITAS
A. TENAGA
B. BAHAN
C. PERALATAN
Analisa EI-849
KETERANGAN
PROYEK :
No. PAKET KONTRAK 0
NAMA PAKET : PENINGKATAN JALAN TPA WAIBRON
PROP / KAB / KODYA : KECAMATAN WAIBRON - KABUPATEN SENTANI
ITEM PEMBAYARAN NO. : 8.4.(9)
JENIS PEKERJAAN : Mata Kucing
SATUAN PEMBAYARAN : BH
PERKIRAAN
NO. KOMPONEN SATUAN KUANTITAS
A. TENAGA
B. BAHAN
C. PERALATAN
KETERANGAN
PROYEK :
No. PAKET KONTRAK 0
NAMA PAKET : PENINGKATAN JALAN TPA WAIBRON
PROP / KAB / KODYA : KECAMATAN WAIBRON - KABUPATEN SENTANI
ITEM PEMBAYARAN NO. : 8.4 (10)
JENIS PEKERJAAN : Kerb Pracetak
SATUAN PEMBAYARAN : M
PERKIRAAN
NO. KOMPONEN SATUAN KUANTITAS
A. TENAGA
B. BAHAN
C. PERALATAN
KETERANGAN
Analisa EI-8412
KETERANGAN
PROYEK :
No. PAKET KONTRAK 0
NAMA PAKET : PENINGKATAN JALAN TPA WAIBRON
PROP / KAB / KODYA : KECAMATAN WAIBRON - KABUPATEN SENTANI
ITEM PEMBAYARAN NO. : 8.4.(12)
JENIS PEKERJAAN : Perkerasan Blok Beton pada Trotoar d
SATUAN PEMBAYARAN : M2
PERKIRAAN
NO. KOMPONEN SATUAN KUANTITAS
A. TENAGA
C. PERALATAN
KETERANGAN
Analisa EI-861
URAIAN ANALISA HARGA SATUAN FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
KETERANGAN
PROYEK
No. PAKET KONTRAK 0
NAMA PAKET : PENINGKATAN JALAN TPA WAIBRON
PROP / KAB / KODYA : KECAMATAN WAIBRON - KABUPATEN SENTANI
ITEM PEMBAYARAN NO. : 8.6(1)
JENIS PEKERJAAN : Kerb Pracetak Pemisah Jalan (Concrete
SATUAN PEMBAYARAN : M
PERKIRAAN
NO. KOMPONEN SATUAN KUANTITAS
A. TENAGA
0.0000
0.24825 1. Pekerja Biasa (L01) jam 0.72
2. Tukang (L02) jam 0.18
3. Mandor (L03) jam 0.09
B. BAHAN
C. PERALATAN
KETERANGAN
0.0000
0.24825
Analisa EI-871
KETERANGAN
PROYEK
No. PAKET KONTRAK 0
NAMA PAKET : PENINGKATAN JALAN TPA WAIBRON
PROP / KAB / KODYA : KECAMATAN WAIBRON - KABUPATEN SENTANI
ITEM PEMBAYARAN NO. : 8.7(1)
JENIS PEKERJAAN : Unit lampu penerangan jalan tunggal
SATUAN PEMBAYARAN : Buah
PERKIRAAN
NO. KOMPONEN SATUAN KUANTITAS
A. TENAGA
B. BAHAN
1 Tiang lampu type tunggal, Lighting Po buah 1.00
2 Lampu sodium 250 watt buah 1.00
3 Kabel type m1 15.00
4 Beton K 250 M3 0.72
5 Reinforcing Steel deform = 56 x 1.05 Kg 58.80
6 MCB,1P, 16 A buah 1.00
7 Plat besi = 0.009x0.4x0.4x7850 M3 0.72
8 Copper Rod = 22/7 x(0.007)^2 x 1 x 7 Kg 1.21
9 Pipa PVC dia 3" M3 15.00
10 Bekisting buah 1.00
C. PERALATAN
KETERANGAN
0.0000
0.24825
Analisa EI-861
PROYEK
No. PAKET KONTRAK 0
NAMA PAKET : PENINGKATAN JALAN TPA WAIBRON
PROP / KAB / KODYA : KECAMATAN WAIBRON - KABUPATEN SENTANI
ITEM PEMBAYARAN NO. : 8.7(2)
JENIS PEKERJAAN : Unit lampu penerangan jalan ganda
SATUAN PEMBAYARAN : Buah
PERKIRAAN
NO. KOMPONEN SATUAN KUANTITAS
A. TENAGA
B. BAHAN
C. PERALATAN
KETERANGAN
0.0000
0.24825
Analisa EI-873
KETERANGAN
PROYEK
No. PAKET KONTRAK 0
NAMA PAKET : PENINGKATAN JALAN TPA WAIBRON
PROP / KAB / KODYA : KECAMATAN WAIBRON - KABUPATEN SENTANI
ITEM PEMBAYARAN NO. : 8.7(3)
JENIS PEKERJAAN : Unit lampu penerangan jalan tunggal
SATUAN PEMBAYARAN : Buah
PERKIRAAN
NO. KOMPONEN SATUAN KUANTITAS
A. TENAGA
B. BAHAN
C. PERALATAN
KETERANGAN
Analisa EI-874
KETERANGAN
PROYEK
No. PAKET KONTRAK 0
NAMA PAKET : PENINGKATAN JALAN TPA WAIBRON
PROP / KAB / KODYA : KECAMATAN WAIBRON - KABUPATEN SENTANI
ITEM PEMBAYARAN NO. : 8.7(4)
JENIS PEKERJAAN : Unit lampu penerangan jalan ganda
SATUAN PEMBAYARAN : Buah
PERKIRAAN
NO. KOMPONEN SATUAN KUANTITAS
A. TENAGA
B. BAHAN
C. PERALATAN
0.0000
0.24825
KETERANGAN
Analisa EI-875
KETERANGAN
PROYEK
No. PAKET KONTRAK 0
NAMA PAKET : PENINGKATAN JALAN TPA WAIBRON
PROP / KAB / KODYA : KECAMATAN WAIBRON - KABUPATEN SENTANI
ITEM PEMBAYARAN NO. : 8.7(5)
JENIS PEKERJAAN : Unit lampu penerangan jalan tunggal
SATUAN PEMBAYARAN : Buah
PERKIRAAN
NO. KOMPONEN SATUAN KUANTITAS
A. TENAGA
B. BAHAN
C. PERALATAN
KETERANGAN
Analisa EI-876
KETERANGAN
PROYEK
No. PAKET KONTRAK 0
NAMA PAKET : PENINGKATAN JALAN TPA WAIBRON
PROP / KAB / KODYA : KECAMATAN WAIBRON - KABUPATEN SENTANI
ITEM PEMBAYARAN NO. : 8.7(6)
JENIS PEKERJAAN : Unit lampu penerangan jalan ganda
SATUAN PEMBAYARAN : Buah
PERKIRAAN
NO. KOMPONEN SATUAN KUANTITAS
A. TENAGA
B. BAHAN
C. PERALATAN
KETERANGAN
Analisa EI-881
KETERANGAN
PROYEK :
No. PAKET KONTRAK 0
NAMA PAKET : PENINGKATAN JALAN TPA WAIBRON
PROP / KAB / KODYA : KECAMATAN WAIBRON - KABUPATEN SENTANI
ITEM PEMBAYARAN NO. : 8.8(1)
JENIS PEKERJAAN : Pagar Pemisah Pedestrian Carbon Stee
SATUAN PEMBAYARAN : M1
PERKIRAAN
NO. KOMPONEN SATUAN KUANTITAS
A. TENAGA
B. BAHAN
KETERANGAN
Analisa EI-882
KETERANGAN
PROYEK :
No. PAKET KONTRAK 0
NAMA PAKET : PENINGKATAN JALAN TPA WAIBRON
PROP / KAB / KODYA : KECAMATAN WAIBRON - KABUPATEN SENTANI
ITEM PEMBAYARAN NO. : 8.8(2)
JENIS PEKERJAAN : Pagar Pemisah Pedestrian Galvanised
SATUAN PEMBAYARAN : M1
PERKIRAAN
NO. KOMPONEN SATUAN KUANTITAS
A. TENAGA
B. BAHAN
C. PERALATAN
KETERANGAN
Analisa EI-841
NDAR UNTUK
NG-MASING HARGA SATUAN
TPA WAIBRON
N - KABUPATEN SENTANI
PERKIRAAN VOL. PEK. : 0.00
TOTAL HARGA (Rp.) : 0.00
% THD. BIAYA PROYEK : 0.00
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
10,000.00 6,000.00
14,285.71 3,214.29
17,142.86 1,285.71
27,500.00 53,625.00
12,000.00 12,600.00
28,600.00 12,870.00
151,738.46 11,380.38
250,593.96 18,794.55
0.00 0.00
TAN ( A + B + C ) 119,769.93
11,976.99
131,746.92
Tenaga Kerja dan Peralatan, volume dan/atau ukuran
NDAR UNTUK
NG-MASING HARGA SATUAN
TPA WAIBRON
N - KABUPATEN SENTANI
PERKIRAAN VOL. PEK. : 0.00
TOTAL HARGA (Rp.) : 0.00
% THD. BIAYA PROYEK : 0.00
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
10,000.00 6,000.00
14,285.71 3,214.29
17,142.86 1,285.71
151,738.46 11,380.38
250,593.96 18,794.55
0.00 0.00
TAN ( A + B + C ) 110,019.93
11,001.99
121,021.92
Tenaga Kerja dan Peralatan, volume dan/atau ukuran
NDAR UNTUK
NG-MASING HARGA SATUAN
TPA WAIBRON
N - KABUPATEN SENTANI
PERKIRAAN VOL. PEK. : 0.00
TOTAL HARGA (Rp.) : 0.00
% THD. BIAYA PROYEK : 0.00
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
10,000.00 5,916.88
14,285.71 5,071.61
17,142.86 2,028.64
176,000.00 176,000.00
154,000.00 154,000.00
1,884,898.58 30,158.38
0.00 0.00
250,593.96 29,654.68
0.00 0.00
TAN ( A + B + C ) 402,830.20
40,283.02
443,113.21
Tenaga Kerja dan Peralatan, volume dan/atau ukuran
NDAR UNTUK
NG-MASING HARGA SATUAN
TPA WAIBRON
N - KABUPATEN SENTANI
PERKIRAAN VOL. PEK. : 0.00
TOTAL HARGA (Rp.) : 0.00
% THD. BIAYA PROYEK : 0.00
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
10,000.00 7,100.26
14,285.71 5,071.61
17,142.86 2,028.64
176,000.00 352,000.00
154,000.00 154,000.00
1,884,898.58 30,158.38
0.00 0.00
250,593.96 29,654.68
0.00 0.00
TAN ( A + B + C ) 580,013.57
58,001.36
638,014.93
Tenaga Kerja dan Peralatan, volume dan/atau ukuran
NDAR UNTUK
NG-MASING HARGA SATUAN
TPA WAIBRON
N - KABUPATEN SENTANI
PERKIRAAN VOL. PEK. : 0.00
TOTAL HARGA (Rp.) : 0.00
% THD. BIAYA PROYEK : 0.00
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
10,000.00 5,916.88
14,285.71 5,071.61
17,142.86 2,028.64
216,500.00 216,500.00
154,000.00 154,000.00
1,884,898.58 30,158.38
0.00 0.00
250,593.96 29,654.68
0.00 0.00
TAN ( A + B + C ) 443,330.20
44,333.02
487,663.21
Tenaga Kerja dan Peralatan, volume dan/atau ukuran
NDAR UNTUK
NG-MASING HARGA SATUAN
TPA WAIBRON
N - KABUPATEN SENTANI
PERKIRAAN VOL. PEK. : 0.00
TOTAL HARGA (Rp.) : 0.00
% THD. BIAYA PROYEK : 0.00
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
10,000.00 5,916.88
14,285.71 5,071.61
17,142.86 2,028.64
216,500.00 433,000.00
154,000.00 154,000.00
1,884,898.58 30,158.38
0.00 0.00
JUMLAH HARGA BAHAN 617,158.38
250,593.96 29,654.68
0.00 0.00
TAN ( A + B + C ) 659,830.20
65,983.02
725,813.21
Tenaga Kerja dan Peralatan, volume dan/atau ukuran
Analisa EI-845
NDAR UNTUK
NG-MASING HARGA SATUAN
TPA WAIBRON
N - KABUPATEN SENTANI
PERKIRAAN VOL. PEK. : 0.00
TOTAL HARGA (Rp.) : 0.00
% THD. BIAYA PROYEK : 0.00
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
10,000.00 5,244.78
14,285.71 3,746.27
17,142.86 1,123.88
1,884,898.58 66,796.09
9,000.00 41,860.55
0.00 0.00
250,593.96 16,428.89
0.00 0.00
TAN ( A + B + C ) 135,200.47
13,520.05
148,720.52
Tenaga Kerja dan Peralatan, volume dan/atau ukuran
NDAR UNTUK
NG-MASING HARGA SATUAN
TPA WAIBRON
N - KABUPATEN SENTANI
PERKIRAAN VOL. PEK. : 0.00
TOTAL HARGA (Rp.) : 0.00
% THD. BIAYA PROYEK : 0.00
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
10,000.00 3,416.88
14,285.71 1,952.50
17,142.86 1,171.50
1,884,898.58 284,996.67
9,000.00 170,100.00
0.00 0.00
250,593.96 17,124.99
0.00 0.00
TAN ( A + B + C ) 478,762.53
47,876.25
526,638.79
Tenaga Kerja dan Peralatan, volume dan/atau ukuran
NDAR UNTUK
NG-MASING HARGA SATUAN
TPA WAIBRON
N - KABUPATEN SENTANI
PERKIRAAN VOL. PEK. : 0.00
TOTAL HARGA (Rp.) : 0.00
% THD. BIAYA PROYEK : 0.00
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
10,000.00 3,416.88
14,285.71 1,952.50
17,142.86 1,171.50
1,884,898.58 118,748.61
9,000.00 70,875.00
0.00 0.00
250,593.96 17,124.99
0.00 0.00
TAN ( A + B + C ) 213,289.48
21,328.95
234,618.43
Tenaga Kerja dan Peralatan, volume dan/atau ukuran
NDAR UNTUK
NG-MASING HARGA SATUAN
TPA WAIBRON
N - KABUPATEN SENTANI
PERKIRAAN VOL. PEK. : 0.00
TOTAL HARGA (Rp.) : 0.00
% THD. BIAYA PROYEK : 0.00
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
10,000.00 13,244.78
14,285.71 4,730.28
17,142.86 2,838.17
412,500.00 412,500.00
1,884,898.58 175,112.81
8,000.00 37,161.22
0.00 0.00
250,593.96 41,488.29
0.00 0.00
TAN ( A + B + C ) 687,075.54
68,707.55
755,783.10
Tenaga Kerja dan Peralatan, volume dan/atau ukuran
komponen untuk menyelesaikan satu satuan pekerjaan
disampaikan Penyedia Jasa tidak dapat diubah kecuali
esuai ketentuan dalam Instruksi Kepada Peserta Lelang
n bakar, bahan habis dipakai dan operator.
eluruh pajak yang berkaitan (tetapi tidak termasuk PPN
Analisa EI-848
NDAR UNTUK
NG-MASING HARGA SATUAN
TPA WAIBRON
N - KABUPATEN SENTANI
PERKIRAAN VOL. PEK. : 0.00
TOTAL HARGA (Rp.) : 0.00
% THD. BIAYA PROYEK : 0.00
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
10,000.00 17,500.00
14,285.71 10,000.00
17,142.86 6,000.00
JUMLAH HARGA TENAGA 33,500.00
1,884,898.58 118,748.61
37,358.00 37,358.00
0.00 0.00
0.00 0.00
TAN ( A + B + C ) 189,606.61
18,960.66
208,567.27
Tenaga Kerja dan Peralatan, volume dan/atau ukuran
Analisa EI-849
NDAR UNTUK
NG-MASING HARGA SATUAN
TPA WAIBRON
N - KABUPATEN SENTANI
PERKIRAAN VOL. PEK. : 0.00
TOTAL HARGA (Rp.) : 0.00
% THD. BIAYA PROYEK : 0.00
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
10,000.00 17,500.00
14,285.71 10,000.00
17,142.86 6,000.00
1,884,898.58 118,748.61
75,000.00 75,000.00
0.00 0.00
0.00 0.00
TAN ( A + B + C ) 227,248.61
22,724.86
249,973.47
Tenaga Kerja dan Peralatan, volume dan/atau ukuran
NDAR UNTUK
NG-MASING HARGA SATUAN
TPA WAIBRON
N - KABUPATEN SENTANI
PERKIRAAN VOL. PEK. : 0.00
TOTAL HARGA (Rp.) : 0.00
% THD. BIAYA PROYEK : 0.00
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
10,000.00 3,890.77
14,285.71 2,223.30
17,142.86 1,333.98
2,406,936.74 189,546.27
0.00 0.00
422,560.94 32,881.74
0.00 0.00
0.00 0.00
TAN ( A + B + C ) 229,876.05
22,987.61
252,863.66
Tenaga Kerja dan Peralatan, volume dan/atau ukuran
NDAR UNTUK
NG-MASING HARGA SATUAN
TPA WAIBRON
N - KABUPATEN SENTANI
PERKIRAAN VOL. PEK. : 0.00
TOTAL HARGA (Rp.) : 0.00
% THD. BIAYA PROYEK : 0.00
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
10,000.00 222.22
14,285.71 1,269.84
17,142.86 2,285.71
43,934.40 585.79
0.00 0.00
TAN ( A + B + C ) 21,284.53
2,128.45
23,412.98
Tenaga Kerja dan Peralatan, volume dan/atau ukuran
TPA WAIBRON
N - KABUPATEN SENTANI
PERKIRAAN VOL. PEK. : 0.00
TOTAL HARGA (Rp.) : 0.00
% THD. BIAYA PROYEK : 0.00
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
10,000.00 7,200.51
14,285.71 2,571.61
17,142.86 1,542.97
2,406,936.74 618,552.66
9,000.00 242,853.19
422,560.94 38,033.18
0.00 0.00
TAN ( A + B + C ) 910,754.11
91,075.41
1,001,829.52
Tenaga Kerja dan Peralatan, volume dan/atau ukuran
NDAR UNTUK
NG-MASING HARGA SATUAN
TPA WAIBRON
N - KABUPATEN SENTANI
PERKIRAAN VOL. PEK. : 0.00
TOTAL HARGA (Rp.) : 0.00
% THD. BIAYA PROYEK : 0.00
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
10,000.00 7,200.51
14,285.71 2,571.61
17,142.86 1,542.97
422,560.94 38,033.18
0.00 0.00
0.00 0.00
TAN ( A + B + C ) 21,781,264.12
2,178,126.41
23,959,390.53
Tenaga Kerja dan Peralatan, volume dan/atau ukuran
NDAR UNTUK
NG-MASING HARGA SATUAN
TPA WAIBRON
N - KABUPATEN SENTANI
PERKIRAAN VOL. PEK. : 0.00
TOTAL HARGA (Rp.) : 0.00
% THD. BIAYA PROYEK : 0.00
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
10,000.00 8,500.64
14,285.71 3,035.94
17,142.86 1,821.57
2,406,936.74 2,406,936.74
9,000.00 18,000.00
422,560.94 44,900.47
0.00 0.00
0.00 0.00
TAN ( A + B + C ) 2,483,195.35
248,319.54
2,731,514.89
Tenaga Kerja dan Peralatan, volume dan/atau ukuran
NDAR UNTUK
NG-MASING HARGA SATUAN
TPA WAIBRON
N - KABUPATEN SENTANI
PERKIRAAN VOL. PEK. : 0.00
TOTAL HARGA (Rp.) : 0.00
% THD. BIAYA PROYEK : 0.00
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
10,000.00 7,200.51
14,285.71 2,571.61
17,142.86 1,542.97
2,406,936.74 2,406,936.74
9,000.00 9,000.00
JUMLAH HARGA BAHAN 2,415,936.74
422,560.94 38,033.18
0.00 0.00
0.00 0.00
TAN ( A + B + C ) 2,465,285.01
246,528.50
2,711,813.51
Tenaga Kerja dan Peralatan, volume dan/atau ukuran
NDAR UNTUK
NG-MASING HARGA SATUAN
TPA WAIBRON
N - KABUPATEN SENTANI
PERKIRAAN VOL. PEK. : 0.00
TOTAL HARGA (Rp.) : 0.00
% THD. BIAYA PROYEK : 0.00
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
10,000.00 8,500.64
14,285.71 3,035.94
17,142.86 1,821.57
2,406,936.74 2,406,936.74
9,000.00 18,000.00
422,560.94 44,900.47
0.00 0.00
0.00 0.00
TAN ( A + B + C ) 2,483,195.35
248,319.54
2,731,514.89
Tenaga Kerja dan Peralatan, volume dan/atau ukuran
NDAR UNTUK
NG-MASING HARGA SATUAN
TPA WAIBRON
N - KABUPATEN SENTANI
PERKIRAAN VOL. PEK. : 0.00
TOTAL HARGA (Rp.) : 0.00
% THD. BIAYA PROYEK : 0.00
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
10,000.00 7,200.51
14,285.71 2,571.61
17,142.86 1,542.97
2,406,936.74 2,406,936.74
9,000.00 9,000.00
JUMLAH HARGA BAHAN 2,415,936.74
422,560.94 38,033.18
0.00 0.00
0.00 0.00
TAN ( A + B + C ) 2,465,285.01
246,528.50
2,711,813.51
Tenaga Kerja dan Peralatan, volume dan/atau ukuran
NDAR UNTUK
NG-MASING HARGA SATUAN
TPA WAIBRON
N - KABUPATEN SENTANI
PERKIRAAN VOL. PEK. : 0.00
TOTAL HARGA (Rp.) : 0.00
% THD. BIAYA PROYEK : 0.00
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
10,000.00 8,500.64
14,285.71 3,035.94
17,142.86 1,821.57
2,406,936.74 2,406,936.74
9,000.00 18,000.00
422,560.94 44,900.47
0.00 0.00
0.00 0.00
TAN ( A + B + C ) 2,483,195.35
248,319.54
2,731,514.89
Tenaga Kerja dan Peralatan, volume dan/atau ukuran
NDAR UNTUK
NG-MASING HARGA SATUAN
TPA WAIBRON
N - KABUPATEN SENTANI
PERKIRAAN VOL. PEK. : 0.00
TOTAL HARGA (Rp.) : 0.00
% THD. BIAYA PROYEK : 0.00
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
10,000.00 470.50
14,285.71 1,344.28
17,142.86 3,226.27
1,765,957.69 100,129.80
0.00 0.00
0.00 0.00
TAN ( A + B + C ) 487,837.05
48,783.71
536,620.76
Tenaga Kerja dan Peralatan, volume dan/atau ukuran
NDAR UNTUK
NG-MASING HARGA SATUAN
TPA WAIBRON
N - KABUPATEN SENTANI
PERKIRAAN VOL. PEK. : 0.00
TOTAL HARGA (Rp.) : 0.00
% THD. BIAYA PROYEK : 0.00
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
10,000.00 470.50
14,285.71 1,344.28
17,142.86 3,226.27
1,765,957.69 100,129.80
20,000.00 61,600.00
15,000.00 105,000.00
422,560.94 19,881.37
97,808.65 362,784.84
0.00 0.00
TAN ( A + B + C ) 654,437.05
65,443.71
719,880.76
Tenaga Kerja dan Peralatan, volume dan/atau ukuran
A. URAIAN PERALATAN
E. LAIN - LAIN
A. URAIAN PERALATAN
E. LAIN - LAIN
A. URAIAN PERALATAN
E. LAIN - LAIN
A. URAIAN PERALATAN
E. LAIN - LAIN
A. URAIAN PERALATAN
E. LAIN - LAIN
A. URAIAN PERALATAN
E. LAIN - LAIN
A. URAIAN PERALATAN
E. LAIN - LAIN
A. URAIAN PERALATAN
E. LAIN - LAIN
A. URAIAN PERALATAN
E. LAIN - LAIN
A. URAIAN PERALATAN
E. LAIN - LAIN
A. URAIAN PERALATAN
E. LAIN - LAIN
A. URAIAN PERALATAN
E. LAIN - LAIN
A. URAIAN PERALATAN
E. LAIN - LAIN
A. URAIAN PERALATAN
E. LAIN - LAIN
A. URAIAN PERALATAN
E. LAIN - LAIN
A. URAIAN PERALATAN
E. LAIN - LAIN
A. URAIAN PERALATAN
E. LAIN - LAIN
KET.
E08
URAIAN ANALISA HARGA SATUAN
KETERANGAN
(E11)
URAIAN ANALISA HARGA SATUAN
KETERANGAN
(E23)
0
0
0
URAIAN ANALISA HARGA SATUAN
KETERANGAN
(E04)
URAIAN ANALISA HARGA SATUAN
KETERANGAN
(E13)
0
0
0
URAIAN ANALISA HARGA SATUAN
KETERANGAN
(E15)
URAIAN ANALISA HARGA SATUAN
KETERANGAN
(E14)
URAIAN ANALISA HARGA SATUAN
KETERANGAN
(E10)
URAIAN ANALISA HARGA SATUAN
KETERANGAN
(E07)
URAIAN ANALISA HARGA SATUAN
KETERANGAN
(E16)
URAIAN ANALISA HARGA SATUAN
KETERANGAN
(E19)
URAIAN ANALISA HARGA SATUAN
KETERANGAN
(E25)
URAIAN ANALISA HARGA SATUAN
KETERANGAN
(E18)
URAIAN ANALISA HARGA SATUAN
KETERANGAN
(E05)
URAIAN ANALISA HARGA SATUAN
KETERANGAN
(E06)
URAIAN ANALISA HARGA SATUAN
KETERANGAN
(E22)
URAIAN ANALISA HARGA SATUAN
KETERANGAN
E26
Analisa EI-101
PROYEK :
No. PAKET KONTRAK :
NAMA PAKET :
PROPINSI :
ITEM PEMBAYARAN NO. : 10.1 (1)
JENIS PEKERJAAN : Pemeliharaan Rutin Perkerasan
SATUAN PEMBAYARAN : Lump Sum / Bulan % THD. BIAYA PROYEK :
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK :
NAMA PAKET :
PROPINSI :
ITEM PEMBAYARAN NO. : 10.1 (2)
JENIS PEKERJAAN : Pemeliharaan Rutin Bahu Jalan
SATUAN PEMBAYARAN : Lump Sum / Bulan % THD. BIAYA PROYEK :
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK :
NAMA PAKET :
PROPINSI :
ITEM PEMBAYARAN NO. : 10.1 (3)
JENIS PEKERJAAN : Pemeliharaan Rutin Selokan, Saluran Air, Galian & Timbunan
SATUAN PEMBAYARAN : Lump Sum / Bulan % THD. BIAYA PROYEK :
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK :
NAMA PAKET :
PROPINSI :
ITEM PEMBAYARAN NO. : 10.1 (4)
JENIS PEKERJAAN : Pemeliharaan Rutin Perlengkapan Jalan
SATUAN PEMBAYARAN : Lump Sum / Bulan % THD. BIAYA PROYEK :
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK :
NAMA PAKET :
PROPINSI :
ITEM PEMBAYARAN NO. : 10.1 (5)
JENIS PEKERJAAN : Pemeliharaan Rutin Jembatan
SATUAN PEMBAYARAN : Lump Sum / Bulan % THD. BIAYA PROYEK :
A. TENAGA
B. BAHAN
C. PERALATAN
1.08
JUMLAH
HARGA
(Rp.)
2,835,000.00
972,000.00
3,807,000.00
3,080,674.93
9,258,682.22
3,703,093.45
7,673,000.00
23,715,450.61
7,700,544.73
7,986,401.77
2,867,856.91
18,554,803.40
46,077,254.01
4,607,725.40
50,684,979.41
6,335,622.43
5,279,685.36
k PPN yang dibayarkan
1.03
JUMLAH
HARGA
(Rp.)
945,000.00
324,000.00
1,269,000.00
26,098,993.77
2,610,000.00
28,708,993.77
3,850,272.36
3,993,200.88
1,841,420.75
9,684,894.00
39,662,887.77
3,966,288.78
43,629,176.54
5,453,647.07
4,544,705.89
k PPN yang dibayarkan
1.11
JUMLAH
HARGA
(Rp.)
1,890,000.00
648,000.00
2,538,000.00
15,455,946.00
15,455,946.00
15,401,089.46
9,472,451.54
24,873,540.99
42,867,486.99
4,286,748.70
47,154,235.69
5,894,279.46
4,911,899.55
k PPN yang dibayarkan
0.27
JUMLAH
HARGA
(Rp.)
472,500.00
81,000.00
553,500.00
5,749,687.20
5,749,687.20
3,993,200.88
3,993,200.88
10,296,388.08
1,029,638.81
11,326,026.89
1,415,753.36
1,179,794.47
k PPN yang dibayarkan
1.43
JUMLAH
HARGA
(Rp.)
5,670,000.00
1,944,000.00
7,614,000.00
7,550,468.75
7,550,468.75
39,932,008.85
39,932,008.85
55,096,477.60
5,509,647.76
60,606,125.36
7,575,765.67
6,313,138.06
k PPN yang dibayarkan
II. PEKERJA
III. BAHAN
IV. ALAT
Thd.Biaya Bahan
ITEM PEMBAYARAN NO. : 10.A
JENIS PEKERJAAN : Pondasi Agregat Kls. B Untuk Pek. Rutin
SATUAN PEMBAYARAN : M3 URAIAN ANALISA HARGA
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : setempat2 di sepanjang jalan
3 Kondisi existing jalan : sedang
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 1.9 KM
5 Tebal lapis agregat padat t 0.15 M
6 Jam kerja efektif per-hari Tk 7.00 jam
7 Berat isi padat Bip 1.81 ton/m3
8 Berat volume agregat (lepas) Bil 1.51 ton/m3
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V 1.50 M3
Faktor bucket Fb 0.85 -
Faktor Efisiensi alat Fa 0.75 -
Waktu Siklus : Ts1
- Mencampur T1 1.00 menit
- Memuat dan lain-lain T2 0.45 menit
Ts1 1.45 menit
3. TENAGA
Produksi menentukan : WHEEL LOADER Q1 69.40 M3/jam
Produksi agregat / hari = Tk x Q1 Qt 485.83 M3
Kebutuhan tenaga :
- Pekerja P 15.00 orang
- Mandor M 1.00 orang
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 0.2161 jam
- Mandor = (Tk x M) : Qt (L03) 0.0144 jam
Berlanjut ke halama
ITEM PEMBAYARAN NO. : 10.A
JENIS PEKERJAAN : Pondasi Agregat Kls. B Untuk Pek. Rutin
SATUAN PEMBAYARAN : M3 URAIAN ANALISA HARGA
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : sedang
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 1.9 KM
5 Tebal Lapis Hotmix padat t 0.04 M
6 Jam kerja efektif per-hari Tk 7.00 Jam
7 Faktor kehilanganmaterial : - Agregat Fh1 1.05 -
- Aspal Fh2 1.03 -
8 Berat isi padat Bip 1.81 ton/m3
9 Berat Isi Agregat (lepas) Bil 1.51 ton/m3
10 Komposisi campuran AC-WC :
- Agr Pch Mesin 5 - 10 & 10 - 15 mm 5-10&10-15 44.70 %
- Agregat Pecah Mesin 0 - 5 mm 0-5 48.00 %
- Semen FF 1.90 %
- Asphalt As 5.40 %
11 Berat Isi bahan :
- AC-WC D1 2.32 ton / M3
- Agr Pch Mesin 5 - 10 & 10 - 15 mm D2 1.42 ton / M3
- Agr Pch Mesin 0 - 5 mm D3 1.57 ton / M3
11 Jarak Stock pile ke Cold Bin l 50.00 m
1. BAHAN
1.a. Agr 5-10 & 10-15 = ("5-10 & 10-15" x (D1 x tM3) x Fh1) : D2 (M92) 0.0307 M3
1.b. Agr 0-5 = ("0-5" x (D1 x tM3) x Fh1) : D3 (M91) 0.0298 M3
1.c. Semen = (FF x (D1 x tM3) x Fh1) x 1000 (M05) 1.8514 Kg
1.d. Aspal = (AS x (D1 x tM3) x Fh2) x 1000 (M10) 5.1615 Kg
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V 1.50 M3
Faktor bucket Fb 0.85 -
Faktor efisiensi alat Fa 0.75 -
Kecepatan maju Vf 15.00 km/jam
Kecepatan kembali Vr 20.00 km/jam
Waktu siklus
((l x 60 : (Vf x 1000)) + (l x 60 : (Vr x 1000))) + 0.75 Ts1 1.10 menit
Berlanjut ke halama
ITEM PEMBAYARAN NO. : 10.B
JENIS PEKERJAAN : Camp. Aspal Panas Utk.Pek.Rutin
SATUAN PEMBAYARAN : M3 URAIAN ANALISA HARGA
3. TENAGA
Produksi menentukan : DUMP TRUCK Q4 1.69 M3 / Jam
Produksi ATB / hari = Tk x Q4 Qt 11.82 M3
Kebutuhan tenaga :
- Pekerja P 10.00 orang
- Mandor M 2.00 orang
Koefisien Tenaga / M3 :
- Pekerja = (Tk x P) / Qt (L01) 5.9214 Jam
- Mandor = (Tk x M) / Qt (L03) 1.1843 Jam
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : sedang
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 1.88 KM
5 Tebal rata2 Lapen t 0.055 M
6 Jam kerja efektif per-hari Tk 7.00 Jam
7 Faktor kehilanganmaterial : - Agregat Fh1 1.10 -
- Aspal Fh2 1.05 -
8 Komposisi campuran Lapen (spesifikasi) :
- Agregat Pokok Ak 133.00 Kg/M2
- Agregat Pengunci Ap 25.00 Kg/M2
- Aspal : - Paska Agregat Pokok As1 5.20 Kg/M2
As2 94.55 Kg/M3
9 Berat jenis bahan :
- Agregat D1 1.80 ton / M3
- Aspal D2 1.01 ton / M3
1. BAHAN
1.a. Agregat Kasar = {(Ak/1000 : t M3) x Fh1} : D1 (M03) 1.4778 M3
1.b. Agregat Pengunci = {(Ap/1000 : t M3) x Fh1} : D1 (M04) 0.2778 M3
1.c. Aspal = {(As : t M3) x Fh2} (M10) 99.2727 Kg
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V 1.50 M3
Faktor bucket Fb 0.85 -
Faktor efisiensi alat Fa 0.75 -
Waktu Siklus Ts1
- Memuat, menuang, kembali T1 0.45 menit
Ts1 0.45 menit
Berlanjut ke halama
ITEM PEMBAYARAN NO. : 10.C
JENIS PEKERJAAN : Penetrasi Macadam Utk.Pek.Rutin
SATUAN PEMBAYARAN : M3 URAIAN ANALISA HARGA
3. TENAGA
Produksi menentukan (Produksi Wheel Loader) Q1 106.25 M3/Jam
Produksi Lapen / hari = Q1 x Tk Qt 743.75 M3
Kebutuhan tenaga :
- Pekerja P 20.00 orang
- Mandor M 2.00 orang
Koefisien Tenaga / M3 :
- Pekerja = (Tk x P) / Qt (L01) 0.1882 Jam
- Mandor = (Tk x M) / Qt (L03) 0.0188 Jam
I. ASUMSI
1 Menggunakan buruh dan alat (semi mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Jarak rata-rata Base camp ke lokasi pekerjaan L 1.9 KM
4 Jam kerja efektif per-hari Tk 7.00 jam
5 Batasan Spesifikasi :
- Ukuran Agregat Nominal Maksimum Sa 19.00 MM
- Kadar Aspal terhadap berat total campuran As 4.50 %
- Tebal nominal padat t 0.04 M
6 Berat Jenis Bahan :
- Campuran Aspal Dingin (diambil) D1 2.01 Ton/M3
- Aspal (diambil) D2 1.00 Ton/M3
- Agregat (diambil) D3 1.60 Ton/M3
7 Faktor kembang campuran Fk 1.20
1. BAHAN
1.a. Agregat Halus = {(100% - As) x 1M3 x D1} : D3 (M04) 1.1997 M3
1.b. Aspal Emulsi = {As x 1M3 x D1} x 1000 (M31) 90.4500 Kg
2. ALAT
2.a. CONCRETE MIXER (E06)
Kapasitas Alat V 500.00 liter
Faktor Efisiensi Alat Fa 0.75 -
Waktu siklus : (T1 + T2 + T3 + T4) Ts1
- Memuat T1 5.00 menit
- Mengaduk T2 3.50 menit
- Menuang T3 3.00 menit
- Tunggu, dll. T4 2.00 menit
Ts1 13.50 menit
3. TENAGA
Produksi menentukan (Produksi Concrete Mixer) Q1 1.667 M3/Jam
Produksi Campuran dalam 1 hari = Tk x Q1 Qt 11.67 M3
Kebutuhan tenaga : - Mandor M 1.00 orang
- Pekerja P 12.00 orang
Koefisien Tenaga / M3 :
- Mandor = (Tk x M) : Qt (L03) 0.6000 jam
- Pekerja = (Tk x P) : Qt (L01) 7.2000 jam
Berlanjut ke halama
ITEM PEMBAYARAN NO. : 10.D
JENIS PEKERJAAN : Camp. Aspal Dingin Utk.Pek.Rutin
SATUAN PEMBAYARAN : 10.D URAIAN ANALISA HARGA
Rp. 2,306,284.07 / M3
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Jarak rata-rata Base Camp ke lokasi pekerjaan L 1.9 KM
4 Jam kerja efektif per-hari Tk 7.00 Jam
5 Faktor kehilangan bahan Fh 1.10 -
6 Komposisi campuran :
- Aspal AC - 10 atau AC - 20 As 87.00 %
- Minyak Fluk / Pencair K 13.00 %
7 Berat jenis bahan :
- Aspal AC - 10 atau AC - 20 D1 1.03 Kg / Ltr
- Minyak Fluk / Pencair D2 0.80 Kg / Ltr
8 Bahan dasar (aspal & minyak pencair) semuanya
diterima dilokasi pekerjaan
1. BAHAN
Untuk mendapatkan 1 liter Lapis resap Pengikat
diperlukan : (1 liter x Fh) Pc 1.10 liter
2. ALAT
2.a. APHALT SPRAYER (E03)
Kapasitas alat V 850.00 liter
Faktor Efisiensi Alat Fa 0.75 -
Waktu Siklus (termasuk proses pemanasan) Ts 2.00 Jam
3. TENAGA
Produksi menentukan : ASPHALT SPRAYER Q1 318.75 liter
Produksi / hari = Tk x Q1 Qt 2,231.25 liter
Kebutuhan tenaga :
- Pekerja P 10.00 orang
- Mandor M 1.00 orang
KETERANGAN
padat
Berlanjut ke halaman berikut
Analisa EI-10A
KETERANGAN
Lump Sum
Berlanjut ke halaman berikut
Analisa EI-10A
KETERANGAN
Analisa EI-10B
KETERANGAN
Gradasi harus -
memenuhi -
Spesifikasi
Berlanjut ke halaman berikut
Analisa EI-10B
KETERANGAN
Berlanjut ke halaman berikut
Analisa EI-10B
KETERANGAN
Lump Sum
Analisa EI-10C
KETERANGAN
Tabel 6.6.4.
Tabel 6.6.4.
Tabel 6.6.4.
(As1 : t)
Lihat panduan
Berlanjut ke halaman berikut
Analisa EI-10C
KETERANGAN
Berlanjut ke halaman berikut
Analisa EI-10C
KETERANGAN
Lump Sum
Analisa EI-10D
KETERANGAN
KETERANGAN
Melayani 1 buah
molen
Berlanjut ke halaman berikut
Analisa EI-10D
KETERANGAN
Analisa EI-10E
KETERANGAN
100 bagian
15 bagian
campuran
Berlanjut ke halaman berikut
Analisa EI-10E
KETERANGAN
ITEM PEMBAYARAN NO. : 10.1 (2)
JENIS PEKERJAAN : Pemeliharaan Rutin Bahu Jalan
SATUAN PEMBAYARAN : M2 URAIAN ANALISA HARGA SATUAN
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang bahu jalan
3 Kondisi Jalan : sedang/rusak
4 Jarak Rata-rata Base Camp ke lokasi Pekerjaan L 3.75 KM
1. BAHAN
Tidak menggunakan bahan
2. ALAT
2.a. MOTOR GRADER (E13)
Panjang operasi grader sekali jalan Lh 50.00 M
Lebar Efektif kerja Blade (sesuai lebar bahu jalan) b 1.50 M
Faktor Efisiensi Alat Fa 0.83 -
Kecepatan rata-rata alat v 2.50 Km / Jam
Jumlah lintasan n 3.00 lintasan
Waktu siklus Ts1
- Perataan 1 kali lintasan = Lh : (v x 1000) x 60 T1 1.20 menit
- Lain-lain T2 3.00 menit
Ts1 4.20 menit
3. TENAGA
Produksi menentukan : Motor Grader Q1 296.80 M2/Jam
Produksi pembersihan / hari = Tk x Q1 Qt 2,077.58 M2
Kebutuhan tenaga :
- Pekerja P 3.00 orang
- Mandor M 1.00 orang
Koefisien tenaga / M2 :
- Pekerja = (Tk x P) : Qt (L01) 0.0101 Jam
- Mandor = (Tk x M) : Qt (L03) 0.0034 Jam
Bersambung
ITEM PEMBAYARAN NO. : 10.1 (2)
JENIS PEKERJAAN : Pemeliharaan Rutin Bahu Jalan
SATUAN PEMBAYARAN : M2 URAIAN ANALISA HARGA SATUAN
Lanjutan
A. TENAGA
B. BAHAN
C. PERALATAN
HARGA
( Rp.)
28 Agregat Pecah Mesin 5-10 & 10-20 m M92 M3 639,705.49 Base Camp
29 Agregat Pecah Mesin 20-30 mm M93 M3 639,705.49 Base Camp
PETA LOKASI
Lokasi Kegiatan
Quarry
30Km
2 Km
6 Km
2 Km
SENTANI
ANALISA HARGA DASAR SATUAN BAHAN
Jenis : M01a - Pasir Pasang
Lokasi: Quarry
Tujuan: Base Camp
I. ASUMSI
1 Menggunakan alat berat
2 Kondisi Jalan : baik
3 Jarak Quarry ke lokasi Base Camp L 30.00 Km
4 Harga satuan pasir di Quarry RpM01 1.00 M3
5 Harga Satuan Dasar Excavator RpE10 1.00 Jam
6 Harga Satuan Dasar Dump Truck RpE09 1.00 Jam
7 Berat volume pasir Bil 1.42 ton/m3
III. PERHITUNGAN
EXCAVATOR (E10)
Kapasitas Bucket V 0.93 M3
Faktor Bucket Fb 0.90 -
Faktor Efisiensi alat Fa 0.75 -
Waktu siklus Ts1
- Menggali / memuat T1 0.50 menit
- Lain-lain T2 0.25 menit
Ts1 0.75 menit
Kap. Prod. / jam =
V x Fb x Fa x 60 Q1 50.22 M3 / Jam
Ts1
I. ASUMSI
1 Menggunakan alat berat
2 Kondisi Jalan : baik
3 Jarak Quarry ke Lokasi Pekerjaan L 30.00 Km
4 Harga satuan batu kali di Quarry RpM02 1.00 M3
5 Harga Satuan Dasar Excavator RpE10 1.00 Jam
6 Harga Satuan Dasar Dump Truck RpE09 1.00 Jam
7 Berat volume batu kali Bil 1.44 ton/m3
III. PERHITUNGAN
EXCAVATOR (E10)
Kapasitas Bucket V 0.93 M3
Faktor Bucket Fb 0.83 -
Faktor Efisiensi alat Fa 0.75 -
Waktu siklus Ts1
- Menggali / memuat T1 2.00 menit
- Lain-lain T2 0.50 menit
Ts1 2.50 menit
Kap. Prod. / jam =
V x Fb x Fa x 60 Q1 13.8942 M3 / Jam
Ts1
I. ASUMSI
1 Menggunakan alat berat
2 Kondisi Jalan : baik
3 Jarak Quarry ke Lokasi Pekerjaan L 30.00 Km
4 Harga satuan batu kali di Quarry RpM06 1.00 M3
5 Harga Satuan Dasar Excavator RpE10 1.00 Jam
6 Harga Satuan Dasar Dump Truck RpE09 1.00 Jam
7 Harga Satuan Dasar Wheel Loader RpE15 1.00 Jam
8 Harga Satuan Upah Pekerja RpL01 1.00 Jam
9 Berat volume batu belah Bil 1.60 ton/m3
3.d PEKERJA
Biaya Pekerja / M3 =
{ (7 Jam x P) : Qt } x RpL01 Rp4 4,978.10 Rupiah
I. ASUMSI
1 Menggunakan alat berat
2 Kondisi Jalan : baik
3 Jarak Quarry ke Lokasi Pekerjaan L 30.00 Km
4 Harga satuan Gravel di Quarry RpM07 1.00 M3
5 Harga Satuan Dasar Excavator RpE10 1.00 Jam
6 Harga Satuan Dasar Dump Truck RpE09 1.00 Jam
7 Berat volume gravel Bil 2.20 ton/m3
III. PERHITUNGAN
EXCAVATOR (E10)
Kapasitas Bucket V 0.93 M3
Faktor Bucket Fb 0.90 -
Faktor Efisiensi alat Fa 0.75 -
Waktu siklus Ts1
- Menggali / memuat T1 0.75 menit
- Lain-lain T2 0.50 menit
Ts1 1.25 menit
Kap. Prod. / jam =
V x Fb x Fa x 60 Q1 30.132 M3 / Jam
Ts1
KET.
Ke Base Camp
Ke Base Camp
Ke Base Camp
Ke Base Camp
Ke Base Camp
Ke Base Camp
Ke Lokasi Pek.
Ke Lokasi Pek.
Ke Lokasi Pek.
Ke Lokasi Pek.
Ke Base Camp
Ke Base Camp
Ke Base Camp
Ke Base Camp
Ke Base Camp
Ke Base Camp
Ke Base Camp
Ke Base Camp
Ke Base Camp
Ke Base Camp
A HARGA DASAR SATUAN BAHAN
HARGA
SATUAN
(Rp.)
175,000.00
544,258.12
428,852.02
A HARGA DASAR SATUAN BAHAN
HARGA
SATUAN
(Rp.)
155,000.00
544,258.12
428,852.02
A HARGA DASAR SATUAN BAHAN
HARGA
SATUAN
(Rp.)
250,000.00
544,258.12
428,852.02
379,887.70
10,000.00
Bersambung
A HARGA DASAR SATUAN BAHAN
Lanjutan
HARGA
SATUAN
(Rp.)
A HARGA DASAR SATUAN BAHAN
HARGA
SATUAN
(Rp.)
250,000.00
544,258.12
428,852.02
ANALISA HARGA DASAR SATUAN BAHAN
Jenis : M09 - Material Pilihan
Lokasi: Quarry
Tujuan: Lokasi Pekerjaan
I. ASUMSI
1 Menggunakan alat berat
2 Kondisi Jalan : baik
3 Jarak Quarry ke lokasi Base Camp L 5.00 Km
4 Harga satuan Sirtu di Quarry RpM16 1.00 M3
5 Harga Satuan Dasar Excavator RpE10 1.00 Jam
6 Harga Satuan Dasar Dump Truck RpE09 1.00 Jam
7 Berat volume sirtu Bil 1.51 ton/m3
III. PERHITUNGAN
EXCAVATOR (E10)
Kapasitas Bucket V 0.93 M3
Faktor Bucket Fb 0.83 -
Faktor Efisiensi alat Fa 0.83 -
Waktu siklus Ts1
- Menggali / memuat T1 1.00 menit
- Lain-lain T2 0.50 menit
Ts1 1.50 menit
Kap. Prod. / jam =
V x Fb x Fa x 60 Q1 25.62708 M3 / Jam
Ts1
I. ASUMSI
1 Menggunakan alat berat
2 Kondisi Jalan : baik
3 Jarak Quarry ke lokasi pekerjaan L 30.00 Km
4 Harga satuan pasir urug di Quarry RpM44 1.00 M3
5 Harga Satuan Dasar Excavator RpE10 1.00 Jam
6 Harga Satuan Dasar Dump Truck RpE09 1.00 Jam
7 Berat volume pasir urug Bil 1.42 ton/m3
III. PERHITUNGAN
EXCAVATOR (E10)
Kapasitas Bucket V 0.93 M3
Faktor Bucket Fb 0.90 -
Faktor Efisiensi alat Fa 0.75 -
Waktu siklus Ts1
- Menggali / memuat T1 0.50 menit
- Lain-lain T2 0.50 menit
Ts1 1.00 menit
Kap. Prod. / jam =
V x Fb x Fa x 60 Q1 37.665 M3 / Jam
Ts1
I. ASUMSI
1 Menggunakan alat berat
2 Kondisi Jalan : baik
3 Jarak Quarry ke lokasi pekerjaan L 30.00 Km
4 Harga satuan pasir urug di Quarry RpM44 1.00 M3
5 Harga Satuan Dasar Excavator RpE10 1.00 Jam
6 Harga Satuan Dasar Dump Truck RpE09 1.00 Jam
7 Berat isi volume pasir beton Bil 1.69 ton/m3
III. PERHITUNGAN
EXCAVATOR (E10)
Kapasitas Bucket V 0.50 M3
Faktor Bucket Fb 0.90 -
Faktor Efisiensi alat Fa 0.75 -
Waktu siklus Ts1
- Menggali / memuat T1 0.50 menit
- Lain-lain T2 0.50 menit
Ts1 1.00 menit
Kap. Prod. / jam =
V x Fb x Fa x 60 Q1 20.25 M3 / Jam
Ts1
I. ASUMSI
1 Menggunakan alat berat
2 Kondisi Jalan : sedang / baik
3 Jarak Quarry ke lokasi pekerjaan L 32.00 Km
4 Harga Satuan Solar di Jayapura RpM44 1.00 Drum
5 Harga Satuan Dasar Wheel Loader RpE15 1.00 Jam
6 Harga Satuan Dasar Dump Truck RpE08 1.00 Jam
III. PERHITUNGAN
I. ASUMSI
1 Menggunakan alat berat
2 Kondisi Jalan : sedang / baik
3 Jarak Quarry ke lokasi pekerjaan L 32.00 Km
4 Harga Satuan Bensin di Jayapura RpM44 1.00 Drum
5 Harga Satuan Dasar Wheel Loader RpE15 1.00 Jam
6 Harga Satuan Dasar Dump Truck RpE08 1.00 Jam
III. PERHITUNGAN
HARGA
SATUAN
(Rp.)
85,000.00
544,258.12
428,852.02
A HARGA DASAR SATUAN BAHAN
HARGA
SATUAN
(Rp.)
15,000.00
544,258.12
428,852.02
A HARGA DASAR SATUAN BAHAN
HARGA
SATUAN
(Rp.)
155,000.00
544,258.12
428,852.02
A HARGA DASAR SATUAN BAHAN
HARGA
SATUAN
(Rp.)
9,000.00
379,887.70
250,593.96
Drum / Jam
Drum / Jam
A HARGA DASAR SATUAN BAHAN
HARGA
SATUAN
(Rp.)
6,000.00
379,887.70
250,593.96
Drum / Jam
ANALISA HARGA DASAR SATUAN BAHAN
Jenis : Semen
Lokasi: Jayapura
Tujuan: Base Camp
I. ASUMSI
1 Menggunakan alat berat
2 Kondisi Jalan : sedang / baik
3 Jarak Quarry ke lokasi pekerjaan L 32.00 Km
4 Harga Satuan Semen di Jayapura 1.00 Zak
6 Harga Satuan Dasar Dump Truck RpE08 1.00 Jam
III. PERHITUNGAN
Pekerja = 4 org
Kapasitas 4.00 Zak
Memuat T1 1.00 menit
Lain-lain T2 1.00 menit
Ts1 2.00 menit
I. ASUMSI
1 Menggunakan alat berat
2 Kondisi Jalan : sedang / baik
3 Jarak Quarry ke lokasi pekerjaan L 32.00 Km
4 Harga Satuan Besi Beton di Jayapura 1.00 Kg
6 Harga Satuan Dasar Dump Truck RpE08 1.00 Jam
III. PERHITUNGAN
Pekerja = 4 org
Kapasitas 100.00 Kg
Memuat T1 2.00 menit
Lain-lain T2 1.00 menit
Ts1 3.00 menit
Q1 2,000.00 Kg/Jam
HARGA
SATUAN
(Rp.)
1,800.00
250,593.96
A HARGA DASAR SATUAN BAHAN
HARGA
SATUAN
(Rp.)
24,250.00
250,593.96
ANALISA HARGA DASAR SATUAN BAHAN
Jenis : Kawat Beton
Lokasi: Jayapura
Tujuan: Base Camp
I. ASUMSI
1 Menggunakan alat berat
2 Kondisi Jalan : sedang / baik
3 Jarak Quarry ke lokasi pekerjaan L 32.00 Km
4 Harga Satuan Besi Beton di Jayapura 1.00 Kg
6 Harga Satuan Dasar Dump Truck RpE08 1.00 Jam
III. PERHITUNGAN
Pekerja = 4 org
Kapasitas 100.00 Kg
Memuat T1 2.00 menit
Lain-lain T2 1.00 menit
Ts1 3.00 menit
Q1 2,000.00 Kg/Jam
I. ASUMSI
1 Menggunakan alat berat
2 Kondisi Jalan : sedang / baik
3 Jarak Quarry ke lokasi pekerjaan L 32.00 Km
4 Harga Satuan Besi Beton di Jayapura 1.00 Kg
6 Harga Satuan Dasar Dump Truck RpE08 1.00 Jam
III. PERHITUNGAN
Pekerja = 4 org
Kapasitas 100.00 Kg
Memuat T1 2.00 menit
Lain-lain T2 1.00 menit
Ts1 3.00 menit
Q1 2,000.00 Kg/Jam
I. ASUMSI
1 Menggunakan alat berat
2 Kondisi Jalan : sedang / baik
3 Jarak Quarry ke lokasi pekerjaan L 5.00 Km
4 Harga Satuan Kayu di Jayapura 1.00 M3
6 Harga Satuan Dasar Dump Truck RpE08 1.00 Jam
III. PERHITUNGAN
Q1 0.14 M3/Jam
I. ASUMSI
1 Menggunakan alat berat
2 Kondisi Jalan : sedang / baik
3 Jarak Quarry ke lokasi pekerjaan L 32.00 Km
4 Harga Satuan Paku di Jayapura 1.00 Kg
6 Harga Satuan Dasar Dump Truck RpE08 1.00 Jam
III. PERHITUNGAN
Pekerja = 4 org
Kapasitas 100.00 Kg
Memuat T1 2.00 menit
Lain-lain T2 1.00 menit
Ts1 3.00 menit
Q1 2,000.00 Kg/Jam
HARGA
SATUAN
(Rp.)
39,500.00
250,593.96
A HARGA DASAR SATUAN BAHAN
HARGA
SATUAN
(Rp.)
55,000.00
250,593.96
A HARGA DASAR SATUAN BAHAN
HARGA
SATUAN
(Rp.)
4,000,000.00
250,593.96
A HARGA DASAR SATUAN BAHAN
HARGA
SATUAN
(Rp.)
35,000.00
250,593.96
Formulir Penentuan Harga Bahan
Bahan : Semen
2 Handling - - -
Bahan : Aspal
778,096.68 2.
250,593.96
544,258.12 2.
407,436.23 5.
423,371.96 1.
A. URAIAN PERALATAN
1. Jenis Peralatan BORE PILE MACHINE
2. Tenaga Pw 125 HP
3. Kapasitas Cp 60.00 CM
4. Alat Baru : a. Umur Ekonomis A 10.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 1,500.0 Jam
c. Harga Alat B 1,170,000,000 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 13.00 % / Tahun
2. Upah Operator / Sopir U1 14,285.71 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 10,714.29 Rp./Jam
4. Bahan Bakar Bensin Mb 7,936.00 Liter
5. Bahan Bakar Solar Ms 10,186.00 Liter
6. Minyak Pelumas Mp 18,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
KET.
E50
ITEM PEMBAYARAN : AGREGAT KASAR & HALUS
JENIS PEKERJAAN : PENGADAAN AGREGAT KASAR & HALUS
SATUAN PEMBAYARAN : M3
I ASUMSI
1 Bahan dasar (Batu dan Pasir) dengan Alat
Pemecah Batu berjarak 100m'
2 Kegiatan dilakukan di dalam lokasi Base Camp
3 Hasil produksi Alat Pemecah Batu : - Agregat Halus H 30.00
- Agregat Kasar K 70.00
4 Berat Isi Bahan : - Batu / Gravel D1 1.20
- Pasir D2 1.40
- Batu Pecah D3 1.35
5 Harga Satuan Bahan Dasar : - Batu Kali Rp1 443,900.00
- Pasir Rp2 322,304.00
6 Biaya Operasi Alat : - Pemecah Batu (Stone Crusher) Rp3 672,062.07
- Genset Rp4 398,751.95
- Wheel Loader Rp5 379,887.70
- Excavator Rp6 544,258.12
- Dump Truck Rp7 250,593.96
7 Kapasitas Alat : - Pemecah Batu (Stone Crusher) Cp1 40.00
- Genset Cp2 175.00
- Wheel Loader Cp3 1.50
- Excavator Cp4 0.93
- Dump Truck Cp5 3.50
8 Faktor Efisiensi Alat : - Pemecah Batu (Stone Crusher) Fa1 0.75
- Genset Fa2 0.75
- Wheel Loader Fa3 0.75
- Excavator Fa4 0.75
- Dump Truck Fa5 0.75
9 Faktor Kehilangan Material Fh 1.10
10 Agregat Halus masih perlu dicampur dengan pasir
II METHODE PELAKSANAAN
III PERHITUNGAN
SATUAN KETERANGAN
%
%
Ton/M3 Berongga
Ton/M3 Berongga
Ton/M3 Berongga
Rp./M3
Rp./M3
Rp./Jam
Rp./Jam
Rp./Jam
Rp./Jam
Rp./Jam
Ton/Jam
KVA
M3 Kap. Bucket
M3 Kap. Bucket
M3 Kap. Bak
-
Jam
M3/Jam Batu pecah
M3/Jam
M3
menit
Jam
Jam
M3
menit
Jam
M3
menit
Jam
Rp./M3
Rp./M3
Berlanjut
URAIAN ANALISA HARGA SATUAN
Lanjutan 1
SATUAN KETERANGAN
%
Rupiah per 1 M3
Rupiah per (Pst) M3
Jam/M3
Rupiah
PROYEK :
No. PAKET KONTRAK 0
NAMA PAKET : PENINGKATAN JALAN TPA WAIBRON
PROP / KAB / KODYA : KECAMATAN WAIBRON - KABUPATEN SENTANI
ITEM PEMBAYARAN NO. : AGREGAT KELAS A :
JENIS PEKERJAAN : PENGADAAN AGREGAT KELAS A :
SATUAN PEMBAYARAN : M3 :
A. TENAGA
B. BAHAN
C. PERALATAN
1. Wheel Loader (E15) jam 0.0418 379,887.70
2. Blending Equpment (E52) jam 0.0533 200,015.20
3 Alat Bantu Ls 1.0000 0.00
JUMLAH
HARGA
(Rp.)
835.68
716.30
1,551.97
225,438.99
338,158.49
94,018.11
657,615.59
15,873.19
10,667.48
0.00
26,540.67
685,708.23
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
PROYEK :
No. PAKET KONTRAK 0
NAMA PAKET : PENINGKATAN JALAN TPA WAIBRON
PROP / KAB / KODYA : KECAMATAN WAIBRON - KABUPATEN SENTANI
A. TENAGA
B. BAHAN
C. PERALATAN
1. Wheel Loader (E15) jam 0.0193 379,887.70
2. Blending Equpment (E52) jam 0.0482 200,015.20
3 Alat Bantu Ls 1.0000 0.00
JUMLAH
HARGA
(Rp.)
386.66
331.43
718.09
199,996.59
208,329.78
119,134.92
527,461.29
7,344.43
9,639.29
0.00
16,983.72
545,163.10
ITEM PEMBAYARAN : AGREGAT KELAS C
JENIS PEKERJAAN : PENGADAAN AGREGAT KELAS C
SATUAN PEMBAYARAN : M3 URAIAN ANALISA HARGA SATU
I ASUMSI
1 Bahan Agregat Kasar, Pasir dan Tanah diterima di lokasi
Base Camp
2 Kegiatan dilakukan di dalam lokasi Base Camp
3 Proporsi campuran : - Agregat Kasar Ak 15.00 %
- Pasir Ps 50.00 %
- Tanah Tn 35.00 %
4 Harga Satuan : - Agregat Kasar HSAk 639,705.49 Rp./M3
- Pasir HSPs 322,304.00 Rp./M3
- Tanah HSTn 15,000.00 Rp./M3
5 Biaya Operasi Alat : - Wheel Loader Rp1 379,887.70 Rp./Jam
6 Faktor Efisiensi Alat : - Wheel Loader Fa1 0.83 -
7 Kapasitas Alat : - Wheel Loader Cp2 1.50 M3
II METHODE PELAKSANAAN
KETERANGAN
65.00
Kap. Bucket
Di luar PPN