Você está na página 1de 2

CLEARANCE

1 -1 /2 "
SEE BEAM ELEVATION
CONTINUOUS TOP BAR
SEE ELEVATION
PLA N
S E E B E A M E L E V A T IO N

SEE

PT TENDONS
@ SUPPORT STIRRUPS OR ,SEE
CONDITIONS BEAM ELEVATION FOR
SIZE AND SPASING

2 # 4 CONTINUOUS
PT TENDONS @ LOW POINT

PT TENDONS @ LOW POINT


CONTINUOUS BOTTOM BAR
SEE ELEVATION

1-1/2" 3/4" CHAMFER TYPICAL


CLEARANCE

SEE BEAM
ELEVATION
CLEARANCE
1 -1 /2 "

SEE BEAM ELEVATION


PLAN
S E E B E A M E L E V A T IO N

SEE

1 2

3 4
5 6

7 8 INDICATES UMBER OF TOP


STIRRUPS OR , 9 10
ADDED REBAR PLACMENT
SEE BEAM ELEVATION SEQUENCE
FOR SIZE AND SPASING

INDICATES UMBER OF
BOT. ADDED REBAR SUPPORT CHAIR
PLACMENT SEQUENCE
7 8

5 6
3 4
1-1/2" CLEARANCE
1 2 TYPICAL

1-1/2"
CLEARANCE

SEE BEAM
ELEVATION
TOP REBAR IN SLAB SEE
PLAN, FOR CLEARNCE

DISTRIBUTED
TENDONS
CLEARNCE
TEADON

H (SEE BEAM
ELEVATION)

1/2" MAX. PENETRATION


OF COLUMN INTO BEAM
TANDON CLEAANCE SEE
2" MIN. BEAM SECTION

PLACE DISTRIBUTED TENDONS WHICH


FALL WITHIN THE LENGTHS OF TOP PLACE TOP BARS WITHIN THIS STRIP
REBARS BELOW THE UPPERMOST
LAYER OF REBAR.
PLACE REMAINDER OF DISTIBUTED 1.5D COLUMN 1.5D 2 # 7 SUPPORT BARS ONE ON
TANDONSAS SHOWN ON PLANS WIDTH EACH SIDE OF COLUMN

T D

2/3T BANDED TENDONS @


COLUMN PER
#4 @ 5" ( B ) EACH
WAY #4 @ 12" O.C. EACH
WAY BOTTOM
2'-0" MIN. 1/2" MAX. PENETATOIN
OF COLUMN INTO
DROP PANEL

REFER TO COL.
DROP PLNEL DIMSTION SCHEDULE
SEEPLAN

Você também pode gostar