REKAPITULASI DAFTAR KUANTITAS DAN HARGA

PEKERJAAN PEMBUATAN RUANG PENITIPAN BAYI


KEMENTERIAN KETENAGAKERJAAN R.I
Jl. Jend. Gatot Subroto Kav. 51

NO PEKERJAAN JUMLAH

I PEKERJAAN PERSIAPAN

II PEKERJAAN BONGKARAN

III PEKERJAAN CIVIL INTERIOR

IV PEKERJAAN INTERIOR BUILT IN & ORNAMEN

V PEKERJAAN MEKANIKAL & ELEKTRIKAL

TOTAL -
PPn 10% -
GRAND TOTAL -
DIBULATKAN -
terbilang:
DAFTAR KUANTITAS DAN HARGA
PEKERJAAN PEMBUATAN RUANG PENITIPAN BAYI
KEMENTERIAN KETENAGAKERJAAN R.I
Jl. Jend. Gatot Subroto Kav. 51

HARGA JUMLAH
NO URAIAN PEKERJAAN VOL SAT
(Rp) (Rp)
I PEKERJAAN PERSIAPAN
1 Administrasi dan Dokumentasi 1.00 ls -
2 Mobilisasi & Demobilisasi (Tenaga Kerja, Alat Bantu, Furnitur Existing) 1.00 ls -
3 Pembuangan Puing ex Bongkaran dan Sisa Pekerjaan Keluar Lokasi 140.00 m -
4 Alat Bantu Kerja & K3 1.00 ls -
5 Direksi Keeth, Gudang Peralatan & Material 28.80 m -
6 Pembersihan Area Kerja 370.00 m -
7 Pagar Pembatas Area Dalam (Proteksi Ruangan Kerja) 105.50 m2 -
SUB TOTAL PEK.PERSIAPAN = -
II PEKERJAAN BONGKARAN
a PEK BONGKARAN
1 Bongkar Screeding Bawah Lantai Existing 11.24 m -
2 Bongkar Lantai Keramik / Teraso 370.00 m -
3 Bongkar Lantai Parquet Existing 57.50 m -
4 Bongkar Lantai Karpet Existing 49.00 m -
5 Bongkar Partisi Gypsum 202.60 m -
6 Bongkar Dinding Bata 4.10 m -
7 Bongkar Partisi Kaca & Cermin 68.05 m -
8 Bongkar Kusen & Daun Pintu 12.00 unit -
9 Bongkar Partisi / Pintu Lipat 32.10 m -
10 Bongkar Plafon Gypsum / Acoustic + Rangka 373.80 m -
11 Bongkar Meja Beton Pantry 0.18 m -
b BONGKARAN MEKANIKAL ELEKTRIKAL EXISTING
1 Bongkar Ducting AC + Diffuser 80.00 m -
2 Bongkar Unit AC Split + Instalasi 7.00 unit -
3 Bongkar Unit AC Window 1.00 unit -
4 Bongkar Instalasi Listrik 60.00 titik -
5 Bongkar Armature Stop kontak & Saklar 31.00 titik -
6 Bongkar Armature Penerangan 29.00 titik -
c BONGKARAN PLUMBING & SANITAIR EXISTING
1 Bongkar Instalasi Air Bersih & Air Kotor Existing 1.00 ls -
2 Bongkar Closet Duduk Existing 2.00 unit -
3 Bongkar Wastafel Existing 1.00 unit -
4 Bongkar Zink Existing 1.00 unit -

SUB TOTAL PEK BONGKARAN = -


TOTAL PEKERJAAN PERSIAPAN & BONGKARAN = -
III PEKERJAAN CIVIL INTERIOR
a PEKERJAAN STRUKTUR
1 Pek. Kolom Praktis ( 12x12 cm) 0.63 m -
2 Pek. Kolom Beton uk 20x60 cm , K.1 1.58 m -
3 Pek. Kolom Beton uk 20x100 cm, K.2 1.76 m -
4 Pek. Balok Beton 15x450 cm 1.93 kg -
5 Pek. Kuda Kuda Baja UNP 150 903.65 kg -
6 Pek. Kuda Kuda Baja UNP 125 229.94 kg -
7 Pek. Gording Baja CNP 125 323.66 kg -
8 Pek. Rood Sag 16mm 67.78 kg -
9 Pek. Wind Braching 16mm 41.71 kg -
10 Pek. Plate Stefner d= 12mm 31.57 kg -
11 Pek. Chemical Anchor HTB M19 12.00 ttk -
12 Pek. Dynabolt 16 mm 30.00 bh -
14 Pek. Roof Insulation 33.36 m -
13 Pek. Penutup Atap Spandek 33.36 m -
15 Pek. Almunium Composite Panel 24.30 m -
14 Pek. Talang Zincalume 24.30 m -
15 Pek. Waterproofing Dak Beton Baru 9.25 m -
SUB TOTAL = -
b PEKERJAAN LANTAI & PENUTUP LANTAI
1 Pek. Screeding Lantai Existing 379.70 m -
2 Pek. Peninggian Lantai Area Service (Pantry, Wastafel, Toilet) 8.54 m -
3 Pek. Floor Corring 1.00 ttk -
4 Pas. Keramik Lantai Coridor, uk. 60x60 cm 34.45 m -
5 Pas. Keramik Lantai Lobby & Receptionist, uk 60x60 cm 48.46 m -
6 Pas. Keramik Lantai R Administrasi, uk 60x60 cm 20.00 m -
7 Pas. Vinyl Lantai R Isolasi & Dokter, uk 6"x36" x3 mm 17.60 m -
8 Pas. Penutup Lantai R Laktasi 13.90 m -
HARGA JUMLAH
NO URAIAN PEKERJAAN VOL SAT
(Rp) (Rp)
9 Pas. Vinyl Lantai Playground & Learning Area, uk 18"x18" x3 mm 68.96 m -
10 Pas. Vinyl Lantai Playground & Learning Area, uk. 6"x36" x3 mm 16.90 m -
11 Pas. Vinyl Lantai Infant & Older Todler Area, uk 6"x36" x3 mm 89.80 m -
12 Pas. Keramik Lantai Toilet, uk. 20x20 cm 18.50 m -
13 Pas. Keramik Lantai Toilet, uk. 60x60 cm 7.35 m -
14 Pas. Keramik Lantai Pantry, uk. 60x60 cm 21.50 m -
15 Pas. Carpet Lantai R. Meeting Darmawanita, uk. 50x50 cm 26.20 m -
16 Pas. Keramik Lantai R. Adm. Darmawanita, uk. 60x60 cm 12.40 m -
17 Pas. Plint Lantai + Finish Duco 248.80 m -
18 Pek. Waterproofing Area Service (Pantry, Wastafel, Toilet) 60.00 m -

SUB TOTAL = -
c PEKERJAAN DINDING DAN PARTISI
1 Pas. Partisi Gypsum 9mm 1 Muka + Rangka Hollow Galvaniz 64.10 m -
2 Pas. Partisi Gypsum 9mm 2 Muka + Rangka Hollow Galvaniz 231.00 m -
3 Pas. Dinding Bata Ringan 110.50 m -
4 Pek. Plesteran 221.00 m -
5 Pek. Acian Halus 84.47 m -
SUB TOTAL = -
d PEKERJAAN PLAFOND
1 Pas. Plafon Gypsum 9mm + Rangka Hollow Galvaniz 385.90 m -
2 Pas. Droop Ceiling Gypsum 9mm + Rangka Hollow Galvaniz 45.90 m -
3 Pas. List Plafon 302.60 m -
SUB TOTAL = -
e PEKERJAAN PINTU DAN JENDELA
1 Pas. Kusen Alluminium 3"+ 2 Daun Pintu Alluminium + Kaca 6mm. P.1 1.00 Unit -
2 Pas. Kusen Alluminium 3" + 1 Daun Pintu Alluminium + Kaca 6mm. P.2 1.00 Unit -
3 Pas. Kusen UPVC 3" + 1 Daun Pintu UPVC + Kaca 6mm. P.3 3.00 Unit -
4 Pas. Kusen Solid Wood + Daun Pintu Solid Wood + Kaca 6mm. P.4 1.00 Unit -
5 Pas. Kusen Alluminium 3" + 1 Daun Pintu Alluminium + Kaca 6mm. P.5 1.00 Unit -
6 Pas. Kusen UPVC 3" + 2 Daun Pintu UPVC + Kaca 6mm. P.6 2.00 Unit -
7 Pas. Kusen UPVC 3" + 1 Daun Pintu UPVC + Kaca 6mm. P.7 1.00 Unit -
8 Pas. Kusen UPVC 3" + 1 Daun Pintu Panel UPVC + Kaca 6mm, P.8 2.00 Unit -
9 Pas. Kusen + 2 Daun Pintu dan Jendela UPVC + Boven + Kaca 6mm, PJ.1 1.00 Unit -
10 Pas. Kusen UPVC 3" + Daun Pintu dan Jendela UPVC + Kaca 6mm. PJ.2 1.00 Unit -
11 Pas. Kusen UPVC 3" + Daun Pintu dan Jendela UPVC + Kaca 6mm. PJ.3 1.00 Unit -
12 Pas. Kusen Jendela UPVC + Kaca 8mm. Tempered. J.1 2.00 Unit -
13 Pek. Perbaikan Jendela Alluminium (existing)
- Pembongkaran & Pembersihan Alluminium 1.00 Unit -
- Penggantian Kaca Clear Glass 6mm, Tempered 8.40 m -
- List Alluminium (Ornamen) 8.40 m -
- Acc.ex Solid, Dekson 3.00 set -
14 Pas. Kusen Jendela UPVC 3" + Kaca 6mm. Tempered. J.3 1.00 Unit -
15 Pas. Kusen Jendela UPVC 3" +Kaca 6mm. Tempered. J.4 1.00 Unit -
16 Pas. Kusen Jendela UPVC 3" + Daun Jendela UPVC + Kaca 6mm. Tempered. J.5 4.00 Unit -
17 Pas. Kusen Jendela UPVC 3" + Kaca 6mm. Tempered. J.6 4.00 Unit -
18 Pas. Architrave 54.26 m -

SUB TOTAL = -
f PEKERJAAN FINISHING DINDING DAN PLAFON
1 Finishing Dinding Koridor
- Emulsion Paint 97.37 m -
- Wall Panels 97.37 m -
2 Finishing Dinding Lobby & Receptionist
- Emulsion Paint 15.72 m -
- Wall Panels 4.40 m -
- Decorative Wall Panels 32.58 m -
- Wallpaper Brick Motif 49.97 m -
- Printing Wallpaper, Custom 8.40 m -
3 Finishing Dinding R. Administrasi
- Emulsion Paint 50.90 m -
4 Finishing Dinding R. Isolasi / Dokter
- Emulsion Paint 44.80 m -
5 Finishing Dinding R. Laktasi
- Washed Painting 34.20 m -
- Wall Panels 10.30 m -
- Keramik uk. 20x40 cm 6.60 m -
6 Finishing Dinding Playground & Learning Area
- Emulsion Paint 36.65 m -
- Wallpaper Brick Motif 15.70 m -
- Wall Art Paint 43.14 m -
- Decorative Wall Panel 25.66 m -
7 Finishing Dinding R. Infant & Older Todler
HARGA JUMLAH
NO URAIAN PEKERJAAN VOL SAT
(Rp) (Rp)
- Wallpaper R Old Todler 64.80 m -
- Wallpaper R. Infant 61.00 m -
- Border, Printing Sticker 40.40 m -
- Wall Panel 53.10 m -
- R. Infant ; Keramik uk. 20x40 cm 7.04 m -
8 Finishing Pantry
- Emulsion Paint 61.60 m -
- Keramik uk. 20x40 cm 3.80 m -
9 Finishing Dinding Toilet
- Keramik Mozaic Tile uk. 30x30 cm 74.93 m -
- Keramik uk. 20x20 cm 17.12 m -
- Emulsion Paint 7.46 m -

10 Finishing Dinding R. Meeting Dharmawanita


- Washed Painting 60.80 m -
11 Finishing Dinding R Adm Dharmawanita
- Emulsion Paint 44.20 m -
12 Finishing Plafond
- Emulsion Paint 201.30 m -
- Ceiling Art Paint 194.90 m -
SUB TOTAL = -
TOTAL PEKERJAAN CIVIL INTERIOR = -
IV PEKERJAAN INTERIOR BUILT IN & ORNAMEN
Looby & Receptionist
1 Pek. Artifisial Tree , Plywood Finish HPL/Duco + Letter + LED Strip Light 1.00 unit -
(280x400 cm)
2 Pek. Backdrop Panel, Plywood Finish HPL/Duco + Letter + LED Strip Light 1.00 unit -
( 240x24x245 cm )
Playground & Learning Area
3 Pek. Artifisial Tree, Plywood Finish HPL/Duco + LED Stip Light 1.00 unit -
(260x420 cm)
4 Pek. Built In Cabinet, Plywood Finish HPL/Duco 1.00 unit -
(620x82x73 cm)

SUB TOTAL = -
TOTAL PEKERJAAN BUILT IN INTERIOR FURNITURE & ORNAMEN = -
V PEKERJAAN MEKANIKAL & ELEKTRIKAL
a PEKERJAAN ELEKTRIKAL DAN ARMATURE
- PEMASANGAN PANEL UTAMA
1 Pas. Panel SDP 1.00 unit -

2 Pas. Kabel Feeder dari MDP - SDP, NYM 4x6 mm 1.00 ttk -
3 Pas. Cable Tray U (300 x 50 x 2400 x 1.2 mm) + Acc 100.00 m -
4 Pas. Instalasi Kabel Induk 100.00 m -

- PEKERJAAN INSTALASI PENERANGAN DAN STOP KONTAK


1 Pas. Instalasi Kabel Penerangan, NYM 3x2,5 mm + Pipa Conduit 48.00 ttk -
2 Pas. Instalasi Kabel Lampu Droop Ceilling, NYM 3x2,5 mm + Pipa Conduit 4.00 ttk -
3 Pas. Instalasi Kabel Stop Kontak, NYM 3x2,5 mm + Pipa Conduit 30.00 ttk -
4 Pas. Lampu RM (incl Reflector) + TL LED 2x18 watt 7.00 unit -
5 Pas. Down Light 4" + LED 13 watt 28.00 unit -
6 Pas. Down Light 3" + LED 9 watt 13.00 unit -
7 Pas. LED Strip Light 12v RGB 5050 45.60 m -
8 Pas. Saklar Single + Inbow Dus 7.00 unit -
9 Pas. Saklar Double + Inbow Dus 11.00 unit -
10 Pas. Stop Kontak CP + Inbow Dus 30.00 unit -
11 Pas. Stop Kontak AC + Inbow Dus 10.00 unit -
12 Pas. Instalasi Kabel CCTV, Super Coaxial RG6 + Power Cable 15.00 ttk -
13 Pas. Instalasi Kabel Telepon, ITC 2 x 2 x 0,6 mm 2.00 ttk -
14 Pas. Instalasi Kabel Fire Alarm, NYM 2x1,5 mm 16.00 ttk -
15 Pas. Armatur Fire Alarm
- ROR Temperature Heat Detector 15.00 ttk -
- Photoelectric Smoke Detector 1.00 ttk -
- Terminal Box -Fire Alarm 4 Zone + Module 1.00 unit -

PEKERJAAN AIR CONDITIONING DAN EXHAUST


16 Pas. Instalasi Kabel Power AC Split Wall Mounted (1Phase), NYM 3x2,5 mm 8.00 ttk -
17 Pas. Instalasi Kabel Power AC Cassette (3Phase) 2.00 ttk -
18 Pas. Instalasi Kabel Kontrol dari Indoor ke Unit Outdoor (1Phase), NYM 3x2,5 mm 8.00 ttk -
19 Pas. Instalasi Kabel Kontrol dari Indoor ke Unit Outdoor (3Phase) 2.00 ttk -
20 Pas. Instalasi Kabel Power Exhaust Fan, NYM 3x2,5 mm 5.00 ttk -
21 Pas. Ceiling Exhaust Fan dia = 10" 5.00 ttk -
HARGA JUMLAH
NO URAIAN PEKERJAAN VOL SAT
(Rp) (Rp)
22 Pas. Ducting Exhaust Fan
- BJLS 60,lengkap dg sambungan, penggantung 15.00 m' -
- Sambungan Kanvas 2.00 bh -
- Bell Mount I/d wiremesh 1.00 bh -
SUB TOTAL = -
b PEKERJAAN PLUMBING DAN SANITARY
PLUMBING
1 Pek. Instalasi Air Bersih, Pipa PVC - 1" AW 100.00 m -
2 Pek. Instalasi Air Bersih Panas, Pipa Rifeng - 1" 37.50 m -
3 Pek. Instalasi Air Kotor, Pipa PVC 1 - 3" AW 43.50 m -
4 Pek. Instalasi Air Kotoran / Limbah, Pipa PVC 3 - 4" AW 9.50 m -
5 Pek. Instalasi Air Hujan, Pipa PVC 3 - 4" AW 4.00 m -
6 Pek. Instalasi Air Buangan AC, Pipa PVC " AW 114.60 m -

SANITARY
1 Pas. Closet Duduk + Acc 2.00 unit -
2 Pas. Wastafel + Acc 1.00 unit -
3 Pas. Wastafel / Baby Bath Tub + Acc 1.00 unit -
4 Pas. Wastafel Stainless Steel + Acc 1.00 unit -
5 Pas. Kitchen Zink + Acc 1.00 unit -
6 Pas. Jet Washer " 2.00 unit -
7 Pas. Shower Set, Panas / Dingin " 4.00 set -
8 Pas. Kran Dinding, Panas/Dingin " 8.00 unit -
9 Pas. Kran Dinding, Dingin " 4.00 unit -
10 Pas. Kran Leher Angsa, Panas/Dingin " 1.00 unit -
11 Pas. Stop Kran " 2.00 unit -
12 Pas. Gate Valve 1" 2.00 unit -
13 Pas. Floor Drain 4" 5.00 unit -
14 Pas. Clean Out 4" 2.00 unit -
15 Pas. Roof Drain 4" 3.00 unit -
16 Pas. Robe Hook 6.00 unit -
17 Pas. Kaca Cermin uk. 3.00 x 0.60 1.00 unit -
18 Pas. Kaca Cermin d.0.30 4.00 unit -
19 Pas. Towel Ring / Hanger 8.00 unit -
SUB TOTAL = -
TOTAL PEKERJAAN MECANICAL ELECTRICAL = -