Item No SAWL
3 ---
4 ---
5 ---
6 ---
7 ---
Table-19, Number, orientation, and location of test pieces per sample for
9
mechanical tests for PSL1 pipes. (Page-58)
Table-20, Number, orientation, and location of test pieces per sample for
mechanical tests for PSL2 pipes. (Page-59)
10
Type Of Test
11 ---
12 ---
Offshore service
J.3.3.2.6. Intermittent tack welding of
the SAWL groove shall not be used,
unless the purchaser has approved data
14 furnished by the manufacturer to
denonstrate that all the mechanical
properties specified for the pipe are
obtainable at both the tack weld and
intermediate positions. (Page-139)
15 ---
16 ---
Table-J7. Number, orientation, and location of test pieces per sample for
17
mechanical tests.(Page-148)
18 ---
19
API 5L 45-th Edition
Sour service
H.3.3.2.5. If agreed, helical seam
pipe maid from coil and containing coil
end welds may be delivered, provided
that such welds are located at least
300mm from the pipe ends and have
been subjected to the same non-
destructive inspection required in
ANNEX K for coil edges and welds.
(Page-124)
Offshore service
J.3.3.2.5. If agreed, helical seam pipe
maid from coil and containing coil end
welds may be delivered, provided that
such welds are located at least 300mm
from the pipe ends and have been
subjected to the same non-destructive
inspection required in ANNEX K for coil
edges and welds. (Page-139)